JPH05118036A - Waling material - Google Patents
Waling materialInfo
- Publication number
- JPH05118036A JPH05118036A JP31006291A JP31006291A JPH05118036A JP H05118036 A JPH05118036 A JP H05118036A JP 31006291 A JP31006291 A JP 31006291A JP 31006291 A JP31006291 A JP 31006291A JP H05118036 A JPH05118036 A JP H05118036A
- Authority
- JP
- Japan
- Prior art keywords
- main body
- bellows
- concrete
- lower surfaces
- waling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は、地盤を根切りして矢板
で山留めする際に、土の崩壊を防止するために前記矢板
を支持する横架材である腹起こし材に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bellows raising member which is a lateral member for supporting the sheet pile in order to prevent the soil from collapsing when the ground is cut off and piled up with the sheet pile.
【0002】[0002]
【従来の技術】従来、山留めにおける腹起こし材は図6
に示すように、H型鋼20を用いていた。そして根切り
をした地下部に構造物のコンクリート躯体を構築後に、
前記腹起こし材20や切梁21を盛り替えていた。ま
た、山留めの矢板22と地下構造物の外壁との間(腹起
こし材分の空間)をコンクリート等を流し込んで埋戻し
を行っていた。2. Description of the Related Art Conventionally, the abdomen uplifting material for mountain retaining is shown in FIG.
As shown in, H-shaped steel 20 was used. And after constructing the concrete frame of the structure in the underground part where the root was cut,
The abdomen 20 and the cutting beam 21 were refilled. Further, the space between the mountain pile sheet pile 22 and the outer wall of the underground structure (a space corresponding to the abdomen uplifting material) is poured into the space for backfilling.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上述の
山留め工法では、腹起こし材や切梁の盛り替えを行うの
で施工が複雑で手間が掛かり、また、腹起こし材を盛り
替えた後に矢板と地下構造物の外壁との間の埋め戻しに
手間と費用が掛かると言った問題がある。更に、腹起こ
し材を設けるための空間が必要なので、その分だけ構造
物用の敷地が狭められ特に都市においては敷地が限られ
ており有効に活用できないと言った欠点が存在した。However, in the above-mentioned mountain retaining method, since the bellows and timbers are refilled, the construction is complicated and troublesome, and after the bellows are refilled, the sheet pile and the underground are rebuilt. There is a problem that backfilling with the outer wall of the structure is troublesome and expensive. Further, since a space for providing the abdomen is required, the site for the structure is narrowed by that much, and there is a drawback that the site cannot be effectively used because the site is limited especially in a city.
【0004】本発明は、上記の課題に鑑みてなされたも
ので、腹起こし材や切梁の盛り替えの手間を省き工期の
短縮とコストの低減を図る腹起こし材を提供することを
目的とする。The present invention has been made in view of the above problems, and an object of the present invention is to provide an abdomen uplifting material, which saves the labor of refilling up the abdomen upset material and cutting beams, shortens the construction period, and reduces the cost. To do.
【0005】[0005]
【課題を解決するための手段】本発明の上記課題を解決
し上記目的を達成するための要旨は、山留めの支保工と
しての横架材である腹起こし材において、腹起こし材の
本体をプレキャストコンクリートで形成するとともに、
当該本体内に構築すべき地下構造物用の補強鉄筋を埋設
し、前記本体の上下面から継手用鉄筋を所定長さで突出
させたことに存する。The gist of the present invention for solving the above-mentioned problems and achieving the above-mentioned object is to provide a body for pre-casting an abdomen member, which is a horizontal member as a supporting member for a mountain retaining member. Formed with concrete,
It consists in embedding a reinforcing reinforcing bar for an underground structure to be constructed in the main body, and projecting a reinforcing bar for a joint with a predetermined length from the upper and lower surfaces of the main body.
【0006】更に、腹起こし材の本体に、該本体の上下
面に貫通する空気抜き用の貫通孔を穿設するとともに、
当該本体の下面をコンクリート打設時のコンクリート充
填能率向上のために傾斜させたことに存する。腹起こし
材の本体の側壁に一端を開口させて仮設足場固定用のイ
ンサート金物を当該本体内に埋設したことを特徴として
なる請求項1または請求項2に記載の腹起こし材。Further, the body of the belly-raising member is provided with through holes for venting air, which penetrate the upper and lower surfaces of the body, and
This is because the lower surface of the main body was inclined to improve the concrete filling efficiency when pouring concrete. The abdomen uplifting material according to claim 1 or 2, wherein one end of the abdomen uprighting material is opened at a side wall of the body and an insert metal fitting for fixing a temporary scaffold is embedded in the body.
【0007】[0007]
【作用】本発明の腹起こし材は、プレキャストコンクリ
ート製としたので、地下構造物の外壁の一部として該地
下構造と一体化させることができる。これにより、腹起
こし材の盛り替えが不要となる。Since the bellows raising material of the present invention is made of precast concrete, it can be integrated with the underground structure as a part of the outer wall of the underground structure. This eliminates the need for refilling the wadding material.
【0008】また、本発明の腹起こし材を地下構造物の
外壁の一部としてコンクリートを打設する際に、腹起こ
し材の本体に空気抜き用の貫通孔および当該本体の下面
を傾斜させたことにより、前記本体の下面と打設するコ
ンクリート上面との間の空気が前記貫通孔から上方へと
抜かれて残留せずコンクリートの充填具合いが良好とな
る。更に、仮設足場を取り付けるためのインサート金物
を一端を開口させて本体に埋設させておけば、容易に仮
設足場を取り付けることが可能となる。Further, when the concrete wadding material of the present invention is placed as a part of the outer wall of the underground structure, the body of the wadding material has a through hole for venting air and the lower surface of the body is inclined. As a result, the air between the lower surface of the main body and the concrete upper surface to be cast is not discharged upward through the through hole, and the filling condition of the concrete is improved. Furthermore, if the insert metal fitting for attaching the temporary scaffold is opened at one end and embedded in the main body, the temporary scaffold can be easily attached.
【0009】[0009]
【実施例】次に、本発明について図面を参照して説明す
る。図1は、本発明の腹起こし材の使用状態を示す拡大
した縦断面図である。図2と図3は同じく正面図と平面
図である。図において符号1は腹起こし材、2は本体、
3は補強鉄筋、4は継手用鉄筋、5はインサート金物、
6は矢板、7は地盤、8は仮設足場、9はボルト、10
はナット、11は切梁、12は貫通孔を各々示してい
る。DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, the present invention will be described with reference to the drawings. FIG. 1 is an enlarged vertical cross-sectional view showing a usage state of the belly rising material of the present invention. 2 and 3 are a front view and a plan view, respectively. In the figure, reference numeral 1 is a belly member, 2 is a main body,
3 is a reinforcing bar, 4 is a reinforcing bar for joints, 5 is an insert hardware,
6 is a sheet pile, 7 is the ground, 8 is a temporary scaffold, 9 is a bolt, 10
Is a nut, 11 is a beam, and 12 is a through hole.
【0010】図1に最良の一実施例を示すように、本発
明に係る腹起こし材1は、腹起こし材の本体2がプレキ
ャストコンクリートで形成される。この際に、構築すべ
き地下構造物用の外壁として必要となる補強鉄筋3を埋
設しておく。As shown in the best embodiment in FIG. 1, a body 1 of the wadding material 1 of the present invention is made of precast concrete. At this time, the reinforcing bar 3 required as an outer wall for the underground structure to be constructed is buried.
【0011】そして、前記本体2の上下面2a,2bか
ら継手用鉄筋4を所定長さで突出させて設け、該本体の
上下面2a,2bに貫通する空気抜き用の貫通孔12を
穿設するとともに、当該本体2の下面2bをコンクリー
ト打設時のコンクリート充填能率向上のために傾斜(矢
板6側から内側に向けて立ち上がる)させてある。Then, a reinforcing bar 4 for a joint is provided so as to project from the upper and lower surfaces 2a and 2b of the main body 2 by a predetermined length, and a through hole 12 is formed in the upper and lower surfaces 2a and 2b of the main body for venting air. At the same time, the lower surface 2b of the main body 2 is inclined (standing up from the sheet pile 6 side toward the inside) in order to improve the concrete filling efficiency when pouring concrete.
【0012】更に、腹起こし材1の本体2の側壁2c
に、一端を開口させて仮設足場8固定用のインサート金
物5を当該本体2内に埋設する。なお、前記本体2の上
下面2a,2bから突設させてある止水板13,13は
地盤7からの地下水が地下構造物内に浸入するのを防止
するためにある。Further, the side wall 2c of the main body 2 of the belly member 1
Then, one end is opened and the insert metal fitting 5 for fixing the temporary scaffold 8 is embedded in the main body 2. The water stop plates 13 and 13 projecting from the upper and lower surfaces 2a and 2b of the main body 2 are provided to prevent groundwater from the ground 7 from entering the underground structure.
【0013】このようにして構成される腹起こし材1を
使用すると、図2乃至図3に示すように、地盤7を根切
りして切梁11と腹起こし材1とで矢板6を支持する。
そして、図1に示すように、本体2の側壁2c側に埋設
してあるインサート金物5にボルト9,ナット10で仮
設足場8を固定する。こうして腹起こし材1から突出さ
せてある継手用鉄筋4に地下構造物用の鉄筋をカプラー
等の連結手段で連結して配筋する。When the bellows raising member 1 constructed in this way is used, as shown in FIGS. 2 to 3, the ground 7 is cut off to support the sheet pile 6 by the cutting beam 11 and the bellow raising member 1.
Then, as shown in FIG. 1, the temporary scaffold 8 is fixed to the insert metal piece 5 buried on the side wall 2c side of the main body 2 with bolts 9 and nuts 10. In this way, the reinforcing bars for the underground structure are connected to the reinforcing bars for joints 4 which are projected from the abdomen 1 by connecting means such as a coupler to arrange them.
【0014】次に、矢板6を一方の型枠となし、他方に
型枠を組み立てて、図2に示す空間14にコンクリート
を打設する。この地下構造物の外壁を構築するコンクリ
ートを打設すると、前記空間14に充填されるコンクリ
ートの上端面が腹起こし材1の下面2bに当接し、該下
面2bが傾斜しているので、打設中のコンクリートの上
端面と前記下面2bとの間の空気が貫通孔12から上方
へと抜かれ、空隙が発生せず良好にコンクリートを空間
14に充填できる。Next, the sheet pile 6 is used as one formwork, the other formwork is assembled, and concrete is poured into the space 14 shown in FIG. When the concrete for constructing the outer wall of this underground structure is poured, the upper end surface of the concrete filled in the space 14 comes into contact with the lower surface 2b of the swelling member 1 and the lower surface 2b is inclined. Air between the upper end surface of the inside concrete and the lower surface 2b is discharged upward from the through hole 12, so that the space 14 can be satisfactorily filled with concrete without generating voids.
【0015】前記打設したコンクリートが所定の強度を
発現した後、型枠を解体し、更に一方の型枠として利用
した矢板6を引き抜きこれを他の場所に転用する。こう
して地下構造物の外壁が形成される。After the cast concrete exhibits a predetermined strength, the form is disassembled, and the sheet pile 6 used as one form is pulled out and diverted to another place. Thus, the outer wall of the underground structure is formed.
【0016】前記腹起こし材1の本体2に継手鉄筋4を
設ける方法としては、図1に示すような方法以外にも、
図4乃至図5に示す方法がある。即ち、前記本体2に上
下方向に円筒状の鋳鉄製スリーブ15を埋設し、その両
端部を開口させておく。そして、該スリーブ15の上下
両方向から縦筋16をスリーブ15内に差し込んで突合
せにし、高強度グラウト材で固める。なお、符号17は
仮設用のブラケットを示している。As a method of providing the joint reinforcing bar 4 on the body 2 of the bellows raising member 1, other than the method shown in FIG.
There is a method shown in FIGS. That is, a cylindrical cast iron sleeve 15 is embedded in the main body 2 in the vertical direction, and both ends thereof are opened. Then, the vertical streaks 16 are inserted into the sleeve 15 from both the upper and lower sides of the sleeve 15 to make a butt joint, and the sleeve 16 is fixed with a high-strength grout material. Reference numeral 17 indicates a temporary bracket.
【0017】また、図5に示すように、本体2にスリー
ブ18を両端開口させて埋設させ、該スリーブ18に縦
筋19を挿通させて所定長さを本体2から突出させて、
その後グラウトを充填させて固着するようにしてもよ
い。Further, as shown in FIG. 5, the sleeve 18 is embedded in the main body 2 by opening both ends thereof, and the vertical stripes 19 are inserted into the sleeve 18 so that a predetermined length is projected from the main body 2.
After that, grout may be filled and fixed.
【0018】[0018]
【発明の効果】以上説明したように、本発明の腹起こし
材は、腹起こし材の本体をプレキャストコンクリートで
形成するとともに、当該本体内に構築すべき地下構造物
用の補強鉄筋を埋設し、前記本体の上下面から継手用鉄
筋を所定長さで突出させたので、腹起こし材を地下構造
物の一部とすることができるので腹起こし材の盛り替え
が不要となり更にコンクリート等の埋め戻し作業も不要
となって、コストの低減と工期の短縮となる。As described above, the wadding material of the present invention is such that the body of the wadding material is formed of precast concrete, and the reinforcing bar for the underground structure to be built is embedded in the body. Since the reinforcing bars for the joints are projected from the upper and lower surfaces of the main body with a predetermined length, the bellows material can be a part of the underground structure, so that the bellows material does not need to be refilled and further backfilling of concrete etc. No work is required, and the cost and construction period are reduced.
【0019】請求項2のようにすれば、空気抜き用の貫
通孔が設けられ当該本体の下面が傾斜せしめられている
ので、コンクリートの充填具合いが良好となる。According to the second aspect, since the through hole for venting air is provided and the lower surface of the main body is inclined, the filling condition of the concrete becomes good.
【0020】また、請求項3に記載のようにすれば、仮
設足場を腹起こし材の側壁に容易に固定することができ
足場組立の作業能率の向上となり、工期の短縮ともな
る。Further, according to the third aspect, the temporary scaffold can be easily fixed to the side wall of the abdomen member, the work efficiency of scaffold assembly can be improved, and the construction period can be shortened.
【図1】本発明の腹起こし材の使用状態を示す一部を拡
大した縦断面図である。FIG. 1 is a partially enlarged vertical cross-sectional view showing a usage state of a belly rising member of the present invention.
【図2】本発明の腹起こし材の使用状態を示す正面図で
ある。FIG. 2 is a front view showing a usage state of the belly rising member of the present invention.
【図3】同じく平面図である。FIG. 3 is a plan view of the same.
【図4】他の実施例を示す説明図である。FIG. 4 is an explanatory diagram showing another embodiment.
【図5】同じく他の実施例を示す説明図である。FIG. 5 is an explanatory view showing another embodiment of the present invention.
【図6】従来例に係る腹起こし材の使用状態を示す正面
図である。FIG. 6 is a front view showing a use state of a belly rising member according to a conventional example.
1 腹起こし材、2 本体、3 補強鉄筋、4 継手用
鉄筋、5 インサート金物、6 矢板、7 地盤、8
仮設足場、9 ボルト、10 ナット、11 切梁、1
2 貫通孔。1 Bellows, 2 Main body, 3 Reinforcing bars, 4 Reinforcing bars, 5 Insert hardware, 6 Sheet piles, 7 Ground, 8
Temporary scaffolding, 9 bolts, 10 nuts, 11 beams, 1
2 through holes.
Claims (3)
起こし材において、腹起こし材の本体をプレキャストコ
ンクリートで形成するとともに、当該本体内に構築すべ
き地下構造物用の補強鉄筋を埋設し、前記本体の上下面
から継手用鉄筋を所定長さで突出させたことを特徴とし
てなる腹起こし材。1. In a waving material which is a horizontal material for supporting a mountain retaining structure, the body of the waving material is formed of precast concrete, and a reinforcing steel bar for an underground structure to be built is embedded in the body. Then, a bellows waving member characterized in that a reinforcing bar for a joint is projected from the upper and lower surfaces of the main body by a predetermined length.
貫通する空気抜き用の貫通孔を穿設するとともに、当該
本体の下面をコンクリート打設時のコンクリート充填能
率向上のために傾斜させたことを特徴としてなる請求項
1に記載の腹起こし材。2. The body of the bellows raising member is provided with through holes for venting air through the upper and lower surfaces of the body, and the lower surface of the body is inclined to improve concrete filling efficiency during concrete pouring. The abdomen rising material according to claim 1, which is characterized in that
せて仮設足場固定用のインサート金物を当該本体内に埋
設したことを特徴としてなる請求項1または請求項2に
記載の腹起こし材。3. The bellows wadding material according to claim 1, wherein one end of the body of the bellows waker is opened and an insert metal fitting for fixing a temporary scaffold is embedded in the body. ..
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31006291A JP2899463B2 (en) | 1991-10-30 | 1991-10-30 | Material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP31006291A JP2899463B2 (en) | 1991-10-30 | 1991-10-30 | Material |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH05118036A true JPH05118036A (en) | 1993-05-14 |
JP2899463B2 JP2899463B2 (en) | 1999-06-02 |
Family
ID=18000712
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP31006291A Expired - Fee Related JP2899463B2 (en) | 1991-10-30 | 1991-10-30 | Material |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2899463B2 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004031510A3 (en) * | 2002-10-07 | 2004-06-24 | Man-Yop Han | Innovative prestressed scaffolding system |
CN100441782C (en) * | 2002-10-07 | 2008-12-10 | 韩万烨 | Innovative prestressed scaffolding system |
JP2011511190A (en) * | 2008-02-01 | 2011-04-07 | (ジュ)スポルテック | Precast temporary structure and construction method thereof |
CN102191776A (en) * | 2011-05-11 | 2011-09-21 | 中天建设集团有限公司 | Structure for underpinning reinforced concrete inner support by profile steels and construction method for same |
CN104631468A (en) * | 2015-03-11 | 2015-05-20 | 中国建筑第八工程局有限公司 | Supporting method for foundation pit excavation project |
CN106193054A (en) * | 2016-09-09 | 2016-12-07 | 中建三局集团有限公司 | A kind of support system for subway foundation pit and construction method thereof |
CN112878334A (en) * | 2021-01-15 | 2021-06-01 | 郑州地铁集团有限公司 | Anchor rod (anchor cable) cutting machine tool in deep foundation pit of subway station and construction process |
CN113737818A (en) * | 2021-10-19 | 2021-12-03 | 上海市城市建设设计研究总院(集团)有限公司 | Assembled transverse row plate groove supporting combined structure |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107740420A (en) * | 2017-09-15 | 2018-02-27 | 浙江申诚环境工程有限公司 | Foundation ditch tears support and support replacement system and method open |
-
1991
- 1991-10-30 JP JP31006291A patent/JP2899463B2/en not_active Expired - Fee Related
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004031510A3 (en) * | 2002-10-07 | 2004-06-24 | Man-Yop Han | Innovative prestressed scaffolding system |
US7144200B2 (en) | 2002-10-07 | 2006-12-05 | Han Man-Yop | Innovative prestressed scaffolding system |
CN100441782C (en) * | 2002-10-07 | 2008-12-10 | 韩万烨 | Innovative prestressed scaffolding system |
JP2011511190A (en) * | 2008-02-01 | 2011-04-07 | (ジュ)スポルテック | Precast temporary structure and construction method thereof |
CN102191776A (en) * | 2011-05-11 | 2011-09-21 | 中天建设集团有限公司 | Structure for underpinning reinforced concrete inner support by profile steels and construction method for same |
CN104631468A (en) * | 2015-03-11 | 2015-05-20 | 中国建筑第八工程局有限公司 | Supporting method for foundation pit excavation project |
CN106193054A (en) * | 2016-09-09 | 2016-12-07 | 中建三局集团有限公司 | A kind of support system for subway foundation pit and construction method thereof |
CN106193054B (en) * | 2016-09-09 | 2018-01-16 | 中建三局集团有限公司 | A kind of support system and its construction method for subway foundation pit |
CN112878334A (en) * | 2021-01-15 | 2021-06-01 | 郑州地铁集团有限公司 | Anchor rod (anchor cable) cutting machine tool in deep foundation pit of subway station and construction process |
CN113737818A (en) * | 2021-10-19 | 2021-12-03 | 上海市城市建设设计研究总院(集团)有限公司 | Assembled transverse row plate groove supporting combined structure |
Also Published As
Publication number | Publication date |
---|---|
JP2899463B2 (en) | 1999-06-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101696916B1 (en) | Construction method of permanent wall with retaining wall combined PHC pile and steel pipe | |
JP2010090607A (en) | Method for constructing tunnel and structure of the tunnel | |
JPH05118036A (en) | Waling material | |
JP3554299B2 (en) | Composite segment in pipe burial method | |
JP3603130B2 (en) | Root-wound reinforcement structure for column bases such as steel columns | |
KR101210368B1 (en) | Uniting Method of Temporary earth wall with basement exterior Wall using Couplers and Bolts. | |
WO2005064088A1 (en) | Round rod-type and bundle-type soil nails | |
JP3543229B2 (en) | Construction method of ready-made concrete pile and foundation | |
JP3659058B2 (en) | Yamadome method with low strength underground wall | |
JP2010168808A (en) | Protective wall and protective wall formation method | |
JP2009209513A (en) | Underpass creation method, and coupling structure of superstructure work girder and underground wall | |
JP2007218086A (en) | Steel tower foundation structure | |
KR20010019079A (en) | Precast steel Plate &Concrete Pile Structure of Semi Down Wall Construction System | |
JPH0813494A (en) | Fixing method of earth retaining wall and timbering | |
KR100380907B1 (en) | Precast concrete segment for arch type culvert and construction method using this segment | |
KR200205800Y1 (en) | A reinforcement structure for a foundation pile | |
JP2876434B2 (en) | Joint structure of underground structures subject to buoyancy | |
KR101110208B1 (en) | Retaining wall-block having variable support and connecting wall-block and method for constructing retaining wall using the same | |
JP2005201009A (en) | Earth retaining wall structure | |
JP2004285613A (en) | Construction method for building foundation | |
JPH09228395A (en) | Retaining wall structure | |
JP4399062B2 (en) | Construction method of viaduct underground beam | |
JP3079421B2 (en) | Construction method of L-shaped retaining wall and prefabricated wall element used therefor | |
KR200183409Y1 (en) | Precast concrete segment for arch type culvert | |
JP3171716B2 (en) | Foundation construction method on inclined surface |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |