Info

Publication number
JP2954823B2
JP2954823B2 JP5341188A JP34118893A JP2954823B2 JP 2954823 B2 JP2954823 B2 JP 2954823B2 JP 5341188 A JP5341188 A JP 5341188A JP 34118893 A JP34118893 A JP 34118893A JP 2954823 B2 JP2954823 B2 JP 2954823B2
Authority
JP
Japan
Prior art keywords
shaft
tunnel
support
segment
ground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP5341188A
Other languages
Japanese (ja)
Other versions
JPH07166790A (en
Inventor
正▲高▼ 上野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kumagai Gumi Co Ltd
Original Assignee
Kumagai Gumi Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kumagai Gumi Co Ltd filed Critical Kumagai Gumi Co Ltd
Priority to JP5341188A priority Critical patent/JP2954823B2/en
Publication of JPH07166790A publication Critical patent/JPH07166790A/en
Application granted granted Critical
Publication of JP2954823B2 publication Critical patent/JP2954823B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、トンネル断面のうちの
一部を先進掘削してなる導坑のための支保工およびトン
ネルの形成方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for forming a tunnel and a shoring for a shaft which is formed by advanced excavation of a part of a section of a tunnel.

【0002】[0002]

【従来の技術】従来、導坑の壁面を支持するため、導坑
の壁面に沿ってリング状に配置された複数のH形鋼材
と、必要に応じて用いられる、前記H形鋼材を貫通して
地山に伸びる鋼製ロックボルトとからなる支保工が適用
されている。
2. Description of the Related Art Conventionally, in order to support the wall surface of a shaft, a plurality of H-shaped steel materials arranged in a ring along the wall surface of the shaft and a plurality of H-shaped steel materials used as necessary have been penetrated. A support structure consisting of a steel lock bolt extending to the ground is applied.

【0003】前記支保工は、前記導坑を利用してトンネ
ル断面の切ひろげを行なう際、撤去される。
The shoring is removed when the tunnel section is cut and widened using the shaft.

【0004】[0004]

【発明が解決しようとする課題】しかし、前記支保工の
撤去には、前記H形鋼材が大きい重量を有し、また、前
記H形鋼材同士の分離を溶断によって行なうため、多大
の労力と時間とを要する。また、前記ロックボルトが打
ち込まれているときは、その撤去のためにさらに労力と
時間とを要する。
However, the removal of the shoring requires a great deal of labor and time because the H-shaped steel material has a large weight and the H-shaped steel materials are separated by fusing. And require. Further, when the lock bolt is driven in, it takes more labor and time to remove the lock bolt.

【0005】本発明の目的は、導坑を利用するトンネル
掘削に要する労力および時間を軽減することにある。
[0005] It is an object of the present invention to reduce the labor and time required for tunnel excavation using a shaft.

【0006】[0006]

【課題を解決するための手段】本発明に係る導坑の支保
工は、導坑の壁面に沿ってリング状に配置された、布袋
にセメントミルクを充填してなる、トンネル掘進機によ
り掘削される少なくとも1つのセグメントを含む。
According to the present invention, there is provided a shaft support for a tunnel, which is excavated by a tunnel excavator, which is arranged along a wall of the shaft and has a cloth bag filled with cement milk. At least one segment.

【0007】また、本発明に係るトンネルの形成方法
は、地山に導坑を掘削し、前記導坑の支保のために前記
壁面に沿ってリング状に配置された、布袋にセメントミ
ルクを充填してなる少なくとも1つのセグメントと該セ
グメントを貫通するグラスファイバー製のロックボルト
を含む支保工を設置した後、トンネル掘進機により前記
支保工を地山と共に掘削して切ひろげを行なう。
Further, in the tunnel forming method according to the present invention, a tunnel is excavated in the ground, and cement bags are filled with cement milk arranged in a ring along the wall surface to support the tunnel. After installing a shoring including at least one segment and a glass fiber lock bolt penetrating the segment, the shoring is excavated together with the ground with a tunnel excavator to perform cutting.

