JP2019030087A - Power control system - Google Patents
Power control system Download PDFInfo
- Publication number
- JP2019030087A JP2019030087A JP2017145915A JP2017145915A JP2019030087A JP 2019030087 A JP2019030087 A JP 2019030087A JP 2017145915 A JP2017145915 A JP 2017145915A JP 2017145915 A JP2017145915 A JP 2017145915A JP 2019030087 A JP2019030087 A JP 2019030087A
- Authority
- JP
- Japan
- Prior art keywords
- power
- group
- consumer
- power consumption
- control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims description 73
- 230000007423 decrease Effects 0.000 claims description 7
- 239000000446 fuel Substances 0.000 claims description 7
- 230000008569 process Effects 0.000 description 64
- 238000004891 communication Methods 0.000 description 44
- 230000006870 function Effects 0.000 description 21
- 238000012545 processing Methods 0.000 description 14
- 238000010248 power generation Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 102220588441 Keratin, type I cytoskeletal 18_S30A_mutation Human genes 0.000 description 5
- 230000008859 change Effects 0.000 description 5
- 230000009471 action Effects 0.000 description 4
- 230000005611 electricity Effects 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 102220588439 Keratin, type I cytoskeletal 18_S10A_mutation Human genes 0.000 description 3
- 238000013459 approach Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 230000003247 decreasing effect Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 3
- 102220477667 Mitochondrial inner membrane protease subunit 2_S40T_mutation Human genes 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005401 electroluminescence Methods 0.000 description 1
- 235000013305 food Nutrition 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 239000003345 natural gas Substances 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
本発明は、電力制御システム、及び分散電源の電力制御方法に関する。 The present invention relates to a power control system and a power control method for a distributed power supply.
近年、携帯電話等を用いた通信サービスに見られるように、複数の顧客をグループ化し、グループに提供するサービスを顧客単体に提供するサービスよりも向上することで、顧客を取り込む試みが行われている。 In recent years, as seen in communication services using mobile phones, etc., attempts have been made to capture customers by grouping multiple customers and improving the services provided to the group over services that provide the customer alone. Yes.
こうした、顧客をグループ化する試みは、例えば特許文献1〜特許文献4に示すように、電力の供給サービスの分野においても行われ始めている。 Such attempts to group customers have begun to be made in the field of power supply services as shown in, for example, Patent Documents 1 to 4.
電力の供給サービスの分野では、電力供給エリア内における各々の需要家で消費される消費電力の合計値の変動、すなわち負荷変動が、発電コストに影響を与える重要な指標となる。 In the field of electric power supply services, fluctuations in the total value of power consumed by each consumer in the electric power supply area, that is, load fluctuations, is an important index that affects power generation costs.
電力の需給バランスが崩れると、電力供給エリア内で停電が発生するため、電気事業者は、電力供給エリア内における最大消費電力(ピーク電力)以上の電力を供給することができる設備を用意する必要がある。したがって、ピーク電力を低減することで、電力の供給に係る設備投資が抑制される。更に、ピーク電力の低減によって負荷変動が抑制されることで、石油や天然ガスを用いた火力発電より発電コストの安い石炭火力発電や原子力発電のように、年間を通じて一定の割合の電力を供給するベース電源と呼ばれる電源の稼動率を増加することができるため、発電コストを更に低減できる場合がある。 If the power supply / demand balance is disrupted, a power outage will occur in the power supply area, so electric utilities need to prepare equipment that can supply more power than the maximum power consumption (peak power) in the power supply area. There is. Therefore, by reducing peak power, capital investment related to power supply is suppressed. In addition, load fluctuations are suppressed by reducing peak power, so that a certain percentage of electricity is supplied throughout the year, such as coal-fired power generation and nuclear power generation, which have lower power generation costs than thermal power generation using oil and natural gas. Since the operating rate of a power source called a base power source can be increased, the power generation cost may be further reduced.
しかしながら、これまでは電力供給エリア内の負荷変動を抑制する目的で顧客をグループ化することは行われてこなかった。 However, until now, customers have not been grouped for the purpose of suppressing load fluctuations in the power supply area.
本発明は、顧客をグループ化した上で、電力供給エリア内における負荷変動を抑制することができる電力制御システム、及び分散電源の電力制御方法を提供することを目的とする。 An object of the present invention is to provide a power control system and a power control method for a distributed power source that can suppress load fluctuations in a power supply area after grouping customers.
上記目的を達成するために、本発明に係る電力制御システムは、負荷で消費される消費電力を測定する電力計を含むグループ化された複数の需要家と、前記電力計で測定された消費電力を前記需要家の各々から受け付ける受付手段と、前記受付手段で受け付けた前記需要家の各々の消費電力を用いて、グループ内の前記需要家の各々における消費電力の合計値をグループ消費電力としてグループ毎に出力する出力手段と、前記出力手段で出力された何れかのグループの前記グループ消費電力が、グループ毎に予め設定されたグループ契約電力を超えた場合、前記グループ消費電力がグループ契約電力を超えた電力超過グループにおける前記グループ消費電力を、前記電力超過グループが予め設定したグループ契約電力以下に制御する制御手段と、を備えた制御装置と、を含む。 In order to achieve the above object, a power control system according to the present invention includes a plurality of grouped consumers including a power meter that measures power consumption consumed by a load, and power consumption measured by the power meter. Receiving from each of the consumers, and using the power consumption of each of the consumers received by the receiving means, the total power consumption of each of the consumers in the group as a group power consumption When the group consumption power of any group output by the output means and any group output by the output means exceeds the group contract power set in advance for each group, the group power consumption represents the group contract power. Control means for controlling the group power consumption in the excess power excess group to be equal to or less than the group contract power preset by the excess power group , And a control device including a.
また、本発明に係る電力制御システムは、負荷で消費される消費電力を測定する電力計を備えた、少なくとも1つの第1需要家と、前記第1需要家と同じグループを形成し、前記電力計及び自需要家内における前記負荷に電力を供給する分散電源を備えた少なくとも1つの第2需要家と、を備え、前記分散電源の各々が、前記第1需要家における消費電力を前記第1需要家に備えられた前記電力計の各々から受け付けると共に、前記第2需要家における消費電力と、前記第2需要家に備えられた前記分散電源から供給される供給電力の大きさを前記第2需要家に備えられた前記電力計の各々から受け付ける受付手段と、前記受付手段で受け付けた前記第1需要家の各々の消費電力と前記第2需要家の各々の消費電力の合計値から、前記受付手段で受け付けた供給電力の合計値を差し引いた値を前記グループにおけるグループ消費電力として出力する出力手段と、前記出力手段で出力された前記グループ消費電力が、前記グループに対して予め設定したグループ契約電力よりも予め低く設定された警告電力以上となった場合に、自身から供給する供給電力を増加する制御を行う制御手段と、を備えることを特徴とする。 Moreover, the power control system according to the present invention forms at least one first consumer having the power meter for measuring power consumption consumed by a load and the same group as the first consumer, and the power And at least one second consumer having a distributed power source for supplying power to the load in the consumer and each of the consumer, wherein each of the distributed power sources consumes the power consumed by the first consumer in the first demand. The second demand is received from each of the wattmeters provided in a house, and the power consumption in the second consumer and the magnitude of the supplied power supplied from the distributed power source provided in the second consumer. From the reception means received from each of the wattmeters provided in the house, and the total value of the power consumption of each of the first consumers and the power consumption of each of the second consumers received by the reception means, the reception hand An output means for outputting the value obtained by subtracting the total value of the supplied power received in the above as group power consumption in the group; and the group power consumption set in advance for the group by the group power consumption output by the output means. Control means for performing control to increase the supply power supplied from itself when the warning power becomes lower than or equal to a preset warning power.
また、本発明に係る分散電源の電力制御方法は、同じグループに属する各々の需要家の消費電力と、前記需要家の少なくとも1つに備えられた分散電源の供給電力の大きさを受け付け、受け付けた各々の消費電力の合計値から前記分散電源の供給電力の合計値を差し引いたグループ消費電力が、前記グループに対して予め設定したグループ契約電力よりも予め低く設定された警告電力以上となった場合に負荷に供給する供給電力を増加する。 Further, the power control method for the distributed power supply according to the present invention receives and accepts the power consumption of each consumer belonging to the same group and the magnitude of the power supplied to the distributed power supply provided to at least one of the consumers. In addition, the group power consumption obtained by subtracting the total power supply value of the distributed power source from the total power consumption value is equal to or higher than the warning power set in advance lower than the group contract power set in advance for the group. In some cases, the power supplied to the load is increased.
本発明に係る電力制御システム、及び分散電源の電力制御方法によれば、顧客をグループ化した上で、電力供給エリア内における負荷変動を抑制することができる、という効果を有する。 According to the power control system and the power control method of the distributed power supply according to the present invention, it is possible to suppress the load fluctuation in the power supply area after grouping customers.
以下、図面を参照して本発明の実施形態について説明する。なお、同じ機能を有する装置及び処理には、全図面を通して同じ符合を付与し、重複する説明を省略する。 Hereinafter, embodiments of the present invention will be described with reference to the drawings. In addition, the same code | symbol is provided to the apparatus and process which have the same function through all the drawings, and the overlapping description is abbreviate | omitted.
<第1実施形態>
図1は、本実施形態に係る電力制御システム100の構成例を示す図である。電力制御システム100は、電力制御システム100における電力の供給を制御する制御装置10と、電力制御システム100に電力を供給する電力供給源20と、電力供給源20から電力を受電するN戸(Nは2以上の整数)の需要家30−1〜需要家30−Nを含む。
<First Embodiment>
FIG. 1 is a diagram illustrating a configuration example of a power control system 100 according to the present embodiment. The power control system 100 includes a control device 10 that controls power supply in the power control system 100, a power supply source 20 that supplies power to the power control system 100, and N units that receive power from the power supply source 20 (N Is an integer greater than or equal to 2) customer 30-1 to customer 30-N.
以降では、需要家30−1〜需要家30−Nを区別して説明する必要がない場合、需要家30−1〜需要家30−Nを総称して「需要家30」ということにする。 Hereinafter, when it is not necessary to distinguish and explain the customer 30-1 to the customer 30-N, the customer 30-1 to the customer 30-N will be collectively referred to as “the customer 30”.
各々の需要家30には、電力計32と、電力計32に接続されたM個(Mは1以上の整数)の負荷34−1〜負荷34−Mが設置される。 Each consumer 30 is provided with a power meter 32 and M loads 34-1 to 34-M connected to the power meter 32 (M is an integer of 1 or more).
電力計32は、通信回線40で制御装置10と接続されると共に、電力線50で電力供給源20と接続される。電力計32を経由して電力供給源20から受電した電力は、各々の負荷34−1〜負荷34−Mに供給され、電力計32は、電力供給源20から受電した電力、すなわち負荷34−1〜負荷34−Mの各々で消費される消費電力の合計値を測定する消費電力測定機能を有する。なお、各々の需要家30において消費される消費電力の合計値を、単に「需要家30の消費電力」という場合がある。 The wattmeter 32 is connected to the control device 10 via the communication line 40 and is connected to the power supply source 20 via the power line 50. The power received from the power supply source 20 via the wattmeter 32 is supplied to each of the loads 34-1 to 34-M, and the wattmeter 32 receives the power received from the power supply source 20, that is, the load 34-. 1 to 34-M having a power consumption measuring function for measuring a total value of power consumed by each of the loads 34-M. In addition, the total value of power consumption consumed in each consumer 30 may be simply referred to as “power consumption of consumer 30”.
また、電力計32は、測定した需要家30の消費電力を、例えば5分といった予め定めた間隔で通信回線40を介して制御装置10に送信する通信機能を有する。ここで、需要家30の消費電力の送信間隔を規定する予め定めた間隔の設定に制約はなく、例えば、数ミリ秒等、他の値であってもよい。電力計32は、需要家30の消費電力を必ずしも予め定めた間隔で送信する必要はなく、例えば、消費電力の増減率が予め定めた割合だけ変動する等の予め定めた事象が発生した場合に送信してもよい。更に言えば、電力計32は、需要家30の消費電力を予め定めた間隔で送信しながら、例えば毎正時のように予め定めた事象が発生する毎に不定期に送信してもよい。 The wattmeter 32 has a communication function for transmitting the measured power consumption of the customer 30 to the control device 10 via the communication line 40 at a predetermined interval such as 5 minutes. Here, there is no restriction on the setting of the predetermined interval that defines the transmission interval of the power consumption of the consumer 30, and other values such as several milliseconds may be used. The wattmeter 32 does not necessarily have to transmit the power consumption of the customer 30 at a predetermined interval. For example, when a predetermined event occurs such that the increase / decrease rate of the power consumption fluctuates by a predetermined ratio. You may send it. Furthermore, the power meter 32 may transmit irregularly every time a predetermined event occurs, for example, every hour on the hour, while transmitting the power consumption of the consumer 30 at a predetermined interval.
