[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP3438208B2 - Tunnel construction equipment - Google Patents

Tunnel construction equipment

Info

Publication number
JP3438208B2
JP3438208B2 JP21159594A JP21159594A JP3438208B2 JP 3438208 B2 JP3438208 B2 JP 3438208B2 JP 21159594 A JP21159594 A JP 21159594A JP 21159594 A JP21159594 A JP 21159594A JP 3438208 B2 JP3438208 B2 JP 3438208B2
Authority
JP
Japan
Prior art keywords
tunnel
tunnel construction
work
concrete
loading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21159594A
Other languages
Japanese (ja)
Other versions
JPH0882184A (en
Inventor
啓二 小野
一夫 服部
修一 岩城
雄三 古賀
利彦 和田
由幸 小原
常和 川端
靖男 石川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP21159594A priority Critical patent/JP3438208B2/en
Publication of JPH0882184A publication Critical patent/JPH0882184A/en
Application granted granted Critical
Publication of JP3438208B2 publication Critical patent/JP3438208B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 【0001】 【産業上の利用分野】本発明は、工期の短縮を図り得る
トンネル施工装置に関する。 【0002】 【従来の技術】建設工事における熟練労働者の不足と高
齢化が進む中で、特にトンネル工事では厳しい労働環境
が強いられている。このため、トンネル工事において
は、作業員を確保することが難しくなってきている。こ
の厳しい労働環境にあるトンネル工事を魅力あるものと
するためには、機械を大型化して、作業箇所の集約化、
省力化を図ることが必要である。そこで近年、提案され
ているのが、多機能型作業構台(ガントリージャンボ)
といわれるトンネル施工装置である。 【0003】そのトンネル施工装置には、様々のものが
提案されているが、その中に、トンネルの切羽に装薬用
の削孔を形成する削岩手段と、発破により破砕されたず
りを積み込み坑口側に搬送するずり積込搬出手段を有す
るものがある。このトンネル施工装置によるトンネルの
施工は、まず、削岩手段によりトンネルの切羽に装薬用
の削孔を形成し、その削孔に装薬して、切羽を破砕す
る。次に、破砕された切羽のずりをずり積込搬出手段に
より積み込み坑口側に搬出し、その後、トンネルの壁面
にコンクリートを吹き付けて覆工を施すという工程を繰
り返すようにして行なわれる。 【0004】 【発明が解決しようとする課題】しかし、近年、益々、
工期の短縮の要望が強く、さらに工期の短縮を図り得る
トンネル施工方法及びトンネル施工装置が求められてい
る。ところが、上記のようなトンネル施工方法及びトン
ネル施工装置においては、更に工期を短縮することは難
しい。 【0005】本発明は、上記事情に鑑み、さらに工期の
短縮を図ることが出来るトンネル施工装置を提供するこ
とを目的としている。 【0006】 【0007】 【課題を解決するための手段】本発明のトンネル施工装
置は、作業構台を有し、前記作業構台には、トンネルの
切羽に削孔を穿設形成する削岩手段と、前記トンネルの
壁面にコンクリートを吹き付けるコンクリート吹付手段
と、前記作業構台を貫通する搬送コンべアと、前記トン
ネルの切羽のずりを前記搬送コンベアに積み込む積込手
段とが設けられていることを特徴とする。 【0008】特に、本発明のトンネル施工装置にあって
は、前記作業構台は、トンネル施工方向に貫通した空間
を有する門型に形成され、前記作業構台は、走行手段を
備え、前記作業構台には、作業ケージが前記トンネル施
工方向に移動自在に設けられ、前記削岩手段は、前記作
業構台に対して前記トンネル施工方向に移動自在に設け
られ、前記コンクリート吹付手段は、コンクリート吹付
ノズル部と、該コンクリート吹付ノズル部を前記トンネ
ルの壁面に沿って移動駆動させる移動駆動手段とを備
え、前記コンクリート吹付手段は、前記作業構台に対し
て前記トンネル施工方向に移動自在に設けられ、前記作
業構台の前記空間側にコンクリートポンプが設けられ、
前記コンクリートポンプは、前記コンクリート吹付手段
に接続され、前記積込手段は、積込コンベアと、該積込
コンベアにずりを掻き込む掻込手段とを備え、前記積込
手段は、前記作業構台に対して前記トンネル施工方向に
移動自在に設けられ、且つ、旋回自在に設けられている
ことを特徴とする。 【0009】 【作用】本発明のトンネル施工装置によれば、ずり搬出
工程と覆工工程とを並行して行なうようにしたので、ト
ンネル施工の一サイクルの迅速化を図ることが出来る。 【0010】すなわち、本発明のトンネル施工装置によ
れば、作業構台をトンネルの切羽に向けて設置すると、
削岩手段により切羽に削孔を形成することが出来るの
で、装薬を容易且つ迅速に行なうことが出来る。次に、
発破により破砕された切羽のずりは、積込手段により搬
送コンベアに積み込むことが出来るので、ずりの搬出を
容易且つ迅速に行なうことが出来る。また、作業構台に
は、コンクリート吹付手段が設けられているので、ずり
の搬出と並行して、トンネルの切羽の壁面にコンクリー
トを吹き付けることによる覆工を行なうことが出来る。 【0011】特に、本発明のトンネル施工装置によれ
ば、走行手段により作業構台をトンネルの切羽に容易且
つ迅速に移動することが出来る。そして、削岩手段を切
羽に向けて移動して切羽に削孔を形成した後には、作業
ケージを切羽に向けて移動し、作業ケージから装薬する
ことにより、装薬作業を容易且つ迅速に行なうことが出
来る。次に、発破により切羽を破砕する際には、作業構
台が走行自在に設けられているので、坑口側への作業構
台の退避を容易且つ迅速に行なうことが出来る。切羽が
破砕された後には、再び作業構台を切羽側に移動して、
積込手段により破砕されたずりを搬送コンベアに積み込
むことが出来る。この際、積込手段は、トンネル施工方
向に移動自在であり且つ旋回自在なので、ずりの積み込
みを容易且つ迅速に行なうことが出来る。搬送コンベア
はそのずりを坑口側へ搬出することが出来る。また、作
業構台はトンネル施工方向に貫通した空間を有する門型
に形成されているので、この空間にトラックミキサー等
のコンクリート搬送手段を設けることが出来る。よっ
て、コンクリートポンプを介してコンクリート吹付手段
へのコンクリートの供給を継続的に行なうことが出来る
ので、ずりの搬出作業と並行して、コンクリートの吹き
付けを迅速に行なうことが出来る。 【0012】 【実施例】以下、本発明の一実施例を図面に基づき説明
する。図1に示すように、施工中のトンネル1には、ト
ンネル施工装置100が設けられており、トンネル施工
装置100は、トンネル1の両側部に、それぞれ、トン
ネル施工方向、即ち、図1矢印A、B方向に敷設された
レール2、2を有している。レール2、2上には、作業
構台10が設置されており、作業構台10は、走行装置
11を備えている。作業構台10は、走行装置11によ
りレール2、2上を走行自在である。 【0013】作業構台10は、トンネル施工方向に貫通
した図2に示す空間S1を有する門型に形成されてお
り、即ち、作業構台10は、ステージ12と、ステージ
12の図2左右端から下方に設けられた複数の支柱13
と、図2左側の複数の支柱13の下端と図2右側の複数
の支柱13の下端にそれぞれトンネル施工方向に沿って
設けられ、且つ、前述の走行装置11が設けられた図1
に示すフレーム14とを有している。また、フレーム1
4には、複数のアウトリガー15が設けられている。 【0014】図2に示すように、作業構台10のステー
ジ12上の中央部には、走行レール25がトンネル施工
方向に敷設されており、走行レール25上には、コンク
リート吹付機20が走行レール25に沿って走行自在に
設けられている。コンクリート吹付機20は、図1に示
すように、トンネル1の切羽1bに向けて設けられたア
ーム23と、アーム23の先端にトンネル1の壁面1a
に向けるように取り付けられたコンクリート吹付ノズル
21と、アーム23に設けられ、コンクリート吹付ノズ
ル21をトンネル1の壁面1aに沿って移動駆動させる
吹付マニュピレータ22とを有している。また、作業構
台10の一方のフレーム14の空間S1側には、コンク
リートポンプ26が設けられており、このコンクリート
ポンプ26は、図示しないコンクリート圧送管を介して
コンクリート吹付機20に、コンクリートを供給するよ
うに接続されている。また、作業構台10の空間S1に
は、コンクリートポンプ26にコンクリートを供給する
トラックミキサー27が停車している。 【0015】図2に示すように、作業構台10のステー
ジ12上の、コンクリート吹付機20の両脇には、それ
ぞれ、走行レール35がトンネル施工方向に敷設されて
おり、走行レール35上には、油圧削岩機30が走行レ
ール35に沿って走行自在に設けられており、また、油
圧削岩機30は、図1に示すそのビット(刃先)31を
トンネル1の切羽1bに向けるように設けられている。 【0016】図2に示すように、作業構台10のステー
ジ12上の、油圧削岩機30、30の更に両側方には、
それぞれ、走行レール45がトンネル施工方向に敷設さ
れており、走行レール45上には、作業ケージ装置40
が走行レール45に沿って走行自在に設けられており、
作業ケージ装置40は、図1に示す作業ケージ41と、
作業ケージ41をトンネル1の切羽1bに向けて突出
し、且つ、作業ケージ41を上下に移動駆動するアーム
装置42を有している。 【0017】図3に示すように、作業構台10の空間S
1の両側方には、それぞれ、搬送コンべア50が、図1
に示すようにフレーム14及び支柱13に支持されるよ
うにトンネル施工方向に設けられており、搬送コンベア
50は、坑口側が高くなるように設置されている。ま
た、搬送コンベア50の坑口側の端部の下方には、重ダ
ンプトラック51が待機している。 【0018】図2に示すように、作業構台10のステー
ジ12の下面の、空間S1の両側方の図1の切羽1b側
には、走行レール65がトンネル施工方向に敷設されて
おり、走行レール65には、トンネル1の切羽1bのず
り1cを搬送コンベア50に積み込むずり積込装置60
が、走行レール65に沿って走行自在に吊設されてい
る。 【0019】ずり積込装置60は、走行レール65に吊
設された走行装置61を有しており、走行装置61に
は、アーム62を水平方向に旋回させる旋回装置63が
設けられている。アーム62には、積込コンベア64
が、切羽1bに向けて設けられており、積込コンベア6
4の坑口側の端部は、搬送コンベア50の切羽1b側の
端部の直上に位置している。また、アーム62には、積
込コンベア64の切羽1b側の端部の前方に、積込コン
ベア64にずり1cを掻き込む掻込装置66が設けられ
ており、掻込装置66は、図2に示すように、ずりガイ
ド板66aと、ずりガイド板66a上に設けられ、ずり
ガイド板66a上のずり1cを積込コンベア64に向け
て掻き込む掻寄腕66bとを有している。 【0020】また、トンネル1の切羽1b側には、図1
に示すように、ずり1cをずり積込装置60に積み込む
積込補助機械70が設けられている。 【0021】トンネル施工装置100等は以上のような
構成を有するので、トンネル1を施工する際には、ま
