JPH0533498A - Movable scaffold device for construction - Google Patents
Movable scaffold device for constructionInfo
- Publication number
- JPH0533498A JPH0533498A JP21460291A JP21460291A JPH0533498A JP H0533498 A JPH0533498 A JP H0533498A JP 21460291 A JP21460291 A JP 21460291A JP 21460291 A JP21460291 A JP 21460291A JP H0533498 A JPH0533498 A JP H0533498A
- Authority
- JP
- Japan
- Prior art keywords
- scaffolding
- pair
- wall
- construction
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、中層建物の施工に適用
する外部足場に人荷搬送設備等の各種機能を備えた建設
用搬送足場装置に係る。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction scaffolding apparatus for construction having various functions such as a load-carrying facility on an external scaffold applicable to construction of a middle-rise building.
【0002】[0002]
【従来の技術】従来、鉄筋コンクリート造の中層建物の
施工には、建物躯体の施工に先攻して複数階分の外部足
場を建物外壁を囲繞するように架設し、同外部足場に作
業員や資材を施工階に搬送するための人荷用昇降リフト
を添設し、さらに工事用の電源・給排水・通信設備等の
仮設設備を配設して、前記装置や仮設設備を利用して建
物の最下階から最上階に向かって一階づつ積層方式によ
り施工をしている。2. Description of the Related Art Conventionally, in the construction of a reinforced concrete medium-rise building, external scaffolds for multiple floors were erected so as to surround the outer wall of the building, ahead of the construction of the building frame, and workers and materials were installed on the external scaffold. A lifting lift for manpower to transport the building to the construction floor is installed additionally, and temporary equipment such as power supply, water supply and drainage, communication equipment for construction is installed, and the equipment and temporary equipment are used to construct the Construction is done from the lower floor to the top floor one by one in a layered system.
【0003】[0003]
【発明が解決しようとする課題】前記従来施工法で使用
する外部足場は鋼製枠組足場が主体であり、同鋼製枠組
足場は強度的な制約から自立高さは数階分が限度のた
め、足場を複数回に分割して架設することが必要であ
り、建物躯体の施工がその都度中断されるとともに、外
部足場転倒防止用の壁繋ぎ材を建物躯体に多数設置する
必要があり外壁仕上げ等作業を阻害する。また従来施工
法では建物躯体完了までは、建物を覆う仮設屋根を外部
足場を利用して架設することが出来ないため屋外作業と
なり、降雨等の天候に左右され日程の遅延や作業環境に
影響を及ぼす。更に人荷用昇降リフトや仮設設備は外部
足場に添設して架設する方法のため複数回に分割して架
設することとなり、作業が面倒で日程やコストも掛り、
且つ電力幹線等の養生不備による問題もあって漏電によ
る感電災害等を引き起こすこともある。The external scaffolds used in the conventional construction method are mainly steel frame scaffolds, and the steel frame scaffolds have a limited self-supporting height of several floors due to strength restrictions. , It is necessary to divide the scaffold into multiple steps, and the construction of the building frame is interrupted each time, and it is necessary to install a large number of wall ties for preventing external scaffold falls on the building frame. And so on. In addition, with the conventional construction method, it is not possible to erection a temporary roof covering the building using an external scaffold until the building frame is completed, which requires outdoor work, which can be affected by weather such as rainfall, which can delay schedules and affect the work environment. Exert. Furthermore, because the lifting lift for temporary cargo and temporary equipment are installed by being attached to an external scaffold, the work will be divided into multiple installations, and the work will be tedious and will take time and cost.
In addition, there is also a problem due to inadequate curing of power trunk lines, etc., which may cause an electric shock hazard due to an electric leakage.
【0004】本発明は、前記従来技術の有する問題点に
鑑みて提案されたもので、その目的とする処は、全天候
方式の作業空間を確保して、同作業空間内で自動式の資
材搬送設備や安全な仮設設備を配置して、省力的で、能
率的で、しかも安全な環境内で施工することができる建
設用搬送足場装置を提供する点にある。The present invention has been proposed in view of the problems of the above-mentioned prior art, and the purpose thereof is to secure an all-weather working space, and to automatically transport materials in the working space. The purpose of the present invention is to provide a construction scaffolding device for construction that can be constructed in a labor-saving, efficient, and safe environment by arranging equipment and safe temporary equipment.
【0005】[0005]
【問題を解決するための手段】前記の目的を達成するた
め、本発明は、対向する一対の方形フレームと同一対の
方形フレームを繋ぎ梁で連結して構成した直方体形状の
単一足場枠を、同単一足場枠の上方及び側方を複数個連
結して形成してなる一双の屏風状の壁面足場ユニットを
建物外壁面に沿わせて並列に立設するとともに、前記単
一足場枠の前後方を複数個連結して形成してなる箱梁状
の屋根梁ユニットを前記一双の壁面足場ユニット間に複
数箇所横架して構成したことを特徴とする。また前記壁
面足場ユニットは、一対の方形フレーム内面両側端にガ
イドレールを垂直方向に添設した単一足場枠を複数個積
層して形成した昇降リフト用の昇降路と、前記昇降路以
外を一対の方形フレーム間に床板を横架し同床板上に一
双の走行レールを載設した単一足場枠で形成した搬送車
両用の搬送通路を備えることを特徴とする。また前記壁
面足場ユニットを構成する単一足場枠の外面建物側に、
昇降路部分は垂直方向に、搬送通路部分は水平方向にそ
れぞれ、仮設設備用の配線配管ラックを備えることを特
徴とする。To achieve the above object, the present invention provides a rectangular parallelepiped-shaped single scaffolding frame constituted by connecting a pair of opposing rectangular frames and the same pair of rectangular frames with a connecting beam. , A pair of folding screen-shaped wall scaffolding units formed by connecting a plurality of upper and lateral sides of the same single scaffolding frame are installed in parallel along the outer wall surface of the building, and It is characterized in that a box-beam-shaped roof beam unit formed by connecting a plurality of front and rear portions is horizontally arranged at a plurality of positions between the pair of wall scaffold units. The wall scaffolding unit includes a hoistway for lifting and lowering lift formed by stacking a plurality of single scaffolding frames having guide rails vertically attached to both ends of a pair of rectangular frames, and a pair other than the hoistway. It is characterized in that it is provided with a transport passage for a transport vehicle which is formed by a single scaffolding frame in which a floor plate is horizontally stretched between square frames and one pair of traveling rails is mounted on the floor plate. Also, on the exterior building side of the single scaffolding frame that constitutes the wall scaffolding unit,
The hoistway portion is provided in the vertical direction, and the transfer passage portion is provided in the horizontal direction, and the wiring pipe rack for temporary equipment is provided.
【0006】[0006]
【作用】本発明によれば前記したように、一双の屏風状
の壁面足場ユニットを建物外壁面に沿わせて並列に立設
するとともに、箱梁状の屋根梁ユニットを前記一双の壁
面足場ユニット間に複数箇所横架して構成することによ
って、建物躯体施工前に一度の作業で搬送足場装置を構
築し、前記搬送足場装置を被覆するように屋根テント及
び外壁テントを張架することによって全天候方式の作業
空間を提供することを可能とする。According to the present invention, as described above, a pair of folding screen-shaped wall scaffolding units are erected in parallel along the outer wall surface of a building, and a box-beam-shaped roof beam unit is installed in the pair of wallboard scaffolding units. By constructing a plurality of horizontal spaces between them, a scaffolding device for transportation can be constructed in one operation before construction of a building structure, and a roof tent and an outer wall tent can be stretched so as to cover the transportation scaffolding device for all weather conditions. It is possible to provide a working space for the method.
