JP2017099111A - Power storage system, control device and operating method - Google Patents

Power storage system, control device and operating method Download PDF

Info

Publication number
JP2017099111A
JP2017099111A JP2015228177A JP2015228177A JP2017099111A JP 2017099111 A JP2017099111 A JP 2017099111A JP 2015228177 A JP2015228177 A JP 2015228177A JP 2015228177 A JP2015228177 A JP 2015228177A JP 2017099111 A JP2017099111 A JP 2017099111A
Authority
JP
Japan
Prior art keywords
power storage
storage device
master
slave
output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015228177A
Other languages
Japanese (ja)
Other versions
JP6583782B2 (en
Inventor
智彦 豊永
Tomohiko Toyonaga
智彦 豊永
祐一郎 寺本
Yuichiro Teramoto
祐一郎 寺本
利哉 岩崎
Toshiya Iwasaki
利哉 岩崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2015228177A priority Critical patent/JP6583782B2/en
Publication of JP2017099111A publication Critical patent/JP2017099111A/en
Application granted granted Critical
Publication of JP6583782B2 publication Critical patent/JP6583782B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Inverter Devices (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a technique of stabilizing power supply even when a load having large power consumption is connected.SOLUTION: A power storage system 100 includes a master power storage device 10 and a slave power storage device 12. The slave power storage device 12 is connected in parallel to the master electric storage device 10 between autonomous electric paths 72 connecting a first output terminal 36 and a second output terminal 38 of the master electric storage device 10 and a load 16. Here, the master power storage device 10 performs voltage control, and the slave electric storage device 12 executes current control. (2) When the preparation processing of the master power storage device 10 is completed (1) after the preparation processing of the slave power storage device 12 is completed, (3) the output from the slave power storage device 12 is started after the output from the master power storage device 10 is started.SELECTED DRAWING: Figure 1

Description

本発明は、直流電力を交流電力に変換して出力する蓄電システム、制御装置、運転方法に関する。   The present invention relates to a power storage system that converts DC power into AC power and outputs the power, a control device, and an operation method.

安定した電力供給を可能にするために、蓄電池を用いた第1の蓄電回路に加えて、電気二重層コンデンサを用いた第2の蓄電回路が備えられる。外部負荷の消費電力が瞬間的に増加した場合、第2の蓄電回路から電力を供給した後に、第1の蓄電回路から電力が供給される(例えば、特許文献1参照)。   In order to enable stable power supply, a second power storage circuit using an electric double layer capacitor is provided in addition to the first power storage circuit using a storage battery. When the power consumption of the external load increases instantaneously, power is supplied from the first power storage circuit after power is supplied from the second power storage circuit (see, for example, Patent Document 1).

特開2002−110210号公報JP 2002-110210 A

連携運転と自立運転とを切替可能な蓄電装置を複数備え、各蓄電装置の自立出力が並列接続されている蓄電システムがある。このような蓄電システムにおいて、いずれかの蓄電装置がマスタ蓄電装置として電圧制御を実行し、残りの蓄電装置がスレーブ蓄電装置として電流制御を実行する。一般的に、マスタ蓄電装置が電力の出力を開始してから、スレーブ蓄電装置が電力の出力を開始する。これは、電流制御であるスレーブ蓄電装置は重畳すべき電圧がなければ出力することができないためである。ここでは、蓄電システムが供給可能な電力以下の消費電力でありながら、各蓄電装置が供給可能な電力よりも大きな消費電力を有する負荷が蓄電システムに接続されている状況下において、マスタ蓄電装置だけが負荷に電力を供給している場合を想定する。このような場合が継続すると、当該マスタ蓄電装置は、過負荷のために停止してしまう。   There is a power storage system that includes a plurality of power storage devices that can switch between cooperative operation and self-sustained operation and in which the independent outputs of the power storage devices are connected in parallel. In such a power storage system, any one of the power storage devices performs voltage control as a master power storage device, and the remaining power storage devices perform current control as slave power storage devices. In general, after the master power storage device starts outputting power, the slave power storage device starts outputting power. This is because the slave power storage device that is current control cannot output without a voltage to be superimposed. Here, in a situation where a load having power consumption that is less than or equal to the power that can be supplied by the power storage system but that is larger than the power that can be supplied by each power storage device is connected to the power storage system, only the master power storage device Assume that is supplying power to the load. When such a case continues, the master power storage device stops due to overload.

本発明はこうした状況に鑑みなされたものであり、その目的は、消費電力の大きな負荷が接続されている場合であっても電力の供給を安定化する技術を提供することにある。   The present invention has been made in view of such circumstances, and an object of the present invention is to provide a technique for stabilizing the supply of power even when a load with large power consumption is connected.

上記課題を解決するために、本発明のある態様の蓄電システムは、マスタ蓄電装置と、マスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、マスタ蓄電装置に並列に接続されるスレーブ蓄電装置とを備える。マスタ蓄電装置は電圧制御を実行し、スレーブ蓄電装置は電流制御を実行し、(1)スレーブ蓄電装置の準備処理が完了してから、(2)マスタ蓄電装置の準備処理が完了すると、マスタ蓄電装置からの出力が開始された後、(3)スレーブ蓄電装置からの出力が開始される。   In order to solve the above-described problem, a power storage system according to an aspect of the present invention includes a master power storage device and a slave power storage device connected in parallel to the master power storage device between electrical paths connecting the output terminal of the master power storage device and a load. With. The master power storage device performs voltage control, the slave power storage device performs current control, and (2) after completion of the preparation processing of the slave power storage device, (2) when the preparation processing of the master power storage device is completed, After the output from the device is started, (3) the output from the slave power storage device is started.

本発明の別の態様は、制御装置である。この装置は、電圧制御を実行するマスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、マスタ蓄電装置に並列に接続されるスレーブ蓄電装置に対して、電流制御を実行する制御装置であって、(1)本スレーブ蓄電装置の準備処理を完了してから、(2)マスタ蓄電装置の準備処理が完了すると、マスタ蓄電装置からの出力が開始された後、(3)本スレーブ蓄電装置からの出力を開始する。   Another aspect of the present invention is a control device. This device is a control device that performs current control on a slave power storage device connected in parallel to a master power storage device between electrical paths connecting an output terminal of the master power storage device that performs voltage control and a load. (1) After completing the preparation processing of the slave power storage device, (2) When the preparation processing of the master power storage device is completed, after the output from the master power storage device is started, (3) From the slave power storage device Starts output.

本発明の別の態様は、運転方法である。この方法は、マスタ蓄電装置と、マスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、マスタ蓄電装置に並列に接続されるスレーブ蓄電装置とを備えるとともに、マスタ蓄電装置は電圧制御を実行し、スレーブ蓄電装置は電流制御を実行する蓄電システムにおける運転方法であって、スレーブ蓄電装置の準備処理を実行するステップと、スレーブ蓄電装置の準備処理が完了してから、マスタ蓄電装置の準備処理を実行するステップと、マスタ蓄電装置の準備処理が完了してから、マスタ蓄電装置からの出力を開始するステップと、マスタ蓄電装置からの出力が開始してから、スレーブ蓄電装置からの出力を開始するステップと、を備える。   Another aspect of the present invention is an operation method. The method includes a master power storage device and a slave power storage device connected in parallel to the master power storage device between a power path connecting the output terminal of the master power storage device and a load, and the master power storage device performs voltage control. The slave power storage device is an operation method in the power storage system that executes current control, and the step of executing the preparation processing of the slave power storage device and the preparation processing of the master power storage device after the preparation processing of the slave power storage device is completed. A step of executing, a step of starting output from the master power storage device after completion of preparation processing of the master power storage device, and a start of output from the slave power storage device after output from the master power storage device is started Steps.

なお、以上の構成要素の任意の組合せ、本発明の表現を方法、装置、システム、コンピュータプログラム、またはコンピュータプログラムを記録した記録媒体などの間で変換したものもまた、本発明の態様として有効である。   Note that any combination of the above-described components, the expression of the present invention converted between a method, an apparatus, a system, a computer program, or a recording medium on which the computer program is recorded are also effective as an aspect of the present invention. is there.

本発明によれば、消費電力の大きな負荷が接続されている場合であっても電力の供給を安定化できる。   According to the present invention, power supply can be stabilized even when a load with large power consumption is connected.

本発明の実施例に係る蓄電システムの構成を示す図である。It is a figure which shows the structure of the electrical storage system which concerns on the Example of this invention. 図1のスレーブ用制御部の構成を示す図である。It is a figure which shows the structure of the control part for slaves of FIG. 図3(a)−(h)は、図1の蓄電システムにおける動作の概要を示す図である。FIGS. 3A to 3H are diagrams showing an outline of the operation in the power storage system of FIG. 図4(a)−(h)は、図1の蓄電システムにおける別の動作の概要を示す図である。4A to 4H are diagrams showing an outline of another operation in the power storage system of FIG. 図5(a)−(h)は、図1の蓄電システムにおけるさらに別の動作の概要を示す図である。5A to 5H are diagrams showing an outline of still another operation in the power storage system of FIG. 図1のスレーブ蓄電装置による出力の開始手順を示すフローチャートである。3 is a flowchart showing a procedure for starting output by the slave power storage device of FIG. 1.

本発明の実施例を具体的に説明する前に、実施例の概要を説明する。実施例は、マスタ蓄電装置とスレーブ蓄電装置が負荷に対して並列に接続される蓄電システムに関する。蓄電システムは、商用電力系統によって供給される商用電力に協調するように動作する連系運転と、商用電力系統からの商用電力の供給が停止している場合に自立的に動作する自立運転とを切りかえながら実行する。ここでは、自立運転を説明の対象とするので、連系運転の説明を省略する。例えば、連系運転には公知の技術が使用されればよい。自立運転を実行している場合、前述のごとく、マスタ蓄電装置は電圧制御を実行し、スレーブ蓄電装置は電流制御を実行するので、スレーブ蓄電装置は、マスタ蓄電装置からの電力の出力を確認してから電力の出力を開始する。   Before specifically describing the embodiments of the present invention, an outline of the embodiments will be described. The embodiment relates to a power storage system in which a master power storage device and a slave power storage device are connected in parallel to a load. The power storage system includes a grid operation that operates so as to cooperate with the commercial power supplied by the commercial power system, and a self-sustained operation that operates independently when the supply of commercial power from the commercial power system is stopped. Execute while switching. Here, since self-sustained operation is an object of description, description of interconnected operation is omitted. For example, a known technique may be used for the interconnected operation. When autonomous operation is being performed, as described above, the master power storage device performs voltage control and the slave power storage device performs current control, so the slave power storage device confirms the output of power from the master power storage device. After that, start outputting power.

ここで、マスタ蓄電装置とスレーブ蓄電装置のそれぞれが供給可能な電力よりも大きな消費電力を有する負荷が蓄電システムに接続されている場合を想定する。なお、負荷の消費電力は、蓄電システムが供給可能な電力以下であるとする。特に、マスタ蓄電装置だけが電力の出力を開始し、スレーブ蓄電装置が電力の出力を開始していないと、マスタ蓄電装置だけが負荷に電力を供給する。このような状況が継続すると、マスタ蓄電装置の運転は、過負荷のために停止してしまう。さらに、マスタ蓄電装置の運転停止は、蓄電システムの自立運転の停止につながる。   Here, it is assumed that a load having power consumption larger than the power that each of the master power storage device and the slave power storage device can supply is connected to the power storage system. Note that the power consumption of the load is less than or equal to the power that can be supplied by the power storage system. In particular, if only the master power storage device starts outputting power and the slave power storage device does not start outputting power, only the master power storage device supplies power to the load. If such a situation continues, the operation of the master power storage device stops due to overload. Further, the operation stop of the master power storage device leads to the stop of the self-sustaining operation of the power storage system.

このような状況に対応するために、本実施例に係る蓄電システムでは、マスタ蓄電装置における準備処理の完了よりも先に、スレーブ蓄電装置における準備処理が完了される。準備処理の完了とは、電力を出力する前の段階までの処理が完了したことに相当する。スレーブ蓄電装置は、準備処理を完了すると、マスタ蓄電装置からの出力電圧を監視する。マスタ蓄電装置は、スレーブ蓄電装置における準備処理の完了後に、準備処理を完了すると、電力の出力を開始する。スレーブ蓄電装置は、マスタ蓄電装置からの出力を検出すると、電力の出力を開始する。マスタ蓄電装置からの出力が検出されるまでに、スレーブ蓄電装置における準備処理が完了しているので、マスタ蓄電装置による電力の出力の開始から、マスタ蓄電装置の出力開始とほぼ同時にスレーブ蓄電装置の出力が開始可能となる。   In order to cope with such a situation, in the power storage system according to the present embodiment, the preparation process in the slave power storage device is completed prior to the completion of the preparation process in the master power storage device. Completion of the preparation process corresponds to the completion of the process up to the stage before outputting power. When the slave power storage device completes the preparation process, the slave power storage device monitors the output voltage from the master power storage device. When the master power storage device completes the preparation processing after the completion of the preparation processing in the slave power storage device, the master power storage device starts outputting power. When the slave power storage device detects an output from the master power storage device, the slave power storage device starts outputting power. Since the preparation process in the slave power storage device is completed by the time the output from the master power storage device is detected, from the start of power output by the master power storage device, the slave power storage device Output can be started.

以下では、説明を明りょうにするために、(1)蓄電システム100の構成および通常時の動作(以下、「通常動作」という)を説明した後に、(2)蓄電システム100において電力の出力が開始される際の動作(以下、「開始動作」という)を説明する。なお、実際には、(2)開始動作が実行された後に、(1)通常動作が実行される。   In the following, for clarity of explanation, (1) the configuration of the power storage system 100 and the normal operation (hereinafter referred to as “normal operation”) are described, and then (2) the power output in the power storage system 100 is An operation at the time of starting (hereinafter referred to as “starting operation”) will be described. In practice, (1) normal operation is executed after (2) start operation is executed.

(1)構成および通常動作
図1は、本発明の実施例に係る蓄電システム100の構成を示す。蓄電システム100は、マスタ蓄電装置10、スレーブ蓄電装置12、トランス14、負荷16、第1電流センサ84、第2電流センサ86を含む。また、マスタ蓄電装置10は、マスタ用蓄電池30、マスタ用DC−AC変換部32、マスタ用制御部34を含み、スレーブ蓄電装置12は、リレー18、スレーブ用蓄電池40、スレーブ用DC−AC変換部42、スレーブ用制御部44を含む。トランス14は、一次巻線20、二次巻線22を含む。
(1) Configuration and Normal Operation FIG. 1 shows a configuration of a power storage system 100 according to an embodiment of the present invention. The power storage system 100 includes a master power storage device 10, a slave power storage device 12, a transformer 14, a load 16, a first current sensor 84, and a second current sensor 86. The master power storage device 10 includes a master storage battery 30, a master DC-AC conversion unit 32, and a master control unit 34. The slave power storage device 12 includes a relay 18, a slave storage battery 40, and a slave DC-AC conversion. Part 42 and a slave control part 44. The transformer 14 includes a primary winding 20 and a secondary winding 22.

マスタ用蓄電池30は、直列または直並列接続された複数の蓄電池セルにより構成される。蓄電池セルには、リチウムイオン蓄電池、ニッケル水素蓄電池などが使用される。なお、マスタ用蓄電池30として、電気二重層コンデンサが使用されてもよい。マスタ用DC−AC変換部32は、自立運転時、つまりマスタ用蓄電池30からの放電時、マスタ用蓄電池30から供給される直流電力を交流電力に変換して第1出力端子36、第2出力端子38から出力する。本実施例では説明を省略するが、系統運転を考慮して、マスタ用DC−AC変換部32は、双方DC−AC変換部であってもよい。マスタ用制御部34は、マスタ用蓄電池30、マスタ用DC−AC変換部32を管理制御する。例えば、マスタ用制御部34は、マスタ用DC−AC変換部32から交流電力を出力する際の電圧値を設定する。マスタ用制御部34での処理については、後述する。   The master storage battery 30 includes a plurality of storage battery cells connected in series or in series and parallel. A lithium ion storage battery, a nickel metal hydride storage battery, etc. are used for a storage battery cell. An electric double layer capacitor may be used as the master storage battery 30. The master DC-AC conversion unit 32 converts the DC power supplied from the master storage battery 30 into AC power during self-sustained operation, that is, when discharging from the master storage battery 30, and converts the first output terminal 36 and the second output. Output from terminal 38. Although description is omitted in the present embodiment, in consideration of system operation, the master DC-AC conversion unit 32 may be a DC-AC conversion unit. The master control unit 34 manages and controls the master storage battery 30 and the master DC-AC conversion unit 32. For example, the master control unit 34 sets a voltage value when AC power is output from the master DC-AC conversion unit 32. The processing in the master control unit 34 will be described later.

