[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP7526078B2 - Pile driver display system - Google Patents

Pile driver display system Download PDF

Info

Publication number
JP7526078B2
JP7526078B2 JP2020188027A JP2020188027A JP7526078B2 JP 7526078 B2 JP7526078 B2 JP 7526078B2 JP 2020188027 A JP2020188027 A JP 2020188027A JP 2020188027 A JP2020188027 A JP 2020188027A JP 7526078 B2 JP7526078 B2 JP 7526078B2
Authority
JP
Japan
Prior art keywords
construction
pile
driver
data
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020188027A
Other languages
Japanese (ja)
Other versions
JP2022077258A (en
Inventor
重希 田中
幸洋 渡邊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2020188027A priority Critical patent/JP7526078B2/en
Publication of JP2022077258A publication Critical patent/JP2022077258A/en
Application granted granted Critical
Publication of JP7526078B2 publication Critical patent/JP7526078B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

本発明は、杭打機の表示システムに関し、詳しくは、運転者による杭打機の運転操作を支援する機能を備えた杭打機の表示システムに関する。 The present invention relates to a display system for a pile driver, and more specifically, to a display system for a pile driver that has a function to assist the operator in operating the pile driver.

一般に、杭の埋設や地盤改良などを行う杭打機には、各種工法を制御するための施工管理プログラムを記憶した施工管理装置が搭載されている。施工管理装置は、鋼管杭や中空ロッドなどの施工部材を地中に圧入する場合に、運転室内に設けた制御装置(コントロールボックス)によって施工管理プログラムを実行させて、リーダやオーガなどの各種部品に設けた複数のセンサ、例えば、エンコーダを使用した深度センサ、オーガのトルクを圧力又は電流で検出するトルクセンサ、オーガの回転パルスを検出する回転センサなどから各データを得るとともに、各データから、深度、速度、トルク、回転数などを求めてディスプレイに表示させ、メモリに記録しながら施工を行っている(例えば、特許文献1参照。)。 In general, pile drivers used for burying piles and improving ground are equipped with a construction management device that stores a construction management program for controlling various construction methods. When driving construction materials such as steel pipe piles and hollow rods into the ground, the construction management device executes the construction management program using a control device (control box) installed in the driver's cab to obtain data from multiple sensors installed in various parts such as the leader and auger, such as a depth sensor using an encoder, a torque sensor that detects the torque of the auger by pressure or current, and a rotation sensor that detects the rotation pulse of the auger, and calculates depth, speed, torque, rotation speed, etc. from each data, displays them on the display, and records them in memory while carrying out construction (see, for example, Patent Document 1).

上述の施工管理装置を用いた杭施工方法では、基礎となる支持層の位置や深さなどを知るための事前のボーリング調査が行われているが、費用の観点から施工する杭の場所全てで行うことは難しいという事情がある。そこで、近年の情報技術の発展に伴い、少ない地盤調査地点数から作成した支持層データに対し、杭打ち作業において逐次取得される支持層到達深度情報を加えて更新を行い、その精度の高い更新結果に基づいて後続の杭打ち作業を行うことが可能な杭施工方法が提案されている(例えば、特許文献2参照。)。 In the pile construction method using the above-mentioned construction management device, a boring survey is conducted in advance to determine the position and depth of the supporting layer that will serve as the foundation, but from a cost perspective, it is difficult to conduct this at all locations where piles are to be constructed. Therefore, with the recent development of information technology, a pile construction method has been proposed in which supporting layer data created from a small number of ground survey points is updated by adding supporting layer reach depth information obtained sequentially during pile driving work, and subsequent pile driving work can be performed based on the highly accurate updated results (see, for example, Patent Document 2).

特開2005-213937号公報JP 2005-213937 A 特開2019-100082号公報JP 2019-100082 A

特許文献2に記載された杭施工方法では、大規模な現場であっても地盤調査地点数を極力少なくして地盤調査に要する期間や費用を抑えることができる。しかしながら、地盤の状況は同じ現場でも施工地点によって様々であり、設計で決められた支持層到達深度で施工を行うと、当初予想していなかった地層の変化、例えば支持層が傾斜している状態や、支持層の一部が軟弱地盤中にとどまっている状態などもあり得る。したがって、地盤調査地点数が少なくなれば、それだけ設計で決めた深度と実際の深度との間にギャップが生じてしまう。こうしたギャップを施工結果に基づいて解消していく方法をとる限り、杭打機の運転者は予測できない地盤の状況に応じた運転を強いられることになる。 The pile construction method described in Patent Document 2 can minimize the number of ground investigation points, even at large-scale sites, and thus reduce the time and costs required for ground investigation. However, ground conditions vary from construction point to construction point, even at the same site, and if construction is carried out at the bearing layer reach depth determined by the design, there may be unanticipated changes in the ground layer, such as a state in which the bearing layer is inclined or part of the bearing layer remains in the soft ground. Therefore, the fewer the number of ground investigation points, the more of a gap will be created between the depth determined by the design and the actual depth. As long as a method is used to eliminate such gaps based on the construction results, the operator of the pile driver will be forced to operate in accordance with unpredictable ground conditions.

そこで本発明は、埋設する杭の支持層への到達予測が可能な支援機能を備えた杭打機の表示システムを提供することを目的としている。 The present invention aims to provide a display system for a pile driver equipped with a support function that can predict when a buried pile will reach the supporting layer.

上記目的を達成するため、本発明の杭打機の表示システムは、ベースマシンの前部に作業装置を備えた杭打機に実装され、施工現場における杭の埋設予定位置及びこれに対応する目標深度を設定した施工計画データを記憶する記憶部と、動作制御のための施工管理プログラムを実行する制御部と、該制御部で作成された実施工データを前記目標深度と比較可能な形式で表示画面に表示させるディスプレイとを備えている杭打機の表示システムにおいて、前記実施工データは、深度毎の施工負荷を示す施工負荷情報と、前記施工計画データに含まれる杭番号とを関連付けて前記記憶部に記憶され、前記制御部は、前記作業装置の運転操作を始める運転者の求めに応じて、該運転者が指定した複数の前記杭番号に対応する複数の前記施工負荷情報を前記記憶部から読み出し、該読み出した複数の施工負荷情報から統計的処理により推定施工負荷情報を求めてグラフ表示データを作成し、前記運転操作の間、前記表示画面に前記グラフ表示データを表示させておくことを特徴としている。 In order to achieve the above object, the display system for a pile driver of the present invention is implemented in a pile driver equipped with a working device at the front of a base machine, and is equipped with a memory unit that stores construction plan data that sets the planned buried position of the pile at the construction site and the corresponding target depth, a control unit that executes a construction management program for operation control, and a display that displays the actual construction data created by the control unit on a display screen in a format that can be compared with the target depth. The actual construction data is stored in the memory unit in association with construction load information indicating the construction load for each depth and the pile number included in the construction plan data, and the control unit, in response to a request from a driver who starts operating the working device, reads out from the memory unit a plurality of pieces of construction load information corresponding to a plurality of pile numbers specified by the driver, obtains estimated construction load information by statistical processing from the read out plurality of pieces of construction load information, creates graph display data, and keeps the graph display data displayed on the display screen during the driving operation.

本発明の杭打機の表示システムによれば、施工開始時において、運転者が求める杭番号に対応する施工負荷情報を読み出し、該読み出した施工負荷情報を運転操作の間、表示画面にグラフで表示させておくので、既に施工を終えた隣接杭の負荷情報を手がかりにして、これから想定される施工負荷を運転者に容易に把握できる形で提示することが可能となる。これにより、埋設する杭の支持層への到達予測が立ち、運転者の安心かつ安全な作業に資するものである。 According to the pile driver display system of the present invention, when construction begins, construction load information corresponding to the pile number requested by the operator is read out, and the read out construction load information is displayed in graph form on the display screen while the driver is operating the machine. This makes it possible to present the anticipated construction load to the operator in a form that is easily comprehensible, using the load information of adjacent piles that have already been constructed as a clue. This makes it possible to predict when the pile to be buried will reach the supporting layer, which contributes to the operator's safe and secure work.

本発明の一形態例を示す表示システムが適用される杭打機の側面図である。1 is a side view of a pile driver to which a display system showing one embodiment of the present invention is applied. ディスプレイに表示される杭選択画面を示す図である。FIG. 13 is a diagram showing a pile selection screen displayed on a display. ディスプレイに表示される施工画面における第1の表示を示す図である。FIG. 13 is a diagram showing a first display on the construction screen displayed on the display. 同じく第2の表示を示す図である。FIG. 同じく第3の表示を示す図である。FIG. 同じく第4の表示を示す図である。FIG. 11 shows a fourth display. 同じく第5の表示を示す図である。FIG. 11 shows the fifth display.

図1乃至図7は、本発明を小型の杭打機に適用した一形態例を示すものである。杭打機11は、図1に示すように、クローラを備えた下部走行体12と、該下部走行体12上に旋回可能に設けられた上部旋回体13とで構成されたベースマシン14と、上部旋回体13の前部に起伏可能に設けられたリーダ15と、該リーダ15を後方から支持するリーダ用の起伏シリンダ16とを備えている。また、上部旋回体13の前部には、リーダ15を起伏可能に支持するフロントブラケット17が設けられ、上部旋回体13の前部上方には、配管を支持する配管支持部材18が設けられている。さらに、上部旋回体13の右側部には運転室19が、左側部にはエンジンや油圧ユニットを収納した機器室20がそれぞれ設けられている。 Figures 1 to 7 show an example of the present invention applied to a small pile driver. As shown in Figure 1, the pile driver 11 is equipped with a base machine 14 consisting of a lower running body 12 equipped with crawlers and an upper rotating body 13 rotatably mounted on the lower running body 12, a leader 15 mounted on the front of the upper rotating body 13 so as to be able to rise and fall, and a leader raising and lowering cylinder 16 that supports the leader 15 from the rear. In addition, a front bracket 17 that supports the leader 15 so as to be able to rise and lower is provided on the front of the upper rotating body 13, and a pipe support member 18 that supports the pipes is provided above the front of the upper rotating body 13. In addition, a driver's cab 19 is provided on the right side of the upper rotating body 13, and an equipment room 20 that houses an engine and a hydraulic unit is provided on the left side.

リーダ15は、複数のリーダ部材を互いに着脱可能に連結したもので、上端部にはトップシーブ21が、下端部には下部ガイド22がそれぞれ装着されており、リーダ15の前面には作業装置の一例であるオーガ23が昇降可能に装着されている。オーガ23は、ギヤケース23a内に挿通したドライブロッド24を把持してこれに回転力を付与するもので、具体的には、ドライブロッド24の角軸部をオーガ23の下側に設けられたチャック装置23bに係合させてドライブロッド24の軸方向の移動を規制し、この状態で出力機構をオーガ駆動用油圧モータで駆動させることによってドライブロッド24を回転させる。 The leader 15 is made up of multiple leader members detachably connected to each other, with a top sheave 21 attached to the upper end and a lower guide 22 attached to the lower end, and an auger 23, which is an example of a working device, attached to the front of the leader 15 so that it can be raised and lowered. The auger 23 grips the drive rod 24 inserted into the gear case 23a and applies a rotational force to it. Specifically, the angular shaft of the drive rod 24 is engaged with a chuck device 23b provided on the underside of the auger 23 to restrict the axial movement of the drive rod 24, and in this state the output mechanism is driven by an auger drive hydraulic motor to rotate the drive rod 24.

オーガ23の上下には、リーダ15の下端部に設けられた駆動スプロケット25と、上端部に設けられた従動スプロケット26との間に架け渡された昇降用チェーン27の両端がそれぞれ取り付けられ、チェーン式の昇降装置を構成する。昇降装置は、駆動スプロケット25をオーガ昇降用油圧モータによって駆動し、該駆動スプロケット25と従動スプロケット26とに掛け回された昇降用チェーン27を上下方向に移動させることにより、リーダ15の前面に沿ってオーガ23を昇降させる。 A lifting chain 27 is attached to the top and bottom of the auger 23, with both ends stretching between a drive sprocket 25 at the bottom end of the leader 15 and a driven sprocket 26 at the top end, forming a chain-type lifting device. The lifting device drives the drive sprocket 25 with an auger lifting hydraulic motor, and moves the lifting chain 27, which is stretched around the drive sprocket 25 and driven sprocket 26, in the vertical direction, thereby lifting and lowering the auger 23 along the front of the leader 15.

杭打機11を鋼管杭の埋設を目的として使用する場合には、施工部材に鋼管杭28が使用される。鋼管杭28は、ドライブロッド24の下端に設けられたキャップロッド29を介して連結され、ドライブロッド24を回転させながらオーガ23を下降させることによって地中に圧入される。また、杭打機11を地盤改良を目的として使用する場合には、施工部材に中空ロッド(図示せず)が使用される。中空ロッドは、上端がオーガ23の上方でスイベルと連結されるとともに下端が撹拌ロッドと連結される。この中空ロッドを回転させながら、中空ロッドを通じて撹拌ロッドの先端から噴射したセメントミルクなどの地盤改良剤が地盤内に注入される。 When the pile driver 11 is used for the purpose of burying steel pipe piles, a steel pipe pile 28 is used as the construction member. The steel pipe pile 28 is connected via a cap rod 29 attached to the lower end of the drive rod 24, and is pressed into the ground by lowering the auger 23 while rotating the drive rod 24. When the pile driver 11 is used for the purpose of ground improvement, a hollow rod (not shown) is used as the construction member. The upper end of the hollow rod is connected to a swivel above the auger 23, and the lower end is connected to a stirring rod. While the hollow rod is being rotated, a ground improvement agent such as cement milk is sprayed from the tip of the stirring rod through the hollow rod and injected into the ground.

こうした杭の埋設や地盤改良などの各種工法を行うために、運転室19内には、走行や旋回、オーガ23の昇降・回転駆動などを行う操作レバーや操作ペダル、押しボタンスイッチ、タッチパネル式のディスプレイなどの機器が操作性を考慮して運転席の近傍に集約的に配置されており、さらに、これらの機器や杭打機11の動作検出手段などと電気的に接続された施工管理装置が設置されている。 In order to carry out various construction methods such as burying piles and ground improvement, inside the cab 19, devices such as operating levers and pedals for driving, turning, raising and lowering the auger 23, operating the rotation drive, push button switches, and a touch panel display are concentrated near the driver's seat for ease of use. In addition, a construction management device is installed that is electrically connected to these devices and the pile driver 11's operation detection means.

施工管理装置は、各種工法制御のための施工管理プログラムを実行して、データ処理や判定などの演算処理を行う制御部(CPU)を中心に構成されており、施工管理プログラムを記憶するFLASH ROMや処理中の各種データを一時的に記憶するRAM、さらには、施工現場における杭の埋設予定位置、目標深度などを設定した施工計画データ及び施工管理プログラムの実行により作成された実施工データの各種データを記憶する記憶部(ハードディスク)や、運転者が施工管理プログラムの実行結果を表示画面で確認したり、タッチパネル操作でデータ入力を行ったりする表示装置(ディスプレイ)などを備えている。 The construction management device is composed of a control unit (CPU) that executes construction management programs for controlling various construction methods and performs calculations such as data processing and judgment. It also includes a flash ROM that stores the construction management programs, a RAM that temporarily stores various data during processing, a memory unit (hard disk) that stores various data on the construction plan, such as the planned buried positions and target depths of piles at the construction site, and actual construction data created by executing the construction management program, and a display device (display) that allows the operator to check the results of the execution of the construction management program on a display screen and input data by operating a touch panel.

