JP2536250Y2 - Steel foundation beam - Google Patents

Steel foundation beam

Info

Publication number
JP2536250Y2
JP2536250Y2 JP1989151899U JP15189989U JP2536250Y2 JP 2536250 Y2 JP2536250 Y2 JP 2536250Y2 JP 1989151899 U JP1989151899 U JP 1989151899U JP 15189989 U JP15189989 U JP 15189989U JP 2536250 Y2 JP2536250 Y2 JP 2536250Y2
Authority
JP
Japan
Prior art keywords
foundation beam
foundation
concrete
flange
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1989151899U
Other languages
Japanese (ja)
Other versions
JPH0389748U (en
Inventor
幹夫 石川
昭弘 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP1989151899U priority Critical patent/JP2536250Y2/en
Publication of JPH0389748U publication Critical patent/JPH0389748U/ja
Application granted granted Critical
Publication of JP2536250Y2 publication Critical patent/JP2536250Y2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Rod-Shaped Construction Members (AREA)

Description

【考案の詳細な説明】 産業上の利用分野 この考案は、鋼製の基礎梁に関するものである。DETAILED DESCRIPTION OF THE INVENTION INDUSTRIAL APPLICATION This invention relates to a steel foundation beam.

従来の技術 上下に対向するフランジとそれらフランジ間を連結す
るウェブとからなる鋼製の基礎梁を現場で設置し、この
基礎梁へ柱等の構造躯体を直接固定する基礎工法が考え
られている。この場合基礎全体の重量を確保するため、
及び、基礎梁の錆を防止するため、この基礎梁部分をコ
ンクリートで被覆するようにしている。この場合、基礎
梁の周辺にコンクリートを打設したのみでは、その基礎
梁とコンクリートとの定着が充分でなく、そのため、基
礎梁をコンクリートへ定着させるための鉄筋を配筋する
必要がある。
2. Description of the Related Art A basic construction method has been considered in which a steel foundation beam composed of a vertically opposed flange and a web connecting the flanges is installed on site, and a structural body such as a pillar is directly fixed to the foundation beam. . In this case, to secure the weight of the entire foundation,
And, in order to prevent the rust of the foundation beam, the foundation beam is covered with concrete. In this case, simply placing the concrete around the foundation beam does not sufficiently fix the foundation beam to the concrete. Therefore, it is necessary to arrange reinforcing bars for fixing the foundation beam to the concrete.

かかる鉄筋の配筋に関して、実願昭57-190854号(実
開昭59-65055号公報)には、H形鋼からなる基礎梁材へ
フープ状の鉄筋を外嵌して取り付けたものが記載されて
いる。
Regarding the reinforcing bar arrangement, Japanese Utility Model Application No. 57-190854 (Japanese Utility Model Application Laid-Open No. 59-65055) describes a hoop-shaped reinforcing steel bar fitted on a base beam made of H-section steel. Have been.

考案が解決しようとする課題 上記において、現場で配筋を行うものでは、現場施工
の工数が増大し、施工期間も長くなる不都合がある。他
方、前記先出願のものは、予めフープ状の鉄筋を基礎梁
へ外嵌しておくことで、このような現場施工の工数を削
減できることになる。
Problems to be Solved by the Invention In the above, in the case of arranging reinforcing bars on site, there are disadvantages that the number of steps of the on-site construction increases and the construction period becomes longer. On the other hand, in the case of the above-mentioned prior application, the man-hours for such on-site construction can be reduced by previously fitting the hoop-shaped reinforcing bar to the foundation beam.

しかしながら、このようなフープ状の鉄筋を用いたも
のでは、まず、鉄筋が基礎梁の上部フランジの上に露出
しているから、その基礎梁の上に設置される柱下端のプ
レートと干渉する場合を生ずるという欠点がある。ま
た、柱以外の部材例えば床パネルや根太などを基礎梁の
上に固定する場合も同様の不都合を生ずる。更に、鉄筋
は、基礎梁の下面にも露出しており、例えばレベル出し
された土台の上にこの基礎梁を設置すると、基礎梁上面
のレベルが正確に出ず、その修正に多大な時間を要する
という欠点がある。しかも、このようにフープ状にする
と、それだけ鉄筋量が多くなりコスト高となる。
However, in the case of using such a hoop-shaped reinforcing bar, first, since the reinforcing bar is exposed on the upper flange of the foundation beam, it may interfere with the plate at the lower end of the column installed on the foundation beam. Has the disadvantage of causing Similar problems also occur when members other than columns, such as floor panels and joists, are fixed on the foundation beams. Furthermore, the rebar is also exposed on the lower surface of the foundation beam.For example, if this foundation beam is installed on a leveled base, the level of the upper surface of the foundation beam will not be accurately obtained, and it will take a lot of time to correct it. There is a disadvantage that it requires. In addition, such a hoop shape results in an increase in the amount of rebar and an increase in cost.

この考案は、このような従来の欠点を解消することを
目的とするものである。
The purpose of the present invention is to eliminate such conventional disadvantages.

課題を解決するための手段 上記の目的を達成するため、この考案は、上下に対向
する一対のフランジと、それらフランジ間を連結するウ
エブとからなり、前記両フランジ間に、コンクリートへ
定着させるための概略コの字型の鉄筋が、その上端の水
平片を上部フランジの下面に溶接し、下端の水平片を下
部フランジの上面に溶接して、各フランジよりも外方に
張り出した状態で固着されるとともに、上部フランジに
は柱の下端を据付けて固定するためのボルト穴を設けて
あることを特徴とする。
Means for Solving the Problems In order to achieve the above object, the present invention consists of a pair of vertically opposed flanges and a web connecting between the flanges, and between the two flanges, for fixing to concrete. The U-shaped rebar is welded with the horizontal piece at the upper end welded to the lower surface of the upper flange, and the horizontal piece at the lower end welded to the upper surface of the lower flange, and secured in a state that it protrudes outward from each flange In addition, the upper flange is provided with a bolt hole for installing and fixing the lower end of the column.

実施例 第4図〜第6図は、この考案の基礎梁を用いたべた基
礎の施工方法を示している。まず、第4図で示すよう
に、地盤を掘削して基礎梁に沿う溝(1)を形成し、そ
の溝(1)及びスラブ部分に砂利(2)を敷くととも
に、溝(1)内の要所々々にコンクリート製の据え付け
台(3)(3)…を現場で施工する。そして、第5図の
ように、この考案の基礎梁(4)を、前記溝(1)内へ
置いて、前記の据え付け台(3)上に設置して、互いに
接合する。基礎梁(4)に囲まれる空間にメッシュ状に
溶接されたスラブ鉄筋(5)を配置し、溝(1)内には
捨て型枠(6)を設置して、その外側の埋め戻しを行な
うとともに、その捨て型枠(6)内及びスラブ部分にコ
ンクリート(7)を打設して、第7図のようなコンクリ
ート基礎を施工するものである。
Embodiment FIGS. 4 to 6 show a method of constructing a solid foundation using the foundation beam of the present invention. First, as shown in FIG. 4, the ground is excavated to form a groove (1) along the foundation beam, gravel (2) is laid on the groove (1) and the slab portion, and the groove (1) in the groove (1) is formed. Concrete installation bases (3) (3) ... are constructed on site at various locations. Then, as shown in FIG. 5, the foundation beam (4) of the present invention is placed in the groove (1), installed on the mounting table (3), and joined together. A slab reinforcing bar (5) welded in a mesh shape is arranged in the space surrounded by the foundation beam (4), and a discarded formwork (6) is installed in the groove (1), and the outside is back-filled. At the same time, concrete (7) is cast in the discarded formwork (6) and the slab portion, and a concrete foundation as shown in FIG. 7 is constructed.

第1図において、この考案の基礎梁(4)は、上下に
対向する一対のフランジ(8)(9)と両フランジ
(8)(9)の中央部間を連結するウェブ(10)とから
なり、フランジ(8)(9)間に、複数のスチフナープ
レート(11)(11)…を、長手方向に適宜間隔を置いて
溶接している。(12)はこの考案の鉄筋であり、概略コ
の字型に折り曲げられるとともに、その上下の水平片
(13)が、夫々に上部側においては上部フランジ(8)
の下面に、下側においては下部フランジ(9)の上面に
溶接されて、夫々ウェブ(10)の両側に相互に対向させ
ながら、長手方向に間隔を置いて多数固着している。ま
た、上部フランジ(8)には、柱等の構造躯体を固定す
るためのアンカーボルト穴(14)が予め形成されてい
る。
In FIG. 1, the foundation beam (4) of the present invention is composed of a pair of vertically opposed flanges (8) and (9) and a web (10) connecting between central portions of the flanges (8) and (9). A plurality of stiffener plates (11) (11) are welded at appropriate intervals in the longitudinal direction between the flanges (8) and (9). (12) is a reinforcing bar of the present invention, which is bent into a substantially U-shape, and upper and lower horizontal pieces (13) are respectively provided on the upper side with an upper flange (8).
Are welded to the upper surface of the lower flange (9) on the lower side, and a number of them are spaced apart in the longitudinal direction while being opposed to both sides of the web (10). An anchor bolt hole (14) for fixing a structural body such as a pillar is formed in the upper flange (8) in advance.

第2図は、コンクリート(7)打設後の状態を示して
おり、このようにコンクリート(7)を打設すると、基
礎梁(4)は、これに固着した鉄筋(12)(12)によっ
て、その打設したコンクリート(7)に定着することに
なる。なお、鉄筋(12)(12)の垂直部分には、従来公
知の円盤型のスペーサー(17)が取付けられて、そのス
ペーサー(17)の外側へ前記の捨て型枠(6)(6)を
当接させることにより、これら鉄筋(12)(12)の被り
厚さが確保されるようになっている。このとき、鉄筋
(12)(12)は、基礎梁(4)の各フランジ(8)
(9)よりも外側に位置しているので、前述のように鉄
筋(12)(12)の被り厚さが確保されると、鉄筋(12)
(12)と被り厚さの異なる基礎梁(4)も、自動的に必
要な被り厚さが得られる。
FIG. 2 shows a state after the concrete (7) is cast. When the concrete (7) is cast in this way, the foundation beam (4) is fixed by the reinforcing bars (12) (12) fixed thereto. , And settles on the cast concrete (7). A conventionally known disk-shaped spacer (17) is attached to the vertical portion of the reinforcing bars (12) (12). The abutting thickness of the rebars (12) and (12) is ensured by the contact. At this time, the reinforcing bars (12) and (12) are connected to each flange (8) of the foundation beam (4).
Since it is located outside of (9), if the thickness of the reinforcing bars (12) and (12) is secured as described above, the reinforcing bars (12)
The foundation beam (4) having a different covering thickness from that of (12) can automatically obtain the required covering thickness.

また、この第2図で示すように、スラブ鉄筋(5)の
端部は、基礎梁(4)のウエブ(10)へ形成した取付け
穴(18)へ差し込まれ、更にその外側の端部において螺
じ込んだナット(19)によって抜けないように保持され
ている。
As shown in FIG. 2, the end of the slab reinforcing bar (5) is inserted into a mounting hole (18) formed in the web (10) of the foundation beam (4). The nut (19) is retained so that it does not come off.

第3図は、柱(20)の取付け構造を示すもので、H型
鋼からなる柱(20)の下端には取付けプレート(21)を
予め溶接しており、この取付けプレート(21)に形成し
たボルト穴(22)と上部フランジ(8)のアンカーボル
ト穴(14)とを互いに合致させ、上方から差込んだボル
ト(23)とそのボルト(23)へ螺合するナット(24)に
よって締め付け固定するようにしている。このようなボ
ルト(23)とナット(24)の締め付け作業を可能にする
ため、柱(20)の取付け部分を予め切り欠いてコンクリ
ートを打設しており、この切り欠き部分(25)は、柱
(20)の取付け後にコンクリートが充填されるものであ
る。
FIG. 3 shows the mounting structure of the column (20). The mounting plate (21) is previously welded to the lower end of the column (20) made of H-shaped steel, and formed on the mounting plate (21). The bolt hole (22) and the anchor bolt hole (14) of the upper flange (8) are aligned with each other, and tightened and fixed by the bolt (23) inserted from above and the nut (24) screwed into the bolt (23). I am trying to do it. In order to enable the bolt (23) and nut (24) to be tightened, concrete has been cut out of the mounting part of the column (20) in advance, and this notched part (25) Concrete is filled after the pillar (20) is installed.

考案の効果 以上のように、この考案によれば、鋼製の基礎梁に、
その基礎梁をコンクリート側へ定着させるための鉄筋を
予め固着しており、そのため、そのような鉄筋配筋を現
場で行なう必要がなく、基礎梁を設置するのみで同時に
配筋を行なうことができ、現場での施工を大幅に省力化
でき、かつ、工期も短縮できるという効果がある。
Effect of the Invention As described above, according to the invention, the steel base beam is
Reinforcing bars for fixing the foundation beams to the concrete side are fixed in advance, so there is no need to perform such reinforcement bars on site, and it is possible to perform reinforcement at the same time simply by installing the foundation beams. This has the effect of greatly reducing labor on site and shortening the construction period.

また、鉄筋は、基礎梁の両フランジ間に溶接して固着さ
れるので、剪断補強として鉄筋の効能が増大され、コン
クリートの強度がより向上される。
Further, since the reinforcing bar is welded and fixed between both flanges of the foundation beam, the effect of the reinforcing bar as shear reinforcement is increased, and the concrete strength is further improved.

さらに、梁の上部フランジには柱固定用のボルト穴を
設けて、柱をこの梁へ直接固定するようにしていること
から、予めアンカーボルトを埋設する必要がないととも
に、コンクリート面のように天端均しを行う必要がない
し、梁間に短い柱を立ててそれらの梁と柱を接合する必
要がない。
Furthermore, the upper flange of the beam is provided with a bolt hole for fixing the column, so that the column is directly fixed to this beam. There is no need for trimming and there is no need to stand short columns between beams and join them with columns.

また、各鉄筋は、概略コの字型にしてその上端の水平
片を梁の上部フランジの下面に、下端の水平片を下部フ
ランジの上面に溶接しており、このため、上部フランジ
上面に設置して固定される柱下端のプレートと干渉する
恐れがなく、他方、下部フランジをレベル出しされた土
台等の上へ設置する場合でも、梁の下側に鉄筋がないの
で、そのように設置するだけで梁上面のレベルが正確に
得られるという利点がある。或いは、鉄筋が土台と干渉
する欠点もない。加えて、工場或いは現場で据え置いた
場合でも、重量の大きい基礎梁のために鉄筋がつぶれる
恐れもない。他方、鉄筋と梁のフランジとは鉄筋をコの
字型に折り曲げてその水平片で溶接するので、充分な溶
接長が得られ、接合強度も充分なものが得られる。
In addition, each reinforcing bar is roughly U-shaped, and the horizontal piece at the upper end is welded to the lower surface of the upper flange of the beam, and the horizontal piece at the lower end is welded to the upper surface of the lower flange. There is no danger of interference with the plate at the lower end of the column fixed on the other hand, and on the other hand, even if the lower flange is installed on a leveled base etc., there is no reinforcing bar under the beam, so install it as such There is an advantage that the level of the upper surface of the beam can be accurately obtained only by using the above method. Alternatively, there is no disadvantage that the reinforcing bar interferes with the base. In addition, there is no danger of the reinforcing bars being crushed due to the heavy foundation beams, even if they are installed at the factory or on site. On the other hand, since the reinforcing bar is bent into a U-shape and welded with the horizontal piece, the reinforcing bar and the flange of the beam can obtain a sufficient welding length and a sufficient bonding strength.

【図面の簡単な説明】[Brief description of the drawings]

第1図は、この考案の基礎梁の要部の斜視図、第2図は
この考案の基礎梁を用いた基礎部分の要部横断面図、第
3図は柱の取付け状態を示す要部の斜視図、第4図〜第
6図は、基礎梁を用いたべた基礎の施工方法を示す斜視
図、第7図は基礎梁を用いたべた基礎の全体の横断面図
である。 (4)……基礎梁、(8)(9)……フランジ、(10)
……ウェブ、(12)……鉄筋、(13)……水平片、(1
4)……ボルト穴。
FIG. 1 is a perspective view of a main part of a foundation beam of the present invention, FIG. 2 is a cross-sectional view of a main part of a foundation part using the foundation beam of the present invention, and FIG. 4 to 6 are perspective views showing a method of constructing a solid foundation using a foundation beam, and FIG. 7 is a cross-sectional view of the entire solid foundation using a foundation beam. (4) ... foundation beam, (8) (9) ... flange, (10)
... web, (12) ... rebar, (13) ... horizontal strip, (1
4) Bolt holes.

Claims (1)

(57)【実用新案登録請求の範囲】(57) [Scope of request for utility model registration] 【請求項1】上下に対向する一対のフランジと、それら
フランジ間を連結するウエブとからなり、前記両フラン
ジ間に、コンクリートへ定着させるための概略コの字型
の鉄筋が、その上端の水平片を上部フランジの下面に溶
接し、下端の水平片を下部フランジの上面に溶接して固
着されるとともに、上部フランジには柱の下端を据付け
て固定するためのボルト穴を設けてあることを特徴とす
る鋼製基礎梁。
1. A substantially U-shaped reinforcing bar for fixing to concrete is provided between a pair of vertically opposed flanges and a web connecting between the flanges. The lower piece is welded to the lower face of the upper flange and the lower piece is fixed to the upper face of the lower flange by welding, and the upper flange has bolt holes for installing and fixing the lower end of the column. A characteristic steel foundation beam.
JP1989151899U 1989-12-27 1989-12-27 Steel foundation beam Expired - Lifetime JP2536250Y2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1989151899U JP2536250Y2 (en) 1989-12-27 1989-12-27 Steel foundation beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1989151899U JP2536250Y2 (en) 1989-12-27 1989-12-27 Steel foundation beam

Publications (2)

Publication Number Publication Date
JPH0389748U JPH0389748U (en) 1991-09-12
JP2536250Y2 true JP2536250Y2 (en) 1997-05-21

Family

ID=31698183

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1989151899U Expired - Lifetime JP2536250Y2 (en) 1989-12-27 1989-12-27 Steel foundation beam

Country Status (1)

Country Link
JP (1) JP2536250Y2 (en)

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5153613Y2 (en) * 1973-11-26 1976-12-22
JPS57160854A (en) * 1981-03-25 1982-10-04 Mitsubishi Electric Corp Catenary controller
JPS5965055U (en) * 1982-10-23 1984-04-28 藤川 徳一 Foundation structure for steel columns
JPS6026724A (en) * 1983-07-23 1985-02-09 Tokuichi Fujikawa Integration work of steel-framed building structure and composite underground beam

Also Published As

Publication number Publication date
JPH0389748U (en) 1991-09-12

Similar Documents

Publication Publication Date Title
JP2522714B2 (en) Construction method of building frame
JP2927402B2 (en) Column-beam joint structure of concrete building
JP2860490B2 (en) Building Steel Foundation
JP2536250Y2 (en) Steel foundation beam
JPH09195438A (en) Precast concrete plate and reinforcing structure of building
JP2860491B2 (en) Solid foundation using steel frame
JPH11166294A (en) Steel frame-contained concrete beam and floor construction method using the concrete beam
JPH10311041A (en) Column base foundation of precast concrete column
JP2860501B2 (en) Concrete foundation
JP2784450B2 (en) Reinforced concrete foundation
JP3487156B2 (en) Foundation using steel foundation beam and its construction method
JP2784449B2 (en) Steel reinforced concrete foundation
JP3043938B2 (en) Joint structure between reinforced concrete columns and steel beams
JPH0514063B2 (en)
JPH044091Y2 (en)
JPH08209831A (en) Compound ultra-light floor board and manufacture thereof
JPS6195136A (en) Construction of multistoried building skeletal by precast reinforced concrete unit
JP3729890B2 (en) Single-sided precast concrete underground beam and its components
JPS605748B2 (en) Construction method for walls using unit steel formwork
JPH0823148B2 (en) Drop-in steel column base
JP3082147B2 (en) Construction method of reinforced concrete structures
JP3002681B2 (en) Building structure
JPS6139457B2 (en)
JPH02171441A (en) Beam structure for building
JPH1018304A (en) Mat foundation structure and its construction method