JP4761886B2 - Robot bending system and bending method - Google Patents

Robot bending system and bending method Download PDF

Info

Publication number
JP4761886B2
JP4761886B2 JP2005239090A JP2005239090A JP4761886B2 JP 4761886 B2 JP4761886 B2 JP 4761886B2 JP 2005239090 A JP2005239090 A JP 2005239090A JP 2005239090 A JP2005239090 A JP 2005239090A JP 4761886 B2 JP4761886 B2 JP 4761886B2
Authority
JP
Japan
Prior art keywords
workpiece
robot
bending
gripper
dimension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005239090A
Other languages
Japanese (ja)
Other versions
JP2007050447A (en
Inventor
隆 若原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Amada Co Ltd
Original Assignee
Amada Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Amada Co Ltd filed Critical Amada Co Ltd
Priority to JP2005239090A priority Critical patent/JP4761886B2/en
Publication of JP2007050447A publication Critical patent/JP2007050447A/en
Application granted granted Critical
Publication of JP4761886B2 publication Critical patent/JP4761886B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bending Of Plates, Rods, And Pipes (AREA)

Description

本発明は、ロボットで把持されたワークの片伸び値を測定する測定装置が小型であって構成が簡単であり、測定時間を短縮することにより、測定効率を向上させ、曲げ角度が90°のみならず鋭角や鈍角のワークを測定対象とすることにより、測定対象の範囲を拡大し、且つワークの片伸び値を測定する測定装置を用いてワークを位置決めし、ロボットが機械本体と干渉することなく曲げ加工を行うロボットによる曲げ加工システム及び曲げ加工方法に関する。   In the present invention, the measuring device for measuring the half elongation value of the workpiece gripped by the robot is small in size and simple in configuration, and the measuring time is shortened to improve the measuring efficiency and the bending angle is only 90 °. In addition, by using a workpiece with an acute or obtuse angle as a measurement target, the range of the measurement target is expanded and the workpiece is positioned using a measuring device that measures the half elongation value of the workpiece, and the robot interferes with the machine body. The present invention relates to a bending system and a bending method by a robot that performs bending without any problem.

従来より、図12に示すように、パンチPとダイDを備えた曲げ加工装置(例えばプレスブレーキ)において、平坦なワークWを曲げ線mに沿って曲げ加工することにより、フランジFを形成し、所定のフランジ寸法Hを得ようとする場合には、このフランジ寸法Hが重要寸法となる。   Conventionally, as shown in FIG. 12, a flange F is formed by bending a flat work W along a bend line m in a bending apparatus (for example, a press brake) having a punch P and a die D. When obtaining a predetermined flange dimension H, the flange dimension H becomes an important dimension.

従って、ワーク位置決め時には(図12(A))、この重要寸法側である曲げ線mから先端部までのワーク部分W1を、図示するように、バックゲージの突当50側に配置し、該重要寸法側ワーク部分W1を突当50に突き当てて位置決めしている。   Therefore, at the time of workpiece positioning (FIG. 12A), the workpiece portion W1 from the bend line m to the tip portion, which is the important dimension side, is arranged on the back gauge abutment 50 side as shown in the drawing, The dimension-side workpiece part W1 is positioned against the abutment 50.

これにより、重要寸法側ワーク部分W1の位置決め状態が安定し、曲げ加工時に(図12(B))、曲げ線mの位置が金型センタCからずれることなく、より正確なフランジ寸法Hが得られるようになっている。   As a result, the positioning state of the workpiece part W1 on the important dimension side is stabilized, and the bending line m is not displaced from the mold center C during bending (FIG. 12B), and a more accurate flange dimension H is obtained. It is supposed to be.

この場合、ワーク位置決め時(図12(A))における突き当て寸法L、即ち曲げ線m位置からワーク先端部までの距離Lを算出し、この突き当て寸法Lの位置にバックゲージの突当50を位置決めする必要がある。   In this case, the abutment dimension L at the time of workpiece positioning (FIG. 12A), that is, the distance L from the position of the bending line m to the tip of the workpiece is calculated, and the back gauge abutment 50 is placed at the position of the abutment dimension L. Need to be positioned.

このため、よく知られているように、ワークWが曲げ加工時に(図12(B))若干伸びることを考慮し、伸び値である片伸び値α(図4)を予め測定しておき、前記所定のフランジ寸法Hからこの片伸び値αを減じた値を、突き当て寸法Lとして算出している。   For this reason, as is well known, in consideration of a slight extension of the workpiece W during bending (FIG. 12B), a single elongation value α (FIG. 4), which is an elongation value, is measured in advance. A value obtained by subtracting the single elongation value α from the predetermined flange dimension H is calculated as an abutment dimension L.

このことは、図13に示すように、既に曲げ線m1に沿って一方のフランジF1が形成されているワークWの他方の曲げ線m2に沿って新たなフランジF2をを形成し、所定の底部寸法Aを得ようとする場合にも同様であり、この底部寸法Aが重要寸法となる。   This means that, as shown in FIG. 13, a new flange F2 is formed along the other bend line m2 of the workpiece W where one flange F1 is already formed along the bend line m1, and a predetermined bottom portion is formed. The same applies to the case where the dimension A is to be obtained, and this bottom dimension A is an important dimension.

従って、ワーク位置決め時には(図13(A))、この重要寸法側である曲げ線m2からフランジF1までのワーク部分W2を、図示するように、バックゲージの突当50側に配置し、該重要寸法側ワーク部分W2を突当50に突き当てて位置決めしている。   Accordingly, at the time of workpiece positioning (FIG. 13A), the workpiece portion W2 from the bend line m2 to the flange F1, which is the important dimension side, is arranged on the back gauge abutment 50 side as shown in FIG. The dimension-side work part W2 is positioned against the abutment 50.

これにより、同様に、重要寸法側ワーク部分W2の位置決め状態が安定し、曲げ加工時に(図13(B))、曲げ線m2の位置が金型センタCからずれることなく、より正確な底部寸法Aが得られるようになっている。   Thereby, similarly, the positioning state of the work part W2 on the important dimension side is stabilized, and the position of the bend line m2 is not displaced from the mold center C at the time of bending (FIG. 13B). A is obtained.

この場合も、同様に、ワーク位置決め時(図13(A))における突き当て寸法L、即ち曲げ線m2位置からフランジF1の外側までの距離Lを算出し、この突き当て寸法Lの位置にバックゲージの突当50を位置決めする必要があり、このため、既述した片伸び値α(図4)を予め測定しておき、前記所定の底部寸法Aからこの片伸び値αを減じた値を、突き当て寸法Lとして算出している。   In this case as well, the abutting dimension L at the time of workpiece positioning (FIG. 13A), that is, the distance L from the position of the bend line m2 to the outside of the flange F1 is calculated, and the back of the abutting dimension L is calculated. The gauge abutment 50 needs to be positioned. Therefore, the above-described single elongation value α (FIG. 4) is measured in advance, and a value obtained by subtracting the single elongation value α from the predetermined bottom dimension A is obtained. The abutting dimension L is calculated.

しかし、前記片伸び値αは、ワークWの板厚などの条件により異なることが多く、現実の加工の場合には、ある工程で測定した片伸び値αを、次工程の突き当て寸法に反映させ補正している。   However, the piece elongation value α is often different depending on conditions such as the thickness of the workpiece W. In actual machining, the piece elongation value α measured in a certain process is reflected in the abutting dimension of the next process. To correct.

例えば、図12において、ある工程で片伸び値αを測定した場合には、次工程での所定のフランジ寸法Hからこの片伸び値αを減じることにより、次工程の突き当て寸法Lを算出し、予めCAD情報などから設定された突き当て寸法の値を補正している。   For example, in FIG. 12, when the single elongation value α is measured in a certain process, the abutting dimension L in the next process is calculated by subtracting the single elongation value α from the predetermined flange dimension H in the next process. The abutting dimension value set in advance from CAD information or the like is corrected.

このことは、ワークWを作業者が手動で把持して曲げ加工する場合も、また、該ワークWをロボットのグリッパで把持して曲げ加工する場合も同様である。   This is the same when the operator manually grips and bending the workpiece W, or when the workpiece W is gripped by a robot gripper and bent.

そして、例えばワークWをロボットのグリッパで把持して曲げ加工する場合に、ある工程において、既述した片伸び値α(図4)の代わりにフランジ寸法を測定し、フランジ寸法の測定値と目標値との差が許容範囲を越えている場合には、次工程における突き当て寸法(曲げ位置データ)を補正する手段が、特開平5−154560号公報に開示されている。   For example, when the workpiece W is gripped by a gripper of a robot and bent, a flange dimension is measured in place of the above-described single elongation value α (FIG. 4), and the measured value of the flange dimension and the target Japanese Patent Laid-Open No. 5-154560 discloses means for correcting the abutting dimension (bending position data) in the next process when the difference from the value exceeds the allowable range.

例えば図12で述べた片伸び値αを測定することと、特開平5−154560号公報に開示されているフランジ寸法を測定することとは、いずれも、測定値を用いて突き当て寸法を補正することにより、より正確なフランジ寸法を得る点で、明らかに共通し、片伸び値αの測定と、フランジ寸法の測定とは、同義である。
特開平5ー154560号公報
For example, the measurement of the half elongation value α described in FIG. 12 and the measurement of the flange dimension disclosed in JP-A-5-154560 are both corrected for the abutting dimension using the measurement value. By doing so, the measurement of the half elongation value α and the measurement of the flange dimension are synonymous with each other in terms of obtaining a more accurate flange dimension.
JP-A-5-154560

上記特開平5−154560号公報に開示されている手段は、上部テーブルの後方に設置された駆動源であるモータと、該モータに対してギアとナットを介して結合し下方に延びるボールねじと、該ボールねじの下端に取り付けられた逆L字型の曲げ長さ検出器と、該曲げ長さ検出器に設けられたポテンショメータ、及びダイに設置された支持姿勢検出器から成る。   The means disclosed in JP-A-5-154560 includes a motor as a drive source installed behind the upper table, and a ball screw coupled to the motor via a gear and a nut and extending downward. , An inverted L-shaped bending length detector attached to the lower end of the ball screw, a potentiometer provided in the bending length detector, and a support attitude detector installed on the die.

しかし、この手段は、全体としてあまりに大型であると共に、構成が複雑であり、それに伴ってコストも高くなる。   However, this means is too large as a whole, has a complicated structure, and costs increase accordingly.

また、ロボットで把持されたワークを曲げ加工した後、ロボットがV曲げされたワークをダイのV溝から取り出してダイ上面に移動させ、フランジ部分をポテンショメータ1の下方に位置決めしなければならない。   Also, after bending the workpiece gripped by the robot, the robot must take out the V-bent workpiece from the V groove of the die and move it to the upper surface of the die, and position the flange portion below the potentiometer 1.

そのため、加工終了後からフランジ寸法の測定が終了するまでの全体の測定時間が長くなり、測定効率が低下する。   For this reason, the entire measurement time from the end of processing to the end of measurement of the flange dimension is lengthened, and the measurement efficiency is lowered.

更に、測定時には、精度を向上させるために、既述した支持姿勢検出器を用いてワークを水平にする必要があり、この点でも、全体の測定時間が長くなり、測定効率が低下する。更にまた、従来は、ポテンショメータを垂直に下降させフランジ端部に当接させることにより、フランジ寸法を測定しているので、フランジ部分の曲げ角度が90°のワークしか測定対象とはならず(上記特開平5ー154560号公報の要約書の構成の欄の3行目に「直角状」と記載されている。)、このため、曲げ角度が鋭角や鈍角のワークは測定対象外であり、測定対象の範囲が極めて狭い。   Further, at the time of measurement, in order to improve accuracy, it is necessary to level the work using the above-described support posture detector, and in this respect as well, the entire measurement time becomes longer and the measurement efficiency is lowered. Furthermore, conventionally, since the flange dimension is measured by vertically lowering the potentiometer and bringing it into contact with the end of the flange, only the workpiece having a flange angle of 90 ° is measured (see above). In the summary column of JP-A-5-154560, it is described as “right-angled” in the third line of the composition column.) For this reason, workpieces with an acute or obtuse bending angle are not subject to measurement. The scope of the subject is very narrow.

一方、図12、図13で述べたように、従来より、正確なフランジ寸法Hや(図12)底部寸法A(図13)を得るために、いずれの場合にも、重要寸法側ワーク部分W1、W2をバックゲージの突当50側に突き当てて位置決めすることにより、該重要寸法側ワーク部分W1、W2の位置決め状態を安定させている。   On the other hand, as described in FIG. 12 and FIG. 13, in order to obtain an accurate flange dimension H and (FIG. 12) bottom dimension A (FIG. 13), in any case, the important dimension side work part W1. , W2 is abutted against the abutment 50 side of the back gauge and positioned, thereby stabilizing the positioning state of the important dimension side work parts W1, W2.

しかし、ワークWをロボットのグリッパ51で把持して曲げ加工する場合であって、重要寸法側ワーク部分よりもそれとは反対側のグリッパ51で把持されるワーク部分の方が寸法が小さい場合には、曲げ加工ができないことがある。   However, when the workpiece W is gripped and bent by the gripper 51 of the robot, and the dimension of the workpiece part gripped by the gripper 51 on the opposite side is smaller than that of the important dimension side workpiece part, , Bending may not be possible.

例えば図13(A)は、グリッパ51で把持されているワーク部分W3の寸法が、重要寸法側ワーク部分W2の寸法よりも明らかに小さく、そのために、グリッパ51がプレスブレーキの機械本体に近付き過ぎている。   For example, in FIG. 13A, the dimension of the work part W3 gripped by the gripper 51 is clearly smaller than the dimension of the important dimension side work part W2, and therefore the gripper 51 is too close to the machine body of the press brake. ing.

従って、曲げ加工の進行に伴ってワークWが跳ね上がり、その跳ね上がり動作にグリッパ51が追従しようとした場合に、該グリッパ51は、機械本体と干渉するおそれがあり、曲げ加工が実際にはできなくなる。   Accordingly, when the workpiece W jumps up as the bending process proceeds and the gripper 51 tries to follow the jumping operation, the gripper 51 may interfere with the machine body, and the bending process cannot actually be performed. .

ところが、従来は、前記した長い寸法を有する重要寸法側ワーク部分W2をグリッパ51で把持した状態でワークWを位置決め可能とすることにより、曲げ加工時においてワーク追従動作を行うグリッパ51と機械本体との干渉を回避し、曲げ加工を実現する手段は、何ら開示されていない。   However, conventionally, by enabling the workpiece W to be positioned with the gripper 51 gripping the important dimension side workpiece portion W2 having a long dimension as described above, the gripper 51 and the machine main body that perform the workpiece follow-up operation during bending are provided. No means for avoiding the interference and realizing the bending is disclosed.

本発明の目的は、ロボットで把持されたワークの片伸び値を測定する測定装置が小型であって構成が簡単であり、測定時間を短縮することにより、測定効率を向上させ、曲げ角度が90°のみならず鋭角や鈍角のワークを測定対象とすることにより、測定対象の範囲を拡大し、且つワークの片伸び値を測定する測定装置を用いてワークを位置決めし、ロボットが機械本体と干渉することなく曲げ加工を行うロボットによる曲げ加工システム及び曲げ加工方法を提供する。   An object of the present invention is to make a measuring device for measuring a half elongation value of a work gripped by a robot small in size and simple in configuration. By reducing the measuring time, the measuring efficiency is improved and the bending angle is 90. By measuring not only ° but also sharp and obtuse workpieces, the range of the measurement target is expanded and the workpiece is positioned using a measuring device that measures the workpiece's half-elongation value, and the robot interferes with the machine body. Provided are a bending system and a bending method by a robot that performs bending without performing the bending process.

上記課題を解決するために、本発明は、
請求項に記載したように、
ロボット13のグリッパ14に取り付けられ、該グリッパ14で把持されたワークWの片伸び値αを測定する測定装置1と、
ロボット13を駆動制御するロボット制御手段10Fと、
前記ワークWの片伸び値αを測定する測定装置1を駆動制御し、ロボット13によるワーク位置決め時点における該測定装置1が示す値a0 と、ロボット13によるワーク跳ね上がり追従動作終了時点における該測定装置1が示す値aとを検出する測定装置制御手段10Eと、
該検出された測定装置1の各値a0 、aに基づいて、ワークWの片伸び値αを算出する加工情報算出手段10Dから成ることを特徴とするロボットによる曲げ加工システム、
請求項2に記載したように、上記測定装置1がポテンショメータにより構成されている請求項1記載のロボットによる曲げ加工システム、及び
請求項に記載したように、
上記請求項1記載のロボットによる曲げ加工システムを使用する曲げ加工方法であって、
ロボット13のグリッパ14で把持したワークWが位置決めされ、その後該ワークWをハーフクランプ状態でパンチPとダイDで固定した後、グリッパ14を前進させることにより、ポテンショメータ1がON信号を出力した時点の該ポテンショメータ1の値a0と、パンチPとダイDでワークWを曲げ加工することにより、曲げ加工の進行に伴うグリッパ14のワーク跳ね上がり追従動作終了時点の該ポテンショメータ1の値aとの差により、片伸び値αを測定することを特徴とする曲げ加工方法という手段を講じている。
In order to solve the above problems, the present invention provides:
As described in claim 1 ,
A measuring device 1 that is attached to the gripper 14 of the robot 13 and that measures a single elongation value α of the workpiece W gripped by the gripper 14;
Robot control means 10F for driving and controlling the robot 13,
The measurement device 1 that measures the single elongation value α of the workpiece W is driven and controlled. The value a 0 indicated by the measurement device 1 at the time of workpiece positioning by the robot 13 and the measurement device at the end of the workpiece jump-up tracking operation by the robot 13 are measured. Measuring device control means 10E for detecting the value a indicated by 1;
A bending system by a robot, characterized by comprising machining information calculation means 10D for calculating a piece elongation value α of the workpiece W based on the detected values a0 and a of the measuring device 1;
As described in claim 2, the robot bending process system according to claim 1, wherein the measuring device 1 is configured by a potentiometer, and as described in claim 3 ,
A bending method using the robot bending system according to claim 1,
When the workpiece W gripped by the gripper 14 of the robot 13 is positioned, and then the workpiece W is fixed with the punch P and the die D in a half clamp state, and then the gripper 14 is moved forward so that the potentiometer 1 outputs an ON signal. The difference between the value a 0 of the potentiometer 1 and the value a of the potentiometer 1 at the end of the workpiece spring-up follow- up operation of the gripper 14 as the bending progresses by bending the workpiece W with the punch P and the die D. Thus, a means called a bending method characterized by measuring the piece elongation value α is taken.

上記本発明の構成によれば、例えばロボット13で把持されたワークWの片伸び値α(図4)を測定する測定装置1を、該ロボット13のグリッパ14に取り付けると共に、該測定装置1をポテンショメータにより構成したことにより、当該工程において(図3(A))、ロボット13のグリッパ14で把持したワークWを、予め設定された突き当て寸法Lの位置に位置決めされたバックゲージ突当23に突き当てて位置決めした後、該ワークWを(図3(C))ハーフクランプ状態でパンチPとダイDで固定した後、グリッパ14を前進させ、ポテンショメータ1がON信号を出力した時点の該ポテンショメータ1の値a0 と、曲げ加工の進行に伴うグリッパ14のワーク追従動作終了時点(図3(C))の該ポテンショメータ1の値aとの差により、片伸び値αを測定することができ、次工程以降においては、この測定した片伸び値αに基づいて、前記突き当て寸法Lを補正し、該補正後の突き当て寸法L位置に、バックゲージの突当23を位置決めすることができる。 According to the configuration of the present invention, for example, the measuring device 1 for measuring the half elongation value α (FIG. 4) of the workpiece W gripped by the robot 13 is attached to the gripper 14 of the robot 13 and the measuring device 1 is attached. Since the potentiometer is used, the workpiece W gripped by the gripper 14 of the robot 13 in this step (FIG. 3A) is applied to the back gauge abutment 23 positioned at the position of the preset abutment dimension L. After the abutting and positioning, the work W is fixed with the punch P and the die D in the half clamp state (FIG. 3C), the gripper 14 is advanced, and the potentiometer when the potentiometer 1 outputs an ON signal. The value a 0 of 1 and the value a of the potentiometer 1 at the end of the work following operation of the gripper 14 as the bending process proceeds (FIG. 3C). Based on the difference, the piece elongation value α can be measured, and in the subsequent steps, the abutting dimension L is corrected based on the measured piece elongation value α, and the corrected abutting dimension L position is obtained. The back gauge abutment 23 can be positioned.

従って、本発明によれば、測定装置1がグリッパ14に取り付けられているので、全体として極めて小型になり、また構成が簡単であり、しかも、当該工程において(図3)、曲げ加工終了と同時に片伸び値αが測定されるので(図3(C))、測定時間を短縮することにより、測定効率を向上させることが可能であり、更に、ワークW(図3(B))の後端部を、曲げ加工の開始から終了までグリッパ14に取り付けられたポテンショメータ1のロッド1Aに当接したままで片伸び値α(図3(C))が測定されるで、金型P、Dに関して、グリッパ14とは反対側のワークWの先端部側の曲げ角度とは無関係に測定可能であり、従って、曲げ角度が90°のみならず鋭角や鈍角のワークを測定対象とすることができ、その分、測定対象の範囲を拡大することが可能となる。   Therefore, according to the present invention, since the measuring device 1 is attached to the gripper 14, the overall size is extremely small, the configuration is simple, and in this process (FIG. 3), simultaneously with the end of the bending process. Since the single elongation value α is measured (FIG. 3C), it is possible to improve the measurement efficiency by shortening the measurement time, and further, the rear end of the workpiece W (FIG. 3B). The part elongation value α (FIG. 3C) is measured while the part is kept in contact with the rod 1A of the potentiometer 1 attached to the gripper 14 from the start to the end of the bending process. The measurement can be performed regardless of the bending angle on the tip side of the workpiece W on the side opposite to the gripper 14, and therefore the workpiece can be measured not only with a bending angle of 90 ° but also with an acute angle or an obtuse angle. Therefore, the scope of the measurement target It is possible to expand.

また、上記本発明の構成によれば、工程ごとに、ロボット13のワーク追従動作の軌跡(フォローイング軌跡)を算出し(図11のステップ201)、この算出したロボット13のフォローイング軌跡に基づいて、グリッパ14がワークWを把持して曲げ加工を行った場合に、機械本体と干渉するか否かの判断により(図11のステップ202)、実際の曲げ加工の際には、従来どおり、バックゲージ突当23を用いてワークWを位置決めするか(図11のステップ203)、グリッパ14に取り付けられた測定装置1を用いてワークWを位置決めするか(図11のステップ204)を選択することができる。   Further, according to the configuration of the present invention described above, a trajectory (following trajectory) of the workpiece following operation of the robot 13 is calculated for each process (step 201 in FIG. 11), and based on the calculated following trajectory of the robot 13. When the gripper 14 grips the workpiece W and performs bending, it is determined whether or not it interferes with the machine body (step 202 in FIG. 11). Whether the workpiece W is positioned using the back gauge abutment 23 (step 203 in FIG. 11) or the workpiece W is positioned using the measuring device 1 attached to the gripper 14 (step 204 in FIG. 11) is selected. be able to.

従って、本発明によれば、従来できなかった重要寸法側のワーク部分W3(図9(B))をロボットのグリッパ14で把持した状態で、測定装置1を用いてワークWを位置決めすることが可能となり、これにより、ロボットが機械本体と干渉することなく曲げ加工を行うことができる。   Therefore, according to the present invention, it is possible to position the workpiece W using the measuring apparatus 1 in a state where the workpiece portion W3 (FIG. 9B) on the important dimension side, which has not been possible in the past, is gripped by the gripper 14 of the robot. As a result, the robot can perform bending without interfering with the machine body.

上記のとおり、本発明によれば、ロボットで把持されたワークの片伸び値を測定する測定装置が小型であって構成が簡単であり、測定時間を短縮することにより、測定効率を向上させ、曲げ角度が90°のみならず鋭角や鈍角のワークを測定対象とすることにより、測定対象の範囲を拡大し、且つワークの片伸び値を測定する測定装置を用いてワークを位置決めし、ロボットが機械本体と干渉することなく曲げ加工を行うロボットによる曲げ加工システム及び曲げ加工方法を提供するという効果を奏する。   As described above, according to the present invention, the measuring device for measuring the half elongation value of the workpiece gripped by the robot is small and simple in configuration, and by improving the measurement efficiency by reducing the measurement time, By measuring not only a bending angle of 90 ° but also a workpiece with an acute angle or an obtuse angle, the range of the measurement target is expanded and the workpiece is positioned using a measuring device that measures the half elongation value of the workpiece. There is an effect of providing a bending system and a bending method by a robot that performs bending without interfering with the machine body.

以下、本発明を、実施の形態により添付図面を参照して、説明する。
図1は本発明の全体図であり、図示するロボットによる曲げ加工システムは、曲げ加工装置11のNC装置10からCAD情報を入力して、曲げ順、金型P、D、金型レイアウトなどを算出すると共に、工程(曲げ順)ごとに、ロボット13のワーク追従動作の軌跡を算出した後(図6のステップ101〜ステップ103)、1工程目では、後述する測定装置1であるポテンショメータを用いて、片伸び値αを(図4)測定し、2工程目以降では、1工程目で測定した片伸び値αを用いて、突き当て寸法Lを補正し、バックゲージ位置として使用する(図6のステップ104〜ステップ105)。
Hereinafter, the present invention will be described with reference to the accompanying drawings by embodiments.
FIG. 1 is an overall view of the present invention, and a bending system using a robot shown in FIG. 1 inputs CAD information from an NC apparatus 10 of a bending apparatus 11 to indicate bending order, molds P, D, mold layout, and the like. After the calculation, the trajectory of the workpiece following operation of the robot 13 is calculated for each process (bending order) (step 101 to step 103 in FIG. 6). In the first process, a potentiometer, which is a measuring apparatus 1 described later, is used. Then, the piece elongation value α is measured (FIG. 4), and after the second step, the abutting dimension L is corrected using the piece elongation value α measured in the first step and used as the back gauge position (FIG. 4). 6 step 104 to step 105).

この場合の曲げ加工装置11(図1)としては、プレスブレーキがあり、よく知られているように、上部テーブル20に装着されたパンチPと、下部テーブル21に装着されたダイDを有している。   The bending apparatus 11 (FIG. 1) in this case includes a press brake, and as is well known, has a punch P mounted on the upper table 20 and a die D mounted on the lower table 21. ing.

下部テーブル21の後方には、バックゲージが配置され、該バックゲージの突当23は、スライダ24に取り付けられ、該スライダ24は、左右方向(紙面に垂直な方向)に延びるストレッチ25に滑り結合している。   A back gauge is disposed behind the lower table 21, and the back gauge abutment 23 is attached to a slider 24. The slider 24 is slidably coupled to a stretch 25 extending in the left-right direction (the direction perpendicular to the paper surface). is doing.

また、上記プレスブレーキの両側には、側板22が設置され、各側板22には、モータ又は油圧シリンダなどから成るラム駆動源が設けられ、下降式プレスブレーキでは、上部テーブル20が下降することにより、上昇式プレスブレーキでは、下部テーブル21が上昇することにより、既述したパンチPとダイDでワークWを曲げ加工する。   Further, side plates 22 are installed on both sides of the press brake, and each side plate 22 is provided with a ram drive source such as a motor or a hydraulic cylinder. In the descending press brake, the upper table 20 is lowered. In the lift press brake, the workpiece W is bent by the punch P and the die D described above when the lower table 21 is lifted.

前記下部テーブル21のベースプレート12には、ロボット13が取り付けられている。   A robot 13 is attached to the base plate 12 of the lower table 21.

このロボット13は、例えば5軸ロボットであって、ロボット全体の左右方向(X軸方向)駆動部aと、アーム19の前後方向(Y軸方向)駆動部b及び上下方向(Z軸方向)駆動部c、更には、該アーム19先端のグリッパ14の水平旋回(X軸を中心とする)駆動部dと鉛直旋回(Z軸を中心とする)駆動部eを有する。   The robot 13 is, for example, a five-axis robot, and includes a left-right direction (X-axis direction) drive unit a of the entire robot, a front-rear direction (Y-axis direction) drive unit b and an up-down direction (Z-axis direction) drive of the arm 19. The part c further includes a horizontal turning (centering on the X axis) driving part d and a vertical turning (centering on the Z axis) driving part e of the gripper 14 at the tip of the arm 19.

また、ロボット13は、既述したように、そのアーム19の先端に、グリッパ14を有し、該グリッパ14は、上下動自在な上グリッパ14Aと、固定された下グリッパ14Bから成り、曲げ加工されるワークWを把持するようになっている。   Further, as described above, the robot 13 has the gripper 14 at the tip of the arm 19, and the gripper 14 includes an upper gripper 14A that can move up and down and a fixed lower gripper 14B. The workpiece W to be held is gripped.

この構成により、ロボット13は、後述するロボット制御手段10Fから前記5軸の駆動信号が送られて来ると、既述した駆動部a〜eを動作させ、これにより、例えば、後述するように、グリッパ14で把持したワークWを位置決めし(図3(A))、ワークWをハーフクランプ状態で、グリッパ14を前進させ(図3(B))、曲げ加工の進行に伴うワークWの跳ね上がりに追従するワーク追従動作を行うことにより(図3(C))、測定装置1を介して片伸び値αを測定する。   With this configuration, the robot 13 operates the drive units a to e described above when a drive signal of the five axes is sent from the robot control means 10F described later, thereby, for example, as described later, Position the workpiece W gripped by the gripper 14 (FIG. 3A), advance the gripper 14 with the workpiece W half-clamped (FIG. 3B), and cause the workpiece W to spring up as the bending progresses. By performing the following operation to follow the workpiece (FIG. 3C), the one-side elongation value α is measured via the measuring device 1.

更に、前記グリッパ14の下グリッパ14B上には(図2)、前記曲げ加工されるワークWの伸び値、例えば片伸び値α(図4)を測定する測定装置1が取り付けられている。   Further, on the lower gripper 14B of the gripper 14 (FIG. 2), a measuring device 1 for measuring an elongation value of the workpiece W to be bent, for example, a piece elongation value α (FIG. 4) is attached.

即ち、既述したように、プレスブレーキにおいては、パンチP(図4)とダイDによりワークWを曲げ加工するが、曲げ加工時には、パンチPの先端部近傍のワーク領域Rが丸みを帯びてアールが形成され、該ワークWの上面は圧縮され、下面は引っ張られることにより、該ワークWは、見掛け上伸びるが、このときのワークWの片方の側(例えば右側)の見掛け上の伸び値を、片伸び値αという(例えば特開2002−79317号公報の段落番号0004参照)。   That is, as described above, in the press brake, the workpiece W is bent by the punch P (FIG. 4) and the die D, but the workpiece region R near the tip of the punch P is rounded during the bending. The rounded surface is formed, the upper surface of the workpiece W is compressed, and the lower surface is pulled, so that the workpiece W is apparently extended, but the apparent elongation value on one side (for example, the right side) of the workpiece W at this time Is referred to as a single elongation value α (see, for example, paragraph number 0004 of JP-A-2002-79317).

そして、この片伸び値αを、既述したように、測定装置1で測定し、この測定装置1としては、例えばポテンショメータがある。   Then, as described above, the single elongation value α is measured by the measuring device 1. As the measuring device 1, for example, there is a potentiometer.

例えば、後述する1工程目の曲げ加工において(図6のステップ104)、グリッパ14(図3(A))で把持されたワークWを、所定位置L(この位置は、予めCAD情報で算出された突き当て寸法Lの値に等しい)に位置決めした突当23に突き当てて位置決めする。   For example, in the first bending process (step 104 in FIG. 6) to be described later, a workpiece W gripped by the gripper 14 (FIG. 3A) is moved to a predetermined position L (this position is calculated in advance using CAD information). It is abutted against the abutment 23 positioned at a position equal to the abutting dimension L).

このとき、図示するように、ワークWの後端部と、ポテンショメータ1のロッド1Aとは当接していないものとする。   At this time, it is assumed that the rear end portion of the work W and the rod 1 </ b> A of the potentiometer 1 are not in contact with each other as illustrated.

この状態で、例えばパンチP(図3(B))を下降してピンチングポイントで停止させ、ダイD上のワークWを固定した後、グリッパ14のうちの上グリッパ14Aを僅かに上昇させ、ワークWとグリッパ14間に隙間を形成して、ワークWをハーフクランプ状態にした後、グリッパ14を前進させる。   In this state, for example, the punch P (FIG. 3B) is lowered and stopped at the pinching point, and after fixing the workpiece W on the die D, the upper gripper 14A of the gripper 14 is slightly raised, A gap is formed between W and the gripper 14 to bring the workpiece W into a half clamp state, and then the gripper 14 is advanced.

これにより、ワークWの後端部がポテンショメータ1のロッド1Aに当接すると、該ポテンショメータ1がON信号を出力するが,そのON信号を出力した時点でのポテンショメータ1の値a0 を後述する測定装置制御手段10E(図1)が検出して記憶手段10Cに記憶させる。 As a result, when the rear end portion of the workpiece W comes into contact with the rod 1A of the potentiometer 1, the potentiometer 1 outputs an ON signal. The value a 0 of the potentiometer 1 at the time when the ON signal is output is measured later. The apparatus control means 10E (FIG. 1) detects and stores it in the storage means 10C.

その後、パンチPを更に下降させると(図3(C))、曲げ加工の進行に伴ってワークWが跳ね上がり、グリッパ14はその跳ね上がったワークWに追従するが、パンチPが所定のラムストロークに到達して停止し、グリッパ14のワーク追従動作が終了した時点でのロッド1Aが没入したポテンショメータ1の値aを、同様に測定装置制御手段10E(図1)が検出して記憶手段10Cに記憶させる。   Thereafter, when the punch P is further lowered (FIG. 3C), the workpiece W jumps up as the bending process proceeds, and the gripper 14 follows the jumped workpiece W, but the punch P reaches a predetermined ram stroke. The value a of the potentiometer 1 in which the rod 1A is immersed at the time when the workpiece follow-up operation of the gripper 14 is finished is similarly detected by the measuring device control means 10E (FIG. 1) and stored in the storage means 10C. Let

そして、記憶手段10Cに記憶された前記ポテンショメータ1の値a0 、aに基づいて、加工情報算出手段10Dがα=a−a0 の式に従って、片伸び値αを算出し、これにより、本発明によれば、グリッパ14に取り付けられたポテンショメータ1を介して片伸び値α(図3、図4)が測定されたことになる。 Then, based on the values a 0 and a of the potentiometer 1 stored in the storage means 10C, the machining information calculation means 10D calculates the one-side elongation value α according to the equation α = a−a 0 , According to the invention, the half elongation value α (FIGS. 3 and 4) is measured via the potentiometer 1 attached to the gripper 14.

2工程目以降の曲げ加工においては(図6のステップ105)、前記1工程目で測定した片伸び値αを用い、突き当て寸法Lを補正し、この補正した突き当て寸法Lの位置に、バックゲージの突当23を位置決めすることにより、バックゲージ位置して使用する。   In the bending process after the second process (step 105 in FIG. 6), the abutting dimension L is corrected using the piece elongation value α measured in the first process, and the position of the corrected abutting dimension L is By positioning the back gauge abutment 23, the back gauge position is used.

図5は、既述した測定装置1の他の実施例を示す図であり、測定装置1がCCDカメラの場合である。   FIG. 5 is a diagram showing another embodiment of the measuring apparatus 1 described above, and the measuring apparatus 1 is a CCD camera.

この場合、例えばCCDカメラで撮像したワークW後端部の画像を、NC装置10(図1)に取り込み、同様に、加工情報算出手段10Dが、α=a(曲げ加工終了時のワークW後端部の値)−a0 (ワーク位置決め時のワークW後端部の値)の式に従って、片伸び値αを算出する。 In this case, for example, an image of the rear end portion of the work W taken by the CCD camera is taken into the NC apparatus 10 (FIG. 1), and similarly, the machining information calculation means 10D has α = a (after the work W at the end of the bending process). The one-side elongation value α is calculated according to the equation of end value) −a 0 (value of the rear end of the workpiece W at the time of workpiece positioning).

上記構成を有するプレスブレーキのNC装置10は(図1)、CPU10Aと、入出力手段10Bと、記憶手段10Cと、加工情報算出手段10Dと、測定装置制御手段10Eと、ロボット制御手段10Fと、曲げ制御手段10Gを有する。   The press brake NC device 10 having the above configuration (FIG. 1) includes a CPU 10A, an input / output means 10B, a storage means 10C, a machining information calculation means 10D, a measuring device control means 10E, a robot control means 10F, It has a bending control means 10G.

CPU10Aは、加工情報算出手段10D,測定装置制御手段10Eなど図1に示す装置全体を統括制御する。   The CPU 10A performs overall control of the entire apparatus shown in FIG. 1, such as the machining information calculation means 10D and the measurement apparatus control means 10E.

入出力手段10Bは、例えばプレスブレーキの上部テーブル20に取り付けられた操作盤(図示省略)であり、キーボードなどの入力手段と、液晶画面などの出力手段により構成され、CAD情報を入力すると共に、入力結果は液晶画面で確認できる。   The input / output means 10B is, for example, an operation panel (not shown) attached to the upper table 20 of the press brake, and includes input means such as a keyboard and output means such as a liquid crystal screen, and inputs CAD information. The input result can be confirmed on the LCD screen.

記憶手段10Cは、前記入出力手段10Bを介して入力されたCAD情報を記憶し、また、既述したポテンショメータ1(図3)を用いて片伸び値αを測定する場合の初期値a0 と(図3(B))、最終値a(図3(C))を記憶し、更には、本発明による加工プログラム(例えば図6〜図8に相当)などを記憶する。 The storage means 10C stores the CAD information input via the input / output means 10B, and the initial value a 0 when measuring the half elongation value α using the potentiometer 1 (FIG. 3) described above. (FIG. 3B), the final value a (FIG. 3C) is stored, and further, a machining program according to the present invention (for example, corresponding to FIGS. 6 to 8) and the like are stored.

加工情報算出手段10Dは(図1)、前記入出力手段10Bを介して入力されたCAD情報(図6のステップ101)に基づいて、曲げ順、金型、金型レイアウトなどを算出し(図6のステップ102)、工程(曲げ順)ごとに、ロボット13のワーク追従動作の軌跡を算出する(図6のステップ103)などワークWの曲げ加工に必要な情報を算出する。   The machining information calculation unit 10D (FIG. 1) calculates a bending order, a mold, a mold layout, and the like based on the CAD information (step 101 in FIG. 6) input via the input / output unit 10B (FIG. 1). 6), for each process (bending order), information necessary for bending the workpiece W is calculated, such as calculating the locus of the workpiece following operation of the robot 13 (step 103 in FIG. 6).

この場合,ロボット13のワーク追従動作の軌跡F(フォローイング軌跡F)は(図3(C))、ワーク姿勢状態図(工程図)に基づいて算出される。   In this case, the trajectory F (following trajectory F) of the workpiece following operation of the robot 13 (FIG. 3C) is calculated based on the workpiece posture state diagram (process diagram).

即ち、加工情報算出手段10Dは(図1)、CAD情報により、ワークW(図3(A))の位置決め時点の姿勢と、跳ね上がり時点での姿勢(図3(C))から成るワーク姿勢状態図を作成し、この作成したワーク姿勢状態図に基づき、ロボット13のフォローイング軌跡Fを算出する。   That is, the machining information calculation means 10D (FIG. 1) uses the CAD information to determine the workpiece posture state consisting of the posture at the time of positioning of the workpiece W (FIG. 3 (A)) and the posture at the time of jumping up (FIG. 3 (C)). A diagram is created, and the following trajectory F of the robot 13 is calculated based on the created workpiece posture state diagram.

また、加工情報算出手段10Dは(図1)、既述したように、記憶手段10Cに記憶されたポテンショメータ1の値a0 (図3(C))、aに基づいて、片伸び値α(図4)を算出する。 Further, the machining information calculation means 10D (FIG. 1), as already described, is based on the value a 0 (FIG. 3C), a of the potentiometer 1 stored in the storage means 10C, and the one-side elongation value α ( FIG. 4) is calculated.

測定装置制御手段10Eは(図1)、測定装置1である例えばポテンショメータ1を駆動制御し、ポテンショメータ1が(図3(B))ON信号を出力した場合には、そのON信号を入力することにより、該ポテンショメータ1の値a0 を検出して記憶手段10C(図1)に記憶させる。 The measurement device control means 10E (FIG. 1) controls driving of the potentiometer 1, for example, the measurement device 1, and inputs the ON signal when the potentiometer 1 outputs the ON signal (FIG. 3B). Thus, the value a 0 of the potentiometer 1 is detected and stored in the storage means 10C (FIG. 1).

また、測定装置制御手段10Eは、パンチP(図3(C))が所定のラムストロークに到達して曲げ加工が終了したことを後述する曲げ制御手段10Gから知らされると、即ち、曲げ加工進行に伴うロボット13のグリッパ14のワーク追従動作が終了すると(図3(C))、その終了時点でロッド1Aが没入したポテンショメータ1の値aを検出して記憶手段10C(図1)に記憶させる。   Further, the measuring device control means 10E is informed by the bending control means 10G, which will be described later, that the punch P (FIG. 3C) has reached a predetermined ram stroke and the bending process has been completed. When the workpiece follow-up operation of the gripper 14 of the robot 13 accompanying the progress is completed (FIG. 3C), the value a of the potentiometer 1 in which the rod 1A is immersed is detected and stored in the storage means 10C (FIG. 1). Let

ロボット制御手段10Fは、既述したように、5軸の駆動信号をロボット13に送ることにより、該ロボット13を駆動制御する。   As described above, the robot control means 10F controls the drive of the robot 13 by sending a 5-axis drive signal to the robot 13.

曲げ制御手段10Gは、ラム駆動源(モータや油圧シリンダなど)を駆動制御することにより、例えば下降式プレスブレーキであれば、ラムである上部テーブル20を下降させることにより、パンチPとダイDでロボット13のグリッパ14で把持されたワークWを曲げ加工する。   The bending control means 10G drives and controls a ram drive source (such as a motor or a hydraulic cylinder). For example, in the case of a descending press brake, the bending control means 10G lowers the upper table 20 that is a ram so that the punch P and die D The workpiece W gripped by the gripper 14 of the robot 13 is bent.

また、曲げ制御手段10Gは、バックゲージ突当23を予め所定位置に位置決めする。   Further, the bending control means 10G positions the back gauge abutment 23 at a predetermined position in advance.

以下、前記構成を有する本発明の動作を、図6〜図8に基づいて説明する。   The operation of the present invention having the above configuration will be described below with reference to FIGS.

(1)ロボット13のワーク追従動作の軌跡を算出するまでの動作。
図6のステップ101において、CAD情報を入力し、ステップ102において、曲げ順、金型、金型レイアウトなどを算出し、ステップ103において、工程(曲げ順)ごとに、ロボット13のワーク追従動作の軌跡を算出する。
(1) The operation until the locus of the workpiece following operation of the robot 13 is calculated.
In step 101 of FIG. 6, CAD information is input. In step 102, bending order, mold, mold layout, and the like are calculated. In step 103, the robot 13 performs the work following operation for each process (bending order). Calculate the trajectory.

即ち、CPU10Aは(図1)、入出力手段10Bを介してCAD情報が入力されたことを検知すると、加工情報算出手段10Dを制御し、曲げ順、金型、金型レイアウトを算出させると共に、工程ごとに、ロボット13のフォローイング軌跡F(図3(C))を算出させる。   That is, when the CPU 10A detects that CAD information is input via the input / output means 10B (FIG. 1), the CPU 10A controls the machining information calculation means 10D to calculate the bending order, the mold, and the mold layout. For each process, the following trajectory F (FIG. 3C) of the robot 13 is calculated.

(2)1工程目の曲げ加工動作。
図6のステップ104において、1工程目の曲げ加工動作を行い、片伸び値αを測定する。
(2) Bending operation in the first step.
In step 104 of FIG. 6, the bending process operation of the first process is performed, and the piece elongation value α is measured.

このステップ104の詳細は、図7に示され、ロボット13によりワークWを搬入して(図7のステップ104A)、ワークWを位置決めした後(図7のステップ104B)、ラム20を下降させ(図7のステップ104C)、該ラム20がピンチングポイントに到達したときに(図7のステップ104DのYES)、ラム20を停止させる(図7のステップ104E)。   Details of this step 104 are shown in FIG. 7. After the work W is loaded by the robot 13 (step 104A in FIG. 7), the work W is positioned (step 104B in FIG. 7), and then the ram 20 is lowered (step 104B in FIG. 7). Step 104C in FIG. 7) When the ram 20 reaches the pinching point (YES in Step 104D in FIG. 7), the ram 20 is stopped (Step 104E in FIG. 7).

即ち、CPU10Aは(図1)、前記図6のステップ103において、加工情報算出手段10Dがロボット13のフォローイング軌跡Fを算出したことを検知すると、ロボット制御手段10Fを介してロボット13のグリッパ14に(図3(A))ワークWを把持させ、該ワークWをパンチPとダイDの間から挿入させプレスブレーキに搬入した後、バックゲージ突当23に突き当てて位置決めさせ、その後、曲げ制御手段10Gを介してラム20(図1)を下降させ、パンチP(図3(B))がピンチングポイントに到達したときに停止させることにより、ダイD上のワークWを固定する。   That is, when the CPU 10A detects that the machining information calculation means 10D has calculated the following trajectory F of the robot 13 in step 103 of FIG. 6 (FIG. 1), the gripper 14 of the robot 13 via the robot control means 10F. (FIG. 3 (A)), the workpiece W is gripped, and the workpiece W is inserted between the punch P and the die D and loaded into the press brake. Then, the workpiece W is abutted against the back gauge abutment 23 and positioned. The work W on the die D is fixed by lowering the ram 20 (FIG. 1) via the control means 10G and stopping when the punch P (FIG. 3B) reaches the pinching point.

この場合、上記バックゲージ突当23は(図3(A))、予めCAD情報により算出された突き当て寸法Lの位置に位置決めされている。   In this case, the back gauge abutment 23 (FIG. 3A) is positioned at the position of the abutment dimension L calculated in advance by CAD information.

次いで、ハーフクランプ状態で、グリッパ14を前進させ(図7のステップ104F)、ポテンショメータ1からON信号が出力された場合には(図7のステップ104GのYES)、グリッパ14を停止させ、そのときのポテンショメータ1の値a0 を検出する(図7のステップ104H)。 Next, in the half clamp state, the gripper 14 is moved forward (step 104F in FIG. 7), and when the ON signal is output from the potentiometer 1 (YES in step 104G in FIG. 7), the gripper 14 is stopped. The value a 0 of the potentiometer 1 is detected (step 104H in FIG. 7).

即ち、CPU10Aは(図1)、図7のステップ104Eにおいて、曲げ制御手段10Gを介してラム20が停止したことを検知すると、ロボット制御手段10Fを介して上グリッパ14Aを(図3(B))僅かに上昇させ、ワークWをハーフクランプ状態にした後、グリッパ14を前進させ、ワークWの後端部がポテンショメータ1に当接しON信号が出力されたときに、グリッパ14を停止させ、測定装置制御手段10E(図1)を介して、そのときのポテンショメータ1の値a0 を検出して記憶手段10Cに記憶する。 That is, when the CPU 10A detects that the ram 20 has stopped via the bending control means 10G in step 104E of FIG. 7 (FIG. 1), the CPU 10A moves the upper gripper 14A via the robot control means 10F (FIG. 3B). ) After slightly raising the workpiece W to a half clamp state, the gripper 14 is advanced, and when the rear end of the workpiece W comes into contact with the potentiometer 1 and an ON signal is output, the gripper 14 is stopped and measured. The value a 0 of the potentiometer 1 at that time is detected and stored in the storage means 10C via the device control means 10E (FIG. 1).

その後、ラム20を再下降させ(図7のステップ104J)、ロボット13によるワーク追従動作を行い(図7のステップ104K)、所定のラムストロークに到達した場合には(図7のステップ104LのYES)、ラム20を停止させ(図7のステップ104M)、そのときのポテンショメータ1の値aを検出し、片伸び値αを算出する(図7のステップ104N)。   Thereafter, the ram 20 is lowered again (step 104J in FIG. 7), the workpiece 13 is followed by the robot 13 (step 104K in FIG. 7), and when a predetermined ram stroke is reached (YES in step 104L in FIG. 7). The ram 20 is stopped (step 104M in FIG. 7), the value a of the potentiometer 1 at that time is detected, and the one-side stretch value α is calculated (step 104N in FIG. 7).

即ち、CPU10Aは(図1)、図7のステップ104Hにおいて、ロボット制御手段10Fを介してグリッパ14が停止し、そのときのポテンショメータ1の値a0 が測定装置制御手段10Eを介して検出され記憶手段10Cに記憶されたことを検知すると、曲げ制御手段10G(図1)を介してラム20を再度下降させ、パンチP(図3(C))を更に下降させると共に、ロボット制御手段10F(図1)を介してワークWを把持したロボット13によるワーク追従動作を行わせ、所定のラムストロークに到達したときに、曲げ制御手段10Gを介してラム20を停止させ、測定装置制御手段10E(図1)を介して、そのときのポテンショメータ1の値a(図3(C))を検出して記憶手段10Cに記憶する。 That, CPU 10A is (1), at step 104H in FIG. 7, the gripper 14 is stopped through the robot control unit 10F, the value a 0 of the potentiometer 1 at that time is detected via the measuring device control section 10E stores When it is detected that the data is stored in the means 10C, the ram 20 is lowered again via the bending control means 10G (FIG. 1), the punch P (FIG. 3C) is further lowered, and the robot control means 10F (FIG. 1), the robot 13 holding the workpiece W is caused to perform a workpiece follow-up operation. When a predetermined ram stroke is reached, the ram 20 is stopped via the bending control means 10G, and the measuring device control means 10E (FIG. 1), the value a of the potentiometer 1 at that time (FIG. 3C) is detected and stored in the storage means 10C.

そして、CPU10Aは、記憶手段10Cに記憶された前記ポテンショメータ1の値a0 、aに基づいて、加工情報算出手段10Dを介して、α=a−a0 の式に従って片伸び値αを算出する。 Then, the CPU 10A calculates the one-side elongation value α according to the equation α = a−a 0 via the machining information calculation unit 10D based on the values a 0 and a of the potentiometer 1 stored in the storage unit 10C. .

これにより、既述したように、本発明によれば、グリッパ14に取り付けられたポテンショメータ1を介して片伸び値α(図3、図4)が測定された。   Thus, as described above, according to the present invention, the half elongation value α (FIGS. 3 and 4) was measured via the potentiometer 1 attached to the gripper 14.

(3)2工程目以降の曲げ加工動作。 (3) Bending operation after the second step.

図6のステップ105において、2工程目以降の曲げ加工動作を行い、前記1工程目で測定した片伸び値αを用い、突き当て寸法Lを補正し、バックゲージ位置として使用する。   In step 105 of FIG. 6, the bending process operation | movement after the 2nd process is performed, the abutting dimension L is correct | amended using the piece elongation value (alpha) measured at the said 1st process, and it uses as a back gauge position.

このステップ105の詳細は、図8に示され、片伸び値αに基づいて、突き当て寸法Lを補正し(図8のステップ105A)、突当23を、補正した突き当て寸法Lの位置に位置決めする(図8のステップ105B)。   Details of this step 105 are shown in FIG. 8, and the abutting dimension L is corrected based on the one-side stretch value α (step 105A in FIG. 8), and the abutment 23 is brought to the position of the corrected abutting dimension L. Positioning is performed (step 105B in FIG. 8).

即ち、CPU10Aは(図1)、図7のステップ104Nにおいて、測定装置制御手段10Eを介してポテンショメータ1の値aが検出されて記憶手段10Cに記憶され、加工情報算出手段10Dを介して片伸び値αが算出されたことを検知すると、再度加工情報算出手段10Dを制御し、片伸び値αに基づき、突き当て寸法Lを補正させる。   That is, the CPU 10A (FIG. 1) detects the value a of the potentiometer 1 via the measuring device control means 10E in step 104N of FIG. 7 and stores it in the storage means 10C, and stretches one side via the machining information calculation means 10D. When it is detected that the value α is calculated, the machining information calculation unit 10D is controlled again, and the abutting dimension L is corrected based on the piece elongation value α.

この場合、加工情報算出手段10Dは(図1)、例えば予めCAD情報により算出されたフランジ寸法をHとした場合には、L=H−αの式に従って、突き当て寸法Lを補正する。   In this case, the machining information calculation unit 10D (FIG. 1) corrects the abutting dimension L according to the equation L = H−α, for example, when the flange dimension calculated in advance by CAD information is H.

そして、CPU10Aは(図1)、曲げ制御手段10Gを介して、前記補正した突き当て寸法Lの位置に、バックゲージの突当23を位置決めする。   Then, the CPU 10A (FIG. 1) positions the back gauge abutment 23 at the position of the corrected abutment dimension L via the bending control means 10G.

その後は、ロボット13によりワークWを搬入し(図8のステップ105C)、ワークWを位置決めし(図8のステップ105D)、ラム20を下降させ(図8のステップ105E)、ロボット13によるワーク追従動作を行い(図8のステップ105F)、所定のラムストロークに到達した場合には(図8のステップ105GのYES)、ラム20を停止させる(図8のステップ105H)。   Thereafter, the work W is carried in by the robot 13 (step 105C in FIG. 8), the work W is positioned (step 105D in FIG. 8), the ram 20 is lowered (step 105E in FIG. 8), and the work following by the robot 13 is performed. The operation is performed (step 105F in FIG. 8), and when the predetermined ram stroke is reached (YES in step 105G in FIG. 8), the ram 20 is stopped (step 105H in FIG. 8).

即ち、CPU10Aは、図8のステップ105Bにおいて、曲げ制御手段10G(図1)を介してバックゲージ突当23が、補正した突き当て寸法Lの位置に位置決めされたことを検知すると、ロボット制御手段10F(図1)を介してロボット13のグリッパ14にワークWを把持させ、該ワークWをパンチPとダイDの間から挿入させプレスブレーキに搬入した後、該ワークWを、前記補正した突き当て寸法Lの位置に位置決めされたバックゲージ突当23に突き当てて位置決めし、その後、曲げ制御手段10Gを介してラム20を下降させると共に、ロボット制御手段10Fを介してワークWを把持したロボット13によるワーク追従動作を行わせ、所定のラムストロークに到達したときに、曲げ制御手段10Gを介してラム20を停止させる。
上記したのは、1枚目のワークWについてであるが、2枚目以降のワークWについても、上記図6のステップ104で測定した1枚目のワークWの片伸び値αを用い、同様に、この片伸び値αに基づいて、突き当て寸法Lを補正し、バックゲージ位置に使用することができる。
例えば、板厚などの条件が同じワークWを100枚曲げ加工する場合には、まず、1枚目のワークWについて上記片伸び値αを測定しておけば、次の2枚目から100枚目までのワークWについては、新たに片伸び値αを測定する必要はなく、この1枚目のワークWについて測定した片伸び値αに基づいて、突き当て寸法Lを補正し、補正後の突き当て寸法Lの位置に、バックゲージの突当23を位置決めすることができる。
That is, when the CPU 10A detects in step 105B in FIG. 8 that the back gauge abutment 23 is positioned at the position of the corrected abutment dimension L via the bending control means 10G (FIG. 1), the robot control means After gripping the workpiece W by the gripper 14 of the robot 13 through 10F (FIG. 1), inserting the workpiece W from between the punch P and the die D and carrying it into the press brake, the workpiece W is moved to the corrected thrust. A robot that abuts against the back gauge abutment 23 positioned at the position of the contact dimension L and then lowers the ram 20 via the bending control means 10G and grips the workpiece W via the robot control means 10F. 13, the ram 20 is stopped via the bending control means 10G when a predetermined ram stroke is reached. Make.
The above is for the first workpiece W, but the second and subsequent workpieces W are similarly used by using the single elongation value α of the first workpiece W measured in step 104 of FIG. In addition, the abutting dimension L can be corrected based on the one-side elongation value α and used for the back gauge position.
For example, in the case of bending 100 workpieces W having the same thickness and other conditions, first, if the above-mentioned single elongation value α is measured for the first workpiece W, the next second to 100 sheets are measured. For the workpiece W up to the eye, it is not necessary to newly measure the single elongation value α. Based on the single elongation value α measured for the first workpiece W, the abutting dimension L is corrected, and the corrected The back gauge abutment 23 can be positioned at the position of the abutment dimension L.

図9〜図11は、本発明による曲げ加工方法の他の例を示し、曲げ加工の際に、ロボット13が、バックゲージ突当23を用いてワークWを位置決めするか、片伸び値αを測定する測定装置1を用いてワークWを位置決めするかを選択可能にした。   9 to 11 show other examples of the bending method according to the present invention. In the bending process, the robot 13 positions the workpiece W using the back gauge abutment 23 or sets the one-side elongation value α. It is possible to select whether the workpiece W is positioned using the measuring device 1 to be measured.

この場合、加工前に、予め工程ごとに、ロボット13のワーク追従動作の軌跡、即ちフォローイング軌跡Fを(例えば図3(C)に相当)算出しておき(図11のステップ201)、このフォローイング軌跡Fを用い、シミュレーションにより、前記したいずれかのワーク位置決めを選択することができる。   In this case, before machining, a trajectory of the workpiece following operation of the robot 13, that is, a following trajectory F (for example, corresponding to FIG. 3C) is calculated in advance for each process (step 201 in FIG. 11). Any of the above-described workpiece positioning can be selected by simulation using the following trajectory F.

例えば、本実施形態においては、図10(A)に示す平坦なワークWを曲げ加工するものとし、1工程目では、曲げ線m1に沿って曲げ加工することにより、フランジF1を形成し(図10(B))、所定のフランジ寸法Hを得ることから、このフランジ寸法Hが重要寸法となり、2工程目では、曲げ線m2に沿って曲げ加工することにより、前記したフランジF1に対向するフランジF2を形成し(図10(C))、所定の底部寸法Aを得ることから、この底部寸法Aが重要寸法となる。   For example, in the present embodiment, it is assumed that the flat workpiece W shown in FIG. 10A is bent, and in the first step, the flange F1 is formed by bending along the bending line m1 (FIG. 10). 10 (B)), because the predetermined flange dimension H is obtained, this flange dimension H becomes an important dimension, and in the second step, the flange is opposed to the flange F1 by bending along the bend line m2. Since F2 is formed (FIG. 10C) and a predetermined bottom dimension A is obtained, this bottom dimension A becomes an important dimension.

そして、前記予め算出したフォローイング軌跡Fを用いて、1工程目において、グリッパ14が重要寸法側ワーク部分とは反対側のワーク部分を把持して曲げ加工を行った場合に、該グリッパ14が機械本体と干渉するか否かを判断する(図11のステップ202)。   Then, in the first step, when the gripper 14 grips the workpiece portion on the side opposite to the important dimension side workpiece portion and performs bending processing in the first step, the gripper 14 It is determined whether or not it interferes with the machine body (step 202 in FIG. 11).

この場合、1工程目では、既述したように、重要寸法側ワーク部分は、W1であり(図10(A))、通常は、この重要寸法側ワーク部分W1をバックゲージの突当23側に当接して位置決め状態を安定させると共に、それと反対側のワーク部分W2をグリッパ14で把持する。   In this case, in the first step, as described above, the important dimension side workpiece part is W1 (FIG. 10A), and this important dimension side workpiece part W1 is usually placed on the back gauge abutment 23 side. The gripper 14 grips the workpiece portion W2 on the opposite side.

この状態が図9(A)に示され、この状態でパンチPを下降してダイDと協働してワークWを曲げ加工すると、該ワークWは跳ね上がり、グリッパ14は前記算出したフォローイング軌跡F(図3(C)に相当)を描く。   This state is shown in FIG. 9A. In this state, when the punch P is lowered and the workpiece W is bent in cooperation with the die D, the workpiece W jumps up, and the gripper 14 moves the calculated following locus. F (corresponding to FIG. 3C) is drawn.

図9(A)の場合には、突当23側の重要寸法側ワーク部分W1の寸法よりも、それとは反対側のグリッパ14が把持しているワーク部分W2の寸法が大きいとすれば、曲げ加工を行ってもグリッパ14はパンチP側などの機械本体とは干渉しない(図11のステップ202のNO)。   In the case of FIG. 9 (A), if the dimension of the workpiece part W2 gripped by the gripper 14 on the opposite side is larger than the dimension of the workpiece part W1 on the critical dimension side on the abutment 23 side, Even if processing is performed, the gripper 14 does not interfere with the machine body such as the punch P (NO in step 202 in FIG. 11).

従って、実際の曲げ加工の際にも、従来どおり、即ち図9(A)に示すように、バックゲージ突当23を用いてワークWを位置決めし(図11のステップ203)、該ワークWを曲げ線m1に沿って曲げ加工し、重要寸法である所定のフランジ寸法Hが得られ(図10(B))、その後は、次の2工程目へ移る(図11)。   Therefore, even during actual bending, as shown in FIG. 9A, the workpiece W is positioned using the back gauge abutment 23 (step 203 in FIG. 11). Bending is performed along the bend line m1 to obtain a predetermined flange dimension H which is an important dimension (FIG. 10B), and thereafter, the process proceeds to the next second step (FIG. 11).

この場合、1工程目のバックゲージ突当23は(図9(A))、既述した片伸び値α(図4)を考慮し、補正後の突き当て寸法L=H−αの位置に位置決めされている。   In this case, the back gauge abutment 23 in the first step (FIG. 9 (A)) is in the position of the corrected abutment dimension L = H−α in consideration of the already described single elongation value α (FIG. 4). It is positioned.

また、2工程目では、既述したように、重要寸法側ワーク部分は、W3であり(図10(B))、通常は、この重要寸法側ワーク部分W3をバックゲージの突当23側に当接して位置決め状態を安定させると共に、それと反対側のワーク部分W4をグリッパ14で把持する。   In the second step, as described above, the important dimension side workpiece part is W3 (FIG. 10B), and this important dimension side workpiece part W3 is usually placed on the back gauge abutment 23 side. While abutting and stabilizing the positioning state, the work part W4 on the opposite side is gripped by the gripper.

しかし、この場合には、突当23側の重要寸法側ワーク部分W3の寸法よりも、それとは反対側のグリッパ14が把持しているワーク部分W4の寸法が小さいとすれば、既述した図13(A)と同じ状態となる。   However, in this case, if the dimension of the workpiece part W4 gripped by the gripper 14 on the opposite side is smaller than the dimension of the workpiece part W3 on the critical dimension side on the abutment 23 side, 13 (A).

このため、パンチPを下降してダイDと協働してワークWを曲げ加工すると、該ワークWは跳ね上がり、グリッパ14は前記算出したフォローイング軌跡F(図3(C)に相当)を描くが、明らかに、グリッパ14は、機械本体と干渉するする(図11のステップ202のYES)。   For this reason, when the workpiece W is bent in cooperation with the die D by lowering the punch P, the workpiece W jumps up and the gripper 14 draws the calculated following locus F (corresponding to FIG. 3C). Obviously, however, the gripper 14 interferes with the machine body (YES in step 202 in FIG. 11).

従って、実際の曲げ加工の際には、後述するように、グリッパ14に取り付けられた測定装置1を用いてワークWを位置決めする(図11のステップ204)。   Therefore, in the actual bending process, as will be described later, the workpiece W is positioned by using the measuring device 1 attached to the gripper 14 (step 204 in FIG. 11).

即ち、実際の曲げ加工の際には、先ず、図9(B)の上図に示すように、寸法が大きい重要寸法側ワーク部分W3をグリッパ14で把持した状態で、該グリッパ14に取り付けられた測定装置1のロッド1Aの位置が、A(底部寸法)−α(片伸び値)=N(残り寸法)の位置に来るように、グリッパ14を位置決めした後、上グリッパ14Aを僅かに上昇させ,ワークWをハーフクランプ状態にしておく。   That is, in the actual bending process, first, as shown in the upper diagram of FIG. 9B, the important dimension side work part W3 having a large dimension is held by the gripper 14 and attached to the gripper 14. After positioning the gripper 14 so that the position of the rod 1A of the measuring device 1 is at the position of A (bottom dimension) −α (one-side stretch value) = N (remaining dimension), the upper gripper 14A is slightly raised. The workpiece W is in a half clamp state.

このとき、1工程目で形成されたフランジF1は、ロッド1Aには当接していず、また、ダイD上のワークWの曲げ線m2は、金型センタCよりも若干後方(突当23側)にあり、更に、突当23は、ワークW先端部よりも若干後方に位置している。   At this time, the flange F1 formed in the first step is not in contact with the rod 1A, and the bending line m2 of the workpiece W on the die D is slightly behind the die center C (the abutment 23 side). Further, the abutment 23 is located slightly rearward of the workpiece W tip.

この状態で、次には,図9(B)の下図に示すように、突当23を前進させてワークWをグリッパ14側に押し込むと、ワークWの後端部のフランジF1が、測定装置1のロッド1Aに当接するので、該測定装置1からはON信号が出力され、その時点で突当23を停止させた後、上グリッパ14Aを下降させることにより、ワークWを把持する。   Next, in this state, as shown in the lower diagram of FIG. 9B, when the abutment 23 is advanced and the workpiece W is pushed into the gripper 14 side, the flange F1 at the rear end portion of the workpiece W becomes the measuring device. Since the measuring device 1 is in contact with the first rod 1A, an ON signal is output. At that time, the abutment 23 is stopped, and then the upper gripper 14A is lowered to grip the workpiece W.

これにより、片伸び値αを測定する測定装置1を用いてワークWを位置決めすことができ、ワークW上の曲げ線m2の位置は、金型センタCと一致し、また、ワークWがグリッパ14に把持されていると共に、突当23に突き当てられているので、該ワークWの位置決め状態が安定する。   As a result, the workpiece W can be positioned using the measuring device 1 that measures the half elongation value α, the position of the bending line m2 on the workpiece W coincides with the mold center C, and the workpiece W is gripper. 14 and the abutment 23, the positioning state of the workpiece W is stabilized.

その後は、パンチPを下降させることにより、ダイD上のワークWを曲げ線m2に沿って曲げ加工すれば、重要寸法側ワーク部分W3を把持するグリッパ14がワーク追従動作を行っても、機械本体と干渉することなく、曲げ加工が進行し、重要寸法である所定の底部寸法Aが得られる(図10(C))。   Thereafter, if the workpiece W on the die D is bent along the bending line m2 by lowering the punch P, even if the gripper 14 holding the important dimension side workpiece portion W3 performs the workpiece following operation, the machine The bending process proceeds without interfering with the main body, and a predetermined bottom dimension A which is an important dimension is obtained (FIG. 10C).

上記図9〜図11の場合には、グリッパ14が機械本体と干渉するか否かの判断は(図11のステップ202)、例えば前記NC装置10(図1)を構成する干渉可否判断手段10Hが行い、該干渉可否判断手段10Hは、加工情報算出手段10Dが算出した工程ごとのロボット13のワーク追従動作の軌跡に基づいて(図11のステップ201)、既述したように、各工程ごとに、グリッパ14が重要寸法側ワーク部分とは反対側のワーク部分を把持して曲げ加工を行った場合に、該グリッパ14が機械本体と干渉するか否かを判断する(図11のステップ202)。   In the case of FIG. 9 to FIG. 11, the determination as to whether or not the gripper 14 interferes with the machine main body (step 202 in FIG. 11) is, for example, the interference availability determination means 10H constituting the NC device 10 (FIG. 1). Based on the trajectory of the workpiece following operation of the robot 13 for each process calculated by the machining information calculation unit 10D (step 201 in FIG. 11), the interference availability determination unit 10H performs each process as described above. In addition, when the gripper 14 grips the workpiece portion opposite to the important dimension side workpiece portion and performs bending, it is determined whether or not the gripper 14 interferes with the machine body (step 202 in FIG. 11). ).

本発明は、ロボットで把持されたワークの片伸び値を測定する測定装置が小型であって構成が簡単であり、測定時間を短縮することにより、測定効率を向上させ、曲げ角度が90°のみならず鋭角や鈍角のワークを測定対象とすることにより、測定対象の範囲を拡大し、且つワークの片伸び値を測定する測定装置を用いてワークを位置決めし、ロボットが機械本体と干渉することなく曲げ加工を行うロボットによる曲げ加工システム及び曲げ加工方法に利用され、具体的には、ワークを把持するロボットのグリッパと、該グリッパに取り付けられてワークの片伸び値を測定するポテンショメータを有するロボットによる曲げ加工システムに利用され、また、当該工程において、ワークの片伸び値を測定した後、次工程以降において、前記測定した片伸び値に基づいて、突き当て寸法を補正し、バックゲージ位置に使用する曲げ加工方法に有用であり、更には、既述したように、曲げ加工の際には、ロボットが、従来どおりバックゲージ突当を用いてワークを位置決めするか、グリッパに取り付けられた片伸び値を測定するポテンショメータを用いてワークを位置決めするかを選択可能な曲げ加工方法にも適用があり、極めて有用である。   In the present invention, the measuring device for measuring the half elongation value of the workpiece gripped by the robot is small in size and simple in configuration, and the measuring time is shortened to improve the measuring efficiency and the bending angle is only 90 °. In addition, by using a workpiece with an acute or obtuse angle as a measurement target, the range of the measurement target is expanded and the workpiece is positioned using a measuring device that measures the half elongation value of the workpiece, and the robot interferes with the machine body. More specifically, a robot having a gripper of a robot that grips a workpiece and a potentiometer that is attached to the gripper and measures a half elongation value of the workpiece In the process, after measuring the elongation value of the workpiece, the measurement is performed in the subsequent process. It is useful for the bending method that corrects the abutting dimension based on the half elongation value and uses it at the back gauge position. There is also a bending method that can be used to select whether to position the workpiece using a back gauge abutment or to position the workpiece using a potentiometer that measures the stretch value attached to the gripper. .

本発明の全体図である。1 is an overall view of the present invention. 本発明のロボット13を示す図である。It is a figure which shows the robot 13 of this invention. 本発明のロボット13の動作説明図である。It is operation | movement explanatory drawing of the robot 13 of this invention. 本発明による片伸び値αの説明図である。It is explanatory drawing of the piece elongation value (alpha) by this invention. 本発明を構成する測定装置1の他の実施例を示す図である。It is a figure which shows the other Example of the measuring apparatus 1 which comprises this invention. 本発明の全体動作を説明するためのフローチャートである。It is a flowchart for demonstrating the whole operation | movement of this invention. 本発明による1工程目の動作を説明するためのフローチャートである。It is a flowchart for demonstrating operation | movement of the 1st process by this invention. 本発明による2工程目以降の動作を説明するためのフローチャートである。It is a flowchart for demonstrating the operation | movement after the 2nd process by this invention. 本発明による曲げ加工方法の他の例を示す図である。It is a figure which shows the other example of the bending method by this invention. 図9で曲げ加工されるワークWの例を示す図である。It is a figure which shows the example of the workpiece | work W bent by FIG. 図9の動作を説明するためのフローチャートである。It is a flowchart for demonstrating the operation | movement of FIG. 従来技術の一例を示す図である。It is a figure which shows an example of a prior art. 従来技術の他の例を示す図である。It is a figure which shows the other example of a prior art.

符号の説明Explanation of symbols

1 測定装置
10 NC装置
10A CPU
10B 入出力手段
10C 記憶手段
10D 加工情報算出手段
10E 測定装置制御手段
10F ロボット制御手段
10G 曲げ制御手段
11 曲げ加工装置
12 ベースプレート
13 ロボット
14 グリッパ
14A 上グリッパ
14B 下グリッパ
19 アーム
20 上部テーブル
21 下部テーブル
22 側板
23 突当
24 スライダ
25 ストレッチ
Dダイ
P パンチ
W ワーク






















1 Measuring device 10 NC device 10A CPU
10B Input / output means 10C Storage means 10D Processing information calculation means 10E Measuring device control means 10F Robot control means 10G Bending control means 11 Bending processing device 12 Base plate 13 Robot 14 Gripper 14A Upper gripper 14B Lower gripper 19 Arm 20 Upper table 21 Lower table 22 Side plate 23 Bump 24 Slider 25 Stretch D die P Punch W Workpiece






















Claims (3)

ロボットのグリッパに取り付けられ、該グリッパで把持されたワークの片伸び値を測定する測定装置と、
ロボットを駆動制御するロボット制御手段と、
前記ワークの片伸び値を測定する測定装置を駆動制御し、ロボットによるワーク位置決め時点における該測定装置が示す値と、ロボットによるワーク跳ね上がり追従動作終了時点における該測定装置が示す値とを検出する測定装置制御手段と、
該検出された測定装置の各値に基づいて、ワークの片伸び値を算出する加工情報算出手段から成ることを特徴とするロボットによる曲げ加工システム。
A measuring device attached to a gripper of a robot and measuring a half elongation value of a work held by the gripper;
Robot control means for driving and controlling the robot;
Measurement that drives and controls a measuring device that measures a single elongation value of the workpiece, and detects a value indicated by the measuring device at the time of positioning of the workpiece by the robot and a value indicated by the measuring device at the end of the workpiece jump-up tracking operation by the robot Device control means;
A robot bending process system comprising machining information calculation means for calculating a piece elongation value of a workpiece based on each value of the detected measuring device.
上記測定装置がポテンショメータにより構成されている請求項1記載のロボットによる曲げ加工システム。 The robot bending process system according to claim 1, wherein the measuring device comprises a potentiometer. 上記請求項1記載のロボットによる曲げ加工システムを使用する曲げ加工方法であって、
ロボットのグリッパで把持したワークが位置決めされ、その後該ワークをハーフクランプ状態でパンチとダイで固定した後、グリッパを前進させることにより、ポテンショメータがON信号を出力した時点の該ポテンショメータの値と、パンチとダイでワークを曲げ加工することにより、曲げ加工の進行に伴うグリッパのワーク跳ね上がり追従動作終了時点の該ポテンショメータの値との差により、片伸び値を測定することを特徴とする曲げ加工方法。
A bending method using the robot bending system according to claim 1,
The workpiece gripped by the robot gripper is positioned, and then the workpiece is fixed with a punch and a die in a half clamp state, and then the gripper is moved forward so that the value of the potentiometer when the potentiometer outputs an ON signal and the punch and by bending the workpiece in the die, by the difference between the bending value of the potentiometer of the workpiece bounce following operation end of the gripper with the progress of machining, bending method and measuring the single elongation value.
JP2005239090A 2005-08-19 2005-08-19 Robot bending system and bending method Expired - Fee Related JP4761886B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005239090A JP4761886B2 (en) 2005-08-19 2005-08-19 Robot bending system and bending method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005239090A JP4761886B2 (en) 2005-08-19 2005-08-19 Robot bending system and bending method

Publications (2)

Publication Number Publication Date
JP2007050447A JP2007050447A (en) 2007-03-01
JP4761886B2 true JP4761886B2 (en) 2011-08-31

Family

ID=37915249

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005239090A Expired - Fee Related JP4761886B2 (en) 2005-08-19 2005-08-19 Robot bending system and bending method

Country Status (1)

Country Link
JP (1) JP4761886B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7169811B2 (en) * 2018-08-07 2022-11-11 株式会社アマダ MACHINING POSITION SETTING DEVICE, MACHINING POSITION SETTING METHOD, AND MACHINING POSITION SETTING PROGRAM
WO2020163997A1 (en) * 2019-02-12 2020-08-20 深圳配天智能技术研究院有限公司 Bending following trajectory planning method, bending system, robot, and storage device
JP6839467B1 (en) * 2020-08-05 2021-03-10 コトヒラ工業株式会社 How to manufacture wall panels
JP6803103B1 (en) * 2020-08-05 2020-12-23 コトヒラ工業株式会社 How to manufacture wall panels
WO2022203084A1 (en) * 2021-03-25 2022-09-29 川崎重工業株式会社 Workpiece transport method, workpiece transport device, and workpiece transport program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06210580A (en) * 1993-01-13 1994-08-02 Nissan Motor Co Ltd Workpiece gripping compensating device
JPH08108234A (en) * 1994-10-07 1996-04-30 Amada Co Ltd Sheet metal working method and work handling robot therefor
JP2000071018A (en) * 1998-08-27 2000-03-07 Amada Co Ltd Method and equipment for correcting position of back gauge
JP2002022432A (en) * 2000-07-11 2002-01-23 Amada Denshi:Kk Equipment for measuring bending

Also Published As

Publication number Publication date
JP2007050447A (en) 2007-03-01

Similar Documents

Publication Publication Date Title
JP6542629B2 (en) Positioning device and method for machining tool
JP2010231575A (en) Device and method for instruction of off-line of robot, and robot system
JP4761886B2 (en) Robot bending system and bending method
EP1016490A1 (en) Method of detecting abrasion quantity of welding gun electrode and welding method
JP2010162558A (en) Bending machine
EP1258299B1 (en) Bending method and bending device
JP6243739B2 (en) Gauging method and gauging apparatus
JP4708541B2 (en) Bending method and bending system
JP2014036969A (en) Work plate thickness detecting device and method in machining tool
JP5890937B2 (en) Seam welding method and system
JP5241330B2 (en) Robot bending apparatus and method
JP2009154208A (en) Bending method by robot and its apparatus
WO2012173012A1 (en) Bending system and bending method
JP4587526B2 (en) Bending machine
JP2002355782A (en) Working force estimation system and working force estimation method for robot tip
JP6243591B2 (en) Program creation system, simulation system and method thereof
JP2862872B2 (en) Control method of industrial robot to supply and position plate material to bending machine
US20210086293A1 (en) Friction Stir Welding Apparatus and Friction Stir Welding Method
JP7472223B2 (en) Press brake, bending system and sensor movement control method
JP7081546B2 (en) Material tester and control method of material tester
JP7478860B1 (en) Automatic calculation device and automatic calculation method
JP5915436B2 (en) Numerical control device and pitch error calculation method
US20220288663A1 (en) Bending method and bending system
JP2018192542A (en) Positioning system and positioning method
JPH05131334A (en) Work positioning device for bending machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080709

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110314

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110512

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110607

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110607

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140617

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees