JPH05118087A - Precast concrete beam member - Google Patents
Precast concrete beam memberInfo
- Publication number
- JPH05118087A JPH05118087A JP3342525A JP34252591A JPH05118087A JP H05118087 A JPH05118087 A JP H05118087A JP 3342525 A JP3342525 A JP 3342525A JP 34252591 A JP34252591 A JP 34252591A JP H05118087 A JPH05118087 A JP H05118087A
- Authority
- JP
- Japan
- Prior art keywords
- connection
- precast concrete
- members
- concrete beam
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/20—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
- E04B1/215—Connections specially adapted therefor comprising metallic plates or parts
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Rod-Shaped Construction Members (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、プレキャストコンクリ
ート製の梁材に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a beam material made of precast concrete.
【0002】[0002]
【発明の目的】本出願人会社では、先に、スパンの中間
部で場所打ちコンクリートにより接続がなされるように
なっていて、接続端面から梁主筋が突出しているプレキ
ャストコンクリート梁材を開発したが(平成2年特許願
第78728号)、このような梁材の架設・接続時に
は、接続部において互に接続される主鉄筋の位置の確保
が難しく、また、接続部において梁の接続端部を支持す
る支保工を長期間設置しなければならない、という施工
上の問題点がある。[Object of the Invention] The applicant company has previously developed a precast concrete beam material in which the connection is made by cast-in-place concrete in the middle part of the span, and the beam main bar projects from the connection end face. (Patent application No. 78728 in 1990), it is difficult to secure the positions of the main reinforcing bars connected to each other at the connecting portion when the beam material is erected and connected, and the connecting end portion of the beam is connected at the connecting portion. There is a problem in construction that supporting shoring must be installed for a long time.
【0003】本発明の目的は、スパンの中間部で場所打
ちコンクリートにより接続されるようになっていて、接
続端面から梁主筋が突出しているプレキャストコンクリ
ート梁材における、前記問題点の解消にある。An object of the present invention is to eliminate the above-mentioned problems in a precast concrete beam material which is designed to be connected by cast-in-place concrete at an intermediate portion of a span and main beam bars project from the connection end face.
【0004】[0004]
【発明の構成】本発明の構成上の基本的な特徴は、スパ
ンの中間部で場所打ちコンクリートにより接続されるよ
うになっていて、接続端面から梁主筋が突出しているプ
レキャストコンクリート梁材において、接続端部に型鋼
から成る梁接続部材を半ば埋め込んで取り付けた点にあ
る。The basic feature of the present invention is that the precast concrete beam material is designed to be connected by cast-in-place concrete in the middle part of the span, and the main beam of the beam projects from the connection end face. It is a point that a beam connecting member made of shaped steel was embedded in the connecting end partly.
【0005】なお、本発明のプレキャストコンクリート
梁材は、下ば主筋と上ば主筋の双方が梁体内に埋設され
ている全プレキャスト式のものと下ば主筋のみが梁体内
に埋設されている半プレキャスト式のものとの何れであ
ってもよい。The precast concrete beam material of the present invention is of a precast type in which both the lower main bar and the upper main bar are embedded in the beam body and the semi-precast concrete beam material in which only the lower main bar is embedded in the beam body. Any of precast type may be used.
【0006】[0006]
【発明の具体的説明】図1に示す梁材1は、プレキャス
トコンクリート製の長尺部2と短尺部3,3とから成
り、中央の長尺部2はその両端部が隣接する柱の上にそ
れぞれ載る長さに形成され、また、両端の短尺部3は、
その長尺部2寄りの端部が柱の上に載り、他側の端部
(接続端部)が隣接のスパンの中間の所定位置(例えば
スパンの1/2の位置)まで延びる長さに形成されてい
る。DETAILED DESCRIPTION OF THE INVENTION A beam 1 shown in FIG. 1 comprises a long portion 2 made of precast concrete and short portions 3 and 3, and a central long portion 2 is on a pillar whose both ends are adjacent to each other. The lengths of the short portions 3 at both ends are
The end near the long part 2 is placed on the pillar, and the end on the other side (connecting end) extends to a predetermined position in the middle of adjacent spans (for example, half the span). Has been formed.
【0007】梁材1は半プレキャスト式で、その全長に
亙って延びる下ば主筋4の両端部は短尺部3の端面(接
続端面)から突出しており、また、長尺部2と各短尺部
3に埋設されたあばら筋5の上方露出部には上ば主筋6
が取り付けられている。The beam 1 is of a semi-precast type, and both ends of a main bar 4 extending over the entire length of the beam 1 project from the end faces (connection end faces) of the short portions 3, and the long portions 2 and each short length. In the upper exposed portion of the stirrup bar 5 embedded in the part 3, the upper main bar 6
Is attached.
【0008】図2に示す梁材7は、長尺部がなくて1対
の短尺部8,8のみから成り、各短尺部8の一端が同じ
柱の上に載るようになっているが、その他の点では梁材
1と同様のものである。The beam member 7 shown in FIG. 2 is composed of only a pair of short length portions 8 and 8 without a long length portion, and one end of each short length portion 8 is placed on the same pillar. In other respects, it is similar to the beam 1.
【0009】9は、梁材1,7の端部(接続端部)に半
ば埋め込んで取り付けられた型鋼から成る梁接続部材で
あり、図にはI型鋼から成るものが示されているが、他
の型鋼であっもよいことは勿論である。Reference numeral 9 denotes a beam connecting member made of shaped steel half-embedded and attached to the ends (connection ends) of the beam members 1 and 7, and although it is shown in the drawing as being made of type I steel, Of course, other shape steels may be used.
【0010】なお、梁材1,7の接続端部には、図4に
示すように、型枠取付け用のインサート10を予め埋設
しておくのが好ましく、また、接続後、プレストレスを
付与する場合には、梁1,7に予めシース(図示しな
い)を埋設しておく必要がある。As shown in FIG. 4, it is preferable to preliminarily embed an insert 10 for mounting the formwork at the connection end portions of the beam members 1 and 7. Also, after connection, prestress is applied. In this case, a sheath (not shown) needs to be embedded in the beams 1 and 7 in advance.
【0011】インサート10はナット状のもので、これ
をを利用してボルトで取り付けられる接続部の型枠は、
図示しないが、縦横のリブで補強された鋼板から成り、
これを梁材1,7の接続端部間に架設することにより、
支保工なしで接続部のコンクリート打設作業を行うこと
ができる。The insert 10 is of a nut shape, and the form of the connecting portion to be bolted using this is
Although not shown, it consists of steel plates reinforced by horizontal and vertical ribs,
By installing this between the connecting ends of the beams 1 and 7,
It is possible to perform concrete pouring work on the connection part without supporting work.
【0012】以上のような梁材1,7を架設・接続する
ときは、梁材1,7を吊って、既に構築済みの柱の柱頭
部に載せ(図1,図2の1点鎖線は柱の中心線を示
す)、接続端部を支保工兼作業台11で受け、ジャッキ
12で接続端部の高さを調整した後、先ず、隣接の梁接
続部材9相互を添接板13,14を介してボルト等で接
続し。それから、下ば主筋4および上ば主筋6を溶接し
て連続させるとともに、接続部15および梁・柱接合部
16のあばら筋5’を正規の位置に固定し、接続部15
の型枠をセットし、接続部15にコンクリートを打設す
る。なお、この際、接続部15の作業と並行して半プレ
キャスト床板の設置、床スラブの配筋等も行って、接続
部15、梁・柱接合部16、および床スラブのコンクリ
ートを同時に打設して、柱、梁、床を一体化するのが好
ましい。When the beam members 1 and 7 as described above are erected and connected, the beam members 1 and 7 are hung and placed on the column head of the already constructed column (the one-dot chain line in FIGS. 1 and 2 indicates (The center line of the pillar is shown), the connection end is received by the support and work bench 11, and the height of the connection end is adjusted by the jack 12. Then, first, the adjacent beam connection members 9 are attached to each other with the splicing plate 13, Connect with a bolt or the like via 14. Then, the lower main bar 4 and the upper main bar 6 are welded to be continuous, and the connecting portion 15 and the stirrup 5 ′ of the beam / column joint portion 16 are fixed to the regular position,
The formwork of (1) is set, and concrete is poured into the connecting portion 15. At this time, in parallel with the work of the connecting portion 15, the semi-precast floor board is installed, the floor slab is reinforced, and the connecting portion 15, the beam / column joint 16 and the concrete of the floor slab are simultaneously poured. Then, it is preferable to integrate the pillar, the beam, and the floor.
【0013】[0013]
【発明の効果】本発明のプレキャストコンクリート梁材
は、接続端部に型鋼からなる梁接続部材を半ば埋め込ん
で取り付けたことにより、次のような効果が期待でき
る。すなわち、梁接続部材の接続により梁から突出して
いる梁主筋の位置が確保されるから、梁主筋の接続作業
を容易にかつ精度良く行うことができる。梁接続部材の
接続により接続部の強度が確保されるから、接続部にお
いて梁の接続端部を支持する支保工に簡単なものを使用
できるし、その早期撤去も可能である。そして、請求項
2のプレキャストコンクリート梁材では、インサートを
利用して接続部の型枠を取り付け、支保工なしで接続部
のコンクリート打設作業を行うことができる利点もあ
る。EFFECTS OF THE INVENTION The precast concrete beam material of the present invention is expected to have the following effects by mounting a beam connecting member made of shaped steel at the connecting end partly by embedding it. That is, since the position of the main beam of the beam protruding from the beam is secured by the connection of the beam connecting member, the work of connecting the main beam of the beam can be easily and accurately performed. Since the strength of the connecting portion is secured by connecting the beam connecting member, a simple one can be used for supporting and supporting the connecting end portion of the beam at the connecting portion, and its early removal is also possible. In addition, the precast concrete beam material according to the second aspect has an advantage that the insert can be used to attach the formwork of the connection portion and the concrete pouring work of the connection portion can be performed without supporting work.
【図1】本発明のプレキャストコンクリート梁材の一例
の全体側面図である。FIG. 1 is an overall side view of an example of a precast concrete beam material according to the present invention.
【図2】本発明のプレキャストコンクリート梁材の別例
の全体側面図である。FIG. 2 is an overall side view of another example of the precast concrete beam material of the present invention.
【図3】図I,図2に示す梁材の接続端部の正面図であ
る。FIG. 3 is a front view of a connection end portion of the beam member shown in FIGS.
【図4】図I,図2に示す梁材の接続作業状態を示す側
面図である。FIG. 4 is a side view showing a connecting work state of the beam members shown in FIGS.
1:梁材、2:長尺部、3:短尺部、4:下ば主筋、
5,5’:あばら筋、6:上ば主筋、7:梁材、8:短
尺部、9:梁接続部材、10:インサート、11:支保
工兼作業台、12:ジヤッキ、13,14:添接板、1
5:接続部、16:梁・柱接合部。1: Beam material, 2: Long part, 3: Short part, 4: Bottom main bar,
5, 5 ': stirrup bar, 6: upper main bar, 7: beam, 8: short part, 9: beam connecting member, 10: insert, 11: support and work bench, 12: jack, 13, 14: Saddle plate, 1
5: connection part, 16: beam-column joint part.
─────────────────────────────────────────────────────
─────────────────────────────────────────────────── ───
【手続補正書】[Procedure amendment]
【提出日】平成4年10月15日[Submission date] October 15, 1992
【手続補正1】[Procedure Amendment 1]
【補正対象書類名】明細書[Document name to be amended] Statement
【補正対象項目名】特許請求の範囲[Name of item to be amended] Claims
【補正方法】変更[Correction method] Change
【補正内容】[Correction content]
【特許請求の範囲】[Claims]
フロントページの続き (72)発明者 武田 剛 大阪府大阪市中央区平野町四丁目2番16号 不動建設株式会社内 (72)発明者 東 良志 大阪府大阪市中央区平野町四丁目2番16号 不動建設株式会社内 (72)発明者 松本 眞治 大阪府大阪市中央区平野町四丁目2番16号 不動建設株式会社内 (72)発明者 田中 宏幸 大阪府大阪市中央区平野町四丁目2番16号 フドウ建研株式会社内Front Page Continuation (72) Inventor Go Takeda 4-2-16 Hirano-cho, Chuo-ku, Osaka City, Osaka Prefecture Fudo Construction Co., Ltd. (72) Yoshishi Higashi 4-2 Hirano-cho, Chuo-ku, Osaka City, Osaka Prefecture No. 16 Fudo Construction Co., Ltd. (72) Inventor Shinji Matsumoto 4-2-1 Hirano-cho, Chuo-ku, Osaka-shi, Osaka Prefecture No. 16 Fudo Construction Co., Ltd. (72) Hiroyuki Tanaka 4-chome, Hirano-cho, Chuo-ku, Osaka-shi, Osaka No. 2-16 Fudou Kenken Co., Ltd.
Claims (2)
により接続されるようになっていて、接続端面から梁主
筋が突出しているプレキャストコンクリート梁材におい
て、接続端部に型鋼から成る梁接続部材を半ば埋め込ん
で取り付けたことを特徴とするプレキャストコンクリー
ト梁材。1. A precast concrete beam material, which is adapted to be connected by cast-in-place concrete at an intermediate portion of a span and has a beam main bar protruding from a connection end surface, in which a beam connection member made of shaped steel is halfway at the connection end portion. Precast concrete beam material that is embedded and installed.
サートを埋設した請求項1記載のプレキャストコンクリ
ート梁材。2. The precast concrete beam material according to claim 1, wherein an insert for attaching the formwork is embedded in the outer surface of the connection end portion.
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3342525A JPH05118087A (en) | 1991-10-25 | 1991-10-25 | Precast concrete beam member |
KR1019920019236A KR930008251A (en) | 1991-10-25 | 1992-10-20 | Precast Concrete Beam and Precast Concrete Beam Unit |
DE4235521A DE4235521C2 (en) | 1991-10-25 | 1992-10-21 | Prefabricated concrete beam and concrete beam unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP3342525A JPH05118087A (en) | 1991-10-25 | 1991-10-25 | Precast concrete beam member |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH05118087A true JPH05118087A (en) | 1993-05-14 |
Family
ID=18354426
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP3342525A Pending JPH05118087A (en) | 1991-10-25 | 1991-10-25 | Precast concrete beam member |
Country Status (3)
Country | Link |
---|---|
JP (1) | JPH05118087A (en) |
KR (1) | KR930008251A (en) |
DE (1) | DE4235521C2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630023A (en) * | 1993-10-14 | 1997-05-13 | Ricoh Company, Limited | Signal processor |
CN110206141A (en) * | 2019-04-23 | 2019-09-06 | 江苏省建筑设计研究院有限公司 | The staggered joint of rectangular steel-tube concrete column and beams of concrete |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110439180A (en) * | 2019-08-20 | 2019-11-12 | 长沙远大住宅工业安徽有限公司 | A kind of cross coupling and construction method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2035474A1 (en) * | 1970-07-17 | 1972-01-20 | Componoform, Inc., Cambridge, Mass. (V St.A.) | |
DE2711403C2 (en) * | 1977-03-16 | 1985-10-03 | Frank Dipl.-Ing. 7449 Neckartenzlingen Huster | Ceiling structure |
-
1991
- 1991-10-25 JP JP3342525A patent/JPH05118087A/en active Pending
-
1992
- 1992-10-20 KR KR1019920019236A patent/KR930008251A/en active IP Right Grant
- 1992-10-21 DE DE4235521A patent/DE4235521C2/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5630023A (en) * | 1993-10-14 | 1997-05-13 | Ricoh Company, Limited | Signal processor |
CN110206141A (en) * | 2019-04-23 | 2019-09-06 | 江苏省建筑设计研究院有限公司 | The staggered joint of rectangular steel-tube concrete column and beams of concrete |
Also Published As
Publication number | Publication date |
---|---|
KR930008251A (en) | 1993-05-21 |
DE4235521A1 (en) | 1993-04-29 |
DE4235521C2 (en) | 1997-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5884442A (en) | Composite joist and concrete panel assembly | |
KR101215060B1 (en) | Steel reinforcement and concrete composite column having vertically coupling means and construction method using the same | |
JP3818020B2 (en) | Cross-section precast segment method | |
JPH05118087A (en) | Precast concrete beam member | |
JP2000038710A (en) | Structure of concrete floor slab | |
JP2000038797A (en) | Semi-precast floor slab | |
JPH09189128A (en) | Fixing structure of form for precast reinforced concrete foundation | |
JPH083935A (en) | Joint structure between precast floor slab and bridge girder for constituting bridge subgrade | |
JP2838608B2 (en) | Connection structure of girder and steel beam | |
JPH084110A (en) | Construction of reinforced concrete structure, and block for column/beam connection | |
JPH01290853A (en) | Composite floor board using deck plate | |
JP3373663B2 (en) | Column weld joint joint structure | |
JPH08253912A (en) | Bride structure | |
JP3388452B2 (en) | Construction method of concrete joint and buried object used in the construction method | |
JPH05148817A (en) | Construction of pc bridge | |
JPH076252Y2 (en) | Joint structure of PC beam and beam | |
JPS603127Y2 (en) | Fixed structure of balustrade pillars | |
JPH07247629A (en) | Anchor structure using perforated steel plate | |
WO1998017879A1 (en) | Method for the reinforcement of reinforced concrete and reinforcement for use thereof | |
JP2580967Y2 (en) | Hardware for through holes in underground foundation beams | |
JPH0420639A (en) | Pc small beam | |
JP2713085B2 (en) | Wall formwork mounting structure | |
JP2560598B2 (en) | RC reverse construction method | |
JP2568987B2 (en) | Support member for reinforcing steel assembly and bridge construction method using the same | |
JP2003239402A (en) | Joint structure between column and beam and joint method between column and beam |