マスタ用DC−AC変換部32の第1出力端子36には第1電圧線L1が接続され、第2出力端子38には第2電圧線L2が接続される。第1電圧線L1、第2電圧線L2の2線によって2線式のマスタ交流電路70が構成される。マスタ交流電路70は、トランス14を介して、3線式の自立電路72に電気的に接続される。具体的に説明すると、マスタ交流電路70における第1電圧線L1は、トランス14の一次巻線20の一端に接続され、第2電圧線L2は、一次巻線20の他端に接続される。トランス14は、一次巻線20に加えて二次巻線22も備えており、二次巻線22の一端は、自立電路72の第1電圧線L11に接続され、二次巻線22の他端は、自立電路72の第2電圧線L12に接続される。さらに、自立電路72の中性点は、自立電路72の中性線L10に接続される。   The first output terminal 36 of the master DC-AC converter 32 is connected to the first voltage line L1, and the second output terminal 38 is connected to the second voltage line L2. A two-wire master AC circuit 70 is constituted by the first voltage line L1 and the second voltage line L2. Master AC circuit 70 is electrically connected to a three-wire self-supporting circuit 72 through transformer 14. More specifically, the first voltage line L1 in the master AC circuit 70 is connected to one end of the primary winding 20 of the transformer 14, and the second voltage line L2 is connected to the other end of the primary winding 20. The transformer 14 includes a secondary winding 22 in addition to the primary winding 20, and one end of the secondary winding 22 is connected to the first voltage line L 11 of the self-supporting electric circuit 72. The end is connected to the second voltage line L12 of the self-supporting electric circuit 72. Further, the neutral point of the independent electric circuit 72 is connected to the neutral line L <b> 10 of the independent electric circuit 72.

このトランス14は、マスタ交流電路70からの2線式200Vの交流電力を単相3線式200/100Vの交流電力に変換して自立電路72に出力する。そのため、第1電圧線L11と第2電圧線L12との間の線間電圧は200Vであり、第1電圧線L11と中性線L10との間の線間電圧は100Vであり、第2電圧線L12と中性線L10との間の線間電圧は100Vである。自立電路72における二次巻線22の反対側には、負荷16が接続される。負荷16は、任意の電気機器であるが、その消費電力は、マスタ蓄電装置10から供給可能な電力、後述のスレーブ蓄電装置12から供給可能な電力のそれぞれよりも大きく、かつマスタ蓄電装置10とスレーブ蓄電装置12によって供給可能な電力以下である。例えば、マスタ蓄電装置10が供給可能な電力が「3kW」であり、スレーブ蓄電装置12が供給可能な電力も「3kW」である場合、負荷16の消費電力は、3kWよりも大きく、かつ6kW以下である。   The transformer 14 converts the two-wire 200V AC power from the master AC circuit 70 into a single-phase three-wire 200 / 100V AC power and outputs the AC power to the independent circuit 72. Therefore, the line voltage between the first voltage line L11 and the second voltage line L12 is 200V, the line voltage between the first voltage line L11 and the neutral line L10 is 100V, and the second voltage The line voltage between the line L12 and the neutral line L10 is 100V. A load 16 is connected to the opposite side of the secondary winding 22 in the self-supporting electric circuit 72. Although the load 16 is an arbitrary electrical device, the power consumption is larger than each of power that can be supplied from the master power storage device 10 and power that can be supplied from a slave power storage device 12 described later, This is less than or equal to the power that can be supplied by the slave power storage device 12. For example, when the power that can be supplied by the master power storage device 10 is “3 kW” and the power that can be supplied by the slave power storage device 12 is also “3 kW”, the power consumption of the load 16 is greater than 3 kW and 6 kW or less. It is.

スレーブ用蓄電池40、スレーブ用DC−AC変換部42は、マスタ用蓄電池30、マスタ用DC−AC変換部32と同様である。なお、スレーブ用蓄電池40の構成はマスタ用蓄電池30の構成と異なっていてもよい。スレーブ用制御部44は、マスタ用制御部34と互いに独立して構成され、スレーブ用蓄電池40、スレーブ用DC−AC変換部42を管理制御する。例えば、スレーブ用制御部44は、スレーブ用DC−AC変換部42から交流電力を出力する際の電流値を設定する。スレーブ用制御部44での処理については、後述する。   The slave storage battery 40 and the slave DC-AC converter 42 are the same as the master storage battery 30 and the master DC-AC converter 32. The configuration of the slave storage battery 40 may be different from the configuration of the master storage battery 30. The slave control unit 44 is configured independently of the master control unit 34 and manages and controls the slave storage battery 40 and the slave DC-AC conversion unit 42. For example, the slave control unit 44 sets a current value when the AC power is output from the slave DC-AC conversion unit 42. Processing in the slave control unit 44 will be described later.

スレーブ用DC−AC変換部42の第1出力端子46には第1電圧線L21が接続され、第2出力端子48には第2電圧線L22が接続される。第1電圧線L21、第2電圧線L22の2線によって2線式のスレーブ交流電路74が構成される。スレーブ交流電路74は、スレーブ用DC−AC変換部42の反対側において自立電路72に接続される。具体的に説明すると、スレーブ交流電路74の第1電圧線L21は、第1接続点76において、自立電路72の第1電圧線L11に接続され、スレーブ交流電路74の第2電圧線L22は、第2接続点78において、自立電路72の第2電圧線L12に接続される。つまり、スレーブ蓄電装置12は、自立電路72の間において、マスタ蓄電装置10に並列に接続される。   The first output terminal 46 of the slave DC-AC converter 42 is connected to the first voltage line L 21, and the second output terminal 48 is connected to the second voltage line L 22. A two-wire slave AC circuit 74 is constituted by the first voltage line L21 and the second voltage line L22. The slave AC circuit 74 is connected to the self-supporting circuit 72 on the opposite side of the slave DC-AC converter 42. More specifically, the first voltage line L21 of the slave AC circuit 74 is connected to the first voltage line L11 of the self-supporting circuit 72 at the first connection point 76, and the second voltage line L22 of the slave AC circuit 74 is The second connection point 78 is connected to the second voltage line L12 of the self-supporting electric circuit 72. That is, slave power storage device 12 is connected in parallel to master power storage device 10 between self-supporting electrical paths 72.

リレー18は、スレーブ交流電路74において、第1接続点76および第2接続点78と、スレーブ用DC−AC変換部42との間に配置される。リレー18がオンにされることによって、スレーブ交流電路74が導通し、リレー18がオフにされることによってスレーブ交流電路74が遮断される。ここで、リレー18のオン/オフは、例えば、スレーブ用制御部44によって制御される。なお、通常動作において、リレー18はオンにされている。   The relay 18 is arranged between the first connection point 76 and the second connection point 78 and the slave DC-AC conversion unit 42 in the slave AC circuit 74. When the relay 18 is turned on, the slave AC circuit 74 is conducted, and when the relay 18 is turned off, the slave AC circuit 74 is interrupted. Here, ON / OFF of the relay 18 is controlled by the slave control unit 44, for example. In normal operation, the relay 18 is turned on.

自立運転における通常動作において、マスタ用制御部34は、マスタ用DC−AC変換部32に電圧制御を実行させる。ここで、マスタ用制御部34は、マスタ蓄電装置の出力電圧が目標電圧となるようマスタ用DC−AC変換部32を制御する。なお、目標電圧は、商用電力系統の公称電圧に設定されており、例えば、200Vである。マスタ用制御部34は、マスタ蓄電装置の出力電圧が目標電圧と目標周波数に一致するようなPWM(Pulse Width Modulation)信号をマスタ用DC−AC変換部32に出力する。これにより、マスタ用DC−AC変換部32は、目標電圧と目標周波数を有した交流電力を出力する。   In the normal operation in the independent operation, the master control unit 34 causes the master DC-AC conversion unit 32 to execute voltage control. Here, master control unit 34 controls master DC-AC conversion unit 32 such that the output voltage of the master power storage device becomes the target voltage. The target voltage is set to the nominal voltage of the commercial power system, and is 200 V, for example. Master control unit 34 outputs a PWM (Pulse Width Modulation) signal to master DC-AC conversion unit 32 such that the output voltage of the master power storage device matches the target voltage and the target frequency. As a result, the master DC-AC converter 32 outputs AC power having the target voltage and the target frequency.

一方、自立運転における通常動作において、スレーブ用制御部44は、スレーブ用DC−AC変換部42に電流制御を実行させる。ここで、スレーブ用制御部44は、スレーブ蓄電装置の出力電流が目標電流となるようスレーブ用DC−AC変換部42を制御する。スレーブ用制御部44が目標電流を決定するために、図1のごとく、自立電路72の第1電圧線L11には、第1電流センサ84が設けられ、第2電圧線L12には、第2電流センサ86が設けられる。第1電流センサ84は、第1電圧線L11の第1負荷電流I11を測定し、測定結果をスレーブ用制御部44に出力する。一方、第2電流センサ86は、第2電圧線L12の第2負荷電流I12を測定し、測定結果をスレーブ用制御部44に出力する。ここで、第1負荷電流I11、第2負荷電流I12は、図1中の矢印の方向を正とする。なお、第1電流センサ84、第2電流センサ86の測定結果は、スレーブ用制御部44がサンプリング周期毎に取得する。   On the other hand, in the normal operation in the independent operation, the slave control unit 44 causes the slave DC-AC conversion unit 42 to execute current control. Here, the slave controller 44 controls the slave DC-AC converter 42 so that the output current of the slave power storage device becomes the target current. In order for the slave control unit 44 to determine the target current, as shown in FIG. 1, a first current sensor 84 is provided in the first voltage line L11 of the self-supporting electric circuit 72, and a second current is provided in the second voltage line L12. A current sensor 86 is provided. The first current sensor 84 measures the first load current I11 of the first voltage line L11 and outputs the measurement result to the slave control unit 44. On the other hand, the second current sensor 86 measures the second load current I12 of the second voltage line L12 and outputs the measurement result to the slave controller 44. Here, the first load current I11 and the second load current I12 are positive in the direction of the arrow in FIG. Note that the measurement results of the first current sensor 84 and the second current sensor 86 are acquired by the slave control unit 44 at each sampling period.

図2は、スレーブ用制御部44の構成を示す。スレーブ用制御部44は、入力部50、測定部52、取得部56、処理部58を含む。取得部56は、第1電流センサ84から、第1負荷電流I11の測定結果を取得するとともに、第2電流センサ86から、第2負荷電流I12の測定結果を取得する。取得部56は、第1負荷電流I11の測定結果と第2負荷電流I12の測定結果とを処理部58に出力する。処理部58は、第1負荷電流I11の測定結果と第2負荷電流I12の測定結果とをもとに、負荷16の消費電力を導出する。ここで、第1負荷電流I11は、第1電圧線L11および中性線L10で構成される100V系の負荷電流に相当し、第2負荷電流I12は、第2電圧線L12および中性線L10で構成される100V系の負荷電流に相当する。そのため、処理部58は、(第1負荷電流I11+第2負荷電流I12)×100を計算することによって、負荷16の消費電力を導出する。   FIG. 2 shows the configuration of the slave control unit 44. The slave control unit 44 includes an input unit 50, a measurement unit 52, an acquisition unit 56, and a processing unit 58. The acquisition unit 56 acquires the measurement result of the first load current I11 from the first current sensor 84, and acquires the measurement result of the second load current I12 from the second current sensor 86. The acquisition unit 56 outputs the measurement result of the first load current I11 and the measurement result of the second load current I12 to the processing unit 58. The processing unit 58 derives the power consumption of the load 16 based on the measurement result of the first load current I11 and the measurement result of the second load current I12. Here, the first load current I11 corresponds to a 100V load current composed of the first voltage line L11 and the neutral line L10, and the second load current I12 is equivalent to the second voltage line L12 and the neutral line L10. This corresponds to a load current of 100V system composed of Therefore, the processing unit 58 derives the power consumption of the load 16 by calculating (first load current I11 + second load current I12) × 100.

次に、処理部58は、負荷16の消費電力を、スレーブ用DC−AC変換部42から出力する交流出力の電圧200Vで除算することによって、換算電流を導出する。換算電流は、マスタ交流電路70、スレーブ交流電路74において、負荷16の消費電力を供給可能な電流である。   Next, the processing unit 58 derives the converted current by dividing the power consumption of the load 16 by the AC output voltage 200 V output from the slave DC-AC conversion unit 42. The converted current is a current that can supply the power consumption of the load 16 in the master AC circuit 70 and the slave AC circuit 74.

(2)開始動作
開始動作は、(2−1)スレーブ蓄電装置12の準備処理、(2−2)マスタ蓄電装置10の準備処理および出力開始、(2−3)スレーブ蓄電装置12の出力開始の順に実行される。ここでは、(2−1)、(2−2)、(2−3)の順に説明する。
(2) Start operation The start operation includes (2-1) preparation process of slave power storage device 12, (2-2) preparation process and output start of master power storage device 10, and (2-3) output start of slave power storage device 12. Are executed in this order. Here, description will be given in the order of (2-1), (2-2), and (2-3).

(2−1)スレーブ蓄電装置12の準備処理
図2における入力部50は、スレーブ蓄電装置12の動作を開始させるための信号(以下、「開始信号S2」という)を入力する。開始信号S2は、スレーブ蓄電装置12に備えられたボタン(図示せず)をユーザが押し下げた場合や、スレーブ蓄電装置12が系統運転から自立運転に切りかわった場合に、入力部50に入力される。入力部50が開始信号S2の入力を処理部58に通知することによって、処理部58は立ち上がる。処理部58は、立ち上がると、図1のリレー18をオフからオンに切りかえる。
(2-1) Preparation Process of Slave Power Storage Device 12 The input unit 50 in FIG. 2 inputs a signal for starting the operation of the slave power storage device 12 (hereinafter referred to as “start signal S2”). The start signal S2 is input to the input unit 50 when a user presses a button (not shown) provided in the slave power storage device 12 or when the slave power storage device 12 is switched from the system operation to the independent operation. The When the input unit 50 notifies the input of the start signal S2 to the processing unit 58, the processing unit 58 starts up. When the processing unit 58 starts up, the processing unit 58 switches the relay 18 in FIG. 1 from OFF to ON.

また、処理部58は、立ち上がると、カウンタ54における内部シーケンスカウンタのカウントアップを指示する。カウンタ54は、処理部58からの指示を受けつけると、所定のクロックで、内部シーケンスカウンタを「0」からカウントアップする。内部シーケンスカウンタは、「20」までカウントアップされ、「20」を維持し続ける。なお、カウンタ54は、処理部58の動作が停止された場合に、内部シーケンスカウンタを「0」にリセットする。   When the processing unit 58 rises, the processing unit 58 instructs the counter 54 to count up the internal sequence counter. Upon receiving an instruction from the processing unit 58, the counter 54 counts up the internal sequence counter from “0” with a predetermined clock. The internal sequence counter is counted up to “20” and continues to maintain “20”. The counter 54 resets the internal sequence counter to “0” when the operation of the processing unit 58 is stopped.

図3(a)−(h)は、蓄電システム100における動作の概要を示す。図3(a)−(d)は、マスタ蓄電装置10の動作を示し、図3(e)−(h)は、スレーブ蓄電装置12の動作を示す。図3(e)は、開始信号S2を示す。入力部50が開始信号S2を入力することは、タイミングT2において、開始信号S2が「ロー」状態から「ハイ」状態に切りかわることに相当する。図3(f)は、内部シーケンスカウンタの値を示す。図示のごとく、タイミングT2より、内部シーケンスカウンタは、「0」から「20」までカウントアップされる。図2に戻る。   3A to 3H show an outline of the operation in the power storage system 100. FIG. 3A to 3D show the operation of the master power storage device 10, and FIGS. 3E to 3 H show the operation of the slave power storage device 12. FIG. 3E shows the start signal S2. Input of the start signal S2 by the input unit 50 corresponds to switching of the start signal S2 from the “low” state to the “high” state at the timing T2. FIG. 3F shows the value of the internal sequence counter. As shown in the figure, the internal sequence counter is counted up from “0” to “20” from timing T2. Returning to FIG.

測定部52は、図1の第3接続点80、第4接続点82に接続される。第3接続点80は、第1電圧線L21における第1出力端子46とリレー18との間に設けられ、第4接続点82は、第2電圧線L22における第2出力端子48とリレー18との間に設けられる。測定部52は、リレー18がオンにされ、かつマスタ蓄電装置10から交流電力が出力されている場合に、マスタ蓄電装置10からの出力電圧を測定する。測定部52は、出力電圧として、電圧の実効値を測定する。なお、測定部52が測定を開始したタイミングにおいて、マスタ蓄電装置10は交流電力を出力していないので、測定部52において測定した出力電圧は「0V」に近くなる。処理部58は、カウンタ54における内部シーケンスカウンタが「8」になるまでの間を「第2準備期間」として、測定部52に出力電圧の測定を実行させる。   The measuring unit 52 is connected to the third connection point 80 and the fourth connection point 82 in FIG. The third connection point 80 is provided between the first output terminal 46 and the relay 18 in the first voltage line L21, and the fourth connection point 82 is connected to the second output terminal 48 and the relay 18 in the second voltage line L22. Between. Measurement unit 52 measures the output voltage from master power storage device 10 when relay 18 is turned on and AC power is output from master power storage device 10. The measuring unit 52 measures the effective value of the voltage as the output voltage. Note that, since the master power storage device 10 does not output AC power at the timing when the measurement unit 52 starts measurement, the output voltage measured by the measurement unit 52 is close to “0 V”. The processing unit 58 causes the measurement unit 52 to measure the output voltage by setting the period until the internal sequence counter in the counter 54 becomes “8” as the “second preparation period”.

処理部58は、第2準備期間を経過した後も、測定部52に出力電圧の測定を実行させるとともに、出力電圧としきい値とを比較する。しきい値は、マスタ蓄電装置10からの交流電力の出力が確認されるように、例えば、整定値である「200V」近くに設定される。処理部58は、第2準備期間を経過してから、出力電圧がしきい値以上になるまでの期間を「判定期間」として管理する。図3(g)は、処理部58において管理される状態を示し、内部シーケンスカウンタ「0」から「8」までの第2準備期間につづいて、内部シーケンスカウンタ「8」以降の判定期間が配置される。   Even after the second preparation period has elapsed, the processing unit 58 causes the measurement unit 52 to measure the output voltage and compares the output voltage with the threshold value. The threshold value is set, for example, near “200 V” which is a set value so that the output of AC power from master power storage device 10 is confirmed. The processing unit 58 manages the period from the elapse of the second preparation period until the output voltage becomes equal to or higher than the threshold value as the “determination period”. FIG. 3G shows a state managed by the processing unit 58, and the determination period after the internal sequence counter “8” is arranged following the second preparation period from the internal sequence counter “0” to “8”. Is done.

(2−2)マスタ蓄電装置10の準備処理および出力開始
図1のマスタ蓄電装置10のマスタ用制御部34には、マスタ蓄電装置10の動作を開始させるための信号(以下、「開始信号S1」という)が入力される。開始信号S1は、開始信号S2と同様に、マスタ蓄電装置10に備えられたボタン(図示せず)をユーザが押し下げた場合や、マスタ蓄電装置10が系統運転から自立運転に切りかわった場合に入力される。開始信号S1の入力によって、マスタ用制御部34は立ち上がる。
(2-2) Preparation Processing and Start of Output of Master Power Storage Device 10 The master control unit 34 of the master power storage device 10 in FIG. Is entered). The start signal S1 is the same as the start signal S2, when the user depresses a button (not shown) provided in the master power storage device 10 or when the master power storage device 10 is switched from system operation to independent operation Entered. The master control unit 34 starts up by the input of the start signal S1.

また、マスタ用制御部34は、立ち上がると、内部シーケンスカウンタのカウントアップを開始する。内部シーケンスカウンタは、所定のクロックで、「0」から「20」までカウントアップされ、「20」を維持し続ける。内部シーケンスカウンタは、マスタ用制御部34の動作が停止された場合に「0」にリセットされる。さらに、マスタ用制御部34は、内部シーケンスカウンタが「0」から「20」までの間を「第1準備期間」として規定する。第1準備期間は、交流電力を出力するまでの待機期間といえる。   Further, when the master control unit 34 starts up, it starts counting up the internal sequence counter. The internal sequence counter is counted up from “0” to “20” at a predetermined clock and continues to maintain “20”. The internal sequence counter is reset to “0” when the operation of the master control unit 34 is stopped. Furthermore, the master control unit 34 defines the interval between the internal sequence counter “0” and “20” as the “first preparation period”. It can be said that the first preparation period is a standby period until AC power is output.

マスタ用制御部34は、内部シーケンスカウンタが「20」になると、つまり、第1準備期間が経過・完了すると、第1準備期間を「自立出力期間」に切りかえる。自立出力期間において、マスタ用制御部34は、マスタ用DC−AC変換部32にPWM信号を出力する。マスタ用DC−AC変換部32は、PWM信号を入力すると、交流電力の出力を開始する。そのため、自立出力期間になると、マスタ蓄電装置10は、前述の通常動作を実行するといえる。   When the internal sequence counter reaches “20”, that is, when the first preparation period has elapsed / completed, the master control unit 34 switches the first preparation period to the “independent output period”. In the self-sustained output period, the master control unit 34 outputs a PWM signal to the master DC-AC conversion unit 32. When receiving the PWM signal, the master DC-AC converter 32 starts outputting AC power. Therefore, it can be said that, during the self-sustained output period, master power storage device 10 performs the above-described normal operation.

図3(a)は、開始信号S1を示す。マスタ用制御部34が開始信号S1を入力することは、タイミングT1において、開始信号S1が「ロー」状態から「ハイ」状態に切りかわることに相当する。なお、ここでは、タイミングT1は、タイミングT2よりも後に到来する。これは、ユーザが、スレーブ蓄電装置12のボタンを押し下げてから、マスタ蓄電装置10のボタンを押し下げることに相当する。図3(b)は、内部シーケンスカウンタの値を示す。図示のごとく、タイミングT1より、内部シーケンスカウンタは、「0」から「20」までカウントアップされる。   FIG. 3A shows the start signal S1. The input of the start signal S1 by the master control unit 34 corresponds to the change of the start signal S1 from the “low” state to the “high” state at the timing T1. Here, the timing T1 comes after the timing T2. This corresponds to the user pressing down the button of the master power storage device 10 after pressing the button of the slave power storage device 12. FIG. 3B shows the value of the internal sequence counter. As shown in the figure, the internal sequence counter is counted up from “0” to “20” from timing T1.

図3(c)は、マスタ用制御部34において管理される状態を示し、内部シーケンスカウンタ「0」から「20」までの第1準備期間につづいて、内部シーケンスカウンタ「20」以降の自立出力期間が配置される。ここで、第1準備期間は第2準備期間よりも遅く開始されるとともに、第1準備期間は第2準備期間よりも長くされる。そのため、スレーブ蓄電装置12の第2準備期間が完了してから、マスタ蓄電装置10の第1準備期間が完了する。図3(d)は、マスタ用制御部34がマスタ用DC−AC変換部32に出力するPWM信号を示す。第1準備期間においてPWM信号は出力されないが、自立出力期間においてPWM信号は出力される。図1に戻る。このように、マスタ用制御部34は、マスタ蓄電装置10における準備処理、出力の開始を制御する。   FIG. 3C shows a state managed by the master control unit 34, and the self-sustained output after the internal sequence counter “20” following the first preparation period from the internal sequence counter “0” to “20”. A period is arranged. Here, the first preparation period starts later than the second preparation period, and the first preparation period is longer than the second preparation period. Therefore, after the second preparation period of slave power storage device 12 is completed, the first preparation period of master power storage device 10 is completed. FIG. 3D shows a PWM signal output from the master controller 34 to the master DC-AC converter 32. Although the PWM signal is not output in the first preparation period, the PWM signal is output in the independent output period. Returning to FIG. Thus, master control unit 34 controls the start of the preparation process and output in master power storage device 10.

(2−3)スレーブ蓄電装置12の出力開始
図2の測定部52は、判定期間において出力電圧を測定し続けているが、マスタ蓄電装置10が交流電力の出力を開始することによって、処理部58は、測定部52において測定した出力電圧がしきい値以上になったことを検出する。処理部58は、出力電圧がしきい値以上になったことを検出すると、判定期間を「自立出力期間」に切りかえる。自立出力期間において、処理部58は、スレーブ用DC−AC変換部42にPWM信号を出力する。スレーブ用DC−AC変換部42は、PWM信号を入力すると、交流電力の出力を開始する。つまり、スレーブ蓄電装置12は、マスタ蓄電装置10からの出力が開始してから、出力を開始する。そのため、自立出力期間になると、スレーブ蓄電装置12は、前述の通常動作を実行するといえる。
(2-3) Start of Output of Slave Power Storage Device 12 The measurement unit 52 in FIG. 2 continues to measure the output voltage during the determination period, but when the master power storage device 10 starts output of AC power, the processing unit 58 detects that the output voltage measured in the measurement unit 52 is equal to or higher than a threshold value. When detecting that the output voltage is equal to or higher than the threshold value, the processing unit 58 switches the determination period to the “independent output period”. In the self-supporting output period, the processing unit 58 outputs a PWM signal to the slave DC-AC conversion unit 42. When the PWM signal is input, the slave DC-AC converter 42 starts output of AC power. That is, the slave power storage device 12 starts output after the output from the master power storage device 10 is started. Therefore, it can be said that when the self-sustained output period is reached, slave power storage device 12 performs the above-described normal operation.

図3(g)では、判定期間につづいて自立出力期間が配置される。図3(h)は、処理部58がスレーブ用DC−AC変換部42に出力するPWM信号を示す。第2準備期間、判定期間においてPWM信号は出力されないが、自立出力期間においてPWM信号は出力される。このように、スレーブ用制御部44は、スレーブ蓄電装置12における準備処理、出力の開始を制御する。   In FIG. 3G, an independent output period is arranged following the determination period. FIG. 3H shows a PWM signal output from the processing unit 58 to the slave DC-AC conversion unit 42. Although the PWM signal is not output in the second preparation period and the determination period, the PWM signal is output in the independent output period. As described above, the slave control unit 44 controls the start of preparation processing and output in the slave power storage device 12.

図3(a)−(h)においては、スレーブ蓄電装置12に開始信号S2が入力された後に、マスタ蓄電装置10に開始信号S1が入力されている。前述のごとく、第2準備期間は第1準備期間よりも短いので、スレーブ蓄電装置12における第2準備期間が完了した後に、マスタ蓄電装置10における第1準備期間が完了する。さらに、マスタ蓄電装置10が、第1準備期間が完了すると交流電力の出力を開始し、これにつづいて、スレーブ蓄電装置12が、交流電力の出力を開始する。以下では、スレーブ蓄電装置12に開始信号S2が入力されるタイミングT2と、マスタ蓄電装置10に開始信号S1が入力されるタイミングT1との相対的な関係が異なる場合を説明する。   3A to 3H, the start signal S1 is input to the master power storage device 10 after the start signal S2 is input to the slave power storage device 12. As described above, since the second preparation period is shorter than the first preparation period, after the second preparation period in slave power storage device 12 is completed, the first preparation period in master power storage device 10 is completed. Further, master power storage device 10 starts outputting AC power when the first preparation period is completed, and slave power storage device 12 starts outputting AC power. Hereinafter, a case where the relative relationship between timing T2 at which start signal S2 is input to slave power storage device 12 and timing T1 at which start signal S1 is input to master power storage device 10 will be described.

図4(a)−(h)は、蓄電システム100における別の動作の概要を示す。これは、スレーブ蓄電装置12に開始信号S2が入力されるタイミングT2と、マスタ蓄電装置10に開始信号S1が入力されるタイミングT1が同一の場合である。図4(a)−(d)は、マスタ蓄電装置10の動作を示し、これは、図3(a)−(d)と同一である。図4(e)−(h)は、図3(e)−(h)と同様に、スレーブ蓄電装置12の動作を示すが、開始信号S2が、タイミングT1と同一のタイミングT2において入力される。このようなタイミングに開始信号S2が入力されても、図4(g)に示すように、第1準備期間が完了する前に、第2準備期間が完了する。これにつづく動作は、これまでと同様である。   4A to 4H show an outline of another operation in the power storage system 100. FIG. This is a case where the timing T2 at which the start signal S2 is input to the slave power storage device 12 and the timing T1 at which the start signal S1 is input to the master power storage device 10 are the same. 4A to 4D show the operation of the master power storage device 10, which is the same as FIGS. 3A to 3D. 4 (e)-(h) shows the operation of the slave power storage device 12 as in FIG. 3 (e)-(h), but the start signal S2 is input at the same timing T2 as the timing T1. . Even if the start signal S2 is input at such timing, the second preparation period is completed before the first preparation period is completed, as shown in FIG. The subsequent operation is the same as before.

図5(a)−(h)は、蓄電システム100におけるさらに別の動作の概要を示す。これは、スレーブ蓄電装置12に開始信号S2が入力されるタイミングT2よりも、マスタ蓄電装置10に開始信号S1が入力されるタイミングT1の方が先の場合である。図5(a)−(d)は、マスタ蓄電装置10の動作を示し、これは、図3(a)−(d)と同一である。図5(e)−(h)は、図3(e)−(h)と同様に、スレーブ蓄電装置12の動作を示すが、開始信号S2が、タイミングT1よりも後のタイミングT2において入力される。このようなタイミングに開始信号S2が入力されても、図5(g)に示すように、第1準備期間が完了する前に、第2準備期間が完了する。つまり、第1準備期間と第2準備期間との差よりも短ければ、タイミングT1よりもタイミングT2が後であっても、第1準備期間が完了する前に、第2準備期間が完了する。これにつづく動作は、これまでと同様である。   FIGS. 5A to 5H show an outline of still another operation in the power storage system 100. FIG. This is a case where the timing T1 at which the start signal S1 is input to the master power storage device 10 is earlier than the timing T2 at which the start signal S2 is input to the slave power storage device 12. FIGS. 5A to 5D show the operation of the master power storage device 10, which is the same as FIGS. 3A to 3D. FIGS. 5E to 5H show the operation of the slave power storage device 12 as in FIGS. 3E to 3H, but the start signal S2 is input at timing T2 after timing T1. The Even when the start signal S2 is input at such timing, the second preparation period is completed before the first preparation period is completed, as shown in FIG. That is, if it is shorter than the difference between the first preparation period and the second preparation period, the second preparation period is completed before the completion of the first preparation period even if the timing T2 is later than the timing T1. The subsequent operation is the same as before.

この構成は、ハードウエア的には、任意のコンピュータのCPU、メモリ、その他のLSIで実現でき、ソフトウエア的にはメモリにロードされたプログラムなどによって実現されるが、ここではそれらの連携によって実現される機能ブロックを描いている。したがって、これらの機能ブロックがハードウエアのみ、ハードウエアとソフトウエアの組合せによっていろいろな形で実現できることは、当業者には理解されるところである。   This configuration can be realized in terms of hardware by a CPU, memory, or other LSI of any computer, and in terms of software, it can be realized by a program loaded in the memory, but here it is realized by their cooperation. Draw functional blocks. Accordingly, those skilled in the art will understand that these functional blocks can be realized in various forms only by hardware, or by a combination of hardware and software.

以上の構成による蓄電システム100の動作を説明する。図6は、スレーブ蓄電装置12による出力の開始手順を示すフローチャートである。処理部58は、立ち上げられた後(S10)、第2準備期間が経過しなければ(S12のN)、待機する。第2準備期間が経過した場合(S12のY)、出力電圧がしきい値以上でなければ(S14のN)、処理部58は待機する。出力電圧がしきい値以上である場合(S14のY)、処理部58は、スレーブ用DC−AC変換部42に出力を開始させる(S16)。   The operation of the power storage system 100 having the above configuration will be described. FIG. 6 is a flowchart showing a procedure for starting output by slave power storage device 12. After being started up (S10), the processing unit 58 stands by if the second preparation period has not elapsed (N in S12). When the second preparation period has elapsed (Y in S12), if the output voltage is not equal to or higher than the threshold value (N in S14), the processing unit 58 stands by. When the output voltage is equal to or higher than the threshold value (Y in S14), the processing unit 58 causes the slave DC-AC conversion unit 42 to start output (S16).

本実施例によれば、スレーブ蓄電装置12、マスタ蓄電装置10のそれぞれの準備処理の完了につづいて、マスタ蓄電装置10からの出力が開始された後、スレーブ蓄電装置12からの出力が開始されるので、マスタ蓄電装置10の出力開始とスレーブ蓄電装置12の出力開始をほぼ同時にできる。また、マスタ蓄電装置10の出力開始とスレーブ蓄電装置12の出力開始をほぼ同時にできるので、負荷16の消費電力が大きい場合であっても、マスタ蓄電装置10だけが出力電力を出力している期間を短縮できる。また、マスタ蓄電装置10だけが出力電力を出力している期間が短縮されるので、マスタ蓄電装置10が動作を停止する可能性を低減できる。また、マスタ蓄電装置10が動作を停止する可能性が低減されるので、消費電力の大きな負荷16が接続されている場合であっても電力の供給を安定化できる。   According to the present embodiment, after completion of the preparation processes of the slave power storage device 12 and the master power storage device 10, output from the master power storage device 10 is started and then output from the slave power storage device 12 is started. Therefore, the output start of master power storage device 10 and the output start of slave power storage device 12 can be performed almost simultaneously. Further, since the output start of the master power storage device 10 and the output start of the slave power storage device 12 can be performed almost simultaneously, even when the power consumption of the load 16 is large, only the master power storage device 10 outputs the output power. Can be shortened. In addition, since the period during which only master power storage device 10 outputs output power is shortened, the possibility that master power storage device 10 stops operating can be reduced. In addition, since the possibility that master power storage device 10 stops operating is reduced, the supply of power can be stabilized even when load 16 having a large power consumption is connected.

また、第1準備期間が第2準備期間よりも長いので、スレーブ蓄電装置12に開始信号S2が入力されるよりも、マスタ蓄電装置10に開始信号S1が入力される場合であっても、第1準備期間の完了よりも第2準備期間を先に完了できる。また、マスタ用制御部34とスレーブ用制御部44とが互いに独立して構成されるので、制御を簡易にできる。   Further, since the first preparation period is longer than the second preparation period, even if the start signal S1 is input to the master power storage device 10 rather than the start signal S2 is input to the slave power storage device 12, The second preparation period can be completed before the completion of the one preparation period. Further, since the master control unit 34 and the slave control unit 44 are configured independently of each other, the control can be simplified.

本発明の一態様の概要は、次の通りである。本発明のある態様の蓄電システム100は、マスタ蓄電装置10と、マスタ蓄電装置10の第1出力端子36、第2出力端子38と負荷16とを結ぶ自立電路72間において、マスタ蓄電装置10に並列に接続されるスレーブ蓄電装置12とを備える。マスタ蓄電装置10は電圧制御を実行し、スレーブ蓄電装置12は電流制御を実行し、(1)スレーブ蓄電装置12の準備処理が完了してから、(2)マスタ蓄電装置10の準備処理が完了すると、マスタ蓄電装置10からの出力が開始された後、(3)スレーブ蓄電装置12からの出力が開始される。   The outline of one embodiment of the present invention is as follows. The power storage system 100 according to an aspect of the present invention includes the master power storage device 10 and the master power storage device 10 between the self-supporting electric circuit 72 connecting the first output terminal 36 and the second output terminal 38 of the master power storage device 10 and the load 16. And a slave power storage device 12 connected in parallel. Master power storage device 10 performs voltage control, slave power storage device 12 performs current control, and (2) preparation processing of master power storage device 10 is completed after (1) preparation processing of slave power storage device 12 is completed. Then, after output from master power storage device 10 is started, (3) output from slave power storage device 12 is started.

マスタ蓄電装置10は、立上げ後に、第1の準備期間を経過してから出力を開始し、スレーブ蓄電装置12は、立上げ後に、第2の準備期間を経過してから、マスタ蓄電装置10からの出力電圧がしきい値以上になった場合に、出力を開始し、第1の準備期間は、第2の準備期間よりも長い。   Master power storage device 10 starts output after the first preparation period has elapsed after startup, and slave power storage device 12 starts master storage device 10 after the second preparation period has elapsed after startup. When the output voltage from becomes higher than the threshold value, output is started, and the first preparation period is longer than the second preparation period.

マスタ蓄電装置10は、準備処理、出力の開始を制御するためのマスタ用制御部34を備えてもよい。スレーブ蓄電装置12は、準備処理、出力の開始を制御するためのスレーブ用制御部44を備えてもよい。マスタ用制御部34とスレーブ用制御部44とは、互いに独立して構成されてもよい。   Master power storage device 10 may include a master control unit 34 for controlling the start of preparation processing and output. The slave power storage device 12 may include a slave control unit 44 for controlling the start of preparation processing and output. The master control unit 34 and the slave control unit 44 may be configured independently of each other.

本発明の別の態様は、スレーブ用制御部44である。この装置は、電圧制御を実行するマスタ蓄電装置10の第1出力端子36、第2出力端子38と負荷16とを結ぶ自立電路72間において、マスタ蓄電装置10に並列に接続されるスレーブ蓄電装置12に対して、電流制御を実行するスレーブ用制御部44であって、(1)本スレーブ蓄電装置12の準備処理を完了してから、(2)マスタ蓄電装置10の準備処理が完了すると、マスタ蓄電装置10からの出力が開始された後、(3)本スレーブ蓄電装置12からの出力を開始する。   Another aspect of the present invention is the slave control unit 44. This device is a slave power storage device connected in parallel to the master power storage device 10 in a self-contained electrical path 72 connecting the first output terminal 36, the second output terminal 38 and the load 16 of the master power storage device 10 that performs voltage control. 12, the slave control unit 44 executes current control, and after (1) the preparation process of the slave power storage device 12 is completed, (2) when the preparation process of the master power storage device 10 is completed, After the output from the master power storage device 10 is started, (3) the output from the slave power storage device 12 is started.

本発明の別の態様は、運転方法である。この方法は、マスタ蓄電装置10と、マスタ蓄電装置10の第1出力端子36、第2出力端子38と負荷16とを結ぶ自立電路72間において、マスタ蓄電装置10に並列に接続されるスレーブ蓄電装置12とを備えるとともに、マスタ蓄電装置10は電圧制御を実行し、スレーブ蓄電装置12は電流制御を実行する蓄電システム100における運転方法であって、スレーブ蓄電装置12の準備処理を実行するステップと、スレーブ蓄電装置12の準備処理が完了してから、マスタ蓄電装置10の準備処理を実行するステップと、マスタ蓄電装置10の準備処理が完了してから、マスタ蓄電装置10からの出力を開始するステップと、マスタ蓄電装置10からの出力が開始してから、スレーブ蓄電装置12からの出力を開始するステップと、を備える。   Another aspect of the present invention is an operation method. In this method, the slave power storage connected in parallel to the master power storage device 10 between the master power storage device 10 and the self-supporting electric circuit 72 connecting the first output terminal 36, the second output terminal 38 of the master power storage device 10, and the load 16 An operation method in the power storage system 100 in which the master power storage device 10 performs voltage control and the slave power storage device 12 executes current control, and a step of performing a preparation process of the slave power storage device 12. Then, after the preparation process of the slave power storage device 12 is completed, the step of executing the preparation process of the master power storage device 10 and the output from the master power storage device 10 are started after the preparation process of the master power storage device 10 is completed. A step of starting output from the slave power storage device 12 after output from the master power storage device 10 is started; Provided.

以上、本発明を実施例をもとに説明した。この実施例は例示であり、それらの各構成要素あるいは各処理プロセスの組合せにいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。   In the above, this invention was demonstrated based on the Example. This embodiment is an exemplification, and it will be understood by those skilled in the art that various modifications can be made to each of those constituent elements or combinations of processing processes, and such modifications are also within the scope of the present invention. .

本実施例において、マスタ蓄電装置10にはマスタ用蓄電池30が接続され、スレーブ蓄電装置12にはスレーブ用蓄電池40が接続される。しかしながらこれに限らず例えば、マスタ蓄電装置10、スレーブ蓄電装置12に、太陽電池が接続されてもよい。本変形例によれば、構成の自由度を向上できる。   In the present embodiment, a master storage battery 30 is connected to the master power storage device 10, and a slave storage battery 40 is connected to the slave power storage device 12. However, the present invention is not limited thereto, and for example, a solar battery may be connected to the master power storage device 10 and the slave power storage device 12. According to this modification, the degree of freedom of configuration can be improved.

10 マスタ蓄電装置、 12 スレーブ蓄電装置、 14 トランス、 16 負荷、 18 リレー、 20 一次巻線、 22 二次巻線、 30 マスタ用蓄電池、 32 マスタ用DC−AC変換部、 34 マスタ用制御部、 36 第1出力端子、 38 第2出力端子、 40 スレーブ用蓄電池、 42 スレーブ用DC−AC変換部、 44 スレーブ用制御部(制御装置)、 46 第1出力端子、 48 第2出力端子、 50 入力部、 52 測定部、 54 カウンタ、 56 取得部、 58 処理部、 100 蓄電システム。   10 master power storage device, 12 slave power storage device, 14 transformer, 16 load, 18 relay, 20 primary winding, 22 secondary winding, 30 master storage battery, 32 master DC-AC conversion unit, 34 master control unit, 36 1st output terminal, 38 2nd output terminal, 40 Storage battery for slaves, 42 DC-AC conversion part for slaves, 44 Control part for slaves (control device), 46 1st output terminal, 48 2nd output terminal, 50 inputs Unit, 52 measurement unit, 54 counter, 56 acquisition unit, 58 processing unit, 100 power storage system.

Claims (5)

マスタ蓄電装置と、
前記マスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、前記マスタ蓄電装置に並列に接続されるスレーブ蓄電装置とを備え、
前記マスタ蓄電装置は電圧制御を実行し、前記スレーブ蓄電装置は電流制御を実行し、
(1)前記スレーブ蓄電装置の準備処理が完了してから、(2)前記マスタ蓄電装置の準備処理が完了すると、前記マスタ蓄電装置からの出力が開始された後、(3)前記スレーブ蓄電装置からの出力が開始されることを特徴とする蓄電システム。
A master power storage device;
A slave power storage device connected in parallel to the master power storage device, between the electrical circuit connecting the output terminal of the master power storage device and a load,
The master power storage device performs voltage control, the slave power storage device performs current control,
(1) After completion of the preparation process of the slave power storage device, (2) when the preparation process of the master power storage device is completed, after the output from the master power storage device is started, (3) the slave power storage device The power storage system is characterized in that output from is started.
前記マスタ蓄電装置は、立上げ後に、第1の準備期間を経過してから出力を開始し、
前記スレーブ蓄電装置は、立上げ後に、第2の準備期間を経過してから、前記マスタ蓄電装置からの出力電圧がしきい値以上になった場合に、出力を開始し、
前記第1の準備期間は、前記第2の準備期間よりも長いことを特徴とする請求項1に記載の蓄電システム。
The master power storage device starts output after the first preparation period has elapsed after startup,
The slave power storage device starts output when the output voltage from the master power storage device is equal to or higher than a threshold after the second preparation period has elapsed after startup,
The power storage system according to claim 1, wherein the first preparation period is longer than the second preparation period.
前記マスタ蓄電装置は、準備処理、出力の開始を制御するためのマスタ用制御部を備え、
前記スレーブ蓄電装置は、準備処理、出力の開始を制御するためのスレーブ用制御部を備え、
前記マスタ用制御部と前記スレーブ用制御部とは、互いに独立して構成されることを特徴とする請求項1または2に記載の蓄電システム。
The master power storage device includes a master control unit for controlling preparation processing and output start,
The slave power storage device includes a slave control unit for controlling preparation processing and output start,
The power storage system according to claim 1, wherein the master control unit and the slave control unit are configured independently of each other.
電圧制御を実行するマスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、前記マスタ蓄電装置に並列に接続されるスレーブ蓄電装置に対して、電流制御を実行する制御装置であって、
(1)本スレーブ蓄電装置の準備処理を完了してから、(2)前記マスタ蓄電装置の準備処理が完了すると、前記マスタ蓄電装置からの出力が開始された後、(3)本スレーブ蓄電装置からの出力を開始することを特徴とする制御装置。
A control device that performs current control on a slave power storage device connected in parallel to the master power storage device between electrical paths connecting an output terminal and a load of the master power storage device that performs voltage control,
(1) After completing the preparation process for the slave power storage device, (2) when the preparation process for the master power storage device is completed, output from the master power storage device is started, and (3) the slave power storage device The control apparatus characterized by starting the output from.
マスタ蓄電装置と、前記マスタ蓄電装置の出力端子と負荷とを結ぶ電路間において、前記マスタ蓄電装置に並列に接続されるスレーブ蓄電装置とを備えるとともに、前記マスタ蓄電装置は電圧制御を実行し、前記スレーブ蓄電装置は電流制御を実行する蓄電システムにおける運転方法であって、
前記スレーブ蓄電装置の準備処理を実行するステップと、
前記スレーブ蓄電装置の準備処理が完了してから、前記マスタ蓄電装置の準備処理を完了するステップと、
前記マスタ蓄電装置の準備処理が完了してから、前記マスタ蓄電装置からの出力を開始するステップと、
前記マスタ蓄電装置からの出力が開始してから、前記スレーブ蓄電装置からの出力を開始するステップと、
を備えることを特徴とする運転方法。
A master power storage device and a slave power storage device connected in parallel to the master power storage device between a power circuit connecting an output terminal and a load of the master power storage device, the master power storage device performs voltage control, The slave power storage device is an operation method in a power storage system that performs current control,
Executing a preparation process of the slave power storage device;
Completing the preparation process of the master power storage device after the preparation processing of the slave power storage device is completed;
A step of starting output from the master power storage device after completion of the preparation process of the master power storage device;
Starting the output from the slave power storage device after the output from the master power storage device is started;
A driving method characterized by comprising:
JP2015228177A 2015-11-20 2015-11-20 Power storage system, control device, operation method Active JP6583782B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015228177A JP6583782B2 (en) 2015-11-20 2015-11-20 Power storage system, control device, operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015228177A JP6583782B2 (en) 2015-11-20 2015-11-20 Power storage system, control device, operation method

Publications (2)

Publication Number Publication Date
JP2017099111A true JP2017099111A (en) 2017-06-01
JP6583782B2 JP6583782B2 (en) 2019-10-02

Family

ID=58804015

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015228177A Active JP6583782B2 (en) 2015-11-20 2015-11-20 Power storage system, control device, operation method

Country Status (1)

Country Link
JP (1) JP6583782B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1189096A (en) * 1997-09-02 1999-03-30 Nissin Electric Co Ltd Operation control method of distributed power supply equipment
JP2008035665A (en) * 2006-07-31 2008-02-14 Toyota Motor Corp Power system and ac power supply method
JP2014050292A (en) * 2012-09-04 2014-03-17 Toshiba Syst Technol Corp Distributed power supply system, and autonomous operation control device
WO2015131958A1 (en) * 2014-03-07 2015-09-11 Abb Technology Ltd Control of a microgrid

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1189096A (en) * 1997-09-02 1999-03-30 Nissin Electric Co Ltd Operation control method of distributed power supply equipment
JP2008035665A (en) * 2006-07-31 2008-02-14 Toyota Motor Corp Power system and ac power supply method
JP2014050292A (en) * 2012-09-04 2014-03-17 Toshiba Syst Technol Corp Distributed power supply system, and autonomous operation control device
WO2015131958A1 (en) * 2014-03-07 2015-09-11 Abb Technology Ltd Control of a microgrid

Also Published As

Publication number Publication date
JP6583782B2 (en) 2019-10-02

Similar Documents

Publication Publication Date Title
JP6224831B2 (en) Uninterruptible power system
JP6190059B2 (en) Uninterruptible power system
JP5567040B2 (en) Secondary battery control device
JP2012154641A (en) Battery state monitoring device
JP2008220121A (en) Charging device
JP4855871B2 (en) Charger
JPWO2015181847A1 (en) Battery charger
JP2013102576A5 (en)
JP6158628B2 (en) Power supply device determination device, power supply device determination method, and power conversion device
JP6329089B2 (en) Uninterruptible power supply system
JP5985000B2 (en) Method for supplying energy from a photovoltaic module of a photovoltaic system and an inverter designed to perform the method
JP6620937B2 (en) Power storage system, operation method
JP6155935B2 (en) Power supply
JP6583782B2 (en) Power storage system, control device, operation method
JP3197575U (en) Switchback charging system
JP6485750B2 (en) Power storage system, control device, operation method
JP2014230332A (en) Charging apparatus
JP2017184353A (en) Charging device and charging method
JP2021152783A (en) Slave device, information processing device, master-slave control system, control method for slave device, and control method for information processing device
JP2015210135A (en) Electric power measurement device
WO2013190892A1 (en) Load control device, electrification device, load control method and recording medium
JP5721650B2 (en) Battery management device, battery management method and program
TWI654820B (en) Booster apparatus
JP2019017199A (en) Storage battery unit
RU2449448C1 (en) Charging device for accumulator battery

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181120

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190611

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190820

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190823

R150 Certificate of patent or registration of utility model

Ref document number: 6583782

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150