なお、需要家30に、制御装置10と通信するための通信機能を有しない電力計が予め設置されている場合、制御装置10と通信するための通信機能を備えた補助装置を当該電力計に接続することで、本実施形態に係る電力計32とすることができる。 In addition, when the power meter which does not have a communication function for communicating with the control apparatus 10 is previously installed in the consumer 30, the auxiliary | assistant apparatus provided with the communication function for communicating with the control apparatus 10 is set to the said watt meter. It can be set as the wattmeter 32 which concerns on this embodiment by connecting.
また、電力計32には、制御装置10から受電停止指示を受け付けると、電力供給源20からの受電を停止する電力遮断機能が備えられている。このように、消費電力測定機能、通信機能、及び電力遮断機能を有する電力計32には、例えばスマートメータが適用される。 Further, the wattmeter 32 is provided with a power cut-off function for stopping power reception from the power supply source 20 when a power reception stop instruction is received from the control device 10. Thus, for example, a smart meter is applied to the wattmeter 32 having the power consumption measuring function, the communication function, and the power cutoff function.
なお、制御装置10と各々の需要家30の電力計32を接続する通信回線40の接続形態は、有線であっても無線であってもよい。また、通信回線40は、不特定多数の人によって共有される公衆回線であっても、制御装置10と電力計32だけが接続される専用回線であってもよい。 The connection form of the communication line 40 that connects the control device 10 and the power meter 32 of each consumer 30 may be wired or wireless. The communication line 40 may be a public line shared by an unspecified number of people or a dedicated line to which only the control device 10 and the wattmeter 32 are connected.
各々の需要家30の中には、他の需要家30と共に予めグループを形成している需要家30が存在する。グループを形成していない単独の需要家30は、需要家30毎に受電可能な電力の上限値である契約電力を、電力供給源20を所管する電気事業者との間で契約する。一方、グループを形成する各々の需要家30は、グループに含まれる需要家30毎ではなく、グループ単位で電力供給源20を所管する電気事業者との間で契約電力を契約する。 Within each customer 30, there is a customer 30 that forms a group in advance with other customers 30. A single consumer 30 that does not form a group contracts contract power, which is the upper limit value of power that can be received for each consumer 30, with an electric power company that has jurisdiction over the power supply source 20. On the other hand, each customer 30 that forms a group contracts contract power with an electric power company that has jurisdiction over the power supply source 20 in units of groups, not for each customer 30 included in the group.
通常、需要家30は、需要家30における消費電力の最大値を推定し、推定した消費電力にいくらかの余裕分を加味した、推定した消費電力を超える電力を契約電力として契約する。一方、グループに含まれる各々の需要家30が単独で契約する際の契約電力の合計値をそのままグループ単位の契約電力とした場合、需要家30がそれぞれ加味した消費電力の余裕分も加算され、推定した消費電力の合計値に対して消費電力の余裕分が大きくなり過ぎることがある。したがって、グループ単位の契約電力は、グループに含まれる各々の需要家30が単独で契約する契約電力の合計値より低い電力に設定される傾向がある。 Normally, the customer 30 estimates the maximum value of power consumption in the customer 30, and contracts the power exceeding the estimated power consumption by adding some margin to the estimated power consumption as contract power. On the other hand, when the total value of the contract power when each customer 30 included in the group contracts alone is used as the contract power of the group unit as it is, the margin of the power consumption that each customer 30 takes into account is added, The margin of power consumption may become too large with respect to the estimated total power consumption. Therefore, the contract power for each group tends to be set to a power lower than the total value of the contract power contracted by each customer 30 included in the group.
例えば、契約電力がP1kWの需要家Aと、契約電力がP2kWの需要家Bがグループを組んだ場合について考える。需要家Aが昼間に比較的電力を消費する需要家30であり、需要家Bが夜間に比較的電力を消費する需要家30であるとすると、需要家Aの消費電力が少ない時間帯に需要家Bが電力を消費することになるため、当該グループの契約電力は、各々の需要家の契約電力を足し合わせた(P1+P2)kWより低く設定することができる。なお、以降では、グループ毎に予め設定された契約電力を「グループ契約電力」ということにする。 For example, consider a case where a consumer A whose contract power is P 1 kW and a consumer B whose contract power is P 2 kW form a group. Assuming that the consumer A is a consumer 30 who consumes relatively power during the daytime and the consumer B is a consumer 30 who consumes relatively electricity during the night, the demand is consumed during a time when the consumer A consumes less power. Since house B consumes power, the contract power of the group can be set lower than (P 1 + P 2 ) kW, which is the sum of the contract power of each consumer. Hereinafter, the contract power preset for each group is referred to as “group contract power”.
図2は、制御装置10の構成例を示す図である。制御装置10は、例えばコンピュータ60を用いて構成される。 FIG. 2 is a diagram illustrating a configuration example of the control device 10. The control device 10 is configured using a computer 60, for example.
コンピュータ60は、本実施形態に係る出力手段及び制御手段の一例であるCPU(Central Processing Unit)61、ROM(Read Only Memory)62、RAM(Random Access Memory)63、不揮発性メモリ64及び入出力インターフェース(I/O)65を備える。そして、CPU61、ROM62、RAM63、不揮発性メモリ64、及びI/O65がバス66を介して各々接続されている。不揮発性メモリ64としてはハードディスクの他、例えばフラッシュメモリを利用したSSD(Solid State Drive)が用いられる。 The computer 60 includes a CPU (Central Processing Unit) 61, a ROM (Read Only Memory) 62, a RAM (Random Access Memory) 63, a nonvolatile memory 64, and an input / output interface, which are examples of output means and control means according to the present embodiment. (I / O) 65 is provided. The CPU 61, ROM 62, RAM 63, nonvolatile memory 64, and I / O 65 are connected via a bus 66. As the nonvolatile memory 64, for example, an SSD (Solid State Drive) using a flash memory is used in addition to a hard disk.
I/O65には、例えば入力装置70、表示装置72、及び通信装置74が接続される。 For example, an input device 70, a display device 72, and a communication device 74 are connected to the I / O 65.
入力装置70は、制御装置10の操作者の指示を受け付けてCPU61に通知する装置であり、例えばキーボード、マウス、タッチパネル、及びマイク等が用いられる。 The input device 70 is a device that receives an instruction from an operator of the control device 10 and notifies the CPU 61 of the input device 70. For example, a keyboard, a mouse, a touch panel, a microphone, and the like are used.
表示装置72は、CPU61の制御によって生成された情報を画像として表示する装置であり、例えば液晶ディスプレイ、及び有機EL(Electroluminescence)ディスプレイ等が用いられる。 The display device 72 is a device that displays information generated by the control of the CPU 61 as an image. For example, a liquid crystal display, an organic EL (Electroluminescence) display, or the like is used.
通信装置74は通信回線40に接続され、需要家30に設置された各々の電力計32と電文を送受信する通信プロトコルを備える。すなわち、通信装置74は、各々の電力計32から需要家30の消費電力を受け付ける受付手段の一例である。 The communication device 74 is connected to the communication line 40 and includes a communication protocol for transmitting / receiving a message to / from each wattmeter 32 installed in the consumer 30. That is, the communication device 74 is an example of a reception unit that receives the power consumption of the customer 30 from each wattmeter 32.
なお、I/O65に接続される装置は図2に例示された装置に限定されない。例えば電力計32との通信が切断された場合に警報を報知する報知装置を接続してもよい。また、入力装置70及び表示装置72は、必ずしも制御装置10に必須の装置ではない。 The device connected to the I / O 65 is not limited to the device illustrated in FIG. For example, you may connect the alerting | reporting apparatus which alert | reports an alarm, when communication with the wattmeter 32 is cut | disconnected. Further, the input device 70 and the display device 72 are not necessarily devices essential to the control device 10.
次に、図3を参照して、制御装置10で実行される、電力制御システム100の電力制御処理の作用について説明する。 Next, with reference to FIG. 3, the effect | action of the electric power control process of the electric power control system 100 performed with the control apparatus 10 is demonstrated.
図3は、制御装置10が起動した後に、CPU61によって実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 3 is a flowchart showing an example of the flow of power control processing executed by the CPU 61 after the control device 10 is activated.
電力制御処理を規定する電力制御プログラムは、例えばROM62に予め記憶されている。CPU61は、ROM62に記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control processing is stored in advance in the ROM 62, for example. The CPU 61 reads a power control program stored in the ROM 62 and executes a power control process.
なお、不揮発性メモリ64には、グループと当該グループに含まれる需要家30とを対応付ける需要家情報が予め記憶されているものとし、RAM63には、通信装置74を介して受け付けた需要家30毎の最新の消費電力が記憶されているものとする。グループを組んでいない需要家30は、各々の需要家30をそれぞれ1つのグループとみなせばよい。 The nonvolatile memory 64 stores customer information that associates the group with the customer 30 included in the group in advance, and the RAM 63 stores each customer 30 received via the communication device 74. It is assumed that the latest power consumption is stored. The consumer 30 who does not form a group should just consider each consumer 30 as one group, respectively.
まず、ステップS10において、制御装置10は需要家情報を参照し、需要家30が何れのグループに属するか特定し、RAM63に記憶されている需要家30毎の最新の消費電力を用いてグループ消費電力を算出する。ここで、「グループ消費電力」とは、同じグループに含まれる全ての需要家30の消費電力の合計値であり、グループ単位の消費電力を表す。 First, in step S <b> 10, the control device 10 refers to the consumer information, identifies which group the consumer 30 belongs to, and uses the latest power consumption for each consumer 30 stored in the RAM 63 to perform group consumption. Calculate power. Here, “group power consumption” is a total value of power consumption of all the consumers 30 included in the same group, and represents power consumption in units of groups.
ステップS20において、制御装置10は、ステップS10で算出したグループ消費電力が、グループ毎に予め設定されたグループ契約電力を超えるグループが存在するか否かを判定する。なお、グループ契約電力は、各々のグループと対応付ける形式で需要家情報に予め記憶しておけばよい。以降では、グループ消費電力がグループ契約電力を超えるグループを「電力超過グループ」ということにする。 In step S20, the control device 10 determines whether there is a group in which the group power consumption calculated in step S10 exceeds the group contract power set in advance for each group. The group contract power may be stored in advance in the customer information in a format associated with each group. Hereinafter, a group whose group power consumption exceeds the group contract power is referred to as a “power excess group”.
ステップS20の判定処理において電力超過グループが存在しない場合、後ほど説明するステップS50に移行する。一方、各グループの中に電力超過グループが少なくとも1つ存在する場合には、ステップS30に移行する。 When the power excess group does not exist in the determination process of step S20, the process proceeds to step S50 described later. On the other hand, when at least one power excess group exists in each group, the process proceeds to step S30.
ステップS30において、制御装置10は、グループ消費電力がグループ契約電力以下となるように、電力超過グループの各々に対して、電力供給源20からの受電を停止させる需要家30を選択する。グループ消費電力がグループ契約電力以下になりさえすれば、制御装置10は、受電を停止させる需要家30をどのように選択してもよい。例えば、不揮発性メモリ64に、グループ消費電力がグループ契約電力を超えた場合に受電を停止する需要家30の順序(受電停止順序)をグループ毎に予め記憶しておき、制御装置10は受電停止順序に従って、グループ消費電力がグループ契約電力以下となるまで、需要家30を順番に停止させてもよい。この場合、受電を停止する需要家30の順序が予め決まっているため、グループ消費電力がグループ契約電力を超えてから受電停止順序を決定する場合と比較して、より早く需要家30の受電を停止することができる。 In step S <b> 30, the control device 10 selects the customer 30 that stops receiving power from the power supply source 20 for each of the power excess groups so that the group power consumption is equal to or less than the group contract power. As long as the group power consumption is equal to or less than the group contract power, the control device 10 may select the consumer 30 that stops power reception. For example, the non-volatile memory 64 stores in advance the order of the consumers 30 that stop receiving power when the group power consumption exceeds the group contract power (power receiving stop order) for each group, and the control device 10 stops receiving power. According to the order, the customer 30 may be stopped in order until the group power consumption becomes equal to or less than the group contract power. In this case, since the order of the consumers 30 to stop power reception is determined in advance, the power reception of the consumers 30 is received earlier than in the case of determining the power reception stop order after the group power consumption exceeds the group contract power. Can be stopped.
また、制御装置10は、電力超過グループの各々に対して、グループ消費電力がグループ契約電力以下となるまで、消費電力が多い需要家30から優先的に受電を停止させるように制御することが好ましい。この場合、受電を停止させる需要家30の数を最小にすることができる。なお、ステップS30で選択した、受電を停止させる対象となった需要家30を「受電停止需要家」という。 Moreover, it is preferable that the control apparatus 10 controls each power excess group so that power reception is preferentially stopped from the consumer 30 with high power consumption until the group power consumption becomes equal to or less than the group contract power. . In this case, the number of consumers 30 for stopping power reception can be minimized. Note that the customer 30 selected in step S30 and whose power reception is to be stopped is referred to as a “power reception stopped customer”.
ステップS40において、制御装置10は、通信装置74に接続された通信回線40を介して、ステップS30で選択した各々の受電停止需要家に対して、受電の停止を指示する受電停止指示を送信する。 In step S <b> 40, the control device 10 transmits a power reception stop instruction instructing stop of power reception to each power reception stop consumer selected in step S <b> 30 via the communication line 40 connected to the communication device 74. .
受電停止指示を受信した各受電停止需要家の電力計32は、電力供給源20から供給される電力を遮断し、受電を停止する。これにより、各々の電力超過グループにおけるそれぞれのグループ消費電力が、各々の電力超過グループが契約しているグループ契約電力以下に制限される。 The power meter 32 of each power receiving stop consumer who has received the power receiving stop instruction cuts off the power supplied from the power supply source 20 and stops receiving power. Thereby, each group power consumption in each power excess group is limited to be equal to or less than the group contract power contracted by each power excess group.
ステップS50において、制御装置10は、入力装置70を介して制御装置10の操作者から制御終了指示を受け付けたか否かを判定する。制御終了指示を受け付けた場合は、図3に示した電力制御処理を終了する。一方、制御終了指示を受け付けていない場合にはステップS10に移行し、ステップS10〜S50の処理を、制御終了指示を受け付けるまで繰り返し実行することで、各グループのグループ消費電力がグループ毎に設定されるグループ契約電力以下となるように電力の需給バランスが制御されることになる。 In step S <b> 50, the control device 10 determines whether a control end instruction has been received from the operator of the control device 10 via the input device 70. When the control end instruction is received, the power control process shown in FIG. 3 is ended. On the other hand, when the control end instruction is not received, the process proceeds to step S10, and the group power consumption of each group is set for each group by repeatedly executing the processes of steps S10 to S50 until the control end instruction is received. The power supply / demand balance is controlled so that it is less than or equal to the group contract power.
なお、電力制御システム100では、電力計32が需要家30の消費電力を予め定めた間隔で制御装置10に送信する形態について説明したが、制御装置10が各々の電力計32に対して需要家30の消費電力を送信するよう指示を出すポーリングを行ってもよい。また、例えばステップS50の判定処理が否定判定の場合、予め定めた時間だけ待機した後、ステップS10に移行することで、グループ消費電力の監視間隔を調整するようにしてもよい。 In addition, although the power control system 100 demonstrated the form in which the wattmeter 32 transmitted the power consumption of the consumer 30 to the control apparatus 10 at the predetermined interval, the control apparatus 10 is a consumer with respect to each wattmeter 32. Polling for instructing to transmit 30 power consumption may be performed. For example, when the determination process in step S50 is negative, the group power consumption monitoring interval may be adjusted by waiting for a predetermined time and then moving to step S10.
このように本実施形態に係る制御装置10によれば、グループ消費電力をグループ毎に監視し、電力超過グループを検出した場合には、電力超過グループ内の少なくとも1つの需要家30の受電を停止させることで、グループ消費電力がグループ契約電力以下となるように制御する。 As described above, according to the control device 10 according to the present embodiment, group power consumption is monitored for each group, and when an excess power group is detected, power reception of at least one customer 30 in the excess power group is stopped. By doing so, the group power consumption is controlled to be equal to or less than the group contract power.
すなわち、需要家30をグループ化することで、グループ契約電力がグループに含まれる各々の需要家30が単独で契約する契約電力の合計値より低い値に設定されやすくなるため、需要家30をグループ化しない場合と比較して、電力供給エリア内のピーク電力が低減され、負荷変動が抑制されることになる。 That is, grouping the consumers 30 makes it easy to set the group contract power to a value lower than the total contract power contracted by each customer 30 included in the group. Compared with the case where the power supply is not changed, the peak power in the power supply area is reduced, and the load fluctuation is suppressed.
電気事業者は、例えばグループ契約電力に応じて設定する基本料金を、グループを組まずにグループ契約電力と同じ大きさの電力を契約電力として契約する個別の需要家30の基本料金より低く抑えることで需要家30のグループ化を促進し、電力の購入先を変更する需要家30の数を抑制することができる。また、需要家30のグループ化が促進されるにつれ、電力供給エリア内のピーク電力が更に低減される傾向を示すため、負荷変動が更に抑制されることになる。 For example, the electric power company keeps the basic charge set according to the group contract power lower than the basic charge of an individual customer 30 who contracts the same amount of power as the group contract power as a contract power without forming a group. Thus, the grouping of the consumers 30 can be promoted, and the number of consumers 30 who change the power purchase destination can be suppressed. Further, as the grouping of the consumers 30 is promoted, the peak power in the power supply area tends to be further reduced, so that the load fluctuation is further suppressed.
<第1実施形態の変形例1>
図3に示した電力制御処理では、受電停止需要家で停電が発生することになるが、受電停止需要家から見た場合、停電が突然発生するよりも、事前に停電の可能性があることを示す通知を受け取ってから停電が発生する方が好ましい。
<Variation 1 of the first embodiment>
In the power control process shown in FIG. 3, a power outage occurs at a power receiving stop consumer, but when viewed from a power receiving stop consumer, there is a possibility of a power outage in advance rather than a power outage suddenly occurring. It is preferable that a power outage occurs after receiving a notification indicating.
したがって、ここでは、グループ消費電力をグループ契約電力以下に抑制する制御に伴って停電が発生する可能性がある場合に、需要家30に事前に警告を通知する制御装置10について説明する。 Therefore, here, the control device 10 that notifies a warning to the customer 30 in advance when there is a possibility that a power failure may occur in association with the control for suppressing the group power consumption to be equal to or less than the group contract power will be described.
図4は、制御装置10が起動した後に、CPU61によって実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 4 is a flowchart illustrating an example of a flow of power control processing executed by the CPU 61 after the control device 10 is activated.
電力制御処理を規定する電力制御プログラムは、例えばROM62に予め記憶されている。CPU61は、ROM62に記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control processing is stored in advance in the ROM 62, for example. The CPU 61 reads a power control program stored in the ROM 62 and executes a power control process.
図4に示す電力制御処理が、図3に示した電力制御処理と異なる点は、ステップS22〜S26が追加された点であり、他の部分は、図3に示した電力制御処理と同じである。 The power control process shown in FIG. 4 is different from the power control process shown in FIG. 3 in that steps S22 to S26 are added, and the other parts are the same as the power control process shown in FIG. is there.
ステップS20で電力超過グループが存在しないと判定された場合、ステップS22が実行される。 If it is determined in step S20 that there is no excess power group, step S22 is executed.
ステップS22において、制御装置10は、各々のグループの中に、グループ消費電力がグループ毎に予め設定された警告電力以上あるグループが存在するか否かを判定する。警告電力は、グループ消費電力がこれ以上の値となった場合、グループ契約電力に達する可能性が高いことを表す閾値であり、グループ契約電力より低い値に設定される。なお、設定された警告電力は、各々のグループと対応付ける形式で需要家情報に予め記憶しておけばよい。以降では、グループ消費電力が警告電力以上であるグループを「警告対象グループ」ということにする。 In step S <b> 22, the control device 10 determines whether or not there is a group whose group power consumption is greater than or equal to warning power set in advance for each group in each group. The warning power is a threshold value indicating that there is a high possibility of reaching the group contract power when the group power consumption becomes a value higher than this, and is set to a value lower than the group contract power. In addition, what is necessary is just to memorize | store the warning power set in the customer information in a format associated with each group. Hereinafter, a group whose group power consumption is equal to or higher than warning power is referred to as a “warning target group”.
ステップS22の判定処理において警告対象グループが存在しない場合にはステップS50に移行し、制御終了指示を受け付けたか否かを判定する。一方、警告対象グループが存在する場合にはステップS24に移行する。 If the warning target group does not exist in the determination process of step S22, the process proceeds to step S50, and it is determined whether a control end instruction is accepted. On the other hand, when the warning target group exists, the process proceeds to step S24.
ステップS24において、制御装置10は、警告対象グループの各々について、グループ消費電力がグループ契約電力を超えた場合、受電を停止させる可能性がある需要家30、すなわち「停電対象需要家」を選択する。 In step S <b> 24, for each of the warning target groups, the control device 10 selects a consumer 30 that may stop receiving power when the group power consumption exceeds the group contract power, that is, a “power failure target consumer”. .
停電対象需要家の選択方法に制約はなく、警告対象グループに含まれる全ての需要家30を選択してもよいし、消費電力が多い需要家30から優先的に、予め定めた割合又は予め定めた数の需要家30を選択してもよい。 There is no restriction on the method of selecting the power outage target consumers, all the customers 30 included in the warning target group may be selected, or a predetermined ratio or a predetermined amount is preferentially selected from the consumers 30 with high power consumption. A number of consumers 30 may be selected.
ステップS26において、制御装置10は、ステップS24で選択した各々の停電対象需要家に対して、停電の可能性があることを示す警告を通知する。 In step S26, the control apparatus 10 notifies the warning which shows that there exists a possibility of a power failure with respect to each power failure object consumer selected in step S24.
警告の通知方法としては、例えば需要家30の各々が予め登録した携帯電話又はスマートフォン等のメールアドレス宛に、通信装置74を用いて警告メッセージを送信する方法が用いられるが、警告の通知方法に特に制約はない。例えば、電力計32に警告を報知する報知機能が備えられている場合、制御装置10は停電対象需要家の電力計32に警告指示を送信し、電力計32から警告を報知させるようにしてもよい。メールアドレス等の警告の通知先情報は、各々の需要家30と対応付ける形式で需要家情報に予め記憶しておけばよい。警告を報知する携帯電話、スマートフォン、及び電力計32は報知装置の一例である。 As a warning notification method, for example, a method of transmitting a warning message using a communication device 74 to a mail address such as a mobile phone or a smartphone registered in advance by each customer 30 is used. There are no particular restrictions. For example, when the notification function for notifying the wattmeter 32 is provided, the control device 10 transmits a warning instruction to the wattmeter 32 of the power outage target consumer so that the wattmeter 32 notifies the warning. Good. The notification destination information such as an email address may be stored in advance in the customer information in a format associated with each customer 30. A mobile phone, a smartphone, and a power meter 32 that notify a warning are examples of a notification device.
図4の電力制御処理では、グループ消費電力が警告電力以上で、かつ、グループ契約電力以下と判定される毎に停電対象需要家に警告が通知されるが、グループ消費電力の監視間隔によっては、警告が連続して通知される場合がある。したがって、ステップS26で停電対象需要家に対して警告を通知した時刻をRAM63に記憶し、前回警告を通知した時刻から予め定めた時間(例えば30分)が経過するまでは、同じ停電対象需要家に対して警告を通知しないようにしてもよい。 In the power control process of FIG. 4, a warning is notified to a power failure target consumer every time it is determined that the group power consumption is greater than or equal to the warning power and less than or equal to the group contract power, but depending on the monitoring interval of the group power consumption, A warning may be notified continuously. Therefore, the time when the warning is notified to the power failure target consumer in step S26 is stored in the RAM 63, and the same power failure target consumer until a predetermined time (for example, 30 minutes) elapses from the time when the previous warning was notified. The warning may not be notified.
また、制御装置10は、警告対象グループのグループ消費電力が警告電力未満に低下した場合、当該警告対象グループの停電対象需要家に対して、停電の可能性が低下したことを表す情報、すなわち警告の解除を報知装置に通知してもよい。しかしながら、この場合、グループ消費電力が警告電力を挟んで繰り返し上下するように変化すると、警告と警告の解除が繰り返し交互に通知されることがあるため、警告対象グループのグループ消費電力が警告電力より低い値に予め設定された警告解除電力未満に低下した場合に警告の解除を通知するようにしてもよい。なお、警告解除電力もグループ毎に予め設定される値であり、各々のグループと対応付ける形式で需要家情報に予め記憶しておけばよい。 In addition, when the group power consumption of the warning target group decreases to less than the warning power, the control device 10 provides information indicating that the possibility of a power failure has decreased with respect to the power failure target customer of the warning target group, that is, a warning. May be notified to the notification device. However, in this case, if the group power consumption changes so as to repeatedly rise and fall across the warning power, the warning and the cancellation of the warning may be alternately and repeatedly notified, so the group power consumption of the warning target group is greater than the warning power. A warning cancellation may be notified when the warning power lowers to a lower value than a preset value. The warning canceling power is also a value set in advance for each group, and may be stored in advance in the customer information in a form associated with each group.
このように、本実施形態の変形例1に係る制御装置10は、グループ消費電力が警告電力を超えた場合、受電が停止される可能性のある需要家30に対して事前に警告を通知する。したがって、警告の通知を受け付けた需要家30では、不要不急な負荷34を停止する等、停電を回避する行動をとる時間が確保されることになる。 As described above, when the group power consumption exceeds the warning power, the control device 10 according to the first modification of the present embodiment notifies a warning to the customer 30 who may stop receiving power in advance. . Therefore, in the customer 30 that has received the warning notification, a time for taking an action to avoid a power failure, such as stopping the unnecessary load 34, is secured.
<第2実施形態>
第1実施形態に係る制御装置10は、電力超過グループを検出した場合には、電力超過グループ内の少なくとも1つの需要家30の受電を停止し、停電させることで、グループ消費電力がグループ契約電力以下となるように制御した。第2実施形態では、グループ消費電力がグループ契約電力を超えた場合であっても、需要家30を停電させることなくグループ消費電力がグループ契約電力以下となるように制御する制御装置10Aについて説明する。
Second Embodiment
When detecting the power excess group, the control device 10 according to the first embodiment stops the power reception of at least one customer 30 in the power excess group and causes a power failure, so that the group power consumption becomes the group contract power. Control was performed as follows. In 2nd Embodiment, even if it is a case where group power consumption exceeds group contract power, 10 A of control apparatuses which control so that group power consumption becomes below group contract power, without making the customer 30 blackout are demonstrated. .
図5は、本実施形態に係る電力制御システム100Aの構成例を示す図である。図5に示す電力制御システム100Aの構成例が、図1に示した電力制御システム100の構成例と異なる点は、制御装置10が制御装置10Aに置き換えられると共に、電力計32が電力計32Aに置き換えられた点である。 FIG. 5 is a diagram illustrating a configuration example of the power control system 100A according to the present embodiment. The configuration example of the power control system 100A shown in FIG. 5 is different from the configuration example of the power control system 100 shown in FIG. 1 in that the control device 10 is replaced with the control device 10A and the wattmeter 32 is replaced with the wattmeter 32A. This is the point that was replaced.
ここで、電力計32Aは、電力計32と以下の点で異なるが、その他の点については電力計32と同じ機能を有する。 Here, the wattmeter 32A differs from the wattmeter 32 in the following points, but has the same function as the wattmeter 32 in other points.
電力計32Aは、負荷34−1〜負荷34−Mの各々で消費される消費電力を個別に測定し、負荷34−1〜負荷34−Mの各々で消費される消費電力の合計値と共に、負荷34−1〜負荷34−Mの各々で消費される消費電力を、それぞれ負荷34−1〜負荷34−Mが接続される端子番号と対応付けて制御装置10に送信するものとする。また、電力計32Aは、制御装置10Aから端子番号を指定した遮断指示を受け付けると、指定された端子番号から負荷34に供給する電力を遮断する電力遮断機能が備えられているものとする。すなわち、遮断指示によって指定された端子番号に接続されている負荷34は強制的に駆動を停止する。 The power meter 32A individually measures the power consumption consumed by each of the loads 34-1 to 34-M, and together with the total value of the power consumption consumed by each of the loads 34-1 to 34-M, The power consumption consumed by each of the loads 34-1 to 34-M is transmitted to the control device 10 in association with the terminal numbers to which the loads 34-1 to 34-M are connected. Further, the power meter 32A is assumed to be provided with a power cut-off function for cutting off the power supplied to the load 34 from the designated terminal number when receiving a cut-off instruction designating the terminal number from the control device 10A. That is, the load 34 connected to the terminal number designated by the cutoff instruction is forcibly stopped.
なお、制御装置10Aの構成例は、図2に示した制御装置10の構成例と同じ構成例が用いられる。 The configuration example of the control device 10A is the same as the configuration example of the control device 10 illustrated in FIG.
次に、図6を参照して、制御装置10Aで実行される、電力制御システム100Aの電力制御処理の作用について説明する。 Next, with reference to FIG. 6, the effect | action of the power control process of 100 A of power control systems performed with 10 A of control apparatuses is demonstrated.
図6は、制御装置10Aが起動した後に、CPU61によって実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 6 is a flowchart illustrating an example of the flow of power control processing executed by the CPU 61 after the control device 10A is activated.
電力制御処理を規定する電力制御プログラムは、例えばROM62に予め記憶されている。CPU61は、ROM62に記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control processing is stored in advance in the ROM 62, for example. The CPU 61 reads a power control program stored in the ROM 62 and executes a power control process.
図6に示す電力制御処理が図3に示した電力制御処理と異なる点は、ステップS30がステップS30Aに置き換えられると共に、ステップS40がステップS40Aに置き換えられた点である。 The power control process shown in FIG. 6 is different from the power control process shown in FIG. 3 in that step S30 is replaced with step S30A and step S40 is replaced with step S40A.
図6のステップS20で少なくとも1つの電力超過グループが存在すると判定された場合、ステップS30Aが実行される。 If it is determined in step S20 in FIG. 6 that at least one power excess group exists, step S30A is executed.
ステップS30Aにおいて、制御装置10Aは、グループ消費電力がグループ契約電力以下となるように、電力超過グループの各々について、駆動を停止させる負荷34を選択する。具体的には、電力超過グループに含まれる各需要家30の電力計32から送信される、端子番号と対応付けられた消費電力を参照し、グループ消費電力がグループ契約電力以下となるように、電力を消費する負荷34が接続された少なくとも1つの端子番号を選択する。この場合、特定の需要家30における全ての負荷34の駆動が停止しないように端子番号を選択した上で、グループ消費電力がグループ契約電力以下になりさえすれば、制御装置10Aは、どの需要家30のどの端子番号を選択してもよい。なお、ステップS30Aで選択した、電力の供給を停止させる対象となった負荷34を「強制停止負荷」という。 In step S30A, the control device 10A selects the load 34 to stop driving for each of the power excess groups so that the group power consumption is equal to or less than the group contract power. Specifically, referring to the power consumption associated with the terminal number transmitted from the power meter 32 of each customer 30 included in the power excess group, so that the group power consumption is equal to or less than the group contract power, At least one terminal number to which the power consuming load 34 is connected is selected. In this case, after selecting the terminal number so that the driving of all the loads 34 in the specific consumer 30 is not stopped, the control device 10A can select which consumer as long as the group power consumption is equal to or less than the group contract power. Any of 30 terminal numbers may be selected. The load 34 selected in step S30A and targeted for stopping the supply of power is referred to as “forced stop load”.
なお、制御装置10Aに、強制停止負荷に選択して欲しくない負荷34を需要家30毎に予め登録しておいてもよい。例えば冷蔵庫等は電力の供給が遮断されると、収容されている食品等の衛生面に影響を与えることが考えられる。したがって、電力の供給が停止されることによって不都合が生じる負荷34は、強制停止負荷から除外することが好ましい。 Note that a load 34 that is not desired to be selected as the forced stop load may be registered in advance in the control device 10A for each customer 30. For example, when power supply is interrupted in a refrigerator or the like, it may be considered to affect the sanitation of foods stored therein. Therefore, it is preferable to exclude the load 34 that causes inconvenience when the supply of power is stopped from the forced stop load.
ステップS40Aにおいて、制御装置10Aは、通信装置74に接続された通信回線40を介して、ステップS30Aで選択した強制停止負荷を有する需要家30の電力計32Aに対して、強制停止負荷が接続される端子番号を指定した遮断指示を送信する。 In step S40A, the control device 10A is connected with the forced stop load to the wattmeter 32A of the customer 30 having the forced stop load selected in step S30A via the communication line 40 connected to the communication device 74. Sends a shut-off instruction with the specified terminal number.
遮断指示を受信した需要家30の電力計32Aは、遮断指示で指定された端子番号から負荷34に供給される電力を遮断する。これにより、各々の電力超過グループにおけるグループ消費電力が、各々の電力超過グループが契約しているグループ契約電力以下に制限される。 The wattmeter 32A of the customer 30 that has received the cutoff instruction cuts off the power supplied to the load 34 from the terminal number designated by the cutoff instruction. Thereby, the group power consumption in each power excess group is limited to be equal to or less than the group contract power contracted by each power excess group.
このように第2実施形態に係る制御装置10Aによれば、電力超過グループに含まれる何れの需要家30も停電させることなく、電力超過グループのグループ消費電力をグループ契約電力以下にすることができる。 As described above, according to the control device 10A according to the second embodiment, the group power consumption of the power excess group can be made equal to or less than the group contract power without causing any customer 30 included in the power excess group to power out. .
<第3実施形態>
第1実施形態に係る電力制御システム100、及び第2実施形態に係る電力制御システム100Aでは、需要家30が、消費する全ての電力を契約する電気事業者から受電する例について説明したが、需要家30の中には、負荷34に電力を供給する分散電源を設置している場合がある。分散電源とは、火力発電所や原子力発電所のように電気事業者が運用及び管理を行う大規模な電源ではなく、例えば需要家30の敷地内といった、電力の消費地である需要家30により近い場所に設置される、需要家30が運用及び管理を行う電源をいう。分散電源には、例えば蓄電池、太陽電池、燃料電池、及びガスを用いて電気と熱を生成するコジェネレーションシステム等が含まれる。
<Third Embodiment>
In the power control system 100 according to the first embodiment and the power control system 100A according to the second embodiment, the example in which the customer 30 receives power from an electric power company that contracts all the power to be consumed has been described. In some cases, a distributed power source that supplies power to the load 34 may be installed in the house 30. A distributed power source is not a large-scale power source that is operated and managed by an electric power company like a thermal power plant or a nuclear power plant, but by a consumer 30 that is a power consumption area, for example, in the site of the customer 30 A power source installed and operated by a consumer 30 in a nearby location. Distributed power sources include, for example, storage batteries, solar cells, fuel cells, and cogeneration systems that generate electricity and heat using gas.
以降では、例えば太陽電池のように供給する電力の大きさの制御が困難な電源ではなく、蓄電池、燃料電池、及びコジェネレーションシステムのように供給する電力の大きさが制御可能な電源を分散電源ということにする。しかしながら、太陽電池のように供給する電力の大きさの制御が困難な電源であっても、発電した電力を蓄電池に蓄電することで、供給する電力の大きさが制御可能な分散電源とすることができる。以降では、分散電源に燃料電池を用いた例について説明する。 In the following, for example, power sources that can control the magnitude of power supplied, such as storage batteries, fuel cells, and cogeneration systems, rather than power sources that are difficult to control, such as solar cells, are distributed power sources. I will say. However, even if it is a power source that is difficult to control the amount of power to be supplied, such as a solar cell, a distributed power source that can control the amount of power to be supplied by storing the generated power in a storage battery. Can do. Hereinafter, an example in which a fuel cell is used as a distributed power source will be described.
第3実施形態では、近年、設置が進められている分散電源から供給される電力を考慮して、電力供給エリア内の負荷変動を抑制する制御装置10Bについて説明する。 In the third embodiment, a description will be given of a control device 10B that suppresses load fluctuations in a power supply area in consideration of power supplied from a distributed power source that has been installed in recent years.
図7は本実施形態に係る電力制御システム100Bの構成例を示す図である。図7に示す電力制御システム100Bの構成例が、図1に示す電力制御システム100の構成例と異なる点は、制御装置10が制御装置10Bに置き換えられ、少なくとも1つの需要家30に分散電源36が追加された点である。 FIG. 7 is a diagram illustrating a configuration example of the power control system 100B according to the present embodiment. The configuration example of the power control system 100B illustrated in FIG. 7 is different from the configuration example of the power control system 100 illustrated in FIG. 1 in that the control device 10 is replaced with the control device 10B, and the distributed power source 36 is provided to at least one customer 30. Is added.
また、分散電源36を有する需要家30では、電力計32が電力計32Bに置き換えられる。電力計32Bは、電力計32と以下の点で異なるが、その他の点については電力計32と同じ機能を有する。 In the customer 30 having the distributed power source 36, the wattmeter 32 is replaced with a wattmeter 32B. The wattmeter 32B differs from the wattmeter 32 in the following points, but has the same function as the wattmeter 32 in other points.
電力計32Bには分散電源36が接続され、分散電源36から供給される電力を受電し、電力供給源20から受電した電力と分散電源36から受電した電力を、分散電源36が設置された需要家30内の負荷34に供給する。この際、電力計32Bは、分散電源36が供給する電力を、電力供給源20から受電する電力より優先して負荷34に供給する。すなわち、分散電源36からの電力では賄いきれない不足分の電力が電力供給源20から受電され、負荷34に供給される。 A distributed power source 36 is connected to the wattmeter 32B to receive the power supplied from the distributed power source 36, and the power received from the power supply source 20 and the power received from the distributed power source 36 are demands where the distributed power source 36 is installed. It supplies to the load 34 in the house 30. At this time, the wattmeter 32 </ b> B supplies the power supplied from the distributed power supply 36 to the load 34 with priority over the power received from the power supply source 20. That is, insufficient power that cannot be covered by power from the distributed power supply 36 is received from the power supply source 20 and supplied to the load 34.
なお、分散電源36が直流電源の場合、パワーコンディショナ等の変換装置で交流に変換してから負荷34に電力を供給する。 When the distributed power source 36 is a DC power source, power is supplied to the load 34 after being converted to AC by a conversion device such as a power conditioner.
電力計32Bは、需要家30の消費電力と、分散電源36から受電した電力、すなわち、分散電源36の供給電力の大きさを、予め定めた間隔で通信回線40を介して制御装置10Bに送信する。以降では、分散電源36の供給電力の大きさを単に「分散電源36の供給電力」ということにする。 The wattmeter 32B transmits the power consumption of the customer 30 and the power received from the distributed power source 36, that is, the magnitude of the power supplied to the distributed power source 36 to the control device 10B via the communication line 40 at predetermined intervals. To do. Hereinafter, the magnitude of the power supplied to the distributed power source 36 is simply referred to as “power supplied to the distributed power source 36”.
分散電源36には、例えば分散電源36を操作する図示しない操作パネル等が付属され、図示しない操作パネルを介して各種指示を受け付ける。 For example, an operation panel (not shown) for operating the distributed power supply 36 is attached to the distributed power supply 36, and various instructions are received through the operation panel (not shown).
なお、制御装置10Bの構成例は、図2に示した制御装置10の構成例と同じ構成例が用いられる。 The same configuration example as the configuration example of the control device 10 illustrated in FIG. 2 is used as the configuration example of the control device 10B.
次に、図8を参照して、制御装置10Bで実行される、電力制御システム100Bの電力制御処理の作用について説明する。 Next, with reference to FIG. 8, the effect | action of the electric power control process of the electric power control system 100B performed with the control apparatus 10B is demonstrated.
図8は、制御装置10Bが起動した後に、CPU61によって実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 8 is a flowchart showing an example of the flow of the power control process executed by the CPU 61 after the control device 10B is activated.
電力制御処理を規定する電力制御プログラムは、例えばROM62に予め記憶されている。CPU61は、ROM62に記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control processing is stored in advance in the ROM 62, for example. The CPU 61 reads a power control program stored in the ROM 62 and executes a power control process.
なお、不揮発性メモリ64には需要家情報が予め記憶されているものとし、RAM63には、通信装置74を介して受け付けた需要家30毎の最新の消費電力が記憶されると共に、分散電源36が設置されている需要家30の場合、最新の消費電力に加えて、分散電源36の最新の供給電力が記憶されているものとする。 It is assumed that customer information is stored in advance in the nonvolatile memory 64, and the latest power consumption for each customer 30 received via the communication device 74 is stored in the RAM 63, and the distributed power source 36 is stored. In addition to the latest power consumption, the latest supply power of the distributed power source 36 is stored.
図8に示す電力制御処理が図3に示した電力制御処理と異なる点は、ステップS10がステップS10Aに置き換えられ、ステップS60〜S130が追加された点である。 The power control process shown in FIG. 8 is different from the power control process shown in FIG. 3 in that step S10 is replaced with step S10A and steps S60 to S130 are added.
ステップS10Aにおいて、制御装置10Bは需要家情報を参照し、需要家30が何れのグループに属するか特定し、RAM63に記憶されている需要家30毎の最新の消費電力を用いてグループ消費電力を算出する。需要家30に分散電源36が設置されている場合、制御装置10Bは、グループ消費電力から分散電源36の供給電力を差し引いた値を、分散電源36が設置された需要家30を含むグループ全体のグループ消費電力とする。 In step S <b> 10 </ b> A, the control device 10 </ b> B refers to the consumer information, identifies which group the consumer 30 belongs to, and uses the latest power consumption for each consumer 30 stored in the RAM 63 to determine the group power consumption. calculate. When the distributed power source 36 is installed in the customer 30, the control device 10 </ b> B determines the value obtained by subtracting the power supplied from the distributed power source 36 from the group power consumption for the entire group including the customer 30 in which the distributed power source 36 is installed. Group power consumption.
すなわち、制御装置10Bは、分散電源36から供給される供給電力分だけ、分散電源36が設置された需要家30を含むグループのグループ消費電力を低減する。これは、電気事業者から見た場合、分散電源36から供給される供給電力分だけ、電気事業者から供給する供給電力が低減されるためである。すなわち、本実施形態におけるグループ消費電力は、同じグループに含まれる全ての需要家30に対して電力供給源20から供給される供給電力の合計値を表す。以降では、分散電源36が設置されている需要家30を、「電力供給需要家」という。 That is, the control device 10B reduces the group power consumption of the group including the customer 30 in which the distributed power source 36 is installed by the amount of power supplied from the distributed power source 36. This is because the power supplied from the electric power company is reduced by the amount of power supplied from the distributed power source 36 when viewed from the electric power company. That is, the group power consumption in the present embodiment represents the total value of the supply power supplied from the power supply source 20 to all consumers 30 included in the same group. Hereinafter, the consumer 30 in which the distributed power source 36 is installed is referred to as “electric power supply consumer”.
そして、ステップS20で、電力超過グループが存在しないと判定された場合、ステップS60が実行される。 If it is determined in step S20 that there is no excess power group, step S60 is executed.
ステップS60において、制御装置10Bは、図4に示したステップS22と同じく、各々のグループの中に警告対象グループが存在するか否かを判定する。警告対象グループが存在しない場合にはステップS50に移行し、制御終了指示を受け付けたか否かを判定する。一方、警告対象グループが存在する場合にはステップS70に移行する。 In step S60, the control device 10B determines whether or not a warning target group exists in each group, as in step S22 shown in FIG. When there is no warning target group, the process proceeds to step S50, and it is determined whether a control end instruction is accepted. On the other hand, when the warning target group exists, the process proceeds to step S70.
ステップS70において、制御装置10Bは、何れか1つの警告対象グループを選択し、選択した警告対象グループに電力供給需要家が少なくとも1つ含まれているか否かを判定する。需要家30が分散電源36を設置しているか否かの情報は、各々の需要家30と対応付ける形式で需要家情報に予め記憶しておけばよい。 In step S70, the control device 10B selects any one warning target group, and determines whether or not at least one power supply consumer is included in the selected warning target group. Information regarding whether or not the customer 30 has installed the distributed power source 36 may be stored in advance in the customer information in a format associated with each customer 30.
選択した警告対象グループに電力供給需要家が少なくとも1つ含まれる場合、ステップS80に移行する。 When at least one power supply consumer is included in the selected warning target group, the process proceeds to step S80.
ステップS80において、制御装置10Bは、選択した警告対象グループに含まれる各々の電力供給需要家における分散電源36の最新の供給電力をRAM63から取得する。 In step S <b> 80, the control device 10 </ b> B acquires from the RAM 63 the latest supply power of the distributed power supply 36 in each power supply consumer included in the selected warning target group.
ステップS90において、制御装置10Bは、各々の電力供給需要家における分散電源36の最大供給電力を上限として、電力供給需要家毎に、ステップS80で取得した各々の電力供給需要家における分散電源36の供給電力より大きな供給電力を目標供給電力として設定する。分散電源36の最大供給電力の情報は、各々の分散電源36と対応付ける形式で需要家情報に予め記憶しておけばよい。 In step S90, the control device 10B sets the maximum supply power of the distributed power supply 36 in each power supply consumer as an upper limit, and sets the distributed power supply 36 in each power supply consumer acquired in step S80 for each power supply consumer. Supply power larger than the supply power is set as the target supply power. The information on the maximum power supply of the distributed power supply 36 may be stored in advance in the customer information in a format associated with each distributed power supply 36.
ステップS100において、制御装置10Bは、通信装置74に接続された通信回線40を介して、選択した警告対象グループに含まれる各々の電力供給需要家の分散電源36に対して、ステップS90でそれぞれ設定した目標供給電力を含む供給量変更指示を送信する。 In step S100, the control device 10B sets each distributed power source 36 of each power supply consumer included in the selected warning target group via the communication line 40 connected to the communication device 74 in step S90. A supply amount change instruction including the target supply power thus transmitted is transmitted.
供給量変更指示を受信した分散電源36は、分散電源36から供給する供給電力が目標供給電力に近づくように、供給電力を増加させる。これにより、電力供給需要家を含む警告対象グループのグループ消費電力が低下し、電力供給エリア内のピーク電力が低減される傾向を示すため、負荷変動が更に抑制されることになる。 The distributed power supply 36 that has received the supply amount change instruction increases the supply power so that the supply power supplied from the distributed power supply 36 approaches the target supply power. Thereby, since the group power consumption of the warning target group including the power supply consumer decreases and the peak power in the power supply area tends to be reduced, the load fluctuation is further suppressed.
なお、ステップS90で設定した目標供給電力が電力供給需要家の消費電力を超える場合、電力計32Bは、電気事業者の電力線50に、電力供給需要家の消費電力を超える部分の電力である余剰電力を供給して余剰電力を電気事業者に売電する、いわゆる「逆潮」を行ってもよい。しかしながら、逆潮を行う場合、送電事業者が所管する電力線50を用いて余剰電力を融通することになるため、電力線50を使用するための託送料金の支払いが求められる。 In addition, when the target supply power set in step S90 exceeds the power consumption of the power supply consumer, the power meter 32B is a surplus that is the power of the portion exceeding the power consumption of the power supply consumer on the power line 50 of the electric power provider. You may perform what is called "reverse tide" which supplies electric power and sells surplus electric power to an electric power company. However, when reverse tide is performed, surplus power is accommodated using the power line 50 that the power transmission company has jurisdiction over, so payment of a consignment fee for using the power line 50 is required.
電力の需給バランスは時間と共に変化しており、電力需要に比べて電力供給が多くなるに従って売電価格が低下することから、電力の需給バランスの状況によっては、託送料金を含めた電力の供給コストが売電価格を上回ることもある。したがって、逆潮が行われないように、ステップS90では、電力供給需要家毎の目標供給電力を各々の電力供給需要家の消費電力以下に設定することが好ましい。 The power supply / demand balance changes with time, and the power selling price decreases as the power supply increases compared to the power demand.Therefore, depending on the power supply / demand balance, the power supply cost including the consignment fee May exceed the power selling price. Therefore, it is preferable to set the target supply power for each power supply consumer to be equal to or less than the power consumption of each power supply consumer in step S90 so that the reverse tide is not performed.
更に、分散電源36としてコジェネレーションシステムを用いる場合、分散電源36の供給電力を増加させることによって生成される熱量も増加するが、増加した熱量の利用先がない場合、増加した熱量は利用されることなく排熱されるため、電気と熱の利用効率を合わせた総合効率が低下する場合がある。したがって、図8に示すように、消費電力の観点から分散電源36の供給電力を増加させる制御を行う場合、コジェネレーションシステムよりも、発電効率が集中火力発電所より高い約60%以上のモノジェネ用燃料電池システムや蓄電池を分散電源36として用いる方が好ましい。 Furthermore, when a cogeneration system is used as the distributed power source 36, the amount of heat generated by increasing the power supplied to the distributed power source 36 also increases. However, if there is no destination for the increased amount of heat, the increased amount of heat is used. In this case, the total efficiency of the combined use efficiency of electricity and heat may be reduced. Therefore, as shown in FIG. 8, when controlling to increase the supply power of the distributed power source 36 from the viewpoint of power consumption, the power generation efficiency is about 60% or more higher than that of the central thermal power plant than the cogeneration system. It is preferable to use a fuel cell system or a storage battery as the distributed power source 36.
一方、ステップS70の判定処理において、選択した警告対象グループに電力供給需要家が含まれない場合、ステップS110に移行する。 On the other hand, in the determination process in step S70, when the selected warning target group does not include a power supply consumer, the process proceeds to step S110.
ステップS110において、制御装置10Bは、図4のステップS24と同様に、選択した警告対象グループから少なくとも1つの停電対象需要家を選択する。 In step S110, the control device 10B selects at least one power outage target customer from the selected warning target group, similarly to step S24 in FIG.
ステップS120において、制御装置10Bは、図4のステップS26と同様に、通信装置74に接続された通信回線40を介して、ステップS110で選択した停電対象需要家に対して、停電の可能性があることを示す警告を通知する。 In step S120, the control device 10B, as in step S26 of FIG. 4, has a possibility of a power outage to the power outage target customer selected in step S110 via the communication line 40 connected to the communication device 74. Notify the warning that there is.
ステップS130において、制御装置10Bは、全ての警告対象グループを選択したか否かを判定し、未選択の警告対象グループが存在する場合には、ステップS70に移行する。そして、全ての警告対象グループを選択するまでステップS70〜S130の処理を繰り返し実行し、警告対象グループに電力供給需要家が含まれる場合には分散電源36の供給電力を増加させ、警告対象グループに電力供給需要家が含まれない場合には停電対象需要家に警告を通知する。 In step S <b> 130, the control device 10 </ b> B determines whether all warning target groups have been selected. If there is an unselected warning target group, the process proceeds to step S <b> 70. Then, the processes in steps S70 to S130 are repeatedly executed until all the warning target groups are selected. When the power supply consumer is included in the warning target group, the supply power of the distributed power source 36 is increased, and the warning target group is set. When the power supply consumer is not included, a warning is notified to the power failure target consumer.
なお、ステップS100では、電力供給需要家の分散電源36に対して供給量変更指示を送信したが、更に、選択した警告対象グループに含まれる各々の需要家30が予め登録した報知装置に、停電の可能性があることを示す警告を通知してもよい。特に、電力供給需要家に対しては、分散電源36の供給電力を増加させることを知らせるメッセージを通知してもよい。 In step S100, the supply amount change instruction is transmitted to the distributed power supply 36 of the power supply consumer. Further, a power failure is transmitted to the notification device registered in advance by each consumer 30 included in the selected warning target group. You may notify the warning which shows that there is possibility of. In particular, a message notifying that the supply power of the distributed power supply 36 is to be increased may be notified to the power supply consumer.
このように第3実施形態に係る制御装置10Bによれば、警告対象グループに含まれる電力供給需要家の分散電源36の供給電力を増加させることで、電力供給エリア内のピーク電力を低減し、負荷変動を抑制する。また、電力供給需要家の分散電源36の供給電力を増加させることで、電力供給需要家と同じグループに含まれる分散電源36を設置していない他の需要家30でも、グループ全体として分散電源36の供給電力の増加分に相当する電力を更に消費することができるようになる。すなわち、分散電源36からの供給電力を他の需要家30に直接融通しない場合でも、電力供給需要家が含まれるグループ内の各需要家30で、分散電源36の供給電力を増加させたメリット(kWの価値)を享受することができる。 Thus, according to the control device 10B according to the third embodiment, the peak power in the power supply area is reduced by increasing the supply power of the distributed power supply 36 of the power supply consumer included in the warning target group, Reduce load fluctuations. Further, by increasing the power supply of the distributed power supply 36 of the power supply consumer, even in other customers 30 that do not have the distributed power supply 36 included in the same group as the power supply consumer, the distributed power supply 36 as a group as a whole. The power corresponding to the increase in the supplied power can be further consumed. That is, even when the power supplied from the distributed power supply 36 is not directly interchanged with other consumers 30, the merits of increasing the power supplied to the distributed power supply 36 at each consumer 30 in the group including the power supply consumer ( value of kW).
<第4実施形態>
第3実施形態に係る電力制御システム100Bでは、グループ消費電力が警告電力以上となった場合、制御装置10Bで分散電源36の供給電力を増加させるように制御したが、分散電源36の制御主体は制御装置10Bに限られない。第4実施形態では、分散電源36でグループ消費電力を監視しながら、分散電源36が自律的に供給電力を制御する電力制御システム100Cについて説明する。
<Fourth embodiment>
In the power control system 100B according to the third embodiment, when the group power consumption is equal to or higher than the warning power, the control device 10B performs control to increase the supply power of the distributed power source 36. It is not limited to the control device 10B. In the fourth embodiment, a power control system 100C in which the distributed power source 36 autonomously controls the supplied power while monitoring the group power consumption with the distributed power source 36 will be described.
図9は、本実施形態に係る電力制御システム100Cの構成例を示す図である。図9に示す電力制御システム100Cの構成例が図7に示した電力制御システム100Bと異なる点は、分散電源36が分散電源36Aに置き換えられ、電力計32Bが電力計32Cに置き換えられた点である。分散電源36Aは通信回線40と切り離され、代わりに分散電源36Aと、分散電源36Aが備えられた需要家30と同じグループに含まれる他の需要家30の電力計32Cとが、グループ内通信回線80によって接続される。なお、同じグループ内に複数の電力供給需要家があってもよい。分散電源36Aが設置されていない需要家30は第1需要家の一例であり、分散電源36Aが設置されている需要家30は第2需要家の一例である。 FIG. 9 is a diagram illustrating a configuration example of a power control system 100C according to the present embodiment. The configuration example of the power control system 100C shown in FIG. 9 is different from the power control system 100B shown in FIG. 7 in that the distributed power source 36 is replaced with a distributed power source 36A, and the wattmeter 32B is replaced with a wattmeter 32C. is there. The distributed power source 36A is disconnected from the communication line 40. Instead, the distributed power source 36A and the power meter 32C of another customer 30 included in the same group as the customer 30 provided with the distributed power source 36A are connected to the intra-group communication line. 80 is connected. There may be a plurality of power supply consumers in the same group. The customer 30 in which the distributed power source 36A is not installed is an example of a first consumer, and the customer 30 in which the distributed power source 36A is installed is an example of a second consumer.
第3実施形態に係る電力計32Bは、需要家30の消費電力と、分散電源36が設置されている場合には分散電源36の供給電力を、予め定めた間隔で制御装置10Bに送信したが、本実施形態に係る電力計32Cは、これらの測定値を、グループ内通信回線80を介して同じグループ内の各々の分散電源36Aにも送信する。当該送信動作を除いて、電力計32Cは電力計32Bと同じ機能を備える。 The power meter 32B according to the third embodiment transmits the power consumption of the customer 30 and the power supplied to the distributed power source 36 when the distributed power source 36 is installed to the control device 10B at predetermined intervals. The wattmeter 32C according to the present embodiment also transmits these measured values to each distributed power source 36A in the same group via the intra-group communication line 80. Except for the transmission operation, the wattmeter 32C has the same function as the wattmeter 32B.
図10は、分散電源36Aの構成例を示す図である。分散電源36Aは、例えばコンピュータ60Aを含んで構成される。 FIG. 10 is a diagram illustrating a configuration example of the distributed power source 36A. The distributed power supply 36A includes, for example, a computer 60A.
コンピュータ60Aは、本実施形態に係る出力手段及び制御手段の一例であるCPU61A、ROM62A、RAM63A、不揮発性メモリ64A及びI/O65Aを備える。そして、CPU61A、ROM62A、RAM63A、不揮発性メモリ64A、及びI/O65Aがバス66Aを介して各々接続されている。不揮発性メモリ64Aとしてはハードディスクの他、例えばフラッシュメモリを利用したSSDが用いられる。 The computer 60A includes a CPU 61A, a ROM 62A, a RAM 63A, a nonvolatile memory 64A, and an I / O 65A that are examples of output means and control means according to the present embodiment. The CPU 61A, ROM 62A, RAM 63A, nonvolatile memory 64A, and I / O 65A are connected via a bus 66A. As the non-volatile memory 64A, for example, an SSD using a flash memory is used in addition to a hard disk.
I/O65Aには、例えば電力供給装置76、通信装置77、及び操作パネル78が接続される。 For example, a power supply device 76, a communication device 77, and an operation panel 78 are connected to the I / O 65A.
電力供給装置76は、CPU61Aの制御に従って、CPU61Aで指定された大きさの供給電力を、電力計32Cを介して負荷34に供給する。分散電源36Aが燃料電池であれば、電力供給装置76は燃料電池スタックを用いた発電ユニットに相当し、分散電源36Aが蓄電池であれば、電力供給装置76は電力を蓄電する蓄電ユニットに相当する。 The power supply device 76 supplies supply power having a magnitude specified by the CPU 61A to the load 34 via the wattmeter 32C according to the control of the CPU 61A. If the distributed power source 36A is a fuel cell, the power supply device 76 corresponds to a power generation unit using a fuel cell stack. If the distributed power source 36A is a storage battery, the power supply device 76 corresponds to a power storage unit that stores power. .
通信装置77は、グループ内通信回線80にそれぞれ接続され、グループ内通信回線80に接続される各々の電力計32Cから、需要家30の消費電力と、需要家30に分散電源36Aが設置されている場合には分散電源36Aの供給電力を受け付ける。すなわち、通信装置77は、電力計32Cから需要家30の消費電力と分散電源36Aの供給電力を受け付ける受付手段の一例である。 The communication device 77 is connected to the intra-group communication line 80, the power consumption of the customer 30 from each power meter 32C connected to the intra-group communication line 80, and the distributed power source 36A is installed in the customer 30. If so, the power supplied from the distributed power source 36A is received. That is, the communication device 77 is an example of a reception unit that receives the power consumption of the customer 30 and the power supply of the distributed power source 36A from the wattmeter 32C.
一方、制御装置10Cの構成例は、図2に示した制御装置10の構成例と同じ構成例が用いられる。 On the other hand, the configuration example of the control device 10C is the same as the configuration example of the control device 10 illustrated in FIG.
次に、図11を参照して、分散電源36Aで実行される電力制御処理の作用について説明する。 Next, with reference to FIG. 11, the operation of the power control process executed by the distributed power supply 36A will be described.
図11は、分散電源36Aが起動した後に、CPU61Aによって実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 11 is a flowchart illustrating an example of a flow of power control processing executed by the CPU 61A after the distributed power source 36A is activated.
電力制御処理を規定する電力制御プログラムは、例えばROM62Aに予め記憶されている。CPU61Aは、ROM62Aに記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control process is stored in advance in, for example, the ROM 62A. The CPU 61A reads a power control program stored in the ROM 62A and executes a power control process.
まず、ステップS200において、分散電源36Aは、グループ内通信回線80によって接続される需要家30の各々の電力計32Cから、需要家30の消費電力と、需要家30に分散電源36Aが設置されている場合には分散電源36Aの供給電力を取得する。 First, in step S200, the distributed power source 36A is configured such that the power consumption of the customer 30 and the distributed power source 36A are installed in the customer 30 from each power meter 32C of the customer 30 connected by the intra-group communication line 80. If so, the power supply of the distributed power source 36A is acquired.
ステップS210において、分散電源36Aは、ステップS200で取得した各需要家30の消費電力の合計値から各分散電源36Aの供給電力の合計値を差し引いた値をグループ消費電力として算出する。 In step S210, the distributed power source 36A calculates, as the group power consumption, a value obtained by subtracting the total power supply value of each distributed power source 36A from the total power consumption value of each consumer 30 acquired in step S200.
ステップS220において、分散電源36Aは、ステップS210で算出したグループ消費電力が、当該グループに予め設定された警告電力以上か否かを判定する。グループ消費電力が警告電力以上の場合、ステップS230に移行する。なお、警告電力は不揮発性メモリ64Aに予め記憶しておけばよい。 In step S220, the distributed power source 36A determines whether the group power consumption calculated in step S210 is equal to or higher than the warning power set in advance for the group. When the group power consumption is equal to or higher than the warning power, the process proceeds to step S230. The warning power may be stored in advance in the nonvolatile memory 64A.
ステップS230において、分散電源36Aは、自身の分散電源36Aから供給することができる最大供給電力を上限として、現在の供給電力より大きな供給電力を目標供給電力として設定する。 In step S230, the distributed power supply 36A sets the supply power larger than the current supply power as the target supply power with the maximum supply power that can be supplied from its own distributed power supply 36A as an upper limit.
ステップS240において、分散電源36Aは、自身の分散電源36Aから供給される供給電力がステップS230で設定した目標供給電力に近づくように、電力供給装置76を制御して供給電力を増加させる。 In step S240, the distributed power source 36A controls the power supply device 76 to increase the supplied power so that the supplied power supplied from its own distributed power source 36A approaches the target supplied power set in step S230.
一方、ステップS220の判定処理において、グループ消費電力が警告電力未満の場合、及びステップS240の実行後、ステップS250に移行する。 On the other hand, in the determination process of step S220, when the group power consumption is less than the warning power, and after execution of step S240, the process proceeds to step S250.
ステップS250において、分散電源36Aは、操作パネル78を介して分散電源36Aの操作者から制御終了指示を受け付けたか否かを判定する。 In step S250, the distributed power source 36A determines whether a control end instruction has been received from the operator of the distributed power source 36A via the operation panel 78.
制御終了指示を受け付けた場合は、図11に示した電力制御処理を終了する。一方、制御終了指示を受け付けていない場合にはステップS200に移行し、ステップS200〜S250の処理を制御終了指示を受け付けるまで繰り返し実行することで、グループ消費電力を監視しながら分散電源36Aが自律的に供給電力を制御する。 When the control end instruction is received, the power control process shown in FIG. 11 is ended. On the other hand, if the control end instruction has not been received, the process proceeds to step S200, and the distributed power supply 36A is autonomously monitored while monitoring the group power consumption by repeatedly executing the processes of steps S200 to S250 until the control end instruction is received. To control the power supply.
したがって、分散電源36Aは、グループ消費電力がグループ契約電力に近づくと、自らの判断によって供給電力を増加し、グループ消費電力がグループ契約電力を超えることによってグループ内の少なくとも1つの需要家30で発生する停電を抑制する。すなわち、分散電源36Aの供給電力が増加されることによって、電力供給源20から供給する電力が低下し、電力供給エリア内のピーク電力が低減される傾向を示すため、負荷変動が抑制されることになる。 Therefore, when the group power consumption approaches the group contract power, the distributed power source 36A increases the power supply by its own judgment, and the group power consumption exceeds the group contract power, and is generated by at least one customer 30 in the group. Suppress power outages. That is, since the power supplied from the power supply source 20 is decreased and the peak power in the power supply area is reduced by increasing the power supplied to the distributed power source 36A, load fluctuation is suppressed. become.
なお、図11に示した電力制御処理では分散電源36Aの供給電力を増加させる制御を行ったが、グループ消費電力が警告電力未満に低下した場合、現在の供給電力より供給電力を低下させる制御を追加してもよい。この場合、グループ消費電力が警告電力を挟んで繰り返し上下するように変化すると、供給電力の変更が繰り返し実行されることになるため、グループ消費電力が警告電力より低い値に予め設定された警告解除電力未満に低下した場合に、分散電源36Aの供給電力を低下させるようにしてもよい。 In the power control process shown in FIG. 11, control is performed to increase the supply power of the distributed power source 36 </ b> A. However, when the group power consumption decreases below the warning power, the control to reduce the supply power from the current supply power is performed. May be added. In this case, if the group power consumption changes so as to repeatedly rise and fall across the warning power, the supply power change will be repeatedly executed, so the group power consumption is preset to a value lower than the warning power. When the power decreases below the power, the power supplied to the distributed power source 36A may be decreased.
図12は、分散電源36Aで図11に示した電力制御処理が実行される場合に、制御装置10Cで実行される電力制御処理の流れの一例を示すフローチャートである。 FIG. 12 is a flowchart illustrating an example of the flow of the power control process executed by the control device 10C when the power control process shown in FIG. 11 is executed by the distributed power source 36A.
図12に示す電力制御処理を規定する電力制御プログラムは、例えばROM62に予め記憶されている。CPU61は、制御装置10Cが起動した後にROM62に記憶される電力制御プログラムを読み込み、電力制御処理を実行する。 A power control program that defines the power control processing shown in FIG. 12 is stored in advance in the ROM 62, for example. The CPU 61 reads a power control program stored in the ROM 62 after the control device 10C is activated, and executes a power control process.
図12に示す電力制御処理は、図8に示す電力制御処理からステップS60〜S130を削除し、ステップS20の判定処理が否定判定の場合、ステップS50に移行するように修正したものである。 The power control process shown in FIG. 12 is modified so that steps S60 to S130 are deleted from the power control process shown in FIG. 8 and the process proceeds to step S50 when the determination process in step S20 is negative.
すなわち、ステップS10Aにおいて、制御装置10Cは需要家情報を参照し、需要家30が何れのグループに属するか特定し、RAM63に記憶されている需要家30毎の最新の消費電力と、分散電源36A毎の最新の供給電力を用いて、グループ毎にグループ消費電力を算出する。 That is, in step S10A, the control device 10C refers to the customer information, identifies which group the customer 30 belongs to, the latest power consumption for each customer 30 stored in the RAM 63, and the distributed power source 36A. The group power consumption is calculated for each group using the latest supply power for each group.
ステップS20において、制御装置10Cは、ステップS10Aで算出したグループ消費電力が、グループ契約電力を超える電力超過グループが存在するか否かを判定する。ステップS20の判定処理が否定判定の場合にはステップS50に移行し、既に説明した制御終了指示の有無を判定する。一方、ステップS20の判定処理が肯定判定の場合にはステップS30に移行し、既に説明したように、各々の電力超過グループから受電停止需要家を選択し、受電停止需要家の電力計32Cに対して受電停止指示を送信する。 In step S20, the control device 10C determines whether there is a power excess group in which the group power consumption calculated in step S10A exceeds the group contract power. If the determination process in step S20 is negative, the process proceeds to step S50, and the presence / absence of the control end instruction already described is determined. On the other hand, when the determination process of step S20 is affirmative determination, the process proceeds to step S30, and as described above, a power receiving stop consumer is selected from each power excess group, and the power meter 32C of the power receiving stop consumer is selected. To send a power stop instruction.
この場合、第3実施形態で説明したように、グループ消費電力が警告電力を超えた警告対象グループに含まれる需要家30に対して、警告を通知する処理を追加してもよいことは言うまでもない。 In this case, as described in the third embodiment, it is needless to say that a process of notifying the warning may be added to the consumers 30 included in the warning target group whose group power consumption exceeds the warning power. .
以上、実施の形態を用いて本発明について説明したが、本発明は各実施の形態に記載の範囲には限定されない。本発明の要旨を逸脱しない範囲で各実施の形態に多様な変更又は改良を加えることができ、当該変更又は改良を加えた形態も本発明の技術的範囲に含まれる。例えば、本発明の要旨を逸脱しない範囲で処理の順序を変更してもよい。 Although the present invention has been described above using the embodiments, the present invention is not limited to the scope described in each embodiment. Various modifications or improvements can be added to the respective embodiments without departing from the gist of the present invention, and embodiments to which the modifications or improvements are added are also included in the technical scope of the present invention. For example, the processing order may be changed without departing from the scope of the present invention.
また、第一実施形態において、通信機能のない電力計に通信機能を備えた補助装置を接続して、電力計の機能を拡張する例を説明したが、補助装置を用いた電力計の機能の拡張例は通信機能に限られない。例えば、電力供給源20からの受電を停止したり、指定された負荷34に供給する電力を遮断したりする電力遮断機能、その他、電力計32、32A、32B、32Cの機能の一部を、電力計に補助装置を接続することで実現するようにしてもよい。 In the first embodiment, an example in which an auxiliary device having a communication function is connected to a wattmeter having no communication function to extend the function of the wattmeter has been described, but the function of the wattmeter using the auxiliary device has been described. The extension example is not limited to the communication function. For example, a part of the functions of the wattmeters 32, 32A, 32B, and 32C, such as a power cut-off function that stops receiving power from the power supply source 20 or cuts off the power supplied to the designated load 34, It may be realized by connecting an auxiliary device to the power meter.
また、各実施の形態では、一例として電力制御処理をソフトウエアで実現する形態について説明したが、図3、図4、図6、図8、図11、及び図12に示したフローチャートと同等の処理を、例えばASIC(Application Specific Integrated Circuit)に実装し、ハードウエアで処理させるようにしてもよい。この場合、各処理をソフトウエアで実行する場合に比べて、処理の高速化が図られる。 Moreover, although each embodiment demonstrated the form which implement | achieves a power control process by software as an example, it is equivalent to the flowchart shown in FIG.3, FIG.4, FIG.6, FIG.8, FIG.11 and FIG. The processing may be implemented in, for example, an ASIC (Application Specific Integrated Circuit) and processed by hardware. In this case, the processing speed can be increased as compared with the case where each processing is executed by software.
また、上述した実施の形態では、電力制御プログラムがROM62、62Aにインストールされている形態を説明したが、これに限定されるものではない。本発明に係る電力制御プログラムは、コンピュータ読み取り可能な記録媒体に記録された形態で提供することも可能である。例えば、本発明に係る電力制御プログラムを、CD(Compact Disc)−ROM、又はDVD(Digital Versatile Disc)−ROM等の光ディスクに記録された形態で提供してもよい。また、本発明に係る電力制御プログラムを、USBメモリ及びフラッシュメモリ等の半導体メモリに記録された形態で提供してもよい。更に、通信回線40を介して、通信回線40に接続される外部装置から本発明に係る電力制御プログラムを取得するようにしてもよい。 Moreover, although embodiment mentioned above demonstrated the form in which the power control program was installed in ROM62, 62A, it is not limited to this. The power control program according to the present invention can also be provided in a form recorded on a computer-readable recording medium. For example, the power control program according to the present invention may be provided in a form recorded on an optical disc such as a CD (Compact Disc) -ROM or a DVD (Digital Versatile Disc) -ROM. The power control program according to the present invention may be provided in a form recorded in a semiconductor memory such as a USB memory and a flash memory. Furthermore, the power control program according to the present invention may be acquired from an external device connected to the communication line 40 via the communication line 40.
10(10A、10B、10C)・・・制御装置
20・・・電力供給源
30・・・需要家
32(32A、32B、32C)・・・電力計
34・・・負荷
36(36A)・・・分散電源
40・・・通信回線
50・・・電力線
60(60A)・・・コンピュータ
61(61A)・・・CPU
70・・・入力装置
72・・・表示装置
74(77)・・・通信装置
76・・・電力供給装置
78・・・操作パネル
80・・・グループ内通信回線
100(100A、100B、100C)・・・電力制御システム
10 (10A, 10B, 10C) ... Control device 20 ... Power supply source 30 ... Consumer 32 (32A, 32B, 32C) ... Wattmeter 34 ... Load 36 (36A) ... Distributed power source 40 ... communication line 50 ... power line 60 (60A) ... computer 61 (61A) ... CPU
70 ... Input device 72 ... Display device 74 (77) ... Communication device 76 ... Power supply device 78 ... Operation panel 80 ... Intra-group communication line 100 (100A, 100B, 100C) ... Power control system
本発明に係る電力制御システムは、負荷で消費される消費電力を測定する電力計を備えた、少なくとも1つの第1需要家と、前記第1需要家と同じグループを形成し、前記電力計及び自需要家内における前記負荷に電力を供給する分散電源を備えた少なくとも1つの第2需要家と、を備え、前記分散電源の各々が、前記第1需要家における消費電力を前記第1需要家に備えられた前記電力計の各々から受け付けると共に、前記第2需要家における消費電力と、前記第2需要家に備えられた前記分散電源から供給される供給電力の大きさを前記第2需要家に備えられた前記電力計の各々から受け付ける受付手段と、前記受付手段で受け付けた前記第1需要家の各々の消費電力と前記第2需要家の各々の消費電力の合計値から、前記受付手段で受け付けた供給電力の合計値を差し引いた値を前記グループにおけるグループ消費電力として出力する出力手段と、前記出力手段で出力された前記グループ消費電力が、前記グループに対して予め設定したグループ契約電力よりも予め低く設定された警告電力以上となった場合に、自身から供給する供給電力を増加する制御を行う制御手段と、を備えることを特徴とする。 The power control system according to the present invention includes at least one first consumer including a power meter that measures power consumption consumed by a load, and the same group as the first consumer, the power meter and And at least one second consumer provided with a distributed power source for supplying power to the load in the consumer, each of the distributed power sources supplying the first consumer with power consumption in the first consumer. While accepting from each of the provided wattmeters, the power consumption of the second consumer and the magnitude of the power supplied from the distributed power source provided to the second consumer to the second consumer From the receiving means that receives from each of the wattmeters provided, and from the total value of the power consumption of each of the first consumers and the power consumption of each of the second consumers received by the receiving means, the receiving means Receiving Output means for outputting the value obtained by subtracting the total value of the supplied power as group power consumption in the group, and the group power consumption output by the output means is based on group contract power set in advance for the group And control means for performing control to increase the supply power supplied from itself when the warning power becomes lower than a preset warning power.
本発明は、電力制御システムに関する。 The present invention relates to a power control system.
本発明は、顧客をグループ化した上で、電力供給エリア内における負荷変動を抑制することができる電力制御システムを提供することを目的とする。 An object of this invention is to provide the electric power control system which can suppress the load fluctuation in an electric power supply area, after grouping a customer.
本発明に係る電力制御システムによれば、顧客をグループ化した上で、電力供給エリア内における負荷変動を抑制することができる、という効果を有する。 According to the power control system of the present invention, it is possible to suppress load fluctuations in the power supply area after grouping customers.
Claims (12)
前記電力計で測定された消費電力を前記需要家の各々から受け付ける受付手段と、前記受付手段で受け付けた前記需要家の各々の消費電力を用いて、グループ内の前記需要家の各々における消費電力の合計値をグループ消費電力としてグループ毎に出力する出力手段と、前記出力手段で出力された何れかのグループの前記グループ消費電力が、グループ毎に予め設定されたグループ契約電力を超えた場合、前記グループ消費電力がグループ契約電力を超えた電力超過グループにおける前記グループ消費電力を、前記電力超過グループが予め設定したグループ契約電力以下に制御する制御手段と、を備えた制御装置と、
を含む電力制御システム。 A plurality of grouped consumers including power meters that measure the power consumed by the load;
A receiving means for receiving power consumption measured by the power meter from each of the consumers, and a power consumption of each of the consumers in the group using the power consumption of each of the consumers received by the receiving means. When the group power consumption of any group output by the output means exceeds the group contract power set in advance for each group, the output means for outputting the total value of each group as group power consumption, A control unit comprising: control means for controlling the group power consumption in the power excess group in which the group power consumption exceeds the group contract power to be equal to or less than the group contract power set in advance by the power excess group;
Including power control system.
請求項1記載の電力制御システム。 The power control system according to claim 1, wherein the control unit in the control device performs control so as to stop power reception in at least one of the consumers included in the power excess group.
請求項2記載の電力制御システム。 The power control system according to claim 2, wherein the control unit in the control device performs control so as to stop power reception in the consumer according to a predetermined power reception stop order of the consumer in the power excess group.
請求項2記載の電力制御システム。 The control means in the control device preferentially stops receiving power from the consumer with high power consumption in the power excess group until the group power consumption in the power excess group becomes equal to or less than the group contract power. The power control system according to claim 2 to be controlled.
請求項1〜請求項4の何れか1項に記載の電力制御システム。 The control means in the control device includes at least one included in any group when the group power consumption of any group is equal to or higher than a warning power set in advance lower than the group contract power. The power control system according to any one of claims 1 to 4, wherein one of the consumers is controlled so that a warning is notified by a notification device registered in advance by the consumer.
前記制御装置における前記受付手段は、前記分散電源が前記負荷に供給している供給電力の大きさを前記分散電源から受け付け、
前記制御装置における前記制御手段は、前記分散電源が備えられている前記需要家を含むグループの前記グループ消費電力から前記供給電力を差し引いた値が前記警告電力以上となった場合、前記分散電源が前記負荷への供給電力を増加するよう制御する
請求項5記載の電力制御システム。 The at least one consumer in the group further includes a distributed power source for supplying power to the load in the consumer,
The accepting means in the control device accepts from the distributed power supply the magnitude of power supplied by the distributed power supply to the load,
When the value obtained by subtracting the supplied power from the group power consumption of the group including the consumer provided with the distributed power source is equal to or higher than the warning power, the control means in the control device has the distributed power source The power control system according to claim 5, wherein control is performed so as to increase power supplied to the load.
請求項6記載の電力制御システム。 The control means in the control device controls the supply power supplied from the distributed power supply so that the supply power supplied from the distributed power supply is less than or equal to the power consumption in the consumer where the distributed power supply is installed. The power control system according to claim 6.
請求項6又は請求項7記載の電力制御システム。 The power control system according to claim 6 or 7, wherein the distributed power source is a fuel cell.
前記第1需要家と同じグループを形成し、前記電力計及び自需要家内における前記負荷に電力を供給する分散電源を備えた少なくとも1つの第2需要家と、
を備え、
前記分散電源の各々が、前記第1需要家における消費電力を前記第1需要家に備えられた前記電力計の各々から受け付けると共に、前記第2需要家における消費電力と、前記第2需要家に備えられた前記分散電源から供給される供給電力の大きさを前記第2需要家に備えられた前記電力計の各々から受け付ける受付手段と、
前記受付手段で受け付けた前記第1需要家の各々の消費電力と前記第2需要家の各々の消費電力の合計値から、前記受付手段で受け付けた供給電力の合計値を差し引いた値を前記グループにおけるグループ消費電力として出力する出力手段と、
前記出力手段で出力された前記グループ消費電力が、前記グループに対して予め設定したグループ契約電力よりも予め低く設定された警告電力以上となった場合に、自身から供給する供給電力を増加する制御を行う制御手段と、
を備えることを特徴とする電力制御システム。 At least one first consumer with a power meter that measures power consumption consumed by the load;
Forming the same group as the first consumer, and at least one second consumer comprising a distributed power source for supplying power to the load in the power meter and own consumer;
With
Each of the distributed power sources receives power consumption in the first consumer from each of the wattmeters provided in the first consumer, power consumption in the second consumer, and the second consumer. Receiving means for receiving from each of the wattmeters provided to the second consumer the magnitude of the supplied power supplied from the provided distributed power supply;
The value obtained by subtracting the total value of the supplied power received by the receiving means from the total value of the power consumption of each of the first consumers and the second consumer received by the receiving means is the group. Output means for outputting as group power consumption in
Control for increasing supply power supplied from itself when the group power consumption output by the output means is equal to or higher than a warning power set in advance lower than the group contract power set in advance for the group Control means for performing
A power control system comprising:
請求項9記載の電力制御システム。 10. The power control according to claim 9, wherein the control unit in the distributed power source performs control to reduce supply power supplied from the control unit when the group power consumption becomes lower than the warning power after the group power consumption becomes equal to or higher than the warning power. system.
受け付けた各々の消費電力の合計値から前記分散電源の供給電力の合計値を差し引いたグループ消費電力が、前記グループに対して予め設定したグループ契約電力よりも予め低く設定された警告電力以上となった場合に負荷に供給する供給電力を増加する
分散電源の電力制御方法。 Accepting the power consumption of each consumer belonging to the same group and the magnitude of the power supplied by the distributed power source provided to at least one of the consumers,
The group power consumption obtained by subtracting the total value of the distributed power supply from the total value of the received power consumptions is equal to or higher than the warning power set in advance lower than the group contract power set in advance for the group. A distributed power control method that increases the power supplied to the load in the event of a load.
請求項11記載の分散電源の電力制御方法。 The power control method for a distributed power supply according to claim 11, wherein when the group power consumption becomes equal to or higher than the warning power and then decreases to less than the warning power, the power supplied to the load is reduced.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017145915A JP6303054B1 (en) | 2017-07-27 | 2017-07-27 | Power control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017145915A JP6303054B1 (en) | 2017-07-27 | 2017-07-27 | Power control system |
Publications (2)
Publication Number | Publication Date |
---|---|
JP6303054B1 JP6303054B1 (en) | 2018-03-28 |
JP2019030087A true JP2019030087A (en) | 2019-02-21 |
Family
ID=61756680
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017145915A Active JP6303054B1 (en) | 2017-07-27 | 2017-07-27 | Power control system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6303054B1 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020194287A (en) * | 2019-05-27 | 2020-12-03 | 三菱電機株式会社 | Data management device |
WO2022070632A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Electric power control system, and program |
WO2022070630A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
WO2022071259A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
WO2022070633A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH112649A (en) * | 1997-06-12 | 1999-01-06 | Sumitomo Metal Mining Co Ltd | Excess-power alarm for domestic use |
JP2005198423A (en) * | 2004-01-07 | 2005-07-21 | Toshiba Corp | Energy management system, energy management method, and energy management program |
JP2011130649A (en) * | 2009-12-21 | 2011-06-30 | Panasonic Electric Works Co Ltd | Electric power supply system |
WO2014042219A1 (en) * | 2012-09-12 | 2014-03-20 | 日本電気株式会社 | Electric power management method, electric power management device and program |
JP2015201987A (en) * | 2014-04-09 | 2015-11-12 | イオンディライト株式会社 | demand management system and method |
-
2017
- 2017-07-27 JP JP2017145915A patent/JP6303054B1/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH112649A (en) * | 1997-06-12 | 1999-01-06 | Sumitomo Metal Mining Co Ltd | Excess-power alarm for domestic use |
JP2005198423A (en) * | 2004-01-07 | 2005-07-21 | Toshiba Corp | Energy management system, energy management method, and energy management program |
JP2011130649A (en) * | 2009-12-21 | 2011-06-30 | Panasonic Electric Works Co Ltd | Electric power supply system |
WO2014042219A1 (en) * | 2012-09-12 | 2014-03-20 | 日本電気株式会社 | Electric power management method, electric power management device and program |
JP2015201987A (en) * | 2014-04-09 | 2015-11-12 | イオンディライト株式会社 | demand management system and method |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020194287A (en) * | 2019-05-27 | 2020-12-03 | 三菱電機株式会社 | Data management device |
JP7421275B2 (en) | 2019-05-27 | 2024-01-24 | 三菱電機株式会社 | data management device |
JP7527460B2 (en) | 2019-05-27 | 2024-08-02 | 三菱電機株式会社 | Wheeling charge calculation system |
WO2022070632A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Electric power control system, and program |
WO2022070630A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
WO2022071259A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
WO2022070633A1 (en) | 2020-09-30 | 2022-04-07 | ダイキン工業株式会社 | Power control system and program |
JP2022057283A (en) * | 2020-09-30 | 2022-04-11 | ダイキン工業株式会社 | Power control system and program |
US12038731B2 (en) | 2020-09-30 | 2024-07-16 | Daikin Industries, Ltd. | Power control system and program |
US12093007B2 (en) | 2020-09-30 | 2024-09-17 | Daikin Industries, Ltd. | Power control system and program |
Also Published As
Publication number | Publication date |
---|---|
JP6303054B1 (en) | 2018-03-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6303054B1 (en) | Power control system | |
WO2015122196A1 (en) | Occupancy state determination device, delivery system, occupancy state determination method, occupancy state determination program, and delivery terminal | |
JP6604327B2 (en) | Distributed power supply system, station control device, control method, and storage medium storing program | |
JP2009124885A (en) | System for supporting adjustment of electric power supply and demand | |
JP2012244631A (en) | Head-end system for advanced metering infrastructure network | |
JP2012147546A (en) | Electric power demand-supply adjusting reservation capacity trading system and electric power demand-supply adjusting reservation capacity trading method | |
JP2014526230A5 (en) | ||
JP2011259656A (en) | Energy management apparatus, energy management method, and energy management program | |
CN108370161B (en) | Method for providing an energy reserve for an energy supply system | |
JP6246412B1 (en) | Power interchange system | |
JP2015112014A (en) | Power control unit, power control system, and power control method | |
JPWO2013157030A1 (en) | Power monitoring apparatus and power monitoring system | |
JP2015092822A (en) | Power conditioner and calculation method | |
JP2015015865A (en) | Server device and power supply-demand control method | |
JP2007020314A (en) | Power demand prediction system | |
JP6481942B2 (en) | Power management system, power management method, and program | |
JP5955581B2 (en) | Electric power supply and demand control device and electric power supply and demand control method | |
JP2014217195A (en) | Electricity rate setting system and electricity supply control system | |
JP2016042411A (en) | Gas consumption type power generation system | |
JP2009071973A (en) | System and method for monitoring exhaust co2 | |
JP2013223316A (en) | Power control system | |
JP5422608B2 (en) | Grid interconnection device | |
WO2015185890A1 (en) | Adaptive battery management system | |
JP2014236521A (en) | Output control method and output control device | |
JP6054807B2 (en) | Sensor position determination method and sensor position determination apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20171107 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180118 |
|
A911 | Transfer to examiner for re-examination before appeal (zenchi) |
Free format text: JAPANESE INTERMEDIATE CODE: A911 Effective date: 20180125 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180227 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180305 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6303054 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |