JP3027920B2 - Piping unit and its installation method - Google Patents

Piping unit and its installation method

Info

Publication number
JP3027920B2
JP3027920B2 JP7096754A JP9675495A JP3027920B2 JP 3027920 B2 JP3027920 B2 JP 3027920B2 JP 7096754 A JP7096754 A JP 7096754A JP 9675495 A JP9675495 A JP 9675495A JP 3027920 B2 JP3027920 B2 JP 3027920B2
Authority
JP
Japan
Prior art keywords
steel frame
pillars
piping unit
piping
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP7096754A
Other languages
Japanese (ja)
Other versions
JPH08291879A (en
Inventor
雅彦 杉谷
秀雄 嵯峨
芳樹 八十
Original Assignee
石川島播磨重工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 石川島播磨重工業株式会社 filed Critical 石川島播磨重工業株式会社
Priority to JP7096754A priority Critical patent/JP3027920B2/en
Publication of JPH08291879A publication Critical patent/JPH08291879A/en
Application granted granted Critical
Publication of JP3027920B2 publication Critical patent/JP3027920B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、原子力発電プラント、
石油化学精製プラント等に布設されている配管路を構成
する配管ユニット及びその据付け工法に関するものであ
る。
The present invention relates to a nuclear power plant,
The present invention relates to a piping unit constituting a piping route laid in a petrochemical refining plant and the like and an installation method thereof.

【0002】[0002]

【従来の技術】一般に、原子力発電プラント、石油化学
精製プラント等には、図3に示すように取り扱う液体や
ガスあるいはケーブル等を通過させるための多種多様な
配管が束状になって布設された配管路Hが設けられてい
る。そして、図示するように、この配管路Hは略矩体状
に形成された鉄骨フレームaに各配管部材bを取り付け
た配管ユニットcをその長さ方向に順次並べて繋ぎ合わ
せてなるものであり、さらに、これら配管ユニットc
は、点検や修理作業等を容易に行うために、所定の高さ
になるように複数の脚柱d上に支持されている。
2. Description of the Related Art Generally, in a nuclear power plant, a petrochemical refining plant and the like, various pipes for passing liquids, gases or cables to be handled are bundled and laid as shown in FIG. A piping path H is provided. As shown in the figure, the piping path H is formed by sequentially arranging and connecting piping units c in which respective piping members b are attached to a substantially rectangular steel frame a in the length direction. Furthermore, these piping units c
Is supported on a plurality of pillars d so as to have a predetermined height for easy inspection and repair work.

【0003】[0003]

【発明が解決しようとする課題】ところで、この配管ユ
ニットcは予め仕様に応じて工場で製作されるようにな
っているため、陸上輸送あるいは海上輸送によってプラ
ント現場まで輸送した後は、起重機や台車によって所定
の位置まで搬送する必要があった。
Since the piping unit c is manufactured in advance at a factory in accordance with the specifications, after transported to the plant site by land transportation or sea transportation, a hoist or a bogie is used. Has to be transported to a predetermined position.

【0004】しかしながら、この配管ユニットcは、場
合によってはその重量が数トンから数十トンにも及ぶも
のもあることから、搬送には大型の起重機を多数使用す
る必要があり、据付工期が長くなってしまう上に、多大
なコストを要するといった欠点があった。一方、図4に
示すように、台車gを使用する方法では、搬送に際して
配管ユニットcの脚柱を地面より所定高さ浮かせる必要
があることから、この配管ユニットcの大きさに合わせ
た仮設受架台eを必要とするため、起重機を用いる方法
と同様に多大なコストを要する上に、使用後にこの仮設
受架台eが無駄になってしまうといった欠点があった。
However, since the piping unit c may have a weight ranging from several tons to several tens of tons in some cases, it is necessary to use a large number of large hoists for transportation, and the installation period is long. In addition, there is a drawback that it requires a large cost. On the other hand, as shown in FIG. 4, in the method using the cart g, since the pillars of the piping unit c need to be lifted from the ground by a predetermined height during transportation, the temporary receiving unit corresponding to the size of the piping unit c is required. Since the mount e is required, there is a drawback that, as in the method using the hoist, a great cost is required, and the temporary mount e is wasted after use.

【0005】そこで、本発明は上記課題を解決するため
に案出されたものであり、その目的は、配管路を構成す
る配管ユニットを安価にかつ容易に所定の位置に据え付
けることができる新規な配管ユニット及びその据付け工
法を提供することにある。
Therefore, the present invention has been devised to solve the above-mentioned problem, and an object of the present invention is to provide a novel method that can easily and inexpensively install a piping unit constituting a piping path at a predetermined position. It is to provide a piping unit and a method of installing the same.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に第一の発明は複数の配管部材を取り付けた鉄骨フレ−
ムを複数の脚柱で支持した配管ユニットにおいて、上記
鉄骨フレ−ムを脚柱に対して昇降自在に設けると共に、
これら脚柱の下端部及び上端部にそれぞれ、上記鉄骨フ
レ−ムを一時的に固定するための仮固定手段を備えたも
のであり、第二の発明はこの配管ユニットの据付け工法
において、上記鉄骨フレ−ムを脚柱の下端部に一時的に
固定し、この鉄骨フレ−ムの部分を台車上に載置し、脚
柱の下端部を浮かせた状態で所定の位置に搬送した後、
これら脚柱の固定を解除してその下端部を着地させ、し
かる後、これら脚柱に沿って上記鉄骨フレームを上昇さ
せてこれら脚柱の上端部に固定するようにしたものであ
る。
In order to achieve the above object, a first invention is to provide a steel frame having a plurality of piping members attached thereto.
In a piping unit in which a frame is supported by a plurality of pillars, the steel frame is provided so as to be vertically movable with respect to the pillars,
The lower end and the upper end of these pillars are provided with temporary fixing means for temporarily fixing the steel frame, respectively. After temporarily fixing the frame to the lower end of the pedestal, placing this steel frame portion on a trolley, and transporting the steel frame to a predetermined position with the lower end of the pedestal floating,
The fixing of these pillars is released, and the lower ends thereof are landed. Thereafter, the steel frame is raised along the pillars and fixed to the upper ends of the pillars.

【0007】[0007]

【作用】本発明は上述したように、鉄骨フレ−ムを脚柱
に対して昇降自在に設けると共に、これら脚柱の下端部
及び上端部にそれぞれ、上記鉄骨フレ−ムを一時的に固
定するための仮固定手段を備えたため、この仮固定手段
によって鉄骨フレームを脚柱の下端部に一時的に固定
し、直接、この鉄骨フレームの部分を台車上に載置する
ことで、従来のような仮設受架台を用いることなく配管
ユニット全体を所定の位置に搬送することができる。そ
して、現場に到着したならば、脚柱の仮固定を解除して
その下端部を着地させた後、これら脚柱に沿って上記鉄
骨フレームを上昇させ、その上端部に溶接等によって本
格的に固定することで現場に据え付けることができる。
According to the present invention, as described above, the steel frame is provided so as to be able to move up and down with respect to the pillars, and the steel frame is temporarily fixed to the lower end and the upper end of the pillars. By temporarily fixing the steel frame to the lower end of the pillar by the temporary fixing means, and directly placing the steel frame portion on the bogie, as in the related art, The entire piping unit can be transported to a predetermined position without using a temporary receiving stand. Then, upon arrival at the site, the temporary fixing of the pillars is released, and the lower ends thereof are landed.Then, the steel frame is raised along these pillars, and the upper ends thereof are fully welded by welding or the like. By fixing it, it can be installed on the site.

【0008】[0008]

【実施例】以下、本発明の一実施例を添付図面に基づい
て詳述する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described below in detail with reference to the accompanying drawings.

【0009】図1は本発明に係る配管ユニット1の一実
施例を示したものである。図示するように、この配管ユ
ニット1は、略矩体状に形成された鉄骨フレーム2にU
ボルト8等によって複数の配管部材4が取り付けられて
おり、上述した配管路Hの一部を構成するようになって
いる。また、この鉄骨フレーム2の両側部には、この鉄
骨フレーム2を所定高さに支持するための長さ方向に沿
って、H鋼材からなる複数の脚柱3…が、複数のボルト
9a等からなる仮固定手段9によって着脱自在に取り付
けられている。
FIG. 1 shows an embodiment of a piping unit 1 according to the present invention. As shown in the figure, this piping unit 1 has a steel frame 2 formed in a substantially rectangular
A plurality of piping members 4 are attached by bolts 8 and the like, and constitute a part of the piping path H described above. On both sides of the steel frame 2, a plurality of pillars 3 made of H steel material are provided along a length direction for supporting the steel frame 2 at a predetermined height from a plurality of bolts 9 a and the like. It is detachably attached by temporary fixing means 9.

【0010】そして、このような構成をした配管ユニッ
ト1を所定の位置に搬送して据え付けるためには、先
ず、図1に示すように、仮固定手段9によって鉄骨フレ
ーム2を脚柱3…の下端部に一時的に固定し、この鉄骨
フレーム2の下面に台車5を搬送した後、台車5上に設
けられたジャッキ(図示せず)によって鉄骨フレーム2
を持ち上げると、その脚柱3…の下端部が地面より所定
高さ浮いた状態となり、配管ユニット1全体が完全に台
車5上に載置される。これによって、従来のように、脚
柱3…を浮かせるための仮設受架台を用いることなく配
管ユニット1を据え付け位置まで搬送することができ
る。
In order to transport and install the piping unit 1 having such a structure at a predetermined position, first, as shown in FIG. After being temporarily fixed to the lower end and transporting the bogie 5 to the lower surface of the steel frame 2, the steel frame 2 is fixed by a jack (not shown) provided on the bogie 5.
Is lifted, the lower ends of the pillars 3... Float above the ground by a predetermined height, and the entire piping unit 1 is completely placed on the carriage 5. Thereby, the piping unit 1 can be transported to the installation position without using a temporary support stand for floating the pillars 3 as in the related art.

【0011】次に、このようにして配管ユニット1を据
付現場まで搬送したならば、図2(A)に示すような昇
降手段10、例えば、各脚柱3…が位置する鉄骨フレー
ム2の上端部に設けられたフック6…にそれぞれワイヤ
7の一端を連結すると共に、この脚柱3…の上端部にそ
れぞれ板状の仮設支持部材11設け、この仮設支持部材
11を跨ぐようにこのワイヤ7を掛け渡し、その他端部
側を地面側に固定された図示しないウィンチ等に連結す
る。尚、この仮設支持部材11には一対のローラ5a、
5aが設けられており、ワイヤ7に加わる荷重を各脚柱
3…側に伝えると共に、ワイヤ7を滑らかに案内するよ
うになっている。
Next, when the piping unit 1 is transported to the installation site in this way, as shown in FIG. 2 (A), elevating means 10, for example, the upper end of the steel frame 2 on which the pillars 3 are located. One end of each of the wires 7 is connected to a hook 6 provided on the portion, and a temporary support member 11 having a plate shape is provided at the upper end of each of the pillars 3. And the other end is connected to a winch or the like (not shown) fixed to the ground side. The temporary support member 11 has a pair of rollers 5a,
5a is provided so that the load applied to the wire 7 is transmitted to each of the pillars 3... And the wire 7 is smoothly guided.

【0012】次に、図示するように、これら脚柱3…を
鉄骨フレーム2側に一時的に固定している仮固定手段9
の各ボルト9aを外してそれぞれの脚柱3…の下端部
を、地面に設けられた例えばコンクリート製の基礎部1
2上に着地させてこれに立設した後、各昇降手段10を
駆動してワイヤ7を巻き取ることで鉄骨フレーム2を脚
柱3…に沿って上昇させる。そして、図2(B)に示す
ように、この鉄骨フレーム2が脚柱3…の上端部に達し
たならば、仮固定手段で固定した後あるいは溶接などに
よって、鉄骨フレーム2を脚柱3…の上端部に本格的に
固定した後、この台車5及び鉄骨フレーム2を吊り上げ
た昇降手段10を除去することで据え付け作業が終了す
る。そして、この台車5を積み降ろし現場まで戻して再
び次の配管ユニット1の搬送に用いることになる。
Next, as shown in the figure, temporary fixing means 9 for temporarily fixing these pillars 3 to the steel frame 2 side.
.. Are removed, and the lower end of each pillar 3... Is mounted on the ground, for example, a concrete base 1.
After the landing, the steel frame 2 is raised along the pillars 3 by driving the respective lifting / lowering means 10 and winding up the wire 7. Then, as shown in FIG. 2 (B), when the steel frame 2 reaches the upper end of the pillar 3, the steel frame 2 is fixed by temporary fixing means or by welding or the like. After the truck is fully fixed to the upper end, the carriage 5 and the lifting / lowering means 10 that lifts the steel frame 2 are removed, thereby completing the installation work. Then, the carriage 5 is unloaded and returned to the site, and is again used for transporting the next piping unit 1.

【0013】このように、本発明は鉄骨フレームを脚柱
に対して昇降自在とし、脚柱の下端部及び上端部のいず
れにも一時的に仮固定することができるようにしたた
め、従来のように、配管ユニットを浮かせて搬送するた
めの仮設受架台や、あるいは複数の大型起重機が不要と
なる。尚、本発明は上記実施例に限定されるものではな
く、例えば、脚柱3側及び鉄骨フレーム2側にそれぞれ
レールを形成して鉄骨フレーム2の昇降をスム−ズに行
うように構成しても良く、また、昇降手段として鉄骨フ
レーム2内にウィンチ等の昇降装置を一体的に組み込ん
だり、さらには、ラックアンドピニオン方式を用いても
良い。
As described above, according to the present invention, the steel frame can be raised and lowered with respect to the pillar, and can be temporarily temporarily fixed to both the lower end and the upper end of the pillar. In addition, a temporary receiving stand for floating and transporting the piping unit or a plurality of large hoists are not required. The present invention is not limited to the above embodiment. For example, rails are formed on the pillar 3 side and the steel frame 2 side, respectively, and the steel frame 2 is smoothly moved up and down. Alternatively, an elevating device such as a winch may be integrated into the steel frame 2 as the elevating means, or a rack and pinion method may be used.

【0014】[0014]

【発明の効果】以上要するに本発明によれば、従来のよ
うに、仮設受架台や大型の起重機が不要となるため、配
管ユニットの据付けコストや労力の低減及び作業の安全
性が向上し、さらには据付工期を短縮することができる
等といった優れた効果を発揮する。
As described above, according to the present invention, unlike the prior art, there is no need for a temporary receiving stand or a large-sized hoist, so that the installation cost and labor of the piping unit are reduced, and the work safety is improved. Has excellent effects such as shortening the installation period.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例を示す斜視図である。FIG. 1 is a perspective view showing one embodiment of the present invention.

【図2】(A)は鉄骨フレームを上昇させる前の状態を
示す正面図である。(B)は鉄骨フレームを上昇させて
脚柱の上端部に据え付けた状態を示す正面図である。
FIG. 2A is a front view showing a state before the steel frame is raised. (B) is a front view which shows the state which raised the steel frame and installed it in the upper end part of a pillar.

【図3】従来の配管ユニットを並べて形成された配管路
の一例を示す概略斜視図である。
FIG. 3 is a schematic perspective view showing an example of a piping path formed by arranging conventional piping units.

【図4】従来の配管ユニットの搬送方法の一例を示す正
面図である。
FIG. 4 is a front view showing an example of a conventional method of transporting a piping unit.

【符号の説明】[Explanation of symbols]

1 配管ユニット 2 鉄骨フレーム 3 脚柱 4 配管部材 5 台車 9 仮固定手段 DESCRIPTION OF SYMBOLS 1 Piping unit 2 Steel frame 3 Pillar 4 Piping member 5 Dolly 9 Temporary fixing means

───────────────────────────────────────────────────── フロントページの続き (72)発明者 八十 芳樹 東京都江東区豊洲三丁目2番16号 石川 島播磨重工業株式会社 豊洲総合事務所 内 (56)参考文献 特開 昭62−68235(JP,A) 特開 昭57−61885(JP,A) 特公 昭54−6726(JP,B1) (58)調査した分野(Int.Cl.7,DB名) F16L 1/00 ──────────────────────────────────────────────────続 き Continuation of the front page (72) Inventor Yoshiki Yaso 3-2-16-1 Toyosu, Koto-ku, Tokyo Ishikawa-jima-Harima Heavy Industries, Ltd. Toyosu General Office (56) References JP-A-62-268235 (JP , A) JP-A-57-61885 (JP, A) JP-B-54-6726 (JP, B1) (58) Fields investigated (Int. Cl. 7 , DB name) F16L 1/00

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 複数の配管部材を取り付けた鉄骨フレ−
ムを複数の脚柱で支持した配管ユニットにおいて、上記
鉄骨フレ−ムを脚柱に対して昇降自在に設けると共に、
これら脚柱の下端部及び上端部にそれぞれ、上記鉄骨フ
レ−ムを一時的に固定するための仮固定手段を備えたこ
とを特徴とする配管ユニット。
1. A steel frame to which a plurality of piping members are attached.
In a piping unit in which a frame is supported by a plurality of pillars, the steel frame is provided so as to be vertically movable with respect to the pillars,
A piping unit comprising temporary fixing means for temporarily fixing the steel frame at the lower end and the upper end of these pillars.
【請求項2】 請求項1記載の配管ユニットの据付け工
法において、上記鉄骨フレ−ムを脚柱の下端部に一時的
に固定し、この鉄骨フレ−ムの部分を台車上に載置する
と共に、これら脚柱下端部を浮かせた状態で所定の位置
に搬送した後、これら脚柱の固定を解除してその下端部
を着地させ、しかる後、これら脚柱に沿って上記鉄骨フ
レームを上昇させてこれら脚柱の上端部に固定するよう
にしたことを特徴とする配管ユニットの据付け工法。
2. A method for installing a piping unit according to claim 1, wherein the steel frame is temporarily fixed to a lower end portion of a pillar, and the steel frame portion is placed on a carriage. After transporting the lower ends of the pillars to a predetermined position in a floating state, the anchors of the pillars are released and the lower ends thereof are landed, and then the steel frame is raised along the pillars. A method of installing a piping unit, characterized by being fixed to the upper ends of these pillars.
JP7096754A 1995-04-21 1995-04-21 Piping unit and its installation method Expired - Lifetime JP3027920B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7096754A JP3027920B2 (en) 1995-04-21 1995-04-21 Piping unit and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7096754A JP3027920B2 (en) 1995-04-21 1995-04-21 Piping unit and its installation method

Publications (2)

Publication Number Publication Date
JPH08291879A JPH08291879A (en) 1996-11-05
JP3027920B2 true JP3027920B2 (en) 2000-04-04

Family

ID=14173457

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7096754A Expired - Lifetime JP3027920B2 (en) 1995-04-21 1995-04-21 Piping unit and its installation method

Country Status (1)

Country Link
JP (1) JP3027920B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5865008B2 (en) * 2011-10-25 2016-02-17 住友精化株式会社 LNG satellite equipment
KR102049892B1 (en) * 2018-03-22 2020-01-08 주식회사 세보엠이씨 Moudles for utilities in mechanical room and ditch of fab and method thereof
SG10201802945QA (en) * 2018-04-09 2019-03-28 Bintai Kindenko Pte Ltd Methods and systems of installing mechanical and electrical modular assembly units in buildings
KR101980304B1 (en) * 2018-08-31 2019-05-20 (주)케이씨이앤씨 Piping installation apparatus and piping construction method using the same
KR102240577B1 (en) * 2020-10-20 2021-04-14 박근우 Piping structure for building and method of setting up the same

Also Published As

Publication number Publication date
JPH08291879A (en) 1996-11-05

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
US5836463A (en) Powered lifting apparatus using multiple booms
CN110525578B (en) Pod installation device and method
JP3027920B2 (en) Piping unit and its installation method
JPH08199580A (en) Side slope lifting device
CN110550544B (en) Crane and method for lifting and carrying heavy object using same
CN115030522B (en) Construction method of large steel structure
US4271578A (en) Method and apparatus for removing a slewing ring from a pedestal mounted crane
KR100293687B1 (en) Concrete delivery device and its installation method
US3384285A (en) Coordinated system for laying parallel pipes
JPH05113026A (en) Temporary scaffold structure
JP3242775B2 (en) Installation method of vertical container
JP2002003163A (en) Cantilever carrier truck and method of changing hose by using the same
JP3471248B2 (en) Portal crane
JP2009097300A (en) Transfer device
CN218665330U (en) Beam conveying device for assisting arch rib in turning over by utilizing cable crane
JP2549491B2 (en) Method of constructing a unitary building and support for a building unit
JPH0949334A (en) Traveling carriage to carry building member and carrying method of building member
JPS6234943Y2 (en)
WO2002095182A1 (en) Apparatus for handling a reel
JPS63181860A (en) Floor panel building construction method and floor panel
JPH0351256Y2 (en)
JPH0677068A (en) Assembling device and method of transformer
JP2775206B2 (en) Material transport equipment for building construction
JP2858612B2 (en) Component transport and installation machine for narrow construction sites