[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP3842725B2 - Wind tunnel testing equipment - Google Patents

Wind tunnel testing equipment Download PDF

Info

Publication number
JP3842725B2
JP3842725B2 JP2002368750A JP2002368750A JP3842725B2 JP 3842725 B2 JP3842725 B2 JP 3842725B2 JP 2002368750 A JP2002368750 A JP 2002368750A JP 2002368750 A JP2002368750 A JP 2002368750A JP 3842725 B2 JP3842725 B2 JP 3842725B2
Authority
JP
Japan
Prior art keywords
wind tunnel
test object
vehicle
support
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002368750A
Other languages
Japanese (ja)
Other versions
JP2004198317A (en
Inventor
敦志 井門
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2002368750A priority Critical patent/JP3842725B2/en
Publication of JP2004198317A publication Critical patent/JP2004198317A/en
Application granted granted Critical
Publication of JP3842725B2 publication Critical patent/JP3842725B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、風洞内の試験対象物に気体を流し、この気体の流れによってこの試験対象物が受ける影響を試験する風洞試験装置に関する。
【0002】
【従来の技術】
図7は、従来の風洞試験装置の側面図である。図8は、従来の風洞試験装置の試験対象物の固定方法を示す断面図である。
従来の風洞試験装置102は、図7及び図8に示すように、空気の速度に応じて地面を移動させる移動地面板104と、この移動地面板104上に車両模型101a〜101dを固定するワイヤ106,107と、車両模型101a〜101dに作用する荷重を検出するロードセル109などを備えている(例えば、非特許文献1)。風洞測定部103dは、天井103bと、固定地面103cと、ベルト104aなどから構成されている。車両模型(先頭車両)101aは、ワイヤ106,107によって固定されており、車両模型(中間車両)101cは車両模型(後尾車両)101dを貫通するワイヤ107を介してデッドウェイト108に連結されている。このような従来の風洞試験装置102では、風洞測定部103d内の車両模型101a〜101dに図中矢印方向に空気を流すとともに、図示しない駆動装置によって移動地面板104がベルト104aをこの空気の速度と同一の速度で移動させて、車両模型(中間車両)101b,101cが受ける空気抵抗などをロードセル109によって検出している。
【0003】
【非特許文献1】
井門敦志 他、「車両の空気抵抗低減のための風洞試験」、鉄道総研報告、財団法人研友社、1999年12月16日発行、第13巻、第12号、第43頁〜第46頁
【0004】
【発明が解決しようとする課題】
従来の風洞試験装置102では、図8に示すように、垂直方向に張られたワイヤ106と水平方向に張られたワイヤ107とによって車両模型101a〜101dを吊り、この車両模型101a〜101dを移動地面板104上で支持し固定している。このような従来の風洞試験装置102では、ワイヤ106,107が空気の流れを遮るためこのワイヤ106,107が空気抵抗を受けてしまう。このため、従来の風洞試験装置102では、ロードセル109が検出した荷重値からワイヤ106,107が受けた空気抵抗値を補正する必要があり補正による誤差が生ずるおそれがあった。
【0005】
この発明の課題は、試験対象物に作用する荷重を高精度に検出することができる風洞試験装置を提供することである。
【0006】
【課題を解決するための手段】
この発明は、以下に記載するような解決手段により、前記課題を解決する。
なお、この発明の実施形態に対応する符号を付して説明するが、この実施形態に限定するものではない。
請求項1の発明は、風洞(3)内の試験対象物(1)に気体を流し、この気体の流れによってこの試験対象物が受ける影響を試験する風洞試験装置であって、前記気体の速度に応じて地面を移動させる移動地面(4)と、前記試験対象物と前記移動地面との間でこの試験対象物を支持する支持部(5)と、前記試験対象物と前記支持部との間に設置され、前記気体の流れによってこの試験対象物に作用する荷重を検出する荷重検出部(9)とを備える風洞試験装置(2)である。
【0007】
請求項2の発明は、請求項1に記載の風洞試験装置において、前記支持部は、前記試験対象物が鉄道車両の模型又は実車であるときに、この鉄道車両の模型又は実車の車輪を支持するレールであり、前記荷重検出部は、前記車輪と前記レールとの間に設置されていることを特徴とする風洞試験装置である。
【0008】
請求項3の発明は、請求項1又は請求項2に記載の風洞試験装置において、前記移動地面上に間隔をあけて前記支持部を固定する固定部材(6,7)を備えることを特徴とする風洞試験装置である。
【0009】
【発明の実施の形態】
以下、図面を参照して、この発明の実施形態について詳しく説明する。
図1は、この発明の実施形態に係る風洞試験装置の側面図である。図2は、この発明の実施形態に係る風洞試験装置の試験対象物の支持方法を示す側面図である。図3は、この発明の実施形態に係る風洞試験装置の支持部の固定方法を示す平面図である。図4は、この発明の実施形態に係る風洞試験装置の支持部の固定方法を示す正面図である。
試験対象物1は、模型又は実物の試験体(供試体)である。試験対象物1は、例えば、図1及び図2に示すような実際の鉄道車両を模擬(縮小)した車両模型(模擬車両)であり、車体1aとこの車体1aを支持する車輪1bとを備えている。
【0010】
風洞試験装置2は、風洞測定部3d内の試験対象物1に気体を流し、この気体の流れによってこの試験対象物1が受ける影響を試験する装置である。風洞試験装置2は、例えば、試験対象物1が受ける空気力(抗力、揚力、横力、モーメント)、圧力、試験対象物1の周辺の気流性状に及ぼす影響を測定する。風洞試験装置2は、図1〜図4に示すように風洞測定部3dと、移動地面板4と、支持部5と、固定部材6,7と、固定用治具8と、荷重検出部9などから構成されている。
【0011】
風洞3は、空気力学的な諸問題を実験的に調査するために人工的な空気の流れを作る装置である。風洞3は、一定の性状の風を人工的に送風する図示しない送風機、ダクト、整流装置及びノズルなどを備えており、ノズル3aから気体を噴出して測定部に一様な流れを作る。風洞測定部3dは、天井3bと、固定地面(床面)3cと、この固定地面3cと同一レベルのベルト4aなどから構成されており、この風洞測定部3d内には試験対象物1が設置されている。
【0012】
移動地面板4は、気体の速度に応じて地面を移動させることにより、風洞試験時に地面を模擬する装置である。地上面を速度Vで走行する車両のまわりの流れを風洞測定部3d内に実現するためには、風速Vの風とともに地面を速度Vで後方に移動させる必要がある。移動地面板4は、ベルト4aを気体の速度と同じ速度で移動させてベルト4aの表面と気体の流れとの間の相対速度をなくす。移動地面板4は、図1に示すように、地面を模擬したベルト4aと、このベルト4aを巻き掛けて図示しない駆動装置によって駆動されるプーリ4b〜4dなどを備えている。
【0013】
支持部5は、試験対象物1と移動地面板4との間でこの試験対象物1を支持する部材である。支持部5は、図2に示すように、試験対象物1が鉄道車両の模型であるときにこの鉄道車両の模型の車輪1bを支持する一対のレールである。この一対のレールは、実際の鉄道用レールを模擬した模擬レールである。支持部5は、図4に示すように断面が四角形状に形成されており、図3に示すように一対の支持部5が平行に配置されている。支持部5の内側側面には、ピアノ線5aが固定されており一対の支持部5が所定の間隔をあけてこのピアノ線5aによって互いに連結されている。支持部5の外側側面には、図3及び図4に示すように、図示しないボルトなどの固定部材によって固定用治具5bが固定されている。
【0014】
固定部材6,7は、移動地面板4上に間隔をあけて支持部5を固定する部材である。固定部材6は、図1、図2及び図4に示すように、支持部5を吊り下げて固定するために垂直方向に張られたピアノ線であり、車両模型の連結部の隙間を通過して固定用治具5bの上面に連結されている。固定部材7は、図3及び図4に示すように、支持部5を吊るために水平方向に張られたピアノ線であり、固定用治具5bの側面に連結されている。
【0015】
図5は、この発明の実施形態に係る風洞試験装置の固定用治具の側面図である。図6は、図5のVI−VI線で切断した状態を示す断面図である。
固定用治具8は、試験対象物1を支持部5に固定するための治具である。固定用治具8は、図6に示すように、外観形状が門型であり、試験対象物1の車輪1bを補強して支持部5上に固定する。固定用治具8には、車体1aの底面に固定される固定部8aと、この固定部8aの両端部から直角に屈曲した一対の脚部8bと、この一対の脚部8bの外側側面に車輪1bの内側側面が嵌合する一対の嵌合部8cと、一対の車輪1bを連結する車軸1cが貫通する貫通孔8dとが形成されている。固定用治具8は、図1及び図2に示すように、車体1aの長さ方向の両端側の車輪1bのみを補強しており、両端側以外の車輪1bは固定用治具8によって補強されておらず、車輪1bの下端が支持部5から僅かに離間して浮き上がった状態である。
【0016】
荷重検出部9は、気体の流れによって試験対象物1に作用する荷重を検出する装置である。荷重検出部9は、試験対象物1と支持部5との間に設置されており、この試験対象物1に作用する空気力(抗力、揚力、横力、モーメント)を検出可能な天秤である。荷重検出部9は、図5及び図6に示すように、車両模型の車輪1bとレールとの間に設置されており、車輪1bの下端に形成された平坦面1d及び脚部8bの下面と支持部5の上面との間に挟み込まれ固定されている。荷重検出部9には、図5に示すように、支持部5の長さ方向に沿って配線された信号線9aが接続されており、荷重検出部9は、検出結果を荷重検出信号として図示しない増幅部を通じて演算部に出力し、各荷重検出部9が検出した荷重の大きさをこの演算部が演算する。
【0017】
次に、この発明の実施形態に係る風洞試験装置の試験方法を説明する。
図1〜図6に示すように、固定部材6,7によって支持部5を吊り移動地面板4上に支持部5を固定するとともに、試験対象物1と支持部5との間に荷重検出部9を設置して、固定用治具8によって試験対象物1が支持部5上に固定される。この状態で、吹出口3aから気体を噴出させて試験対象物1に気体を流し、この気体の速度と略同一速度で移動地面板4がベルト4aを駆動する。その結果、気体の流れによって試験対象物1が抗力(空気抵抗)を受け、荷重検出部9によってこの抗力が検出される。
【0018】
この発明の実施形態に係る風洞試験装置には、以下に記載するような効果がある。
(1) この実施形態では、試験対象物1と移動地面板4との間で試験対象物1を支持部5が支持し、気体の流れによって試験対象物1に作用する荷重を検出する荷重検出部9が試験対象物1と支持部5との間に設置されている。図7及び図8に示す従来の風洞試験装置102では、車両模型101を吊るワイヤ106,107が空気の流れを遮るため、ロードセル109が検出した検出結果からこのワイヤ106,107が受ける空気抵抗を補正する必要がある。しかし、この実施形態では、試験対象物1と支持部5との間に荷重検出部9が設置されているため、支持部5が空気抵抗を受けても荷重検出部9の検出結果に影響がなく、試験対象物1を吊るスティングやワイヤなどが必要なくなる。その結果、試験対象物1が受ける空気抵抗のみを荷重検出部9によって検出することができ、検出結果に誤差がなくなって試験対象物1に作用する荷重を高精度に検出することができる。
【0019】
(2) この実施形態では、試験対象物1が鉄道車両の模型であるときに、この鉄道車両の模型の車輪1bを支持するレールが支持部5であり、この車輪1bと支持部5との間に荷重検出部9が設置されている。試験対象物1が鉄道車両である場合には、移動地面板4と同じ速度で支持部5も移動することが理想的である。しかし、レールの幅は鉄道車両の幅に比べて非常に狭いため、レールが固定されていても空気抵抗などによる影響は極めて少ないと考えられる。この実施形態では、車輪1bと支持部5との間に荷重検出部9を設置しているため、支持部5が空気抵抗を受けても荷重検出部9によって車両模型が受ける空気抵抗のみを測定することができる。
【0020】
(3) この実施形態では、移動地面板4上に間隔をあけて支持部5を固定部材6,7が固定する。その結果、試験対象物1を支持部5上に支持した状態でこの支持部5を移動地面板4上に固定することができる。特に、鉄道車両の風洞試験をする場合には、移動地面板4上に設置された支持部5は、車輪1bを支持するレールであるので、車輪底面と地面との間の距離を実際の状況に合わせた風洞試験をすることができる。
【0021】
この発明は、以上説明した実施形態に限定するものではなく、以下に記載するように種々の変形又は変更が可能であり、これらもこの発明の範囲内である。
(1) この実施形態では、試験対象物1として鉄道車両の模型を例に挙げて説明したがこれに限定するものではない。例えば、ガイドウェイに支持された状態で走行する移動体や鉄道車両の実車などについてもこの発明を適用することができる。また、この実施形態では、支持部5の下方に移動地面板4を設置した場合を例に挙げて説明したが、支持部5を地面に固定して一対の支持部5の内側及び外側に移動地面板4をそれぞれ設置してもよい。さらに、この実施形態では、ベルト4aを駆動する移動地面板4を例に挙げて説明したが、移動地面を板状の構造に限定するものではない。
【0022】
(2) この実施形態では、車体1aの一部の車輪1b(車体1aの長さ方向の両端側の車輪1b)と支持部5との間に荷重検出部9を設置しているが、車体1aの全ての車輪1bと支持部5との間に荷重検出部9を設置してもよい。また、この実施形態では、固定用治具8によって車輪1bと支持部5とを固定しているが、車輪1bの強度が十分である場合には固定用治具8を省略して車輪1bを支持部5に直接固定してもよい。さらに、この実施形態では、試験対象物1に空気を流す場合を例に挙げて説明したが、空気以外の気体を試験対象物1に流して風洞試験をする場合についてもこの発明を適用することができる。
【0023】
【発明の効果】
以上説明したように、この発明によると、試験対象物に作用する荷重を高精度に検出することができる。
【図面の簡単な説明】
【図1】この発明の実施形態に係る風洞試験装置の側面図である。
【図2】この発明の実施形態に係る風洞試験装置の試験対象物の支持方法を示す側面図である。
【図3】この発明の実施形態に係る風洞試験装置の支持部の固定方法を示す平面図である。
【図4】この発明の実施形態に係る風洞試験装置の支持部の固定方法を示す正面図である。
【図5】この発明の実施形態に係る風洞試験装置の固定用治具の側面図である。
【図6】図5のVI−VI線で切断した状態を示す断面図である。
【図7】従来の風洞試験装置の側面図である。
【図8】従来の風洞試験装置の試験対象物の固定方法を示す断面図である。
【符号の説明】
1 試験対象物
2 風洞試験装置
3 風洞
3d 風洞測定部
4 移動地面板(移動地面)
5 支持部
6,7 固定部材
8 固定用治具
9 荷重検出部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a wind tunnel testing apparatus for testing a influence of a gas flow on a test object in a wind tunnel and the influence of the gas flow on the test object.
[0002]
[Prior art]
FIG. 7 is a side view of a conventional wind tunnel testing apparatus. FIG. 8 is a cross-sectional view showing a method for fixing a test object of a conventional wind tunnel test apparatus.
As shown in FIGS. 7 and 8, the conventional wind tunnel test apparatus 102 includes a moving ground plate 104 that moves the ground according to the velocity of air, and wires that fix the vehicle models 101 a to 101 d on the moving ground plate 104. 106, 107, and a load cell 109 for detecting a load acting on the vehicle models 101a to 101d (for example, Non-Patent Document 1). The wind tunnel measuring unit 103d includes a ceiling 103b, a fixed ground 103c, a belt 104a, and the like. The vehicle model (lead vehicle) 101a is fixed by wires 106 and 107, and the vehicle model (intermediate vehicle) 101c is connected to the dead weight 108 via a wire 107 that passes through the vehicle model (tail vehicle) 101d. . In such a conventional wind tunnel test apparatus 102, air flows through the vehicle models 101a to 101d in the wind tunnel measuring unit 103d in the direction of the arrow in the figure, and the moving ground plate 104 moves the belt 104a through the belt 104a by a driving device (not shown). The load cell 109 detects the air resistance received by the vehicle models (intermediate vehicles) 101b and 101c.
[0003]
[Non-Patent Document 1]
Satoshi Imon et al., "Wind tunnel test for reducing air resistance of vehicles", Railway Research Institute report, Kenkyusha, issued December 16, 1999, Vol. 13, No. 12, pp. 43-46 [0004]
[Problems to be solved by the invention]
In the conventional wind tunnel testing apparatus 102, as shown in FIG. 8, the vehicle models 101a to 101d are suspended by the wire 106 stretched in the vertical direction and the wire 107 stretched in the horizontal direction, and the vehicle models 101a to 101d are moved. It is supported and fixed on the ground plate 104. In such a conventional wind tunnel test apparatus 102, since the wires 106 and 107 block the flow of air, the wires 106 and 107 receive air resistance. For this reason, in the conventional wind tunnel test apparatus 102, it is necessary to correct the air resistance value received by the wires 106 and 107 from the load value detected by the load cell 109, which may cause an error due to the correction.
[0005]
An object of the present invention is to provide a wind tunnel testing apparatus capable of detecting a load acting on a test object with high accuracy.
[0006]
[Means for Solving the Problems]
The present invention solves the above-mentioned problems by the solving means described below.
In addition, although the code | symbol corresponding to embodiment of this invention is attached | subjected and demonstrated, it is not limited to this embodiment.
The invention of claim 1 is a wind tunnel test apparatus for testing the influence of the gas flow on the test object (1) in the wind tunnel (3) and testing the influence of the gas flow on the test object. A moving ground (4) that moves the ground according to the test object, a support part (5) that supports the test object between the test object and the moving ground, and the test object and the support part. It is a wind tunnel test apparatus (2) provided with the load detection part (9) installed in the middle and detecting the load which acts on this test object by the said gas flow.
[0007]
According to a second aspect of the present invention, in the wind tunnel testing apparatus according to the first aspect, when the test object is a model of a railway vehicle or an actual vehicle, the support unit supports the model of the rail vehicle or an actual vehicle wheel. The wind tunnel test apparatus is characterized in that the load detection unit is installed between the wheel and the rail.
[0008]
A third aspect of the present invention is the wind tunnel test apparatus according to the first or second aspect, further comprising a fixing member (6, 7) for fixing the support portion at an interval on the moving ground. This is a wind tunnel testing device.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
FIG. 1 is a side view of a wind tunnel testing apparatus according to an embodiment of the present invention. FIG. 2 is a side view showing a method for supporting the test object of the wind tunnel test apparatus according to the embodiment of the present invention. FIG. 3 is a plan view showing a fixing method of the support portion of the wind tunnel testing apparatus according to the embodiment of the present invention. FIG. 4 is a front view showing a fixing method of the support portion of the wind tunnel testing apparatus according to the embodiment of the present invention.
The test object 1 is a model or a real test body (specimen). The test object 1 is, for example, a vehicle model (simulated vehicle) that simulates (reduces) an actual railway vehicle as shown in FIGS. 1 and 2, and includes a vehicle body 1a and wheels 1b that support the vehicle body 1a. ing.
[0010]
The wind tunnel test apparatus 2 is an apparatus for flowing a gas to the test object 1 in the wind tunnel measuring unit 3d and testing the influence of the gas flow on the test object 1. The wind tunnel test apparatus 2 measures, for example, the influence exerted on the aerodynamic force (drag, lift, lateral force, moment) received by the test object 1, pressure, and airflow properties around the test object 1. As shown in FIGS. 1 to 4, the wind tunnel test apparatus 2 includes a wind tunnel measurement unit 3 d, a moving ground plate 4, a support unit 5, fixing members 6 and 7, a fixing jig 8, and a load detection unit 9. Etc.
[0011]
The wind tunnel 3 is a device that creates an artificial air flow to experimentally investigate aerodynamic problems. The wind tunnel 3 includes a blower (not shown), a duct, a rectifier, a nozzle, and the like that artificially blows wind with a certain property, and blows gas from the nozzle 3a to create a uniform flow in the measurement unit. The wind tunnel measuring unit 3d includes a ceiling 3b, a fixed ground (floor surface) 3c, a belt 4a of the same level as the fixed ground 3c, and the like, and the test object 1 is installed in the wind tunnel measuring unit 3d. Has been.
[0012]
The moving ground plate 4 is a device that simulates the ground during a wind tunnel test by moving the ground according to the velocity of the gas. In order to realize the flow around the vehicle traveling on the ground surface at the speed V in the wind tunnel measuring unit 3d, it is necessary to move the ground backward at the speed V together with the wind of the wind speed V. The moving ground plate 4 moves the belt 4a at the same speed as the gas, thereby eliminating the relative speed between the surface of the belt 4a and the gas flow. As shown in FIG. 1, the moving ground plate 4 includes a belt 4 a that simulates the ground, and pulleys 4 b to 4 d that are wound around the belt 4 a and are driven by a driving device (not shown).
[0013]
The support unit 5 is a member that supports the test object 1 between the test object 1 and the moving ground plate 4. As shown in FIG. 2, the support portion 5 is a pair of rails that support the wheels 1 b of the model of the railway vehicle when the test object 1 is a model of the railway vehicle. The pair of rails are simulated rails simulating an actual rail for rail. As shown in FIG. 4, the support part 5 has a quadrangular cross section, and a pair of support parts 5 are arranged in parallel as shown in FIG. A piano wire 5a is fixed to the inner side surface of the support portion 5, and a pair of support portions 5 are connected to each other by the piano wire 5a at a predetermined interval. As shown in FIGS. 3 and 4, a fixing jig 5 b is fixed to the outer side surface of the support portion 5 by a fixing member such as a bolt (not shown).
[0014]
The fixing members 6 and 7 are members that fix the support portion 5 at an interval on the moving ground plate 4. As shown in FIGS. 1, 2, and 4, the fixing member 6 is a piano wire that is stretched in the vertical direction to suspend and fix the support portion 5, and passes through the gap between the connecting portions of the vehicle model. Are connected to the upper surface of the fixing jig 5b. As shown in FIGS. 3 and 4, the fixing member 7 is a piano wire stretched in the horizontal direction to suspend the support portion 5, and is connected to the side surface of the fixing jig 5 b.
[0015]
FIG. 5 is a side view of the fixing jig of the wind tunnel testing apparatus according to the embodiment of the present invention. 6 is a cross-sectional view showing a state cut along line VI-VI in FIG.
The fixing jig 8 is a jig for fixing the test object 1 to the support portion 5. As shown in FIG. 6, the fixing jig 8 has a portal shape, and reinforces and fixes the wheel 1 b of the test object 1 on the support portion 5. The fixing jig 8 includes a fixing portion 8a fixed to the bottom surface of the vehicle body 1a, a pair of leg portions 8b bent at right angles from both ends of the fixing portion 8a, and an outer side surface of the pair of leg portions 8b. A pair of fitting portions 8c into which the inner side surface of the wheel 1b is fitted and a through hole 8d through which the axle 1c connecting the pair of wheels 1b passes are formed. As shown in FIGS. 1 and 2, the fixing jig 8 reinforces only the wheels 1 b at both ends in the longitudinal direction of the vehicle body 1 a, and the wheels 1 b other than both ends are reinforced by the fixing jig 8. In other words, the lower end of the wheel 1b is slightly separated from the support portion 5 and floats.
[0016]
The load detection unit 9 is a device that detects a load acting on the test object 1 by a gas flow. The load detection unit 9 is installed between the test object 1 and the support unit 5 and is a balance capable of detecting aerodynamic forces (drag, lift, lateral force, moment) acting on the test object 1. . As shown in FIGS. 5 and 6, the load detection unit 9 is installed between the wheel 1b of the vehicle model and the rail. It is sandwiched and fixed between the upper surface of the support portion 5. As shown in FIG. 5, the load detection unit 9 is connected to a signal line 9a wired along the length direction of the support unit 5. The load detection unit 9 illustrates the detection result as a load detection signal. It outputs to a calculating part through the amplification part which does not, and this calculating part calculates the magnitude | size of the load which each load detection part 9 detected.
[0017]
Next, a test method for a wind tunnel test apparatus according to an embodiment of the present invention will be described.
As shown in FIGS. 1 to 6, the support portion 5 is suspended by the fixing members 6 and 7, the support portion 5 is fixed on the moving ground plate 4, and the load detection portion is interposed between the test object 1 and the support portion 5. 9 is installed, and the test object 1 is fixed on the support portion 5 by the fixing jig 8. In this state, gas is blown out from the air outlet 3a to flow the gas to the test object 1, and the moving ground plate 4 drives the belt 4a at substantially the same speed as this gas. As a result, the test object 1 receives a drag (air resistance) due to the gas flow, and the load detection unit 9 detects this drag.
[0018]
The wind tunnel testing apparatus according to the embodiment of the present invention has the following effects.
(1) In this embodiment, the load detecting unit detects the load acting on the test object 1 by the gas flow, with the support unit 5 supporting the test object 1 between the test object 1 and the moving ground plate 4. The part 9 is installed between the test object 1 and the support part 5. In the conventional wind tunnel test apparatus 102 shown in FIGS. 7 and 8, since the wires 106 and 107 that suspend the vehicle model 101 block the air flow, the air resistance that the wires 106 and 107 receive from the detection result detected by the load cell 109 is determined. It is necessary to correct. However, in this embodiment, since the load detection part 9 is installed between the test object 1 and the support part 5, even if the support part 5 receives air resistance, the detection result of the load detection part 9 is affected. In addition, there is no need for a sting or a wire for hanging the test object 1. As a result, only the air resistance received by the test object 1 can be detected by the load detection unit 9, and the load acting on the test object 1 can be detected with high accuracy with no error in the detection result.
[0019]
(2) In this embodiment, when the test object 1 is a model of a railway vehicle, the rail that supports the wheel 1b of the model of the railway vehicle is the support part 5, and the wheel 1 b and the support part 5 A load detection unit 9 is installed between them. When the test object 1 is a railway vehicle, it is ideal that the support portion 5 also moves at the same speed as the moving ground plate 4. However, since the width of the rail is very narrow compared to the width of the railway vehicle, even if the rail is fixed, the influence of air resistance or the like is considered to be extremely small. In this embodiment, since the load detection part 9 is installed between the wheel 1b and the support part 5, even if the support part 5 receives air resistance, only the air resistance received by the vehicle model by the load detection part 9 is measured. can do.
[0020]
(3) In this embodiment, the fixing members 6 and 7 fix the support portion 5 on the moving ground plate 4 with an interval. As a result, the support 5 can be fixed on the movable ground plate 4 with the test object 1 supported on the support 5. In particular, when a wind tunnel test of a railway vehicle is performed, the support portion 5 installed on the moving ground plate 4 is a rail that supports the wheel 1b, so that the distance between the wheel bottom surface and the ground is the actual situation. Wind tunnel tests tailored to
[0021]
The present invention is not limited to the embodiment described above, and various modifications or changes can be made as described below, and these are also within the scope of the present invention.
(1) In this embodiment, a model of a railway vehicle has been described as an example of the test object 1, but is not limited thereto. For example, the present invention can be applied to a moving body that is supported by a guideway or a real vehicle of a railway vehicle. In this embodiment, the case where the movable ground plate 4 is installed below the support portion 5 has been described as an example. However, the support portion 5 is fixed to the ground and moved to the inside and outside of the pair of support portions 5. The ground plate 4 may be installed respectively. Furthermore, in this embodiment, the moving ground plate 4 that drives the belt 4a has been described as an example, but the moving ground is not limited to a plate-like structure.
[0022]
(2) In this embodiment, the load detection unit 9 is installed between some of the wheels 1b of the vehicle body 1a (the wheels 1b on both ends in the longitudinal direction of the vehicle body 1a) and the support unit 5. You may install the load detection part 9 between all the wheels 1b and the support part 5 of 1a. Further, in this embodiment, the wheel 1b and the support portion 5 are fixed by the fixing jig 8, but when the strength of the wheel 1b is sufficient, the fixing jig 8 is omitted and the wheel 1b is fixed. You may fix to the support part 5 directly. Furthermore, in this embodiment, the case where air is allowed to flow through the test object 1 has been described as an example. However, the present invention is also applied to the case where a wind tunnel test is performed by flowing a gas other than air through the test object 1. Can do.
[0023]
【The invention's effect】
As described above, according to the present invention, the load acting on the test object can be detected with high accuracy.
[Brief description of the drawings]
FIG. 1 is a side view of a wind tunnel testing apparatus according to an embodiment of the present invention.
FIG. 2 is a side view showing a method for supporting a test object of a wind tunnel testing apparatus according to an embodiment of the present invention.
FIG. 3 is a plan view showing a method for fixing the support portion of the wind tunnel testing apparatus according to the embodiment of the present invention.
FIG. 4 is a front view showing a method of fixing a support portion of the wind tunnel testing apparatus according to the embodiment of the present invention.
FIG. 5 is a side view of a fixing jig of the wind tunnel testing apparatus according to the embodiment of the present invention.
6 is a cross-sectional view showing a state cut along line VI-VI in FIG. 5;
FIG. 7 is a side view of a conventional wind tunnel testing apparatus.
FIG. 8 is a cross-sectional view showing a method for fixing a test object of a conventional wind tunnel testing apparatus.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Test object 2 Wind tunnel test apparatus 3 Wind tunnel 3d Wind tunnel measuring part 4 Moving ground board (moving ground)
5 Supporting parts 6 and 7 Fixing member 8 Fixing jig 9 Load detection part

Claims (3)

風洞内の試験対象物に気体を流し、この気体の流れによってこの試験対象物が受ける影響を試験する風洞試験装置であって、
前記気体の速度に応じて地面を移動させる移動地面と、
前記試験対象物と前記移動地面との間でこの試験対象物を支持する支持部と、
前記試験対象物と前記支持部との間に設置され、前記気体の流れによってこの試験対象物に作用する荷重を検出する荷重検出部と、
を備える風洞試験装置。
A wind tunnel test device for flowing a gas through a test object in a wind tunnel and testing the influence of the gas flow on the test object,
A moving ground that moves the ground according to the velocity of the gas;
A support for supporting the test object between the test object and the moving ground;
A load detector that is installed between the test object and the support, and detects a load acting on the test object by the gas flow;
Wind tunnel testing device comprising:
請求項1に記載の風洞試験装置において、
前記支持部は、前記試験対象物が鉄道車両の模型又は実車であるときに、この鉄道車両の模型又は実車の車輪を支持するレールであり、
前記荷重検出部は、前記車輪と前記レールとの間に設置されていること、
を特徴とする風洞試験装置。
The wind tunnel testing apparatus according to claim 1,
The support part is a rail that supports the model of the railway vehicle or the wheel of the actual vehicle when the test object is a model or actual vehicle of the railway vehicle.
The load detector is installed between the wheel and the rail;
Wind tunnel testing device characterized by
請求項1又は請求項2に記載の風洞試験装置において、
前記移動地面上に間隔をあけて前記支持部を固定する固定部材を備えること、
を特徴とする風洞試験装置。
In the wind tunnel testing apparatus according to claim 1 or 2,
Comprising a fixing member for fixing the support portion at an interval on the moving ground;
Wind tunnel testing device characterized by
JP2002368750A 2002-12-19 2002-12-19 Wind tunnel testing equipment Expired - Fee Related JP3842725B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002368750A JP3842725B2 (en) 2002-12-19 2002-12-19 Wind tunnel testing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002368750A JP3842725B2 (en) 2002-12-19 2002-12-19 Wind tunnel testing equipment

Publications (2)

Publication Number Publication Date
JP2004198317A JP2004198317A (en) 2004-07-15
JP3842725B2 true JP3842725B2 (en) 2006-11-08

Family

ID=32765236

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002368750A Expired - Fee Related JP3842725B2 (en) 2002-12-19 2002-12-19 Wind tunnel testing equipment

Country Status (1)

Country Link
JP (1) JP3842725B2 (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102008014716A1 (en) * 2008-03-18 2009-09-24 Dr. Ing. H.C. F. Porsche Aktiengesellschaft Aerodynamic test stand
JP5244700B2 (en) * 2009-05-20 2013-07-24 三菱重工業株式会社 Wind tunnel test facility
CN101979994A (en) * 2010-10-25 2011-02-23 中南大学 Method for testing alternating airload of train body of high-speed train
CN102628732B (en) * 2012-04-12 2014-09-17 中国铁道科学研究院机车车辆研究所 Method and device for measuring air resistance of train
CN103217270B (en) * 2013-04-17 2016-08-17 中南大学 Measure movable model method and the application thereof of bullet train tunnel air resistance coefficient
CN105224763B (en) * 2015-10-20 2018-02-02 北京交通大学 A kind of tunnel additive air resistance Iterative Learning Identification Method of train
CN107328549B (en) * 2017-06-26 2023-04-07 西南交通大学 Survey frame device of short-term test wind field strides to relevance
CN108639378B (en) * 2018-06-29 2024-06-04 长沙市云智航科技有限公司 Clamping device for lift force test of aircraft
CN112665816B (en) * 2021-01-05 2022-06-28 中国空气动力研究与发展中心超高速空气动力研究所 Hypersonic wind tunnel heavy-calibre spray pipe strutting arrangement
CN112903234B (en) * 2021-01-11 2023-10-20 宁波市电力设计院有限公司 Wind load test device of local pole system of transmission tower structure
CN114923656B (en) * 2022-07-20 2023-05-23 中国空气动力研究与发展中心高速空气动力研究所 Rope supporting system for full-machine flutter wind tunnel test
CN115575074B (en) * 2022-12-09 2023-03-10 中国空气动力研究与发展中心高速空气动力研究所 High-speed wind tunnel ventilation model internal resistance measurement uncertainty analysis method

Also Published As

Publication number Publication date
JP2004198317A (en) 2004-07-15

Similar Documents

Publication Publication Date Title
JP5733987B2 (en) Vehicle restraint system
JP3842725B2 (en) Wind tunnel testing equipment
JP4599356B2 (en) Test stand and method for aerodynamic measurements in vehicles
Dorigatti et al. Crosswind effects on the stability of a model passenger train—A comparison of static and moving experiments
Niu et al. Experimental study on the effect of Reynolds number on aerodynamic performance of high-speed train with and without yaw angle
KR101581489B1 (en) Autopilot system for use in a wind tunnel
JP2011513746A (en) Prop assembly
CN208013317U (en) Bow net detects model configuration
Cogotti Generation of a controlled level of turbulence in the pininfarina wind tunnel for the measurement of unsteady aerodynamics and aeroacoustics
CN207937174U (en) A kind of multi-angle tire dynamic rate experimental rig
CN109991021A (en) A kind of multi-angle tire dynamic rate experimental rig
JP5668309B2 (en) Vehicle tank test equipment
CN109682615A (en) A kind of suspension type single track car body strength test device
JP2012122903A (en) Flow rate regulating structure for wind tunnel testing apparatuses, and wind tunnel testing apparatus
CN112098022A (en) Device for static and dynamic load test of bridge model, control method and application
CN208140380U (en) Multifunctional sliding trolley with rubber-tyred rail APM system for cold sliding and limit detection
JP2006170639A (en) Wind tunnel test system
JP6707037B2 (en) Aerodynamic model test equipment
JP4632460B2 (en) Model structure testing apparatus and testing method
Takaishi et al. Experimental method for wind tunnel tests to simulate turbulent flow on the roof of high-speed trains
JP3808016B2 (en) Aerodynamic test method for moving body model and moving body model for aerodynamic testing
JPH06341920A (en) Wind tunnel test device
CN106628249B (en) Ducted aircraft testing device and testing method thereof
JP2873142B2 (en) Apparatus and method for testing fluid characteristics of tracked vehicle
KR102434301B1 (en) Apparatus and method for Endurance test of railway vehicle steering drive

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050628

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060704

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20060808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20060810

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees