JP2017054604A - Battery pack - Google Patents

Battery pack Download PDF

Info

Publication number
JP2017054604A
JP2017054604A JP2015175916A JP2015175916A JP2017054604A JP 2017054604 A JP2017054604 A JP 2017054604A JP 2015175916 A JP2015175916 A JP 2015175916A JP 2015175916 A JP2015175916 A JP 2015175916A JP 2017054604 A JP2017054604 A JP 2017054604A
Authority
JP
Japan
Prior art keywords
blower
battery
air
battery stack
passage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015175916A
Other languages
Japanese (ja)
Other versions
JP6507951B2 (en
Inventor
加藤 真也
Shinya Kato
真也 加藤
啓善 山本
Hiroyoshi Yamamoto
啓善 山本
井上 美光
Yoshimitsu Inoue
美光 井上
山下 浩二
Koji Yamashita
浩二 山下
翔太 井口
Shota Iguchi
翔太 井口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2015175916A priority Critical patent/JP6507951B2/en
Publication of JP2017054604A publication Critical patent/JP2017054604A/en
Application granted granted Critical
Publication of JP6507951B2 publication Critical patent/JP6507951B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Secondary Cells (AREA)
  • Battery Mounting, Suspending (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a battery pack that can secure cooling performance for both of a battery stack having deteriorated battery cooling performance and other battery stacks in a housing.SOLUTION: A first circulation passage constitutes a series of paths through which air flowing out from a first air blowing device flows into a mixture passage after the air comes into contact with a first wall of a housing, heat-exchanges with a first battery stack after the air flows out from the mixture passage, and then flows into the first air blowing device. A second circulation passage constitutes a series of paths through which air flowing out from a second air blowing device flows into a mixture passage after coming into contact with a second wall of the housing, heat-exchanges with a second battery stack after flowing out from the mixture passage, and then flows into the second air blowing device. When the battery cooling performance of the first battery stack is deteriorated as compared with the second battery stack, a control device controls so that the amount of air blown by the first air blowing device corresponding to the first battery stack is larger than that of the second air blowing device.SELECTED DRAWING: Figure 7

Description

この明細書における開示は、筐体内部に収容された複数個の電池セルを有する電池パックに関する。   The disclosure in this specification relates to a battery pack having a plurality of battery cells housed in a housing.

従来、電池セルを収容する電池パックとして、例えば、特許文献1に記載されたものが知られている。特許文献1の電池パックは、回転異常の第1の冷却ファンを検出したとき、その他の正常な第2の冷却ファンの回転数が第1の冷却ファンの回転数に近づくように第2の冷却ファンの回転数を決定する。   Conventionally, what was described in patent document 1 is known as a battery pack which accommodates a battery cell, for example. When the battery pack of Patent Document 1 detects the first cooling fan with abnormal rotation, the second cooling is performed so that the rotation speed of the other normal second cooling fan approaches the rotation speed of the first cooling fan. Determine the fan speed.

具体的には、回転異常の第1の冷却ファンを検出したとき、第1の冷却ファンが冷却する第1の電池モジュールの温度が正常な第2の電池モジュールの温度よりも高い場合は、第2の冷却ファンの回転数が第1の冷却ファンの回転数よりも低くなるように制御する。さらに、第1の電池モジュールの温度が正常な第2の電池モジュールの温度よりも低い場合は、第2の冷却ファンの回転数が第1の冷却ファンの回転数よりも高くなるように制御する。   Specifically, when the temperature of the first battery module cooled by the first cooling fan is higher than the temperature of the normal second battery module when the first cooling fan with abnormal rotation is detected, The number of rotations of the second cooling fan is controlled to be lower than the number of rotations of the first cooling fan. Further, when the temperature of the first battery module is lower than the normal temperature of the second battery module, control is performed so that the rotational speed of the second cooling fan is higher than the rotational speed of the first cooling fan. .

特開2005−310596号公報JP 2005-310596 A

特許文献1の電池パックによると、電池パックが有する複数の電池モジュールについて、温度のばらつきが小さくなるように、正常な方の冷却ファンの回転数を低下させて異常な冷却ファンの回転数に近づける。したがって、電池パックに含まれる複数の電池における温度のばらつきは抑制できるが、正常な方の冷却ファンによる電池冷却能力を低下させるので、電池パック全体の電池を冷却する能力が正常な状態に比べて著しく低下することがある。このため、電池冷却性能が低下した電池スタックと他の電池スタックとの両方について必要な冷却性能を確保することができないという課題がある。   According to the battery pack of Patent Document 1, the rotational speed of the normal cooling fan is lowered to approach the abnormal rotational speed of the cooling fan so that the temperature variation of the plurality of battery modules included in the battery pack is reduced. . Therefore, it is possible to suppress variations in temperature among a plurality of batteries included in the battery pack, but since the battery cooling capacity of the normal cooling fan is reduced, the ability to cool the battery of the entire battery pack is lower than that in a normal state. May decrease significantly. For this reason, there is a problem that the necessary cooling performance cannot be ensured for both the battery stack having the lowered battery cooling performance and the other battery stacks.

このような課題に鑑み、この明細書における開示の目的は、筐体内部において電池冷却性能が低下した電池スタックと他の電池スタックとの両方について冷却性能の確保を図る電池パックを提供することである。   In view of such a problem, an object of the disclosure in this specification is to provide a battery pack that secures cooling performance for both a battery stack whose battery cooling performance is reduced inside the casing and other battery stacks. is there.

この明細書に開示された複数の態様は、それぞれの目的を達成するために、互いに異なる技術的手段を採用する。また、特許請求の範囲及びこの項に記載した括弧内の符号は、ひとつの態様として後述する実施形態に記載の具体的手段との対応関係を示す一例であって、技術的範囲を限定するものではない。   A plurality of aspects disclosed in this specification adopt different technical means to achieve each purpose. Further, the reference numerals in parentheses described in the claims and in this section are examples showing the correspondence with the specific means described in the embodiments described later as one aspect, and limit the technical scope. is not.

開示された電池パックのひとつは、それぞれ複数の単電池(121)の集合体である第1電池スタック(120A)及び第2電池スタック(120B)と、第1電池スタックを冷却する流体を送風する第1送風装置(140A)と、第2電池スタックを冷却する流体を送風する第2送風装置(140B)と、第1電池スタック及び第2電池スタックと第1送風装置及び第2送風装置とを少なくとも内部に収容する筐体(110)と、筐体の内部に形成される流体の循環通路であって、第1送風装置から流出した流体が筐体の内壁面に接触してから第1電池スタックと熱交換した後、第1送風装置に流入する一連の流体の流通経路をなす第1循環通路(130A)と、筐体の内部に形成される流体の循環通路であって、第2送風装置から流出した流体が筐体の内壁面に接触してから第2電池スタックと熱交換した後、第2送風装置に流入する一連の流体の流通経路をなす第2循環通路(130B)と、第1送風装置及び第2送風装置のそれぞれを制御する制御装置(100)と、を備え、
第1循環通路は、第1送風装置から流出した流体が筐体の第1壁(114)に接触してから混合通路(133)に流入し、混合通路を流出してから第1電池スタックと熱交換した後、第1送風装置に流入する一連の経路を構成し、
第2循環通路は、第2送風装置から流出した流体が筐体の第2壁(113)に接触してから混合通路に流入し、混合通路を流出してから第2電池スタックと熱交換した後、第2送風装置に流入する一連の経路を構成し、
制御装置は、第1電池スタック及び第2電池スタックのうち、一方の電池スタックについて正常時よりも電池冷却性能が低下した場合に、他方の電池スタックに対応する送風装置の方が一方の電池スタックに対応する送風装置と比べて送風する風量が大きくなるように、第1送風装置及び第2送風装置の少なくとも一つを制御する。
One of the disclosed battery packs blows a first battery stack (120A) and a second battery stack (120B), each of which is an aggregate of a plurality of single cells (121), and a fluid that cools the first battery stack. The first blower (140A), the second blower (140B) that blows the fluid that cools the second battery stack, the first battery stack, the second battery stack, the first blower, and the second blower. At least the housing (110) accommodated in the interior, and a fluid circulation passage formed inside the housing, the first battery after the fluid flowing out from the first blower contacts the inner wall surface of the housing After heat exchange with the stack, a first circulation passage (130A) that forms a flow path for a series of fluids flowing into the first blower and a fluid circulation passage formed inside the casing, the second circulation passage Out of the device A second circulation passage (130B) that forms a flow path for a series of fluids flowing into the second blower after the fluid contacts the inner wall surface of the housing and then exchanges heat with the second battery stack; And a control device (100) for controlling each of the second blower devices,
The first circulation passage enters the mixing passage (133) after the fluid flowing out from the first blower comes into contact with the first wall (114) of the housing, and flows out of the mixing passage and then the first battery stack. After the heat exchange, configure a series of paths that flow into the first blower,
The second circulation passage flows into the mixing passage after the fluid flowing out from the second blower comes into contact with the second wall (113) of the housing, and exchanges heat with the second battery stack after flowing out of the mixing passage. After that, a series of paths that flow into the second blower is configured,
When the battery cooling performance of one of the first battery stack and the second battery stack is lower than that of the normal battery stack, the control device has one of the battery stacks corresponding to the other battery stack. At least one of the first blower and the second blower is controlled so that the amount of air blown becomes larger than the blower corresponding to.

開示された電池パックによれば、電池冷却性能が低下した一方の電池スタックに対応する送風装置よりも他方の電池スタックに対応する送風装置の方が相対的に送風風量が大きくなるように送風装置を制御する。これにより、相対的に風量が大きくなった他方の送風装置から送風される流体を混合通路を通じて一方の電池スタックにも供給できるので、電池冷却性能が低下した方の電池スタックについて電池冷却性能を回復させることができる。このため、特許文献1の電池パックに比べて、電池パック全体としての送風風量が著しく低下することを回避できる電池パックが得られる。したがって、この電池パックは、筐体内部において電池冷却性能が低下した電池スタックと他の電池スタックとの両方について冷却性能の確保を図ることができる。   According to the disclosed battery pack, the air blower so that the air blower corresponding to the other battery stack has a larger air flow rate than the air blower corresponding to the one battery stack whose battery cooling performance is reduced. To control. As a result, the fluid blown from the other blower with the relatively large air volume can be supplied to one of the battery stacks through the mixing passage, so that the battery cooling performance of the battery stack having the lowered battery cooling performance is recovered. Can be made. For this reason, compared with the battery pack of patent document 1, the battery pack which can avoid that the ventilation air volume as the whole battery pack falls remarkably is obtained. Therefore, this battery pack can ensure the cooling performance of both the battery stack whose battery cooling performance is reduced inside the casing and the other battery stack.

第1実施形態の電池パックの構成及び流体流れを示す平面図である。It is a top view which shows the structure and fluid flow of the battery pack of 1st Embodiment. 図1のII−II断面における矢視図である。It is an arrow line view in the II-II cross section of FIG. 図1のIII−III断面における矢視図である。It is an arrow line view in the III-III cross section of FIG. 図1のIV−IV断面における矢視図である。It is an arrow line view in the IV-IV cross section of FIG. 内部フィンを示す分解斜視図である。It is a disassembled perspective view which shows an internal fin. 外部フィンを示す斜視図である。It is a perspective view which shows an external fin. 筐体内における内部フィンに関わる流体流れを示す斜視図である。It is a perspective view which shows the fluid flow in connection with the internal fin in a housing | casing. 外部ダクト内の流体流れを示す斜視図である。It is a perspective view which shows the fluid flow in an external duct. 第1実施形態の電池パック内における循環通路を模式化した図面である。It is drawing which modeled the circulation path in the battery pack of 1st Embodiment. 第1実施形態の電池パックにおいて一方の電池スタック側の冷却性能が低下した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when the cooling performance by the side of one battery stack falls in the battery pack of 1st Embodiment. 第1実施形態において異常時の温度調節制御を示すフローチャートである。It is a flowchart which shows the temperature adjustment control at the time of abnormality in 1st Embodiment. 第2実施形態の電池パックについて異常時の温度調節制御を示すフローチャートである。It is a flowchart which shows the temperature adjustment control at the time of abnormality about the battery pack of 2nd Embodiment. 第3実施形態において一方の電池スタック側の送風装置に異常が発生した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when abnormality generate | occur | produces in the air blower by the side of one battery stack in 3rd Embodiment. 第4実施形態の電池パックにおいて一方の電池スタック側の冷却性能が低下した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each ventilation apparatus when the cooling performance by the side of one battery stack falls in the battery pack of 4th Embodiment. 第5実施形態の電池パックの内部構成及び流体流れを示す図面である。It is drawing which shows the internal structure and fluid flow of the battery pack of 5th Embodiment. 第5実施形態の電池パック内における循環通路を模式化した図面である。It is drawing which modeled the circulation path in the battery pack of 5th Embodiment. 第5実施形態の電池パックにおいて一方の電池スタック側の冷却性能が低下した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when the cooling performance by the side of one battery stack falls in the battery pack of 5th Embodiment. 第6実施形態において一方の電池スタック側の送風装置に異常が発生した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when abnormality generate | occur | produces in the air blower by the side of one battery stack in 6th Embodiment. 第6実施形態の電池パックについて異常時の温度調節制御を示すフローチャートである。It is a flowchart which shows the temperature adjustment control at the time of abnormality about the battery pack of 6th Embodiment. 第7実施形態の電池パックにおいて一方の電池スタック側の冷却性能が低下した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when the cooling performance by the side of one battery stack falls in the battery pack of 7th Embodiment. 第8実施形態において一方の電池スタック側の送風装置に異常が発生した場合の、各送風装置による風量バランスと通風経路を示した図面である。It is drawing which showed the air volume balance and ventilation path by each air blower when abnormality generate | occur | produces in the air blower by the side of one battery stack in 8th Embodiment.

以下に、図面を参照しながら本開示を実施するための複数の形態を説明する。各形態において先行する形態で説明した事項に対応する部分には同一の参照符号を付して重複する説明を省略する場合がある。各形態において構成の一部のみを説明している場合は、構成の他の部分については先行して説明した他の形態を適用することができる。各実施形態で具体的に組み合わせが可能であることを明示している部分同士の組み合わせばかりではなく、特に組み合わせに支障が生じなければ、明示していなくても実施形態同士を部分的に組み合せることも可能である。   Hereinafter, a plurality of modes for carrying out the present disclosure will be described with reference to the drawings. In each embodiment, parts corresponding to the matters described in the preceding embodiment may be denoted by the same reference numerals, and redundant description may be omitted. When only a part of the configuration is described in each mode, the other modes described above can be applied to the other parts of the configuration. Not only combinations of parts that clearly indicate that the combination is possible in each embodiment, but also a combination of the embodiments even if they are not clearly specified unless there is a problem with the combination. It is also possible.

(第1実施形態)
第1実施形態の電池パック1について、図1〜図11を参照しながら説明する。電池パック1は、例えば、電池に充電された電力によって駆動されるモータと、内燃機関とを走行駆動源とするハイブリッド自動車、モータを走行駆動源とする電気自動車等に用いられる。電池パック1に含まれる複数の単電池121は、例えば、ニッケル水素二次電池、リチウムイオン二次電池、有機ラジカル電池等である。
(First embodiment)
The battery pack 1 of 1st Embodiment is demonstrated referring FIGS. 1-11. The battery pack 1 is used in, for example, a hybrid vehicle using a motor driven by electric power charged in a battery and an internal combustion engine as a travel drive source, an electric vehicle using a motor as a travel drive source, and the like. The plurality of single cells 121 included in the battery pack 1 are, for example, a nickel metal hydride secondary battery, a lithium ion secondary battery, an organic radical battery, or the like.

電池パック1は、車両のトランクルーム、あるいはトランクルームより下方に設けられたトランクルーム裏エリア等のパック収容スペースに設置される。この電池パック収容スペースは、例えば、スペアタイヤ、工具等も収納可能な場所でもよい。電池パック1は、底壁112や両方の底壁側通路135を下側にした姿勢で、電池パック収容スペースに設置される。   The battery pack 1 is installed in a pack accommodation space such as a trunk room of a vehicle or a back area of the trunk room provided below the trunk room. This battery pack accommodation space may be, for example, a place where spare tires, tools, etc. can be accommodated. The battery pack 1 is installed in the battery pack housing space with the bottom wall 112 and both the bottom wall side passages 135 facing downward.

また、電池パック1は、車両の車室内に設けられる前部座席の下方や後部座席等の下方に設置されるようにしてもよい。この場合、電池パック1は、底壁112や両方の底壁側通路135を下側にした姿勢で、前部座席や後部座席等の下方に設置される。また、後部座席の下方において電池パック1を設置する空間は、トランクルームよりも下方のトランクルーム裏エリアに連通させるようにしてもよい。また当該設置空間は、車外に連通するようにも構成できる。   Further, the battery pack 1 may be installed below a front seat or a rear seat provided in a vehicle interior of the vehicle. In this case, the battery pack 1 is installed below the front seat, the rear seat, and the like with the bottom wall 112 and both bottom wall side passages 135 facing downward. Further, the space where the battery pack 1 is installed below the rear seat may be communicated with the trunk room back area below the trunk room. The installation space can also be configured to communicate with the outside of the vehicle.

この実施形態では、例えば図1において、Frは車両前方側を示し、Rrは車両後方側を示し、RHは車両右側を示し、LHは車両左側を示している。方向Rr、方向Frは、電池積層方向である。電池パック1における方向を示す際に、Fr−Rrの方向は前後方向や電池積層方向と称することもある。RH−LHの方向は左右方向と称することもある。重力の作用する方向は上下方向と称することもある。   In this embodiment, for example, in FIG. 1, Fr indicates the vehicle front side, Rr indicates the vehicle rear side, RH indicates the vehicle right side, and LH indicates the vehicle left side. The direction Rr and the direction Fr are battery stacking directions. When showing the direction in the battery pack 1, the direction of Fr-Rr may be called the front-back direction or a battery lamination direction. The direction of RH-LH may be referred to as the left-right direction. The direction in which gravity acts is sometimes referred to as the up-down direction.

電池パック1は、外部と隔離した密閉された内部空間を形成する筐体110と、筐体110の内部に収容されて、通電可能に接続される複数の単電池121を集合体として電気的に接続してそれぞれ構成される二つの電池スタック120と、を少なくとも備える。二つの電池スタック120は、車両の左右方向に並び、側壁114側に位置する第1電池スタック120Aと、側壁113側に位置する第2電池スタック120Bとである。以降、第1電池スタック120A及び第2電池スタック120Bのそれぞれをまたは両方を電池スタック120と記載することもある。   The battery pack 1 is electrically formed as a collection of a casing 110 that forms a sealed internal space that is isolated from the outside, and a plurality of single cells 121 that are housed in the casing 110 and connected to be energized. And at least two battery stacks 120 connected to each other. The two battery stacks 120 are a first battery stack 120A located on the side wall 114 side and a second battery stack 120B located on the side wall 113 side, which are arranged in the left-right direction of the vehicle. Hereinafter, each of or both the first battery stack 120 </ b> A and the second battery stack 120 </ b> B may be referred to as the battery stack 120.

図1及び図4に図示するように、筐体110は、各電池スタック120A,120Bよりも車両後方側で左右方向に並ぶ2個の第1送風装置140A及び第2送風装置140Bを収容する。第1送風装置140Aは、筐体110の内部において、第1電池スタック120Aを冷却する空気を送風する。第2送風装置140Bは、筐体110の内部において、第2電池スタック120Bを冷却する空気を送風する。   As shown in FIGS. 1 and 4, the housing 110 accommodates two first air blowers 140 </ b> A and second air blowers 140 </ b> B arranged in the left-right direction on the vehicle rear side of the battery stacks 120 </ b> A and 120 </ b> B. 140 A of 1st air blowers blow the air which cools 120 A of 1st battery stacks inside the housing | casing 110. FIG. The second blower 140 </ b> B blows air that cools the second battery stack 120 </ b> B inside the housing 110.

筐体110の内部には、第1送風装置140Aによって送風される空気の循環通路として構成される第1循環通路130Aが設けられる。第1循環通路130Aは、第1送風装置140Aから流出した空気が筐体110の側壁114に接触してから第1電池スタック120Aと熱交換した後、第1送風装置140Aに流入する一連の空気の流通経路である。筐体110の内部には、第2送風装置140Bによって送風される空気の循環通路として構成される第2循環通路130Bが設けられる。第2循環通路130Bは、第2送風装置140Bから流出した空気が筐体110の側壁113に接触してから第2電池スタック120Bと熱交換した後、第2送風装置140Bに流入する一連の空気の流通経路である。   Inside the housing 110, a first circulation passage 130A configured as a circulation passage for air blown by the first blower 140A is provided. The first circulation passage 130A is a series of air that flows into the first air blower 140A after the air flowing out from the first air blower 140A contacts the side wall 114 of the housing 110 and exchanges heat with the first battery stack 120A. Is a distribution channel. Inside the housing 110, a second circulation passage 130B configured as a circulation passage for air blown by the second blower 140B is provided. The second circulation passage 130B is a series of air that flows into the second air blower 140B after the air flowing out from the second air blower 140B comes into contact with the side wall 113 of the housing 110 and exchanges heat with the second battery stack 120B. Is a distribution channel.

電池パック1は、第1電池スタック120Aに近い側において、筐体110の側壁114の内側に第1内部フィン150A、天壁111の内側に第1内部フィン151Aが設けられている。電池パック1は、第1電池スタック120Aに近い側において、側壁114の外側に外部フィン160、天壁111の外側に外部フィン161が設けられている。電池パック1は、第2電池スタック120Bに近い側において、筐体110の側壁113の内側に第2内部フィン150B、天壁111の内側に第2内部フィン151Bが設けられている。電池パック1は、第2電池スタック120Bに近い側において、側壁114の外側に外部フィン160、天壁111の外側に外部フィン161が設けられている。さらに、図8に示すように、外部フィン160、161の外側には、送風装置172を有する外部ダクト170が外部フィン160、外部フィン161を覆うように設けられている。   The battery pack 1 is provided with a first internal fin 150A inside the side wall 114 of the housing 110 and a first internal fin 151A inside the top wall 111 on the side close to the first battery stack 120A. The battery pack 1 is provided with external fins 160 outside the side walls 114 and external fins 161 outside the top wall 111 on the side close to the first battery stack 120A. The battery pack 1 is provided with a second internal fin 150B inside the side wall 113 of the housing 110 and a second internal fin 151B inside the top wall 111 on the side close to the second battery stack 120B. The battery pack 1 is provided with external fins 160 outside the side walls 114 and external fins 161 outside the top wall 111 on the side close to the second battery stack 120B. Furthermore, as shown in FIG. 8, an external duct 170 having a blower 172 is provided outside the external fins 160 and 161 so as to cover the external fins 160 and the external fins 161.

筐体110は、内部の空間を包囲する複数の壁からなる箱形を呈し、アルミニウム板または鉄板の成型品で形成されている。筐体110は、例えば、上下方向に扁平な直方体となっており、例えば6面である、天壁111、底壁112、側壁113、側壁114、側壁115、及び側壁116を有する。筐体110は、内部を区画する区画壁117と、底壁112における補強用の第1の梁3及び第2の梁4と、を有する。さらに第1の梁3、第2の梁4には、これらの上面に閉塞壁118及び閉塞壁119が設けられている。   The casing 110 has a box shape composed of a plurality of walls surrounding the internal space, and is formed of a molded product of an aluminum plate or an iron plate. The casing 110 is, for example, a rectangular parallelepiped flat in the vertical direction, and includes, for example, a top wall 111, a bottom wall 112, a side wall 113, a side wall 114, a side wall 115, and a side wall 116 that are six surfaces. The housing 110 includes a partition wall 117 that partitions the inside, and a first beam 3 and a second beam 4 for reinforcement on the bottom wall 112. Further, the first beam 3 and the second beam 4 are provided with a blocking wall 118 and a blocking wall 119 on their upper surfaces.

天壁111は、筐体110の上面を形成する壁であり、前後方向に長辺を有する長方形の壁である。底壁112は、筐体110の下面を形成する壁であり、天壁111と同様の形状を有する。側壁113、側壁114は、筐体110の左右側の面を形成する壁であり、前後方向に長辺を有する細長い長方形の壁である。側壁113、側壁114は、互いに向かい合う位置関係にある。側壁115、側壁116は、筐体110の前後側の面を形成する壁であり、左右方向に長辺を有する細長い長方形の壁である。側壁115、側壁116は、互いに向かい合う位置関係にある。側壁115、側壁116は、側壁113、側壁114に対して直交するように設けられている。   The top wall 111 is a wall that forms the upper surface of the housing 110, and is a rectangular wall having long sides in the front-rear direction. The bottom wall 112 is a wall that forms the lower surface of the housing 110, and has the same shape as the top wall 111. The side wall 113 and the side wall 114 are walls that form the left and right surfaces of the casing 110, and are elongated rectangular walls having long sides in the front-rear direction. The side wall 113 and the side wall 114 are in a positional relationship facing each other. The side wall 115 and the side wall 116 are walls that form the front and rear surfaces of the housing 110, and are elongated rectangular walls having long sides in the left-right direction. The side wall 115 and the side wall 116 are in a positional relationship facing each other. The side walls 115 and 116 are provided so as to be orthogonal to the side walls 113 and 114.

筐体110は、各壁111〜116を用いたものに代えて、複数のケース体を接合して組み立てることにより、内部に空間を形成して製作するようにしてもよい。また、筐体110を形成する複数の壁のうち、所定の壁の表面には、放熱面積を大きくするために複数の凸部または凹部を形成するようにしてもよい。また、電池パック1において、側壁113、側壁114の長辺に沿う方向が前後方向に対応しており、また、側壁115、側壁116の長辺に沿う方向が左右方向に対応している。   The housing 110 may be manufactured by forming a space in the interior by joining and assembling a plurality of case bodies instead of using the walls 111 to 116. Moreover, you may make it form a some convex part or a recessed part in the surface of a predetermined wall among the several walls which form the housing | casing 110, in order to enlarge a thermal radiation area. In the battery pack 1, the direction along the long sides of the side walls 113 and 114 corresponds to the front-rear direction, and the direction along the long sides of the side walls 115 and 116 corresponds to the left-right direction.

区画壁117は、筐体110の内部において、側壁116寄りに配置されて、側壁116と平行となって、側壁113と側壁114とを繋ぐ壁である。区画壁117は、底壁112の内面から筐体110の上下方向の中間位置まで延びている。区画壁117と側壁116との間には空間117aが形成されている。   The partition wall 117 is a wall that is disposed near the side wall 116 inside the housing 110, is parallel to the side wall 116, and connects the side wall 113 and the side wall 114. The partition wall 117 extends from the inner surface of the bottom wall 112 to an intermediate position in the vertical direction of the housing 110. A space 117 a is formed between the partition wall 117 and the side wall 116.

空間117aには、例えば、電池管理ユニット100が収容される。電池管理ユニット(Battery Management Unit)100は、車両に搭載された各種の電子制御装置と通信可能に構成されている。電池管理ユニット100は、少なくとも単電池121の蓄電量を管理する機器であり、単電池121に係る制御を行う電池制御ユニットの一例である。また、電池管理ユニット100は、単電池121に関する電流、電圧、温度等を監視するとともに、単電池121の異常状態、漏電等を管理する機器であってもよい。   For example, the battery management unit 100 is accommodated in the space 117a. A battery management unit 100 is configured to be able to communicate with various electronic control devices mounted on a vehicle. The battery management unit 100 is a device that manages at least the amount of electricity stored in the single battery 121, and is an example of a battery control unit that performs control related to the single battery 121. In addition, the battery management unit 100 may be a device that monitors current, voltage, temperature, and the like related to the unit cell 121 and manages an abnormal state, electric leakage, and the like of the unit cell 121.

電池管理ユニット100には、電流センサによって検出された電流値に係る信号が入力される。電池管理ユニット100は、車両ECUと同様に入力回路、マイクロコンピュータ、及び出力回路等を備えている。マイクロコンピュータが有する記憶手段には、電池情報がデータとして随時蓄積されている。蓄積される電池情報のデータは、例えば、電池パック1における電池電圧、充電電流、放電電流及び電池温度等である。   The battery management unit 100 receives a signal related to the current value detected by the current sensor. The battery management unit 100 includes an input circuit, a microcomputer, an output circuit, and the like, like the vehicle ECU. Battery information is stored as data in the storage means of the microcomputer. The stored battery information data includes, for example, the battery voltage, the charging current, the discharging current, and the battery temperature in the battery pack 1.