【0008】[0008]

【発明の作用および効果】本発明によれば、トンネルの
全断面の掘削に先立って形成される導坑の支保工が導坑
の壁面に沿ってリング状に配置された、布袋にセメント
ミルクを充填してなる少なくとも1つのセグメントは、
トンネル掘進機により地山と共に掘削することができる
物質であることから、前記導坑を利用しての切ひろげの
際の支保工の撤去と、これに要する労力および時間とを
不要とすることができる。
According to the present invention, according to the present invention, the support of a tunnel formed prior to the excavation of the entire cross section of the tunnel is provided with cement milk in a cloth bag arranged in a ring along the wall of the tunnel. At least one filled segment is
Since it is a substance that can be excavated together with the ground by a tunnel excavator, it is unnecessary to remove the support work at the time of cutting and widening using the shaft and the labor and time required for this. it can.

【0009】また、グラスファイバー製のロックボルト
もまた前記トンネル掘削機による破砕が可能であること
から、前記切ひろげの際、ロックボルトを引き抜く必要
がなく、したがって撤去のための労力および時間も必要
でない。
Further, since the glass fiber lock bolt can also be crushed by the tunnel excavator, it is not necessary to pull out the lock bolt at the time of the cutting and spreading, and therefore labor and time for removal are also required. Not.

【0010】[0010]

【実施例】図1および図2を参照すると、トンネル断面
のうち、その一部を先進して掘削された導坑10とこれ
に適用された支保工12とが示されている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIGS. 1 and 2, there is shown a tunnel 10 partially excavated in a tunnel section and a shoring 12 applied thereto.

【0011】支保工12は、導坑10の壁面14に沿っ
てリング状に配置された、布袋16にセメントミルク1
8を充填してなる少なくとも1つ(図示の例では4つ)
のセグメント20を含み、壁面14の崩壊を防止する。
図示の支保工12は、さらに、各セグメント20を導坑
10の半径方向へ貫通しかつ地山を伸びるグラスファイ
バー製のロックボルト22(図1および図4参照)を含
む。
The shoring 12 includes a cement bag 1 and a cloth bag 16 arranged in a ring along the wall surface 14 of the shaft 10.
At least one filled with 8 (four in the example shown)
And prevents the collapse of the wall surface 14.
The illustrated shoring 12 further includes glass fiber lock bolts 22 (see FIGS. 1 and 4) that extend through each segment 20 in the radial direction of the shaft 10 and extend through the ground.

【0012】導坑10は、例えばトンネル掘進機(TB
M)24で地山を掘削することにより形成される。支保
工12は、トンネル掘進機24により地山を掘り進んだ
直後における掘削壁面にその周方向へ4つの布袋16を
順次に並べかつこれらを前記掘削壁面に支持した後、各
布袋16にセメントミルクを注入することにより形成さ
れる。前記セメントミルクが固化することにより、布袋
16とその注入物である前記セメントミルクとがセグメ
ント20となる。
The shaft 10 is, for example, a tunnel machine (TB).
M) Formed by excavating the ground at 24. The supporter 12 sequentially arranges four cloth bags 16 in the circumferential direction on the digging wall immediately after digging the ground by the tunnel digging machine 24 and supports them on the digging wall. Is formed by injecting. When the cement milk solidifies, the cloth bag 16 and the cement milk, which is an injection thereof, become segments 20.

【0013】各布袋16を前記掘削壁面に支持するため
の支持手段として、例えば、導坑10の周方向へ伸びる
一対の相対する湾曲部材26と、両湾曲部材26の内周
面に沿って伸びる金網28とからなる。この支持手段
は、その複数(図示の例では4つ)を導坑10の周方向
に接続するときにリング状を呈する。この支持手段によ
れば、両湾曲部材と金網28とが規定する空間に袋16
を収容し、前記セメントミルクが注入されるときの袋1
6の膨張を規制し、扁平な形状に規定することができ
る。
As a support means for supporting each cloth bag 16 on the excavation wall surface, for example, a pair of opposed curved members 26 extending in the circumferential direction of the shaft 10 and extending along the inner peripheral surface of both curved members 26. And a wire net 28. The support means has a ring shape when a plurality of the support means (four in the illustrated example) are connected in the circumferential direction of the shaft 10. According to this supporting means, the bag 16 is placed in the space defined by the two bending members and the wire mesh 28.
And the bag 1 when the cement milk is injected
6 can be restricted to have a flat shape.

【0014】前記支持手段は、袋16内のセメントミル
ク18が固化した後、撤去することができる。前記支持
手段の撤去後に残る、導坑10の周方向に互いに接して
リング状を呈する4つのセグメント20が地山の崩壊を
防止する。
The support means can be removed after the cement milk 18 in the bag 16 has solidified. Four ring-shaped segments 20 remaining in contact with each other in the circumferential direction of the shaft 10 and remaining after removal of the support means prevent the collapse of the ground.

【0015】図3に示すように、各袋16は例えば1.2m
x 3.0m の縦および横の長さ寸法を有する、水は通すが
前記セメントミルクは通さない綿製、合性繊維製の矩形
状の2枚の布を重ね合わせかつこれらの四周縁部を縫合
してなり、前記矩形のほぼ中央部に前記セメントミルク
を注入するための口30が設けられている。また、前記
2枚の布は膨らみを制限するために複数の箇所32にお
いて糸で止められている。
As shown in FIG. 3, each bag 16 is, for example, 1.2 m
two rectangular cloths made of cotton and synthetic fiber, having a length of 3.0 m and a width of 3.0 m, which allow water but not the cement milk to overlap, and sew these four peripheral edges A port 30 for injecting the cement milk is provided substantially at the center of the rectangle. Also, the two cloths are threaded at a plurality of locations 32 to limit swelling.

【0016】好ましくは、支保工12は、さらに、各セ
グメント20を導坑10の半径方向へ貫通しかつ地山を
伸びるグラスファイバー製のロックボルト22(図1お
よび図4参照)を含む。各ロックボルト22の端部に螺
合するナット34をワッシャまたはベアリングプレート
35を介して締め付けることにより、各セグメント20
を地山に密着することができる。
Preferably, the shoring 12 further includes glass fiber lock bolts 22 (see FIGS. 1 and 4) that extend through each segment 20 in the radial direction of the shaft 10 and extend through the ground. By tightening a nut 34 screwed to the end of each lock bolt 22 via a washer or a bearing plate 35, each segment 20
Can be closely attached to the ground.

【0017】ロックボルト22は、例えば、導坑10の
掘削後に該導坑内から地山に削孔してなる孔に挿入し、
前記孔内にモルタルを充填することにより設置すること
ができる。各袋16には、これを導坑10の壁面に沿っ
て配置するとき、ロックボルト22の挿通を許す穴36
が設けられている。
For example, the lock bolt 22 is inserted into a hole formed by drilling the ground from inside the shaft after the shaft 10 is excavated.
It can be installed by filling the mortar into the hole. Each bag 16 has a hole 36 for allowing the lock bolt 22 to pass therethrough when the bag is placed along the wall surface of the shaft 10.
Is provided.

【0018】導坑10を形成し、支保工12を設置した
後、例えば他のトンネル掘進機を用いて切ひろげる。前
記セメントミルクの固化物およびグラスファイバーは共
に前記トンネル掘進機によって剪断または切断可能であ
ることから、支保工12を撤去することなく、これを破
壊しながら切ひろげ作業を進めながら、トンネルの全断
面にわたって掘削することができる。
After the shaft 10 is formed and the shoring 12 is installed, it is cut and spread using, for example, another tunneling machine. Since both the solidified cement milk and the glass fiber can be sheared or cut by the tunnel excavator, the entire cross section of the tunnel is advanced without removing the support 12 while performing the cutting and spreading work while destroying it. Can be excavated.

【図面の簡単な説明】[Brief description of the drawings]

【図1】導坑の縦断面図である。FIG. 1 is a longitudinal sectional view of a shaft.

【図2】導坑の横断面図である。FIG. 2 is a cross-sectional view of a shaft.

【図3】布袋の平面図である。FIG. 3 is a plan view of a cloth bag.

【図4】導坑の壁面および支保工の一部拡大断面図であ
る。
FIG. 4 is a partially enlarged sectional view of a wall surface of a shaft and a shoring.

【符号の説明】[Explanation of symbols]

10 導坑 12 支保工 16 布袋 18 セメントミルク 20 セグメント 22 ロックボルト DESCRIPTION OF REFERENCE NUMERALS 10 shaft 12 support 16 cloth bag 18 cement milk 20 segment 22 lock bolt

Claims (3)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 導坑の壁面に沿ってリング状に配置され
た、布袋にセメントミルクを充填してなる、トンネル掘
進機により掘削される少なくとも1つのセグメントを含
む、導坑の支保工。
1. A tunnel support comprising at least one segment excavated by a tunnel excavator, the cloth bag being filled with cement milk, arranged in a ring along the wall of the shaft.
【請求項2】 さらに、前記セグメントを貫通するグラ
スファイバー製のロックボルトを含む、請求項1に記載
の導坑の支保工。
2. The shaft support according to claim 1, further comprising a glass fiber lock bolt penetrating the segment.
【請求項3】 地山に導坑を掘削し、前記導坑の支保の
ために前記壁面に沿ってリング状に配置された、布袋に
セメントミルクを充填してなる少なくとも1つのセグメ
ントと該セグメントを貫通するグラスファイバー製のロ
ックボルトを含む支保工を設置した後、トンネル掘進機
により前記支保工を地山と共に掘削して切ひろげを行な
う、トンネルの形成方法。
3. A mine shaft excavated in the ground, and at least one segment formed of a cloth bag filled with cement milk and arranged in a ring shape along the wall surface for supporting the mine shaft, and the segment. A method of forming a tunnel, comprising: installing a support including a glass fiber lock bolt that penetrates the support, excavating the support along with the ground with a tunnel excavator, and performing cutting and widening.
JP5341188A 1993-12-13 1993-12-13 Shaft support and tunnel formation method Expired - Fee Related JP2954823B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP5341188A JP2954823B2 (en) 1993-12-13 1993-12-13 Shaft support and tunnel formation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP5341188A JP2954823B2 (en) 1993-12-13 1993-12-13 Shaft support and tunnel formation method

Publications (2)

Publication Number Publication Date
JPH07166790A JPH07166790A (en) 1995-06-27
JP2954823B2 true JP2954823B2 (en) 1999-09-27

Family

ID=18344048

Family Applications (1)

Application Number Title Priority Date Filing Date
JP5341188A Expired - Fee Related JP2954823B2 (en) 1993-12-13 1993-12-13 Shaft support and tunnel formation method

Country Status (1)

Country Link
JP (1) JP2954823B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112983439A (en) * 2021-03-16 2021-06-18 北京市市政工程研究院 Construction passing method for tunnel collapse section

Also Published As

Publication number Publication date
JPH07166790A (en) 1995-06-27

Similar Documents

Publication Publication Date Title
JPH11159275A (en) Whale bone construction method of large cross-section tunnel
KR20190023619A (en) Tunnel Reinforcement structure and Tunnel Reinforcement methods using the same
KR100415809B1 (en) precast pile for braced wall and the method using the same
JP2954823B2 (en) Shaft support and tunnel formation method
JP2955893B2 (en) Ground reinforcement method
JP4003152B2 (en) Deep foundation method using packed concrete
JP3026134B2 (en) How to build underground structures under roads
JPH0313689A (en) Construction method for tunnel
JPH0637830B2 (en) Vertical shaft for shield method
JPH0660495B2 (en) Foundation pile construction equipment
JPS59118926A (en) Improving work of ground under water pressure and iron-bar setter to be used therein
JP2725972B2 (en) Underground structure construction method and segment piece used therefor
JPH0643217Y2 (en) Ground improvement device
JP3698505B2 (en) Underground cylinder drawing method and split ring used in the method
JPH0676690B2 (en) Pile hole excavation method and equipment for removing existing piles and excavating pile holes for new piles
JP2955892B2 (en) Ground reinforcement method
JPH03206213A (en) Construction method of earth support
JPH04309694A (en) Underground space construction method
JPH08177039A (en) Improving method of weak ground
KR890004540B1 (en) Structures for consolidating soft soils
JPS63304821A (en) Construction work of underground continuous cut-off wall
JPH0372764B2 (en)
JPH03262894A (en) Tunnel face stabilization work method
JP3178357B2 (en) Construction method of large section tunnel
JP2777541B2 (en) Tunnel connection method, tunnel connection structure and tunnel connection segment

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19990706

LAPS Cancellation because of no payment of annual fees