ず、作業構台10をトンネル1の切羽1bに向けて(図
1矢印A方向に)移動し切羽1bから所定の間隔を有す
る位置に位置決めする。このとき、作業構台10は、走
行装置11によりトンネル施工方向(矢印A、B方向)
に走行自在に設けられているので、その移動及び位置決
めを容易且つ迅速に移動することが出来る。また、アウ
トリガー15をトンネル1の底面に下ろすことにより作
業構台10をその位置に固定することが出来る。 【0022】次に、作業構台10のステージ12上に設
けられた油圧削岩機30、30を切羽1b側(矢印A方
向)に向けて移動し、そのビット31により切羽1bに
複数の削孔を形成する。削孔は油圧削岩機30、30に
より容易且つ迅速に形成することが出来る。削孔が形成
されると、油圧削岩機30、30は、坑口側(矢印B方
向)に戻される。これは、作業構台10と切羽1b間の
作業スペースを広く確保するためである。 【0023】次に、油圧削岩機30、30の隣りに設け
られた作業ケージ装置40、40の作業ケージ41、4
1に作業員を乗せ、作業ケージ装置40、40を切羽1
b側(矢印A方向)に移動する。すると、各作業ケージ
装置40の作業ケージ41を切羽1bに形成された削孔
に接近させることが出来る。よって、この作業ケージ4
1から削孔への装薬を行なうことが出来る。よって、装
薬作業を容易且つ迅速に行なうことが出来る。装薬が完
了すると、作業ケージ装置40、40は、坑口側(矢印
B方向)に戻される。 【0024】次に、発破により切羽を破砕する際には、
作業構台10を坑口側(矢印B方向)に退避させる。こ
のとき、作業構台10は、走行自在なので、その退避を
容易且つ迅速に行なうことが出来る。 【0025】切羽1bが破砕された後には、浮石等を落
としてトンネル1の壁面1aの形状を修繕するこそく作
業を行なう。こそく作業が完了すると、作業ケージ装置
40、40は、坑口側(矢印B方向)に戻される。ま
た、崩落を阻止するために、必要に応じて、トンネル1
の壁面1a及び切羽1bに支保工を施し、また、金網の
取り付けを行なう。 【0026】次に、ずり積込装置60を駆動して破砕さ
れたずり1cを搬送コンベア50に積み込む。ずり積込
装置60は、トンネル施工方向(矢印A、B方向)に移
動自在であり且つ旋回自在なので、掻込装置66の図2
に示すずりガイド板66aを自在に移動することにより
ずり1cをすくうことが出来、ガイド板66aにすくわ
れたずり1cは、ガイド板66a上に設けられた掻寄腕
66bにより積込コンベア64に載せることが出来る。
そのようにして、図1に示すように、積込コンベア64
により、ずり1cを搬送コンベア50に積み込むことが
出来る。よって、ずり積込装置60によりずり1cを積
み込むことが出来るので、ずり1cの積み込みを容易且
つ迅速に行なうことが出来る。また、作業構台10と切
羽1bとの間に、作業構台10の貫通した空間S1を通
じて移動してきた積込補助機械70を設け、その積込補
助機械70によりずり1cの積込を補助することによ
り、ずり1cの積み込みを更に容易且つ迅速に行なうこ
とが出来る。 【0027】また、搬送コンベア50は、積み込まれた
ずり1cを坑口側(矢印B方向)に搬送することが出来
る。また、搬送コンベア50の坑口側の端部の下方に
は、重ダンプトラック51が待機しており、この重ダン
プトラック51にずり1cは積載される。よって、搬送
コンベア50及び重ダンプトラック51によりずり1c
を搬出することが出来る。 【0028】また、ずり1cの搬出作業に並行して作業
構台10のステージ12上に設けられたコンクリート吹
付機20を切羽1b側(矢印A方向)に向けて移動し、
そのコンクリート吹付ノズル21からトンネル1の壁面
1aにコンクリートを吹き付けて覆工を施す。このと
き、コンクリート吹付ノズル21はトンネル施工方向
(矢印A、B方向)に移動自在であり、且つ、吹付マニ
ュピレータ22により壁面1aに沿って移動自在なの
で、その覆工作業を容易且つ迅速に行なうことが出来
る。 【0029】また、作業構台10はトンネル施工方向
(矢印A、B方向)に貫通した空間S1を有する門型に
形成されているので、この空間S1にトラックミキサー
27等のコンクリート搬送手段を設けることが出来る。
よって、フレーム11の空間S1側に設けられたコンク
リートポンプ26を介してコンクリート吹付機20への
コンクリートの供給を継続的に行なうことが出来る。従
って、ずり1cの搬出作業と並行して、コンクリートの
吹き付けによる覆工を迅速に行なうことが出来る。よっ
て、従来のように、ずり1cの搬出作業を待った後に、
コンクリートの吹き付け作業を行なう場合に比して、ト
ンネル施工の一サイクルを迅速に行なうことが出来る。 【0030】コンクリートの吹き付け作業の後には、再
び、作業ケージ41、41に作業員を乗せ、作業ケージ
装置40、40を切羽1b側(矢印A方向)に移動す
る。すると、各作業ケージ装置40の作業ケージ41か
ら覆工へのロックボルトの装着を行なうことが出来るの
で、ロックボルトの装着作業を容易且つ迅速に行なうこ
とが出来る。 【0031】トンネル施工装置100は、上記工程を繰
り返すようにして、トンネル1を施工することが出来
る。従って、上記実施例のトンネル施工によれば、各工
程の迅速化及びずり搬出工程と覆工工程との並行化によ
り、一サイクルの迅速化を図ることが出来るので、一層
の工期の短縮を図ることが出来る。 【0032】尚、上記実施例においては、油圧削岩機3
0を設けたが、削孔を形成し得る限りにおいていかなる
削岩機であってもよいことは勿論である。 【0033】 【発明の効果】本発明のトンネル施工装置によれば、ト
ンネル施工の一サイクルの迅速化を図ることが出来るの
で、工期の短縮を図ることが出来る。 【0034】すなわち、本発明のトンネル施工装置によ
れば、作業構台にずりを積み込む積込手段及び搬送コン
ベアと共にコンクリート吹付手段を設けたので、ずりの
搬出と並行してトンネルの切羽の壁面にコンクリートを
吹き付けることによる覆工を行なうことが出来る。よっ
て、トンネル施工の一サイクルの迅速化を図ることが出
来るので、工期の短縮を図ることが出来る。 【0035】特に、本発明のトンネル施工装置によれ
ば、走行手段により作業構台をトンネルの切羽に容易且
つ迅速に移動することが出来、削岩手段を切羽に向けて
移動して切羽に削孔を形成した後には、作業ケージを切
羽に向けて移動し、作業ケージから装薬することによ
り、装薬作業を容易且つ迅速に行なうことが出来る。ま
た、発破により切羽を破砕する際には、作業構台が走行
自在に設けられているので、坑口側への作業構台の退避
を容易且つ迅速に行なうことが出来る。また、積込手段
を、トンネル施工方向に移動自在且つ旋回自在に設けた
ので、ずりの積み込みを容易且つ迅速に行なうことが出
来る。また、作業構台のトンネル施工方向に貫通した空
間にトラックミキサー等のコンクリート搬送手段を設け
ることが出来るので、コンクリートポンプを介して、コ
ンクリート吹付手段へのコンクリートの供給を継続的に
行なうことが出来る。よって、ずりの搬出作業と並行し
て、コンクリートの吹き付けを迅速に行なうことが出来
る。以上のことから、更にトンネル施工の一サイクルの
迅速化を図ることが出来るので、一層、工期の短縮を図
ることが出来る。
Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention can shorten the construction period.
Related to tunnel construction equipment . 2. Description of the Related Art With the shortage of skilled workers and the aging of construction workers, harsh working conditions are required especially in tunnel construction. For this reason, it is becoming difficult to secure workers in tunnel construction. In order to make tunnel construction in this harsh working environment attractive, it is necessary to increase the size of the machinery,
Labor saving is required. Therefore, in recent years, a multifunctional work gantry (gantry jumbo) has been proposed.
This is a tunnel construction device. [0003] Various types of tunnel construction devices have been proposed. Among them, rock drilling means for forming drilling holes in the face of the tunnel and rocks crushed by blasting are loaded into the tunnel. Some have a loading / unloading means for transporting to the side. In the construction of a tunnel by this tunnel construction device, first, a drilling hole for charging is formed on a face of the tunnel by rock drilling means, and the drilling is charged to crush the face. Next, the process of carrying out the shearing of the crushed face by the loading / unloading means to the loading pit side and then spraying concrete on the wall surface of the tunnel to perform lining is repeated. [0004] However, in recent years, increasingly,
There is a strong demand for shortening the construction period, and a tunnel construction method and a tunnel construction apparatus capable of further shortening the construction period are required. However, in the tunnel construction method and the tunnel construction apparatus as described above, it is difficult to further shorten the construction period. [0005] In view of the above circumstances, an object of the present invention is to provide a tunnel construction apparatus capable of further shortening the construction period. [0007] A tunnel construction apparatus according to the present invention has a work gantry, and the work gantry includes rock drilling means for drilling a hole in a face of the tunnel. A concrete spraying means for spraying concrete on a wall surface of the tunnel, a transport conveyor penetrating through the work gantry, and a loading means for loading a shear of the cutting face of the tunnel onto the transport conveyor. And Particularly, in the tunnel construction apparatus of the present invention,
The work gantry is formed in a gate shape having a space penetrating in the tunnel construction direction, the work gantry is provided with traveling means, and the work gantry is provided with a work cage movably in the tunnel construction direction. The rock drilling means is provided so as to be movable in the tunnel construction direction with respect to the work gantry, and the concrete spraying means includes a concrete spraying nozzle portion and a concrete spraying nozzle portion along the wall surface of the tunnel. Moving drive means for moving and moving, the concrete spraying means is provided movably in the tunnel construction direction with respect to the work gantry, a concrete pump is provided on the space side of the work gantry,
The concrete pump is connected to the concrete spraying means, the loading means includes a loading conveyor, and a scraping means for scraping a shear into the loading conveyor, and the loading means is mounted on the work gantry. On the other hand, it is provided so as to be movable in the tunnel construction direction and to be pivotable. According to the tunnel construction apparatus of the present invention, since the shearing-out step and the lining step are performed in parallel, one cycle of the tunnel construction can be speeded up. That is, according to the tunnel construction apparatus of the present invention, when the work gantry is installed facing the face of the tunnel,
Since drilling holes can be formed in the face by the rock drilling means, charging can be performed easily and quickly. next,
Since the shears of the cutting face crushed by the blasting can be loaded on the conveyor by the loading means, the transport of the shears can be performed easily and quickly. In addition, since the work gantry is provided with concrete spraying means, lining can be performed by spraying concrete on the wall surface of the tunnel face in parallel with carrying out the shear. In particular, according to the tunnel construction apparatus of the present invention, the work gantry can be easily and quickly moved to the face of the tunnel by the traveling means. Then, after the rock drilling means is moved toward the face to form a hole in the face, the work cage is moved toward the face, and charging is performed from the work cage, thereby facilitating the charging operation easily and quickly. You can do it. Next, when the face is crushed by blasting, the work gantry is provided so as to be freely movable, so that the work gantry can be easily and quickly retracted to the wellhead side. After the face was crushed, move the work gantry to the face again,
Shears crushed by the loading means can be loaded on the conveyor. At this time, the loading means is movable and pivotable in the tunnel construction direction, so that the loading of the shear can be performed easily and quickly. The conveyor can carry the shear to the wellhead side. Further, since the work gantry is formed in a portal shape having a space penetrating in the tunnel construction direction, a concrete conveying means such as a truck mixer can be provided in this space. Therefore, the concrete can be continuously supplied to the concrete spraying means via the concrete pump, so that the concrete can be quickly sprayed in parallel with the work of carrying out the shear. An embodiment of the present invention will be described below with reference to the drawings. As shown in FIG. 1, a tunnel construction device 100 is provided in the tunnel 1 under construction. The tunnel construction device 100 is provided on both sides of the tunnel 1 in the tunnel construction direction, that is, the arrow A in FIG. , B in the direction B. A work gantry 10 is provided on the rails 2 and 2, and the work gantry 10 includes a traveling device 11. The work gantry 10 can travel on the rails 2 and 2 by the traveling device 11. The work gantry 10 is formed in a portal shape having a space S1 shown in FIG. 2 that penetrates in the tunnel construction direction, that is, the work gantry 10 has a stage 12 and a lower part from the left and right ends of the stage 12 in FIG. Plural columns 13 provided in
FIG. 1 is provided at the lower ends of the plurality of columns 13 on the left side of FIG. 2 and the lower ends of the plurality of columns 13 on the right side of FIG. 2 along the tunnel construction direction, and the traveling device 11 is provided.
And a frame 14 shown in FIG. Also, frame 1
4 is provided with a plurality of outriggers 15. As shown in FIG. 2, a traveling rail 25 is laid in the center of the work gantry 10 on the stage 12 in the tunnel construction direction, and a concrete spraying machine 20 is mounted on the traveling rail 25. 25 are provided so as to be able to travel freely. As shown in FIG. 1, the concrete spraying machine 20 includes an arm 23 provided toward the face 1 b of the tunnel 1, and a wall 1 a of the tunnel 1
