JP5618201B2 - Lifting method of prefabricated manhole using lifting jig for prefabricated manhole - Google Patents
Lifting method of prefabricated manhole using lifting jig for prefabricated manhole Download PDFInfo
- Publication number
- JP5618201B2 JP5618201B2 JP2010231102A JP2010231102A JP5618201B2 JP 5618201 B2 JP5618201 B2 JP 5618201B2 JP 2010231102 A JP2010231102 A JP 2010231102A JP 2010231102 A JP2010231102 A JP 2010231102A JP 5618201 B2 JP5618201 B2 JP 5618201B2
- Authority
- JP
- Japan
- Prior art keywords
- prefabricated manhole
- anchor
- prefabricated
- manhole
- wires
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 28
- 230000005484 gravity Effects 0.000 claims description 8
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 210000000078 claw Anatomy 0.000 description 6
- 238000009434 installation Methods 0.000 description 6
- 230000002093 peripheral effect Effects 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 2
- 235000019658 bitter taste Nutrition 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Sewage (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Description
本発明は、例えば、コンクリート基礎等の据付場所において、複数のプレハブマンホールを接合させて管路マンホールを構築するための、プレハブマンホール用の吊り上げ治具を使用した、プレハブマンホールの吊り上げ方法に関するものである。 The present invention relates to a method for lifting a prefabricated manhole using a lifting jig for a prefabricated manhole, for example , for constructing a duct manhole by joining a plurality of prefabricated manholes at an installation place such as a concrete foundation. is there.
従来のプレハブマンホールPは、例えば、図15・図16に示すように、所定の大きさと厚みを有する角筒状のコンクリート躯体により形成されている。そして、プレハブマンホールPを立てた状態にした際に位置付けられる上面側を天壁とし、その天壁に4個のフックFが打設されている。 For example, as shown in FIGS. 15 and 16, the conventional prefabricated manhole P is formed of a rectangular tubular concrete frame having a predetermined size and thickness. And the upper surface side, which is positioned when the prefabricated manhole P is set up, is the top wall, and four hooks F are placed on the top wall.
この様なプレハブマンホールPを吊り上げて移動させる場合には、例えば、図16に示すように、天壁のフックFにワイヤーWを掛けて、このワイヤーWをクレーン重機のフックKにより吊っている。 When such a prefabricated manhole P is lifted and moved, for example, as shown in FIG. 16, a wire W is hung on a hook F on the top wall, and the wire W is hung by a hook K of a crane heavy machine.
その為、プレハブマンホールPをクレーン重機により吊り上げて運搬車輌QにプレハブマンホールPを載せるとき、また、運搬車輌Qに載せているプレハブマンホールPを運搬車輌Qから降ろして特定の場所に設置するときには、作業員がプレハブマンホールPの天壁に昇って種々の作業を実施しなければならない。 Therefore, when the prefabricated manhole P is lifted by a heavy crane and the prefabricated manhole P is placed on the transporting vehicle Q, or when the prefabricated manhole P placed on the transporting vehicle Q is lowered from the transporting vehicle Q and installed at a specific location, An operator must ascend to the top wall of the prefabricated manhole P and perform various operations.
具体的には、運搬車輌Qに載せているプレハブマンホールPを運搬車輌Qから降ろして特定の場所に設置する作業の場合、まず、図15に示すように、プレハブマンホールPに梯子Sを立て掛けて、作業員が梯子Sを介してプレハブマンホールPの天壁側に移動する。 Specifically, when the prefabricated manhole P placed on the transport vehicle Q is lowered from the transport vehicle Q and installed in a specific place, first, as shown in FIG. The worker moves to the top wall side of the prefab manhole P through the ladder S.
そして、図16に示すように、作業員がプレハブマンホールPの天壁上で、天壁の四隅に打設されている合計4個のフックFに、ワイヤーWの端部を手作業で接続する。 Then, as shown in FIG. 16, the worker manually connects the ends of the wires W to the four hooks F placed on the four corners of the top wall on the top wall of the prefabricated manhole P. .
次に、作業員は、天壁上でクレーン重機のフックKにワイヤーWを引っ掛ける作業を行って、クレーン重機により運搬車輌Qの荷台に乗せているプレハブマンホールPを吊り上げ、特定の場所に設置するのである。 Next, the worker performs the work of hooking the wire W on the hook K of the heavy crane on the top wall, lifts the prefabricated manhole P placed on the loading platform of the transport vehicle Q by the heavy crane, and installs it at a specific location. It is.
一方、特許文献1に開示されているように、前後端にそれぞれ上部落とし込み用の凸部及び凹部を形成している、角筒状のボックスカルバートが存在する。このボックスカルバートにおいても、天壁に2個のフックFが打設されていることから(特許文献1の図1参照)、作業員が天壁に昇って種々の作業を実施しなければならない点は、図15・図16に示すプレハブマンホールPの場合と全く同様である。
On the other hand, as disclosed in
この他、プレハブマンホールPにおいては、所定の据付場所に吊り上げて移送した後に、コンクリート基礎の所定位置にプレハブマンホールPを設置し、これに隣接するように次のプレハブマンホールPを基礎上に設置した後、水平方向に移動させて、既に設置されているプレハブマンホールPの端面に接合させる必要がある。 In addition, in the prefabricated manhole P, after being lifted and transferred to a predetermined installation location, the prefabricated manhole P is installed at a predetermined position of the concrete foundation, and the next prefabricated manhole P is installed on the foundation so as to be adjacent thereto. Then, it is necessary to move it in the horizontal direction and join it to the end face of the prefabricated manhole P that has already been installed.
この様な、プレハブマンホールPの水平方向の移動(横引き)に際し、プレハブマンホールPの上方である地面付近に切梁Hが存在する場合には、プレハブマンホールPを吊り上げているワイヤーWがこの切梁Hに当たってしまうため、切梁Hを回避する措置が必要となる。 When the prefabricated manhole P is moved in the horizontal direction (horizontal pulling) and there is a cut beam H near the ground above the prefabricated manhole P, the wire W lifting the prefabricated manhole P Since it hits the beam H, measures to avoid the cut beam H are required.
しかし、従来においては、プレハブマンホールPの据付場所における水平方向の移動(横引き)に際し、切梁Hを回避するための工夫がなされていないことから、ワイヤーWによりプレハブマンホールPを吊り上げている状態のまま、プレハブマンホールPを水平方向に移動(横引き)させ、既に設置されているプレハブマンホールPの端面に接合させることは困難である。 However, in the past, when the horizontal movement (lateral pulling) of the prefabricated manhole P at the installation location has not been devised to avoid the cut beam H, the prefabricated manhole P is lifted by the wire W. As it is, it is difficult to move the prefabricated manhole P in the horizontal direction (laterally pull) and join it to the end face of the prefabricated manhole P that has already been installed.
その為、苦肉の策として、プレハブマンホールPを降ろし、プレハブマンホールPを吊り上げている4本のワイヤーWの端部の全てを、プレハブマンホールPの天壁に打設されている4個のフックFからそれぞれ取り外して、プレハブマンホールP自体を水平方向に移動(横引き)させていた。 Therefore, as a measure of bitterness, the prefabricated manhole P is lowered, and all the ends of the four wires W that lift the prefabricated manhole P are separated from the four hooks F placed on the top wall of the prefabricated manhole P, respectively. It was removed and the prefabricated manhole P itself was moved (laterally pulled) in the horizontal direction.
その具体的な措置は、例えば、図17に示すように、プレハブマンホールPを移動用鋼棒Tに乗せた状態で、プレハブマンホールPを吊り上げている4本のワイヤーWをそれぞれ取り外す。そして、複数の作業員がバール等の工具を用いてプレハブマンホールPを一方側から強く押し込んで、プレハブマンホールPを移動用鋼棒Tと共に水平方向に移動(横引き)させるのである。 Specifically, for example, as shown in FIG. 17, the four wires W lifting the prefabricated manhole P are removed while the prefabricated manhole P is placed on the moving steel rod T. Then, a plurality of workers push the prefabricated manhole P strongly from one side using a tool such as a bar to move the prefabricated manhole P together with the moving steel rod T in the horizontal direction (lateral pulling).
