JP6464069B2 - Templates, template sets and reinforcement methods - Google Patents

Templates, template sets and reinforcement methods Download PDF

Info

Publication number
JP6464069B2
JP6464069B2 JP2015189140A JP2015189140A JP6464069B2 JP 6464069 B2 JP6464069 B2 JP 6464069B2 JP 2015189140 A JP2015189140 A JP 2015189140A JP 2015189140 A JP2015189140 A JP 2015189140A JP 6464069 B2 JP6464069 B2 JP 6464069B2
Authority
JP
Japan
Prior art keywords
template
opening
plane
hole
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015189140A
Other languages
Japanese (ja)
Other versions
JP2017066591A (en
Inventor
修啓 松川
修啓 松川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2015189140A priority Critical patent/JP6464069B2/en
Publication of JP2017066591A publication Critical patent/JP2017066591A/en
Application granted granted Critical
Publication of JP6464069B2 publication Critical patent/JP6464069B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、配筋に用いるテンプレート、テンプレートセットおよびこれを用いた配筋方法に関する。   The present invention relates to a template used for bar arrangement, a template set, and a bar arrangement method using the same.

構造物を構築する際の工期短縮や工費削減を図るため、柱や梁等をプレキャストコンクリート部材(以下、PCa部材という)として工場であらかじめ製造し、建設現場に搬送して接合・組立を行う方法が用いられている。   In order to shorten the work period and reduce the construction cost when constructing a structure, pillars and beams are pre-manufactured as precast concrete members (hereinafter referred to as PCa members) at the factory and transported to the construction site for joining and assembly Is used.

PCa部材の接合は、例えばPCa部材から突出した鉄筋と接合対象の部材の鉄筋をスリーブによって接続することで行われるが、このような方法ではこれらの鉄筋同士の位置合わせが重要である。例えばPCa部材による柱を、現場打ちコンクリートの基礎梁と接合する場合、現場打ちコンクリートの基礎梁の鉄筋(柱主筋)を如何にして固定し、配置精度を確保するのかが重要になる。加えて、工期短縮を更に図るため、基礎梁を地組してユニット化し吊り込んで設置する配筋方法を行う場合があるが、その場合、配筋手順にあった固定方法としなくてはならない。   The PCa member is joined by, for example, connecting a reinforcing bar protruding from the PCa member and a reinforcing bar of a member to be joined by a sleeve. In such a method, the alignment of these reinforcing bars is important. For example, when a column made of a PCa member is joined to a foundation beam of a cast-in-place concrete, it is important how to fix the reinforcing bars (column main bars) of the foundation beam of the cast-in-place concrete and secure the placement accuracy. In addition, in order to further shorten the construction period, there is a case where a bar arrangement method is used in which the foundation beam is grounded and united and suspended, but in that case, it must be fixed according to the bar arrangement procedure. .

このような接続用の鉄筋(柱主筋)の配置精度を向上させる方法としては、当該鉄筋を単管やアングル材で組んだ櫓に固定して配置した後、基礎梁の梁主筋等の他の鉄筋を配筋する方法がある。一方、他の鉄筋を先にセットしておき、後から接続用の鉄筋を配置して後施工のアングルフレームやテンプレートにより固定する方法もある。特許文献1には鉄筋の固定に用いるテンプレートの例が記載されている。   As a method of improving the placement accuracy of such connecting reinforcing bars (column main reinforcing bars), the reinforcing bars are fixedly placed on a rod made of a single pipe or an angle member, and then the other reinforcing bars such as the main reinforcing bars of the foundation beam are used. There is a way to rebar. On the other hand, there is also a method in which other reinforcing bars are set first, connecting reinforcing bars are arranged later, and are fixed by an angle frame or a template for subsequent construction. Patent Document 1 describes an example of a template used for fixing a reinforcing bar.

実開平3-130855号公報Japanese Utility Model Publication No. 3-130855

前者の方法では、櫓などが邪魔になって後施工の鉄筋が配筋しづらくなるという欠点がある。例えば地組した基礎梁鉄筋を設置する際に先に配置した櫓や鉄筋が邪魔になり設置自体が出来ない。後者の方法では上記のような問題が改善されるが、例えばテンプレートを用いて接続用の鉄筋を固定する場合には、外側の鉄筋の位置を先に固定した後では内側の鉄筋の固定が難しくなるなど作業性が悪くなり、固定に必要な反力を簡単には取れないという欠点もある。よって後者の場合、接続用の鉄筋の配置精度を確保することが難しい。   In the former method, there is a drawback in that it is difficult to arrange the reinforcing bars in the post-construction due to hindrances and the like. For example, when installing a grounded foundation beam reinforcing bar, the anchors and reinforcing bars previously placed interfere with each other and the installation itself cannot be performed. In the latter method, the above problems are improved. For example, when fixing a reinforcing bar for connection using a template, it is difficult to fix the inner reinforcing bar after fixing the position of the outer reinforcing bar first. The workability becomes worse, and the reaction force necessary for fixing cannot be easily obtained. Therefore, in the latter case, it is difficult to ensure the placement accuracy of the connecting reinforcing bars.

本発明は上記の問題に鑑みてなされたものであり、配筋時の作業性等を向上可能なテンプレート等を提供し、それらによる簡易な固定方法を実現することを目的とする。   The present invention has been made in view of the above problems, and it is an object of the present invention to provide a template or the like that can improve workability during bar arrangement and to realize a simple fixing method using them.

前述した目的を達成するための第1の発明は、鉄筋の配置に用いるテンプレートであって、板材の平面の内側と外側に前記鉄筋を挿入するための開口が形成され、少なくとも内側の前記開口に、前記板材の平面から突出する管体が設けられ、内側の前記開口の開口端である前記管体の突出端が、外側の前記開口の、前記管体の突出端と同じ側にある開口端よりも、前記板材の平面から離れた位置にあることを特徴とするテンプレートである。   1st invention for achieving the objective mentioned above is a template used for arrangement | positioning of a reinforcement, Comprising: The opening for inserting the said reinforcement is formed in the inner side and the outer side of the plane of a board | plate material, At least in the said opening of an inner side A tube projecting from the plane of the plate material is provided, and the projecting end of the tube serving as the opening end of the inner opening is on the same side of the outer opening as the projecting end of the tube Rather, the template is located at a position far from the plane of the plate.

前記テンプレートでは、外側の前記開口に、前記板材の平面から突出する管体が設けられ、内側と外側の前記開口に設けられた管体は、前記板材の平面に対し同じ側に突出し、内側の前記管体の突出端が、外側の前記開口の開口端である外側の前記管体の突出端よりも、前記板材の平面から離れた位置にあることが望ましい。
また、前記テンプレートはコンクリートの打設に用いる孔を有することが望ましい。
また、前記テンプレートは前記テンプレートの固定に用いる固定具を取付けるための取付部を有することが望ましい。
In the template, a tube projecting from the plane of the plate material is provided in the opening on the outside, and the tube provided in the opening on the inside and the outside projects on the same side with respect to the plane of the plate material, It is desirable that the protruding end of the tubular body is located farther from the plane of the plate member than the protruding end of the outer tubular body that is the opening end of the outer opening.
The template preferably has a hole used for placing concrete.
Moreover, it is desirable that the template has an attachment portion for attaching a fixture used for fixing the template.

第2の発明は、鉄筋の配置に用いる一対のテンプレートによるテンプレートセットであって、一方のテンプレートは、第1の発明のテンプレートであり、前記一方のテンプレートの開口は前記鉄筋の一端を挿入するために用いられ、他方のテンプレートは、間隔を空けて配置された一対の板材を有し、一方の前記板材の平面の内側と外側に前記鉄筋の他端を挿入するための開口が形成されることを特徴とするテンプレートセットである。   2nd invention is a template set by a pair of template used for arrangement | positioning of a reinforcing bar, Comprising: One template is a template of 1st invention, The opening of said one template inserts one end of the said reinforcing bar The other template has a pair of plates arranged at intervals, and an opening for inserting the other end of the reinforcing bar is formed inside and outside the plane of the one plate. Is a template set characterized by

一方の前記板材の平面に、コンクリート打設用の孔が設けられることが望ましい。
また他方の前記板材の平面に、コンクリート打設用の孔が設けられ、平面において、一方の前記板材の前記孔が、他方の前記板材の前記孔を包含していることも望ましい。
It is desirable that a hole for placing concrete is provided in the plane of one of the plate members.
It is also desirable that a hole for placing concrete is provided in the plane of the other plate member, and the hole of one plate member includes the hole of the other plate member in the plane.

第3の発明は、内側と外側に鉄筋を配置する工程(a)と、第1の発明に記載のテンプレートを移動させ、前記テンプレートの内側の前記開口に設けた前記管体の突出端から内側の前記鉄筋の一端を挿入した後、外側の前記開口に外側の前記鉄筋の一端を挿入する工程(b)と、を具備することを特徴とする配筋方法である。   The third invention is a step (a) in which reinforcing bars are arranged inside and outside, and the template according to the first invention is moved to the inside from the protruding end of the tubular body provided in the opening inside the template. And (b) inserting one end of the outer reinforcing bar into the outer opening after inserting one end of the reinforcing bar.

前記テンプレートの取付部に固定具を取付け、前記固定具により前記テンプレートを周囲のフレームに対し固定する工程(c)を有することが望ましい。
また、前記工程(a)において、間隔を空けて配置された一対の板材を有し、一方の前記板材の平面の内側と外側に前記鉄筋の他端を挿入するための開口が形成された別のテンプレートを用い、内側と外側の前記鉄筋の他端を前記別のテンプレートの内側および外側の開口に挿入して配置することも望ましい。
ここで、一方の前記板材の平面に、コンクリート打設用の孔が設けられることが望ましい。
また他方の前記板材の平面に、コンクリート打設用の孔が設けられ、平面において、一方の前記板材の前記孔が、他方の前記板材の前記孔を包含していることも望ましい。
It is desirable to include a step (c) of attaching a fixture to the template attachment portion and fixing the template to a surrounding frame with the fixture.
Further, in the step (a), there is a pair of plate members arranged at intervals, and an opening for inserting the other end of the reinforcing bar is formed inside and outside the plane of the one plate member. It is also desirable that the other end of the inner and outer reinforcing bars be inserted into the inner and outer openings of the other template.
Here, it is desirable that a hole for placing concrete is provided in the plane of one of the plate members.
It is also desirable that a hole for placing concrete is provided in the plane of the other plate member, and the hole of one plate member includes the hole of the other plate member in the plane.

第1の発明のテンプレートを用い、内側の鉄筋から外側の鉄筋へと順次その上端をテンプレートの開口に挿入することにより、鉄筋の位置決めを容易に行うことができる。例えば、外側の鉄筋の位置決めを行った後その内側に手を挿し込んで鉄筋の位置決めを行うといったことがなく、また管体に挿入済みの内側の鉄筋がガイドとなり、テンプレートを移動させてその他の開口に鉄筋を挿入する作業が楽になるので、一度に全ての鉄筋をテンプレートの開口に挿入する場合と比べて作業性は格段に向上する。テンプレートは簡易な構成で軽量であり、またテンプレートによる位置決めを行うことで鉄筋の配置精度も充分に確保できる。   By using the template of the first invention and sequentially inserting the upper end of the reinforcing bar from the inner reinforcing bar to the outer reinforcing bar into the opening of the template, the reinforcing bar can be positioned easily. For example, after positioning the outer reinforcing bar, do not insert the hand inside it to position the reinforcing bar, and the inner reinforcing bar already inserted into the tube serves as a guide, and the template is moved to Since the work of inserting the reinforcing bars into the openings becomes easier, the workability is remarkably improved as compared with the case where all the reinforcing bars are inserted into the openings of the template at one time. The template is simple and lightweight, and the positioning accuracy of the reinforcing bars can be sufficiently secured by positioning with the template.

また、第1の発明のテンプレートでは、内外の開口に管体を設けることで、その突出長さの違いにより施工特性に応じて鉄筋の挿入作業を段階的に分けることができる。さらに、テンプレートの中央部に孔を設けることで、テンプレートの上からコンクリートの打設を好適に行うことができる。加えて、テンプレートに固定具の取付用の孔を設けることで、レバーホイスト等の固定具を用いてテンプレートを周囲の架台等に固定することができる。テンプレートや架台は、コンクリートの打設後に撤去して転用することができ、無駄がない。   Moreover, in the template of 1st invention, the insertion operation of a reinforcing bar can be divided in steps according to a construction characteristic by providing a tubular body in the opening inside and outside according to the difference in the projection length. Furthermore, by providing a hole in the center of the template, it is possible to suitably place concrete from above the template. In addition, by providing a hole for attaching a fixing tool to the template, the template can be fixed to a surrounding frame or the like using a fixing tool such as a lever hoist. Templates and mounts can be removed and reused after placing concrete, so there is no waste.

また、間隔を空けて配置した上下の板材から成る別のテンプレートを併用し、鉄筋の両端の位置決めを行うことで、鉄筋の配置精度がさらに向上する。また、このテンプレート自体をスペーサとして機能させ、当該テンプレート上に配筋した基礎梁の梁主筋等の他の鉄筋のかぶりを確保することもできる。加えて、上下の板材の孔を用いてコンクリートの打設を好適に行うことができ、これらの孔が包含関係になっていることで、コンクリートが回り込みやすくなる。   Moreover, the positioning accuracy of the reinforcing bars is further improved by using another template made of upper and lower plate members arranged at intervals and positioning both ends of the reinforcing bars. Moreover, this template itself can be made to function as a spacer, and the cover of other reinforcing bars, such as the beam main reinforcement of the foundation beam arranged on the said template, can also be ensured. In addition, it is possible to suitably place the concrete using the holes of the upper and lower plate members, and the concrete is easy to go around because these holes are in an inclusion relationship.

これらのテンプレートを用いて前述のように配筋を行うことで鉄筋の配置精度が充分に確保でき、且つ、従来の方法で同程度の配置精度を確保する場合に比べ、大幅に工程を短縮し、工費を削減することができる。   By using these templates to place the bars as described above, the placement accuracy of the reinforcing bars can be sufficiently secured, and the process can be greatly shortened compared to the case where the same placement accuracy is ensured by the conventional method. , Can reduce the construction cost.

本発明によれば、配筋時の作業性等を向上可能なテンプレート等を提供し、それらによる簡易な固定方法を実現することができる。   According to the present invention, it is possible to provide a template or the like that can improve workability at the time of bar arrangement, and to realize a simple fixing method using them.

上部テンプレート1の概要を示す図The figure which shows the outline of upper template 1 上部テンプレート1の斜視図Perspective view of upper template 1 下部テンプレート15の概要を示す図The figure which shows the outline | summary of the lower template 15 下部テンプレート15の斜視図Perspective view of the lower template 15 配筋方法を示す図Diagram showing the bar arrangement method 配筋方法を示す図Diagram showing the bar arrangement method 配筋方法を示す図Diagram showing the bar arrangement method 配筋方法を示す図Diagram showing the bar arrangement method コンクリート41の打設について示す図Diagram showing the placement of concrete 41

以下、図面に基づいて本発明の好適な実施形態について詳細に説明する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

(1.テンプレート)
まず、本発明の実施形態に係るテンプレートについて図1〜図4を参照して説明する。本実施形態では以下説明する一対のテンプレート(上部テンプレートと下部テンプレート)によるテンプレートセットを用い、基礎梁の配筋を行う。その方法については後述する。
(1. Template)
First, a template according to an embodiment of the present invention will be described with reference to FIGS. In the present embodiment, a base beam is arranged using a template set of a pair of templates (upper template and lower template) described below. The method will be described later.

図1は上部テンプレート1の概要を示す図である。図1(a)は上部テンプレート1の上面図、図1(b)は図1(a)の線A−Aによる上部テンプレート1の断面図である。また図2は上部テンプレート1の斜視図であり、下面を上にして見たものである。   FIG. 1 is a diagram showing an outline of the upper template 1. FIG. 1A is a top view of the upper template 1, and FIG. 1B is a cross-sectional view of the upper template 1 taken along line AA in FIG. FIG. 2 is a perspective view of the upper template 1 as viewed from the bottom side.

上部テンプレート1は鋼板3、鞘管7等から構成される。鋼板3は外周が略矩形(正方形)状となる板材であり、中央部にコンクリートを打設するための孔9が形成される。孔9は略正方形状であるがこれに限ることはなく、略円形としてもよい。また鋼板3の四隅には、上部テンプレート1を固定するための固定具の取付に用いる孔11(取付部)が形成される。なお、鋼板3の外周部に上部テンプレート1の運搬用の持ち手(不図示)を設けることも可能である。   The upper template 1 is composed of a steel plate 3, a sheath tube 7, and the like. The steel plate 3 is a plate material having a substantially rectangular (square) outer periphery, and a hole 9 for placing concrete in the center is formed. The hole 9 has a substantially square shape, but is not limited thereto, and may have a substantially circular shape. Further, holes 11 (attachment portions) used for attaching a fixture for fixing the upper template 1 are formed at the four corners of the steel plate 3. It is also possible to provide a handle (not shown) for carrying the upper template 1 on the outer periphery of the steel plate 3.

孔9の周囲には複数の開口5が形成される。開口5は鉄筋を挿入するためのものであり、開口5a〜5cからなる。開口5aは平面において内側にあり、開口5b、5cはそれよりも外側に形成される。   A plurality of openings 5 are formed around the hole 9. The opening 5 is for inserting a reinforcing bar and includes openings 5a to 5c. The opening 5a is on the inner side in the plane, and the openings 5b and 5c are formed on the outer side.

各開口5a〜5cには、鋼板3の平面に対して同じ側(下面側)に突出する管体である鞘管7(7a〜7c)が設けられる。鞘管7a〜7cは溶接等によって開口5a〜5cの内周面に取付けられる。   Each opening 5 a to 5 c is provided with a sheath tube 7 (7 a to 7 c) that is a tubular body that protrudes on the same side (lower surface side) with respect to the plane of the steel plate 3. The sheath pipes 7a to 7c are attached to the inner peripheral surfaces of the openings 5a to 5c by welding or the like.

各鞘管7a〜7cが鋼板3の平面から突出する長さは内側へ行くほど長くなっている。すなわち、内側の鞘管7aの突出長さは外側の鞘管7b、7cより長く、鞘管7aの突出端(開口5aの開口端)は鞘管7b、7cの突出端(開口5b、5cの開口端)より下方にあり、鋼板3の平面からより離れた位置にある。   The length in which each sheath tube 7a-7c protrudes from the plane of the steel plate 3 becomes longer as it goes inward. That is, the protruding length of the inner sheath tube 7a is longer than that of the outer sheath tubes 7b and 7c, and the protruding end of the sheath tube 7a (the opening end of the opening 5a) is the protruding end of the sheath tubes 7b and 7c (the openings 5b and 5c). It is below the opening end) and is further away from the plane of the steel plate 3.

なお、図2に示すように、鞘管7b、7cを比較した場合には、鞘管7bの突出長さの方が鞘管7cより長く、鞘管7bの突出端は、鞘管7cの突出端よりも鋼板3の平面から離れた位置にある。   As shown in FIG. 2, when the sheath tubes 7b and 7c are compared, the projecting length of the sheath tube 7b is longer than that of the sheath tube 7c, and the projecting end of the sheath tube 7b is the projecting end of the sheath tube 7c. It is in a position farther from the plane of the steel plate 3 than the end.

図3は下部テンプレート15の概要を示す図である。図3(a)は下部テンプレート15の上面図、図3(b)は図3(a)の線B−Bによる断面図である。また図4は下部テンプレート15の斜視図であり、上面を上にして見たものである。   FIG. 3 is a diagram showing an outline of the lower template 15. 3A is a top view of the lower template 15, and FIG. 3B is a cross-sectional view taken along line BB in FIG. 3A. FIG. 4 is a perspective view of the lower template 15 as viewed from the top.

下部テンプレート15は、上部鋼板17と下部鋼板19を間隔保持材21によって間隔を空けて配置して構成される。上部鋼板17と下部鋼板19は、外周が略矩形(正方形)状となる板材であり、四辺の中央部および四隅同士が間隔保持材21で接続され一体化される。間隔保持材21としてはチャンネル材が用いられるが、これに限ることはない。   The lower template 15 is configured by arranging an upper steel plate 17 and a lower steel plate 19 with a spacing member 21 spaced from each other. The upper steel plate 17 and the lower steel plate 19 are plate materials having an outer periphery that is substantially rectangular (square), and the central portions and four corners of the four sides are connected and integrated by a spacing member 21. A channel material is used as the spacing member 21, but is not limited thereto.

上部鋼板17では、中央部にコンクリート打設用の孔25が形成され、その周囲に鉄筋を挿入するための複数の開口23が形成される。開口23は開口23a〜23cからなり、それぞれ上部テンプレート1の開口5a〜5cの位置に対応する。開口23aは平面において内側にあり、開口23b、23cはそれよりも外側に形成される。   In the upper steel plate 17, a concrete placing hole 25 is formed at the center, and a plurality of openings 23 for inserting reinforcing bars are formed around the hole 25. The opening 23 includes openings 23 a to 23 c and corresponds to the positions of the openings 5 a to 5 c of the upper template 1, respectively. The opening 23a is on the inner side in the plane, and the openings 23b and 23c are formed on the outer side.

下部鋼板19の中央部にはコンクリート打設用の孔27が形成される。上部鋼板17の孔25と下部鋼板19の孔27は、平面において孔25が孔27を包含する位置関係にある。この例では、孔25、孔27がともに略正方形状であり1辺の長さは孔25のほうが大きく、且つ孔27が孔25に対して平面において45度回転した位置関係となっている。   A concrete placing hole 27 is formed at the center of the lower steel plate 19. The hole 25 of the upper steel plate 17 and the hole 27 of the lower steel plate 19 are in a positional relationship in which the hole 25 includes the hole 27 in a plane. In this example, the hole 25 and the hole 27 are both substantially square, the length of one side is larger in the hole 25, and the hole 27 is in a positional relationship rotated 45 degrees in the plane with respect to the hole 25.

(2.配筋方法)
次に、上部テンプレート1および下部テンプレート15(テンプレートセット)を用いた配筋方法について説明する。本実施形態では、キャプリングパイル工法によって杭頭にPCリングを被せて補強した後、その上に基礎梁を構築する例を説明する。
(2. Bar arrangement method)
Next, a bar arrangement method using the upper template 1 and the lower template 15 (template set) will be described. In the present embodiment, an example will be described in which a foundation beam is constructed on a pile head after a PC ring is covered with a PC ring and reinforced by a capping pile method.

図5に示すように、本実施形態では地中に打設された左右の杭(不図示)の杭頭がPCリング33で補強されており、まずPCリング33の間に架け渡すように下部テンプレート15が設置される。なお、図示は省略するがPCリング33からは定着筋が上方に突出しており、この定着筋が下部テンプレート15に干渉するようなケースでは、定着筋を挿通するための孔を下部テンプレート15に予め設けておく。   As shown in FIG. 5, in this embodiment, the pile heads of left and right piles (not shown) placed in the ground are reinforced by the PC ring 33, and the lower part is first bridged between the PC rings 33. A template 15 is installed. Although illustration is omitted, in the case where the fixing stripe protrudes upward from the PC ring 33 and this fixing stripe interferes with the lower template 15, a hole for inserting the fixing stripe is provided in the lower template 15 in advance. Keep it.

下部テンプレート15の設置後、図6(a)に示すように基礎梁の水平方向の梁主筋37と鉛直方向の柱主筋39を配置する。なお、図では説明のため梁主筋37および柱主筋39を簡略化して表示している。また、本実施形態では予め地組した梁主筋37を下部テンプレート15の上に載せて先に配置し、その後柱主筋39の配置を行う。この時、下部テンプレート15は下部の梁主筋37のかぶりを確保するスペーサとして機能する。柱主筋39はPCa部材の鉄筋との接続に用いられる。   After the installation of the lower template 15, as shown in FIG. 6 (a), the horizontal beam main bar 37 and the vertical column main bar 39 of the foundation beam are arranged. In the figure, the beam main bar 37 and the column main bar 39 are shown in a simplified manner for explanation. In the present embodiment, the prefabricated beam main bar 37 is placed on the lower template 15 and arranged first, and then the column main bar 39 is arranged. At this time, the lower template 15 functions as a spacer for ensuring the covering of the lower beam main reinforcement 37. The column main bar 39 is used for connection with the reinforcing bar of the PCa member.

図6(b)は下部テンプレート15の上面図である(PCリング33の図示は省略している)が、図6(b)に示すように柱主筋39は平面において内外2段に配置される。   FIG. 6B is a top view of the lower template 15 (the PC ring 33 is not shown). As shown in FIG. 6B, the column main bars 39 are arranged in two steps on the inside and outside of the plane. .

内側の柱主筋39aは、下端を上部鋼板17の開口23aに通して下部鋼板19上に配置される。外側の柱主筋39b、39cは、下端を上部鋼板17の開口23b、23cに通して下部鋼板19上に配置される。これにより、内外の柱主筋39a〜39cの下端の位置決めが行われる。   The inner column main reinforcement 39 a is arranged on the lower steel plate 19 with the lower end passing through the opening 23 a of the upper steel plate 17. The outer column main bars 39 b and 39 c are arranged on the lower steel plate 19 with the lower ends passing through the openings 23 b and 23 c of the upper steel plate 17. Thereby, the positioning of the lower ends of the inner and outer column main bars 39a to 39c is performed.

次に、図7に示すように柱主筋39の周囲に架台40を設置し、柱主筋39の上方から上部テンプレート1を下降させ、まず内側の柱主筋39aの上端を鞘管7aの突出端から開口5aに挿入する。これにより、内側の柱主筋39aの上端の位置決めがなされる。   Next, as shown in FIG. 7, a frame 40 is installed around the column main bar 39, the upper template 1 is lowered from above the column main bar 39, and the upper end of the inner column main bar 39a is first moved from the protruding end of the sheath tube 7a. Insert into opening 5a. As a result, the upper end of the inner column main reinforcement 39a is positioned.

内側の柱主筋39aをガイドとして上部テンプレート1をさらに下降させ、図8(a)および上部テンプレート1の上面図である図8(b)に示すように、外側の柱主筋39b、39cの上端を鞘管7b、7cの突出端から開口5b、5cに挿入する。これにより柱主筋39b、39cの上端の位置決めが行われる。その後、上部テンプレート1をレバーホイスト50などの固定具によって周囲の架台40に固定する。   The upper template 1 is further lowered by using the inner column main reinforcement 39a as a guide, and the upper ends of the outer column main reinforcements 39b and 39c are moved as shown in FIG. 8 (a) and FIG. 8 (b) which is a top view of the upper template 1. It inserts into opening 5b, 5c from the protrusion end of sheath tube 7b, 7c. Thereby, positioning of the upper ends of the column main bars 39b and 39c is performed. Thereafter, the upper template 1 is fixed to the surrounding gantry 40 with a fixing tool such as a lever hoist 50.

なお、本実施形態では鞘管7bの突出長さのほうが鞘管7cよりも長いので、上部テンプレート1を下降させる過程で、先に柱主筋39bの上端を鞘管7bの突出端から開口5bに挿入した後、柱主筋39cの上端を鞘管7cの突出端から開口5cに挿入することになる。   In the present embodiment, the protruding length of the sheath tube 7b is longer than that of the sheath tube 7c. Therefore, in the process of lowering the upper template 1, the upper end of the column main muscle 39b is first moved from the protruding end of the sheath tube 7b to the opening 5b. After the insertion, the upper end of the columnar main bar 39c is inserted into the opening 5c from the protruding end of the sheath tube 7c.

また本実施形態では、架台40に取付けたレバーホイスト50の先端のフックを上部テンプレート1の孔11に引っ掛けることで、レバーホイスト50の緊張により上部テンプレート1の位置調整および固定を行うことができる。   In this embodiment, the hook of the tip of the lever hoist 50 attached to the gantry 40 is hooked in the hole 11 of the upper template 1, so that the position adjustment and fixing of the upper template 1 can be performed by the tension of the lever hoist 50.

以上のようにして配筋を行った後、型枠(不図示)を組立てて図9に示すようにコンクリート41の打設を行う。この際、上部テンプレート1の孔9からコンクリート41を流し込み、柱主筋39の周囲にコンクリート41が打設される。上部鋼板17の孔25が下部鋼板19の孔27を包含する位置関係となっていることで、底部においてもコンクリート41が回り込みやすくなっている。コンクリート41は鞘管7aの突出端よりも低い位置まで打設され、上部テンプレート1は撤去して転用可能である。架台40についても同様に撤去して転用できる。   After the bar arrangement as described above, a formwork (not shown) is assembled and concrete 41 is placed as shown in FIG. At this time, concrete 41 is poured from the holes 9 of the upper template 1, and the concrete 41 is placed around the column main bars 39. Since the hole 25 of the upper steel plate 17 includes the hole 27 including the hole 27 of the lower steel plate 19, the concrete 41 is easily circulated even at the bottom. The concrete 41 is cast to a position lower than the protruding end of the sheath tube 7a, and the upper template 1 can be removed and diverted. The gantry 40 can be removed and diverted in the same manner.

コンクリート41から上方に突出した柱主筋39は、その上部のPCa部材(不図示)の鉄筋とスリーブにより接続され、構造物の柱部分の構築が行われる。柱主筋39は上部テンプレート1と下部テンプレート15によって正確な位置に配置されているので、PCa部材の鉄筋との接続も確実に行える。   The column main bar 39 protruding upward from the concrete 41 is connected to the reinforcing bar of the PCa member (not shown) on the upper side by a sleeve, and the column part of the structure is constructed. Since the column main bar 39 is arranged at an accurate position by the upper template 1 and the lower template 15, the connection with the reinforcing bar of the PCa member can be performed reliably.

このように、本実施形態によれば、上部テンプレート1を用い、内側の柱主筋39aから外側の柱主筋39b、39cへと順次その上端を上部テンプレート1の鞘管7a〜7cに挿入することにより、柱主筋39a〜39cの上端の位置決めを容易に行うことができる。例えば、外側の鉄筋の位置決めを行った後その内側に手を挿し込んで鉄筋の位置決めを行うといったことがなく、また鞘管7aに挿入済みの内側の柱主筋39aがガイドとなり、上部テンプレート1を移動させてその他の鞘管7b、7cに柱主筋39b、39cを挿入する作業が楽になるので、一度に全ての鉄筋をテンプレートの開口に挿入する場合と比べて作業性は格段に向上する。上部テンプレート1は簡易な構成で軽量であり、また上部テンプレート1による位置決めを行うことで柱主筋39a〜39cの配置精度も充分に確保できる。   Thus, according to the present embodiment, the upper template 1 is used, and the upper ends of the upper template 1 are sequentially inserted into the outer tube main bars 39b and 39c into the sheath tubes 7a to 7c of the upper template 1. In addition, it is possible to easily position the upper ends of the column main bars 39a to 39c. For example, after positioning the outer rebar, the hand is not inserted into the rebar to position the rebar, and the inner column main bar 39a inserted into the sheath 7a serves as a guide, and the upper template 1 is Since the work of inserting the column main bars 39b and 39c into the other sheath tubes 7b and 7c is facilitated, the workability is remarkably improved as compared with the case where all the reinforcing bars are inserted into the template openings at once. The upper template 1 is simple and lightweight, and positioning accuracy of the column main bars 39a to 39c can be sufficiently secured by positioning with the upper template 1.

また、上部テンプレート1では内外の開口5a〜5cに鞘管7a〜7cを設けることで、その突出長さの違いにより施工特性に応じて柱主筋39a〜39cの挿入作業を段階的に分けることができる。さらに、上部テンプレート1の中央部に孔9を設けることで、上部テンプレート1の上からコンクリート41の打設を好適に行うことができる。加えて、上部テンプレート1にレバーホイスト50などの固定具の取付用の孔11を設けることで、固定具を用いて上部テンプレート1を周囲の架台40に固定することができる。架台40を利用してコンクリート打設時の安全性を確保することも可能であり、また上部テンプレート1や架台40は、コンクリート41の打設後に撤去して転用することができるので無駄がない。   Moreover, in the upper template 1, by providing the sheath pipes 7a to 7c in the inner and outer openings 5a to 5c, the insertion work of the column main bars 39a to 39c can be divided in stages according to the construction characteristics due to the difference in the protruding length. it can. Furthermore, by providing the hole 9 at the center of the upper template 1, the concrete 41 can be suitably placed from above the upper template 1. In addition, by providing the upper template 1 with a hole 11 for attaching a fixing tool such as the lever hoist 50, the upper template 1 can be fixed to the surrounding base 40 using the fixing tool. It is possible to secure the safety at the time of placing the concrete by using the gantry 40, and the upper template 1 and the gantry 40 can be removed and diverted after the concrete 41 is placed, so there is no waste.

また、間隔を空けて配置した上下の鋼板17、19からなる下部テンプレート15を併用し、柱主筋39a〜39cの下端の位置決めを行うことで、基礎梁の梁主筋37を配置した後に柱主筋39a〜39cを配置するような場合でも、その配置精度がさらに向上する。また、下部テンプレート15自体をスペーサとして機能させることで、基礎梁の梁主筋37のかぶりを確保できる。   Further, by using the lower template 15 composed of the upper and lower steel plates 17 and 19 arranged at intervals, and positioning the lower ends of the column main bars 39a to 39c, the column main bars 39a after the beam main bars 37 of the foundation beam are arranged. Even when ˜39c is arranged, the arrangement accuracy is further improved. Further, by allowing the lower template 15 itself to function as a spacer, it is possible to ensure the covering of the beam main reinforcement 37 of the foundation beam.

加えて、上部鋼板17と下部鋼板19の孔25、27を用いてコンクリート41の打設を好適に行うことができ、これらの孔25、27が包含関係になっていることで、コンクリート41が回り込みやすい。なお、孔25、27の形状や位置関係は上記で説明したものに限らず、孔25が孔27を包含するような関係になっていればよい。例えば孔25、27を略円形とし、孔25の径を孔27より大きくしてもよい。   In addition, it is possible to suitably place the concrete 41 using the holes 25 and 27 of the upper steel plate 17 and the lower steel plate 19, and the concrete 41 is formed by the inclusion relationship between these holes 25 and 27. Easy to wrap around. Note that the shapes and positional relationships of the holes 25 and 27 are not limited to those described above, and it is sufficient that the holes 25 include the holes 27. For example, the holes 25 and 27 may be substantially circular, and the diameter of the hole 25 may be larger than the hole 27.

本実施形態では、これらのテンプレート1、15を用いて前述のように配筋を行うことで柱主筋39の配置精度が充分に確保でき、且つ、従来の方法で同程度の配置精度を確保する場合に比べ大幅に工程を短縮し、工費を削減することができる。   In the present embodiment, the placement accuracy of the columnar reinforcing bars 39 can be sufficiently ensured by arranging the bars using the templates 1 and 15 as described above, and the same degree of placement accuracy can be secured by the conventional method. Compared to the case, the process can be greatly shortened and the construction cost can be reduced.

しかしながら、本発明はこれに限らない。例えば本実施形態では、PCリング33上に下部テンプレート15を設置したが、PCリング33は必須ではなく、様々な構造物の構築時に、本発明のテンプレート1、15を用いて鉄筋の位置決めができる。また柱主筋39を、その他の鉄筋である梁主筋37より先に配筋することも可能である。   However, the present invention is not limited to this. For example, in the present embodiment, the lower template 15 is installed on the PC ring 33. However, the PC ring 33 is not essential, and the reinforcing bars can be positioned by using the templates 1 and 15 of the present invention when constructing various structures. . Further, it is possible to arrange the column main bars 39 before the beam main bars 37 which are other reinforcing bars.

また、上部テンプレート1および下部テンプレート15の形状も上述したものに限らない。例えば、上部テンプレート1の開口5や下部テンプレート15の開口23の配置、数等も上述したものに限らず、配筋する鉄筋の位置や数量に対応したものとする。例えば、内外3段以上に柱主筋39を配置する場合では、これに応じて開口5や鞘管7を内外3段以上に設けることも可能である。さらに、固定具が取付可能であれば上部テンプレート1に孔11以外の取付部を設けてもよい。   Further, the shapes of the upper template 1 and the lower template 15 are not limited to those described above. For example, the arrangement and number of the openings 5 of the upper template 1 and the openings 23 of the lower template 15 are not limited to those described above, and correspond to the position and quantity of reinforcing bars to be arranged. For example, in the case where the column main bars 39 are arranged in three or more stages inside and outside, it is possible to provide the openings 5 and the sheath tube 7 in three or more stages inside and outside according to this. Further, if the fixture can be attached, an attachment portion other than the hole 11 may be provided in the upper template 1.

また本実施形態では上部テンプレート1に3種類の長さの鞘管7を設けたが、これに限らない。例えば鞘管7の長さを2種類とし、内側の鞘管7の突出長さを長く、外側の鞘管7を短くしてもよい。また外側の鞘管7を省略することも可能である。いずれにせよ、内側の開口5の鞘管7の突出端(開口端)の位置が、外側の開口5の開口端よりも上部テンプレート1の平面から離れていればよい。   In the present embodiment, the upper template 1 is provided with the three types of length of the sheath tube 7, but the present invention is not limited to this. For example, the length of the sheath tube 7 may be two types, the protruding length of the inner sheath tube 7 may be increased, and the outer sheath tube 7 may be shortened. It is also possible to omit the outer sheath tube 7. In any case, the position of the protruding end (opening end) of the sheath tube 7 of the inner opening 5 only needs to be farther from the plane of the upper template 1 than the opening end of the outer opening 5.

また、本実施形態では上部テンプレート1と下部テンプレート15を両方用いたが、柱主筋39の下端は下部テンプレート15を用いず別途の方法で位置決めし、柱主筋39の上端を上部テンプレート1を用いて位置決めして配筋を行うことも可能である。また逆に、柱主筋39の下端を下部テンプレート15を用いて位置決めし、柱主筋39の上端は上部テンプレート1を用いず別途の方法で位置決めしてもよい。   In this embodiment, both the upper template 1 and the lower template 15 are used. However, the lower end of the column main bar 39 is positioned by another method without using the lower template 15, and the upper end of the column main bar 39 is used by the upper template 1. It is also possible to place the bars after positioning. Conversely, the lower end of the column main bar 39 may be positioned using the lower template 15, and the upper end of the column main bar 39 may be positioned by another method without using the upper template 1.

以上、添付図面を参照して、本発明の好適な実施形態について説明したが、本発明は係る例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It will be apparent to those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea disclosed in the present application, and these are naturally within the technical scope of the present invention. Understood.

1;上部テンプレート
3;鋼板
5、5a、5b、5c、23、23a、23b、23c;開口
7、7a、7b、7c;鞘管
9、11、25、27;孔
15;下部テンプレート
17;上部鋼板
19;下部鋼板
21;間隔保持材
37;梁主筋
39、39a、39b;柱主筋
40;架台
41;コンクリート
50;レバーホイスト
1; upper template 3; steel plates 5, 5a, 5b, 5c, 23, 23a, 23b, 23c; openings 7, 7a, 7b, 7c; sheath tubes 9, 11, 25, 27; hole 15; lower template 17; Steel plate 19; Lower steel plate 21; Spacing member 37; Beam main bars 39, 39a, 39b; Column main bars 40; Base 41; Concrete 50; Lever hoist

Claims (12)

配筋に用いるテンプレートであって、
板材の平面の内側と外側に鉄筋を挿入するための開口が形成され、
少なくとも内側の前記開口に、前記板材の平面から突出する管体が設けられ、
内側の前記開口の開口端である前記管体の突出端が、
外側の前記開口の、前記管体の突出端と同じ側にある開口端よりも、前記板材の平面から離れた位置にあることを特徴とするテンプレート。
A template used for reinforcement,
Openings for inserting reinforcing bars are formed inside and outside the plane of the plate material,
At least the inner opening is provided with a tube projecting from the plane of the plate,
The protruding end of the tubular body, which is the opening end of the inner opening,
The template, wherein the outer opening is located farther from the plane of the plate than the opening end on the same side as the protruding end of the tubular body.
外側の前記開口に、前記板材の平面から突出する管体が設けられ、
内側と外側の前記開口に設けられた管体は、前記板材の平面に対し同じ側に突出し、
内側の前記管体の突出端が、
外側の前記開口の開口端である外側の前記管体の突出端よりも、前記板材の平面から離れた位置にあることを特徴とする請求項1記載のテンプレート。
A tube projecting from the plane of the plate material is provided in the opening on the outside,
The tube provided in the opening on the inside and outside protrudes on the same side with respect to the plane of the plate,
The protruding end of the inner tube is
2. The template according to claim 1, wherein the template is located farther from a plane of the plate member than a protruding end of the outer tubular body that is an opening end of the outer opening.
コンクリートの打設に用いる孔を有することを特徴とする請求項1または請求項2記載のテンプレート。   3. The template according to claim 1, further comprising a hole used for placing concrete. 前記テンプレートの固定に用いる固定具を取付けるための取付部を有することを特徴とする請求項1から請求項3のいずれかに記載のテンプレート。   The template according to any one of claims 1 to 3, further comprising an attachment portion for attaching a fixture used for fixing the template. 配筋に用いる一対のテンプレートによるテンプレートセットであって、
一方のテンプレートは、
請求項1から請求項4のいずれかに記載のテンプレートであり、前記一方のテンプレートの開口は鉄筋の一端を挿入するためのものであり、
他方のテンプレートは、
間隔を空けて配置された一対の板材を有し、
一方の前記板材の平面の内側と外側に前記鉄筋の他端を挿入するための開口が形成されたことを特徴とするテンプレートセット。
A template set with a pair of templates used for reinforcement,
One template is
The template according to any one of claims 1 to 4, wherein the opening of the one template is for inserting one end of a reinforcing bar,
The other template is
Having a pair of plates spaced apart,
The template set characterized by the opening for inserting the other end of the said reinforcing bar formed in the inner side and the outer side of the plane of one said board | plate material.
一方の前記板材の平面に、コンクリート打設用の孔が設けられたことを特徴とする請求項5記載のテンプレートセット。   The template set according to claim 5, wherein a hole for placing concrete is provided in a plane of one of the plate members. 他方の前記板材の平面に、コンクリート打設用の孔が設けられ、平面において、一方の前記板材の前記孔が、他方の前記板材の前記孔を包含していることを特徴とする請求項6記載のテンプレートセット。   7. A hole for placing concrete is provided in a plane of the other plate member, and the hole of one plate member includes the hole of the other plate member in the plane. The template set described. 内側と外側に鉄筋を配置する工程(a)と、
請求項1から請求項4のいずれかに記載のテンプレートを移動させ、前記テンプレートの内側の前記開口に設けた前記管体の突出端から内側の前記鉄筋の一端を挿入した後、外側の前記開口に外側の前記鉄筋の一端を挿入する工程(b)と、
を具備することを特徴とする配筋方法。
Arranging the reinforcing bars inside and outside (a);
The template according to any one of claims 1 to 4 is moved, and after inserting one end of the reinforcing bar inside from the protruding end of the tubular body provided in the opening inside the template, the outside opening (B) inserting one end of the outer reinforcing bar into
A bar arrangement method comprising the steps of:
前記テンプレートとして請求項4に記載のテンプレートを用い、
前記テンプレートの取付部に固定具を取付け、前記固定具を用いて前記テンプレートを固定する工程(c)を有することを特徴とする請求項8記載の配筋方法。
The template according to claim 4 is used as the template,
9. The bar arrangement method according to claim 8, further comprising a step (c) of attaching a fixture to the template attachment portion and fixing the template using the fixture.
前記工程(a)において、
間隔を空けて配置された一対の板材を有し、一方の前記板材の平面の内側と外側に前記鉄筋の他端を挿入するための開口が形成された別のテンプレートを用い、
内側と外側の前記鉄筋の他端を前記別のテンプレートの内側および外側の開口に挿入して配置することを特徴とする請求項8または請求項9に記載の配筋方法。
In the step (a),
Using another template having an opening for inserting the other end of the reinforcing bar into the inner side and the outer side of the plane of one of the plate members, having a pair of plate members arranged at intervals,
10. The bar arrangement method according to claim 8, wherein the other ends of the inner and outer reinforcing bars are inserted into the inner and outer openings of the other template.
一方の前記板材の平面に、コンクリート打設用の孔が設けられることを特徴とする請求項10記載の配筋方法。   11. The bar arrangement method according to claim 10, wherein a hole for placing concrete is provided on a plane of the one plate member. 他方の前記板材の平面に、コンクリート打設用の孔が設けられ、平面において、一方の前記板材の前記孔が、他方の前記板材の前記孔を包含していることを特徴とする請求項11記載の配筋方法。   12. A hole for placing concrete is provided in a plane of the other plate member, and the hole of one plate member includes the hole of the other plate member in the plane. The bar arrangement method described.
JP2015189140A 2015-09-28 2015-09-28 Templates, template sets and reinforcement methods Active JP6464069B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015189140A JP6464069B2 (en) 2015-09-28 2015-09-28 Templates, template sets and reinforcement methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015189140A JP6464069B2 (en) 2015-09-28 2015-09-28 Templates, template sets and reinforcement methods

Publications (2)

Publication Number Publication Date
JP2017066591A JP2017066591A (en) 2017-04-06
JP6464069B2 true JP6464069B2 (en) 2019-02-06

Family

ID=58491922

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015189140A Active JP6464069B2 (en) 2015-09-28 2015-09-28 Templates, template sets and reinforcement methods

Country Status (1)

Country Link
JP (1) JP6464069B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7378861B1 (en) * 2023-02-28 2023-11-14 小川工業株式会社 Concrete template and method for manufacturing concrete template

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5971849U (en) * 1982-11-08 1984-05-16 大成建設株式会社 Column main reinforcement fixing device
US8381479B1 (en) * 2009-09-28 2013-02-26 Felix E. Ferrer Pre-fabricated modular reinforcement cages for concrete structures
JP2015007317A (en) * 2013-06-25 2015-01-15 前田建設工業株式会社 Erection device for column reinforcement

Also Published As

Publication number Publication date
JP2017066591A (en) 2017-04-06

Similar Documents

Publication Publication Date Title
JP5718861B2 (en) Construction method of pile-type pier
JP6424075B2 (en) REINFORCED CONCRETE COLUMN STEEL BEAM JOINTING MEMBER, ITS MANUFACTURING METHOD, AND BUILDING CONSTRUCTION METHOD
JP5734169B2 (en) Building structure
JP5948838B2 (en) Column and beam joining method
JP5250096B2 (en) Building structure
JP2020165232A (en) Anchor member and installation method
JP6357324B2 (en) Construction adjustment method and building
JP2009108611A (en) Reinforcement erecting tool and reinforcement erecting method
JP2016138398A (en) Footing integrated foundation pile structure and footing integrated foundation pile construction method
JP6464069B2 (en) Templates, template sets and reinforcement methods
JP2017125322A (en) Base structure
JP6362141B2 (en) Reinforcing bar reinforced frame, hoop, and reinforcing bar
JP2016223094A (en) Pile head connection device, pile head connection structure, and pile head connection method
JP2018115514A (en) Method for constructing pile bearing structure, and reinforcement member used in the pile bearing structure
JP6228836B2 (en) Reverse winding method
JP6849491B2 (en) Exposed column base structure of steel columns and its construction method
JP5407597B2 (en) Method for constructing joint structure between steel frame and cast-in-place pile
JP2009185582A (en) Unit and method for mounting pile head reinforcement
JP7200048B2 (en) pile foundation structure
JP6220659B2 (en) Position adjustment method of reaction force receiving member and top of column
JP2011032670A (en) Auxiliary implement for bar arrangement work for foundation of caisson type pile, and construction method for bar arrangement using the same
JP2020153080A (en) Method for constructing column
JP6999282B2 (en) Pile foundation structure and its construction method
JP2015007317A (en) Erection device for column reinforcement
JP6407603B2 (en) Joint structure between foundation pile and ground structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180305

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190107

R150 Certificate of patent or registration of utility model

Ref document number: 6464069

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250