And a spray manipulator 22 provided on the arm 23 for driving the concrete spray nozzle 21 to move along the wall surface 1a of the tunnel 1. A concrete pump 26 is provided on the space S1 side of one of the frames 14 of the work gantry 10, and the concrete pump 26 supplies the concrete to the concrete spraying machine 20 via a concrete pumping pipe (not shown). Connected. In the space S1 of the work gantry 10, a truck mixer 27 for supplying concrete to the concrete pump 26 is stopped. As shown in FIG. 2, on both sides of the concrete spraying machine 20 on the stage 12 of the work gantry 10, running rails 35 are respectively laid in the tunnel construction direction. , A hydraulic rock drill 30 is provided so as to be able to travel along a traveling rail 35, and the hydraulic rock drill 30 directs its bit (blade) 31 shown in FIG. Is provided. As shown in FIG. 2, on the stage 12 of the work gantry 10, on both sides of the hydraulic rock drills 30, 30,
Each of the traveling rails 45 is laid in the tunnel construction direction.
Are provided to be able to travel along the traveling rail 45,
The work cage device 40 includes a work cage 41 shown in FIG.
An arm device 42 projects the work cage 41 toward the face 1b of the tunnel 1 and drives the work cage 41 to move up and down. As shown in FIG. 3, the space S of the work gantry 10
1 are respectively provided on both sides of the transport conveyor 50 in FIG.
As shown in (1), it is provided in the tunnel construction direction so as to be supported by the frame 14 and the column 13, and the transport conveyor 50 is installed so that the wellhead side is higher. A heavy dump truck 51 is waiting below the wellhead end of the conveyor 50. As shown in FIG. 2, a traveling rail 65 is laid in the tunnel construction direction on the lower surface of the stage 12 of the work gantry 10 on both sides of the space S1 and on the side of the face 1b in FIG. 65 is a shear loading device 60 for loading the shear 1c of the face 1b of the tunnel 1 on the transport conveyor 50.
Are suspended along the traveling rail 65 so as to be able to travel freely. The shear loading device 60 has a traveling device 61 suspended from a traveling rail 65. The traveling device 61 is provided with a turning device 63 for turning an arm 62 in a horizontal direction. The arm 62 has a loading conveyor 64
Is provided facing the face 1b, and the loading conveyor 6
4 is located directly above the end of the conveyor 50 on the side of the cutting face 1b. The arm 62 is provided with a scraping device 66 for scraping the shears 1c into the loading conveyor 64 in front of the end of the loading conveyor 64 on the side of the cutting face 1b. As shown in FIG. 7, the sliding guide plate 66a includes a shear guide plate 66a and a scraping arm 66b provided on the shear guide plate 66a and for scraping the shear 1c on the shear guide plate 66a toward the loading conveyor 64. Also, on the face 1b side of the tunnel 1, FIG.
As shown in FIG. 1, a loading auxiliary machine 70 for loading the shears 1c into the shear loading device 60 is provided. Since the tunnel construction apparatus 100 and the like have the above-described configuration, when constructing the tunnel 1, first, the work gantry 10 is moved toward the face 1b of the tunnel 1 (in the direction of arrow A in FIG. 1). It is positioned at a position having a predetermined distance from the cutting face 1b. At this time, the work gantry 10 is moved by the traveling device 11 in a tunnel construction direction (arrows A and B directions).
Since it is provided so that it can run freely, its movement and positioning can be moved easily and quickly. Further, by lowering the outrigger 15 to the bottom of the tunnel 1, the work gantry 10 can be fixed at that position. Next, the hydraulic rock drills 30, 30 provided on the stage 12 of the work gantry 10 are moved toward the face 1b (in the direction of arrow A), and a plurality of holes are drilled in the face 1b by the bits 31. To form Drilling can be easily and quickly formed by the hydraulic rock drills 30,30. When the drilling is formed, the hydraulic rock drills 30, 30 are returned to the wellhead side (the direction of arrow B). This is to ensure a wide working space between the work gantry 10 and the face 1b. Next, the work cages 41, 4 of the work cage devices 40, 40 provided next to the hydraulic rock drills 30, 30 are provided.
1 and the work cage devices 40, 40
Move to the b side (direction of arrow A). Then, the work cage 41 of each work cage device 40 can be made to approach the hole formed in the face 1b. Therefore, this work cage 4
1 to charge the drilling. Therefore, the charging operation can be performed easily and quickly. When charging is completed, the working cage devices 40, 40 are returned to the wellhead side (the direction of the arrow B). Next, when crushing a face by blasting,
The work gantry 10 is retracted toward the wellhead (in the direction of arrow B). At this time, since the work gantry 10 can freely move, the evacuation can be easily and quickly performed. After the face 1b is crushed, an operation for repairing the shape of the wall surface 1a of the tunnel 1 by dropping a floating stone or the like is performed. When the work is completed, the work cage devices 40, 40 are returned to the wellhead side (arrow B direction). In addition, in order to prevent collapse, tunnel 1
The wall 1a and the face 1b are supported and the wire mesh is attached. Next, the shear loading device 60 is driven to load the crushed waste 1c on the transport conveyor 50. The shear loading device 60 is movable in the tunnel construction direction (directions of arrows A and B) and is pivotable.
The shear 1c can be scooped by freely moving the shear guide plate 66a shown in FIG. 1, and the shear 1c scooped by the guide plate 66a is transferred to the loading conveyor 64 by a scraping arm 66b provided on the guide plate 66a. Can be placed.
As such, as shown in FIG.
Thus, the shears 1c can be loaded on the transport conveyor 50. Therefore, since the shears 1c can be loaded by the shear loading device 60, the loading of the shears 1c can be performed easily and quickly. Further, a loading auxiliary machine 70 moved through the space S1 penetrated by the work gantry 10 is provided between the work gantry 10 and the face 1b, and the loading assist machine 70 assists loading of the shears 1c. , Can be more easily and quickly loaded. The transport conveyor 50 can transport the loaded waste 1c toward the wellhead (in the direction of arrow B). A heavy dump truck 51 is waiting below the wellhead end of the conveyor 50, and the slip 1 c is loaded on the heavy dump truck 51. Therefore, the transport conveyor 50 and the heavy dump truck 51 cause the shear 1c.
Can be carried out. In addition, the concrete spraying machine 20 provided on the stage 12 of the work gantry 10 is moved toward the face 1b (in the direction of arrow A) in parallel with the work of unloading the shears 1c.
Concrete is sprayed from the concrete spray nozzle 21 onto the wall surface 1a of the tunnel 1 to perform lining. At this time, the concrete spray nozzle 21 is movable in the tunnel construction direction (directions of arrows A and B) and is movable along the wall surface 1a by the spray manipulator 22, so that the lining work can be performed easily and quickly. Can be done. Since the work gantry 10 is formed in a portal shape having a space S1 penetrating in the tunnel construction direction (directions of arrows A and B), it is necessary to provide a concrete conveying means such as a truck mixer 27 in this space S1. Can be done.
Therefore, the concrete can be continuously supplied to the concrete spraying machine 20 via the concrete pump 26 provided on the space S1 side of the frame 11. Therefore, in parallel with the work of carrying out the shears 1c, the lining by spraying the concrete can be quickly performed. Therefore, as in the conventional case, after waiting for the work of unloading the shears 1c,
One cycle of tunnel construction can be performed more quickly than when performing concrete spraying work. After the concrete spraying operation, the worker is again put on the work cages 41, 41 and the work cage devices 40, 40 are moved toward the face 1b (in the direction of arrow A). Then, since the lock bolt can be mounted on the lining from the work cage 41 of each work cage device 40, the work of mounting the lock bolt can be performed easily and quickly. The tunnel construction apparatus 100 can construct the tunnel 1 by repeating the above steps. Therefore, according to the tunnel construction of the above embodiment, one cycle can be speeded up by speeding up each process and paralleling the shearing-out process and the lining process, thereby further shortening the construction period. I can do it. In the above embodiment, the hydraulic rock drill 3
Although 0 is provided, it is needless to say that any rock drill can be used as long as a drill can be formed. According to the tunnel construction apparatus of the present invention, one cycle of tunnel construction can be speeded up, so that the construction period can be shortened. That is, according to the tunnel construction apparatus of the present invention, since the concrete blasting means is provided together with the loading means for loading the work gantry and the conveyor, the concrete is provided on the wall surface of the tunnel face in parallel with the carry-out of the shear. Can be applied by spraying. Therefore, one cycle of the tunnel construction can be speeded up, and the construction period can be shortened. In particular, according to the tunnel construction apparatus of the present invention, the work gantry can be easily and quickly moved to the face of the tunnel by the traveling means, and the rock drilling means is moved toward the face to drill holes in the face. Is formed, the work cage is moved toward the face, and the work is charged from the work cage, whereby the charging operation can be performed easily and quickly. Further, when the face is crushed by blasting, the work gantry is provided so as to be freely movable, so that the work gantry can be easily and quickly retracted to the wellhead side. Further, since the loading means is provided so as to be movable and pivotable in the tunnel construction direction, the loading of the shear can be performed easily and quickly. In addition, since concrete conveying means such as a truck mixer can be provided in a space penetrating the work gantry in the tunnel construction direction, the concrete can be continuously supplied to the concrete spraying means via the concrete pump. Therefore, the concrete can be quickly sprayed in parallel with the work of carrying out the shear. From the above, one cycle of the tunnel construction can be further speeded up, so that the construction period can be further shortened.

【図面の簡単な説明】 【図1】 本発明のトンネル施工装置の一実施例を示す
図である。 【図2】 図1のトンネル施工装置を切羽側から見た図
である。 【図3】 図1のトンネル施工装置を坑口側から見た図
である。 【符号の説明】 1…トンネル 1a…壁面 1b…切羽 1c…ずり 2…レール(走行手段) 10…作業構台 11…走行装置(走行手段) 20…コンクリート吹付機(コンクリート吹付手段) 21…コンクリート吹付ノズル(コンクリート吹付ノズ
ル部) 22…吹付マニュピレータ(移動駆動手段) 23…アーム(移動駆動手段) 26…コンクリートポンプ 30…油圧削岩機(削岩手段) 41…作業ケージ 50…搬送コンベア 60…ずり積込装置(積込手段) 64…積込コンベア 66…掻込装置(掻込手段) 100…トンネル施工装置 S1…空間
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a view showing one embodiment of a tunnel construction device of the present invention. FIG. 2 is a view of the tunnel construction apparatus of FIG. 1 as viewed from a face side. FIG. 3 is a view of the tunnel construction apparatus of FIG. 1 as viewed from a wellhead side. DESCRIPTION OF SYMBOLS 1 ... Tunnel 1a ... Wall surface 1b ... Face 1c ... Shear 2 ... Rail (running means) 10 ... Work gantry 11 ... Running device (running means) 20 ... Concrete spraying machine (concrete spraying means) 21 ... Concrete spraying Nozzle (concrete spray nozzle part) 22 ... spray manipulator (moving drive means) 23 ... arm (moving drive means) 26 ... concrete pump 30 ... hydraulic rock drilling machine (rock drilling means) 41 ... working cage 50 ... transport conveyor 60 ... shear Loading device (loading means) 64 Loading conveyor 66 Raising device (raising means) 100 Tunnel construction device S1 Space

フロントページの続き (72)発明者 岩城 修一 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 古賀 雄三 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 和田 利彦 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 小原 由幸 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 川端 常和 群馬県多野郡吉井町吉井1058 古河機械 金属株式会社内 (72)発明者 石川 靖男 東京都北区西ケ原1−27−3 古河ドリ ルテック株式会社内 (56)参考文献 特公 平6−33718(JP,B2) 特公 平2−29160(JP,B2) (58)調査した分野(Int.Cl.7,DB名) E21D 9/00 E21D 9/10 E21D 9/12 E21B 7/02 (72) Inventor Shuichi Iwaki 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Yuzo Koga 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation In-company (72) Inventor Toshihiko Wada 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Yoshiyuki Ohara 1-2-3 Shibaura, Minato-ku, Tokyo Shimizu Corporation (72) Inventor Tsunewa Kawabata 1058 Yoshii-cho, Yoshii-machi, Tano-gun, Gunma Prefecture Inside Furukawa Kikai Metal Co., Ltd. (72) Inventor Yasuo Ishikawa 1-27-3 Nishigahara, Kita-ku, Tokyo Inside Furukawa Drill Tech Co., Ltd. (56) References Japanese Patent Publication No. 6-33718 (JP, B2) Japanese Patent Publication No. 2-29160 (JP, B2) (58) Fields investigated (Int. Cl. 7 , DB name) E21D 9/00 E21D 9/10 E21D 9/12 E21B 7/02

Claims (1)

(57)【特許請求の範囲】 【請求項1】 作業構台を有し、 前記作業構台には、トンネルの切羽に削孔を穿設形成す
る削岩手段と、前記トンネルの壁面にコンクリートを吹
き付けるコンクリート吹付手段と、前記作業構台を貫通
する搬送コンべアと、前記トンネルの切羽のずりを前記
搬送コンベアに積み込む積込手段とが設けられている
ンネル施工装置であって、 前記作業構台は、トンネル施工方向に貫通した空間を有
する門型に形成され、 前記作業構台は、走行手段を備え、 前記作業構台には、作業ケージが前記トンネル施工方向
に移動自在に設けられ、 前記削岩手段は、前記作業構台に対して前記トンネル施
工方向に移動自在に設けられ、 前記コンクリート吹付手段は、コンクリート吹付ノズル
部と、該コンクリート吹付ノズル部を前記トンネルの壁
面に沿って移動駆動させる移動駆動手段とを備え、 前記コンクリート吹付手段は、前記作業構台に対して前
記トンネル施工方向に移動自在に設けられ、 前記作業構台の前記空間側にコンクリートポンプが設け
られ、 前記コンクリートポンプは、前記コンクリート吹付手段
に接続され、 前記積込手段は、積込コンベアと、該積込コンベアにず
りを掻き込む掻込手段とを備え、 前記積込手段は、前記作業構台に対して前記トンネル施
工方向に移動自在に設けられ、且つ、旋回自在に設けら
れていることを特徴とするトンネル施工装置。
(57) [Claim 1] A work gantry, a rock drilling means for forming a hole in a face of a tunnel, and a concrete spraying on a wall surface of the tunnel. A concrete spraying means, a transport conveyor penetrating the work gantry, and a loading means for loading the shear of the face of the tunnel onto the transport conveyor .
In the tunnel construction device, the work gantry is formed in a portal shape having a space penetrating in a tunnel construction direction, the work gantry includes a traveling unit, and the work gantry has a work cage in the tunnel construction direction. The rock drilling means is movably provided in the tunnel construction direction with respect to the work gantry, The concrete spraying means includes a concrete spraying nozzle portion, and the concrete spraying nozzle portion is provided in the tunnel. A moving drive means for moving and driving along the wall of the concrete blasting means, the concrete spraying means is provided movably in the tunnel construction direction with respect to the work gantry, and a concrete pump is provided on the space side of the work gantry. The concrete pump is connected to the concrete spraying means, and the loading means comprises a loading conveyor Scraping means for scraping the shears into the loading conveyor, wherein the loading means is provided movably in the tunnel construction direction with respect to the work gantry, and is provided so as to be pivotable. Characteristic tunnel construction equipment.
JP21159594A 1994-09-05 1994-09-05 Tunnel construction equipment Expired - Fee Related JP3438208B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21159594A JP3438208B2 (en) 1994-09-05 1994-09-05 Tunnel construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21159594A JP3438208B2 (en) 1994-09-05 1994-09-05 Tunnel construction equipment

Publications (2)

Publication Number Publication Date
JPH0882184A JPH0882184A (en) 1996-03-26
JP3438208B2 true JP3438208B2 (en) 2003-08-18

Family

ID=16608371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21159594A Expired - Fee Related JP3438208B2 (en) 1994-09-05 1994-09-05 Tunnel construction equipment

Country Status (1)

Country Link
JP (1) JP3438208B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723455B (en) * 2019-03-06 2024-03-08 中国铁建重工集团股份有限公司 Quick change system for tunnel defect operation unit

Also Published As

Publication number Publication date
JPH0882184A (en) 1996-03-26

Similar Documents

Publication Publication Date Title
CN104564050B (en) Equipment for heading and anchoring parallel operation construction
CN101169036B (en) Pedrail type lifting top slope anchor shaft anchor cable construction drilling machine and single-alley fast tunneling technique
CN107060795A (en) A kind of underground mine TBM assembly construction methods
CN109630123B (en) Rock tunneller for deep shaft
JP3438208B2 (en) Tunnel construction equipment
CN113374480B (en) Well unloading process for shaft boring machine well drilling equipment
JP3441016B2 (en) Tunnel construction equipment
JP3831900B2 (en) Tunnel construction method
JP2797244B2 (en) Shaft excavation device and shaft construction method
CN217080322U (en) Rotary drilling rig
CN216198102U (en) Portal frame type arch frame transportation structure and tunnel construction device
JPH0626297A (en) Tunnel drilling method
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
JP2767231B2 (en) Tunnel excavation method
JP2898818B2 (en) Tunnel construction method
JP2996096B2 (en) Large section tunnel excavator
CN114233355A (en) Tunneling roadway rapid supporting equipment and working method thereof
JP2618798B2 (en) Multi-function excavator
JP2762140B2 (en) Construction method of underground continuous wall based on underground tunnel
JP2854227B2 (en) Form-mounted gantry jumbo
JP7503355B2 (en) Tunnel construction method
JP7503354B2 (en) Tunnel construction method
JP7503356B2 (en) Tunnel construction method
JP3543633B2 (en) Tunnel drilling rig
JPH03233098A (en) Method and device for installation of precast concrete plate for tunnel

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20030422

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080613

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090613

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees