Reinforcing unit and method of constructing reinforced concrete building using the same

Info

Publication number
JP3281972B2
JP3281972B2 JP21413094A JP21413094A JP3281972B2 JP 3281972 B2 JP3281972 B2 JP 3281972B2 JP 21413094 A JP21413094 A JP 21413094A JP 21413094 A JP21413094 A JP 21413094A JP 3281972 B2 JP3281972 B2 JP 3281972B2
Authority
JP
Japan
Prior art keywords
floor
wall
unit
support
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP21413094A
Other languages
Japanese (ja)
Other versions
JPH0874381A (en
Inventor
正喜 渡辺
利之 鞍橋
喜久 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP21413094A priority Critical patent/JP3281972B2/en
Publication of JPH0874381A publication Critical patent/JPH0874381A/en
Application granted granted Critical
Publication of JP3281972B2 publication Critical patent/JP3281972B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Reinforcement Elements For Buildings (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、鉄筋コンクリート造建
築物の施工に用いる鉄筋ユニットおよびそれを用いた施
工方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a reinforcing bar unit for use in the construction of a reinforced concrete building and a construction method using the same.

【0002】[0002]

【従来の技術】近年、耐震性に優れる鉄筋コンクリート
造の高層ビルの構造形式としてコアウォール型と称され
るものが検討されつつある。これは、建築物の中心部に
例えば厚みが500mmにも及ぶような鉄筋コンクリー
ト造の高剛性の耐震壁(コアウォール)によってコア部
を設け、そのコア部の内外にコアウォールから支持する
形態で各階の床スラブを形成するというものである。
2. Description of the Related Art In recent years, what is called a core wall type is being studied as a structural type of a reinforced concrete high-rise building having excellent earthquake resistance. This is because a core is provided at the center of a building by a reinforced concrete high-rigidity earthquake-resistant wall (core wall) having a thickness of, for example, 500 mm, and each floor is supported inside and outside the core from the core wall. To form a floor slab.

【0003】[0003]

【発明が解決しようとする課題】ところで、上記のよう
なコアウォール型の建築物を施工するに際しては、コア
ウォールの壁厚が従来一般の建築物における壁に比して
格段に大きいこと、それに伴って壁鉄筋量も膨大になる
こと、また、コアウォールのコンクリート強度は床に比
して大きく設定されること、等の理由から、従来一般の
鉄筋コンクリート造の施工方法、すなわち、各階の床と
壁とを同時に施工していくという手法をそのまま採用す
ることはできず、そのような形態の建築物を施工するた
めの有効な手段の開発が急務とされていた。
However, when constructing a core-wall type building as described above, the wall thickness of the core wall is much larger than that of a conventional general building. Along with this, the amount of wall reinforcement also becomes enormous, and the concrete strength of the core wall is set to be larger than that of the floor. The technique of simultaneously constructing a wall cannot be adopted as it is, and there is an urgent need to develop an effective means for constructing such a building.

【0004】[0004]

【課題を解決するための手段】上記事情に鑑み、本発明
の鉄筋ユニットは、例えばコアウォール型建築物を施工
する際に用いて好適な壁用の鉄筋ユニットであって、縦
筋および横筋とを格子状に組み立ててなるユニット本体
に、床型枠を支持するとともに壁型枠の一部となる支持
具を床との接合部の位置に取り付けてなることを特徴と
するものである。本発明の鉄筋ユニットにおける支持具
はこの鉄筋ユニットを吊り上げる際の治具を兼ねること
が好ましく、また、その支持具にコンクリート中に埋設
されて当該支持具とコンクリートとを一体化せしめる定
着具を取り付けることが好ましく、さらに、その支持具
に床配筋の一部を取り付けるようにすることが好まし
い。
SUMMARY OF THE INVENTION In view of the above circumstances, the reinforcing bar unit of the present invention is a wall reinforcing bar unit suitable for use, for example, when constructing a core wall type building. Are supported in a unit body constructed in a lattice shape, and a support tool that supports the floor formwork and is a part of the wall formwork is attached to the position of the joint with the floor. The support in the rebar unit of the present invention is preferably used also as a jig for lifting the rebar unit, and a fixing device embedded in the concrete and integrated with the support and the concrete is attached to the support. It is preferable that a part of the floor reinforcement is attached to the support.

【0005】また、本発明の施工方法は、上記の鉄筋ユ
ニットを用いて例えばコアウォール型建築物を施工する
に際し、前記鉄筋ユニットを壁形成位置に建て込んで壁
コンクリートを打設することにより壁を床に先行して形
成した後、該鉄筋ユニットにおける支持具に床型枠を支
持してそれを敷設し、床配筋の後に床コンクリートを打
設して床を形成することを特徴とするものである。
In the construction method of the present invention, when, for example, a core wall type building is constructed using the above-described rebar unit, the rebar unit is erected at a wall forming position and wall concrete is poured into the wall. After the floor is formed in advance, the floor form is supported on the support in the reinforcing bar unit, and the floor form is laid, and after the floor reinforcement, the floor concrete is cast to form the floor. Things.

【0006】[0006]

【作用】本発明の鉄筋ユニットは、壁を形成するべき位
置に一括して建て込まれ、その周囲に適宜の壁型枠が取
り付けられ、その内部に壁コンクリートが打設されるこ
とで壁を形成するものである。鉄筋ユニットに予め取り
付けられている支持具は壁打継部における壁型枠となる
ので、当該部分における面倒な型枠組み立て作業が不要
である。また、床型枠を支持具に支持して敷設すること
により床型枠の敷設作業の簡略化が図られる。さらに、
鉄筋ユニットの揚重の際には支持具を吊り治具として兼
用可能であり、支持具に定着具を取り付けておきかつ支
持具に床配筋を行なうことにより壁コンクリートと床コ
ンクリートとの一体化が図られる。
The rebar unit of the present invention is erected collectively at a position where a wall is to be formed, an appropriate wall form is attached around the unit, and wall concrete is poured into the interior to form the wall. To form. Since the support tool attached to the reinforcing bar unit in advance serves as a wall formwork at the wall joint, a troublesome work of assembling the formwork at that portion is unnecessary. In addition, by laying the floor form while supporting it with the support, the work of laying the floor form can be simplified. further,
When lifting the rebar unit, the support can also be used as a hanging jig. The fixing fixture is attached to the support and the floor is arranged on the support to integrate the wall concrete and floor concrete. Is achieved.

【0007】また、本発明の施工方法では、上記の鉄筋
ユニットを用いて壁を施工した後に、床を施工する。つ
まり、壁の先行施工を行なうものであり、以て、例えば
コアウォールの如き壁厚が十分に大きくかつコンクリー
ト強度が床に比して高く設定されるような壁の施工を合
理的に行ない得る。
According to the construction method of the present invention, a floor is constructed after a wall is constructed using the above-mentioned reinforcing bar unit. In other words, the pre-construction of the wall is performed, and thus the construction of the wall such as a core wall whose wall thickness is sufficiently large and the concrete strength is set higher than the floor can be rationally performed. .

【0008】[0008]

【実施例】以下、本発明の実施例を説明する。まず、図
1〜図4を参照して鉄筋ユニットについて説明する。本
実施例の鉄筋ユニット1は例えばコアウォール等の厚み
が500mm程度の壁を形成するために用いられるもの
で、例えばD29〜D38程度の縦筋2…とD19〜D
25程度の横筋3…とを番線により連結あるいは溶接し
て格子状のユニット本体4を形成し、2面のユニット本
体4,4を所定寸法離間させて対向配置して一体化し、
それらの上部所定位置に支持具5を取り付けた構成のも
のである。
Embodiments of the present invention will be described below. First, the rebar unit will be described with reference to FIGS. The rebar unit 1 of the present embodiment is used to form a wall having a thickness of, for example, about 500 mm such as a core wall, and for example, the vertical rebars 2 of about D29 to D38 and D19 to D
25 or more horizontal streaks 3 are connected or welded by a number line to form a lattice-shaped unit main body 4, and the two unit main bodies 4, 4 are arranged facing each other with a predetermined distance therebetween, and integrated.
This is a configuration in which the support tool 5 is attached to a predetermined position on the upper part.

【0009】支持具5は壁型枠の一部となるとともに、
この鉄筋ユニット1を挟んでその両側に形成される床を
施工する際にそれらの床型枠を支持するためのものであ
り、しかも、この鉄筋ユニット1を揚重する際の吊り治
具を兼ねるものである。
The support 5 becomes a part of the wall formwork,
This is to support the floor formwork when constructing floors formed on both sides of the reinforcing bar unit 1 and also serves as a suspending jig for lifting the reinforcing bar unit 1. Things.

【0010】この支持具5は、図2および図3に示すよ
うに、いずれも鋼材により形成された左右一対の側板
6,6と、それら側板6,6どうしを連結している連結
板7…からなる。側板6,6は壁コンクリートを打設す
る際に壁型枠Fに連続して打継部の壁型枠となるもので
あり、それら側板6,6の外面側にはそれぞれ床型枠と
して用いられるデッキプレートPを支持するための支持
部6a,6aが突出して設けられている。また、連結板
7は両側板6,6の間に所定間隔おきに設けられてそれ
ら側板6,6どうしを連結しており、これら連結板7…
に所定の横筋3,3が連結固定されることで支持具5全
体がユニット本体4,4に取り付けられ、かつ、連結板
7に設けられているリング8を用いてこの支持具5を介
して鉄筋ユニット1全体をクレーンにより吊り上げられ
るようになっている。
As shown in FIGS. 2 and 3, the support 5 has a pair of left and right side plates 6, 6 each formed of a steel material, and a connecting plate 7 for connecting the side plates 6, 6 to each other. Consists of The side plates 6 and 6 are used as a wall form of a joint part continuously to the wall form F when the wall concrete is cast. The outer side of the side plates 6 and 6 is used as a floor form. Support portions 6a, 6a for supporting the deck plate P to be provided are provided to protrude. The connecting plates 7 are provided at predetermined intervals between the side plates 6 and 6 to connect the side plates 6 and 6 to each other.
Is fixed to the unit main bodies 4 and 4 by connecting and fixing the predetermined horizontal streaks 3 and 3 to the unit main body 4 and 4, and using the ring 8 provided on the connecting plate 7 through the support 5 The entire rebar unit 1 can be lifted by a crane.

【0011】また、支持具5の内側には壁と床のコンク
リートを強固に一体化するために床鉄筋の一部であるス
ラブ差し筋9が配筋されるようになっており、側板6に
はその差し筋9を差し込むための差し筋挿通孔10が形
成されている。また、側板6の内外両面には壁および床
のコンクリートに対する支持具5の定着を強化するため
の定着具11が取り付けられている。本実施例では定着
具11として例えばD16程度の鉄筋を短く切断したも
のを側板6に溶接して用いているが、例えばスタッド等
を用いても勿論良い。
A slab reinforcing bar 9, which is a part of a floor reinforcing bar, is arranged inside the support 5 in order to firmly integrate the concrete of the wall and the floor. Has an insertion hole 10 for inserting the insertion line 9. A fixing device 11 for strengthening the fixing of the support 5 to the concrete on the wall and floor is attached to both the inner and outer surfaces of the side plate 6. In this embodiment, a fixing tool 11 obtained by cutting a short reinforcing bar of, for example, about D16 and welding it to the side plate 6 is used, but, for example, a stud or the like may be used.

【0012】なお、支持具5の各部の形状や寸法はユニ
ット本体4の形状や寸法、この鉄筋ユニット1を用いて
構築される壁や床等の設計条件に対応して決定されるも
のである。本実施例においては、一方(図3において右
側)の側板6としてL型鋼を用いてその下部をそのまま
支持部6aとし、他方(同、左側)の側板6としては帯
鋼板を用いてその表面に固定したアングル材を支持部6
aとし、かつ、両側の床レベルに対応して双方の支持部
6a,6aのレベルに差をつけているが、これは設計条
件に対応した一例であって支持具5の具体的な構成はこ
れに限るものでは勿論ない。
The shape and size of each part of the support 5 are determined according to the shape and size of the unit body 4 and the design conditions of the wall and floor constructed using the reinforcing bar unit 1. . In this embodiment, an L-shaped steel is used as one (the right side in FIG. 3) side plate 6 and its lower part is used as the supporting portion 6a, and the other (the same as the left side) side plate 6 is made of a strip steel plate. Fix the fixed angle material to the supporting part 6
a, and the level of both support portions 6a, 6a is made different according to the floor level on both sides, but this is an example corresponding to the design conditions, and the specific configuration of the support 5 is Of course, it is not limited to this.

【0013】上記のような鉄筋ユニット1を組み立てる
には、図4に示すように、支柱12,12と横架材13
による仮設の地組構台14を設けて、予め製作した支持
具5を地組構台14の上部にほぼ水平に保持し、その支
持具5の内側に縦筋2…の上端部を通して仮連結するこ
とでそれらの転倒を防止しつつ、縦筋2…に対して横筋
3…を順次連結していって格子状に組み立てていけば良
い。
In order to assemble the reinforcing bar unit 1 as described above, as shown in FIG.
Is provided, and the support 5 manufactured in advance is held substantially horizontally on the upper part of the truss gantry 14, and is temporarily connected to the inside of the support 5 through the upper ends of the vertical streaks 2. It is sufficient to connect the horizontal stripes 3 to the vertical stripes 2 in order while preventing them from overturning, and assemble them in a lattice shape.

【0014】以上で鉄筋ユニット1について説明した
が、次に、それを用いた建築物の施工方法について図5
〜図10を参照して説明する。以下で説明する施工方法
はコアウォール型建築物の壁Wおよび床Sを施工するた
めのもので、所望の配筋の鉄筋ユニット1を地組してそ
れを揚重して設置位置に建て込み、壁型枠としてはセル
フクライミング式の移動型枠Fを用い、床型枠としては
デッキプレートPを用いることとし、壁Wを床Sに先行
して施工していくものである。
The rebar unit 1 has been described above. Next, a method of constructing a building using the rebar unit 1 will be described with reference to FIG.
This will be described with reference to FIGS. The construction method described below is for constructing a wall W and a floor S of a core wall type building. The reinforcement unit 1 having a desired arrangement of reinforcing bars is laid, lifted, and built at the installation position. The self-climbing movable form F is used as the wall form, the deck plate P is used as the floor form, and the wall W is constructed prior to the floor S.

【0015】図5はN階の壁Wの施工が完了した状態を
示す。この状態では壁型枠である移動型枠Fはまだ脱型
されておらず、上下の支持具5,5の間に残置されてい
る。壁Wの上部には鉄筋ユニット1の上端部が突出して
おり、また上階であるN+1階の床施工のための支持具
5およびスラブ差し筋9がこの壁Wの上端部に既に設け
られている。また、このN階の床の施工は完了しておら
ず、床型枠であるデッキプレートPの敷設と床鉄筋15
の配筋が完了しているのみで床コンクリートは未だ打設
されていない。
FIG. 5 shows a state where the construction of the wall W on the Nth floor is completed. In this state, the movable form F, which is a wall form, has not been removed yet, and is left between the upper and lower supports 5,5. The upper end of the reinforcing bar unit 1 protrudes from the upper portion of the wall W, and the support 5 and the slab reinforcement 9 for the floor construction on the (N + 1) th floor, which is the upper floor, are already provided at the upper end of the wall W. I have. In addition, the construction of the floor on the Nth floor is not completed.
Only the rebar arrangement has been completed, and the floor concrete has not been cast yet.

【0016】図5の状態からの施工手順を説明すると、
図6に示すように、N+1階の壁を形成するための鉄筋
ユニット1を地組してそれをクレーンにより揚重し、そ
の下端を施工済みのN階の壁Wの上部に突出している鉄
筋ユニット1の上端に溶接あるいは継手により接合す
る。
The construction procedure from the state of FIG. 5 will be described.
As shown in FIG. 6, a reinforcing bar unit 1 for forming a wall of the (N + 1) th floor is laid, lifted by a crane, and a lower end of which is protruded above a wall W of the completed Nth floor. It is joined to the upper end of the unit 1 by welding or a joint.

【0017】次いで、図7に示すように、移動型枠Fを
N階からN+1階に盛り替える。また、図8に示すよう
にN+1階の床を施工するための床型枠であるデッキプ
レートPをN階の壁Wの上端部の支持具5に支持して敷
設し、その上部に床鉄筋15を配筋する。また、N+2
階のスラブ差し筋9を支持具5に取り付ける。
Next, as shown in FIG. 7, the movable form F is changed from the Nth floor to the (N + 1) th floor. As shown in FIG. 8, a deck plate P, which is a floor formwork for constructing the floor on the (N + 1) th floor, is laid by supporting it on the support 5 at the upper end of the wall W on the Nth floor. Arrange 15 bars. Also, N + 2
The floor slab streaks 9 are attached to the support 5.

【0018】次いで、図9に示すように、N+1階の壁
コンクリートを打設すれば、このN+1階の壁Wが完了
する。この図9に示す状態は図5に示した状態と同様で
あり、以下、同様の手順を繰り返して各階の壁Wを施工
していき、各階の床はデッキプレートPの敷設と床鉄筋
15を配筋するに止めておく。
Next, as shown in FIG. 9, the wall concrete on the (N + 1) th floor is cast, and the wall W on the (N + 1) th floor is completed. The state shown in FIG. 9 is the same as the state shown in FIG. 5, and thereafter, the same procedure is repeated to construct the walls W of each floor, and the floor of each floor is constructed by laying the deck plate P and reinforcing the floor reinforcing bars 15. Stop arranging the bars.

【0019】そのようにして所定の階まで壁Wを施工し
たら、下階の所定の階において床コンクリートを打設し
てその階の床Sを施工する。図10はN+1階の壁コン
クリートを打設した時点でN階およびN+1階の床コン
クリートを打設して床Sを形成した状態を示している
が、一般には床コンクリート打設を壁コンクリート打設
より所定階数分遅れて実施するようにすれば良い。つま
り、N階の壁コンクリートを打設する際にはそれと同時
に例えば3階分下階であるN−3階の床コンクリートを
打設すれば良い。なお、壁Wの両側の床S,Sに対する
コンクリート打設は同時に実施することでも勿論良い
が、必要であればそれらの施工時期をずらすことでも良
く、例えばN階の壁コンクリートを打設する際にN−3
階において一方(例えばコアウォールの内側)の床コン
クリートを打設し、それと同時にN−6階において他方
(同、外側)の床コンクリートを打設するといったこと
が可能である。また、場合によっては複数階の床コンク
リートを同時に打設することでも良い。
After the wall W has been constructed to the predetermined floor in this way, floor concrete is cast on the predetermined floor below and the floor S of that floor is constructed. FIG. 10 shows a state in which the floor concrete on the Nth floor and the N + 1th floor is cast and the floor S is formed when the wall concrete on the (N + 1) th floor is cast. What is necessary is just to carry out more than predetermined floors later. That is, when the wall concrete on the Nth floor is cast, for example, the floor concrete on the N-3th floor, which is the lower floor for three floors, may be cast at the same time. It should be noted that the concrete placement on the floors S, S on both sides of the wall W may be carried out at the same time. However, if necessary, the construction time may be shifted, for example, when placing the N-th floor wall concrete. N-3
It is possible to cast one (for example, inside the core wall) of the floor concrete on the floor, and at the same time, to cast the other (the same, outside) of the floor concrete on the N-6 floor. Moreover, depending on the case, it is also possible to pour floor concrete of a plurality of floors simultaneously.

【0020】上記方法によれば、従来一般のように壁W
と床Sとを各階ごとに同時に施工するのではなく、壁W
を床Sより先行施工するので、コアウォール型建築物の
ような大きな壁厚の壁を有し、しかも壁Wのコンクリー
ト強度が床Sのコンクリート強度より大きく設定される
ような建築物を合理的に施工することができる。また、
壁鉄筋を地組して鉄筋ユニット1とし、これを支持具5
を介して一括して揚重して配筋位置に配置するようにし
たので、大径かつ多量の鉄筋を用いる場合であっても配
筋作業の手間を大きく削減できる。
According to the above method, the wall W
And floor S are not constructed at the same time for each floor.
Is constructed earlier than the floor S, so that a building having a large wall thickness such as a core wall type building and in which the concrete strength of the wall W is set to be larger than the concrete strength of the floor S is reasonable. Can be installed on Also,
Reinforcing the wall rebar into a rebar unit 1
, And are arranged at the bar arrangement position at a time, so that even when a large diameter and a large number of reinforcing bars are used, the labor of the bar arrangement work can be greatly reduced.

【0021】しかも、鉄筋ユニット1に設けた支持具5
により床型枠であるデッキプレートPの敷設作業の簡略
化が図られるのみならず、その支持具5は壁打継部の壁
型枠となるので壁型枠作業の簡略化を図ることができ、
さらに、支持具5に設けた定着具11およびスラブ差し
筋9により壁Wと床Sとの構造的な一体化を十分に図る
ことができる。
Moreover, the support 5 provided on the reinforcing bar unit 1
Not only simplifies the work of laying the deck plate P as the floor formwork, but also simplifies the work of the wall formwork because the support tool 5 serves as the wall formwork of the wall joint. ,
Further, the structural integration of the wall W and the floor S can be sufficiently achieved by the fixing tool 11 and the slab streaks 9 provided on the support tool 5.

【0022】なお、上述したように本発明の施工方法は
コアウォールの如き大壁厚の壁を有する建築物の施工に
採用して好適であるが、必ずしもそのような場合に限定
されるものではなく、他の形式の鉄筋コンクリート造建
築物を施工する際にも適用可能であり、その具体的な作
業手順も壁を床より先行施工する限りにおいて種々の設
計的な変更を任意に行ない得るものである。そして、例
えば上記実施例においてはセルフクライミン式の移動型
枠Fを用いるようにしたが、移動型枠に代えて一般の型
枠を採用することも可能であるし、床型枠としては支持
具5に支持できるものであればデッキプレートPに限ら
ず他の形式の床型枠を採用することも可能である。
As described above, the construction method of the present invention is suitable for construction of a building having a large wall thickness such as a core wall, but is not necessarily limited to such a case. It is also applicable to the construction of other types of reinforced concrete buildings, and the specific work procedure can be arbitrarily changed variously as long as the wall is pre-constructed from the floor. is there. For example, in the above-described embodiment, the self-climining movable form F is used. However, a general form can be used instead of the movable form, and the floor form is supported. Not limited to the deck plate P, any other type of floor form can be adopted as long as it can be supported by the tool 5.

【0023】[0023]

【発明の効果】以上で説明したように、本発明の鉄筋ユ
ニットは、縦筋と横筋とを格子状に組み立てたユニット
本体に床型枠を支持するとともに壁型枠の一部となる支
持具を取り付けた構成であるので、床型枠の敷設作業の
簡略化を図ることができるとともに、壁打継部の面倒な
型枠作業の簡略化を図ることができ、さらに、支持具を
吊り治具を兼ねるものとすれば揚重作業を容易に行なう
ことができ、支持具に定着具を設けておくとともにそこ
に床配筋を行なうことにより壁と床との構造的な一体化
を十分に図ることができる。
As described above, the reinforcing bar unit according to the present invention supports the floor form on the unit body in which the vertical and horizontal streaks are assembled in a lattice shape and becomes a part of the wall form. With this configuration, the work of laying the floor formwork can be simplified, and the troublesome work of the formwork of the wall joint can be simplified. If it also serves as a fixture, lifting work can be easily performed, and a fixing device is provided on the support and floor reinforcement is provided there, so that the structural integration of the wall and the floor is sufficient. Can be planned.

【0024】また、本発明の施工方法は、上記の鉄筋ユ
ニットを用いるので、大径かつ多量の鉄筋を用いる場合
であっても配筋作業の手間を大きく削減でき、また、床
型枠敷設作業の簡略化を実現でき、しかも、壁を床に先
行して施工するので、特にコアウォール型建築物のよう
な大きな壁厚の壁を有し、しかも壁のコンクリート強度
が床のコンクリート強度より大きく設定されるような建
築物を施工する際に採用して好適である。
Further, the construction method of the present invention uses the above-described reinforcing bar unit, so that even when a large diameter and a large amount of reinforcing bars are used, the labor for arranging the reinforcing bars can be greatly reduced, and the floor form laying operation can be performed. In addition, since the wall is constructed prior to the floor, the wall has a large wall thickness, such as a core wall type building, and the concrete strength of the wall is larger than the concrete strength of the floor. It is suitable to be adopted when constructing a building to be set.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施例である鉄筋ユニットを示す斜視
図である。
FIG. 1 is a perspective view showing a reinforcing bar unit according to an embodiment of the present invention.

【図2】同ユニットにおける支持具の部分拡大図であ
る。
FIG. 2 is a partially enlarged view of a support in the unit.

【図3】同支持具の拡大側面図である。FIG. 3 is an enlarged side view of the support.

【図4】同ユニットを地組している状態を示す図であ
る。
FIG. 4 is a diagram showing a state where the unit is grounded.

【図5】同ユニットを用いた施工手順を説明する図であ
って、N階の壁の施工が完了した状態を示す図である。
FIG. 5 is a view for explaining a construction procedure using the unit, and is a view showing a state in which construction of a wall on the Nth floor is completed.

【図6】同じく、N+1階に鉄筋ユニットを建て込んだ
状態を示す図である。
FIG. 6 is a view showing a state where a reinforcing bar unit is built on the (N + 1) th floor.

【図7】同じく、N+1階に移動型枠を盛り替えた状態
を示す図である。
FIG. 7 is a view showing a state in which a movable formwork is rearranged on the (N + 1) th floor.

【図8】同じく、N+1階のデッキプレートを敷設した
状態を示す図である。
FIG. 8 is a view showing a state where a deck plate on the (N + 1) th floor is laid.

【図9】同じく、N+1階の壁コンクリートを打設した
状態を示す図である。
FIG. 9 is a view showing a state where wall concrete on the (N + 1) th floor is cast.

【図10】同じく、床コンクリートを打設した状態を示
す図である。
FIG. 10 is a view showing a state in which floor concrete is cast.

【符号の説明】[Explanation of symbols]

W 壁 S 床 P デッキプレート(床型枠) F 移動型枠(壁型枠) 1 鉄筋ユニット 2 縦筋 3 横筋 4 ユニット本体 5 支持具 6 側板 6a 支持部 7 連結板 8 リング 9 スラブ差し筋(床鉄筋) 10 差し筋挿通孔 11 定着具。 W Wall S Floor P Deck plate (floor formwork) F Moving formwork (wall formwork) 1 Reinforcing bar unit 2 Vertical bar 3 Horizontal bar 4 Unit body 5 Supporting tool 6 Side plate 6a Supporting unit 7 Connecting plate 8 Ring 9 Slab stud ( Floor reinforcement) 10 Slit insertion hole 11 Fixing tool.

───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04C 5/04 E04G 11/06 E04G 11/38 E04B 2/84 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E04C 5/04 E04G 11/06 E04G 11/38 E04B 2/84

Claims (5)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 鉄筋コンクリート造建築物を施工する際
に用いる壁用の鉄筋ユニットであって、縦筋および横筋
とを格子状に組み立ててなるユニット本体に、床型枠を
支持するとともに壁型枠の一部となる支持具を床との接
合部の位置に取り付けてなることを特徴とする鉄筋ユニ
ット。
1. A wall rebar unit for use in constructing a reinforced concrete building, wherein a wall form is supported on a unit body formed by assembling vertical and horizontal rebars in a lattice shape. A support unit, which is a part of the rebar, is attached to a position of a joint with the floor.
【請求項2】 前記支持具はこの鉄筋ユニットを吊り上
げる際の治具を兼ねることを特徴とする請求項1記載の
鉄筋ユニット。
2. The rebar unit according to claim 1, wherein the support also serves as a jig for lifting the rebar unit.
【請求項3】 前記支持具にコンクリート中に埋設され
て当該支持具とコンクリートとを一体化せしめる定着具
を取り付けてなることを特徴とする請求項1または2記
載の鉄筋ユニット。
3. The rebar unit according to claim 1, wherein a fixing tool embedded in the concrete and integrated with the concrete is attached to the support tool.
【請求項4】 前記支持具に床配筋の一部を取り付ける
ことを特徴とする請求項1または2または3記載の鉄筋
ユニット。
4. The reinforcing bar unit according to claim 1, wherein a part of a floor reinforcing bar is attached to the support.
【請求項5】 請求項1〜4のいずれかに記載の鉄筋ユ
ニットを用いて鉄筋コンクリート造建築物を施工するに
際し、前記鉄筋ユニットを壁形成位置に建て込んで壁コ
ンクリートを打設することにより壁を床に先行して形成
した後、該鉄筋ユニットにおける支持具に床型枠を支持
してそれを敷設し、床配筋の後に床コンクリートを打設
して床を形成することを特徴とする鉄筋コンクリート造
建築物の施工方法。
5. When a reinforced concrete building is constructed using the reinforced unit according to claim 1, the reinforced concrete unit is erected at a wall forming position and wall concrete is poured into the reinforced concrete building. After the floor is formed in advance, the floor form is supported on the support in the reinforcing bar unit, and the floor form is laid, and after the floor reinforcement, the floor concrete is cast to form the floor. Construction method of reinforced concrete building.
JP21413094A 1994-09-07 1994-09-07 Reinforcing unit and method of constructing reinforced concrete building using the same Expired - Fee Related JP3281972B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP21413094A JP3281972B2 (en) 1994-09-07 1994-09-07 Reinforcing unit and method of constructing reinforced concrete building using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP21413094A JP3281972B2 (en) 1994-09-07 1994-09-07 Reinforcing unit and method of constructing reinforced concrete building using the same

Publications (2)

Publication Number Publication Date
JPH0874381A JPH0874381A (en) 1996-03-19
JP3281972B2 true JP3281972B2 (en) 2002-05-13

Family

ID=16650727

Family Applications (1)

Application Number Title Priority Date Filing Date
JP21413094A Expired - Fee Related JP3281972B2 (en) 1994-09-07 1994-09-07 Reinforcing unit and method of constructing reinforced concrete building using the same

Country Status (1)

Country Link
JP (1) JP3281972B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5944680B2 (en) * 2012-02-13 2016-07-05 株式会社熊谷組 Method for forming floor foundation for passage and formwork used therefor
JP7542522B2 (en) * 2018-08-07 2024-08-30 ジョン、クレメント、プレストン Method for constructing a multi-storey structure, facade and building
CN108979155A (en) * 2018-09-14 2018-12-11 中铁建设集团有限公司 A kind of construction operation platform

Also Published As

Publication number Publication date
JPH0874381A (en) 1996-03-19

Similar Documents

Publication Publication Date Title
US7337591B2 (en) Building construction system
US20040098934A1 (en) Load bearing building panel
GB2234276A (en) Light-weight panel of wire mesh truss used as building wall element
JP3281972B2 (en) Reinforcing unit and method of constructing reinforced concrete building using the same
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JP2790959B2 (en) Underground beam construction method
JP2817591B2 (en) Construction method of steel reinforced concrete building
JPH06299718A (en) Construction of wall, floor in atomic power plant and wall slab thereof
JP2003193484A (en) Pc footing beam member, and method for constructing continuous footing or mat foundation using the same
JP3207276B2 (en) How to build a unit building
JPS61169559A (en) Semi-existing concrete panel using assembled reinforcement
JP3045839B2 (en) Method and apparatus for installing floor slab in unit building
AU2002234421B2 (en) A load bearing building panel
JPH02167937A (en) Connecting work of steel plate-concrete structure
JPH0621469B2 (en) Multi-story building frame construction method
JP2984626B2 (en) PC pillar construction method and its PC pillar
JPH09112042A (en) Method for reinforcing vibration resistance of building
JP2002256643A (en) Construction method for steel-framed reinforced concrete(src) structure
JP3312945B2 (en) Construction method of concrete structure
JPH1082090A (en) Cantilever skeleton
JPH0542547B2 (en)
JPH04124352A (en) Construction of double floor
JPH06167066A (en) Slab forming method
JPH01187237A (en) Method for beam-column joining in precast reinforced concrete structure
JPH1181450A (en) Floor/wall type reinforced concrete structure with no beam

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20020108

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080301

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090301

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100301

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110301

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees