[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP3815103B2 - Air conditioning control system and communication processing method thereof - Google Patents

Air conditioning control system and communication processing method thereof Download PDF

Info

Publication number
JP3815103B2
JP3815103B2 JP03649099A JP3649099A JP3815103B2 JP 3815103 B2 JP3815103 B2 JP 3815103B2 JP 03649099 A JP03649099 A JP 03649099A JP 3649099 A JP3649099 A JP 3649099A JP 3815103 B2 JP3815103 B2 JP 3815103B2
Authority
JP
Japan
Prior art keywords
air conditioning
command
conditioning control
communication processing
command signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP03649099A
Other languages
Japanese (ja)
Other versions
JP2000234791A (en
Inventor
芳郎 高須賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Electric Works Co Ltd
Original Assignee
Matsushita Electric Works Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Works Ltd filed Critical Matsushita Electric Works Ltd
Priority to JP03649099A priority Critical patent/JP3815103B2/en
Publication of JP2000234791A publication Critical patent/JP2000234791A/en
Application granted granted Critical
Publication of JP3815103B2 publication Critical patent/JP3815103B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)
  • Control By Computers (AREA)
  • Selective Calling Equipment (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、空気調和を行う複数の空調機器を制御するための空調制御システムおよびその通信処理方法に関するものである。
【0002】
【従来の技術】
図9は従来の空調制御システムの概略構成図である。上位監視装置1には通信回線2を介して複数台の通信処理装置3a,3b,3c…が接続される。各通信処理装置3a,3b,3c…には、それぞれ、通信回線4を介して複数台の操作設定器5と空調制御装置6a,6b…とが接続されている。各通信処理装置3a,3b,3c…は通信回線4を介して操作設定器5および空調制御装置6a,6b…との間で所謂1:Nポーリング方式により通信を行い、操作設定器5および空調制御装置6a,6b…を個別にアクセスして、監視データや制御データを授受する。操作設定器5は対応する空調機器7a,7b…の設置場所付近に設けられ、操作者のオン/オフ操作に応じて対応する空調機器7a,7b…をオン/オフさせる操作指令信号を発生する。また、上位監視装置1からも通信回線2を介して通信処理装置3a,3b,3c…に所望の空調機器7a,7b…をオン/オフさせる上位指令信号を送信することができ、各通信親器3a,3b,3c…は上位監視装置1や操作設定器5から上位指令信号や操作指令信号を受信すると、通信回線4を介して対応する空調制御装置6a,6b…に制御データを送信し、空調制御装置6a,6b…では通信処理装置3a,3b,3c…から送信された制御データに応じて空調機器7a,7b…をオン/オフさせている。
【0003】
【発明が解決しようとする課題】
この空調制御システムの動作を通信処理装置3aを例として以下に簡単に説明する。通信処理装置3aは操作設定器5および空調制御装置6a,6b…を予め定められた順番でポーリングしており、操作設定器5および空調制御装置6a,6b…を個別にアクセスして監視データを読み込む。操作者が所望の空調機器7a,7b…をオン/オフさせるために対応する操作設定器5を操作すると、操作設定器5は空調機器7a,7b…をオン/オフさせる操作指令信号を発生する。上述のように通信処理装置3aは操作設定器5及び空調制御装置6a,6b…を所定の順番でポーリングしており、操作指令信号を発生した操作設定器5をアクセスした時点で、この操作設定器5から操作指令信号を監視データとして読み込み、読み込んだ操作指令信号に基づいて所望の空調機器7a,7b…をオン/オフさせるための制御データを作成し、対応する空調制御装置6a,6b…に制御データを送信する。
【0004】
空調制御装置6a,6b…は通信処理装置3aから制御データが入力されると、その制御データに基づいて空調機器7a,7b…を起動又は停止させる。通信処理装置3aは対応する空調制御装置6a,6b…に制御データを送信した後、所定の順番で操作設定器5及び空調制御装置6a,6b…のポーリングを再開しており、前回制御データを送信した空調制御装置6a,6b…を再びアクセスした時点で、この空調制御装置6a,6b…から空調機器7a,7b…の運転状態を示す監視データを受信し、空調機器7a,7b…の運転状態の変化を上位監視装置1へ送信する。
【0005】
このように通信処理装置3aは対応する空調制御装置6a,6b…に制御データを送信した後、所定の順番でポーリングを再開しているので、操作者が操作設定器5を操作した時点から、通信処理装置3aがその操作設定器5をアクセスして操作指令信号を監視データとして読み込み、この監視データに基づいて作成した制御データを対応する空調制御装置6a,6b…に送信した後、制御データを受信した空調制御装置6a,6b…が空調機器7a,7b…をオン/オフさせて、その運転状態の変化を検出し、さらに通信処理装置3aがこの空調制御装置6a,6b…をポーリングして、空調機器7a,7b…の運転状態の変化を監視データとして読み込み、この監視データを上位監視装置1に送信するまでの間に、最大でポーリング周期の2周期分の時間がかかっていた。
【0006】
また、上位監視装置1が所望の空調機器7a,7b…をオン/オフさせる上位指令信号を対応する通信処理装置3a,3b,3c…に送信すると、各通信処理装置3a,3b,3c…では、上位指令信号を受信した時点で、上位指令信号に基づいて作成した制御データを対応する空調制御装置6a,6b…に送信するが、その後は所定の順番で操作設定器5や空調制御装置6a,6b…をポーリングするため、制御データを受信した空調制御装置6a,6b…が空調機器7a,7b…をオン/オフさせて、その運転状態の変化を検出した後、通信処理装置3aがこの空調制御装置6a,6b…をポーリングして、空調機器7a,7b…の運転状態の変化を監視データとして読み込み上位監視装置1に送信するまでの間に、最大でポーリング周期の1周期分の時間がかかっていた。そのため、上位監視装置1により空調機器7a,7b…のオン/オフ操作や運転状態の確認を行う担当者は、上位監視装置1により空調機器7a,7b…の起動/停止操作を行ってからその操作結果を確認するまでの間に長い時間を要し、作業効率が低下するという問題があった。
【0007】
ここで、上位監視装置1や操作設定器5から各通信処理装置3a,3b,3c…に上位指令信号や操作指令信号が送信されると、各空調機器7a,7bの運転状態は後から送信された指令信号によって決定されるため、上位監視装置1からの指令信号を優先させたい場合は、各通信処理装置3a,3b,3c…から操作設定器5の操作を無効とする操作禁止指令を操作設定器5に送信させて、操作設定器5の操作を無効とするような処理を行う必要があった。
【0008】
しかしながら、上位監視装置1において、空調機器7a,7b…が停止中であることを確認した後、停止状態を維持させるために対応する通信処理装置3a,3b,3c…から操作禁止指令を送信させて、操作設定器5による空調機器7a,7b…のオン/オフ操作を禁止させたとしても、上述のように操作者が操作設定器5を用いてオン/オフ操作を行った時点から、各通信処理装置3a,3b,3c…で対応する空調機器7a,7b…の運転状態の変化を読み込むまでの間に最大でポーリング周期の2周期分の時間がかかるため、操作禁止指令の送信後に、操作禁止指令が送信される以前の操作設定器5の操作によって空調機器7a,7b…が停止状態から起動状態に変化してしまい、通信処理装置3a,3b,3c…が空調機器7a,7b…の最新の運転状態を空調制御装置6a,6b…から読み出して、上位監視装置1に送信すると、操作設定器5の操作禁止指令を送信した時点で上位監視装置1が確認している空調機器7a,7b…の運転状態と実際の運転状態との間に食い違いが発生する虞があり、その場合は上位監視装置1から空調機器7a,7b…を停止させる上位指令信号を送り直すという処理を行う必要があるため、上位監視装置1から各通信処理装置3a,3b,3c…に指令データを1回送信するだけでは操作が完了せず、処理が煩雑になるという問題があった。
【0009】
また、火災等の緊急時には空調機器7a,7b…を強制的に停止させる必要があるが、空調機器7a,7b…を強制的に停止させる場合には、まず各通信処理装置3a,3b,3c…から操作設定器5へ操作禁止指令を送信させて、操作設定器5によるオン/オフ操作を禁止した後、運転中の空調機器7a,7b…を停止させる上位指令信号を対応する通信処理装置3a,3b,3c…に送信するという二重の処理を行っていた。また、この場合でも上述と同様に操作設定器5へ操作禁止指令を送信した時点では、空調機器7a,7b…が停止状態にあるという監視データが上位監視装置1に送信されていたとしても、実際には操作禁止指令を送信する以前の操作設定器5の操作によって通信処理装置3a,3b,3c…から空調制御装置6a,6b…へ空調機器7a,7b…を起動させるという制御データが既に送信されており、空調機器7a,7b…が運転状態にあるにもかかわらず、この空調制御装置6a,6bにポーリングの順番が回ってきていないために、空調機器7a,7b…が運転状態にあるという監視データが上位監視装置1に送信されていないという状態が発生する虞があり、その場合は上位監視装置1から各通信処理装置3a,3b,3c…へ空調機器7a,7b…を停止させるという上位指令信号を送信するという処理を行わねばならず、処理が煩雑になるという問題があった。
【0010】
本発明は上記問題点に鑑みて為されたものであり、その目的とするところは、空調機器の運転状態の変化をいち早く上位監視装置へ伝達すると共に、操作設定器による起動/停止操作と上位監視装置による起動/停止操作との優先順位にしたがって空調機器を起動/停止させることのできる空調制御システムおよびその通信処理方法を提供することにある。
【0011】
【課題を解決するための手段】
上記目的を達成するために、請求項1の発明では、空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムにおいて、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスする機能を通信処理装置に設けたことを特徴とし、通信処理装置では上位監視装置や操作設定端末から指令信号を受信すると、対応する空調制御端末に指令信号を送信し、指令信号を送信した空調制御端末を通常ポーリング配列から除外すると共に、上位指令処理配列或いは操作指令処理配列に登録して、通常ポーリング配列に登録されている端末を1台アクセスする毎に、上位指令処理配列或いは操作指令処理配列に登録された空調制御端末を交互に1台づつアクセスしているので、各空調を所定の通常ポーリング配列にしたがって順にアクセスする場合に比べて、指令信号を送信した空調制御端末が制御する空調機器の運転状態の変化をいち早く検出することができる空調制御システムを実現できる。しかも、上位指令信号として空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令を設けており、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効としているので、空調機器の運転状態を現状のままとして、操作設定端末による起動/停止操作を禁止したい場合にも、操作設定端末による起動/停止操作を無効にする操作無効指令を空調制御端末に送信する必要はなく、したがって操作無効指令を送信した後に、操作無効指令送信前の操作設定端末による起動/停止操作によって空調機器の運転状態が変化し、操作者の意図と違った運転状態となるのを防止でき、改めて上位監視装置から空調機器を起動又は停止させる上位指令信号を送信する必要がなく、上位監視装置の通信処理の負担を低減できる。
【0012】
請求項2の発明では、請求項1の発明において、通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とし、火災発生時には通信処理装置が通信処理を中断して空調制御端末に火災指令を送信し、空調制御端末では火災指令に応じて空調機器を強制的に停止させ、上位監視装置や操作設定端末からの指令信号を保留しているので、上位監視装置から操作設定端末の操作を禁止する信号を出力する必要がなく、しかも通信処理装置は火災信号を送信した空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行しているので、火災指令により空調機器が停止したことをいち早く検出することができ、空調制御端末は火災指令が入力されなくなると保留している指令信号を実行するから、火災状態解除後もそれまでの指令信号と矛盾することなく通常時の処理に復旧させることができる空調制御システムを実現できる。
【0013】
請求項3の発明では、空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムの通信処理方式であって、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通信処理装置は通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスすることを特徴とし、通信処理装置では上位監視装置や操作設定端末から指令信号を受信すると、対応する空調制御端末に指令信号を送信し、指令信号を送信した空調制御端末を通常ポーリング配列から除外すると共に、上位指令処理配列或いは操作指令処理配列に登録して、通常ポーリング配列に登録されている端末を1台アクセスする毎に、上位指令処理配列或いは操作指令処理配列に登録された空調制御端末を交互に1台づつアクセスしているので、各空調を所定の通常ポーリング配列にしたがって順にアクセスする場合に比べて、指令信号を送信した空調制御端末が制御する空調機器の運転状態の変化をいち早く検出することができる。しかも、上位指令信号として空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令を設けており、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効としているので、空調機器の運転状態を現状のままとして、操作設定端末による起動/停止操作を禁止したい場合にも、操作設定端末による起動/停止操作を無効にする操作無効指令を空調制御端末に送信する必要はなく、したがって操作無効指令を送信した後に、操作無効指令送信前の操作設定端末による起動/停止操作によって空調機器の運転状態が変化し、操作者の意図と違った運転状態となるのを防止でき、改めて上位監視装置から空調機器を起動又は停止させる上位指令信号を送信する必要がなく、上位監視装置の通信処理の負担を低減できる。
【0014】
請求項4の発明では、請求項3の発明において、通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とし、火災発生時には通信処理装置が通信処理を中断して空調制御端末に火災指令を送信し、空調制御端末では火災指令に応じて空調機器を強制的に停止させ、上位監視装置や操作設定端末からの指令信号を保留しているので、上位監視装置から操作設定端末の操作を禁止する信号を出力する必要がなく、しかも通信処理装置は火災信号を送信した空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行しているので、火災指令により空調機器が停止したことをいち早く検出することができ、空調制御端末は火災指令が入力されなくなると保留している指令信号を実行するから、火災状態解除後もそれまでの指令信号と矛盾することなく通常時の処理に復旧させることができる。
【0015】
【発明の実施の形態】
本発明の実施の形態を図面を参照して説明する。
【0016】
(実施形態1)
図1は本実施形態の空調制御システムの概略構成図である。上位監視装置1には通信回線(第2の通信線)2を介して通信処理装置3が接続され、通信処理装置3には通信回線(第1の通信線)4を介して操作設定器(操作設定端末)5および空調制御装置(空調制御端末)6が接続されている。通常、上位監視装置1には通信回線2を介して複数台の通信処理装置3が接続され、通信処理装置3には通信回線4を介して複数台の操作設定器5及び空調制御装置6が接続されるが、図1では省略して通信処理装置3、操作設定器5及び空調制御装置6を1台づつ図示してある。
【0017】
上位監視装置1は、操作者のオン/オフ操作に応じて所望の空調機器をオン/オフさせる操作信号を発生する入出力処理部11と、入出力処理部11の発生した操作信号を判定、処理して上位指令信号を作成し、この上位指令信号を送受信データメモリ12に転送する演算処理部13と、送受信データメモリ12に格納された上位指令信号を通信回線2を介して通信処理装置3に送信するとともに、通信処理装置3から通信回線2を介して空調機器の運転状態や故障状態などを示す監視データを受信して送受信データメモリ12に格納する通信処理部14と、送受信データメモリ12に格納された空調機器の運転状態や故障状態などを示す監視データを演算処理部13が判定・処理した結果を表示する表示部15とを備えている。
【0018】
通信処理装置3は、通信回線2を介して上位監視装置1との間でデータの送受信を行う通信処理部31と、通信処理部31の送受信するデータが格納される送受信データメモリ32と、通信回線4を介して操作設定器5および空調制御装置6との間でデータの送受信を行う通信処理部33と、通信処理部33の送受信するデータが格納される送受信データメモリ34と、通信処理部33に通信回線4を介して接続された複数台の端末(すなわち操作設定器5および空調制御装置6)の種別(操作設定器5か空調制御装置6かの区別を示すデータ)やアドレス(通信局番)、操作設定器5と空調制御装置6との対応関係などのデータが予め登録された通信用データテーブル35と、演算処理部36とを備えている。
【0019】
操作設定器5は、操作者のオン/オフ操作に応じた操作信号を発生する入出力処理部51と、入出力処理部51が発生した操作信号を判定、処理して操作指令信号を作成する演算処理部52と、演算処理部52の作成した操作指令信号などのデータを格納する送受信データメモリ53と、通信処理装置3からアクセスされた際に送受信データメモリ53に格納された操作指令信号を通信回線4を介して通信処理装置3に返送するとともに、通信処理装置3から対応する空調機器の運転状態等を示すデータを受信して送受信データメモリ53に格納する通信処理部54と、送受信データメモリ53に格納された対応する空調機器の運転状態等を示すデータを演算処理部52が判定、処理した結果を表示する表示部55とで構成される。
【0020】
空調制御装置6は、通信処理装置3から通信回線4を介して送信された制御データを受信する通信処理部61と、通信処理部61が受信した上位監視装置1や操作設定器5からの指令信号や対応する空調機器の現在の運転状態を示すデータを格納する送受信データメモリ62と、空調機器をオン/オフさせるオン/オフ信号(ONパルス、OFFパルス)を空調機器動力盤7に出力するとともに空調機器の運転状態や故障状態を示す信号(ON入力、故障入力)が空調機器動力盤7から入力される入出力処理部63と、送受信データメモリ62に格納された上位監視装置1や操作設定器5からの制御データを処理、判定して、入出力処理部63から空調機器動力盤7に起動信号或いは停止信号を出力させる演算処理部64とを備えており、通信処理装置3から送信される制御データに応じて空調機器動力盤7の動作を制御し、空調機器を起動または停止させている。
【0021】
通信処理部33は通信回線4を介して操作設定器5および空調制御装置6との間で所謂1:Nポーリング方式により通信処理を行い、操作設定器5および空調制御装置6を個別にアクセスして監視データや制御データを授受する。通信処理部33は空調制御装置6から空調機器の動作状態や故障状態を示す監視データを受信すると、受信した監視データを判定、処理して送信データを作成し、作成した送信データを送受信データメモリ32に格納する。そして通信処理部31は送受信データメモリ32に格納された送信データを通信回線2を介して上位監視装置1に送信する。また通信処理部33が操作設定器5からオン/オフ操作を示す操作指令信号を受信して、この操作指令信号を送受信データメモリ34に格納すると、演算処理部36は送受信データメモリ34に格納された操作指令信号から通信用データテーブル35に設定されたデータに基づいて制御データを作成し、作成した制御データを通信処理部33から対応する空調制御装置6に送信させるとともに、当該空調制御装置6が制御する空調機器の運転状態等を示すデータを通信処理部33から操作設定器5に送信させている。また、通信処理部31が上位監視装置1から所望の空調機器を起動/停止させる上位指令信号などのデータを受信すると、通信処理部31は受信したデータを送受信データメモリ32に格納する。演算処理部36は、送受信データメモリ32に格納されたデータを通信用データテーブル35に設定されたデータに基づいて判定、処理して制御データを作成し、作成した制御データを送受信データメモリ34に格納する。そして、通信処理部33が、送受信データメモリ34に格納された制御データを対応する空調制御装置6に送信する。
【0022】
ここで、空調制御装置6の送受信データメモリ62のメモリ領域は、上位監視装置1或いは操作設定器5からの指令信号を格納する指令格納エリアと、対応する空調機器の運転状態を示すデータを格納する運転状態格納エリアとに大きく分かれており、さらに指令格納エリア及び運転状態格納エリアは、それぞれ、上位監視装置用と操作設定器用とに分かれている。而して、通信処理装置3が上位監視装置1から空調機器を起動/停止させる上位指令信号を受信し、この上位指令信号を対応する空調制御装置6に送信する場合、通信処理部61は通信処理装置3から受信した上位指令信号を上位監視装置用の指令格納エリア62aに格納する。また、通信処理装置3が操作設定器5から操作指令信号を読み出し、この操作指令信号を対応する空調制御装置6に送信する場合、通信処理部61は通信処理装置3から受信した操作指令信号を操作設定器用の指令格納エリア62cに格納する。また、演算処理部64は入出力処理部63から入力された空調機器の運転状態や故障状態を示す信号を処理し、通信処理装置3を介して上位監視装置1に送信する場合は上位監視装置用の運転状態格納エリア62bに格納し、通信処理装置3を介して操作設定器5に送信する場合は操作設定器用の運転状態格納エリア62dに格納する。
【0023】
ところで、上位監視装置1が発生する起動/停止指令には、操作設定器5による操作指令信号と関係なく空調機器を強制的に起動/停止させる“上位オン指令”、“上位オフ指令”、及び、操作設定器5の操作指令信号に応じて空調機器を起動又は停止させる“操作設定器参照指令”の3種類がある。また、上位監視装置用の運転状態格納エリア62bに格納される空調機器の運転状態を示すデータにも、上述と同様に、上位オン指令にしたがって起動している状態を示す“上位オン状態”、上位オフ指令にしたがって停止している状態を示す“上位オフ状態”、操作設定器5の操作指令信号に応じて空調機器を起動又は停止させる“操作設定器参照状態”の3種類がある。一方、操作設定器5が発生する操作指令信号には“オフ指令”と、それぞれ異なる風量で空調機器を起動させる“第1オン指令”、“第2オン指令”、“第3オン指令”および“第4オン指令”の5種類がある。また、操作設定器用の運転状態格納エリア62dに格納される空調機器の運転状態を示すデータにも、上述と同様に、オフ指令にしたがって停止している状態を示す“オフ状態”、第1〜第4オン指令に応じた風量で運転している状態を示す第1〜第4オン状態の5種類のデータがある。なお、第1〜第4オン指令は、例えばファンコイルユニットのように送風機の風量が複数段階に切り換えられる空調機器に対応するためのもので、風量を切り換える機能のない空調機器では、第1〜第4オン指令を単なるオン指令と同様に扱えば良い。
【0024】
以下に空調制御装置6の動作を図7のフローチャートを参照して説明する。まず、空調制御装置6の演算処理部64は、送受信データメモリ62の上位監視装置用の指令格納エリア62aをチェックし、通信処理装置3を介して上位監視装置1から送信された上位指令信号の有無を判定し(ステップS1)、上位指令信号があればその内容を判断する(ステップS2)。
【0025】
ここで、上位指令信号が上位オン指令の場合、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が停止中か否かを判断し(ステップS3)、運転中であればステップS7に移行し、停止中であれば入出力処理部63から空調機器動力盤7に起動信号を出力させ(ステップS4)、空調機器の運転状態と上位指令信号の内容とが一致したか否かを判断する(ステップS14)。そして、空調機器が起動し、その運転状態と上位指令信号の内容が一致すると、上位監視装置用の運転状態格納エリア62bに空調機器の運転状態を示すデータを格納する(ステップS15)。なお、ステップS14において運転状態と上位指令信号の内容が一致していなければ、ステップS1に戻り上述の処理を繰り返す。
【0026】
また、ステップS2において上位指令信号が上位オフ指令の場合、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が運転中か否かを判断し(ステップS5)、停止中であればステップS7に移行し、運転中であれば入出力処理部63から空調機器動力盤7に停止信号を出力させ(ステップS6)、空調機器の運転状態と上位指令信号の内容とが一致したか否かを判断する(ステップS14)。そして、空調機器が停止し、その運転状態と上位指令信号の内容が一致すると、上位監視装置用の運転状態格納エリア62bに空調機器の運転状態を示すデータを格納する(ステップS15)。なお、ステップS14において運転状態と上位指令信号の内容が一致していなければ、ステップS1に戻り上述の処理を繰り返す。このように上位指令信号が上位オン指令或いは上位オフ指令の場合、空調制御装置6は操作設定器5からのオン指令、オフ指令に関係無く、空調機器を強制的に起動又は停止させている。
【0027】
一方、ステップS2において上位指令信号が操作設定器参照指令の場合、演算処理部64は操作設定器用の指令格納エリア62cをチェックし、通信処理装置3を介して操作設定器5から送信された操作指令信号の有無を判定し(ステップS8)、操作指令信号があればその内容を判断する(ステップS9)。ここで、操作指令信号がオン指令の場合、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が停止中か否かを判断し(ステップS10)、運転中であればステップS14に移行し、停止中であれば入出力処理部63から空調機器動力盤7に起動信号を出力させた後(ステップS11)、ステップS14に移行し上述と同様の処理を実行する。また、ステップS9において操作指令信号がオフ指令の場合、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が停止中か否かを判断し(ステップS12)、停止中であればステップS14に移行し、運転中であれば入出力処理部63から空調機器動力盤7に起動信号を出力させた後(ステップS13)、ステップS14に移行し上述と同様の処理を実行する。
【0028】
また、ステップS1において上位指令信号がない場合、演算処理部64は送受信データメモリ62の上位監視装置用の運転状態格納エリア62bをチェックし(ステップS7)、運転状態格納エリア62b内のデータが上位オフ状態又は上位オン状態であればステップS14に移行して上述の処理を実行し、操作設定器参照状態であれば、ステップS8に移行して上述の処理を実行する。
【0029】
ところで、通信処理装置2の通信用データテーブル35には、通信回線4を介して接続された個々の端末(操作設定器5および空調制御装置6)の種別(すなわち操作設定器5か空調制御装置6かの区別)とその通信局番(例えば1,2,3,4…N)とが予め登録されており、図2に示すように通信局番の若いものから順番に配列(以下、この配列を通常ポーリング配列という)Aを作り、通常はこの通常ポーリング配設Aにしたがって通信処理装置3が操作設定器5および空調制御装置6をポーリングする。なお、通信処理装置3は操作設定器5および空調制御装置6を上述の通常ポーリング配列Aにしたがって1台ポーリングする毎に、上位監視装置1との間でデータを送受信しており、直前にポーリングした端末(操作設定器5或いは空調制御装置6)から読み込んだ各種のデータを上位監視装置1に送信するとともに、上位監視装置1から通信処理装置3へデータが送信されると、通信処理装置3は受信したデータを対応する操作設定器5或いは空調制御装置6に出力する。
【0030】
ここで、上位監視装置1から例えば通信局番が3番の空調制御装置6を起動/停止させる上位オン指令或いは上位オフ指令が通信処理装置3に送信され、通信処理装置3が上位オフ指令或いは上位オン指令を通信局番が3番の空調制御装置6に送信した場合、図3に示すように、通信局番が3番の空調制御装置6を通常ポーリング配列Aから除外するとともに、上位指令信号に応じて動作中の空調制御装置6をポーリングする順番を規定する上位指令処理配列Bに通信局番が3番の空調制御装置6を登録し、通信処理装置3は通常ポーリング配列Aに登録された操作設定器5及び空調制御装置6と、上位指令処理配列Bに登録された空調制御装置6とを交互にポーリングする。なお、上位指令処理配列Bにおける順番は、上位監視装置1から上位指令信号を受け取った順番とする。
【0031】
通信局番が3番の空調制御装置6では、上述のように通信処理装置3から受信した上位オフ指令或いは上位オン指令にしたがって空調機器動力盤7にオフ信号或いはオン信号を出力しており、演算処理部64は空調機器動力盤7から入出力処理部63に入力された空調機器の運転状態を示すデータを処理して、空調機器の運転状態が上位指令信号の内容に一致すると、上位監視装置用の運転状態格納領域62bに空調機器の運転状態を書き込む。そして、通信処理装置3がこの空調制御装置6をポーリングし、上位監視装置用の運転状態格納領域62bに格納された空調機器の運転状態を読み込み、空調機器の運転状態が上位指令信号の内容に一致したと判断すると、通信局番が3番の空調制御装置6を上位指令処理配列Bから通常ポーリング配列Aに戻し、通常ポーリング配列Aにしたがって操作設定器5および空調制御装置6をポーリングする。この時同時に通信処理装置3は対応する操作設定器5および上位監視装置1に空調機器の動作状態を示すデータを送信する。
【0032】
また、上位監視装置1から通信処理装置3に操作設定器参照指令が送信された場合、通信処理装置3は上位監視装置1から入力された操作設定器参照指令を対応する空調制御装置6に送信する。この時、通信処理装置3は操作設定器参照指令を送信した空調制御装置6の通信局番を通常ポーリング配列Aから除外するとともに、この空調制御装置6の通信局番を上位指令処理配列Bに登録し、通常ポーリング配列Aに登録された操作設定器5及び空調制御装置6と、上位指令処理配列Bに登録された空調制御装置6とを交互にポーリングする。
【0033】
通信処理装置3から操作設定器参照指令が送信された空調制御装置6では、通信処理部61が受信した操作設定器参照指令を送受信データメモリ32の上位監視装置用指令格納エリア62aに格納する。演算処理部64は指令格納エリア62aに格納された操作設定器参照指令を処理して、対応する操作設定器5からの操作指令信号に応じて空調機器動力盤7を制御する操作指令参照状態に動作モードを切り換え、上位監視装置用の運転状態格納エリア62bに操作設定器参照状態を示すデータを格納する。通信処理装置3は通常ポーリング配列Aに登録された操作設定器5及び空調制御装置6と、上位指令処理配列Bに登録された空調制御装置6とを交互にポーリングしており、操作設定器参照指令を送信した空調制御装置6をポーリングして、運転状態格納エリア62bに格納されたデータを読み込む。そして、運転状態格納エリア62bに格納されたデータが操作設定器参照状態となった時点で、この空調制御装置6の通信局番を上位指令処理配列Bから除外して、通常ポーリング順列Aに復帰させる。また、通信処理装置3はこの空調制御装置6が操作設定器参照状態となったことを示すデータを対応する操作設定器5および上位監視装置1に送信する。なお、この時点では空調制御装置6の動作状態を操作設定器参照状態に切り換えているだけで、空調制御装置6から空調機器動力盤7へオン/オフ信号は出力されないので、空調機器の実際の運転状態は変化しない。
【0034】
操作設定器5は通信処理装置3から対応する空調制御装置6の上位監視装置用運転状態格納エリア62bに格納されたデータを受信しており、そのデータが上位オフ状態或いは上位オン状態である場合には、操作者が入出力処理部51により起動或いは停止などの設定操作を行ったとしても、演算処理部52は入出力処理部51による設定操作を無視するとともに、表示部55に入出力処理部51による設定操作が無効であることを表示する。一方、上位監視装置用の運転状態格納エリア62bに格納されたデータが設定器参照状態になると、操作者が入出力処理部51により起動或いは停止などの設定操作を行った時点で、演算処理部53が入出力処理部51による設定操作の内容を送受信データメモリ52に格納し、通信処理装置3からのポーリングによって通信処理装置3に読み出されるのを待つ。
【0035】
ここで、通信処理装置3が操作設定器5をアクセスして、送受信データメモリ53に格納された入出力操作部51による設定操作の内容を読み込んだ際に、送受信データメモリ52に有効な設定操作の内容が格納されており、なお且つ、対応する通信局番が例えば3番の空調制御装置6が上位監視装置1から送信された上位指令信号の処理中でなければ(すなわち、通信局番が3番の空調制御装置6が上位指令処理配列Bに登録されていなければ)、送受信データメモリ52に格納された設定操作の内容を対応する空調制御装置6に送信する。この時、通信処理装置3は、図4に示すように、この空調制御装置6の通信局番を通常ポーリング配列Aから除外し、操作指令信号に応じて動作中の空調制御装置6をポーリングする順番を規定する操作指令処理配列Cに登録して、通常ポーリング配列Aに登録された操作設定器5及び空調制御装置6と、操作指令処理配列Cに登録された空調制御装置6とを交互にポーリングする。そして、空調制御装置6が操作設定器5の操作指令信号に応じて空調機器動力盤7を制御し、空調機器の運転状態と操作指令信号の内容とが一致すると、通信処理装置3は通信局番が3番の空調制御装置6を操作指令処理配列Cから除外し、通常ポーリング配列Aに戻してポーリングを行う。この時同時に、通信処理装置3は対応する操作設定器5および上位監視装置1に空調機器の運転状態を示すデータを送信する。
【0036】
また、通信局番が3番の空調制御装置6が対応する操作設定器5からの操作指令信号に応じて動作中に、上述と同様にして通信処理装置3が、通信局番が2番の空調制御装置6に対応する操作設定器5から操作指令信号を読み込むと、通信処理装置3は操作設定器5から読み込んだ操作指令信号を通信局番が2番の空調制御装置6に送信するとともに、その通信局番を通常ポーリング配列Aから除外して、操作指令処理配列Cに登録し(図5参照)、通常ポーリング配列Aに登録された操作設定器5及び空調制御装置6と、操作指令処理配列Cに登録された空調制御装置6とを交互にポーリングする。なお、操作指令処理配列Cにおける順番は、通信処理装置3が操作設定器5からの操作指令を受け取った順番とする。
【0037】
ここで、図6に示すように、上位指令処理配列Bに通信局番が3番の空調制御装置6が登録され、操作指令処理配列Cに通信局番が2番の空調制御装置6が登録されている場合、通信処理装置3は、通常ポーリング配列Aに登録されている通信局番が4番の端末(操作設定器5或いは空調制御装置6)をアクセスした後、上位指令処理配列Bに登録された通信局番が3番の空調制御装置6をアクセスし、さらに通常ポーリング配列Aに登録された通信局番が5番の端末局をアクセスする。そして、操作指令処理配列Cに登録された通信局番が2番の空調制御装置2をアクセスした後、通常ポーリング配列Aに登録された通信局番が6番の端末(操作設定器5或いは空調制御装置6)をアクセスする。このように、通常ポーリング配列Aに登録された端末局を1台アクセスする毎に、指令処理配列Bに登録された空調制御装置6、又は、操作指令処理配列Cに登録された空調制御装置6を1台づつ交互にアクセスしているので、通信処理装置3は空調制御装置6の運転状態の変化をいち早く検出して、上位監視装置1に送信することができる。
【0038】
なお、空調制御装置6は操作設定器5からの操作指令信号に応じて動作中に、通信処理装置3を介して上位監視装置1からの上位指令信号を受け取ると、操作設定器5からの操作指令信号よりも上位監視装置1からの上位指令信号を優先して動作する。この時、通信処理装置3は、この空調制御装置6の通信局番を操作指令処理配列Cから除外して上位指令処理配列Bに登録し、通常ポーリング配列Aに登録された操作設定器5或いは空調制御装置6を1台ポーリングする毎に、上位指令処理配列Bに登録された空調制御装置6を交互にアクセスする。そして、上位監視装置1からの上位指令信号の内容と空調機器の運転状態が一致すると、通信処理装置3はこの空調制御装置6の通信局番を通常ポーリング配列Aに戻し、操作設定器5による操作指令信号を無効にする。なお、空調制御装置6は操作設定器5からの指令信号よりも上位監視装置1からの上位指令信号を優先させているので、上位指令信号によって動作中に操作指令信号を受け、操作指令信号により動作することはない。
【0039】
上述のように、通信処理装置3は上位監視装置1から上位指令信号を受け取るか、又は、操作設定器5から操作指令信号を受け取ると、上位指令信号又は操作指令信号を対応する空調制御装置6に送信するとともに、この空調制御装置6の通信局番を通常ポーリング配列から除外して、上位監視装置1からの上位指令信号に応じて動作中の空調制御装置6をポーリングする順番を設定する上位指令処理配列B、或いは、操作設定器5からの操作指令信号に応じて動作中の空調制御装置6をポーリングする順番を設定する操作指令処理配列Cに登録し、通信処理装置3は通常ポーリング配列Cにしたがって空調制御装置6あるいは操作設定器5を1台アクセスする毎に、上位指令処理配列Bあるいは操作指令処理配列Cに登録された空調制御機器6を1台づつ交互にアクセスして通信処理を行っているので、上位指令信号又は操作指令信号による空調機器の運転状態の変化を、通常ポーリング配列の順番に関係なくいち早く検出して、上位監視装置1に送信することができる。
【0040】
また、この空調制御システムでは、上位監視装置1が通信処理装置を介して空調制御装置6に操作設定器参照指令を送信した期間のみ、操作設定器5による起動/停止操作を有効にしているので、空調機器の運転状態を現状のままとして、操作設定器5による起動/停止操作を禁止したい場合にも、操作設定器5による起動/停止操作を無効にする操作無効指令を空調制御装置6に送信する必要はない。したがって操作無効指令を送信した後に、操作無効指令送信前の操作設定器5による起動/停止操作によって空調機器の運転状態が変化し、操作者の意図と違った運転状態となるのを防止でき、改めて上位監視装置1からの空調機器を起動又は停止させる上位指令信号を送信する必要がなく、上位監視装置1の通信処理の負担を低減できる。
【0041】
(実施形態2)
実施形態1の空調制御システムでは、通信処理装置3が上位監視装置1からの強制オン指令、強制オフ指令を操作設定器5からの操作指令信号よりも優先して取り扱っているので、操作設定器5に対して操作設定器5の操作を禁止する操作禁止指令を送信することなく、上位監視装置1からの上位オン指令又は上位オフ指令を優先させて空調制御装置3の動作を制御することができる。また、通信処理装置3は上位監視装置1からの上位指令信号や操作設定器5からの操作指令信号を対応する空調制御装置6に送信すると、この空調制御装置6を通常ポーリング配列Aとは別の上位指令処理配列B或いは操作指令処理配列Cに登録して、上位指令信号や操作指令信号の内容が実現されるまでの間、通常ポーリング配列Aに登録された端末(操作設定器5及び空調制御装置6)を1台アクセスする毎に、上位指令処理配列B或いは操作指令処理配列Cに登録された空調制御装置6を交互に1台づつアクセスしているので、空調機器の運転状態の変化をいち早く検出し、その運転状態を上位監視装置1に送信することができる。
【0042】
ところで、一般的にビル内に配設される空調制御システムでは上位監視装置1によりビル内の火災発生を検出しており、火災発生時には上位監視装置1から各通信処理装置へ火災が発生したことを示す火災発生信号を送出し、各通信処理装置3により運転中の空調機器を停止させる必要があるが、各通信処理装置3において上位監視装置1から送信された火災発生信号を上位指令信号として取り扱うと、火災発生信号が送信された時点で上位監視装置1に送信されている各空調機器の運転状態だけではなく、上位監視装置1からの上位指令信号や操作設定器5からの操作指令信号に応じて空調制御装置6が空調機器を起動させている途中か否かの判定を行う必要がある。
【0043】
また、予め設定されたスケジュールで空調機器を起動させる制御データを空調制御装置6に送信しておき、通常は空調制御装置6が所定のスケジュールにしたがって空調機器を起動/停止させている場合に、上位監視装置1からの上位指令信号と、所定のスケジュールによる起動/停止動作とは後指令を優先するよう設定されていると、火災発生時に上位監視装置1から通信処理装置3を介して各空調制御装置6に空調機器を停止させる停止指令を送信したとしても、その直後に空調制御装置6がスケジュールによって動作し、空調機器を起動させる虞があった。
【0044】
そこで本実施形態では、空調制御装置6の送受信データメモリ62に、上位監視装置1や操作設定器5からの指令信号を格納する上位監視装置用の指令格納エリア62a、操作設定器用の指令格納エリア62cとは別に火災の発生を示す火災指令を格納する火災信号格納エリア(図示せず)を設けている。そして、火災発生時に通信処理装置3から空調制御装置6へ火災指令が送信されると、通信処理部61が通信処理装置3からの火災指令を受信して送受信データメモリ62の火災信号格納エリアに格納し、この火災指令に基づいて演算処理部64は上位監視装置1や操作設定器5からの指令信号に関わらず対応する空調機器を停止させている。なお、送受信データメモリ62以外の構成は実施形態1と同様であるので、同一の構成要素についての図示および説明は省略する。
【0045】
また、火災中に空調機器を停止させる間、演算処理部64は送受信データメモリ62の上位監視装置用の運転状態格納エリア62bに上位オフ状態を示すデータを出力するとともに、操作設定器用の運転状態格納エリア62dにオフ状態を示すデータを出力する。そして、火災状態格納エリア内に格納されるデータが火災発生中から火災解除となるまでの間、上位監視装置1からの上位指令信号や操作設定器5からの操作指令信号や空調制御装置6に設定されたスケジュールによる起動又は停止の実行を保留する。保留中に上位監視装置1、操作設定器5或いは空調制御装置6に設定されたスケジュールにより、新たな指令が入力されると保留中の指令内容を新規の指令内容に更新する。なお、上位監視装置1からの上位指令信号と、空調制御装置6に設定されたスケジュール動作による起動/停止指令とは後指令の方を優先する。
【0046】
その後、火災状態格納エリア内に格納された火災状態を示すデータが火災発生から火災解除に変化すると、空調制御装置6では保留中の最新指令の内、上位監視装置1からの上位指令信号、或いは、スケジュール動作による起動/停止指令を優先して実行し、もし最新指令が上位監視装置1からの操作設定器参照指令であったならば、操作設定器5による起動/停止指令を実行する。
【0047】
ところで、通信処理装置3では、上位監視装置1が火災発生を検知するビル内のエリア(以下、火災検知エリアという)毎に、上位監視装置1から火災状態を示すデータを格納する火災情報格納領域を送受信データメモリ32に設けており、通信用データテーブル35には火災検知エリアに対応する空調制御装置6の通信局番が予め登録されている。そして、通信処理装置3が上位監視装置1から火災発生中を示す火災発生信号を受信すると、通信処理装置3は現在行っている通信処理を一旦中断し、火災発生中の火災検知エリアに対応する空調制御装置6に火災発生を示す火災指令を送信して、火災指令を送信した空調制御装置6に対しその通信局番の順にポーリングを行う。一方、火災指令を受信した空調制御装置6では受信した火災指令を火災信号格納エリアに格納する。
【0048】
ここで、空調制御装置6の動作を図8のフローチャートを参照して簡単に説明する。空調制御装置6では、演算処理部64が送受信データメモリ62の火災信号格納エリアをチェックし、火災信号格納エリアに格納されたデータから火災中か否かを判断する(ステップS21)。火災中であれば、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が運転中か否かを判断し(ステップS37)、停止中であればステップS39に移行し、運転中であれば入出力処理部63から空調機器動力盤7に停止信号を出力させ(ステップS38)、上位指令信号や操作指令信号やスケジュールによる起動/停止指令を保留する(ステップS39)。その後、演算処理部64は空調機器動力盤7から入出力処理部63に入力されるON入力に基づいて空調機器が停止したと判断すると、上位監視装置用の運転状態格納エリア62bに上位オフ状態を示すデータを格納する。上述のように通信処理装置3は火災指令を送信した空調制御装置6をポーリングしており、上位監視装置用の運転状態格納エリア62bからデータを読み込み、そのデータが上位オフ状態になると、上位監視装置1にその運転状態を送信して、この空調制御装置6をポーリングの対象から除外する。そして火災発生中の火災検知エリアに対応する全ての空調制御装置6の運転状態が上位オフ状態になると、通信処理装置3は一旦中断していた火災発生前の通信処理を再開する。但し、火災発生中となった火災検知エリアが火災解除状態に切り替わった場合は、対応する空調制御装置6を強制的にオフ状態とする処理が完了していなくても、その時点で対応する空調制御装置6のポーリングを終了し、当該火災検知エリアに対応する空調制御装置6に火災解除状態を示すデータを送信する。なお、ステップS21において火災中ではないと判断した場合の空調制御装置6の動作(ステップS22〜S36)は、実施形態1で説明した空調制御装置6の動作(ステップS1〜S15)と同様であるので、その説明は省略する。
【0049】
このように、火災発生時には通信処理装置3から対応する空調制御装置6へ火災発生を示す火災指令を送信し、火災発生中は空調制御装置6が空調機器を強制的に停止させているので、火災発生時には上位監視装置1により停止中であると認識されため、停止指令が送信されなかった空調制御装置6が実際には起動処理中であり、その後運転状態になって上位監視装置1に運転状態を示すデータが送信され、上位監視装置1が通信処理装置3を介して空調制御装置6へオフ信号を送信しなければならなくなるという状態を防止することができる。また、空調制御装置6は通信処理装置3から火災指令を受け取ると、上位監視装置1からの上位オン指令を保留しているので、火災発生中の火災検知エリアに対応した空調制御装置6へ上位監視装置1が誤って上位オン指令を送出したとしても、この空調制御装置6は上位オン指令を保留し、実際に運転されることはない。さらに、操作設定器5による操作信号は無効となるので、対応する操作設定器5へ操作禁止指令を送信する必要はなく、空調制御装置6に設定されたスケジュール動作による起動指令も保留されるので、空調制御装置6にスケジュール動作を禁止する禁止指令を送信する必要もない。しかも火災解除時には保留中の指令が実行されるので、火災解除時に上位監視装置1側でスケジュール動作の内容を判断し、本来空調機器が運転している時刻であれば通信処理装置3を介して空調制御装置6へ空調機器を起動させる信号を送信する必要がなく、上位監視装置1の処理を減らすことができる。
【0050】
また、上位監視装置1から送信される火災状態の変化によって、火災発生時の処理を最優先で実行するため、火災発生時に空調機器が停止したか否かの確認をいち早く行うことができ、したがって火災情報が誤報であった場合にも対応する空調機器の復旧作業を迅速且つ容易に行うことができる。
【0051】
【発明の効果】
上述のように請求項1の発明は、空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムにおいて、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスする機能を通信処理装置に設けたことを特徴とし、通信処理装置では上位監視装置や操作設定端末から指令信号を受信すると、対応する空調制御端末に指令信号を送信し、指令信号を送信した空調制御端末を通常ポーリング配列から除外すると共に、上位指令処理配列或いは操作指令処理配列に登録して、通常ポーリング配列に登録されている端末を1台アクセスする毎に、上位指令処理配列或いは操作指令処理配列に登録された空調制御端末を交互に1台づつアクセスしているので、各空調を所定の通常ポーリング配列にしたがって順にアクセスする場合に比べて、指令信号を送信した空調制御端末が制御する空調機器の運転状態の変化をいち早く検出することができる空調制御システムを実現できるという効果がある。しかも、上位指令信号として空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令を設けており、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効としているので、空調機器の運転状態を現状のままとして、操作設定端末による起動/停止操作を禁止したい場合にも、操作設定端末による起動/停止操作を無効にする操作無効指令を空調制御端末に送信する必要はなく、したがって操作無効指令を送信した後に、操作無効指令送信前の操作設定端末による起動/停止操作によって空調機器の運転状態が変化し、操作者の意図と違った運転状態となるのを防止でき、改めて上位監視装置から空調機器を起動又は停止させる上位指令信号を送信する必要がなく、上位監視装置の通信処理の負担を低減できるという効果がある。
【0052】
請求項2の発明は、請求項1の発明において、通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とし、火災発生時には通信処理装置が通信処理を中断して空調制御端末に火災指令を送信し、空調制御端末では火災指令に応じて空調機器を強制的に停止させ、上位監視装置や操作設定端末からの指令信号を保留しているので、上位監視装置から操作設定端末の操作を禁止する信号を出力する必要がなく、しかも通信処理装置は火災信号を送信した空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行しているので、火災指令により空調機器が停止したことをいち早く検出することができ、空調制御端末は火災指令が入力されなくなると保留している指令信号を実行するから、火災状態解除後もそれまでの指令信号と矛盾することなく通常時の処理に復旧させることができる空調制御システムを実現できるという効果がある。
【0053】
請求項3の発明は、空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムの通信処理方式であって、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通信処理装置は通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスすることを特徴とし、通信処理装置では上位監視装置や操作設定端末から指令信号を受信すると、対応する空調制御端末に指令信号を送信し、指令信号を送信した空調制御端末を通常ポーリング配列から除外すると共に、上位指令処理配列或いは操作指令処理配列に登録して、通常ポーリング配列に登録されている端末を1台アクセスする毎に、上位指令処理配列或いは操作指令処理配列に登録された空調制御端末を交互に1台づつアクセスしているので、各空調を所定の通常ポーリング配列にしたがって順にアクセスする場合に比べて、指令信号を送信した空調制御端末が制御する空調機器の運転状態の変化をいち早く検出できるという効果がある。しかも、上位指令信号として空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令を設けており、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効としているので、空調機器の運転状態を現状のままとして、操作設定端末による起動/停止操作を禁止したい場合にも、操作設定端末による起動/停止操作を無効にする操作無効指令を空調制御端末に送信する必要はなく、したがって操作無効指令を送信した後に、操作無効指令送信前の操作設定端末による起動/停止操作によって空調機器の運転状態が変化し、操作者の意図と違った運転状態となるのを防止でき、改めて上位監視装置から空調機器を起動又は停止させる上位指令信号を送信する必要がなく、上位監視装置の通信処理の負担を低減できるという効果がある。
【0054】
請求項4の発明は、請求項3の発明において、通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とし、火災発生時には通信処理装置が通信処理を中断して空調制御端末に火災指令を送信し、空調制御端末では火災指令に応じて空調機器を強制的に停止させ、上位監視装置や操作設定端末からの指令信号を保留しているので、上位監視装置から操作設定端末の操作を禁止する信号を出力する必要がなく、しかも通信処理装置は火災信号を送信した空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行しているので、火災指令により空調機器が停止したことをいち早く検出することができ、空調制御端末は火災指令が入力されなくなると保留している指令信号を実行するから、火災状態解除後もそれまでの指令信号と矛盾することなく通常時の処理に復旧させることができるという効果がある。
【図面の簡単な説明】
【図1】実施形態1の空調制御システムの概略構成図である。
【図2】同上の空調制御システムの動作を説明する説明図である。
【図3】同上の空調制御システムの別の動作を説明する説明図である。
【図4】同上の空調制御システムのまた別の動作を説明する説明図である。
【図5】同上の空調制御システムのさらに別の動作を説明する説明図である。
【図6】同上の空調制御システムのまたさらに別の動作を説明する説明図である。
【図7】同上の空調制御システムの動作を説明するフローチャートである。
【図8】実施形態2の空調制御システムの動作を説明するフローチャートである。
【図9】従来の空調制御システムの概略構成図である。
【符号の説明】
1 上位監視装置
3 通信処理装置
5 操作設定器
6 空調制御装置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an air conditioning control system for controlling a plurality of air conditioning equipment that performs air conditioning and a communication processing method thereof.
[0002]
[Prior art]
FIG. 9 is a schematic configuration diagram of a conventional air conditioning control system. A plurality of communication processing devices 3a, 3b, 3c... Are connected to the host monitoring device 1 via a communication line 2. Each of the communication processing devices 3a, 3b, 3c... Is connected to a plurality of operation setting devices 5 and air conditioning control devices 6a, 6b. Each communication processing device 3a, 3b, 3c ... communicates with the operation setting device 5 and the air conditioning control devices 6a, 6b ... via the communication line 4 by a so-called 1: N polling method. The control devices 6a, 6b,... Are individually accessed to exchange monitoring data and control data. The operation setting device 5 is provided in the vicinity of the installation location of the corresponding air conditioner 7a, 7b... And generates an operation command signal for turning on / off the corresponding air conditioner 7a, 7b. . Further, the host monitoring device 1 can also transmit a host command signal for turning on / off desired air conditioners 7a, 7b,... To the communication processing devices 3a, 3b, 3c. When the devices 3a, 3b, 3c,... Receive the upper command signal or the operation command signal from the upper monitoring device 1 or the operation setting device 5, they transmit control data to the corresponding air conditioning control devices 6a, 6b,. In the air conditioning control devices 6a, 6b, etc., the air conditioning devices 7a, 7b,... Are turned on / off according to the control data transmitted from the communication processing devices 3a, 3b, 3c,.
[0003]
[Problems to be solved by the invention]
The operation of this air conditioning control system will be briefly described below using the communication processing device 3a as an example. The communication processing device 3a polls the operation setting device 5 and the air conditioning control devices 6a, 6b... In a predetermined order, and accesses the operation setting device 5 and the air conditioning control devices 6a, 6b. Read. When the operator operates the corresponding operation setting unit 5 to turn on / off the desired air conditioners 7a, 7b,..., The operation setter 5 generates an operation command signal for turning on / off the air conditioners 7a, 7b,. . As described above, the communication processing device 3a polls the operation setting device 5 and the air conditioning control devices 6a, 6b... In a predetermined order, and when the operation setting device 5 that generated the operation command signal is accessed, this operation setting is performed. The operation command signal is read from the device 5 as monitoring data, and control data for turning on / off desired air conditioners 7a, 7b,... Is created based on the read operation command signal, and the corresponding air conditioning control devices 6a, 6b,. Send control data to.
[0004]
When the control data is input from the communication processing device 3a, the air conditioning controllers 6a, 6b,... Start or stop the air conditioners 7a, 7b,. The communication processing device 3a resumes polling of the operation setting device 5 and the air conditioning control devices 6a, 6b... In a predetermined order after transmitting control data to the corresponding air conditioning control devices 6a, 6b. When the transmitted air-conditioning control devices 6a, 6b,... Are accessed again, monitoring data indicating the operating state of the air-conditioning devices 7a, 7b,. A change in state is transmitted to the host monitoring device 1.
[0005]
As described above, since the communication processing device 3a resumes polling in a predetermined order after transmitting control data to the corresponding air conditioning control devices 6a, 6b, from the time when the operator operates the operation setting device 5, The communication processing device 3a accesses the operation setting device 5 to read the operation command signal as monitoring data, and transmits the control data created based on the monitoring data to the corresponding air conditioning control devices 6a, 6b. The air-conditioning control devices 6a, 6b, etc. that have received the signals turn on / off the air-conditioning devices 7a, 7b, etc. to detect changes in their operating states, and the communication processing device 3a polls the air-conditioning control devices 6a, 6b,. The change in the operating state of the air conditioners 7a, 7b,... Is read as monitoring data, and the monitoring data is transmitted to the host monitoring device 1 at the maximum polling cycle. Time of two periods was at stake.
[0006]
When the host monitoring device 1 transmits a host command signal for turning on / off desired air conditioners 7a, 7b,... To the corresponding communication processing devices 3a, 3b, 3c,. When the higher order command signal is received, the control data created based on the higher order command signal is transmitted to the corresponding air conditioning control devices 6a, 6b..., But thereafter, the operation setting unit 5 and the air conditioning control device 6a in a predetermined order. , 6b..., 6b..., 6b..., 6b. ... polling the air-conditioning control devices 6a, 6b ... until the reading of changes in the operating state of the air-conditioning equipment 7a, 7b ... Time of one cycle of the was at stake. Therefore, the person in charge who performs the ON / OFF operation of the air conditioners 7a, 7b... And the operation state check by the host monitoring device 1 performs the start / stop operation of the air conditioners 7a, 7b. It took a long time to confirm the operation result, and there was a problem that work efficiency was lowered.
[0007]
Here, when an upper command signal or an operation command signal is transmitted from the upper monitoring device 1 or the operation setting unit 5 to each communication processing device 3a, 3b, 3c,..., The operation state of each air conditioner 7a, 7b is transmitted later. In order to prioritize the command signal from the higher-level monitoring device 1, an operation prohibition command for invalidating the operation of the operation setting unit 5 from each communication processing device 3 a, 3 b, 3 c. It has been necessary to perform processing that is transmitted to the operation setting device 5 to invalidate the operation of the operation setting device 5.
[0008]
However, after confirming that the air conditioners 7a, 7b,... Are stopped in the host monitoring device 1, an operation prohibition command is transmitted from the corresponding communication processing devices 3a, 3b, 3c,. Thus, even if the on / off operation of the air conditioners 7a, 7b... Is prohibited by the operation setting device 5, each time the operator performs the on / off operation using the operation setting device 5 as described above, Since it takes a maximum of two periods of the polling period before reading the change in the operating state of the corresponding air conditioner 7a, 7b,... By the communication processing devices 3a, 3b, 3c,. The air conditioners 7a, 7b... Are changed from the stopped state to the activated state by the operation of the operation setting unit 5 before the operation prohibition command is transmitted, and the communication processing devices 3a, 3b, 3c. When the latest operation state of b... is read from the air conditioning control devices 6a, 6b... and transmitted to the higher-level monitoring device 1, the higher-level monitoring device 1 confirms the air-conditioning that is confirmed by the higher-level monitoring device 1 There is a risk of a discrepancy between the operating state of the devices 7a, 7b ... and the actual operating state. In this case, a process of resending an upper command signal for stopping the air conditioners 7a, 7b ... from the host monitoring device 1 Therefore, there is a problem that the operation is not completed only by transmitting the command data from the host monitoring device 1 to each of the communication processing devices 3a, 3b, 3c.
[0009]
Further, in the event of an emergency such as a fire, it is necessary to forcibly stop the air conditioners 7a, 7b ..., but when the air conditioners 7a, 7b ... are forcibly stopped, first, the respective communication processing devices 3a, 3b, 3c. .. Is transmitted to the operation setting device 5 to prohibit the on / off operation by the operation setting device 5, and then the communication processing device corresponding to the upper command signal for stopping the operating air conditioners 7a, 7b. Double processing of transmitting to 3a, 3b, 3c... Was performed. Even in this case, even when monitoring data indicating that the air conditioners 7a, 7b,... Are in a stopped state is transmitted to the host monitoring device 1 at the time when the operation prohibition command is transmitted to the operation setting device 5 as described above, Actually, control data for starting the air conditioners 7a, 7b... From the communication processing devices 3a, 3b, 3c... To the air conditioning controllers 6a, 6b. Although the air conditioners 7a, 7b,... Are transmitted and the air-conditioning control devices 6a, 6b are not in the polling order, the air conditioners 7a, 7b,. There is a possibility that the state that the monitoring data is not transmitted to the higher-level monitoring device 1 may occur. In this case, air conditioning is performed from the higher-level monitoring device 1 to each of the communication processing devices 3a, 3b, 3c. Vessel 7a, not must be performed a process of sending a host command signal that stops the 7b ..., there is a problem that the process becomes complicated.
[0010]
The present invention has been made in view of the above-mentioned problems, and the object of the present invention is to promptly transmit a change in the operating state of the air conditioner to the host monitoring device, and to start / stop operation by the operation setting device and the host device. An object of the present invention is to provide an air conditioning control system capable of starting / stopping air conditioning equipment in accordance with the priority order of start / stop operations by a monitoring device, and a communication processing method thereof.
[0011]
[Means for Solving the Problems]
To achieve the above object, according to the first aspect of the present invention, a plurality of air conditioning control terminals for controlling the operation of the air conditioning equipment and a plurality of operation settings for generating an operation command signal in response to an on / off operation from the operator. A terminal, a plurality of air conditioning control terminals, and a plurality of operation setting terminals are connected to each other via the first communication line, and each terminal is accessed in order according to a normal polling sequence that defines the order in which each terminal is accessed individually. One or more communication processing devices that transmit and receive data and a plurality of communication processing devices are connected via a second communication line, and the host that monitors and controls the operation of the air conditioning control terminal connected to each communication processing device In an air conditioning control system composed of a monitoring device, the air conditioning equipment is forcibly turned on / off by a higher order command signal transmitted from the higher order monitoring device to the air conditioning control terminal via each communication processing device. An upper setting command, an upper setting command, and an operation setting terminal reference command that operates in response to an operation command signal from the operation setting terminal are provided, and an operation command from the operation setting terminal only when the upper command signal is an operation setting terminal reference command When the communication processing device reads the host command signal from the host monitoring device or the operation command signal from the operation setting terminal, the communication processing device transmits the host command signal and the operation command signal to the corresponding air conditioning control terminal, and The air conditioning control terminal is excluded from the normal polling array, and the operating air conditioning control terminal is polled according to the upper command processing array or the operation command signal for setting the order of polling the operating air conditioning control terminal according to the upper command signal. Each time the terminal is accessed according to the normal polling array, it is registered in one of the operation command processing arrays for setting the order. The communication processing device is provided with a function for accessing the air conditioning control terminals registered in the processing array and the operation command processing array one by one. When the communication processing device receives a command signal from the host monitoring device or the operation setting terminal, The command signal is transmitted to the corresponding air conditioning control terminal, the air conditioning control terminal that has transmitted the command signal is excluded from the normal polling array, and is registered in the upper command processing array or the operation command processing array, and is registered in the normal polling array. Each time one terminal is accessed, the air conditioning control terminals registered in the higher order command processing array or the operation command processing array are alternately accessed one by one. Compared to access, the change in the operating state of the air conditioning equipment controlled by the air conditioning control terminal that sent the command signal can be detected more quickly. Air conditioning control system that can be In addition, the upper command and upper command for forcibly turning on / off the air conditioning equipment are provided as the upper command signal, and the operation command signal from the operation setting terminal is valid only when the higher command signal is the operation setting terminal reference command. Therefore, even if it is desired to prohibit the start / stop operation by the operation setting terminal while the operation state of the air conditioning equipment remains as it is, an operation invalidation command for invalidating the start / stop operation by the operation setting terminal is given to the air conditioning control terminal. Therefore, after the operation invalidation command is transmitted, the operation state of the air conditioner is changed by the start / stop operation by the operation setting terminal before the operation invalidation command is transmitted, resulting in an operation state different from the operator's intention. This eliminates the need to send a higher-order command signal for starting or stopping the air conditioning equipment from the higher-level monitoring device again, and burdens the communication processing of the higher-level monitoring device. It can be reduced.
[0012]
According to a second aspect of the present invention, in the first aspect of the invention, when the communication processing device receives a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing is interrupted and a fire occurs at the corresponding air conditioning control terminal. When the air conditioning control terminal receives the fire command from the communication processing device, the air conditioning equipment is forcibly stopped by holding the command signal from the host monitoring device or the operation setting terminal. When the air-conditioning control terminal confirms that the corresponding air-conditioning equipment has been stopped, the communication processing is executed again. When a fire occurs, the communication processing device interrupts the communication processing and sends a fire command to the air-conditioning control terminal. However, the air conditioning control terminal forcibly stops the air conditioning equipment in response to the fire command and holds the command signal from the host monitoring device or operation setting terminal. Since it is not necessary to output a signal prohibiting the operation of the communication processing device, and the communication processing apparatus confirms that the air conditioning control terminal that transmitted the fire signal has stopped the corresponding air conditioning equipment, the communication processing is executed again, It is possible to quickly detect that the air-conditioning equipment has stopped due to the fire command, and the air conditioning control terminal executes the command signal that has been suspended when the fire command is no longer input. It is possible to realize an air conditioning control system that can restore normal processing without contradiction.
[0013]
In the invention of claim 3, a plurality of air conditioning control terminals that control the operation of the air conditioning equipment, a plurality of operation setting terminals that generate operation command signals in response to an on / off operation from an operator, and a plurality of air conditioning control terminals And a plurality of operation setting terminals are connected via a first communication line, and each terminal is accessed in order according to a normal polling arrangement that defines the order of accessing each terminal individually. An air conditioning system including a plurality of communication processing devices connected to each other via a second communication line, and a host monitoring device that monitors and controls the operation of an air conditioning control terminal connected to each communication processing device. A communication processing method for a control system, in which a higher order on signal for forcibly turning on / off an air conditioner is received by a higher order command signal transmitted from a higher order monitoring device to each air conditioning control terminal via each communication processing device. An upper setting command and an operation setting terminal reference command that operates in response to an operation command signal from the operation setting terminal are provided, and the operation command signal from the operation setting terminal is valid only when the upper command signal is the operation setting terminal reference command. When the communication processing device reads the higher order command signal from the higher order monitoring device and the operation command signal from the operation setting terminal, the communication processing device transmits the higher order command signal and the operation command signal to the corresponding air conditioning control terminal, and the air conditioning control terminal Is excluded from the normal polling array, and the order of polling the operating air conditioning control terminals according to the upper command signal is set. The order of polling the operating air conditioning control terminals according to the operation command signal is set. Registered in one of the operation command processing arrays to be performed, and the communication processing device is in the higher order each time one terminal is accessed according to the normal polling array. The air conditioning control terminals registered in the command processing array and the operation command processing array are accessed one by one, and when the communication processing apparatus receives a command signal from the host monitoring apparatus or the operation setting terminal, the corresponding air conditioning control terminal Sends a command signal, excludes the air conditioning control terminal that sent the command signal from the normal polling array, registers it in the upper command processing array or the operation command processing array, and accesses one terminal registered in the normal polling array Each time the air conditioning control terminals registered in the higher order command processing array or the operation command processing array are alternately accessed one by one, compared to the case where each air conditioning is sequentially accessed according to a predetermined normal polling array, It is possible to quickly detect a change in the operating state of the air conditioner controlled by the air conditioning control terminal that has transmitted the command signal. In addition, the upper command and upper command for forcibly turning on / off the air conditioning equipment are provided as the upper command signal, and the operation command signal from the operation setting terminal is valid only when the higher command signal is the operation setting terminal reference command. Therefore, even if it is desired to prohibit the start / stop operation by the operation setting terminal while the operation state of the air conditioning equipment remains as it is, an operation invalidation command for invalidating the start / stop operation by the operation setting terminal is given to the air conditioning control terminal. Therefore, after the operation invalidation command is transmitted, the operation state of the air conditioner is changed by the start / stop operation by the operation setting terminal before the operation invalidation command is transmitted, resulting in an operation state different from the operator's intention. This eliminates the need to send a higher-order command signal for starting or stopping the air conditioning equipment from the higher-level monitoring device again, and burdens the communication processing of the higher-level monitoring device. It can be reduced.
[0014]
In the invention of claim 4, in the invention of claim 3, when the communication processing device receives a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing is interrupted to cause a fire to occur in the corresponding air conditioning control terminal. When the air conditioning control terminal receives the fire command from the communication processing device, the air conditioning equipment is forcibly stopped by holding the command signal from the host monitoring device or the operation setting terminal. When the air-conditioning control terminal confirms that the corresponding air-conditioning equipment has been stopped, the communication processing is executed again. When a fire occurs, the communication processing device interrupts the communication processing and sends a fire command to the air-conditioning control terminal. However, the air conditioning control terminal forcibly stops the air conditioning equipment in response to the fire command and holds the command signal from the host monitoring device or operation setting terminal. Since it is not necessary to output a signal prohibiting the operation of the communication processing device, and the communication processing apparatus confirms that the air conditioning control terminal that transmitted the fire signal has stopped the corresponding air conditioning equipment, the communication processing is executed again, It is possible to quickly detect that the air-conditioning equipment has stopped due to the fire command, and the air conditioning control terminal executes the command signal that has been suspended when the fire command is no longer input. The normal processing can be restored without contradiction.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described with reference to the drawings.
[0016]
(Embodiment 1)
FIG. 1 is a schematic configuration diagram of an air conditioning control system according to the present embodiment. A communication processing device 3 is connected to the host monitoring device 1 via a communication line (second communication line) 2, and an operation setting device (first communication line) 4 is connected to the communication processing device 3. An operation setting terminal) 5 and an air conditioning control device (air conditioning control terminal) 6 are connected. Normally, a plurality of communication processing devices 3 are connected to the host monitoring device 1 via a communication line 2, and a plurality of operation setting devices 5 and an air conditioning control device 6 are connected to the communication processing device 3 via a communication line 4. Although not shown in FIG. 1, the communication processing device 3, the operation setting device 5, and the air conditioning control device 6 are illustrated one by one.
[0017]
The host monitoring apparatus 1 determines an operation signal generated by the input / output processing unit 11 and an input / output processing unit 11 that generates an operation signal for turning on / off a desired air conditioner according to an on / off operation of the operator. An upper processing signal is generated by processing, and the arithmetic processing unit 13 that transfers the upper command signal to the transmission / reception data memory 12, and the upper processing signal stored in the transmission / reception data memory 12 through the communication line 2. A communication processing unit 14 that receives monitoring data indicating an operation state or a failure state of the air conditioner from the communication processing device 3 via the communication line 2 and stores the monitoring data in the transmission / reception data memory 12, and the transmission / reception data memory 12. And a display unit 15 for displaying the result of the arithmetic processing unit 13 determining and processing the monitoring data indicating the operating state and failure state of the air conditioning equipment stored in the computer.
[0018]
The communication processing device 3 includes a communication processing unit 31 that transmits / receives data to / from the host monitoring device 1 via the communication line 2, a transmission / reception data memory 32 that stores data transmitted / received by the communication processing unit 31, and a communication A communication processing unit 33 that transmits / receives data between the operation setting unit 5 and the air conditioning control device 6 via the line 4, a transmission / reception data memory 34 that stores data transmitted / received by the communication processing unit 33, and a communication processing unit The types (data indicating the distinction between the operation setting device 5 and the air conditioning control device 6) and addresses (communication) of a plurality of terminals (that is, the operation setting device 5 and the air conditioning control device 6) connected to the communication terminal 33 via the communication line 4 A communication data table 35 in which data such as correspondence between the station number) and the operation setting device 5 and the air conditioning control device 6 are registered in advance, and an arithmetic processing unit 36.
[0019]
The operation setting device 5 generates an operation command signal by determining and processing the operation signal generated by the input / output processing unit 51 and the input / output processing unit 51 that generates an operation signal according to the on / off operation of the operator. An arithmetic processing unit 52, a transmission / reception data memory 53 that stores data such as an operation command signal created by the arithmetic processing unit 52, and an operation command signal stored in the transmission / reception data memory 53 when accessed from the communication processing device 3. A communication processing unit 54 that returns data to the communication processing device 3 via the communication line 4, receives data indicating the operating state of the corresponding air conditioner from the communication processing device 3, and stores the data in the transmission / reception data memory 53; The display unit 55 is configured to display the result of the arithmetic processing unit 52 determining and processing the data indicating the operation state of the corresponding air conditioner stored in the memory 53.
[0020]
The air conditioning control device 6 includes a communication processing unit 61 that receives control data transmitted from the communication processing device 3 via the communication line 4, and commands from the host monitoring device 1 and the operation setting unit 5 received by the communication processing unit 61. A transmission / reception data memory 62 for storing signals and data indicating the current operating state of the corresponding air conditioner and an on / off signal (ON pulse, OFF pulse) for turning on / off the air conditioner are output to the air conditioner power panel 7. In addition, an input / output processing unit 63 that receives signals (ON input, failure input) indicating the operating state and failure state of the air conditioner from the air conditioner power panel 7, and the host monitoring device 1 and operation stored in the transmission / reception data memory 62 An arithmetic processing unit 64 that processes and determines control data from the setting device 5 and outputs an activation signal or a stop signal from the input / output processing unit 63 to the air conditioner power board 7. It controls the operation of the air conditioning equipment power board 7 according to the control data transmitted from the processing unit 3, and start or stop the air conditioner.
[0021]
The communication processing unit 33 performs communication processing by the so-called 1: N polling method between the operation setting device 5 and the air conditioning control device 6 via the communication line 4 and individually accesses the operation setting device 5 and the air conditioning control device 6. Send and receive monitoring data and control data. When the communication processing unit 33 receives the monitoring data indicating the operation state or failure state of the air conditioning equipment from the air conditioning control device 6, the communication processing unit 33 determines and processes the received monitoring data, creates transmission data, and transmits the created transmission data to the transmission / reception data memory. 32. The communication processing unit 31 transmits the transmission data stored in the transmission / reception data memory 32 to the higher-level monitoring device 1 via the communication line 2. When the communication processing unit 33 receives an operation command signal indicating an on / off operation from the operation setting device 5 and stores the operation command signal in the transmission / reception data memory 34, the arithmetic processing unit 36 is stored in the transmission / reception data memory 34. Control data is created based on the data set in the communication data table 35 from the received operation command signal, and the created control data is transmitted from the communication processing unit 33 to the corresponding air conditioning control device 6. Is transmitted from the communication processing unit 33 to the operation setting device 5. In addition, when the communication processing unit 31 receives data such as a higher order command signal for starting / stopping a desired air conditioning device from the higher order monitoring device 1, the communication processing unit 31 stores the received data in the transmission / reception data memory 32. The arithmetic processing unit 36 determines and processes the data stored in the transmission / reception data memory 32 based on the data set in the communication data table 35 to create control data, and creates the control data in the transmission / reception data memory 34. Store. Then, the communication processing unit 33 transmits the control data stored in the transmission / reception data memory 34 to the corresponding air conditioning control device 6.
[0022]
Here, the memory area of the transmission / reception data memory 62 of the air conditioning control device 6 stores a command storage area for storing a command signal from the host monitoring device 1 or the operation setting device 5 and data indicating the operating state of the corresponding air conditioning equipment. The command storage area and the operation status storage area are divided into a host monitoring device and an operation setting device, respectively. Thus, when the communication processing device 3 receives a high order command signal for starting / stopping the air conditioning equipment from the high order monitoring device 1 and transmits this high order command signal to the corresponding air conditioning control device 6, the communication processing unit 61 performs communication. The upper command signal received from the processing device 3 is stored in the command storage area 62a for the upper monitoring device. When the communication processing device 3 reads an operation command signal from the operation setting device 5 and transmits the operation command signal to the corresponding air conditioning control device 6, the communication processing unit 61 receives the operation command signal received from the communication processing device 3. It stores in the command storage area 62c for the operation setting device. In addition, the arithmetic processing unit 64 processes a signal indicating an operation state or a failure state of the air conditioner input from the input / output processing unit 63 and transmits the signal to the upper monitoring device 1 via the communication processing device 3. Is stored in the operation state storage area 62b for the operation setting device when it is stored in the operation state storage area 62b for use and transmitted to the operation setting device 5 via the communication processing device 3.
[0023]
By the way, the start / stop commands generated by the host monitoring device 1 include “upper on command”, “upper off command” for forcibly starting / stopping the air conditioner regardless of the operation command signal from the operation setting unit 5, and There are three types of “operation setting device reference command” for starting or stopping the air conditioning equipment in accordance with the operation command signal of the operation setting device 5. Further, in the data indicating the operation state of the air conditioner stored in the operation state storage area 62b for the upper monitoring device, the “upper on state” indicating the state of being activated in accordance with the upper on command, as described above, There are three types: “upper off state” indicating a state of being stopped according to the higher order off command, and “operation setting device reference state” in which the air conditioner is started or stopped according to the operation command signal of the operation setting device 5. On the other hand, the operation command signal generated by the operation setting device 5 includes an “off command”, a “first on command”, a “second on command”, a “third on command”, and a “first on command” for starting the air conditioner with different air volumes. There are five types of “4th ON command”. Similarly to the above, the data indicating the operation state of the air conditioner stored in the operation state storage area 62d for the operation setting device also includes the “off state”, the first to There are five types of data of the first to fourth on states indicating the state of operation with the air volume according to the fourth on command. Note that the first to fourth ON commands are for air conditioning equipment in which the air volume of the blower is switched in a plurality of stages, such as a fan coil unit. The fourth on command may be handled in the same way as a simple on command.
[0024]
Below, operation | movement of the air-conditioning control apparatus 6 is demonstrated with reference to the flowchart of FIG. First, the arithmetic processing unit 64 of the air conditioning control device 6 checks the command storage area 62a for the higher-level monitoring device in the transmission / reception data memory 62, and the higher-order command signal transmitted from the higher-level monitoring device 1 via the communication processing device 3 is checked. The presence or absence is determined (step S1), and if there is a higher order command signal, the content is determined (step S2).
[0025]
Here, when the higher order command signal is the higher order ON command, the arithmetic processing unit 64 determines whether or not the air conditioning equipment is stopped based on the ON input input from the air conditioning equipment power panel 7 to the input / output processing section 63 ( Step S3) If the operation is in progress, the process proceeds to step S7. If the operation is stopped, the input / output processing unit 63 outputs an activation signal to the air conditioner power panel 7 (step S4). It is determined whether or not the content of the signal matches (step S14). When the air conditioner is activated and the operation state matches the content of the upper command signal, data indicating the operation state of the air conditioner is stored in the operation state storage area 62b for the upper monitoring device (step S15). If the operating state does not match the contents of the upper command signal in step S14, the process returns to step S1 and the above-described processing is repeated.
[0026]
When the higher order command signal is the higher order off command in step S2, the arithmetic processing unit 64 determines whether the air conditioner is in operation based on the ON input input from the air conditioner power board 7 to the input / output processing unit 63. (Step S5) If the operation is stopped, the process proceeds to Step S7. If the operation is in progress, the stop signal is output from the input / output processing unit 63 to the air conditioner power panel 7 (Step S6). It is determined whether or not the content of the higher order command signal matches (step S14). When the air conditioner is stopped and the operation state matches the content of the upper command signal, the data indicating the operation state of the air conditioner is stored in the operation state storage area 62b for the upper monitoring device (step S15). If the operating state does not match the contents of the upper command signal in step S14, the process returns to step S1 and the above-described processing is repeated. As described above, when the higher order command signal is the higher order on instruction or the higher order off instruction, the air conditioning control device 6 forcibly starts or stops the air conditioning equipment regardless of the on command and the off command from the operation setting device 5.
[0027]
On the other hand, when the higher order command signal is the operation setting device reference command in step S2, the arithmetic processing unit 64 checks the operation setting device command storage area 62c, and the operation transmitted from the operation setting device 5 via the communication processing device 3. The presence / absence of a command signal is determined (step S8), and if there is an operation command signal, the content is determined (step S9). Here, when the operation command signal is an on command, the arithmetic processing unit 64 determines whether or not the air conditioning equipment is stopped based on the ON input input from the air conditioning equipment power panel 7 to the input / output processing unit 63 (step). S10) If the operation is in progress, the process proceeds to step S14. If the operation is stopped, the input / output processing unit 63 outputs an activation signal to the air conditioner power panel 7 (step S11), and then the process proceeds to step S14. A similar process is executed. When the operation command signal is an off command in step S9, the arithmetic processing unit 64 determines whether or not the air conditioner is stopped based on the ON input input from the air conditioner power panel 7 to the input / output processing unit 63. (Step S12) If the operation is stopped, the process proceeds to Step S14. If the operation is in progress, an input signal is output from the input / output processing unit 63 to the air conditioner power panel 7 (Step S13), and then the process proceeds to Step S14. The same processing as described above is executed.
[0028]
If there is no higher order command signal in step S1, the arithmetic processing unit 64 checks the operating state storage area 62b for the higher order monitoring device in the transmission / reception data memory 62 (step S7), and the data in the operating state storage area 62b is higher. If it is in the off state or the upper on state, the process proceeds to step S14 and the above process is executed. If it is in the operation setting device reference state, the process proceeds to step S8 and the above process is executed.
[0029]
By the way, in the communication data table 35 of the communication processing device 2, the types of the individual terminals (the operation setting device 5 and the air conditioning control device 6) connected via the communication line 4 (that is, the operation setting device 5 or the air conditioning control device). 6) and communication station numbers (for example, 1, 2, 3, 4... N) are registered in advance, and are arranged in order from the smallest communication station number as shown in FIG. A) is created, and the communication processing device 3 normally polls the operation setting unit 5 and the air conditioning control device 6 according to the normal polling arrangement A. The communication processing device 3 transmits / receives data to / from the higher-level monitoring device 1 every time the operation setting unit 5 and the air conditioning control device 6 are polled according to the normal polling array A described above, and polling is performed immediately before. When various data read from the terminal (operation setting device 5 or air conditioning control device 6) is transmitted to the host monitoring device 1, and when data is transmitted from the host monitoring device 1 to the communication processing device 3, the communication processing device 3 Outputs the received data to the corresponding operation setting device 5 or the air conditioning control device 6.
[0030]
Here, for example, an upper on command or upper off command for starting / stopping the air conditioning control device 6 with the communication station number 3 is transmitted from the upper monitoring device 1 to the communication processing device 3, and the communication processing device 3 receives the upper off command or the upper host command. When the ON command is transmitted to the air conditioning control device 6 with the communication station number 3, as shown in FIG. 3, the air conditioning control device 6 with the communication station number 3 is excluded from the normal polling array A and responds to the upper command signal. The air conditioning control device 6 whose communication station number is 3 is registered in the higher order command processing array B that defines the polling order of the air conditioning control device 6 that is operating, and the communication processing device 3 has the operation settings registered in the normal polling array A. The air conditioner 5 and the air conditioning control device 6 and the air conditioning control device 6 registered in the higher order command processing array B are alternately polled. The order in the higher order command processing array B is the order in which the higher order command signal is received from the higher order monitoring apparatus 1.
[0031]
The air conditioning control device 6 with the communication station number 3 outputs an off signal or an on signal to the air conditioner power panel 7 in accordance with the upper off command or upper on command received from the communication processing device 3 as described above. The processing unit 64 processes the data indicating the operating state of the air conditioner input from the air conditioner power panel 7 to the input / output processing unit 63, and when the operating state of the air conditioner matches the content of the upper command signal, the upper monitoring device The operation state of the air conditioner is written in the operation state storage area 62b. Then, the communication processing device 3 polls the air conditioning control device 6, reads the operating state of the air conditioner stored in the operating state storage area 62b for the upper monitoring device, and the operating state of the air conditioner is changed to the content of the upper command signal. If it is determined that they match, the air conditioning controller 6 with the communication station number 3 is returned from the higher order command processing array B to the normal polling array A, and the operation setting device 5 and the air conditioning controller 6 are polled according to the normal polling array A. At the same time, the communication processing device 3 transmits data indicating the operation state of the air conditioner to the corresponding operation setting device 5 and the upper monitoring device 1.
[0032]
Further, when the operation setting device reference command is transmitted from the host monitoring device 1 to the communication processing device 3, the communication processing device 3 transmits the operation setting device reference command input from the host monitoring device 1 to the corresponding air conditioning control device 6. To do. At this time, the communication processing device 3 excludes the communication station number of the air conditioning control device 6 that has transmitted the operation setter reference command from the normal polling array A, and registers the communication station number of the air conditioning control device 6 in the higher order command processing array B. The operation setting unit 5 and the air conditioning control device 6 registered in the normal polling array A and the air conditioning control device 6 registered in the higher order command processing array B are alternately polled.
[0033]
In the air conditioning control device 6 to which the operation setting device reference command is transmitted from the communication processing device 3, the operation setting device reference command received by the communication processing unit 61 is stored in the upper monitoring device command storage area 62 a of the transmission / reception data memory 32. The arithmetic processing unit 64 processes the operation setting device reference command stored in the command storage area 62a, and enters the operation command reference state for controlling the air conditioner power panel 7 according to the operation command signal from the corresponding operation setting device 5. The operation mode is switched, and data indicating the operation setter reference state is stored in the operation state storage area 62b for the host monitoring device. The communication processing device 3 alternately polls the operation setting device 5 and the air conditioning control device 6 registered in the normal polling array A and the air conditioning control device 6 registered in the higher order command processing array B, see the operation setting device. The air conditioning control device 6 that has transmitted the command is polled to read the data stored in the operation state storage area 62b. Then, when the data stored in the operation state storage area 62b is in the operation setter reference state, the communication station number of the air conditioning control device 6 is excluded from the higher order command processing array B and returned to the normal polling sequence A. . Further, the communication processing device 3 transmits data indicating that the air conditioning control device 6 has entered the operation setting device reference state to the corresponding operation setting device 5 and the upper monitoring device 1. At this time, the air conditioner control device 6 is only switched to the operation setter reference state, and no on / off signal is output from the air conditioner control device 6 to the air conditioner power panel 7. The operating state does not change.
[0034]
The operation setting device 5 receives data stored in the operation state storage area 62b for the upper monitoring device of the corresponding air conditioning control device 6 from the communication processing device 3, and the data is in the upper off state or the upper on state. Even if the operator performs a setting operation such as starting or stopping by the input / output processing unit 51, the arithmetic processing unit 52 ignores the setting operation by the input / output processing unit 51, and the input / output processing is performed on the display unit 55. It is displayed that the setting operation by the unit 51 is invalid. On the other hand, when the data stored in the operating state storage area 62b for the higher-level monitoring device is in the setting device reference state, the arithmetic processing unit is set when the operator performs a setting operation such as starting or stopping by the input / output processing unit 51. 53 stores the contents of the setting operation by the input / output processing unit 51 in the transmission / reception data memory 52 and waits for the communication processing device 3 to read the contents by polling from the communication processing device 3.
[0035]
Here, when the communication processing device 3 accesses the operation setting unit 5 and reads the contents of the setting operation by the input / output operation unit 51 stored in the transmission / reception data memory 53, the setting operation effective in the transmission / reception data memory 52 is performed. Is stored and the corresponding communication station number is, for example, No. 3, the air conditioning control device 6 is not processing the higher order command signal transmitted from the higher order monitoring device 1 (that is, the communication station number is No. 3). If the air conditioning control device 6 is not registered in the higher order command processing array B), the contents of the setting operation stored in the transmission / reception data memory 52 are transmitted to the corresponding air conditioning control device 6. At this time, as shown in FIG. 4, the communication processing device 3 excludes the communication station number of the air conditioning control device 6 from the normal polling array A, and polls the operating air conditioning control device 6 according to the operation command signal. The operation setting unit 5 and the air conditioning control device 6 registered in the normal polling array A and the air conditioning control device 6 registered in the operation command processing array C are alternately polled. To do. When the air conditioning control device 6 controls the air conditioning equipment power panel 7 in accordance with the operation command signal of the operation setting device 5 and the operation state of the air conditioning equipment matches the content of the operation command signal, the communication processing device 3 determines the communication station number. No. 3 is excluded from the operation command processing array C and returned to the normal polling array A for polling. At the same time, the communication processing device 3 transmits data indicating the operation state of the air conditioner to the corresponding operation setting device 5 and the upper monitoring device 1.
[0036]
Further, during the operation according to the operation command signal from the operation setting device 5 corresponding to the air conditioning control device 6 with the communication station number 3, the communication processing device 3 performs the air conditioning control with the communication station number 2 in the same manner as described above. When the operation command signal is read from the operation setting device 5 corresponding to the device 6, the communication processing device 3 transmits the operation command signal read from the operation setting device 5 to the air conditioning control device 6 whose communication station number is 2, and the communication. The station number is excluded from the normal polling array A and registered in the operation command processing array C (see FIG. 5). The operation setting unit 5 and the air conditioning controller 6 registered in the normal polling array A and the operation command processing array C are registered. The registered air conditioning controller 6 is alternately polled. Note that the order in the operation command processing array C is the order in which the communication processing device 3 receives the operation command from the operation setting device 5.
[0037]
Here, as shown in FIG. 6, the air conditioning control device 6 with the communication station number 3 is registered in the higher order command processing array B, and the air conditioning control device 6 with the communication station number 2 is registered in the operation command processing array C. The communication processing device 3 is registered in the higher order command processing array B after accessing the terminal (the operation setting device 5 or the air conditioning control device 6) whose communication station number is registered in the normal polling array A. The air conditioning controller 6 with the communication station number 3 is accessed, and the terminal station with the communication station number 5 registered in the normal polling array A is accessed. Then, after accessing the air conditioning controller 2 with the communication station number 2 registered in the operation command processing array C, the terminal with the communication station number 6 registered in the normal polling array A (the operation setting device 5 or the air conditioning controller). 6) is accessed. Thus, every time one terminal station registered in the normal polling array A is accessed, the air conditioning control device 6 registered in the command processing array B or the air conditioning control device 6 registered in the operation command processing array C. Are alternately accessed one by one, the communication processing device 3 can quickly detect a change in the operating state of the air conditioning control device 6 and transmit it to the host monitoring device 1.
[0038]
When the air conditioning control device 6 receives an upper command signal from the upper monitoring device 1 via the communication processing device 3 during operation according to the operation command signal from the operation setting device 5, an operation from the operation setting device 5 is performed. The higher order command signal from the higher order monitoring device 1 is prioritized over the command signal. At this time, the communication processing device 3 excludes the communication station number of the air conditioning control device 6 from the operation command processing array C and registers it in the upper command processing array B, and the operation setting unit 5 or air conditioning registered in the normal polling array A. Every time one control device 6 is polled, the air conditioning control devices 6 registered in the higher order command processing array B are alternately accessed. When the content of the higher order command signal from the higher order monitoring device 1 matches the operation state of the air conditioning equipment, the communication processing device 3 returns the communication station number of the air conditioning control device 6 to the normal polling array A, and the operation by the operation setting device 5 is performed. Disable the command signal. Since the air conditioning control device 6 gives priority to the upper command signal from the host monitoring device 1 over the command signal from the operation setting device 5, the operation command signal is received during operation by the upper command signal, and the operation command signal is received. It will not work.
[0039]
As described above, when the communication processing device 3 receives the upper command signal from the upper monitoring device 1 or receives the operation command signal from the operation setting device 5, the air conditioning control device 6 corresponding to the upper command signal or the operation command signal. And the communication station number of the air conditioning control device 6 is excluded from the normal polling array, and the higher order command for setting the order of polling the operating air conditioning control device 6 according to the higher order command signal from the higher order monitoring device 1 is set. The processing array B or the operation command processing array C for setting the order of polling the operating air conditioning control device 6 in accordance with the operation command signal from the operation setting device 5 is registered, and the communication processing device 3 is set to the normal polling array C. Each time the air conditioning control device 6 or the operation setting device 5 is accessed, the air conditioning controller registered in the higher order command processing array B or the operation command processing array C Since the communication processing is performed by alternately accessing 6 units one by one, the change in the operating state of the air conditioner due to the higher order command signal or the operation command signal is quickly detected regardless of the order of the normal polling sequence, and the higher order monitoring is performed. It can be transmitted to the device 1.
[0040]
In this air conditioning control system, the start / stop operation by the operation setting device 5 is enabled only during the period when the host monitoring device 1 transmits the operation setting device reference command to the air conditioning control device 6 via the communication processing device. When the operation state of the air conditioner is left as it is and the start / stop operation by the operation setting device 5 is prohibited, an operation invalidation command for invalidating the start / stop operation by the operation setting device 5 is given to the air conditioning control device 6. There is no need to send. Therefore, after the operation invalidation command is transmitted, it is possible to prevent the operation state of the air conditioner from changing due to the start / stop operation by the operation setting device 5 before the operation invalidation command transmission, and to be different from the operator's intention. There is no need to transmit a higher order command signal for starting or stopping the air conditioner from the higher order monitoring apparatus 1 again, and the burden of communication processing of the higher order monitoring apparatus 1 can be reduced.
[0041]
(Embodiment 2)
In the air conditioning control system according to the first embodiment, the communication processing device 3 handles the forced on command and the forced off command from the host monitoring device 1 with priority over the operation command signal from the operation setting device 5. The operation of the air conditioning control device 3 can be controlled by giving priority to the upper on command or the upper off command from the upper monitoring device 1 without transmitting an operation prohibiting command for prohibiting the operation of the operation setting device 5 to it can. Further, when the communication processing device 3 transmits a higher order command signal from the higher order monitoring device 1 or an operation command signal from the operation setting device 5 to the corresponding air conditioning control device 6, the communication processing device 3 is separated from the normal polling array A. Until the contents of the upper command signal and the operation command signal are realized and the terminals (operation setting unit 5 and air conditioner) registered in the normal polling array A are registered. Each time one control device 6) is accessed, the air conditioner control devices 6 registered in the higher order command processing array B or the operation command processing array C are alternately accessed one by one, so that the operating state of the air conditioning equipment changes. Can be detected quickly, and the operating state can be transmitted to the host monitoring device 1.
[0042]
By the way, in an air conditioning control system generally installed in a building, a fire in the building is detected by the host monitoring device 1, and when the fire occurs, a fire has occurred from the host monitoring device 1 to each communication processing device. It is necessary to stop the air-conditioning equipment in operation by each communication processing device 3, but the fire occurrence signal transmitted from the upper monitoring device 1 in each communication processing device 3 is used as an upper command signal. When handled, not only the operating state of each air conditioner transmitted to the host monitoring device 1 when the fire occurrence signal is transmitted, but also the host command signal from the host monitoring device 1 and the operation command signal from the operation setting device 5 Accordingly, it is necessary to determine whether or not the air conditioning control device 6 is in the process of starting the air conditioning equipment.
[0043]
In addition, when the control data for starting the air conditioner in accordance with a preset schedule is transmitted to the air conditioner control device 6, and normally the air conditioner control device 6 starts / stops the air conditioner according to a predetermined schedule, If the higher order command signal from the higher order monitoring apparatus 1 and the start / stop operation based on a predetermined schedule are set to give priority to the post-command, each air conditioning system will communicate from the higher order monitoring apparatus 1 via the communication processing apparatus 3 in the event of a fire. Even if a stop command for stopping the air conditioning device is transmitted to the control device 6, immediately after that, the air conditioning control device 6 may operate according to the schedule and start the air conditioning device.
[0044]
Therefore, in the present embodiment, in the transmission / reception data memory 62 of the air conditioning control device 6, a command storage area 62a for the host monitoring device that stores command signals from the host monitoring device 1 and the operation setting device 5, and a command storage area for the operation setting device. In addition to 62c, a fire signal storage area (not shown) for storing a fire command indicating the occurrence of a fire is provided. When a fire command is transmitted from the communication processing device 3 to the air conditioning control device 6 when a fire occurs, the communication processing unit 61 receives the fire command from the communication processing device 3 and enters the fire signal storage area of the transmission / reception data memory 62. Based on this fire command, the arithmetic processing unit 64 stops the corresponding air conditioner regardless of the command signal from the host monitoring device 1 or the operation setting device 5. Since the configuration other than the transmission / reception data memory 62 is the same as that of the first embodiment, illustration and description of the same components are omitted.
[0045]
While the air conditioner is stopped during the fire, the arithmetic processing unit 64 outputs data indicating the upper off state to the operation state storage area 62b for the upper monitoring device of the transmission / reception data memory 62, and the operation state for the operation setting device. Data indicating the off state is output to the storage area 62d. Then, until the data stored in the fire state storage area is from the occurrence of a fire until the fire is released, the higher order command signal from the higher order monitoring device 1, the operation command signal from the operation setting device 5, and the air conditioning control device 6 Suspends starting or stopping execution according to the set schedule. When a new command is input according to the schedule set in the host monitoring device 1, the operation setting device 5 or the air conditioning control device 6 during the suspension, the pending command content is updated to the new command content. The higher order command signal from the higher order monitoring apparatus 1 and the start / stop instruction by the schedule operation set in the air conditioning control apparatus 6 have priority over the post instruction.
[0046]
After that, when the data indicating the fire state stored in the fire state storage area changes from the occurrence of a fire to the release of the fire, the air conditioning control device 6 has a higher order command signal from the higher order monitoring device 1 among the latest commands pending, or Then, the start / stop command by the schedule operation is executed with priority, and if the latest command is the operation setter reference command from the host monitoring device 1, the start / stop command by the operation setter 5 is executed.
[0047]
By the way, in the communication processing device 3, a fire information storage area for storing data indicating a fire state from the host monitoring device 1 for each area in the building where the host monitoring device 1 detects a fire occurrence (hereinafter referred to as a fire detection area). Is stored in the transmission / reception data memory 32, and the communication station number of the air conditioning control device 6 corresponding to the fire detection area is registered in the communication data table 35 in advance. Then, when the communication processing device 3 receives a fire occurrence signal indicating that a fire is occurring from the host monitoring device 1, the communication processing device 3 temporarily interrupts the communication processing currently being performed, and corresponds to the fire detection area where the fire is occurring. A fire command indicating the occurrence of a fire is transmitted to the air conditioning control device 6, and polling is performed in the order of the communication station numbers for the air conditioning control device 6 that has transmitted the fire command. On the other hand, the air conditioning control device 6 that has received the fire command stores the received fire command in the fire signal storage area.
[0048]
Here, operation | movement of the air-conditioning control apparatus 6 is demonstrated easily with reference to the flowchart of FIG. In the air conditioning control device 6, the arithmetic processing unit 64 checks the fire signal storage area of the transmission / reception data memory 62, and determines whether or not a fire is occurring from the data stored in the fire signal storage area (step S21). If there is a fire, the arithmetic processing unit 64 determines whether or not the air conditioner is in operation based on the ON input input from the air conditioner power panel 7 to the input / output processor 63 (step S37), and is stopped. If there is, the process proceeds to step S39, and if it is in operation, a stop signal is output from the input / output processing unit 63 to the air conditioner power panel 7 (step S38), and a higher order command signal, an operation command signal, or a start / stop command based on a schedule is issued. Hold (step S39). Thereafter, when the arithmetic processing unit 64 determines that the air conditioner has been stopped based on the ON input input from the air conditioner power panel 7 to the input / output processing unit 63, the operation state storage area 62b for the upper monitoring device is in the upper off state. The data indicating is stored. As described above, the communication processing device 3 is polling the air-conditioning control device 6 that has transmitted the fire command, reads data from the operation state storage area 62b for the higher-level monitoring device, and when the data is in the higher-level off state, The operating state is transmitted to the device 1 and the air conditioning control device 6 is excluded from the polling target. When all the air-conditioning control devices 6 corresponding to the fire detection area where the fire is occurring are turned off, the communication processing device 3 resumes the communication processing before the occurrence of the fire once interrupted. However, if the fire detection area in which a fire has occurred is switched to the fire release state, the corresponding air conditioning at that time is not completed even if the processing for forcibly turning off the corresponding air conditioning control device 6 has not been completed. The polling of the control device 6 is ended, and data indicating the fire release state is transmitted to the air conditioning control device 6 corresponding to the fire detection area. In addition, operation | movement (step S22-S36) of the air-conditioning control apparatus 6 when it is judged that it is not in fire in step S21 is the same as the operation | movement (step S1-S15) of the air-conditioning control apparatus 6 demonstrated in Embodiment 1. Therefore, the description is omitted.
[0049]
As described above, when a fire occurs, a fire command indicating the occurrence of a fire is transmitted from the communication processing device 3 to the corresponding air conditioning control device 6, and the air conditioning control device 6 forcibly stops the air conditioning equipment during the fire occurrence. When a fire breaks out, the host monitoring device 1 recognizes that it is stopped Ru Therefore, the air-conditioning control device 6 to which the stop command has not been transmitted is actually in the startup process, and thereafter, enters the operating state and data indicating the operating state is transmitted to the higher-level monitoring device 1, and the higher-level monitoring device 1 performs communication processing. It is possible to prevent a situation in which an off signal must be transmitted to the air conditioning control device 6 via the device 3. When the air conditioning control device 6 receives the fire command from the communication processing device 3, the air conditioning control device 6 holds the upper on command from the host monitoring device 1, so that the host air conditioning control device 6 corresponding to the fire detection area where the fire is occurring Even if the monitoring device 1 erroneously sends out the upper on command, the air conditioning control device 6 holds the upper on command and is not actually operated. Further, since the operation signal from the operation setting device 5 becomes invalid, there is no need to transmit an operation prohibition command to the corresponding operation setting device 5, and the start command by the schedule operation set in the air conditioning control device 6 is also suspended. In addition, it is not necessary to transmit a prohibition command for prohibiting the schedule operation to the air conditioning control device 6. Moreover, since the pending command is executed when the fire is released, the upper monitoring device 1 determines the contents of the schedule operation when the fire is released, and if it is the time when the air-conditioning equipment is originally operating, the communication processing device 3 is used. It is not necessary to transmit a signal for starting the air conditioning equipment to the air conditioning control device 6, and the processing of the host monitoring device 1 can be reduced.
[0050]
In addition, since the process at the time of the fire is executed with the highest priority due to the change in the fire status transmitted from the host monitoring device 1, it is possible to quickly check whether the air conditioner has stopped at the time of the fire. Even if the fire information is a false alarm, it is possible to quickly and easily carry out the restoration work of the air conditioning equipment corresponding to the fire information.
[0051]
【The invention's effect】
As described above, the invention of claim 1 includes a plurality of air conditioning control terminals that control the operation of the air conditioning equipment, a plurality of operation setting terminals that generate operation command signals in response to an on / off operation from an operator, The air conditioning control terminal and a plurality of operation setting terminals are respectively connected via the first communication line, and each terminal is accessed in order according to a normal polling arrangement that defines the order of accessing each terminal individually, and data is transmitted and received One or a plurality of communication processing devices, and a plurality of communication processing devices connected via a second communication line, and a host monitoring device that monitors and controls the operation of the air conditioning control terminal connected to each communication processing device. In a configured air conditioning control system, an upper order command for forcibly turning on / off air conditioning equipment is transmitted to a higher order command signal transmitted from the host monitoring device to the air conditioning control terminal via each communication processing device, A command-off command and an operation setting terminal reference command that operates in response to an operation command signal from the operation setting terminal are provided, and the operation command signal from the operation setting terminal is valid only when the upper command signal is the operation setting terminal reference command. When the communication processing device reads the high order command signal from the high order monitoring device or the operation command signal from the operation setting terminal, the communication processing device transmits the high order command signal and the operation command signal to the corresponding air conditioning control terminal, and the air conditioning control terminal It is excluded from the normal polling array and sets the order of polling the operating air conditioning control terminals according to the upper command signal, or sets the order of polling the operating air conditioning control terminals according to the operation command signal. Every time one terminal is accessed according to the normal polling array, it is registered in one of the operation command processing arrays, The communication processing device is provided with a function for accessing the air conditioning control terminals registered in the operation command processing array one by one. When the communication processing device receives a command signal from the host monitoring device or the operation setting terminal, it responds. A terminal that transmits a command signal to the air conditioning control terminal, excludes the air conditioning control terminal that has transmitted the command signal from the normal polling array, and registers it in the upper command processing array or the operation command processing array, and is registered in the normal polling array. Each time one unit is accessed, the air conditioning control terminals registered in the higher order command processing array or the operation command processing array are alternately accessed one by one, so that each air conditioning is accessed in order according to a predetermined normal polling array. Compared to the air conditioning system, it is possible to quickly detect changes in the operating state of the air conditioning equipment controlled by the air conditioning control terminal that sent the command signal. There is an effect that the control system can be realized. In addition, the upper command and upper command for forcibly turning on / off the air conditioning equipment are provided as the upper command signal, and the operation command signal from the operation setting terminal is valid only when the higher command signal is the operation setting terminal reference command. Therefore, even if it is desired to prohibit the start / stop operation by the operation setting terminal while the operation state of the air conditioning equipment remains as it is, an operation invalidation command for invalidating the start / stop operation by the operation setting terminal is given to the air conditioning control terminal. Therefore, after the operation invalidation command is transmitted, the operation state of the air conditioner is changed by the start / stop operation by the operation setting terminal before the operation invalidation command is transmitted, resulting in an operation state different from the operator's intention. This eliminates the need to send a higher-order command signal for starting or stopping the air conditioning equipment from the higher-level monitoring device again, and burdens the communication processing of the higher-level monitoring device. There is an effect that can be reduced.
[0052]
According to a second aspect of the present invention, in the first aspect of the invention, when the communication processing device receives a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing is interrupted to cause a fire to occur in the corresponding air conditioning control terminal. When the air conditioning control terminal receives the fire command from the communication processing device, the air conditioning equipment is forcibly stopped by holding the command signal from the host monitoring device or the operation setting terminal. When the air-conditioning control terminal confirms that the corresponding air-conditioning equipment has been stopped, the communication processing is executed again. When a fire occurs, the communication processing device interrupts the communication processing and sends a fire command to the air-conditioning control terminal. However, the air conditioning control terminal forcibly stops the air conditioning equipment in response to the fire command and holds the command signal from the host monitoring device or operation setting terminal. It is not necessary to output a signal to prohibit the operation, and the communication processing device executes the communication processing again when it confirms that the air conditioning control terminal that sent the fire signal has stopped the corresponding air conditioning equipment. It is possible to quickly detect that the air-conditioning equipment has been stopped by the command, and the air-conditioning control terminal executes the command signal that is on hold when the fire command is not input. There is an effect that it is possible to realize an air conditioning control system that can be restored to normal processing without being performed.
[0053]
The invention of claim 3 is a plurality of air conditioning control terminals that control the operation of the air conditioning equipment, a plurality of operation setting terminals that generate operation command signals in response to an on / off operation from an operator, and a plurality of air conditioning control terminals. And a plurality of operation setting terminals are connected via a first communication line, and each terminal is accessed in order according to a normal polling arrangement that defines the order of accessing each terminal individually. An air conditioning system including a plurality of communication processing devices connected to each other via a second communication line, and a host monitoring device that monitors and controls the operation of an air conditioning control terminal connected to each communication processing device. A communication processing method for a control system, in which a higher order command signal forcibly turning on / off an air conditioner in response to a higher order command signal transmitted from a higher level monitoring device to each air conditioning control terminal via each communication processing device A higher order off command and an operation setting terminal reference command that operates in response to an operation command signal from the operation setting terminal are provided, and the operation command signal from the operation setting terminal is valid only when the higher order command signal is the operation setting terminal reference command. When the communication processing device reads the high order command signal from the high order monitoring device or the operation command signal from the operation setting terminal, the communication processing device transmits the high order command signal and the operation command signal to the corresponding air conditioning control terminal, and the air conditioning control terminal It is excluded from the normal polling array and sets the order of polling the operating air conditioning control terminals according to the upper command signal, or sets the order of polling the operating air conditioning control terminals according to the operation command signal. Registered in one of the operation command processing arrays, and the communication processing device will be instructed to The air conditioning control terminals registered in the processing array and the operation command processing array are accessed one by one, and when the communication processing device receives a command signal from the host monitoring device or the operation setting terminal, it instructs the corresponding air conditioning control terminal. The air conditioning control terminal that transmitted the signal and transmitted the command signal is excluded from the normal polling array, and registered in the upper command processing array or the operation command processing array, and one terminal registered in the normal polling array is accessed. Each time, the air conditioning control terminals registered in the higher order command processing array or the operation command processing array are alternately accessed one by one, so that the command is compared with the case where each air conditioning is sequentially accessed according to a predetermined normal polling array. There is an effect that it is possible to quickly detect a change in the operating state of the air conditioner controlled by the air conditioning control terminal that has transmitted the signal. In addition, the upper command and upper command for forcibly turning on / off the air conditioning equipment are provided as the upper command signal, and the operation command signal from the operation setting terminal is valid only when the higher command signal is the operation setting terminal reference command. Therefore, even if it is desired to prohibit the start / stop operation by the operation setting terminal while the operation state of the air conditioning equipment remains as it is, an operation invalidation command for invalidating the start / stop operation by the operation setting terminal is given to the air conditioning control terminal. Therefore, after the operation invalidation command is transmitted, the operation state of the air conditioner is changed by the start / stop operation by the operation setting terminal before the operation invalidation command is transmitted, resulting in an operation state different from the operator's intention. This eliminates the need to send a higher-order command signal for starting or stopping the air conditioning equipment from the higher-level monitoring device again, and burdens the communication processing of the higher-level monitoring device. There is an effect that can be reduced.
[0054]
According to a fourth aspect of the present invention, in the invention of the third aspect, when the communication processing device receives a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing is interrupted and a fire is generated at the corresponding air conditioning control terminal. When the air conditioning control terminal receives the fire command from the communication processing device, the air conditioning equipment is forcibly stopped by holding the command signal from the host monitoring device or the operation setting terminal. When the air-conditioning control terminal confirms that the corresponding air-conditioning equipment has been stopped, the communication processing is executed again. When a fire occurs, the communication processing device interrupts the communication processing and sends a fire command to the air-conditioning control terminal. However, the air conditioning control terminal forcibly stops the air conditioning equipment in response to the fire command and holds the command signal from the host monitoring device or operation setting terminal. It is not necessary to output a signal to prohibit the operation, and the communication processing device executes the communication processing again when it confirms that the air conditioning control terminal that sent the fire signal has stopped the corresponding air conditioning equipment. It is possible to quickly detect that the air-conditioning equipment has been stopped by the command, and the air-conditioning control terminal executes the command signal that is on hold when the fire command is not input. There is an effect that the processing can be restored to the normal processing without doing.
[Brief description of the drawings]
FIG. 1 is a schematic configuration diagram of an air conditioning control system according to a first embodiment.
FIG. 2 is an explanatory diagram for explaining the operation of the air conditioning control system of the above.
FIG. 3 is an explanatory diagram for explaining another operation of the air conditioning control system according to the first embodiment.
FIG. 4 is an explanatory diagram for explaining another operation of the air conditioning control system according to the first embodiment.
FIG. 5 is an explanatory diagram explaining still another operation of the air conditioning control system same as above.
FIG. 6 is an explanatory diagram for explaining still another operation of the above air conditioning control system.
FIG. 7 is a flowchart for explaining the operation of the air conditioning control system of the above.
FIG. 8 is a flowchart illustrating the operation of the air conditioning control system according to the second embodiment.
FIG. 9 is a schematic configuration diagram of a conventional air conditioning control system.
[Explanation of symbols]
1 Host monitoring device
3 Communication processing device
5 Operation setting device
6 Air conditioning controller

Claims (4)

空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムにおいて、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスする機能を通信処理装置に設けたことを特徴とする空調制御システム。A plurality of air conditioning control terminals that control the operation of the air conditioning equipment, a plurality of operation setting terminals that generate operation command signals in response to an on / off operation from an operator, a plurality of air conditioning control terminals, and a plurality of operation setting terminals 1 to a plurality of communication processing devices that are respectively connected via the first communication line and access each terminal in order according to a normal polling arrangement that defines the order in which each terminal is accessed individually, and a plurality of communication processing devices In the air conditioning control system that is connected to the communication processing device via the second communication line and is configured to monitor and control the operation of the air conditioning control terminal connected to each communication processing device, the host monitoring device To the upper command signal transmitted to the air conditioning control terminal via each communication processing device, the upper ON command for forcibly turning on / off the air conditioning equipment, the upper OFF command, and the operation setting terminal An operation setting terminal reference command that operates in response to the operation command signal is provided, and the operation command signal from the operation setting terminal is validated only when the upper command signal is an operation setting terminal reference command. When the upper command signal from the operation setting signal or the operation command signal from the operation setting terminal is read, the upper command signal or the operation command signal is transmitted to the corresponding air conditioning control terminal, and the air conditioning control terminal is excluded from the normal polling array. Register in either the higher order command processing array that sets the polling order for the air conditioning control terminals that are operating according to the signal or the operation command processing array that sets the order for polling the operating air conditioning control terminals according to the operation command signal Whenever one terminal is accessed according to the normal polling array, the empty command processing array and the operation command processing array registered Air-conditioning system, characterized in that provided in the communication processing apparatus a function of one by one access control terminal. 通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とする請求項1記載の空調制御システム。Upon receiving a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing device interrupts the communication processing and transmits a fire command indicating the occurrence of a fire to the corresponding air conditioning control terminal. When the above fire command is received, the command signal from the host monitoring device or the operation setting terminal is suspended and the air conditioning device is forcibly stopped, and the communication processing device stops the air conditioning device corresponding to the air conditioning control terminal. The air-conditioning control system according to claim 1, wherein the communication process is executed again when the communication is confirmed. 空調機器の動作を制御する複数の空調制御端末と、操作者からのオン/オフ操作に応じて操作指令信号を発生する複数の操作設定端末と、複数の空調制御端末および複数の操作設定端末が第1の通信線を介してそれぞれ接続され、各端末を個別にアクセスする順番を規定した通常ポーリング配列にしたがって各端末を順番にアクセスしてデータを送受信する1乃至複数の通信処理装置と、複数の通信処理装置が第2の通信線を介して接続され、各通信処理装置に接続された空調制御端末の動作を監視、制御する上位監視装置とで構成される空調制御システムの通信処理方式であって、上位監視装置から各通信処理装置を介して空調制御端末に送信される上位指令信号に、空調機器を強制的にオン/オフさせる上位オン指令、上位オフ指令と、操作設定端末からの操作指令信号に応じて動作させる操作設定端末参照指令とを設け、上位指令信号が操作設定端末参照指令の場合のみ操作設定端末からの操作指令信号を有効とし、通信処理装置は、上位監視装置からの上位指令信号や操作設定端末からの操作指令信号を読み込むと、上位指令信号や操作指令信号を対応する空調制御端末に送信するとともに、当該空調制御端末を通常ポーリング配列から除外し、上位指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する上位指令処理配列又は操作指令信号に応じて動作中の空調制御端末をポーリングする順番を設定する操作指令処理配列のいずれかに登録し、通信処理装置は通常ポーリング配列にしたがって各端末を1台アクセスする毎に、上位指令処理配列および操作指令処理配列に登録された空調制御端末を1台づつアクセスすることを特徴とする空調制御システムの通信処理方法。A plurality of air conditioning control terminals that control the operation of the air conditioning equipment, a plurality of operation setting terminals that generate operation command signals in response to an on / off operation from an operator, a plurality of air conditioning control terminals, and a plurality of operation setting terminals 1 to a plurality of communication processing devices that are respectively connected via the first communication line and access each terminal in order according to a normal polling arrangement that defines the order in which each terminal is accessed individually, and a plurality of communication processing devices The communication processing system of the air conditioning control system is configured with a host monitoring device that is connected to each other through the second communication line and monitors and controls the operation of the air conditioning control terminal connected to each communication processing device. An upper order command signal for forcibly turning on / off the air conditioner to an upper order command signal transmitted from the host monitoring device to the air conditioning control terminal via each communication processing device, The operation setting terminal reference command to be operated in response to the operation command signal from the operation setting terminal is provided, and the operation command signal from the operation setting terminal is validated only when the upper command signal is the operation setting terminal reference command. When a host command signal from a host monitoring device or an operation command signal from an operation setting terminal is read, the host command signal or operation command signal is transmitted to the corresponding air conditioning control terminal and the air conditioning control terminal is excluded from the normal polling array. A higher order command processing array for setting the order of polling the operating air conditioning control terminals according to the higher order command signal or an operation command processing array for setting the order of polling the operating air conditioning control terminals according to the operation command signal. Each time the communication processing device accesses each terminal according to the normal polling array, the higher order command processing array and the operation are registered. Communication processing method of the air conditioning control system characterized by one by one access to the air conditioning control terminal registered to the command processing sequence. 通信処理装置は上位監視装置から火災の発生を示す火災発生信号を受け取ると、上記通信処理を中断して対応する空調制御端末に火災発生を示す火災指令を送信し、空調制御端末は通信処理装置から上記火災指令を受け取ると、上位監視装置や操作設定端末からの指令信号を保留して空調機器を強制的に停止させ、通信処理装置は当該空調制御端末が対応する空調機器を停止させたのを確認すると上記通信処理を再び実行することを特徴とする請求項3記載の空調制御システムの通信処理方法。Upon receiving a fire occurrence signal indicating the occurrence of a fire from the host monitoring device, the communication processing device interrupts the communication processing and transmits a fire command indicating the occurrence of a fire to the corresponding air conditioning control terminal. When the above fire command is received, the command signal from the host monitoring device or the operation setting terminal is suspended and the air conditioning device is forcibly stopped, and the communication processing device stops the air conditioning device corresponding to the air conditioning control terminal. 4. The communication processing method for an air conditioning control system according to claim 3, wherein the communication processing is executed again when the information is confirmed.
JP03649099A 1999-02-15 1999-02-15 Air conditioning control system and communication processing method thereof Expired - Fee Related JP3815103B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP03649099A JP3815103B2 (en) 1999-02-15 1999-02-15 Air conditioning control system and communication processing method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP03649099A JP3815103B2 (en) 1999-02-15 1999-02-15 Air conditioning control system and communication processing method thereof

Publications (2)

Publication Number Publication Date
JP2000234791A JP2000234791A (en) 2000-08-29
JP3815103B2 true JP3815103B2 (en) 2006-08-30

Family

ID=12471276

Family Applications (1)

Application Number Title Priority Date Filing Date
JP03649099A Expired - Fee Related JP3815103B2 (en) 1999-02-15 1999-02-15 Air conditioning control system and communication processing method thereof

Country Status (1)

Country Link
JP (1) JP3815103B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103388885B (en) * 2012-05-08 2016-03-23 珠海格力电器股份有限公司 Control method, device and system of air conditioning system
JP6432838B2 (en) * 2015-04-16 2018-12-05 パナソニックIpマネジメント株式会社 Setting terminal, communication system, and program
JP6476100B2 (en) * 2015-09-24 2019-02-27 東芝キヤリア株式会社 Air conditioning system and air conditioner operating state notification method
JP6610342B2 (en) * 2016-03-04 2019-11-27 日本電気株式会社 Power control device

Also Published As

Publication number Publication date
JP2000234791A (en) 2000-08-29

Similar Documents

Publication Publication Date Title
JPH0324119B2 (en)
JP3815103B2 (en) Air conditioning control system and communication processing method thereof
JPH06319176A (en) Multiple air conditioner
JPH0750684A (en) Communication control system
EP2078234A2 (en) System and method of double address detection
JPH0239648A (en) Disaster monitor device
JPH05276178A (en) Home bus system
JPS584408A (en) State monitoring system
JP2000148544A (en) Dump output system
JPH0429321Y2 (en)
JPH11110333A (en) Central supervisory system
JPH06162372A (en) Monitor and control device for disaster prevention system
JP4822237B2 (en) Security system
JPH02146449A (en) Inspection method for air conditioner
JPS5839307A (en) Programmable controller
JP2001157276A (en) Communication processing method in control system
JP2602916B2 (en) Elevator signal transmission equipment
JP2966720B2 (en) Centralized control device
JP3342782B2 (en) Fire alarm system
JP2519349B2 (en) Load control system
JPH07318150A (en) Air conditioner system and heat exchange ventilator used therefor
JP3116106B2 (en) Management system for facilities such as buildings
JPH0879852A (en) Device information collection method for control
JPH05252561A (en) State supervisory device
JP2693010B2 (en) Elevator signal transmission equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040213

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060511

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060516

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060529

LAPS Cancellation because of no payment of annual fees