ここで、オーガ23の動作検出手段を構成する複数のセンサにはトルクセンサや深度センサ、回転センサなどが挙げられる。トルクセンサは、オーガ23に把持された施工部材のトルクを測定するセンサであって、オーガ駆動用油圧モータの油圧回路の供給側と電磁比例弁の油圧回路の二次側とにそれぞれ圧力センサを設け、各圧力センサによってオーガ駆動用油圧モータの作動圧力及び制御圧力を検出している。検出された信号は制御部に伝達され、圧力及びオーガ駆動用油圧モータの容量に基づき、施工負荷として施工トルクが算出される。また、深度センサは、従動スプロケット26の回転角度をエンコーダで検出している。検出された信号は制御部に伝達され、回転角度及びスプロケット径に基づいて深度及び昇降速度が算出される。回転センサは、出力機構の歯車の歯を近接センサで検出し、そのパルス信号をカウントしている。検出された信号は制御部に伝達され、累計カウントに基づいて積算回転数及び回転速度が算出される。 The multiple sensors constituting the operation detection means of the auger 23 include a torque sensor, a depth sensor, and a rotation sensor. The torque sensor is a sensor that measures the torque of the workpiece gripped by the auger 23, and pressure sensors are provided on the supply side of the hydraulic circuit of the auger drive hydraulic motor and the secondary side of the hydraulic circuit of the solenoid proportional valve, respectively, and each pressure sensor detects the operating pressure and control pressure of the auger drive hydraulic motor. The detected signal is transmitted to the control unit, and the construction torque is calculated as the construction load based on the pressure and the capacity of the auger drive hydraulic motor. The depth sensor also detects the rotation angle of the driven sprocket 26 with an encoder. The detected signal is transmitted to the control unit, and the depth and lifting speed are calculated based on the rotation angle and sprocket diameter. The rotation sensor detects the gear teeth of the output mechanism with a proximity sensor and counts the pulse signal. The detected signal is transmitted to the control unit, and the integrated rotation number and rotation speed are calculated based on the cumulative count.

また、施工管理装置は、通信接続によって施工管理プログラムや施工計画データなどをダウンロードすることが可能である。施工計画データは、施工現場におけるボーリング調査(地盤調査の一例)の結果などを踏まえて作成した施工計画書に基づき、あらかじめ事務所内のコンピュータに入力されるもので、杭番号の他、該杭番号に関連付けられた施工順序や、目標深度、フィード速度、回転数、セメントミルク流量などの各種の施工目標値が含まれる。施工計画データの入力作業は、施工図面と対比して杭位置データを入力することによって行われ、具体的には、施工地点(杭の埋設予定位置)を、座標上の原点からの相対的位置(距離)として二次元座標で指定することになる。 The construction management device can also download construction management programs and construction plan data via a communication connection. The construction plan data is input in advance into a computer in the office based on a construction plan created based on the results of a boring survey (an example of a ground survey) at the construction site, and includes pile numbers as well as the construction sequence associated with the pile numbers, and various construction target values such as the target depth, feed speed, rotation speed, and cement milk flow rate. The construction plan data is input by inputting pile position data in comparison with the construction drawings. Specifically, the construction point (the planned location for burying the pile) is specified in two-dimensional coordinates as a relative position (distance) from the origin on the coordinate system.

作成された施工計画データは、施工現場の住所の位置情報や施工する杭打機11の号機情報などが付加されて、ネットワーク上のデータサーバにアップロードされる。また、施工計画データに基づいて実施される工法、例えば既製杭工法のための施工管理プログラムや、該施工管理プログラムの設定パラメータのデータも作成され、同様にして、データサーバにアップロードされる。 The created construction plan data is uploaded to a data server on the network with the addition of location information such as the address of the construction site and the model number of the pile driver 11 that will be used for construction. In addition, a construction management program for the construction method to be implemented based on the construction plan data, such as the prefabricated pile method, and data on the setting parameters of the construction management program are also created and uploaded to the data server in the same manner.

このように構成された施工管理装置は、追加的に組み込まれる制御プログラムを実行させることにより、杭打機11の運転操作、特にオーガ23の運転操作を支援する表示システムを機能させる。以下では、表示システムの具体的な動作について、図2乃至図7に示す表示画面を参照しながら説明する。 The construction management device configured in this manner executes an additionally incorporated control program to function as a display system that supports the operation of the pile driver 11, particularly the operation of the auger 23. The specific operation of the display system will be described below with reference to the display screens shown in Figures 2 to 7.

まず、施工現場において施工管理装置の電源を起動すると、制御部では基本プログラムが実行され、ディスプレイにログイン画面が表示される。ここで、作業者IDによりシステムにログインするとともに、メニュー画面から目的に応じて条件を設定すると、必要な施工管理プログラムや施工計画データなどがダウンロードされ、図2に示すように、ディスプレイには施工計画杭配置画面(杭選択画面)が表示される。 First, when the power supply of the construction management device is turned on at the construction site, the basic program is executed in the control unit, and the login screen is displayed on the display. Here, when the worker logs into the system using his/her worker ID and sets conditions according to the purpose from the menu screen, the necessary construction management program and construction plan data are downloaded, and the construction plan pile placement screen (pile selection screen) is displayed on the display, as shown in Figure 2.

施工計画杭配置画面は、施工現場の全体が表示されるように縮尺が調整された表示画面であって、二次元座標で図形的に表示されている。円形で表された複数の杭表示体Pは施工地点を示し、円の内側の数字(0~22)は施工順序、外側の4桁数字(0000~0022)は杭番号をそれぞれ示している。また、対角上2地点にある円形内部をグレーで塗り潰した杭表示体、つまり杭番号「0000」,「0012」では、既にボーリング調査結果が得られており、この調査結果に基づいて施工計画データが作成されている。すなわち、これら2地点は支持層の位置や深さ、土質などの地盤状況が明らかになっている。 The construction plan pile placement screen is a display screen whose scale has been adjusted so that the entire construction site is displayed graphically in two-dimensional coordinates. Multiple pile display bodies P, represented as circles, indicate construction locations, the numbers inside the circles (0-22) indicate the construction order, and the four-digit numbers on the outside (0000-0022) indicate the pile numbers. In addition, boring survey results have already been obtained for the pile display bodies with grey interiors at two diagonal points, namely pile numbers "0000" and "0012," and construction plan data has been created based on the results of these surveys. In other words, the ground conditions at these two points, such as the position and depth of the supporting layer and soil quality, are known.

ここで、例えば、杭番号「0001」を施工する場合、杭打機11を施工地点(杭芯)に位置合わせした後、タッチパネルの操作で1番の杭表示体Pを選択する。そして、図3に示すように、表示を施工画面に切り替えた状態で、実施工データを作成しながら目標深度に到達するまで計画通りに杭打ち作業が進められる。画面中には、「杭番号」や「目標深度」,「施工トルク」などの各種数値データとともに、縦軸を深度、横軸を施工負荷情報(施工トルクや積分トルクなど)の大きさで示したグラフ表示データとして、二次元座標の折れ線グラフが表示されている。施工負荷情報は、種類毎に定めた色のグラフで波形変化が視覚的に認識され、該波形変化を、例えば土質(砂、礫、粘土)の変化と捉えて地盤の構成をある程度判断することができる。 For example, when constructing pile number "0001", the pile driver 11 is aligned with the construction site (pile core) and the No. 1 pile display body P is selected by operating the touch panel. Then, as shown in FIG. 3, with the display switched to the construction screen, pile driving work proceeds as planned until the target depth is reached while creating actual construction data. On the screen, along with various numerical data such as "pile number", "target depth", and "construction torque", a two-dimensional coordinate line graph is displayed as graph display data showing depth on the vertical axis and the magnitude of construction load information (construction torque, integral torque, etc.) on the horizontal axis. The construction load information is visually recognized as a change in waveform on a graph with a color determined for each type, and the waveform change can be interpreted as a change in soil type (sand, gravel, clay), for example, to determine the composition of the ground to some extent.

作成された実施工データは、オーガ23の運転操作に従って、施工画面に数値やグラフ形式により現在の実施工データとしてリアルタイムに表示され、これと同時に、深度毎の施工負荷を示す施工トルク(施工負荷情報)と、杭番号「0001」とが関連付けられて施工管理装置の記憶部に逐次記憶される。そして施工完了後、隣接する次の杭番号「0002」の地点を施工する場合も同様にして、図2に示されるように杭選択画面からタッチパネルの操作で2番の杭表示体Pを選択し、表示を施工画面に切り替えた状態で運転操作やデータ処理が行われ、画面に表示された目標深度と、前の杭番号「0001」の施工結果とから支持層の位置をある程度予測しながら、目標深度に対して計画通りに杭打ち作業が進められる。 The created construction data is displayed in real time as the current construction data in numerical and graphical form on the construction screen in accordance with the operation of the auger 23, and at the same time, the construction torque (construction load information) indicating the construction load for each depth is associated with the pile number "0001" and sequentially stored in the memory unit of the construction management device. After construction is completed, the same procedure is followed when constructing the adjacent pile number "0002". The pile display body P No. 2 is selected from the pile selection screen by operating the touch panel as shown in Figure 2, and operation and data processing are performed with the display switched to the construction screen. The pile driving work is carried out as planned to the target depth, while the position of the supporting layer is predicted to some extent from the target depth displayed on the screen and the construction result of the previous pile number "0001".

ところで、ボーリング調査地点間で地中内の地盤の構成が均一に変化しているとは限らないので、ボーリング調査地点の数が少なくなれば、それだけ設計時の目標深度と実際の深度との間にギャップが生じやすくなり、こうしたギャップはボーリング調査地点から遠くなるほど顕著になる。この場合、杭打機11の運転者は予測できない地盤の状況に応じた運転を強いられ、万一、途中で杭長の過不足が発生した場合には、作業の中断や管理者への報告など、非定常的な作業に労力を要することとなる。 However, since the composition of the ground underground does not necessarily change uniformly between boring survey points, the fewer the number of boring survey points, the more likely it is that a gap will occur between the target depth at the time of design and the actual depth, and this gap becomes more pronounced the farther away from the boring survey points. In this case, the operator of the pile driver 11 is forced to operate according to unpredictable ground conditions, and in the unlikely event that the pile length is too long or too short during the process, this requires effort in non-routine tasks such as interrupting work and reporting to the manager.

そこで、例えばボーリング調査地点から離れた地点である杭番号「0003」を施工する場合には、施工履歴取得メニューから隣接する前の杭番号「0002」を指定し、この指定状態で3番の杭表示体Pを選択する。このとき、運転者の求めに応じて、制御部では運転者が指定した杭番号「0002」に対応する施工トルク(施工負荷情報)の値を記憶部から読み出し、これを実績施工トルク(実績施工負荷情報)とするグラフ表示データを作成して施工画面に表示させる。この場合、実績施工トルクは、オーガ23の運転操作の間、図4の破線で示す波形変化のように、現在の施工トルクなどと同一の座標軸の折れ線グラフで表示され、終了操作や表示切替え操作が行われるまで画面に表示されている。 For example, when constructing pile number "0003" at a location away from the boring survey location, the adjacent previous pile number "0002" is specified from the construction history acquisition menu, and pile display body P No. 3 is selected in this specified state. At this time, at the request of the driver, the control unit reads out the value of the construction torque (construction load information) corresponding to pile number "0002" specified by the driver from the memory unit, creates graph display data with this as the actual construction torque (actual construction load information), and displays it on the construction screen. In this case, the actual construction torque is displayed as a line graph on the same coordinate axis as the current construction torque, etc., as the waveform change shown by the dashed line in Figure 4 during the operation of the auger 23, and is displayed on the screen until the end operation or display switching operation is performed.

表示された実績施工トルクは、例えば、目標深度8mに対し、その8m付近で値が大きく上昇している(図4)。これにより、運転操作を始める運転者は、深度8m付近から施工トルクが必要になるという見通しが立ち、その負荷を覚悟しながら運転操作を行うことができる。また、運転操作の間は、同一座標軸に現在の施工トルクが重畳的に表示されるので、運転者は実績施工トルクと現在の施工トルクとのグラフの重なり具合を確認しながら、注意深く運転操作を行うことができる。 For example, the displayed actual construction torque increases significantly at around 8m compared to the target depth of 8m (Figure 4). This allows the driver who starts driving to foresee that construction torque will be required from a depth of around 8m, and allows the driver to drive while preparing for that load. In addition, while driving, the current construction torque is displayed superimposed on the same coordinate axis, so the driver can drive carefully while checking the degree of overlap between the graphs of the actual construction torque and the current construction torque.

このように構成された表示システムでは、同一現場における様々な地盤の状況に対応することが可能であり、例えば、表示された実績施工トルクが、図5の破線で示す波形変化のように、目標深度8mに対し5m付近で値が上昇している場合でも、これは硬い中間層の存在に起因したものであると判断することができる。また、図6の破線で示す波形変化のように、目標深度8mに対し、実際は6m付近の深度に支持層がある場合でも、当初の計画よりも浅い深度で打ち止めとする判断が行える。これと反対に、図7の破線で示す波形変化のように、目標深度6mに対し、実際は8m付近の深度に支持層がある場合では、実績施工トルクの表示から、更に2m延長する必要があるという判断が行える。 A display system configured in this way can respond to various ground conditions at the same site. For example, even if the displayed actual construction torque rises at around 5m from the target depth of 8m, as in the waveform change shown by the dashed line in Figure 5, it can be determined that this is due to the presence of a hard intermediate layer. Also, even if the supporting layer is actually at a depth of around 6m from the target depth of 8m, as in the waveform change shown by the dashed line in Figure 6, it can be determined that the drilling should be stopped at a depth shallower than the original plan. Conversely, if the supporting layer is actually at a depth of around 8m from the target depth of 6m, as in the waveform change shown by the dashed line in Figure 7, it can be determined that it is necessary to extend the drilling depth by another 2m from the display of the actual construction torque.

後続の施工地点についても同様に施工を行っていくと、これに連れて読み出しが可能な杭番号の数も多くなってくる。そこで、表示システムでは、複数の施工地点における施工結果に基づいて、現在の施工地点における必要な施工トルクを推定し、これをグラフ表示することが可能になっている。例えば、施工現場の中心部に位置する杭番号「0021」を施工する場合、施工履歴取得メニューから複数の杭番号「0018」,「0019」,「0020」を指定し、この指定状態で9番の杭表示体Pを選択する。 As construction work is carried out at subsequent construction sites in the same way, the number of pile numbers that can be read out increases accordingly. Therefore, the display system is capable of estimating the construction torque required at the current construction site based on the construction results at multiple construction sites, and displaying this in a graph. For example, when constructing pile number "0021" located in the center of the construction site, multiple pile numbers "0018", "0019", and "0020" are specified from the construction history acquisition menu, and pile display body P number 9 is selected in this specified state.

このとき、運転者の求めに応じて、制御部では運転者が指定した複数の杭番号「0018」,「0019」,「0020」にそれぞれ対応する複数の施工トルク(施工負荷情報)の値を記憶部から読み出し、これらの実績施工トルク(実績施工負荷情報)から統計的処理により推定施工トルク(推定施工負荷情報)を求める。統計的処理では、平均、最小二乗法などを適用して複数の値から一つの代表値を推定するための処理が行われ、特に現在の施工地点と参照する複数の施工地点との位置関係(距離)を考慮してもよい。これにより、例えば各地点で得た施工結果から施工現場における支持層の傾斜や起伏を読み取り、これに基づいて精度の高い推定施工負荷情報が求められる。統計的処理で求めた推定施工トルクの値はグラフ表示データとして作成され、図4などの破線で示す波形変化と同様の形式(折れ線グラフ)で表示される。 At this time, in response to the request of the driver, the control unit reads out from the memory unit the values of multiple construction torques (construction load information) corresponding to the multiple pile numbers "0018", "0019", and "0020" designated by the driver, and calculates the estimated construction torque (estimated construction load information) from these actual construction torques (actual construction load information) by statistical processing. In the statistical processing, a process is performed to estimate one representative value from multiple values by applying the average, least squares method, etc., and in particular, the positional relationship (distance) between the current construction point and the multiple reference construction points may be taken into consideration. In this way, for example, the inclination and undulation of the supporting layer at the construction site can be read from the construction results obtained at each point, and highly accurate estimated construction load information can be calculated based on this. The estimated construction torque value calculated by statistical processing is created as graph display data and displayed in the same format (line graph) as the waveform changes shown by the dashed lines in Figure 4, etc.

このように、本発明の杭打機11の表示システムによれば、施工開始時において、運転者が求める杭番号に対応する施工負荷情報を読み出し、該読み出した施工負荷情報を運転操作の間、表示画面にグラフで表示させておくので、既に施工を終えた隣接杭の負荷情報を手がかりにして、これから想定される施工負荷を運転者に容易に把握できる形で提示することが可能となる。これにより、埋設する杭の支持層への到達予測が立ち、運転者の安心かつ安全な作業に資するものである。 In this way, the display system of the pile driver 11 of the present invention reads out the construction load information corresponding to the pile number requested by the operator at the start of construction, and the read-out construction load information is displayed in a graph on the display screen while the driver is operating the machine. This makes it possible to present the expected construction load to the driver in a form that is easy to understand, using the load information of adjacent piles that have already been constructed as a clue. This makes it possible to predict when the pile to be buried will reach the supporting layer, contributing to the driver's safe and secure work.

また、杭打機11の運転者が交代した場合でも、途中から運転を引き継いだ者は、表示画面から得た指標である既設杭の施工負荷情報に基づいて必要な運転操作や措置を講じることが可能となる。こうした杭打機11の運転支援機能により、安全で効率的な杭施工方法が達成されるとともに、従来からの経験や勘に頼る不安定な運転操作、すなわち、作業装置などの故障の原因をなくして杭打機11の長寿命化にも寄与するものである。 In addition, even if the operator of the pile driver 11 is replaced, the person who takes over operation midway can take the necessary driving operations and measures based on the construction load information of the existing piles, which is an indicator obtained from the display screen. This driving support function of the pile driver 11 not only achieves a safe and efficient pile construction method, but also contributes to extending the life of the pile driver 11 by eliminating the unstable driving operations that have traditionally relied on experience and intuition, i.e., causes of breakdowns in the working equipment, etc.

さらに、グラフ表示データが複数の施工負荷情報から統計的処理により求めた推定施工負荷情報を用いて作成されるので、規模が大きい施工現場であっても施工の進捗に連れて精度の高い支持層到達予測が立ち、杭打機11を使用した杭施工方法をより効率的に達成することができる。とりわけ、施工管理装置については、ハード的な変更はほとんど不要であって、ソフト的な変更を行うだけで済むことから、既存の施工管理システムへの適用が容易となる。この場合、複数台の杭打機11で作成した実施工データを相互に共有するなど、データ活用の促進につなげることができる。 Furthermore, since the graph display data is created using estimated construction load information obtained by statistical processing of multiple pieces of construction load information, highly accurate predictions of when the load will reach the supporting layer can be made as construction progresses, even at large-scale construction sites, and the pile construction method using the pile driver 11 can be achieved more efficiently. In particular, since almost no hardware changes are required for the construction management device, and only software changes are required, it can be easily applied to existing construction management systems. In this case, it is possible to promote data utilization, such as by sharing construction data created by multiple pile drivers 11 with each other.

なお、本発明は、前記形態例に限定されるものではなく、表示される施工負荷情報には施工トルクや積分トルクの他、電流値や積分電流値などの各種データが含まれる。また、表示システムの画面構成は、あくまで一例であり、数値データやグラフ表示データを複数の杭番号から個別に作成してもよく、表示領域を様々な観点から分割したり、まとめて一つの領域として構成したりすることができる。さらに、杭番号の指定や各種処理などは、例えば、杭打機にGPS機能を搭載して、これにより得た位置情報に基づいて行うなどの自動化を図ってもよい。加えて、実施例では、小型杭打機を例に挙げて説明したが、これに限定されるものではなく、3点式杭打機のような大型杭打機にも適用することができる。この場合、電動駆動される作業装置の電気的負荷抵抗に基づいて施工負荷情報を取得することができる。 The present invention is not limited to the above-mentioned embodiment, and the displayed construction load information includes various data such as construction torque, integral torque, current value, and integral current value. The screen configuration of the display system is merely an example, and numerical data and graph display data may be created individually from multiple pile numbers, and the display area may be divided from various viewpoints or configured as one area. Furthermore, the pile number designation and various processing may be automated, for example, by equipping the pile driver with a GPS function and performing them based on the position information obtained by the GPS. In addition, although the embodiment has been described using a small pile driver as an example, the present invention is not limited to this, and can also be applied to large pile drivers such as three-point pile drivers. In this case, construction load information can be obtained based on the electrical load resistance of the electrically driven working device.

11…杭打機、12…下部走行体、13…上部旋回体、14…ベースマシン、15…リーダ、16…起伏シリンダ、17…フロントブラケット、18…配管支持部材、19…運転室、20…機器室、21…トップシーブ、22…下部ガイド、23…オーガ、23a…ギヤケース、23b…チャック装置、24…ドライブロッド、25…駆動スプロケット、26…従動スプロケット、27…昇降用チェーン、28…鋼管杭、29…キャップロッド 11...pile driver, 12...lower running body, 13...upper rotating body, 14...base machine, 15...leader, 16...drilling cylinder, 17...front bracket, 18...pipe support member, 19...operator's cab, 20...equipment room, 21...top sheave, 22...lower guide, 23...auger, 23a...gear case, 23b...chuck device, 24...drive rod, 25...driving sprocket, 26...driven sprocket, 27...lifting chain, 28...steel pipe pile, 29...cap rod

Claims (1)

ベースマシンの前部に作業装置を備えた杭打機に実装され、施工現場における杭の埋設予定位置及びこれに対応する目標深度を設定した施工計画データを記憶する記憶部と、動作制御のための施工管理プログラムを実行する制御部と、該制御部で作成された実施工データを前記目標深度と比較可能な形式で表示画面に表示させるディスプレイとを備えている杭打機の表示システムにおいて、
前記実施工データは、深度毎の施工負荷を示す施工負荷情報と、前記施工計画データに含まれる杭番号とを関連付けて前記記憶部に記憶され、
前記制御部は、前記作業装置の運転操作を始める運転者の求めに応じて、該運転者が指定した複数の前記杭番号に対応する複数の前記施工負荷情報を前記記憶部から読み出し、該読み出した複数の施工負荷情報から統計的処理により推定施工負荷情報を求めてグラフ表示データを作成し、前記運転操作の間、前記表示画面に前記グラフ表示データを表示させておくことを特徴とする杭打機の表示システム。
A display system for a pile driver is provided on a base machine equipped with a work device at the front thereof, the display system including a memory unit for storing construction plan data that sets the planned buried positions of piles at a construction site and the corresponding target depths, a control unit for executing a construction management program for controlling the operation of the pile driver, and a display for displaying on a display screen the actual construction data created by the control unit in a format that can be compared with the target depths.
The execution construction data is stored in the storage unit in association with construction load information indicating the construction load for each depth and the pile number included in the construction plan data,
The control unit, in response to a request from a driver who begins operating the work equipment, reads out from the memory unit a number of pieces of construction load information corresponding to a number of pile numbers specified by the driver, obtains estimated construction load information from the read out number of pieces of construction load information by statistical processing, creates graph display data, and displays the graph display data on the display screen during the operation of the pile driver.
JP2020188027A 2020-11-11 2020-11-11 Pile driver display system Active JP7526078B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020188027A JP7526078B2 (en) 2020-11-11 2020-11-11 Pile driver display system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020188027A JP7526078B2 (en) 2020-11-11 2020-11-11 Pile driver display system

Publications (2)

Publication Number Publication Date
JP2022077258A JP2022077258A (en) 2022-05-23
JP7526078B2 true JP7526078B2 (en) 2024-07-31

Family

ID=81654192

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020188027A Active JP7526078B2 (en) 2020-11-11 2020-11-11 Pile driver display system

Country Status (1)

Country Link
JP (1) JP7526078B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4343066A1 (en) * 2022-09-23 2024-03-27 BAUER Maschinen GmbH Civil engineering machine and method for constructing a foundation in the ground
EP4350077A1 (en) * 2022-10-06 2024-04-10 BAUER Maschinen GmbH Civil engineering machine and method for operating a civil engineering machine
JP7401944B1 (en) * 2023-02-01 2023-12-20 日邦電機株式会社 Pile construction information recording system and program

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3647445B1 (en) 2004-04-22 2005-05-11 積水ハウス株式会社 Pile construction management device
JP2007085137A (en) 2005-09-26 2007-04-05 Alive:Kk Ground improvement work evaluation device
US20160108598A1 (en) 2014-10-21 2016-04-21 Terracon Pile design optimization
JP2017190579A (en) 2016-04-12 2017-10-19 日本車輌製造株式会社 Construction method of pile driver
JP2018112011A (en) 2017-01-12 2018-07-19 株式会社大林組 Support layer arrival determination method and determination assist system
JP2018112010A (en) 2017-01-12 2018-07-19 株式会社大林組 Support layer arrival determination method and determination assist system
JP2019100082A (en) 2017-12-01 2019-06-24 株式会社竹中工務店 Pile construction method and pile construction management system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3647445B1 (en) 2004-04-22 2005-05-11 積水ハウス株式会社 Pile construction management device
JP2007085137A (en) 2005-09-26 2007-04-05 Alive:Kk Ground improvement work evaluation device
US20160108598A1 (en) 2014-10-21 2016-04-21 Terracon Pile design optimization
JP2017190579A (en) 2016-04-12 2017-10-19 日本車輌製造株式会社 Construction method of pile driver
JP2018112011A (en) 2017-01-12 2018-07-19 株式会社大林組 Support layer arrival determination method and determination assist system
JP2018112010A (en) 2017-01-12 2018-07-19 株式会社大林組 Support layer arrival determination method and determination assist system
JP2019100082A (en) 2017-12-01 2019-06-24 株式会社竹中工務店 Pile construction method and pile construction management system

Also Published As

Publication number Publication date
JP2022077258A (en) 2022-05-23

Similar Documents

Publication Publication Date Title
JP7526078B2 (en) Pile driver display system
US7079931B2 (en) Positioning system for an excavating work machine
CN108713084B (en) Construction machine
EP2468960B1 (en) Ground drilling method and apparatus.
JP7079896B2 (en) Construction machine with learning function
CN109837942B (en) Controlling an earth moving machine
CN101790613A (en) Trencher with auto-plunge and boom depth control
JP2011043002A (en) Excavation support device
JP5074293B2 (en) Construction quality control system for ground improvement
JP7388972B2 (en) Pile driver display system
JP3647445B1 (en) Pile construction management device
JP6763655B2 (en) Ground improvement system and ground improvement method
JP7107771B2 (en) Working machines and systems containing working machines
JP2017203739A (en) Evaluation method and system of trafficability
JP4954166B2 (en) Control system for stirring and mixing equipment
JP7266371B2 (en) Working machines and systems containing working machines
JP7266372B2 (en) Working machines and systems containing working machines
JP3755086B2 (en) Automatic control method of ground improvement processing machine equipped with wire type excavation accuracy control device
JP2018150760A (en) Earth drill machine
JP2024064320A (en) Control system for pile driver
US20240102375A1 (en) Civil engineering machine and method for creating a foundation in the ground
JP2016223201A (en) Operation support device of working machine
JP4459272B2 (en) Ground agitator management system
RU2791628C1 (en) Telescopic loader with control system
CN115387426B (en) Control method, device and equipment of working machine and working machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231002

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240604

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240702

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240716

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20240719

R150 Certificate of patent or registration of utility model

Ref document number: 7526078

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150