【0007】また、壁面足場ユニットは昇降リフト用の
昇降路と搬送車両用の搬送通路を備えているので、前記
壁面足場ユニットにコンピューター制御の昇降リフトと
搬送車両を設けることによって、資材や人の自動化搬送
を可能とする。また、壁面足場ユニットは垂直方向と水
平方向に仮設設備用の配線配管ラックを備えているの
で、配線配管ラック内に所定の電線や水道管や排水管や
通信線等を設備することによって、一度の作業で安全な
仮設設備を提供することを可能とする。Further, since the wall surface scaffolding unit is provided with a hoistway for lifting and lowering lifts and a transporting path for transporting vehicles, by providing a computer-controlled lifting lift and a transporting vehicle in the wall surface scaffolding unit, it is possible to save materials and personnel. Enables automated transportation. In addition, since the wall scaffolding unit is equipped with wiring and piping racks for temporary equipment in the vertical and horizontal directions, it is possible to install it once by installing certain electric wires, water pipes, drainage pipes, communication lines, etc. in the wiring and piping rack. It is possible to provide safe temporary equipment by the work of.
【0008】[0008]
【実施例】以下本発明の一実施例を図面により説明す
る。図1は、一双の屏風状の壁面足場ユニット7,7を
鉄筋コンクリート造の中層階建物Bに沿わせて並列に立
設するとともに、箱梁状の屋根梁ユニット8を前記一双
の壁面足場ユニット7,7間に複数箇所横架して構成し
た搬送足場装置Aを、同搬送足場装置Aを被覆するよう
に屋根テント17と壁テント18を張架した全天候方式
の作業空間内で、鉄筋コンクリート造の中層建物Bの施
工をしている実施状況を示す説明図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below with reference to the drawings. In FIG. 1, a pair of folding screen-shaped wall scaffolding units 7 and 7 are erected in parallel along a reinforced concrete middle-rise building B, and a box-beam-shaped roof beam unit 8 is installed on the one wall surface scaffolding unit 7. , A transportation scaffolding device A formed by horizontally straddling a plurality of places between 7 and 7, in a weatherproof work space in which a roof tent 17 and a wall tent 18 are stretched so as to cover the transportation scaffolding device A. It is explanatory drawing which shows the implementation condition which is constructing the middle-rise building B.
【0009】前記壁面足場ユニット7,7には、後記す
る図7のように昇降路10と搬送通路13が配設されて
おり、前記昇降路10に自動制御方式の昇降リフト23
を設けて、人の昇降や昇降リフト23の昇降架台19上
に搭載した自動制御方式の搬送車両28を施工階に昇降
する。さらに搬送通路13の走行レール上を前記搬送車
両28を自動制御で運転して施工階の所定位置に建設資
材31を搬送する。また、壁面足場ユニット7,7に垂
直方向と水平方向に仮設設備用の配線配管ラック16
(図2、3、4参照)が配設されており、前記配線配管
ラック16内に所定の電線や水道管や排水管や通信線等
を設備することによって、中層建物Bの施工に必要なエ
ネルギーを必要箇所に安全に供給する。The wall scaffolding units 7, 7 are provided with a hoistway 10 and a transfer passage 13 as shown in FIG. 7, which will be described later.
Is provided to lift and lower a person and to lift and lower the automatically controlled transport vehicle 28 mounted on the lift base 19 of the lift 23 to the construction floor. Further, the transport vehicle 28 is automatically controlled on the traveling rail of the transport passage 13 to transport the construction material 31 to a predetermined position on the construction floor. In addition, the wall and scaffolding units 7 and 7 are vertically and horizontally arranged in a wiring and piping rack 16 for temporary equipment.
(See FIGS. 2, 3, and 4) are installed, and by installing predetermined electric wires, water pipes, drainage pipes, communication lines, etc. in the wiring and piping rack 16, it is necessary for construction of the middle-rise building B. Supply energy safely to where it is needed.
【0010】図2乃至図4は壁面足場ユニット7を構成
する搬送通路13用と昇降路10用の単一足場枠4及び
配線配管ラック16の構成を説明する1実施例である。
図2は単一足場枠4を搬送通路13として利用する場合
の構成を説明する斜視図で、対向する一対の鋼製方形フ
レーム1,1と方形フレーム1,1間を繋ぎ梁2で連結
して形成した直方体形状の単一足場枠4と、床板11
と、走行レール12で構成される。前記単一足場枠4の
方形フレーム1,1間に床板11を横架し、同床板11
上に一双の走行レール12を載設して搬送車両28の搬
送通路13となる。本実施例では単一足場枠4の寸法
は、高さが建物一階相当、長さが1スパン相当、幅が約
2米としている。2 to 4 show one embodiment for explaining the construction of the single scaffolding frame 4 and the wiring / piping rack 16 for the transport passage 13 and the hoistway 10 which constitute the wall surface scaffolding unit 7.
FIG. 2 is a perspective view for explaining the structure in which the single scaffolding frame 4 is used as the transport passage 13. The pair of steel rectangular frames 1 and 1 facing each other and the rectangular frames 1 and 1 are connected by a connecting beam 2. Single rectangular scaffolding frame 4 and floor plate 11
And the traveling rail 12. A floorboard 11 is laid horizontally between the rectangular frames 1 and 1 of the single scaffolding frame 4,
A pair of traveling rails 12 are mounted on the upper side to serve as a transport passage 13 for a transport vehicle 28. In this embodiment, the dimensions of the single scaffolding frame 4 are such that the height is equivalent to the first floor of the building, the length is equivalent to 1 span, and the width is about 2 rice.
【0011】図3は単一足場枠4を昇降路10として利
用する場合の構成を説明する斜視図で、単一足場枠4
と、ラック方式のガイドレール9で構成される。前記単
一足場枠4の一対の方形フレーム1,1の内面両側端に
ラック方式のガイドレール9を垂直方向に添設して昇降
リフト23の昇降路10となる。FIG. 3 is a perspective view for explaining the structure when the single scaffold frame 4 is used as the hoistway 10. The single scaffold frame 4 is shown in FIG.
And a rack type guide rail 9. Rack type guide rails 9 are vertically attached to both ends of the inner surfaces of the pair of rectangular frames 1 and 1 of the single scaffolding frame 4 to form a hoistway 10 of a hoisting lift 23.
【0012】図4は配線配管ラック16の構成を説明す
る斜視図で、断面凹状の樋の両側面間に棒鋼を梯子状に
溶着した基台14と同基台14に蓋板15を螺着してい
る。前記基台14の棒鋼に電線や水道管や排水管や通信
線等を結束して固定して蓋板15を螺着する。なお配線
や配管の取出し部分は前記蓋板15の一部を取外せばよ
い。FIG. 4 is a perspective view for explaining the structure of the wiring and piping rack 16. A base 14 on which steel bars are welded in a ladder shape between both sides of a gutter having a concave cross section, and a cover plate 15 is screwed to the base 14. is doing. An electric wire, a water pipe, a drain pipe, a communication line, and the like are bound and fixed to the steel bar of the base 14, and the cover plate 15 is screwed. It should be noted that a part of the cover plate 15 may be removed to take out the wiring and the piping.
【0013】図5乃至図6は搬送足場装置Aの架設工程
を説明する1実施例である。図5は壁面足場ユニット7
の架設工程を示し、施工予定の中層建物Bの両側壁に沿
って、前記壁面足場ユニット7の土台32を地盤C上に
木材等で水平に配設する。前記土台32上に一層目の単
一足場枠4を一列に配置し、単一足場枠4同志と単一足
場枠4と土台32を連結プレート5を介して接合ボルト
6で螺着する。この場合昇降リフト23を配置する位置
にはガイドレール9を添設した昇降路10用の単一足場
枠4を設置し、それ以外の位置には床板11と走行レー
ル12を載設した搬送通路13用の単一足場枠4を使用
する。一層目を架設した後、中層建物Bの高さに応じて
一層目と同様に昇降路10や搬送通路13用の単一足場
枠4を順次積層して、一双の屏風状の壁面足場ユニット
7,7を立設する。なお壁面足場ユニット7が高い場合
は、転倒防止のため架設中はワイヤー33等で控えを取
って置く必要がある。FIGS. 5 to 6 show one embodiment for explaining the erection process of the transfer scaffolding apparatus A. Figure 5 shows a wall scaffolding unit 7
The erection process is shown, and the base 32 of the wall surface scaffolding unit 7 is horizontally arranged on the ground C with wood or the like along both side walls of the middle-rise building B to be constructed. The single-layer scaffolding frames 4 of the first layer are arranged in a line on the base 32, and the single scaffolding frame 4 and the single scaffolding frame 4 and the base 32 are screwed to each other via the connecting plate 5 with the joining bolts 6. In this case, a single scaffolding frame 4 for a hoistway 10 with a guide rail 9 is installed at a position where the lifting lift 23 is arranged, and a transport passage having a floor board 11 and a traveling rail 12 installed at other positions. A single scaffolding frame 4 for 13 is used. After the first layer is erected, the single scaffolding frames 4 for the hoistway 10 and the transport passage 13 are sequentially stacked in accordance with the height of the middle-rise building B in the same manner as the first layer, and a pair of folding screen-shaped wall scaffolding units 7 are sequentially stacked. , 7 are erected. If the wall surface scaffolding unit 7 is high, it is necessary to keep a copy of the wire scaffolding 33 or the like during erection to prevent it from falling.
【0014】図6は屋根梁ユニット8を前記一双の壁面
足場ユニット7,7間に横架した工程を示し、単一足場
枠4の方形フレーム1同士を対向させ連結用ボルト穴3
を接合ボルト6で螺着して所定スパンの箱梁状の屋根梁
ユニット8を形成し、同屋根梁ユニット8の底面に床板
11を敷設する。前記屋根梁ユニット8を、一双の壁面
足場ユニット7,7間の両外端位置と中間部に複数箇所
横架して搬送足場装置Aを構築する。次いで、前記搬送
足場装置Aを被覆するように屋根テント17及び外壁テ
ント18を張架する。FIG. 6 shows a process in which the roof beam unit 8 is laid horizontally between the pair of wall scaffolding units 7, 7, and the square frames 1 of the single scaffolding frame 4 are opposed to each other and the connecting bolt holes 3 are formed.
Is fastened with a joining bolt 6 to form a box-beam-shaped roof beam unit 8 having a predetermined span, and a floor plate 11 is laid on the bottom surface of the roof beam unit 8. The roof beam unit 8 is horizontally crossed at a plurality of outer end positions between the pair of wall scaffolding units 7 and 7 and an intermediate portion to construct a transport scaffolding device A. Next, the roof tent 17 and the outer wall tent 18 are stretched so as to cover the transport scaffolding device A.
【0015】図7は搬送足場装置Aに装置した昇降リフ
ト23と搬送車両28による資材搬送の実施状況を説明
するもので、昇降リフト23の昇降は、例えば昇降路1
0に添設したラック方式のガイドレール9に係合した歯
車式電動機20を回転駆動して昇降させる。建設資材3
1の搬送手順は、昇降リフト23の昇降台19に敷設し
た走行レール12上に停止した搬送車両28に、一階荷
置場Dの建設資材31をホークリフト34等で移載し、
昇降リフト23を駆動して施工階に運行し停止したら、
搬送車両28の電動車輪25を駆動して施工階の所定位
置まで運行する。前記手順で搬送されて来た建設資材3
1は、施工中の中層建物B床上で稼働しているホークリ
フト34やクレーン等(図示せず)で建物内に横取す
る。次いで空車となった搬送車両28は上昇時と逆の手
順で一階に運行する。なお搬送車両28は複数台用意し
て運転すると効率的である。FIG. 7 is a diagram for explaining the state of material transportation by the lifting lift 23 and the transfer vehicle 28 mounted on the transfer scaffolding apparatus A.
The gear-type electric motor 20 engaged with the rack-type guide rail 9 attached to 0 is rotationally driven to move up and down. Construction materials 3
The transfer procedure of No. 1 is to transfer the construction material 31 of the first floor loading place D by the hawk lift 34, etc. to the transfer vehicle 28 stopped on the traveling rail 12 laid on the lift 19 of the lift 23.
After driving the elevator 23 to the construction floor and stopping,
The electric wheels 25 of the transport vehicle 28 are driven to drive to a predetermined position on the construction floor. Construction materials that have been transported in the above procedure 3
1 is intercepted in the building by a hawk lift 34, a crane or the like (not shown) operating on the floor of the middle-rise building B under construction. Next, the emptied transport vehicle 28 travels to the first floor in the reverse order of the ascending procedure. It is efficient to prepare a plurality of transport vehicles 28 and operate them.
【0016】また前記昇降リフト23の制御盤21にマ
イクロコンピューター22を備えさせ、搬送車両28の
制御盤26にマイクロコンピューター(図示せず)を装
置し、中央制御手段(図示せず)のメーンコンピュータ
ー(図示せず)と接続して、予め組み込まれた運行プロ
グラムに従って昇降リフト23と搬送車両28を運転制
御をすることによって、資材搬送の無人化又は自動化が
可能である。Further, the control board 21 of the lifting lift 23 is provided with a microcomputer 22, the control board 26 of the transfer vehicle 28 is equipped with a microcomputer (not shown), and a main computer of a central control means (not shown). By connecting (not shown) and controlling the operation of the lift 23 and the transfer vehicle 28 in accordance with a pre-installed operation program, the material transfer can be automated or unmanned.
【0017】[0017]
【発明の効果】本発明によれば前記したように、一双の
屏風状の壁面足場ユニットを建物外壁面に沿わせて並列
に立設するとともに、箱梁状の屋根梁ユニットを前記一
双の壁面足場ユニット間に複数箇所横架して構成するこ
とによって、建物躯体施工前に一度の作業で搬送足場装
置を構築し、前記搬送足場装置を被覆するように屋根テ
ント及び外壁テントを張架することによって全天候方式
の作業空間を提供することを可能としたので、風雨等に
左右されることなく日程の遅延を防止し、作業場内の作
業環境の改善が図られ、作業場外への防塵や防音効果で
周辺環境の保全が図られる。As described above, according to the present invention, a pair of folding screen wall scaffolding units are erected in parallel along an outer wall of a building, and a box-beam-shaped roof beam unit is installed on the wall surface of the one pair. By constructing a transportation scaffolding device in a single operation before constructing a building structure by constructing it horizontally between scaffolding units, and stretching the roof tent and outer wall tent so as to cover the transportation scaffolding device. It is possible to provide an all-weather working space, so it is possible to prevent delays in schedules without being affected by wind and rain, improve the working environment inside the workplace, and prevent dust and noise outside the workplace. Protects the surrounding environment.
【0018】また、壁面足場ユニットは昇降リフト用の
昇降路と搬送車両用の作業通路を備えているので、前記
壁面足場ユニットにコンピューター制御の昇降リフトと
搬送車両を装置することによって、昇降路内で昇降リフ
トを駆動して搬送車両を所定階に運行し、作業通路内を
前記搬送車両を走行させて所定位置に運行することによ
って資材搬送の無人化又は自動化が容易となる。Further, since the wall surface scaffolding unit is provided with a hoistway for lifting and lowering lifts and a working passage for transporting vehicles, the wall surface scaffolding unit is equipped with a computer-controlled lifting and lowering lift and transporting vehicles so that In order to facilitate the unmanned or automated material transportation, the elevating lift is driven to drive the transportation vehicle to a predetermined floor, and the transportation vehicle is driven to move to a predetermined position in the work passage.
【0019】また、壁面足場ユニットは垂直方向と水平
方向に仮設設備用の配線配管ラックを備えているので、
所定ルートの配線配管ラック内に電線や水道管や排水管
や通信線等の仮設設備を一度の作業で設備することが可
能となり、日程や工費が低減され、建物の施工に必要な
エネルギーを必要箇所に安全に供給することが図られ
る。Since the wall scaffolding unit is provided with the wiring and piping racks for temporary equipment in the vertical and horizontal directions,
It is possible to install temporary equipment such as electric wires, water pipes, drainage pipes, and communication lines in a single line in the wiring and piping rack of a predetermined route in a single operation, reducing the schedule and construction cost, and the energy required for building construction is required. It can be safely supplied to the place.
【図1】本発明に係る建設用搬送足場装置の一実施例の
使用状況を示す概略斜視図である。FIG. 1 is a schematic perspective view showing a usage state of an embodiment of a construction transporting scaffolding device according to the present invention.
【図2】壁面足場ユニットを構成する搬送通路の構成を
説明する斜視図である。FIG. 2 is a perspective view illustrating a configuration of a transport passage that constitutes a wall surface scaffolding unit.
【図3】図2の昇降路の構成を説明する斜視図である。FIG. 3 is a perspective view illustrating the configuration of the hoistway of FIG.
【図4】図2の配線配管ラックの構成を説明する斜視図
である。FIG. 4 is a perspective view illustrating a configuration of the wiring and piping rack in FIG.
【図5】本発明装置の架設工程を示す斜視図である。FIG. 5 is a perspective view showing a erection process of the device of the present invention.
【図6】前記工程の次工程を示す斜視図である。FIG. 6 is a perspective view showing a step subsequent to the above step.
【図7】本発明装置による資材搬送の実施状況を示す縦
断正面図である。FIG. 7 is a vertical cross-sectional front view showing an implementation state of material transportation by the device of the present invention.
1 方形フレーム 2 繋ぎ梁 4 単一足場枠 7 壁面足場ユニット 8 屋根梁ユニット 10 昇降路 12 走行レール 13 搬送通路 28 搬送車両 1 square frame 2 connecting beams 4 single scaffolding frame 7 Wall scaffolding unit 8 roof beam unit 10 hoistway 12 running rails 13 Transport passage 28 Transport vehicles
Claims (3)
方形フレームを繋ぎ梁で連結して構成した直方体形状の
単一足場枠を、同単一足場枠の上方及び側方を複数個連
結して形成してなる一双の屏風状の壁面足場ユニットを
建物外壁面に沿わせて並列に立設するとともに、前記単
一足場枠の前後方を複数個連結して形成してなる箱梁状
の屋根梁ユニットを前記一双の壁面足場ユニット間に複
数箇所横架して構成したことを特徴とする建設用搬送足
場装置。1. A rectangular parallelepiped-shaped single scaffold frame constituted by connecting a pair of opposing rectangular frames and the same pair of rectangular frames with a connecting beam, and connecting a plurality of upper and lateral sides of the single scaffold frame. A pair of folding screen-shaped wall scaffolding units formed by standing upright in parallel along the outer wall of the building and connecting the front and rear of the single scaffolding frame to form a box-beam shape. A construction scaffolding device for construction, characterized in that a roof beam unit is horizontally arranged at a plurality of positions between the pair of wall scaffolding units.
レーム内面両側端にガイドレールを垂直方向に添設した
単一足場枠を複数個積層して形成した昇降リフト用の昇
降路と、前記昇降路以外を一対の方形フレーム間に床板
を横架し同床板上に一双の走行レールを載設した単一足
場枠で形成した搬送車両用の搬送通路を備えることを特
徴とする請求項1記載の建設用搬送足場装置。2. The wall scaffolding unit comprises an elevator hoistway formed by stacking a plurality of single scaffolding frames in which guide rails are vertically attached to both ends of a pair of rectangular frame inner surfaces, and the hoisting / lowering unit. 2. A transport passage for a transport vehicle, which is formed of a single scaffolding frame in which a floor plate is horizontally extended between a pair of rectangular frames other than a road and one pair of traveling rails is mounted on the floor plate. Transport scaffolding equipment for construction.
場枠外面の建物側に、昇降路部分は垂直方向に、搬送通
路部分は水平方向にそれぞれ、仮設設備用の配線配管ラ
ックを備えることを特徴とする請求項1又は2に記載の
建設用搬送足場装置。3. A wiring and piping rack for temporary equipment is provided on the building side of the outer surface of the single scaffolding frame that constitutes the wall surface scaffolding unit, in which the hoistway portion is vertical and the transfer passage portion is horizontal. The construction scaffolding device for construction according to claim 1 or 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21460291A JP2683171B2 (en) | 1991-07-31 | 1991-07-31 | Construction transport scaffolding equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP21460291A JP2683171B2 (en) | 1991-07-31 | 1991-07-31 | Construction transport scaffolding equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0533498A true JPH0533498A (en) | 1993-02-09 |
JP2683171B2 JP2683171B2 (en) | 1997-11-26 |
Family
ID=16658434
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP21460291A Expired - Fee Related JP2683171B2 (en) | 1991-07-31 | 1991-07-31 | Construction transport scaffolding equipment |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2683171B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130024891A (en) * | 2010-02-25 | 2013-03-08 | 존 클레멘트 프레스톤 | Scaffolding |
JP2013231328A (en) * | 2012-05-01 | 2013-11-14 | Shimizu Corp | Temporary facility unit frame |
JP2016535184A (en) * | 2013-10-16 | 2016-11-10 | プレストン、ジョン | Modular building structure using composite interconnected frame panels |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL2031356B1 (en) * | 2022-03-21 | 2023-09-29 | Javad Rostami | Masonry scaffolding with console on the facade side |
-
1991
- 1991-07-31 JP JP21460291A patent/JP2683171B2/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20130024891A (en) * | 2010-02-25 | 2013-03-08 | 존 클레멘트 프레스톤 | Scaffolding |
AU2016200710B2 (en) * | 2010-02-25 | 2018-05-10 | Trewhella Holdings Pty Limited | Scaffolding |
EP2539521B1 (en) * | 2010-02-25 | 2023-06-07 | John Clement Preston | Scaffolding |
JP2013231328A (en) * | 2012-05-01 | 2013-11-14 | Shimizu Corp | Temporary facility unit frame |
JP2016535184A (en) * | 2013-10-16 | 2016-11-10 | プレストン、ジョン | Modular building structure using composite interconnected frame panels |
Also Published As
Publication number | Publication date |
---|---|
JP2683171B2 (en) | 1997-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101794085B1 (en) | Construction system and method for multi-floor buildings | |
EP0487516B1 (en) | Construction apparatus and construction method | |
WO2019015243A1 (en) | Shaft module splicing system and splicing method therefor | |
CN105442773A (en) | Technology and construction platform for installing and constructing inner plates of metal roof | |
JP2683171B2 (en) | Construction transport scaffolding equipment | |
US3726053A (en) | Method and apparatus for erecting modular high-rise building | |
JPH0483060A (en) | Building construction | |
JPH08333898A (en) | Trestle for vertically and horizontally conveying building blocks | |
JP3212231B2 (en) | Plant construction method and construction equipment | |
JP3192543B2 (en) | Building demolition method | |
KR102454050B1 (en) | Building material transport device | |
CN215853971U (en) | Translation type three-dimensional component storage yard | |
KR200200364Y1 (en) | High building construction apparatus | |
JP2835880B2 (en) | High-rise building frame construction method | |
JP2880884B2 (en) | Moving scaffold for wall construction | |
JP3234442B2 (en) | Building and scrap type building method | |
GB1565498A (en) | Portable buildings | |
JP2627705B2 (en) | Automatic frame assembly method | |
JPH07166712A (en) | Conveyance system | |
CN118850985A (en) | Prefabricated floor slab installation device and installation method | |
JP3035139B2 (en) | Floor slab construction method for multi-story buildings | |
JPH0726727A (en) | Building lifting device and construction using thereof | |
JPH04131447A (en) | Constructing method for building, and carrier device for construction | |
JPH086461B2 (en) | Climbing all-weather temporary roof | |
JPH10102816A (en) | Package constructing method of silos |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
LAPS | Cancellation because of no payment of annual fees |