しかしながら、従来においては、図15・図16に示すように、作業員が梯子Sを使ってプレハブマンホールPの天壁に上り、天壁の四隅に打設されているフックFにワイヤーWの端部を接続する作業や、クレーン重機のフックKにワイヤーWを引っ掛ける作業を実施しなければならないが、プレハブマンホールPの天壁部分とその周囲には、作業員の安全ベルトを掛けることのできる部材が全く存在していない。 However, in the prior art, as shown in FIGS. 15 and 16, an operator climbs the top wall of the prefabricated manhole P using a ladder S, and hooks F placed at the four corners of the top wall at the ends of the wires W. The work which connects a part and the work which hooks the wire W to the hook K of a heavy crane of a crane must be implemented, but the member which can hang a worker's safety belt on the top wall part of the prefab manhole P and its circumference Does not exist at all.
その為、作業員が梯子Sを昇るとき、また、プレハブマンホールPの天壁においてフックFにワイヤーWの端部を接続するとき、さらには、クレーン重機のフックKにワイヤーWを引っ掛けるときのいずれにおいても、作業員の安全が確保されていない、所謂無胴綱状態になってしまう。 Therefore, either when the worker ascends the ladder S, when the end of the wire W is connected to the hook F on the top wall of the prefabricated manhole P, or when the wire W is hooked on the hook K of a crane heavy machine. However, the safety of the worker is not ensured, so that it becomes a so-called unwound rope state.
その結果、梯子Sや、比較的に高所となるプレハブマンホールPの天壁から、作業員が落下してしまう危険性が常に伴っていた。 As a result, there has always been a risk that an operator may fall from the ladder S or the top wall of the prefabricated manhole P which is relatively high.
この様な作業員の無胴綱状態を要因として作業員が落下してしまう危険性が伴うことは、特許文献1に開示されているボックスカルバートにおいても全く同様である。
The box culvert disclosed in
尚、作業員の無胴綱状態を解消して、作業員の安全を確保するために、例えば、プレハブマンホールPを載せている運搬車輌Qに、作業員の安全ベルトを掛けるための親綱を張設する治具を設置する措置も存在するが、設置費用が高額となることから、殆ど採用されていないのが実状である。 In addition, in order to eliminate the involuntary state of the worker and ensure the safety of the worker, for example, a master rope for hanging the safety belt of the worker on the transport vehicle Q carrying the prefabricated manhole P is provided. There are measures to install a jig to be stretched, but since the installation cost is high, the fact is that it is hardly adopted.
この他、プレハブマンホールPの水平方向の移動(横引き)に際し、プレハブマンホールPの上方である地面付近に切梁Hが存在する場合に、切梁Hを回避するために、図17に示すように、プレハブマンホールPを移動用鋼棒Tに乗せた状態で、プレハブマンホールPを吊り上げているワイヤーWを全て取り外して、複数の作業員がバール等の工具を用いてプレハブマンホールPを一方側から強く押し込むと、プレハブマンホールPが転倒してしまう危険性がある。 In addition, when the prefabricated manhole P is moved (laterally pulled) in the horizontal direction and the cut beam H is present near the ground above the prefabricated manhole P, in order to avoid the cut beam H, as shown in FIG. In addition, with the prefabricated manhole P placed on the moving steel rod T, all the wires W lifting the prefabricated manhole P are removed, and a plurality of workers use a tool such as a bar to remove the prefabricated manhole P from one side. If pushed in too strongly, there is a risk that the prefabricated manhole P will fall over.
即ち、図17に示すように、プレハブマンホールPを移動用鋼棒Tに乗せたとき、プレハブマンホールPは、移動用鋼棒Tの移動する方向に、自身の内部空間を向けている。そのため、移動用鋼棒Tに接している自身の底壁において、底壁の長手方向に直交する方向に作業員による押し込み力が作用したときに、その押し込み力が強いと、プレハブマンホールPの天壁が作業員側に向けて転倒してしまうのである。 That is, as shown in FIG. 17, when the prefabricated manhole P is placed on the moving steel rod T, the prefabricated manhole P faces its own internal space in the moving direction of the moving steel rod T. Therefore, when the pushing force by the worker acts on the bottom wall in contact with the moving steel rod T in the direction perpendicular to the longitudinal direction of the bottom wall, if the pushing force is strong, the ceiling of the prefabricated manhole P The wall falls to the worker side.
また、特許文献1には、前後端にそれぞれ上部落とし込み用の凸部及び凹部を形成してなるボックスカルバートの頂板に設けられた一対のフックの合力の作用点は、ボックスカルバートの重心位置よりも凸部側に距離eだけ偏心しており、クレーン等で吊り上げた場合、ボックスカルバートは水平状態とならず凹部側に傾いた状態となり、この状態で既設のボックスカルバートに他のボックスカルバートを接合する旨の記載は存在する。
Further, in
しかし、特許文献1には、プレハブマンホールPの水平方向の移動(横引き)に際し、プレハブマンホールPの上方である地面付近に切梁Hが存在する場合に、この切梁Hを回避する措置については、何ら記載されていない。
However, in
そこで、本発明は如上のような従来存した諸事情に鑑み創出されたもので、プレハブマンホールを構成する左右の側壁部のそれぞれにおいて、作業員の手が届く高さの位置にアンカーを取り付けることにより、プレハブマンホールの天壁における作業員の各種作業を排除して、作業員がプレハブマンホールから落下してしまう危険性を無くすことを第1の目的とする。 Therefore, the present invention was created in view of the existing circumstances as described above, and the anchors are attached to positions at a height that can be reached by workers on each of the left and right side walls constituting the prefabricated manhole. Accordingly, the first object is to eliminate the danger of the worker falling from the prefabricated manhole by eliminating the various operations of the worker on the top wall of the prefabricated manhole.
また、本発明は、プレハブマンホールの水平方向の移動(横引き)に際し、据付場所の地面付近に切梁が存在する場合であっても、水平部材と水平部材の両端部にそれぞれ2本ずつ取り付けたワイヤーによりプレハブマンホールを吊り上げ、必要に応じてプレハブマンホールを地面に降ろし、ワイヤーのプレハブマンホールへの取り付けと取り外しを適宜行うことにより、プレハブマンホールの転倒を防止しながら切梁を回避することを第2の目的とする。 Further, according to the present invention, when the prefabricated manhole is moved in the horizontal direction (horizontal pulling), two beams are attached to both ends of the horizontal member and the horizontal member even when there are cut beams near the ground of the installation place. The prefabricated manhole is lifted by the wire, and if necessary, the prefabricated manhole is lowered to the ground, and the wire is attached to and removed from the prefabricated manhole as appropriate, thereby preventing the prefabricated manhole from falling and avoiding the beam. The purpose of 2.
角筒状に形成されているプレハブマンホールを、プレハブマンホールに取り付けているアンカーを介して吊り上げるための、プレハブマンホール用の吊り上げ治具であり、クレーン重機を利用して吊り上げる水平部材と、水平部材の両端部にそれぞれ2本ずつ取り付けたワイヤーにより構成され、個々のワイヤーの先端部に、プレハブマンホールのアンカーに掛け止めする掛止体を備えている、プレハブマンホール用の吊り上げ治具を使用したプレハブマンホールの吊り上げ方法において、プレハブマンホールのアンカーは、プレハブマンホールを構成する左右の側壁部のそれぞれにおいて、プレハブマンホールの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカーが水平に取り付けられているプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、その切梁を避けるために、
プレハブマンホールの移動方向側に位置する2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの移動方向側に位置する2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように2本のワイヤーを前方に移動させ、2本のワイヤーの掛止体を、プレハブマンホールのアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に若干移動させ、プレハブマンホールの他方側の2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
切梁に近接した他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように他方側の2本のワイヤーを前方に移動させ、他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程、を実施する、プレハブマンホール用の吊り上げ治具を使用してプレハブマンホールを吊り上げることで、同じく上述した課題を解決した。
A lifting tool for a prefabricated manhole for lifting a prefabricated manhole formed in a square tube shape through an anchor attached to the prefabricated manhole. A prefabricated manhole using a lifting tool for prefabricated manholes, which is composed of two wires attached to both ends, each of which has a hooking body that hooks onto the anchor of the prefabricated manhole. In the lifting method described above, the anchors of the prefabricated manholes are spaced apart from each other on the left and right side walls constituting the prefabricated manholes at positions above the center of gravity of the prefabricated manholes and at a height that can be reached by workers. Open with two anchors attached horizontally Moving the blanking manhole in the horizontal direction (lateral pulling) case, if the direction of movement, the wire that lifting the prefabricated manhole will hit the Setsuhari, in order to avoid the Setsuhari,
A step of lowering the prefabricated manhole to the ground in a state where the two wires located on the moving direction side of the prefabricated manhole are close to the beam,
Removing the hooks of the two wires located on the moving direction side of the prefabricated manhole from the anchor of the prefabricated manhole;
A step of moving the two wires forward so as to straddle the beam, and again hooking the hooks of the two wires on the anchors of the prefabricated manhole,
Lifting the prefabricated manhole, moving it slightly forward, and lowering the prefabricated manhole to the ground with the two wires on the other side of the prefabricated manhole in close proximity to the beam,
Removing the hooks of the other two wires adjacent to the beam from the anchor of the prefabricated manhole;
Moving the two wires on the other side forward so as to straddle the cut beam, and re-hanging the hooks of the other two wires on the anchor of the prefabricated manhole;
The above-mentioned problem has been solved by lifting the prefabricated manhole using a lifting tool for the prefabricated manhole, which performs the step of lifting the prefabricated manhole and moving it forward.
さらに、角筒状に形成されているプレハブマンホールを、プレハブマンホールに取り付けているアンカーを介して吊り上げるための、プレハブマンホール用の吊り上げ治具であり、クレーン重機を利用して吊り上げる水平部材と、水平部材の両端部にそれぞれ2本ずつ取り付けたワイヤーにより構成され、個々のワイヤーの先端部に、プレハブマンホールのアンカーに掛け止めする掛止体を備えている、プレハブマンホール用の吊り上げ治具を使用したプレハブマンホールの吊り上げ方法において、プレハブマンホールを構成する矩形状の天壁において、天壁を形成する一対の短辺の中央部近傍のそれぞれにアンカーを取り付けると共に、天壁を形成する一方の対角部のそれぞれにアンカーを取り付けている場合において、水平部材の両端部に取り付けている2本のワイヤーを利用し、2本のワイヤーの掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしてプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、その切梁を避けるために、
2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしている掛止体を、プレハブマンホールのアンカーから取り外す工程、
一方の掛止体を、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めし、他方の掛止体を、切梁を跨ぐように前方に移動させ、天壁を形成する対角部の他方側に位置しているアンカーに掛け止めする工程、
水平部材が切梁と交差するように斜めに配置した状態で、プレハブマンホールを吊り上げて、前方に若干移動させ、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしている一方のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
天壁を形成する対角部に位置しているそれぞれのアンカーに掛け止めしている掛止体を取り外す工程、
天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしていた一方の掛止体を、切梁を跨ぐように前方に移動させ、両掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程、を実施する、プレハブマンホール用の吊り上げ治具を使用してプレハブマンホールを吊り上げることで、同じく上述した課題を解決した。
Furthermore, it is a lifting tool for a prefabricated manhole for lifting a prefabricated manhole formed in a rectangular tube shape through an anchor attached to the prefabricated manhole, and a horizontal member that lifts using a crane heavy machine, A lifting jig for prefabricated manholes is used, which is composed of two wires attached to both ends of each member, and each of the wire ends is provided with a latching body that latches on the anchor of the prefabricated manhole. In the lifting method of the prefabricated manhole, in the rectangular top wall constituting the prefabricated manhole, an anchor is attached to each of the central portions of a pair of short sides forming the top wall, and one diagonal portion forming the top wall Both ends of the horizontal member when anchors are attached to each of the Using two attached wires, hook the two wire hooks on the anchors located near the center of the pair of short sides that form the top wall of the prefabricated manhole. When moving the prefabricated manhole in the horizontal direction (lateral pulling), if the wire lifting the prefabricated manhole hits the cutting beam in that moving direction, in order to avoid the cutting beam,
The process of lowering the prefabricated manhole to the ground with two wires in close proximity to the beam,
A step of removing a latching body that is latched to an anchor located in the vicinity of the center part of a pair of short sides forming the top wall of the prefabricated manhole from the anchor of the prefabricated manhole,
One hanging body is hooked to the anchor located on one side of the diagonal part forming the top wall, the other hanging body is moved forward so as to straddle the beam, and the top wall is A step of hooking on an anchor located on the other side of the diagonal portion to be formed,
With the horizontal member placed diagonally so as to intersect the beam, the prefabricated manhole is lifted and moved slightly forward and hooked to the anchor located on one side of the diagonal that forms the top wall. The process of lowering the prefabricated manhole to the ground with one of the wires in close proximity to the cutting beam,
Removing a latching body that is latched to each anchor located at a diagonal portion that forms the top wall;
Move one latching body, which was latched on the anchor located on one side of the diagonal part forming the top wall, forward so as to straddle the beam, and connect both latching bodies to the prefabricated manhole. Re-hanging on the anchors located near the center of the pair of short sides forming the top wall,
The above-mentioned problem has been solved by lifting the prefabricated manhole using a lifting tool for the prefabricated manhole, which performs the step of lifting the prefabricated manhole and moving it forward.
本発明に係るプレハブマンホール用の吊り上げ治具によれば、プレハブマンホールの天壁における作業員の各種作業を排除して、作業員がプレハブマンホールから落下してしまう危険性を無くすことができる。 According to the lifting jig for a prefabricated manhole according to the present invention, it is possible to eliminate the various operations of the worker on the top wall of the prefabricated manhole and eliminate the risk that the worker falls from the prefabricated manhole.
具体的には、吊り上げるプレハブマンホール自体について、左右の側壁部のそれぞれにおいて、プレハブマンホールの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカーを水平に取り付けていることから、ワイヤーの端部をアンカーに接続するときに、作業員がプレハブマンホールの天壁に昇る必要性が無い。 Specifically, for the prefabricated manhole itself to be lifted, two left and right side wall portions above the center of gravity of the prefabricated manhole and at a height that can be reached by the operator's hand, are separated by two pieces. Since the anchor is attached horizontally, there is no need for the worker to climb to the top wall of the prefabricated manhole when connecting the end of the wire to the anchor.
そのため、プレハブマンホールの天壁から作業員が落下してしまう事態が、そもそも生じないのである。 Therefore, the situation where an operator falls from the top wall of the prefab manhole does not occur in the first place.
同様に、梯子も使用しないことから、作業員が梯子から落下してしまう事態も生じない。 Similarly, since the ladder is not used, a situation where the worker falls from the ladder does not occur.
また、吊り上げ治具は、クレーン重機を利用して吊り上げる水平部材と、水平部材の両端部にそれぞれ取り付けた2本のワイヤーにより構成されていることから、水平部材とワイヤーにより、プレハブマンホールを安定した状態で吊り上げることができる。 Moreover, since the lifting jig is composed of a horizontal member that is lifted using a heavy crane and two wires attached to both ends of the horizontal member, the prefabricated manhole is stabilized by the horizontal member and the wire. Can be lifted in a state.
さらに、ワイヤーの先端部には、プレハブマンホールのアンカーに掛け止めする掛止体を備えていることから、アンカーへの掛止体の取り付けと、アンカーからの掛止体の取り外しが容易である。 Furthermore, since the front-end | tip part of a wire is equipped with the latching body latched on the anchor of a prefabricated manhole, attachment of a latching body to an anchor and removal of a latching body from an anchor are easy.
また、水平部材は、プレハブマンホールを構成する左右の側壁部の幅員よりも長い略長方形の板片により形成されており、板片の両端部において、ワイヤーを真っ直ぐに降ろした状態で、ワイヤーの端部を左右の側壁部に固定したアンカーに接続することから、プレハブマンホールを安定した状態で吊り上げることができる。 Further, the horizontal member is formed by a substantially rectangular plate piece that is longer than the width of the left and right side wall portions constituting the prefabricated manhole, and the end of the wire is in a state where the wire is straightly lowered at both ends of the plate piece. Since the portion is connected to the anchor fixed to the left and right side wall portions, the prefabricated manhole can be lifted in a stable state.
加えて、略長方形の板片は、その短辺が立設するように板片を配置し、板片の長手方向における両側面に、補強用リブが設けられていることから、水平部材自体の堅牢性を維持することができる。 In addition, the substantially rectangular plate pieces are arranged so that the short sides thereof stand up, and reinforcing ribs are provided on both side surfaces in the longitudinal direction of the plate pieces. Robustness can be maintained.
その為、重量のあるプレハブマンホールを、この水平部材を介して確実に吊り上げることができ、水平部材の破損によりプレハブマンホールが落下してしまう事態の発生を確実に阻止することができる。 Therefore, the heavy prefabricated manhole can be reliably lifted through the horizontal member, and the occurrence of a situation where the prefabricated manhole falls due to breakage of the horizontal member can be reliably prevented.
加えて、プレハブマンホールに取り付けているアンカーは、所定の長さの棒体の先端部に、薄板円形状の頭部を取り付けて形成し、棒体の基端部が、プレハブマンホールの側壁部に設けている窪み部に固定されており、
このアンカーに掛け止めするワイヤーの掛止体は、ワイヤーの先端部に取り付けた、端部に略円形の孔を有する接続片と、接続片の孔に回転可能に取り付けた中空円環状のカプラーにより構成され、
カプラーの周面に、アンカーの頭部を挿入する開口部を設け、この開口部に幅狭な長孔を連設していることから、アンカーの頭部にカプラーの開口部を宛がってアンカーの頭部をカプラー内に導入し、カプラーの長孔が上方に移動するようにカプラーを回転させて、カプラーの長孔にアンカーの頭部を係合させることで、プレハブマンホールのアンカーに、ワイヤーの掛止体を簡単に取り付けることができる。
In addition, the anchor attached to the prefabricated manhole is formed by attaching a thin plate-shaped head to the tip of the rod of a predetermined length, and the base end of the rod is attached to the side wall of the prefabricated manhole. It is fixed to the recess that is provided,
The hook of the wire to be hooked on the anchor is composed of a connecting piece attached to the tip of the wire and having a substantially circular hole at the end, and a hollow annular coupler rotatably attached to the hole of the connecting piece. Configured,
An opening for inserting the head of the anchor is provided on the peripheral surface of the coupler, and a narrow slot is continuously provided in this opening. Therefore, the opening of the coupler is directed to the head of the anchor. By introducing the head of the anchor into the coupler, rotating the coupler so that the long hole of the coupler moves upward, and engaging the head of the anchor with the long hole of the coupler, to the anchor of the prefabricated manhole, It is possible to easily attach the hook of the wire.
また、ワイヤーによりプレハブマンホールを吊り上げているとき、アンカーの頭部は、常にカプラーの幅狭な長孔に係合しているので、アンカーの頭部からカプラーが外れることが無い。 Further, when the prefabricated manhole is lifted by the wire, the anchor head always engages with the narrow elongated hole of the coupler, so that the coupler does not come off from the anchor head.
さらに、プレハブマンホールのアンカーから、ワイヤーの掛止体を取り外すときは、プレハブマンホールを降ろしている状態において、カプラーの長孔が下方に移動するようにカプラーを回転させる。そして、アンカーの頭部に係合しているカプラーの長孔を移動させて、カプラーの開口部をアンカーの頭部の位置に配置する。このカプラーの開口部を介して、アンカーの頭部からカプラーを簡単に取り外すことができる。 Further, when removing the wire hook from the anchor of the prefabricated manhole, the coupler is rotated so that the long hole of the coupler moves downward in a state where the prefabricated manhole is lowered. Then, the long hole of the coupler engaged with the anchor head is moved, and the opening of the coupler is arranged at the position of the anchor head. The coupler can be easily removed from the head of the anchor through the opening of the coupler.
また、カプラーの開口部に隣接するように爪部を設けていることから、この爪片を介して、カプラーの回転操作が、極めて容易である。 Further, since the claw portion is provided adjacent to the opening of the coupler, the rotation operation of the coupler is very easy through this claw piece.
この他、本発明に係るプレハブマンホールの吊り上げ方法においては、プレハブマンホールのアンカーは、プレハブマンホールを構成する左右の側壁部のそれぞれにおいて、プレハブマンホールの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカーが水平に取り付けられているプレハブマンホールに対し、プレハブマンホール用の吊り上げ治具を使用してプレハブマンホールを吊り上げることから、プレハブマンホールの天壁における作業員の各種作業を排除して、作業員がプレハブマンホールから落下してしまう危険性を無くすことができる。 In addition, in the prefabricated manhole lifting method according to the present invention, the anchor of the prefabricated manhole can reach the operator's hand above the position of the center of gravity of the prefabricated manhole in each of the left and right side walls constituting the prefabricated manhole. Since the prefabricated manhole is lifted by using a lifting tool for the prefabricated manhole against the prefabricated manhole in which two anchors are mounted horizontally at a predetermined interval at a height, the top of the prefabricated manhole is By eliminating the various operations of the worker on the wall, it is possible to eliminate the risk that the worker will fall from the prefabricated manhole.
また、プレハブマンホールのアンカーは、プレハブマンホールを構成する左右の側壁部のそれぞれにおいて、プレハブマンホールの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカーが水平に取り付けられているプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、
プレハブマンホールの移動方向側に位置する2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの移動方向側に位置する2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように2本のワイヤーを前方に移動させ、2本のワイヤーの掛止体を、プレハブマンホールのアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に若干移動させ、プレハブマンホールの他方側の2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
切梁に近接した他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように他方側の2本のワイヤーを前方に移動させ、他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程を実施することにより、その切梁を避けることができる。
Further, the anchor of the prefabricated manhole is spaced at a predetermined interval at a position above the center of gravity of the prefabricated manhole and at a height that can be reached by the operator in each of the left and right side walls constituting the prefabricated manhole. When moving the prefabricated manhole where the anchors are attached horizontally (horizontal pulling), if the wire that lifts the prefabricated manhole hits the cutting beam in that moving direction,
A step of lowering the prefabricated manhole to the ground in a state where the two wires located on the moving direction side of the prefabricated manhole are close to the beam,
Removing the hooks of the two wires located on the moving direction side of the prefabricated manhole from the anchor of the prefabricated manhole;
A step of moving the two wires forward so as to straddle the beam, and again hooking the hooks of the two wires on the anchors of the prefabricated manhole,
Lifting the prefabricated manhole, moving it slightly forward, and lowering the prefabricated manhole to the ground with the two wires on the other side of the prefabricated manhole in close proximity to the beam,
Removing the hooks of the other two wires adjacent to the beam from the anchor of the prefabricated manhole;
Moving the two wires on the other side forward so as to straddle the cut beam, and re-hanging the hooks of the other two wires on the anchor of the prefabricated manhole;
By carrying out a process of lifting the prefabricated manhole and moving it forward, the cut beam can be avoided.
その結果、ワイヤーが切梁を避けながら、プレハブマンホールを水平方向に移動させる(横引き)ことが可能となり、既に設置されているプレハブマンホールの端面に、他のプレハブマンホールを容易に接合させることができる。 As a result, it is possible to move the prefabricated manhole in the horizontal direction (lateral pulling) while avoiding the cut beam, and it is possible to easily join another prefabricated manhole to the end face of the prefabricated manhole already installed. it can.
また、プレハブマンホールを水平方向に移動させる(横引き)とき、地面に降ろしている状態のプレハブマンホールにおいて、4本のワイヤーのうちの2本が、必ずプレハブマンホールのアンカーに接続されていることから、地面に降ろしている状態のプレハブマンホールが転倒してしまう事態の発生を確実に防止している。 In addition, when the prefabricated manhole is moved horizontally (laterally pulled), two of the four wires are always connected to the anchor of the prefabricated manhole in the prefabricated manhole that is lowered to the ground. The prefabricated manhole that has been lowered to the ground is reliably prevented from falling.
さらに、水平部材は、プレハブマンホールを構成する左右の側壁部の幅員よりも長い略長方形の板片により形成されており、水平部材の端部において、ワイヤーを真っ直ぐに降ろした状態で、ワイヤーの端部をプレハブマンホールの側壁部に固定したアンカーに接続している。 Further, the horizontal member is formed by a substantially rectangular plate piece that is longer than the width of the left and right side walls constituting the prefabricated manhole, and at the end of the horizontal member, the end of the wire is lowered straightly. The part is connected to an anchor fixed to the side wall of the prefabricated manhole.
その為、移動方向側に位置している2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程と、切梁を跨ぐように2本のワイヤーを前方に移動させ、2本のワイヤーの掛止体を、プレハブマンホールのアンカーに、再度掛け止めする工程を、容易に実施することができる。 For this reason, the process of removing the two wire latches located on the moving direction side from the anchor of the prefabricated manhole and the two wires are moved forward so as to straddle the beam. It is possible to easily carry out the step of latching the latching body again on the anchor of the prefabricated manhole.
また、他方側に位置している2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程と、切梁を跨ぐように2本のワイヤーを前方に移動させ、2本のワイヤーの掛止体を、プレハブマンホールのアンカーに、再度掛け止めする工程も容易に実施でき、切梁を避けることができるのである。 In addition, the process of removing the hooks of the two wires located on the other side from the anchor of the prefabricated manhole, and the two wires are moved forward so as to straddle the cut beam. The process of latching the stop on the anchor of the prefabricated manhole can be easily carried out, and the beam can be avoided.
この様に、プレハブマンホールを水平方向に移動させる(横引き)場合にも、プレハブマンホールの側壁部に取り付けているアンカーを利用してプレハブマンホールを吊り上げるのであるが、プレハブマンホールを設置する場所において、その幅スペースが非常に狭くなっており、作業員がプレハブマンホールの側壁部の近傍でワイヤーの掛止体をアンカーから取り外し、アンカーに掛け止めする作業を実施し難い場合には、プレハブマンホールを構成する天壁にも、アンカーを取り付けておくと良い。 Thus, even when moving the prefabricated manhole in the horizontal direction (lateral pulling), the prefabricated manhole is lifted using the anchor attached to the side wall of the prefabricated manhole, but in the place where the prefabricated manhole is installed, If the space is very narrow and it is difficult for workers to remove the wire latching body from the anchor near the side wall of the prefabricated manhole and lock it to the anchor, the prefabricated manhole is constructed. It is recommended that an anchor be attached to the ceiling wall.
具体的には、プレハブマンホールを構成する矩形状の天壁において、天壁を形成する一対の短辺の中央部近傍のそれぞれにアンカーを取り付けると共に、天壁を形成する一方の対角部のそれぞれにアンカーを取り付けておくのである。 Specifically, in the rectangular top wall constituting the prefabricated manhole, an anchor is attached to each of the vicinity of the center part of the pair of short sides forming the top wall, and each of the diagonal parts forming the top wall is provided. The anchor is attached to the.
そして、水平部材の両端部に取り付けている2本のワイヤーを利用し、2本のワイヤーの掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしてプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、
2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしている掛止体を、プレハブマンホールのアンカーから取り外す工程、
一方の掛止体を、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めし、他方の掛止体を、切梁を跨ぐように前方に移動させ、天壁を形成する対角部の他方側に位置しているアンカーに掛け止めする工程、
水平部材が切梁と交差するように斜めに配置した状態で、プレハブマンホールを吊り上げて、前方に若干移動させ、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしている一方のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
天壁を形成する対角部に位置しているそれぞれのアンカーに掛け止めしている掛止体を取り外す工程、
天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしていた一方の掛止体を、切梁を跨ぐように前方に移動させ、両掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程、を実施することにより、その切梁を避けることができる。
Then, using two wires attached to both ends of the horizontal member, the hooks of the two wires are positioned in the vicinity of the center of the pair of short sides forming the top wall of the prefabricated manhole. When the prefabricated manhole is moved horizontally by pulling it on the anchor (lateral pulling), the wire lifting the prefabricated manhole hits the cut beam in the moving direction.
The process of lowering the prefabricated manhole to the ground with two wires in close proximity to the beam,
A step of removing a latching body that is latched to an anchor located in the vicinity of the center part of a pair of short sides forming the top wall of the prefabricated manhole from the anchor of the prefabricated manhole,
One hanging body is hooked to the anchor located on one side of the diagonal part forming the top wall, the other hanging body is moved forward so as to straddle the beam, and the top wall is A step of hooking on an anchor located on the other side of the diagonal portion to be formed,
With the horizontal member placed diagonally so as to intersect the beam, the prefabricated manhole is lifted and moved slightly forward and hooked to the anchor located on one side of the diagonal that forms the top wall. The process of lowering the prefabricated manhole to the ground with one of the wires in close proximity to the cutting beam,
Removing a latching body that is latched to each anchor located at a diagonal portion that forms the top wall;
Move one latching body, which was latched on the anchor located on one side of the diagonal part forming the top wall, forward so as to straddle the beam, and connect both latching bodies to the prefabricated manhole. Re-hanging on the anchors located near the center of the pair of short sides forming the top wall,
By carrying out the step of lifting the prefabricated manhole and moving it forward, the beam can be avoided.
以下に、図面を参照して、本発明を実施するための形態を詳細に説明する。 Hereinafter, embodiments for carrying out the present invention will be described in detail with reference to the drawings.
本発明に係るプレハブマンホールP用の吊り上げ治具1は、図1・図2に示すように、プレハブマンホールPを構成する左右の側壁部のそれぞれにおいて、プレハブマンホールPの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカー2を水平に取り付けている構成のプレハブマンホールPを吊り上げるものである。
As shown in FIGS. 1 and 2, the lifting
この様な構成のプレハブマンホールPを吊り上げる、プレハブマンホール用の吊り上げ治具1は、図1・図2に示すように、クレーン重機を利用して吊り上げる水平部材11と、水平部材11の両端部にそれぞれ取り付けた2本のワイヤーWにより構成され、それぞれのワイヤーWの先端部に、プレハブマンホールPのアンカー2に掛け止めする掛止体3を備えている。
The prefabricated
プレハブマンホールPは、左右の側壁部において、図3に示すように、それぞれ水平となる2箇所に、略半円球状に抉られた窪み部4が設けられている。この窪み部4の奥部中央には、図2・図3に示すように、アンカー2が固定されている。このアンカー2は、図5(a)に示すように、棒体2aの両端に薄板円形状の頭部2bを備えている。そして、図6(a)に示すように、アンカー2の一方の頭部2bが側壁内に埋め込まれ、他方の頭部2bは、窪み部4内に突出している。
As shown in FIG. 3, the prefabricated manhole P is provided with
このプレハブマンホールPの窪み部4とアンカー2は、プレハブマンホールPの側壁において、プレハブマンホールPの重心位置よりも上側で、作業員の手の届く高さ(例えば、底面から1m〜1.5m程度の高さ)に配置されている。
The
また、プレハブマンホールPを吊り上げる水平部材11は、図1・図2に示すように、プレハブマンホールPを構成する左右の側壁部の幅員よりも長い略長方形の板片により形成され、その短辺が立設するように板片を配置し、板片の長手方向における両側面に、補強用リブ12が設けられている。
Moreover, the
さらに、図1・図2に示すように、水平部材11の両端部のそれぞれにおいて、上方に1個の取付孔13aが設けられている。また、下方に2個の取付孔13bが設けられている。
Further, as shown in FIGS. 1 and 2, one mounting
この上方の取付孔13aには、クレーン重機のフックKに掛けられている2本のワイヤーWの端部が接続されている。また、下方の2個の取付孔13bにおいて、内側の取付孔13bには、プレハブマンホールPを吊り上げている2本のワイヤーWが接続されている。この2本のワイヤーWは、取付孔13bに掛け止めしている、閉鎖した逆U字状の取付治具Vを介して、取付孔13bに接続されている。
The ends of the two wires W hung on the hooks K of the heavy crane are connected to the upper mounting
また、2本のワイヤーWの他端部には、所定の取付治具Vを介して、掛止体3を接続している。
In addition, the
掛止体3は、図4・図5に示すように、プレハブマンホールPを構成する側壁部に設けている窪み部4内に固定されているアンカー2に、掛け止めするものである。
As shown in FIGS. 4 and 5, the latching
この掛止体3は、図1・図3(a)(b)に示すように、ワイヤーWの取付治具Vにおけるリング部材に接続する接続片3cと、接続片3cに回転可能に取り付けたカプラー3aにより構成されている。
As shown in FIGS. 1 and 3 (a) and 3 (b), the hooking
接続片3cは、図3(a)(b)に示すように、略長方形状の板材に形成され、基端側部分の全体に矩形状の開口部3gが設けられている。この開口部3gに、取付治具Vに係合しているリング部材が取り付けられている。また、接続片3cの先端部分には、略円形の孔3fが設けられている。この孔3fに、カプラー3aが回転可能に取り付けられている。
As shown in FIGS. 3A and 3B, the
カプラー3aは、図5(a)・図6(a)に示すように、全体が中空円環状に形成されている。この中空円環状のカプラー3aの周面には、アンカー2の頭部2bを導入するための開口部5を設け、この開口部5に、幅狭な長孔6を連設している。
As shown in FIGS. 5A and 6A, the
中空円環状のカプラー3aは、プレハブマンホールPの側壁部に設けている窪み部4の内周面に沿って回転できる程度の大きさを備えている。また、カプラー3aの周面には、開口部5に隣接して、爪部3eが突設されている。
The hollow
カプラー3aの開口部5は、アンカー2の頭部2bにカプラー3aの開口部5を宛がって、アンカー2の頭部2bをカプラー3a内に導入するものである。また、カプラー3aの幅狭な長孔6は、この長孔6内にアンカー2の頭部2bを係合させて、アンカー2の頭部2bからのカプラー3aの離脱を阻止している。
The
そして、図3・図4に示すように、プレハブマンホールPを構成する側壁部に設けている窪み部4内に固定されているアンカー2に、カプラー3aを取り付けるときは、まず、図5(a)(b)・図6(a)(b)に示すように、アンカー2の頭部2bにカプラー3aの開口部5を宛がって、アンカー2の頭部2bをカプラー3a内に導入する。
As shown in FIGS. 3 and 4, when the
次に、爪部3eを摘んでカプラー3aの長孔6が上方に移動するようにカプラー3aを回転させて、図5(c)・図6(c)に示すように、カプラー3の長孔6にアンカー2の頭部2bを係合させる。そして、ワイヤーWによりプレハブマンホールPを吊り上げると、アンカー2の頭部2bは、常にカプラー3aの幅狭な長孔6に係合した状態が維持されるので、アンカー2の頭部2bからカプラー3aが外れることが無い。
Next, the
これに対し、プレハブマンホールPのアンカー2から、カプラー3a取り外すときは、まず、プレハブマンホールPを地面に等に降ろす。そして、図5(c)・図6(c)に示す状態のカプラー3aの爪部3eを摘んで、カプラー3aの長孔6が下方に移動するようにカプラー3aを回転させる。そして、アンカー2の頭部2bに係合しているカプラー3aの長孔6を移動させて、図3(a)に示すように、カプラー3aの開口部5をアンカー2の頭部2bの位置に配置する。このカプラー3aの開口部5を介して、アンカー2の頭部2bからカプラー3aを離脱させるのである。
On the other hand, when removing the
本発明に係るプレハブマンホールP用の吊り上げ治具1を使用して、プレハブマンホールPを吊り上げるときは、図1・図2に示すように、クレーン重機のフックKに掛けられている2本のワイヤーWを水平部材11の両端部に接続し、この水平部材11の両端部のそれぞれにおいて、2本のワイヤーWを真っ直ぐに下方に降ろし、2本のワイヤーWに接続している掛止体3としてのカプラー3aを、プレハブマンホールPの左右の側壁部に設けている窪み部4内のアンカー2の頭部2bに取り付ける。
When lifting the prefabricated manhole P using the lifting
この状態でクレーン重機を作動させて、フックKの下側に存在するプレハブマンホールPを、水平部材11を介して吊り上げる。そして、例えば、図7に示すように、プレハブマンホールPを運搬車輌Qの荷台に載せる。
In this state, the crane heavy machine is operated to lift the prefabricated manhole P existing below the hook K through the
次に、水平部材11を若干降ろした状態とし、掛止体3としてのカプラー3aを、プレハブマンホールPの左右の側壁部に設けている窪み部4内のアンカー2の頭部2bから取り外す。
Next, the
そして、運搬車輌Qの荷台にプレハブマンホールPを固定する措置を施して、運搬車輌QによりプレハブマンホールPを運搬する。 Then, measures are taken to fix the prefabricated manhole P to the loading platform of the transporting vehicle Q, and the prefabricated manhole P is transported by the transporting vehicle Q.
次に、運搬車輌Qの荷台からプレハブマンホールPを移動させるときは、例えば、図7に示すように、運搬車輌Qの荷台に作業員が乗り込んで、水平部材11の両端部のそれぞれにおいて、2本のワイヤーWを真っ直ぐに下方に降ろし、2本のワイヤーWに接続している掛止体3としてのカプラー3aを、プレハブマンホールPの左右の側壁部に設けている窪み部4内のアンカー2の頭部2bに再度取り付ける。
Next, when the prefabricated manhole P is moved from the loading platform of the transport vehicle Q, for example, as shown in FIG. The
この状態でクレーン重機を作動させて、フックKの下側に存在するプレハブマンホールPを、水平部材11を介して吊り上げるのである。
In this state, the crane heavy machine is operated, and the prefabricated manhole P existing below the hook K is lifted through the
以下に、プレハブマンホールP用の吊り上げ治具1を使用した、プレハブマンホールP用の吊り上げ方法において、切梁Hを避けながら、プレハブマンホールPを水平方向に移動させる(横引き)具体的な工程を説明する。
Hereinafter, in the lifting method for the prefabricated manhole P using the lifting
このプレハブマンホールPの水平方向への移動(横引き)においては、例えば、図8に示すように、既に設置されているプレハブマンホールPの端面に、新たなプレハブマンホールPの端面を接合させるときに、その移動方向において、プレハブマンホールPを吊り上げているワイヤーWが切梁Hに当たってしまうことがある。 In the movement (lateral pulling) of the prefabricated manhole P in the horizontal direction, for example, as shown in FIG. 8, when the end face of the new prefabricated manhole P is joined to the end face of the prefabricated manhole P already installed. In the moving direction, the wire W lifting the prefabricated manhole P may hit the cut beam H.
以下に示す各工程は、この切梁Hを避けながら、プレハブマンホールPを水平方向に移動させる(横引き)手順である。 Each process shown below is a procedure for moving the prefabricated manhole P in the horizontal direction while avoiding the cut beam H (lateral pulling).
先ず、図9(a)・(b)に示すように、プレハブマンホールPを水平方向に移動させて、プレハブマンホールPを吊り上げている移動方向側に位置している2本のワイヤーWが切梁Hに近接したとき、プレハブマンホールPを地面に降ろす。 First, as shown in FIGS. 9A and 9B, the prefabricated manhole P is moved in the horizontal direction, and the two wires W positioned on the moving direction side where the prefabricated manhole P is lifted are cut beams. When approaching H, the prefabricated manhole P is lowered to the ground.
次に、図9(c)に示すように、プレハブマンホールPの移動方向側に位置している2本のワイヤーWの掛止体3を、プレハブマンホールPのアンカー2から取り外す。
Next, as shown in FIG. 9C, the
次に、図9(c)(d)に示すように、切梁Hを跨ぐように、移動方向側に位置している2本のワイヤーWを前方に移動させ、2本のワイヤーWの掛止体3を、プレハブマンホールPのアンカー2に、再度掛け止めする。
Next, as shown in FIGS. 9C and 9D, the two wires W located on the moving direction side are moved forward so as to straddle the cutting beam H, and the two wires W are hooked. The
次に、図9(d)・(e)・(f)に示すように、プレハブマンホールPを吊り上げて、前方に移動させ、プレハブマンホールPの他方側に位置している2本のワイヤーWが切梁Hに近接した状態で、プレハブマンホールPを地面に降ろす。 Next, as shown in FIGS. 9D, 9E and 9F, the prefabricated manhole P is lifted and moved forward, and the two wires W positioned on the other side of the prefabricated manhole P are In the state close to the cut beam H, the prefabricated manhole P is lowered to the ground.
次に、図9(g)に示すように、切梁Hに近接した他方側に位置している2本のワイヤーWの掛止体3を、プレハブマンホールPのアンカー2から取り外す。
Next, as shown in FIG. 9 (g), the
次に、図9(g)(h)に示すように、切梁Hを跨ぐように、他方側に位置している2本のワイヤーWを前方に移動させ、2本のワイヤーWの掛止体3を、プレハブマンホールPのアンカー2に、再度掛け止めする。
Next, as shown in FIGS. 9 (g) and 9 (h), the two wires W located on the other side are moved forward so as to straddle the cutting beam H, and the two wires W are latched. The
最後に、図9(h)(i)に示すように、プレハブマンホールPを吊り上げて、前方に移動させ、所定の場所に設置するのである。 Finally, as shown in FIGS. 9H and 9I, the prefabricated manhole P is lifted, moved forward, and installed at a predetermined location.
この様な工程を実施することにより、ワイヤーWが切梁Hを避けながらプレハブマンホールPを水平方向に移動させる(横引き)ことが可能となり、既に設置されているプレハブマンホールPの端面に、他のプレハブマンホールPを容易に接合させることができる。 By carrying out such a process, it becomes possible for the wire W to move the prefabricated manhole P in the horizontal direction while avoiding the cut beam H (lateral pulling), and to the end face of the prefabricated manhole P already installed, The prefabricated manhole P can be easily joined.
また、このプレハブマンホールPを水平方向に移動させる(横引き)とき、地面に降ろしている状態のプレハブマンホールPにおいて、4本のワイヤーWのうちの2本のワイヤーWが、必ずプレハブマンホールPのアンカー2に接続されていることから、プレハブマンホールPが転倒してしまう事態の発生を確実に防止している。
In addition, when the prefabricated manhole P is moved in the horizontal direction (horizontal pulling), in the prefabricated manhole P in a state of being lowered to the ground, two of the four wires W are always in the prefabricated manhole P. Since it is connected to the
この様に、切梁Hを避けながらプレハブマンホールPを水平方向に移動させる(横引き)場合にも、プレハブマンホールPの側壁部に取り付けているアンカー2を利用してプレハブマンホールPを吊り上げるのであるが、プレハブマンホールPを設置する場所において、その幅スペースが非常に狭くなっており、作業員がプレハブマンホールPの側壁部の近傍でワイヤーWの掛止体3をアンカー2から取り外し、アンカー2に掛け止めする作業を実施し難い場合には、プレハブマンホールPを構成する天壁にも、アンカー2を取り付けておくと良い。
Thus, even when the prefabricated manhole P is moved in the horizontal direction while avoiding the cut beam H (lateral pulling), the prefabricated manhole P is lifted by using the
具体的には、図10に示すように、プレハブマンホールPを構成する矩形状の天壁において、天壁を形成する一対の短辺の中央部近傍のそれぞれにアンカー2を取り付けると共に、天壁を形成する一方の対角部のそれぞれにアンカー2を取り付けておくのである。
Specifically, as shown in FIG. 10, in the rectangular ceiling wall constituting the prefabricated manhole P, the
尚、アンカー2は、天壁を形成する他方の対角部のそれぞれにアンカー2を取り付けも良い。
The
そして、図11に示すように、水平部材12の両端部に2本ずつ取り付けている計4本のワイヤーWの内、2本のワイヤーWのみを利用して、プレハブマンホールPを吊り上げるのである。
Then, as shown in FIG. 11, the prefabricated manhole P is lifted using only two wires W out of a total of four wires W attached to both ends of the
尚、図11乃至図14においては、説明を明確にするために、2本のワイヤーWのみを記載している。 In FIG. 11 to FIG. 14, only two wires W are shown for clarity of explanation.
そして、図11に示すように、プレハブマンホールPの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカー2に、2本のワイヤーWの掛止体3を掛け止めしている状態と、図12に示すように、天壁を形成する一方の対角部のそれぞれに位置しているアンカー2に、2本のワイヤーWの掛止体3を掛け止めしている状態を適宜維持して、切梁Hを避けながら、プレハブマンホールPを水平方向に移動させる(横引き)のである。
Then, as shown in FIG. 11, the
具体的には、まず、図13(a)に示すように、2本のワイヤーWの掛止体3を、プレハブマンホールPの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカー2に掛け止めしてプレハブマンホールPを水平方向に移動させる(横引き)。
Specifically, first, as shown in FIG. 13 (a), the hooking
そして、図13(b)に示すように、2本のワイヤーWが切梁Hに近接した状態で、プレハブマンホールPを地面に降ろす。 Then, as shown in FIG. 13B, the prefabricated manhole P is lowered to the ground in a state where the two wires W are close to the cut beam H.
次に、プレハブマンホールPの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカー2に掛け止めしている掛止体3を、プレハブマンホールのアンカーから取り外す。
Next, the
次に、図13(c)に示すように、一方の掛止体3を、天壁を形成する対角部の一方側に位置しているアンカー2に掛け止めし、他方の掛止体3を、切梁Hを跨ぐように前方に移動させ、天壁を形成する対角部の他方側に位置しているアンカー2に掛け止めする。
Next, as shown in FIG.13 (c), one latching
そして、水平部材11が切梁Hと交差するように斜めに配置した状態で、プレハブマンホールPを吊り上げて、図14(a)に示すように、前方に若干移動させ、天壁を形成する対角部の一方側に位置しているアンカー2に掛け止めしている一方のワイヤーWが切梁Hに近接した状態で、プレハブマンホールPを地面に降ろす。
Then, in a state in which the
次に、天壁を形成する対角部に位置しているそれぞれのアンカー2に掛け止めしている掛止体3を取り外し、図14(b)に示すように、天壁を形成する対角部の一方側に位置しているアンカー2に掛け止めしていた一方の掛止体3を、切梁Hを跨ぐように前方に移動させ、両掛止体3を、プレハブマンホールPの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカー2に再度掛け止めする。
Next, the
この状態において、図14(c)に示すように、プレハブマンホールPを吊り上げて前方に移動させ、切梁Hを避けながら、プレハブマンホールPを水平方向に移動させる(横引き)のである。 In this state, as shown in FIG. 14C, the prefabricated manhole P is lifted and moved forward, and the prefabricated manhole P is moved in the horizontal direction while avoiding the cut beam H (lateral pulling).
尚、本発明は、前記した実施の形態に限定されるものではなく、本発明の目的を達成できる範囲での改良・変形等は、本発明に全て包含されるものである。 It should be noted that the present invention is not limited to the above-described embodiment, and all the improvements and modifications within the scope that can achieve the object of the present invention are included in the present invention.
本発明は、コンクリート基礎等の据付場所に複数のプレハブマンホールを設置して管路マンホールを布設・構築するために使用されることの他に、種々の建造物を布設・構築する際の吊り上げ治具と吊り上げ工法として、幅広く利用することができる。 In addition to being used for laying and constructing pipe manholes by installing a plurality of prefabricated manholes at installation locations such as concrete foundations, the present invention provides a lifting treatment for laying and constructing various structures. It can be widely used as a tool and lifting method.
P…プレハブマンホール
Q…運搬車輌
S…梯子
T…移動用鋼棒
K…フック
F…フック
W…ワイヤー
1…吊り上げ治具
2…アンカー
2a…棒体
2b…頭部
3…掛止体
3a…カプラー
3c…接続片
3e…爪部
3f…孔
3g…開口部
4…窪み部
5…開口部
6…長孔
P ... Prefabricated manhole Q ... Transport vehicle S ... Ladder T ... Moving steel rod K ... Hook F ... Hook W ...
Claims (2)
プレハブマンホールのアンカーは、プレハブマンホールを構成する左右の側壁部のそれぞれにおいて、プレハブマンホールの重心位置よりも上側で、作業員の手が届く高さの位置に、所定の間隔を開けて2個のアンカーが水平に取り付けられているプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、その切梁を避けるために、
プレハブマンホールの移動方向側に位置する2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの移動方向側に位置する2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように2本のワイヤーを前方に移動させ、2本のワイヤーの掛止体を、プレハブマンホールのアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に若干移動させ、プレハブマンホールの他方側の2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
切梁に近接した他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーから取り外す工程、
切梁を跨ぐように他方側の2本のワイヤーを前方に移動させ、他方側の2本のワイヤーの掛止体を、プレハブマンホールのアンカーに、再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程、を実施する、プレハブマンホール用の吊り上げ治具を使用したプレハブマンホールの吊り上げ方法。 A lifting tool for a prefabricated manhole for lifting a prefabricated manhole formed in a square tube shape through an anchor attached to the prefabricated manhole. A prefabricated manhole using a lifting tool for prefabricated manholes, which is composed of two wires attached to both ends, each of which has a hooking body that hooks onto the anchor of the prefabricated manhole. In the lifting method of
The anchors of the prefabricated manhole are two spaced apart from each other on the left and right side walls constituting the prefabricated manhole at positions above the center of gravity of the prefabricated manhole and at a height that can be reached by workers. When moving the prefabricated manhole to which the anchor is attached horizontally (lateral pulling), if the wire that lifts the prefabricated manhole hits the cutting beam in that moving direction, in order to avoid the cutting beam,
A step of lowering the prefabricated manhole to the ground in a state where the two wires located on the moving direction side of the prefabricated manhole are close to the beam,
Removing the hooks of the two wires located on the moving direction side of the prefabricated manhole from the anchor of the prefabricated manhole;
A step of moving the two wires forward so as to straddle the beam, and again hooking the hooks of the two wires on the anchors of the prefabricated manhole,
Lifting the prefabricated manhole, moving it slightly forward, and lowering the prefabricated manhole to the ground with the two wires on the other side of the prefabricated manhole in close proximity to the beam,
Removing the hooks of the other two wires adjacent to the beam from the anchor of the prefabricated manhole;
Moving the two wires on the other side forward so as to straddle the beam, and hooking the hooks of the other two wires on the anchor of the prefabricated manhole again,
A method of lifting a prefabricated manhole using a lifting tool for a prefabricated manhole, wherein the prefabricated manhole is lifted and moved forward.
プレハブマンホールを構成する矩形状の天壁において、天壁を形成する一対の短辺の中央部近傍のそれぞれにアンカーを取り付けると共に、天壁を形成する一方の対角部のそれぞれにアンカーを取り付けている場合において、水平部材の両端部に取り付けている2本のワイヤーを利用し、2本のワイヤーの掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしてプレハブマンホールを水平方向に移動させる(横引き)場合、その移動方向において、プレハブマンホールを吊り上げているワイヤーが切梁に当たってしまう場合、その切梁を避けるために、
2本のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに掛け止めしている掛止体を、プレハブマンホールのアンカーから取り外す工程、
一方の掛止体を、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めし、他方の掛止体を、切梁を跨ぐように前方に移動させ、天壁を形成する対角部の他方側に位置しているアンカーに掛け止めする工程、
水平部材が切梁と交差するように斜めに配置した状態で、プレハブマンホールを吊り上げて、前方に若干移動させ、天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしている一方のワイヤーが切梁に近接した状態で、プレハブマンホールを地面に降ろす工程、
天壁を形成する対角部に位置しているそれぞれのアンカーに掛け止めしている掛止体を取り外す工程、
天壁を形成する対角部の一方側に位置しているアンカーに掛け止めしていた一方の掛止体を、切梁を跨ぐように前方に移動させ、両掛止体を、プレハブマンホールの天壁を形成する一対の短辺の中央部近傍のそれぞれに位置しているアンカーに再度掛け止めする工程、
プレハブマンホールを吊り上げて、前方に移動させる工程、を実施する、プレハブマンホール用の吊り上げ治具を使用したプレハブマンホールの吊り上げ方法。 A lifting tool for a prefabricated manhole for lifting a prefabricated manhole formed in a square tube shape through an anchor attached to the prefabricated manhole. A prefabricated manhole using a lifting tool for prefabricated manholes, which is composed of two wires attached to both ends, each of which has a hooking body that hooks onto the anchor of the prefabricated manhole. In the lifting method of
In the rectangular ceiling wall that constitutes the prefabricated manhole, the anchor is attached to each of the central portions of the pair of short sides forming the ceiling wall, and the anchor is attached to each of the diagonal portions forming the ceiling wall. When using the two wires attached to both ends of the horizontal member, the hooks of the two wires are respectively attached to the vicinity of the center of the pair of short sides forming the top wall of the prefabricated manhole. To move the prefabricated manhole in the horizontal direction by hanging it on the anchor that is positioned (lateral pulling), if the wire that lifts the prefabricated manhole hits the cut beam in that moving direction, to avoid the cut beam ,
The process of lowering the prefabricated manhole to the ground with two wires in close proximity to the beam,
A step of removing a latching body that is latched to an anchor located in the vicinity of the center part of a pair of short sides forming the top wall of the prefabricated manhole from the anchor of the prefabricated manhole,
One hanging body is hooked to the anchor located on one side of the diagonal part forming the top wall, the other hanging body is moved forward so as to straddle the beam, and the top wall is A step of hooking on an anchor located on the other side of the diagonal portion to be formed,
With the horizontal member placed diagonally so as to intersect the beam, the prefabricated manhole is lifted and moved slightly forward and hooked to the anchor located on one side of the diagonal that forms the top wall. The process of lowering the prefabricated manhole to the ground with one of the wires in close proximity to the cutting beam,
Removing a latching body that is latched to each anchor located at a diagonal portion that forms the top wall;
Move one latching body, which was latched on the anchor located on one side of the diagonal part forming the top wall, forward so as to straddle the beam, and connect both latching bodies to the prefabricated manhole. Re-hanging on the anchors located near the center of the pair of short sides forming the top wall,
A method of lifting a prefabricated manhole using a lifting tool for a prefabricated manhole, wherein the prefabricated manhole is lifted and moved forward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010231102A JP5618201B2 (en) | 2010-10-14 | 2010-10-14 | Lifting method of prefabricated manhole using lifting jig for prefabricated manhole |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010231102A JP5618201B2 (en) | 2010-10-14 | 2010-10-14 | Lifting method of prefabricated manhole using lifting jig for prefabricated manhole |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2012082645A JP2012082645A (en) | 2012-04-26 |
JP5618201B2 true JP5618201B2 (en) | 2014-11-05 |
Family
ID=46241801
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2010231102A Expired - Fee Related JP5618201B2 (en) | 2010-10-14 | 2010-10-14 | Lifting method of prefabricated manhole using lifting jig for prefabricated manhole |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5618201B2 (en) |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3012278C2 (en) * | 1980-03-29 | 1983-10-27 | Ernst Dr.-Ing. 4300 Essen Haeussler | Device for attaching a precast concrete part to a hoist |
JPS61117364A (en) * | 1984-11-09 | 1986-06-04 | 高見 恭司 | Connection of concrete product |
JP2869438B2 (en) * | 1989-11-30 | 1999-03-10 | 株式会社北研 | Lifting setting device for large concrete products |
JP3481665B2 (en) * | 1994-03-24 | 2003-12-22 | 藤村ヒューム管株式会社 | Laying concrete blocks |
JPH1160147A (en) * | 1997-08-19 | 1999-03-02 | Hitachi Metals Ltd | Suspension fitting |
JP3684347B2 (en) * | 2001-11-26 | 2005-08-17 | 株式会社ホクコン | Construction method of precast concrete water tank |
JP4639163B2 (en) * | 2006-04-27 | 2011-02-23 | 有限会社アスラック | Concrete block construction method |
JP4264095B2 (en) * | 2006-06-23 | 2009-05-13 | 株式会社協和エクシオ | Manhole reinforcement structure |
JP4866713B2 (en) * | 2006-12-07 | 2012-02-01 | 矢内 誠 | Manhole structure |
-
2010
- 2010-10-14 JP JP2010231102A patent/JP5618201B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JP2012082645A (en) | 2012-04-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100704720B1 (en) | Temporary lifting device and temporary lifting method | |
KR100760286B1 (en) | Gang foam drop prevention device | |
KR20190066241A (en) | Gang form safety apparatus with integrated safety hook | |
JP3181041U (en) | Mounting member for scaffolding for bridge | |
JP2010090646A (en) | Method for constructing cylindrical concrete structure, inside form device, and fall prevention device | |
KR100514133B1 (en) | Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same | |
JP5901873B2 (en) | How to install a temporary scaffold for slopes | |
JP5618201B2 (en) | Lifting method of prefabricated manhole using lifting jig for prefabricated manhole | |
JP3977400B2 (en) | Concrete structure construction method | |
JP6166870B2 (en) | Pillar standing method and pillar | |
KR200467345Y1 (en) | A pile lifting structrue | |
KR100866412B1 (en) | Gangform Fall Prevention Device | |
KR20080110373A (en) | Jack bass | |
KR20130050323A (en) | Method for the safe transport of moving goods using apartmenthouse balcony structure | |
JP5745384B2 (en) | Exterior wall material mounting system | |
KR200433916Y1 (en) | Gang foam drop prevention structure for wall construction using coupling of buried support cone | |
KR200392054Y1 (en) | A guide rail fix device of a contructing a building gaengpom | |
KR200459687Y1 (en) | An apparatus for engaging the rope for cleaning the surface of a building | |
JP6777322B2 (en) | Temporary walkway for workbench | |
JP3124057U (en) | Unic arm suspension scaffold | |
JP2008222411A (en) | Hoisting accessory for connected block and construction method of connected block | |
JP2001020529A (en) | Hanger for outer wall panel | |
KR200410232Y1 (en) | Guide rail fixing device of sliding form | |
CN211664614U (en) | Vertical transport means | |
JP3097604U (en) | Forming equipment for openings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20130326 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20140507 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140703 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20140822 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20140904 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 5618201 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
LAPS | Cancellation because of no payment of annual fees |