JPH05247941A - Heaping method of rubble-mound, earth, etc. - Google Patents
Heaping method of rubble-mound, earth, etc.Info
- Publication number
- JPH05247941A JPH05247941A JP2009891A JP2009891A JPH05247941A JP H05247941 A JPH05247941 A JP H05247941A JP 2009891 A JP2009891 A JP 2009891A JP 2009891 A JP2009891 A JP 2009891A JP H05247941 A JPH05247941 A JP H05247941A
- Authority
- JP
- Japan
- Prior art keywords
- rubble
- tremie pipe
- earth
- hull
- sand
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、トレミー管を使用して
捨石、土砂等を水底に投入する際に、その投入された捨
石、土砂等のレベルがリアルタイムに測定できる捨石、
土砂等の投入方法に関するものである。BACKGROUND OF THE INVENTION The present invention relates to a rubble stone that can be used to measure the level of rubble stone, earth and sand, etc. in real time when the gravel stone, earth and sand, etc. are thrown into the water bottom using a tremie pipe.
It relates to the method of inputting earth and sand.
【0002】[0002]
【従来の技術】防波堤や護岸の築造のため、水底にケー
ソンを設置する際に、その設置区域の水底に捨石を投入
し、その捨石のレベルを均らして捨石マウンドを造成し
ている。また、水底にドレーン用の砂杭を打設する前
に、砂を投入してサンドマットを敷設している。2. Description of the Related Art For the construction of breakwaters and seawalls, when a caisson is installed on the bottom of the water, rubble stones are thrown into the water bottom of the installation area, and the level of the rubble is leveled to form a rubble mound. In addition, sand is put in to lay a sand mat before placing sand piles for drains on the bottom of the water.
【0003】そこで、作業船の船首などに配置したトレ
ミー管を使用して捨石や土砂等を水底に投入するには、
従来、捨石や土砂の投入区域のレベルを事前に音響測深
機で測定し、トレミー管で捨石、土砂等を投入するごと
に、作業員がレッド、すなわち重錘付のロープ等を降ろ
して水深を測定して、所定のレベルに投入されているか
どうかを概略確認し、投入が終了した後に音響測深機で
投入区域のレベルを測定して高さを確認していた。Therefore, in order to throw rubble stones, earth and sand, etc. to the bottom of the water by using a tremie pipe arranged on the bow of a work boat,
Conventionally, the level of the rubble and earth and sand input area is measured in advance with an acoustic sounder, and every time the gravel and earth and sand are put into the tremie pipe, the worker lowers the red, that is, the rope with a weight to adjust the water depth. It was measured to roughly confirm whether or not it was thrown into a predetermined level, and after the loading was finished, the level of the throwing area was measured with an acoustic sounder to check the height.
【0004】したがって、捨石、土砂等の投入には、そ
の投入高さを正確に知ることができないので、投入作業
の終了後に、所定高さより高い部分や低い部分を手直し
する必要があり、作業能率が悪いという問題があった。
また、投入された捨石、土砂等の厚さも、投入時には分
らないという問題があった。Therefore, when throwing in rubble stones, earth and sand, etc., it is not possible to accurately know the throwing height. Therefore, after finishing the throwing work, it is necessary to rework a portion higher or lower than a predetermined height, thus improving work efficiency. There was a problem that was bad.
In addition, there is a problem that the thickness of the thrown rubble, earth and sand, etc. is not known at the time of throwing.
【0005】[0005]
【発明の解決しようとする課題】本発明は、前記従来の
問題点を解決するためになされたものであり、トレミー
管を使用して捨石、土砂等の投入を行なう際に、ほぼリ
アルタイムで投入高さが測定でき、その投入作業能率の
向上をはかりうる捨石、土砂等の投入方法を提供するこ
とを解決課題としたものである。DISCLOSURE OF THE INVENTION The present invention has been made in order to solve the above-mentioned conventional problems, and when gravel stones, earth and sand, etc. are thrown in using a tremie pipe, they are thrown in almost in real time. The problem to be solved is to provide a method for charging rubble stones, earth and sand, etc., which can measure the height and improve the efficiency of the charging operation.
【0006】[0006]
【課題を解決するための手段】上記の課題を解決するた
めの手段として、本発明の捨石、土砂等の投入方法は、
船体位置を測位装置、例えば自動追尾式測位装置などで
確認しながら、所定位置にてスイング可能に係留された
作業船に配置したトレミー管経由、捨石、土砂等を投入
の後、トレミー管周囲の前後左右に配置した4組の測深
機、例えばオートレッドにより前後左右の各水深を測定
し、各測定値及び測定した座標を記録の後、トレミー管
のほぼ直径分だけ船体をスイングする上記一連の作業を
繰り返して、所要の幅のスイング内の作業が終了した
後、船体を幅方向にほぼトレミー管の直径分だけ移動
し、前記一連の作業を繰り返し行なっていくことを特徴
としたものである。[Means for Solving the Problems] As means for solving the above problems, the method of throwing rubble stones, earth and sand, etc. of the present invention is as follows.
While checking the hull position with a positioning device, such as an automatic tracking type positioning device, put the rubble, earth and sand, etc. through the tremie pipe placed on the work boat moored so that it can swing at a predetermined position, Four sets of depth sounders arranged in front, back, left and right, for example, each depth in front, back, left and right are measured by Auto Red, and after recording each measured value and measured coordinates, the above series of swinging the hull by about the diameter of the tremie pipe After the work is repeated and the work within the swing of the required width is completed, the hull is moved in the width direction by about the diameter of the tremie pipe, and the series of work is repeated. .
【0007】以上の作業により、トレミー管の左右前後
の各測深機により捨石、土砂等の投入前及び投入後の水
深をほぼリアルタイムで測定でき、船体のスイング方向
及び前後方向におけるトレミー管のほぼ直径分づつの移
動する水域の捨石、土砂等の投入厚さが直ちに測定でき
る。By the above work, the depth of water before and after the throwing of rubble, earth and sand, etc. can be measured almost in real time by the sounding machines at the left, right, front and back of the tremie pipe, and the diameter of the tremie pipe in the swinging direction and the front-back direction of the hull is almost the same. The input thickness of rubble stones, earth and sand, etc. in the moving water area can be measured immediately.
【0008】[0008]
【実施例】以下図面を参照して本発明の捨石、土砂等の
投入方法による一実施例を説明するが、本実施例は捨石
投入の場合であり、図1はその投入方法による捨石投入
システムの概略斜視図、図2は図1の施工管理監視室の
CRT画面表示例を示す正面図、図3及び図4は、図1
のトレミー管の施工例における説明用平面図である。DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the method for throwing rubble stones, earth and sand, etc. according to the present invention will be described below with reference to the drawings. This embodiment is a case of throwing rubble stones, and FIG. 1 shows a rubble stone throwing system by the throwing method. 2 is a front view showing a CRT screen display example of the construction management and monitoring room of FIG. 1, and FIGS. 3 and 4 are FIG.
It is an explanatory plan view of a construction example of the tremie pipe.
【0009】まず、図1のごとく、陸上、または水上の
既知の固定点に測位装置、例えば商品名、ジオジメータ
と称して知られている自動追尾式測位装置1等を設置
し、これに付帯してデータ無線伝送装置、例えばテレメ
トリーの送信器2と、電源としてバッテリー3や太陽電
池4を配置している。次に、ウインチ5により上げ下げ
可能なテレスコープ型のトレミー管6を船首などに配置
した作業船7を、図示されていないクリスマスツリーア
ンカーやスパッド等でスイング可能に所定位置に係留す
る。First, as shown in FIG. 1, a positioning device, for example, an automatic tracking type positioning device 1 known as a trade name or a geodimer is installed at a known fixed point on land or on water, and is attached to this. A data wireless transmission device, for example, a telemetry transmitter 2, and a battery 3 and a solar cell 4 as power sources are arranged. Next, the work boat 7 having the telescope type tremie pipe 6 that can be raised and lowered by the winch 5 arranged on the bow or the like is moored at a predetermined position so as to be swingable by a Christmas tree anchor, a spud or the like (not shown).
【0010】上記のトレミー管6の周囲には、この作業
船7の船体の前後方向と左右方向とに合計4組の測深
機、例えばオートレッド8を配置している。さらに、作
業船7の所定箇所に前記自動追尾式測位装置1からの光
Lを反射する反射プリズム9を配置し、操船室に船体の
向きを測定するジャイロコンパス10とデータ無線伝送
装置、例えばテレメトリーの受信器11と、図2に示す
CRT画面12Aを有する施工管理監視盤12を配置し
ている。Around the above-mentioned tremie pipe 6, a total of four sets of sounding machines, for example, an auto red 8 are arranged in the longitudinal direction and the lateral direction of the hull of the work boat 7. Further, a reflection prism 9 for reflecting the light L from the automatic tracking type positioning device 1 is arranged at a predetermined position of the work boat 7, and a gyro compass 10 for measuring the direction of the hull in the marine vessel and a data wireless transmission device, for example, telemetry. The receiver 11 and the construction management monitoring board 12 having the CRT screen 12A shown in FIG. 2 are arranged.
【0011】そこで、自動追尾式測位装置1により作業
船7の船体の位置を確認しながら、船体を所定の位置に
確認して、捨石をトレミー管6上部からその内部を経由
して供給し、捨石Gを水底に投入した後に、トレミー管
6の周囲の前後左右に配置した4組のオートレッド8に
より水深を測定し、測定値とその測定した座標を記録す
る。Therefore, while confirming the position of the hull of the work boat 7 by the automatic tracking type positioning device 1, the hull is confirmed at a predetermined position, and rubble stones are supplied from the upper part of the tremie pipe 6 via the inside thereof. After throwing the rubble stones G into the water bottom, the water depth is measured by four sets of auto reds 8 arranged in the front, rear, left and right around the tremie pipe 6, and the measured value and the measured coordinates are recorded.
【0012】なお、自動追尾式測位装置1は、反射プリ
ズム9の動きを予測して、自動的に追尾する機能を有す
るが、一旦反射プリズム9を逃すと、反射プリズム9の
位置を探すために水平方向および上下方向に回転し、再
度反射プリズム9を捕らえるまでに時間がかかるおそれ
がある。そこで、自動追尾式測位装置1の視準窓に小型
ビデオカメラを取り付けると共に、自動追尾式測位装置
1にCPUを介して遠隔操作用ノブを配置し、作業船7
の操船室に小型ビデオカメラの映像を写すモニターテレ
ビと自動追尾式測位装置1の視準方向を操作する遠隔操
作用ノブをCPUに接続して設けておき、ビデオカメラ
のデータをモニターテレビに伝送し、操船室の遠隔操作
用ノブのデータを自動追尾式測位装置1側のCPUに伝
送するためのパラボラアンテナ等の伝送装置を作業船7
と自動追尾式測位装置1の近傍にそれぞれ配置すること
により、自動追尾式測位装置1が反射プリズム9を逃し
た時にモニターテレビに写し出された自動追尾式測位装
置1の視準窓の画像をみながら、遠隔操作用ノブを操作
して反射プリズム9を探すことができ、反射プリズム9
を捕らえる時間が短縮できる。The automatic tracking type positioning device 1 has a function of predicting the movement of the reflecting prism 9 and automatically tracking it. However, once the reflecting prism 9 is missed, the position of the reflecting prism 9 is searched for. There is a possibility that it may take time before the reflection prism 9 is caught again by rotating in the horizontal direction and the vertical direction. Therefore, a small video camera is attached to the collimation window of the automatic tracking positioning device 1, and a remote control knob is arranged on the automatic tracking positioning device 1 via the CPU, so that the work boat 7
A monitor TV that captures images from a small video camera and a remote control knob that controls the sighting direction of the automatic tracking positioning device 1 are provided in the ship's cabin to be connected to the CPU, and the video camera data is transmitted to the monitor TV. Then, a transmission device such as a parabolic antenna for transmitting the data of the remote control knob in the marine vessel to the CPU on the side of the automatic tracking positioning device 1 is installed on the work boat 7
And the automatic tracking positioning device 1 are arranged in the vicinity, respectively, so that the image of the collimation window of the automatic positioning device 1 displayed on the monitor TV when the automatic positioning device 1 misses the reflection prism 9 is viewed. While operating the remote control knob, the reflection prism 9 can be searched for.
The time to catch can be shortened.
【0013】また、図1において、8Aは各オートレッ
ド8の重錘で、8Bはオートレッド制御盤であり、ま
た、6Bは2組のトレミー管繰り出し計である。次に、
上記の作業を繰り返し、船体の所定の幅のスイングが終
了したら、船体を前後方向にほぼトレミー管6の直径分
だけ移動して再び上記一連の作業を繰り返す。Further, in FIG. 1, 8A is a weight of each auto red 8, 8B is an auto red control panel, and 6B is two sets of tremie tube payout meters. next,
When the above-described work is repeated and the swing of the hull with a predetermined width is completed, the hull is moved in the front-rear direction by about the diameter of the tremie pipe 6, and the above-described series of work is repeated.
【0014】上記のごときトレミー管6の直径分だけス
イングして捨石Gを投入して測深する作業を繰り返した
後、トレミー管6の直径分だけ船体を前後方向に移動し
て同様の操作をする作業を、その投入水域全体にわたっ
て繰り返し行なっていくことになる。以上に説明した投
入方法によれば、自動追尾式測位装置1と、ジャイロコ
ンパス10とにより、オートレッド8で測定した水深が
どの位置のものかが判明することになる。After repeating the work of swinging by the diameter of the tremie pipe 6 and introducing the rubble G to measure the depth, the hull is moved forward and backward by the diameter of the tremie pipe 6 and the same operation is performed. The work will be repeated over the entire input water area. According to the charging method described above, the automatic tracking type positioning device 1 and the gyro compass 10 determine the position of the water depth measured by the auto red 8.
【0015】すなわち、トレミー管6を設置した作業船
7の当初の矢印Sで示すスイングしながら捨石を投入し
ている状態を説明している図3及び矢印Fの前進方向
に、斜線で示す前回施工場所Xからトレミー管6のほぼ
直径分だけ移動して、スイングを繰り返しながら捨石、
土砂等の投入を行なっている状態を説明している図4に
おいて、右スイングの場合は、Aで示すオートレッドで
スイングS方向の投入後の水深を測定 (後測) し、Cで
示すオートレッドでスイングS方向の投入前の水深を測
定 (前測) し、Bで示すオートレッドで前進方向Fの投
入後の水深を測定(後測) し、Dで示すオートレッドで
矢印Fの前進方向の投入前の水深を測定 (前測) するこ
とになる。That is, the state in which the rubble is being thrown while swinging as shown by the initial arrow S of the work boat 7 in which the tremie pipe 6 is installed is illustrated in FIG. Move from the construction site X by about the diameter of the tremie pipe 6 and repeat the swing to rubble stones,
In the case of a right swing in Fig. 4 which explains the state where the earth and sand are being thrown in, in the case of a right swing, the water depth after throwing in the swing S direction is measured (post-measurement) with the auto red shown in A, and the auto shown in C is shown. Measure the water depth before throwing in the swing S direction with red (preliminary measurement), measure the water depth after advancing in direction F with B auto-red (post-measurement), and advance with arrow F with auto red shown D. The water depth will be measured (preliminary measurement) before the direction is input.
【0016】なお、図3において上記の説明は矢印Sの
スイングが右スイングの場合であり、左スイングの場合
はC及びAで示すオートレッドの前測と後測とは入れ替
わり、図4においてBで示すオートレッドで測定した値
は、トレミー管6の投入位置が前回施工した場所から所
定距離離れているかどうかの船体の前進移動量の判断に
利用できるが、図3及び図4におけるA,B,C,Dで
示すオートレッド8の機能を表1にまとめている。表1
は図3及び図4における各オートレッドの機能を説明し
た表である。In FIG. 3, the above explanation is for the case where the swing of the arrow S is a right swing, and in the case of a left swing, the pre-measurement and the post-measurement of the auto red shown by C and A are interchanged, and in FIG. The value measured by the auto red shown in Fig. 3 can be used to judge the amount of forward movement of the hull whether or not the input position of the tremie pipe 6 is a predetermined distance away from the place where it was constructed last time. Table 1 summarizes the functions of Auto Red 8 indicated by C, D. Table 1
Is a table explaining the function of each auto red in FIGS. 3 and 4.
【0017】 また、この実施例では、船体の動揺による影響を考慮し
ていないが、ピッチング計とローリング計とを作業船7
に配置しておけば、船体の動揺による影響も考慮した測
定が可能である。なお、本実施例は捨石の場合について
説明したが、土砂等の場合にも適用可能である。[0017] Further, in this embodiment, the pitching meter and the rolling meter are used as the work boat 7 although the influence of the motion of the hull is not taken into consideration.
If it is placed at, it will be possible to take into consideration the influence of the shaking of the hull. Although the present embodiment has been described for the case of rubble, it is also applicable to the case of earth and sand.
【0018】[0018]
【発明の効果】以上に説明した本発明の捨石、土砂等の
投入方法によれば、捨石や土砂等をトレミー管を使用し
て投入する際、捨石や土砂の投入後の高さレベル及びそ
の投入厚さが、ほぼリアルタイムで測定できるので、万
一投入すべき所定高さや厚さを満たさない場合には、手
直しがその場で直ちにしかも容易に行なえるので、正確
な捨石、土砂等の投入が行なえ、その作業能率が著しく
向上するという効果がある。EFFECTS OF THE INVENTION According to the method for charging rubble stones, earth and sand, etc. according to the present invention described above, when throwing rubble stones, earth and sand, etc. using a tremie pipe, the height level after the rubble stones, earth and sand and the Since the input thickness can be measured almost in real time, if the specified height or thickness that should be input is not met, rework can be done immediately and easily on the spot, so accurate input of rubble, earth and sand, etc. The work efficiency can be significantly improved.
【図1】本発明の方法を採用して捨石、土砂等の投入を
行なう捨石投入システムの一実施例の概略斜視図であ
る。FIG. 1 is a schematic perspective view of an embodiment of a rubble throwing system for throwing rubble, earth and sand, etc. by adopting the method of the present invention.
【図2】図1の施工管理室に設けられるCRT画面表示
例の正面図である。2 is a front view of a CRT screen display example provided in the construction management room of FIG. 1. FIG.
【図3】図1のトレミー管の施工例の船体のスイング方
向を示す説明用平面図である。FIG. 3 is an explanatory plan view showing a swing direction of a hull of a construction example of the tremie pipe of FIG. 1.
【図4】図1のトレミー管の施工例の船体の前進方向を
示す説明用平面図である。FIG. 4 is an explanatory plan view showing the forward direction of the hull of the tremie pipe construction example of FIG. 1;
1 自動追尾式測位装置 2 送信器 6 トレミー管 7 作業船 8 オートレッド 11 受信器 G 捨石、土砂等 1 Automatic Tracking Positioning Device 2 Transmitter 6 Tremy Tube 7 Work Vessel 8 Auto Red 11 Receiver G Rubble, Sediment, etc.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 永木 君治 神奈川県横浜市鶴見区安善町1―3 東亜 建設工業株式会社内 ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Kimiji Nagaki 1-3, Azencho, Tsurumi-ku, Yokohama-shi, Kanagawa Toa Construction Industry Co., Ltd.
Claims (1)
定位置にてスイング可能に係留された作業船に配置して
トレミー管経由、捨石、土砂等の投入の後、トレミー管
周囲の前後左右に配置した4組の測深機により各水深を
測定し、各測定値及び測定した座標を記録の後、トレミ
ー管のほぼ直径分だけ船体をスイングする上記一連の作
業を繰り返して、所要の幅のスイング内の作業が終了し
た後、船体を前後方向にほぼトレミー管の直径分だけ移
動して前記一連の作業を繰り返し行なっていく捨石、土
砂等の投入方法。1. While confirming the hull position with a positioning device, the hull position is arranged on a work boat swingably moored at a predetermined position, and after the tremie pipe, rubble stones, earth and sand, etc. After measuring each water depth with four sets of sounding machines arranged in the, and recording each measured value and the measured coordinates, the above series of work of swinging the hull by about the diameter of the tremie pipe is repeated to obtain the required width. After finishing the work in the swing, a method of throwing in rubble, earth and sand, etc., in which the ship is moved in the front-rear direction by about the diameter of the tremie pipe and the series of work is repeated.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009891A JPH0694667B2 (en) | 1991-02-13 | 1991-02-13 | How to throw in rubble, earth and sand, etc. |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2009891A JPH0694667B2 (en) | 1991-02-13 | 1991-02-13 | How to throw in rubble, earth and sand, etc. |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05247941A true JPH05247941A (en) | 1993-09-24 |
JPH0694667B2 JPH0694667B2 (en) | 1994-11-24 |
Family
ID=12017646
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2009891A Expired - Fee Related JPH0694667B2 (en) | 1991-02-13 | 1991-02-13 | How to throw in rubble, earth and sand, etc. |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH0694667B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6103808A (en) * | 1997-06-27 | 2000-08-15 | Bridgestone Corporation | High aromatic oil and rubber composition and oil extended synthetic rubber using the same |
JP2008285871A (en) * | 2007-05-17 | 2008-11-27 | Taisei Corp | Riprap dropping system and riprap dropping method |
JP2009249956A (en) * | 2008-04-08 | 2009-10-29 | Honmagumi:Kk | Sediment input ship and sediment input method |
-
1991
- 1991-02-13 JP JP2009891A patent/JPH0694667B2/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6103808A (en) * | 1997-06-27 | 2000-08-15 | Bridgestone Corporation | High aromatic oil and rubber composition and oil extended synthetic rubber using the same |
JP2008285871A (en) * | 2007-05-17 | 2008-11-27 | Taisei Corp | Riprap dropping system and riprap dropping method |
JP2009249956A (en) * | 2008-04-08 | 2009-10-29 | Honmagumi:Kk | Sediment input ship and sediment input method |
Also Published As
Publication number | Publication date |
---|---|
JPH0694667B2 (en) | 1994-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6429802B1 (en) | Determining the condition of a concrete structure using electromagnetic signals | |
ES2364121T3 (en) | A SYSTEM AND A PROCEDURE TO IMPROVE THE DRUG. | |
US5297109A (en) | Piling and pier inspection apparatus and method | |
JP6349607B2 (en) | Cavity exploration method and risk assessment method | |
CN108614270B (en) | Underwater riprap real-time monitoring system based on three-dimensional point cloud system and working method thereof | |
CN106383471A (en) | Control system and control method for assisting in construction of land piling vehicle | |
CN108761469A (en) | A kind of detection method of the submerged structure damage and channel scour scanned based on sonar | |
TW201139795A (en) | Cutters suction dredger for dredging ground and method for dredging using this cutter suction dredger | |
KR101339678B1 (en) | Calculation method of rock and non-rock area for surveying | |
JPH05247941A (en) | Heaping method of rubble-mound, earth, etc. | |
JP3676277B2 (en) | Pile driving method | |
JP5468725B2 (en) | Rubble throwing system | |
CN109765595A (en) | Multi-beam detection system and detection method for underwater concealed work | |
JP2003278158A (en) | Construction management method for back hoe barge | |
Crowson et al. | SUPERDUCK nearshore processes experiment: Summary of studies CERC Field Research Facility | |
Chesterman et al. | Acoustic surveys of the sea floor near Hong Kong | |
Bryant | Side scan sonar for hydrography-an evaluation by the Canadian hydrographic service | |
Lawrence | Guidelines on field measurement procedures for quantifying catchment sediment yields. | |
JPH01216288A (en) | Method for surveying submarine terrain | |
CN116295158B (en) | Instrument and method for measuring sludge depth based on airborne double-frequency depth finder | |
CN109386016A (en) | It is a kind of to survey integrating advanced water measurement method for dredging for free floating suction dredge(r) | |
DE102005055986B4 (en) | Mobile device and method for the spatial measurement of object points | |
CN210194630U (en) | Vertical chute stone throwing boat | |
Stubbing et al. | Surveying from a vessel using a Multibeam Echosounder and a terrestrial laser scanner in New Zealand | |
JPH04282412A (en) | Water-depth measuring method |