電池管理ユニット100は、第1送風装置140A、第2送風装置140B、送風装置172及びPTCヒータ2の作動を制御する制御装置としても機能する。電池管理ユニット100には、単電池121の温度を検出する温度検出器によって検出された温度情報が入力される。第1温度検出器60は、第1電池スタック120Aにおいて、各単電池121または所定の単電池121に設けられている。第2温度検出器61は、第2電池スタック120Bにおいて、各単電池121または所定の単電池121に設けられている。各温度検出器60,61は、電池管理ユニット100に対して信号を出力する温度検出線、温度センサ等によって構成することができる。電池管理ユニット100は、各温度検出器60,61によって検出される電池温度に応じて電池冷却、あるいは電池加熱を実施する条件が成立した場合には、第1送風装置140A、第2送風装置140B、送風装置172及びPTCヒータ2の各作動を制御する。   The battery management unit 100 also functions as a control device that controls the operation of the first blower 140A, the second blower 140B, the blower 172, and the PTC heater 2. The battery management unit 100 receives temperature information detected by a temperature detector that detects the temperature of the unit cell 121. The first temperature detector 60 is provided in each unit cell 121 or a predetermined unit cell 121 in the first cell stack 120A. The second temperature detector 61 is provided in each unit cell 121 or a predetermined unit cell 121 in the second cell stack 120B. Each of the temperature detectors 60 and 61 can be configured by a temperature detection line that outputs a signal to the battery management unit 100, a temperature sensor, or the like. When a condition for performing battery cooling or battery heating according to the battery temperature detected by each of the temperature detectors 60 and 61 is satisfied, the battery management unit 100 has the first blower 140A and the second blower 140B. Each operation of the blower 172 and the PTC heater 2 is controlled.

第1の梁3及び第2の梁4は、図1〜図4に示すように、筐体110の強度を向上させるための補強部材であり、底壁112の内側に、左右方向に並んで複数本、設けられている。この実施形態では、梁は、3本の設置されている。図3に示すように、3本の梁は、側壁113寄りに位置する第1の梁3、側壁113と側壁114との中間部に位置する第2の梁4、側壁114寄りに位置する第1の梁3である。各梁3,4は、細長い棒状であり、その長手方向が筐体110において前後方向を向き、かつ左右方向に等間隔で並ぶようにして、底壁112に設置されている。   As shown in FIGS. 1 to 4, the first beam 3 and the second beam 4 are reinforcing members for improving the strength of the housing 110, and are arranged in the left-right direction inside the bottom wall 112. There are several. In this embodiment, three beams are installed. As shown in FIG. 3, the three beams are the first beam 3 positioned near the side wall 113, the second beam 4 positioned in the middle portion between the side wall 113 and the side wall 114, and the first beam positioned near the side wall 114. One beam 3. Each of the beams 3 and 4 has a long and narrow bar shape, and is installed on the bottom wall 112 such that the longitudinal direction thereof is directed in the front-rear direction in the housing 110 and is arranged at equal intervals in the left-right direction.

各梁3,4は、筐体110に対して別体に形成されたものであり、例えば、断面形状が矩形状や台形状をなす部材である。例えば、各梁3,4は、断面形状がU字状やコの字状であり、開口する部分が下方を向くように底壁112に固定されている。各梁3,4の上面には、第1電池スタック120Aや第2電池スタック120Bが載っている。したがって、各梁3,4は、筐体110の底壁112側で各電池スタック120を下方から支えている。また、各梁3,4は、例えば、アルミニウム材、または鉄材等から形成されている。   Each of the beams 3 and 4 is formed separately from the housing 110 and is, for example, a member having a rectangular or trapezoidal cross-sectional shape. For example, each of the beams 3 and 4 has a U-shaped or U-shaped cross section, and is fixed to the bottom wall 112 so that the opening portion faces downward. The first battery stack 120 </ b> A and the second battery stack 120 </ b> B are placed on the upper surfaces of the beams 3 and 4. Therefore, the beams 3 and 4 support the battery stacks 120 from below on the bottom wall 112 side of the housing 110. The beams 3 and 4 are made of, for example, an aluminum material or an iron material.

2本の第1の梁3は、左右方向の両最外部に位置する梁であり、側壁113、側壁114に沿うように設置されている。第1の梁3は、側壁113または側壁114と底壁112に接触して一体に設置され、側壁113、側壁114、底壁112を補強する機能を果たしている。   The two first beams 3 are beams located at the outermost both sides in the left-right direction, and are installed along the side wall 113 and the side wall 114. The first beam 3 is installed integrally in contact with the side wall 113 or the side wall 114 and the bottom wall 112, and functions to reinforce the side wall 113, the side wall 114, and the bottom wall 112.

2本の第1の梁3と1本の第2の梁4は、等間隔に設置されている。隣り合う梁同士の中心線間距離は、単電池121の左右方向の寸法と同等となるように設定されている。隣り合う梁間の寸法は、1つの梁の幅寸法よりも大きくなるように設定されている。各梁3,4の幅寸法とは、2本の第1の梁3と1本の第2の梁4が並べられる方向の各梁の長さである。各梁3,4の板厚は、底壁112の板厚よりも厚くなるように設定されている。   The two first beams 3 and the one second beam 4 are installed at equal intervals. The distance between the center lines of the adjacent beams is set to be equal to the horizontal dimension of the unit cell 121. The dimension between adjacent beams is set to be larger than the width dimension of one beam. The width dimension of each beam 3, 4 is the length of each beam in the direction in which two first beams 3 and one second beam 4 are arranged. The plate thickness of each beam 3, 4 is set to be thicker than the plate thickness of the bottom wall 112.

各梁3,4の長手方向の長さは、図1に示すように、電池スタック120全体における単電池121の積層方向長さよりも長くなるように設定されている。換言すると、各梁3,4の長手方向における一端部及び他端部は、それぞれ、各電池スタック120よりも前後方向の外側に飛び出すように延設されている。左右方向の両最外部の各第1の梁3及び中間位置の第2の梁4は、それぞれの長手方向の一端部が側壁115に当接するように側壁115まで延設されている。同様に、各梁3、4の長手方向の他端部は、区画壁117を貫通して、側壁116に当接するように側壁116まで延設されている。   As shown in FIG. 1, the length in the longitudinal direction of each beam 3, 4 is set to be longer than the length in the stacking direction of the unit cells 121 in the entire battery stack 120. In other words, one end portion and the other end portion in the longitudinal direction of each beam 3, 4 extend so as to protrude outward in the front-rear direction from each battery stack 120. The outermost first beams 3 and the second beam 4 at the intermediate position are extended to the side wall 115 so that one end portion in the longitudinal direction is in contact with the side wall 115. Similarly, the other end in the longitudinal direction of each beam 3, 4 extends through the partition wall 117 and extends to the side wall 116 so as to contact the side wall 116.

閉塞壁118は、平板部材であり、各梁3,4において、単電池121が配置されている領域よりも前後方向の外側にまで、すなわち区画壁117に近づく位置まで設けられている。閉塞壁118は、区画壁117と電池スタック120との間において、各梁3,4の上面において側壁113から側壁114に至るまで延設されている。両端の第1の梁3と中間の第2の梁4よりも上方の空間は、閉塞壁118によって、区画壁117と各電池スタック120との間における底壁112の部分から遮断されている。閉塞壁118は、アルミニウム板または鉄板から形成されている。   The blocking wall 118 is a flat plate member, and is provided in each of the beams 3 and 4 to the outer side in the front-rear direction, that is, to a position closer to the partition wall 117 than the area where the unit cells 121 are disposed. The blocking wall 118 extends from the side wall 113 to the side wall 114 on the upper surface of each beam 3, 4 between the partition wall 117 and the battery stack 120. The space above the first beam 3 at both ends and the intermediate second beam 4 is blocked from the portion of the bottom wall 112 between the partition wall 117 and each battery stack 120 by the blocking wall 118. The blocking wall 118 is formed from an aluminum plate or an iron plate.

閉塞壁119は、閉塞壁118と同様に平板部材であり、各梁3,4において、単電池121が配置されている領域よりも前後方向の外側にまで、側壁115に達する位置まで設けられている。閉塞壁119は、側壁115と各電池スタック120との間において、各梁3,4の上面において側壁113から側壁114に至るまで延設されている。両端の第1の梁3と中間の第2の梁4よりも上方の空間は、閉塞壁119によって、側壁115と各電池スタック120との間における底壁112の部分から遮断されている。閉塞壁119は、アルミニウム板または鉄板から形成されている。閉塞壁119には、第1送風装置140A、第2送風装置140Bの各吸込み口143aに対応する位置に開口孔が設けられている。この2つの開口孔は、各底壁側通路135と2つの吸込み口143aとをそれぞれ連通させる2個の連通開口部を構成する。   The blocking wall 119 is a flat plate member similar to the blocking wall 118 and is provided in each of the beams 3 and 4 to a position reaching the side wall 115 to the outside in the front-rear direction from the region where the unit cell 121 is disposed. Yes. The blocking wall 119 extends from the side wall 113 to the side wall 114 on the upper surface of each beam 3, 4 between the side wall 115 and each battery stack 120. The space above the first beam 3 at both ends and the intermediate second beam 4 is blocked from the portion of the bottom wall 112 between the side wall 115 and each battery stack 120 by the blocking wall 119. The blocking wall 119 is formed from an aluminum plate or an iron plate. The blocking wall 119 is provided with an opening hole at a position corresponding to each suction port 143a of the first blower 140A and the second blower 140B. The two opening holes constitute two communication openings that allow the bottom wall side passages 135 and the two suction ports 143a to communicate with each other.

単電池121は、外装ケースが前後方向に扁平な直方体を成しており、外装ケースの一端面から外部に突出する正極端子、負極端子といった電極端子121aを備える。各電池スタック120は、複数の単電池121が積層されて、この積層された単電池121が拘束されて一体に形成されている。   The unit cell 121 has a rectangular parallelepiped whose outer case is flat in the front-rear direction, and includes electrode terminals 121a such as a positive electrode terminal and a negative electrode terminal that protrude outward from one end surface of the outer case. In each battery stack 120, a plurality of unit cells 121 are stacked, and the stacked unit cells 121 are constrained and formed integrally.

各電池スタック120において、隣り合う単電池121における異極の電極端子間は、バスバ等の導電部材によって電気的に接続される。バスバと電極端子との接続は、例えばネジ締めや、溶接等により行われる。したがって、バスバ等によって電気的に接続された複数の単電池121の両端に配された総端子部は、外部から電力が供給されたり、他の電気機器へ向けて放電したりするようになっている。   In each battery stack 120, electrode terminals of different polarities in adjacent unit cells 121 are electrically connected by a conductive member such as a bus bar. The connection between the bus bar and the electrode terminal is performed, for example, by screwing or welding. Therefore, the total terminal portions arranged at both ends of the plurality of unit cells 121 electrically connected by a bus bar or the like are supplied with electric power from the outside or discharged toward other electric devices. Yes.

第1電池スタック120A、第2電池スタック120Bは、第1の梁3及び第2の梁4の上面に載る状態で設置されている。例えば、側壁114寄りに設置されている第1電池スタック120Aは、下端部1211における側壁114側の一端部が第1の梁3によって下方から支持され、下端部1211における他端部が第2の梁4によって下方から支持される。また、側壁113寄りに設置されている第2電池スタック120Bは、下端部1211における側壁113側の一端部が第1の梁3によって下方から支持され、下端部1211における他端部が第2の梁4によって下方から支持される。このように、側壁114側の第1電池スタック120A及び側壁113側の第2電池スタック120Bのそれぞれは、左右方向の両端部で第1の梁3と第2の梁4によって支持されている。   The first battery stack 120 </ b> A and the second battery stack 120 </ b> B are installed on the upper surfaces of the first beam 3 and the second beam 4. For example, in the first battery stack 120A installed near the side wall 114, one end portion on the side wall 114 side of the lower end portion 1211 is supported from below by the first beam 3, and the other end portion of the lower end portion 1211 is the second end portion. It is supported from below by the beam 4. Further, in the second battery stack 120B installed near the side wall 113, one end of the lower end 1211 on the side of the side wall 113 is supported from below by the first beam 3, and the other end of the lower end 1211 is the second end. It is supported from below by the beam 4. Thus, each of the first battery stack 120A on the side wall 114 side and the second battery stack 120B on the side wall 113 side is supported by the first beam 3 and the second beam 4 at both ends in the left-right direction.

したがって、各第1の梁3は、底壁112と側壁114側の第1電池スタック120Aまたは側壁113側の第2電池スタック120Bとに挟まれた状態で、底壁112及び各電池スタック120と一体になることで、筐体110の強度を高めている。第2の梁4は、底壁112と2個の電池スタック120とに挟まれた状態で、底壁112及び2個の電池スタック120と一体になることで、筐体110の強度を高めている。   Accordingly, each first beam 3 is sandwiched between the bottom wall 112 and the first battery stack 120A on the side wall 114 side or the second battery stack 120B on the side wall 113 side. By being integrated, the strength of the housing 110 is increased. The second beam 4 is integrated with the bottom wall 112 and the two battery stacks 120 while being sandwiched between the bottom wall 112 and the two battery stacks 120, thereby increasing the strength of the casing 110. Yes.

第1循環通路130Aは、側壁側通路132、天壁側通路133、第1電池スタック120Aにおける電池間通路134、第1底壁側通路135A、及び第1送風装置140Aを結ぶ一連の経路をなす。第2循環通路130Bは、側壁側通路131、天壁側通路133、第2電池スタック120Bにおける電池間通路134、第2底壁側通路135B、及び第2送風装置140Bを結ぶ一連の経路をなす。側壁側通路132は、天壁111、及び底壁112の両方に直交し、側壁114に対して平行に延び、第1電池スタック120Aと側壁114との間に形成される通路である。側壁側通路131は、天壁111、及び底壁112の両方に直交し、側壁113に対して平行に延び、第2電池スタック120Bと側壁113との間に形成される通路である。   The first circulation passage 130A forms a series of paths connecting the side wall side passage 132, the top wall side passage 133, the inter-battery passage 134 in the first battery stack 120A, the first bottom wall side passage 135A, and the first blower 140A. . The second circulation passage 130B forms a series of paths connecting the side wall-side passage 131, the top wall-side passage 133, the inter-battery passage 134, the second bottom wall-side passage 135B, and the second blower 140B in the second battery stack 120B. . The side wall-side passage 132 is a passage that is orthogonal to both the top wall 111 and the bottom wall 112, extends parallel to the side wall 114, and is formed between the first battery stack 120 </ b> A and the side wall 114. The side wall-side passage 131 is a passage formed between the second battery stack 120 </ b> B and the side wall 113, which is orthogonal to both the top wall 111 and the bottom wall 112, extends parallel to the side wall 113.

側壁側通路132と天壁側通路133は、天壁111と側壁114との境界部の内側で繋がっている。側壁側通路131と天壁側通路133は、天壁111と側壁113との境界部の内側で繋がっている。天壁側通路133は、天壁111と電池スタック120との間に形成されて、天壁111に平行に延びる、第1循環通路130Aと第2循環通路130Bとに含まれる共通の通路である。したがって、天壁側通路133は、側壁側通路131と側壁側通路132との両方に繋がる通路であり、側壁側通路132を流通してきた空気と側壁側通路131を流通してきた空気とが混合可能な混合空間を構成する。換言すれば、天壁側通路133は、第1循環通路130Aと第2循環通路130Bとの両方に含まれる混合通路である。この構成により、第1送風装置140Aから流出した空気と第2送風装置140Bから流出した空気は、側壁114と側壁113に接触してから、天壁側通路133で混ざり合うことになる。   The side wall side passage 132 and the top wall side passage 133 are connected inside the boundary portion between the top wall 111 and the side wall 114. The side wall side passage 131 and the top wall side passage 133 are connected inside the boundary portion between the top wall 111 and the side wall 113. The ceiling wall side passage 133 is a common passage included in the first circulation passage 130A and the second circulation passage 130B that is formed between the ceiling wall 111 and the battery stack 120 and extends parallel to the ceiling wall 111. . Therefore, the top wall side passage 133 is a passage connected to both the side wall side passage 131 and the side wall side passage 132, and the air flowing through the side wall side passage 132 and the air flowing through the side wall side passage 131 can be mixed. A simple mixing space. In other words, the ceiling wall side passage 133 is a mixing passage included in both the first circulation passage 130A and the second circulation passage 130B. With this configuration, the air that flows out from the first air blower 140A and the air that flows out from the second air blower 140B come into contact with the side wall 114 and the side wall 113, and then mix in the top wall side passage 133.

電池間通路134は、第1電池スタック120A、第2電池スタック120Bのそれぞれにおいて、隣り合う単電池121間の通路であり、天壁側通路133と第1底壁側通路135A及び第2底壁側通路135Bのそれぞれとを連通させる複数の通路である。したがって、天壁側通路133を流れる空気は、各電池スタック120において複数の電池間通路134に分流し、各電池間通路134から流出した後、第1底壁側通路135A及び第2底壁側通路135Bのそれぞれで合流する。   The inter-battery passage 134 is a passage between the adjacent single cells 121 in each of the first battery stack 120A and the second battery stack 120B, and includes a top wall side passage 133, a first bottom wall side passage 135A, and a second bottom wall. A plurality of passages communicating with each of the side passages 135B. Therefore, the air flowing through the top wall side passage 133 is divided into the plurality of inter-cell passages 134 in each battery stack 120 and flows out from the inter-battery passages 134, and then the first bottom wall side passage 135A and the second bottom wall side They merge at each of the passages 135B.

また、電池間通路134の流入部は、電池間通路134の流出部でもある各底壁側通路135の流入部に対向する位置関係にある。したがって、天壁側通路133から電池間通路134に流入した空気は、下方に向かって流下して、対応する第1底壁側通路135Aや第2底壁側通路135Bに流入する。   Further, the inflow portion of the inter-battery passage 134 is in a positional relationship facing the inflow portion of each bottom wall side passage 135 that is also the outflow portion of the inter-battery passage 134. Therefore, the air that has flowed into the inter-battery passage 134 from the top wall side passage 133 flows downward and flows into the corresponding first bottom wall side passage 135A and second bottom wall side passage 135B.

第1底壁側通路135Aは、少なくとも底壁112、第1電池スタック120Aの下端部1211及び各梁3,4によって囲まれた空間として形成される通路である。第1底壁側通路135Aは、電池間通路134よりも下流に設けられて第1送風装置140Aの流入部に向けて延びる流体通路である。第2底壁側通路135Bは、少なくとも底壁112、第2電池スタック120Bの下端部1211及び各梁3,4によって囲まれた空間として形成される通路である。第2底壁側通路135Bは、電池間通路134よりも下流に設けられて第2送風装置140Bの流入部に向けて延びる流体通路である。さらに、各底壁側通路135には、底壁112、閉塞壁118及び梁3,4によって囲まれた空間と、底壁112、閉塞壁119及び梁3,4によって囲まれた空間も含まれる。各底壁側通路135は、各電池スタック120の下側で、隣り合う第1の梁3と第2の梁4との間に形成される通路であり、この実施形態では、電池パック1は、左右方向に並び前後方向または電池積層方向に通路が延びる2本の底壁側通路135を備えている。この第1底壁側通路135Aと第2底壁側通路135Bとは、この2つの通路間において流体の出入りがない互いに独立した通路を構成する。   The first bottom wall side passage 135A is a passage formed as a space surrounded by at least the bottom wall 112, the lower end portion 1211 of the first battery stack 120A, and the beams 3 and 4. The first bottom wall side passage 135A is a fluid passage that is provided downstream of the inter-battery passage 134 and extends toward the inflow portion of the first blower 140A. The second bottom wall side passage 135B is a passage formed as a space surrounded by at least the bottom wall 112, the lower end portion 1211 of the second battery stack 120B, and the beams 3 and 4. The second bottom wall side passage 135B is a fluid passage that is provided downstream of the inter-battery passage 134 and extends toward the inflow portion of the second blower 140B. Furthermore, each bottom wall side passage 135 includes a space surrounded by the bottom wall 112, the blocking wall 118 and the beams 3 and 4, and a space surrounded by the bottom wall 112, the blocking wall 119 and the beams 3 and 4. . Each bottom wall side passage 135 is a passage formed between the adjacent first beam 3 and second beam 4 below each battery stack 120. In this embodiment, the battery pack 1 is , Two bottom wall side passages 135 are arranged in the left-right direction and the passages extend in the front-rear direction or the battery stacking direction. The first bottom wall side passage 135A and the second bottom wall side passage 135B constitute mutually independent passages between which the fluid does not enter and exit.

第1送風装置140Aは、筐体110の内部に収容されて、第1循環通路130Aに熱交換用の空気を強制的に循環させる流体駆動手段である。第2送風装置140Bは、筐体110の内部に収容されて、第2循環通路130Bに熱交換用の空気を強制的に循環させる流体駆動手段である。第1送風装置140Aと第2送風装置140Bは、閉塞壁119の上に並んで配置されている。以下、2つの送風装置140Aと送風装置140Bを総称して送風装置140として記載することもある。第1循環通路130Aや第2循環通路130Bに循環させる流体としては、例えば、空気、各種のガス、水、冷媒等の流体を用いることができる。   140 A of 1st air blowers are the fluid drive means accommodated in the inside of the housing | casing 110, and forcedly circulates the air for heat exchange in 130 A of 1st circulation paths. The second blower 140B is a fluid drive unit that is accommodated in the housing 110 and forcibly circulates heat-exchanging air through the second circulation passage 130B. The first blower 140A and the second blower 140B are arranged side by side on the blocking wall 119. Hereinafter, the two air blowers 140A and the air blower 140B may be collectively referred to as the air blower 140. As the fluid to be circulated through the first circulation passage 130A and the second circulation passage 130B, for example, fluid such as air, various gases, water, and a refrigerant can be used.

第1送風装置140Aと第2送風装置140Bは、筐体110の前後方向を向く中心線に対して対称となるように、筐体110の内部において、側壁115と各電池スタック120との間に設置されている。第1送風装置140A、第2送風装置140Bは、それぞれモータ141、シロッコファン142及びファンケーシング143を有する。モータ141は、シロッコファン142を回転駆動させる電気機器であり、シロッコファン142の上側に設けられる。シロッコファン142は、回転軸方向に流体を吸入し、遠心方向に流体を吹出す遠心式のファンであり、回転軸が上下方向を向くように設置されている。   140A of 1st air blowers and 140B of 2nd air blowers are symmetrical between the side wall 115 and each battery stack 120 in the inside of the housing | casing 110 so that it may become symmetrical with respect to the centerline which faces the front-back direction of the housing | casing 110. is set up. 140A of 1st air blowers and 140B of 2nd air blowers have the motor 141, the sirocco fan 142, and the fan casing 143, respectively. The motor 141 is an electric device that rotationally drives the sirocco fan 142, and is provided above the sirocco fan 142. The sirocco fan 142 is a centrifugal fan that sucks fluid in the direction of the rotation axis and blows out the fluid in the centrifugal direction. The sirocco fan 142 is installed such that the rotation axis is directed in the vertical direction.

ファンケーシング143は、シロッコファン142を覆うように形成されて、シロッコファン142による流体の吸込み、及び吹出し方向を設定する導風部材となっている。ファンケーシング143は、シロッコファン142の下側で開口する吸込み口143a、吹出した流体の流れを導く吹出しダクト143b、及び吹出しダクト143bの先端部で開口する吹出し口143cを有する。各吹出しダクト143bは、図4に示すように、シロッコファン142の側面から筐体110内の中心側に一旦延びてからUターンするようにして、側壁側通路131側、側壁側通路132側にそれぞれ向かう通路を形成する。   The fan casing 143 is formed so as to cover the sirocco fan 142, and serves as an air guide member that sets the suction and discharge directions of the fluid by the sirocco fan 142. The fan casing 143 includes a suction port 143a that opens below the sirocco fan 142, a blow-out duct 143b that guides the flow of the blown fluid, and a blow-out port 143c that opens at the tip of the blow-out duct 143b. As shown in FIG. 4, each blowing duct 143b extends once from the side surface of the sirocco fan 142 to the center side in the housing 110 and then makes a U-turn so as to be on the side wall side passage 131 side and the side wall side passage 132 side. Form a path to each of them.

第1送風装置140Aの吸込み口143aは、閉塞壁119の連通開口部の位置に対応するように配置されている。第2送風装置140Bの吸込み口143aは、閉塞壁119の連通開口部の位置に対応するように配置されている。第1送風装置140Aの吸込み口143aは、閉塞壁119の連通開口部を介して、側壁114側に位置する第1底壁側通路135Aに繋がっている。また、第2送風装置140Bの吸込み口143aは、閉塞壁119の連通開口部を介して、側壁113側に位置する第2底壁側通路135Bに繋がっている。   The suction port 143a of the first blower 140A is disposed so as to correspond to the position of the communication opening of the blocking wall 119. The suction port 143a of the second blower 140B is arranged so as to correspond to the position of the communication opening of the blocking wall 119. The suction port 143a of the first blower 140A is connected to the first bottom wall side passage 135A located on the side wall 114 side through the communication opening of the blocking wall 119. In addition, the suction port 143a of the second blower 140B is connected to the second bottom wall side passage 135B located on the side wall 113 side through the communication opening of the blocking wall 119.

第1送風装置140Aの吹出し口143cは、側壁側通路132に繋がるように配置されている。吹出し口143cは、側壁側通路132における底壁112寄りの位置であって、積層される複数の単電池121のうち側壁115に最も接近する単電池121の近傍において側壁116側を向くように配置されている。第2送風装置140Bの吹出し口143cは、側壁側通路131に繋がるように配置されている。吹出し口143cは、側壁側通路131における底壁112寄りの位置であって、積層される複数の単電池121のうち、側壁115の最も接近する単電池121の近傍において側壁116側を向くように配置されている。   The outlet 143 c of the first blower 140 </ b> A is disposed so as to be connected to the side wall passage 132. The outlet 143c is located near the bottom wall 112 in the side wall-side passage 132, and is arranged to face the side wall 116 in the vicinity of the unit cell 121 closest to the side wall 115 among the plurality of unit cells 121 to be stacked. Has been. The outlet 143 c of the second blower 140 </ b> B is disposed so as to be connected to the side wall passage 131. The outlet 143c is located near the bottom wall 112 in the side wall passage 131, and faces the side wall 116 in the vicinity of the unit cell 121 closest to the side wall 115 among the plurality of unit cells 121 to be stacked. Has been placed.

ファンケーシング143内の上下方向の中間位置には、流体を所定温度となるように加熱する加熱装置が設けられている。加熱装置には、例えば、自己温度制御機能を有するPTCヒータ2が用いられる。   A heating device that heats the fluid to a predetermined temperature is provided at an intermediate position in the vertical direction in the fan casing 143. For example, a PTC heater 2 having a self-temperature control function is used as the heating device.

図3に示すように、第1内部フィン150Aは、側壁114の内壁面から側壁側通路132に突出する熱交換促進用の熱交換促進部であり、側壁114を介した筐体放熱に寄与する。第2内部フィン150Bは、側壁113の内壁面から側壁側通路131に突出する熱交換促進用の熱交換促進部であり、側壁113を介した筐体放熱に寄与する。したがって、側壁113、側壁114は、第1送風装置140A、第2送風装置140Bから流出した空気が接触して筐体110の外部に対して熱を放出する放熱部となる。   As shown in FIG. 3, the first internal fin 150 </ b> A is a heat exchange promotion part for promoting heat exchange that protrudes from the inner wall surface of the side wall 114 to the side wall side passage 132, and contributes to heat radiation of the housing via the side wall 114. . The second internal fin 150 </ b> B is a heat exchange promoting part for promoting heat exchange that protrudes from the inner wall surface of the side wall 113 to the side wall passage 131, and contributes to heat radiation of the casing through the side wall 113. Therefore, the side wall 113 and the side wall 114 serve as a heat radiating part that releases the heat to the outside of the housing 110 when the air flowing out from the first air blowing device 140A and the second air blowing device 140B comes into contact.

第1内部フィン151Aは、天壁111の内面における側壁114側において突出する熱交換促進用の熱交換促進部であり、天壁111を介した筐体放熱に寄与する。第2内部フィン151Bは、天壁111の内面における側壁113側において突出する熱交換促進用の熱交換促進部であり、天壁111を介した筐体放熱に寄与する。各第1内部フィン、各第2内部フィンは、熱伝導性に優れるアルミニウム材、あるいは鉄材等から形成されている。   The first internal fin 151 </ b> A is a heat exchange promoting part for promoting heat exchange that protrudes on the side wall 114 side on the inner surface of the top wall 111, and contributes to housing heat dissipation via the top wall 111. The second internal fin 151 </ b> B is a heat exchange promoting part for promoting heat exchange that protrudes on the side wall 113 side of the inner surface of the top wall 111, and contributes to housing heat dissipation via the top wall 111. Each 1st internal fin and each 2nd internal fin are formed from the aluminum material or iron material etc. which are excellent in heat conductivity.

第1内部フィン150Aと第2内部フィン150Bは、筐体110の前後方向を向く中心線に対して対称となるように、側壁114と側壁113に設けられている。第1内部フィン151Aと第2内部フィン151Bは、筐体110の前後方向を向く中心線に対して対称となるように天壁111における側壁114側と側壁113側とにそれぞれ設けられている。各内部フィンは、例えば、流体に対する流通抵抗を比較的小さく設定することのできるストレートフィンが採用されている。ストレートフィンは、薄肉板状の基板部から垂直に突出する薄肉板状のフィン部が平行となるように多数並び、各フィン部の間に流体用の通路が形成されるフィンである。また、各内部フィンとしては、ストレートフィンに限らず、他のコルゲートフィン、オフセットフィン等とを採用してもよい。   The first internal fins 150 </ b> A and the second internal fins 150 </ b> B are provided on the side wall 114 and the side wall 113 so as to be symmetric with respect to the center line facing the front-rear direction of the housing 110. The first internal fins 151A and the second internal fins 151B are respectively provided on the side wall 114 side and the side wall 113 side of the top wall 111 so as to be symmetrical with respect to the center line facing the front-rear direction of the housing 110. As each internal fin, for example, a straight fin that can set a flow resistance to a fluid relatively small is employed. The straight fins are fins in which a large number of thin plate-like fin portions protruding vertically from the thin plate-like substrate portion are arranged in parallel, and a fluid passage is formed between the fin portions. Moreover, as each internal fin, you may employ | adopt not only a straight fin but another corrugated fin, an offset fin, etc.

図5に示すように、第2内部フィン150Bの基板部は、角部A、角部B、角部Cを結んだ細長い直角三角形状を成しており、角部Bはほぼ直角をなしている。前後方向に延びる長辺ABの長さは、対応する第2電池スタック120Bの積層方向長さと同等に設定されている。また、上下方向に延びる短辺BCの長さは、側壁113の上下方向の寸法に対して多少小さい寸法となるように設定されている。基板部は、前後方向の位置が、第2電池スタック120Bの位置に対応するように配置されている。短辺BCが側壁116側に位置し、また短辺BCに対向する角部Aが側壁115側に位置し、長辺ABが側壁113、114の上側の辺に沿うように配置されて、基板部は、側壁113、114の内側の面にそれぞれ接合されている。よって、基板部の斜辺CAは、側壁115側から側壁116側に向けて、下方向に傾斜する辺となっている。   As shown in FIG. 5, the substrate portion of the second internal fin 150B has an elongated right triangle shape connecting the corner portion A, the corner portion B, and the corner portion C, and the corner portion B has a substantially right angle. Yes. The length of the long side AB extending in the front-rear direction is set to be equal to the length of the corresponding second battery stack 120B in the stacking direction. Further, the length of the short side BC extending in the vertical direction is set to be slightly smaller than the vertical dimension of the side wall 113. The board part is arranged so that the position in the front-rear direction corresponds to the position of the second battery stack 120B. The short side BC is located on the side wall 116 side, the corner A facing the short side BC is located on the side wall 115 side, and the long side AB is arranged along the upper side of the side walls 113 and 114, and the substrate The portions are joined to the inner surfaces of the side walls 113 and 114, respectively. Therefore, the oblique side CA of the substrate portion is a side inclined downward from the side wall 115 side toward the side wall 116 side.

第2内部フィン150Bのフィン部は、基板部から複数の単電池121側に向けて垂直に突出しており、フィン部の内部により多くの流体が流通するように、突出した先端部は複数の単電池121の側面に近接する位置まで延びている。またフィン部の板面は、上下方向に対して、下側から上側に向けて、側壁116側に傾くように設定されている。また、フィン部による流体通路の長さは、側壁115側から側壁116側に向かうほど、長くなっている。以上のように説明した第2内部フィン150Bの形状は、第1内部フィン150Aの形状と同様である。   The fin portion of the second internal fin 150B protrudes vertically from the substrate portion toward the plurality of unit cells 121, and the protruding tip portion has a plurality of single units so that more fluid flows through the fin portion. The battery 121 extends to a position close to the side surface. Further, the plate surface of the fin portion is set to be inclined toward the side wall 116 from the lower side to the upper side with respect to the vertical direction. Moreover, the length of the fluid passage by a fin part becomes so long that it goes to the side wall 116 side from the side wall 115 side. The shape of the second internal fin 150B described above is the same as the shape of the first internal fin 150A.

図5に示すように、第2内部フィン151Bの基板部は、角部D、角部E、角部Fを結んだ細長い三角形状を成している。前後方向に延びる長辺DEの長さは、第2内部フィン150Bの基板部の長辺ABと同等に設定されている。第2内部フィン151Bの基板部は、前後方向の位置が、第2内部フィン150Bの位置に対応するように配置されている。短辺EFが側壁115側に位置し、また短辺EFに対向する角部Dが側壁116側に位置し、長辺DEが天壁111における前後方向の辺に沿うように配置されている。第2内部フィン151Bの基板部は、第2内部フィン150Bのフィン部と隣り合うように、天壁111の内側の面に接合されている。   As shown in FIG. 5, the substrate portion of the second internal fin 151 </ b> B has an elongated triangular shape connecting the corner portion D, the corner portion E, and the corner portion F. The length of the long side DE extending in the front-rear direction is set to be equal to the long side AB of the substrate portion of the second internal fin 150B. The substrate portions of the second internal fins 151B are arranged so that the position in the front-rear direction corresponds to the position of the second internal fins 150B. The short side EF is located on the side wall 115 side, the corner D facing the short side EF is located on the side wall 116 side, and the long side DE is arranged along the side of the top wall 111 in the front-rear direction. The substrate portion of the second internal fin 151B is joined to the inner surface of the top wall 111 so as to be adjacent to the fin portion of the second internal fin 150B.

第2内部フィン151Bのフィン部は、基板部から複数の単電池121側に向けて垂直に突出しており、フィン部の内部により多くの流体が流通するように、突出した先端部は、複数の単電池121の上面に近接する位置まで延びている。フィン部の板面は、左右方向に対して、筐体110の中心側に向かうほど、側壁116側に傾くように設定されている。フィン部による流体通路の長さは、側壁115側から側壁116側に向かうほど、短くなっている。第2内部フィン151Bのフィン部による流体通路は、第2内部フィン150Bのフィン部による流体通路と連続するように接続されている。以上のように説明した第2内部フィン151Bの形状は、第1内部フィン151Aの形状と同様である。   The fin portion of the second internal fin 151B protrudes vertically from the substrate portion toward the plurality of unit cells 121, and the protruding tip portion has a plurality of tips so that more fluid flows through the fin portion. It extends to a position close to the upper surface of the unit cell 121. The plate surface of the fin portion is set to be inclined toward the side wall 116 toward the center side of the housing 110 with respect to the left-right direction. The length of the fluid passage by the fin portion is shortened from the side wall 115 side toward the side wall 116 side. The fluid passage formed by the fin portion of the second internal fin 151B is connected to the fluid passage formed by the fin portion of the second internal fin 150B. The shape of the second internal fin 151B described above is the same as the shape of the first internal fin 151A.

外部フィン160、外部フィン161は、図6に示すように、筐体110の外側に設けられた熱交換促進用のフィンである。各外部フィン160,161は、熱伝導性に優れるアルミニウム材、あるいは鉄材等から形成されている。外部フィン160は、筐体110の前後方向を向く中心線に対して対称となるように側壁113側と側壁114側とにそれぞれ設けられている。外部フィン161は、筐体110の前後方向を向く中心線に対して対称となるように、天壁111における側壁113側及び側壁114側となる2カ所にそれぞれ設けられている。   As shown in FIG. 6, the external fin 160 and the external fin 161 are fins for promoting heat exchange provided on the outside of the housing 110. Each of the external fins 160 and 161 is formed of an aluminum material or an iron material having excellent thermal conductivity. The external fins 160 are respectively provided on the side wall 113 side and the side wall 114 side so as to be symmetric with respect to the center line facing the front-rear direction of the housing 110. The external fins 161 are provided at two locations on the top wall 111 on the side wall 113 side and the side wall 114 side so as to be symmetrical with respect to the center line facing the front-rear direction of the housing 110.

ここでは、各外部フィン160,161は、例えば、流体に対する熱伝達性能を比較的大きく設定することのできるコルゲートフィンが採用されている。コルゲートフィンは、全体形状が波状を成して、波状の互いに対向する面には多数のルーバが形成されており、波状の互いに対向する面の間、及びルーバの間に流体用の通路が形成されるフィンとなっている。また、各外部フィン160,161としては、各内部フィンのようなストレートフィン、ルーバ無しのコルゲートフィン、あるいはオフセットフィン等とすることもできる。   Here, for example, corrugated fins that can set heat transfer performance with respect to a fluid relatively large are employed as the external fins 160 and 161. The corrugated fin has a wave shape as a whole, and a large number of louvers are formed on the wavy surfaces facing each other, and a fluid passage is formed between the wavy surfaces facing each other and between the louvers. It has become a fin. Moreover, as each external fin 160,161, it can also be set as a straight fin like each internal fin, a corrugated fin without a louver, or an offset fin.

外部フィン160は、複数本、例えば2本が一組となって設けられている。外部フィン160は、側壁114、側壁113において、第1内部フィン150A、第2内部フィン150Bと対応する位置で、波の連続する方向が前後方向を向き、かつ多少、側壁116側にオフセットされるように配置されている。外部フィン161は、複数本、例えば2本が一組となって設けられている。外部フィン161は、天壁111における側壁114、側壁113側において、第1内部フィン151A、第2内部フィン151Bと対応する位置で波の連続する方向が前後方向を向き、かつ外部フィン160よりも多少、側壁115側となるように配置されている。   A plurality of external fins 160, for example, two are provided as a set. The external fin 160 is located at a position corresponding to the first internal fin 150 </ b> A and the second internal fin 150 </ b> B on the side wall 114 and the side wall 113, and the wave continuation direction faces the front-rear direction and is slightly offset toward the side wall 116. Are arranged as follows. A plurality of external fins 161, for example, two are provided as a set. The external fin 161 has a wave-continuous direction in the front and rear direction at positions corresponding to the first internal fin 151A and the second internal fin 151B on the side wall 114 and side wall 113 side of the top wall 111, and more than the external fin 160. It is arranged to be somewhat on the side wall 115 side.

図8に示すように、外部ダクト170は、空気を筐体110の外側表面に沿うように流通させるダクトである。空気は、例えば、車室内の空調された空気が使用される。外部ダクト170は、断面形状が扁平状に形成されて、筐体110の外側表面、例えば側壁113、側壁114、天壁111における側壁113側、側壁114側、及び側壁115に設けられている。外部ダクト170は、外部フィン160、外部フィン161を内包する。   As shown in FIG. 8, the external duct 170 is a duct that allows air to flow along the outer surface of the housing 110. As the air, for example, air conditioned in the passenger compartment is used. The external duct 170 has a flat cross-sectional shape and is provided on the outer surface of the housing 110, for example, the side wall 113, the side wall 114, the side wall 113 side, the side wall 114 side, and the side wall 115 of the top wall 111. The external duct 170 includes the external fin 160 and the external fin 161.

外部ダクト170は、側壁116側の両端部が、空調空気を吸い込む吸込み部となっている。この吸込み部の直後となる下流側には、吸い込んだ空調空気を外部フィン160の下側、及び外部フィン161よりも筐体110の中央側に分流させる風向装置171が設けられている。外部ダクト170の内部における側壁115側の中央には、送風装置172が設けられており、送風装置172の上部、及び下部が空調空気を吹出す吹出し部となっている。送風装置172には、例えば、ターボファンが用いられる。   In the external duct 170, both end portions on the side wall 116 side are suction portions that suck in the conditioned air. A wind direction device 171 for diverting the sucked conditioned air to the lower side of the external fin 160 and the central side of the casing 110 from the external fin 161 is provided on the downstream side immediately after the suction portion. An air blower 172 is provided in the center of the external duct 170 on the side wall 115 side, and the upper and lower portions of the air blower 172 serve as blow-out portions that blow out conditioned air. For the blower 172, for example, a turbo fan is used.

電池間通路134は、第1電池スタック120A及び第2電池スタック120Bのそれぞれにおいて、積層される単電池121と単電池121との間に形成される通路であり、隣り合う単電池121間に設けられたスペーサ部材5によって形成されている。スペーサ部材5は、単電池121と単電池121との間を仕切る仕切り壁部を有する。スペーサ部材5は、例えば樹脂によって成形される。スペーサ部材5は、両側に位置する単電池121間を絶縁する機能も有する。   The inter-battery passage 134 is a passage formed between the unit cells 121 and the unit cells 121 stacked in each of the first battery stack 120A and the second battery stack 120B, and is provided between the adjacent unit cells 121. The spacer member 5 is formed. The spacer member 5 has a partition wall portion that partitions the unit cell 121 and the unit cell 121. The spacer member 5 is formed of resin, for example. The spacer member 5 also has a function of insulating between the single cells 121 located on both sides.

仕切り壁部は、平板状であり、単電池121の主面と対向し、主面を覆う大きさを有する。単電池121の主面は、扁平状の単電池121における最も面積が大きい面である。仕切り壁部には、それぞれ主面の上下方向長さと同等の長さで上下方向に延びる複数の溝部が形成されている。複数の溝部は、所定の間隔をあけて左右方向に並んでいる。したがって、仕切り壁部は、隣り合う溝部と溝部の間に位置する上下方向に細長い平坦部を複数有する。単電池121と単電池121との間にスペーサ部材5を挟んだ電池スタック120において、平坦部50bが単電池121の主面と当接することで単電池121における主面の膨張を抑制する。主面と溝部50aとの間に形成される上下方向に延びる細長い通路は、電池間通路134を構成する。   The partition wall portion has a flat plate shape and is opposed to the main surface of the unit cell 121 and has a size covering the main surface. The main surface of the unit cell 121 is the surface having the largest area in the flat unit cell 121. A plurality of grooves extending in the vertical direction are formed in the partition wall portion, each having a length equivalent to the vertical length of the main surface. The plurality of grooves are arranged in the left-right direction with a predetermined interval. Therefore, the partition wall portion has a plurality of flat portions that are elongated in the vertical direction and located between adjacent groove portions. In the battery stack 120 in which the spacer member 5 is sandwiched between the unit cell 121 and the unit cell 121, the flat portion 50 b abuts on the main surface of the unit cell 121, thereby suppressing expansion of the main surface of the unit cell 121. An elongated passage extending in the vertical direction formed between the main surface and the groove 50a constitutes an inter-battery passage 134.

拘束部材は、各電池スタック120の積層方向の両端面を、積層方向に押圧する拘束力を与えることで拘束する。スペーサ部材5の側壁部は、スペーサ部材5と単電池121とを交互に積層して一体にした電池スタック120が形成された状態において、単電池121の側面を覆い、複数の単電池121を拘束する拘束部材と接触する部分である。したがって、側壁部は、拘束部材から単電池121の側面を保護する機能も有する。   The restraining member restrains both end faces in the stacking direction of the battery stacks 120 by applying a restraining force that presses the battery stack 120 in the stacking direction. The side wall portion of the spacer member 5 covers the side surface of the unit cell 121 and restrains the plurality of unit cells 121 in a state where the battery stack 120 is formed by alternately stacking the spacer members 5 and the unit cells 121. It is a part which contacts the restraint member to perform. Therefore, the side wall portion also has a function of protecting the side surface of the unit cell 121 from the restraining member.

次に電池パック1において、第1送風装置140Aと第2送風装置140Bに共通する制御について説明する。各単電池121は、電流が取り出される出力時及び充電される入力時に自己発熱する。各単電池121は、例えば季節に応じて筐体110の外部の温度の影響を受ける。電池管理ユニット100は、第1温度検出器60、第2温度検出器61によって所定の単電池121の温度を常時モニターし、検出した単電池121の温度に基づいて第1送風装置140A、第2送風装置140B、送風装置172、及びPTCヒータ2の作動を制御する。   Next, in the battery pack 1, control common to the first blower 140A and the second blower 140B will be described. Each unit cell 121 self-heats at the time of output from which current is extracted and at the time of input to be charged. Each unit cell 121 is affected by the temperature outside the housing 110 according to, for example, the season. The battery management unit 100 constantly monitors the temperature of the predetermined unit cell 121 using the first temperature detector 60 and the second temperature detector 61, and based on the detected temperature of the unit cell 121, the first blower 140A and the second The operation of the blower 140B, the blower 172, and the PTC heater 2 is controlled.

電池管理ユニット100は、単電池121の温度に応じて第1送風装置140A、第2送風装置140Bのそれぞれに、最大電圧に対して0%〜100%に含まれる任意の値のデューティ比に制御した電圧を印加して、シロッコファン142の回転数を可変させる。単電池121の温度によっては、第1送風装置140A及び第2送風装置140BとともにPTCヒータ2を作動させる場合、あるいは第1送風装置140A及び第2送風装置140Bとともに送風装置172を作動させる場合がある。   The battery management unit 100 controls the duty ratio of an arbitrary value included in 0% to 100% with respect to the maximum voltage in each of the first blower 140A and the second blower 140B according to the temperature of the unit cell 121. The rotation speed of the sirocco fan 142 is varied by applying the applied voltage. Depending on the temperature of the unit cell 121, the PTC heater 2 may be operated together with the first air blowing device 140A and the second air blowing device 140B, or the air blowing device 172 may be operated together with the first air blowing device 140A and the second air blowing device 140B. .

例えば、電池管理ユニット100は、春、秋等において、単電池121の温度が中間的な温度のときは、第1送風装置140A、第2送風装置140Bに印加する電圧のデューティ比を比較的小さく設定して、低風量で送風装置を作動させる。例えば、電池管理ユニット100は、冬期等において単電池121の温度が予め定めた第1所定温度よりも低くなる低温度のときは、各送風装置140A,140Bに印加する電圧のデューティ比を中間レベルに設定して中風量で送風装置を作動させPTCヒータ2を作動させる。例えば、電池管理ユニット100は、夏期等において、単電池121の温度が予め定めた第2所定温度よりも高くなる高温度のときは、第1送風装置140A、第2送風装置140Bに対する電圧デューティ比を比較的大きく設定する。これにより、高風量で送風装置を作動させるとともに所定風量を上限として送風装置172を作動させる。   For example, the battery management unit 100 sets the duty ratio of the voltage applied to the first blower 140A and the second blower 140B to be relatively small when the temperature of the unit cell 121 is an intermediate temperature in spring, autumn, or the like. Set and operate the blower with low airflow. For example, the battery management unit 100 sets the duty ratio of the voltage to be applied to each of the air blowers 140A and 140B to an intermediate level when the temperature of the unit cell 121 is lower than a predetermined first predetermined temperature in winter or the like. And the air blower is operated with the medium air volume, and the PTC heater 2 is operated. For example, the battery management unit 100 determines the voltage duty ratio for the first blower 140A and the second blower 140B when the temperature of the unit cell 121 is higher than a predetermined second predetermined temperature in summer or the like. Is set relatively large. As a result, the air blower is operated with a high air volume and the air blower 172 is operated with the predetermined air volume as the upper limit.

例えば春、秋等において、第1送風装置140A及び第2送風装置140Bのみが作動された場合、筐体110内における内部の空気は、図1に示すように、第1循環通路130A、第2循環通路130Bのそれぞれを循環する。このとき空気は、第1送風装置140A、第2送風装置140Bのそれぞれの吸込み口143aから吸い込まれ、吹出しダクト143bを介して、吹出し口143cから吹出される空気は、それぞれ側壁側通路132、側壁側通路131に流入する。   For example, when only the first air blower 140A and the second air blower 140B are activated in spring, autumn, etc., the air inside the housing 110 is, as shown in FIG. It circulates through each of the circulation passages 130B. At this time, the air is sucked in from the suction ports 143a of the first blower 140A and the second blower 140B, and the air blown out from the blowout port 143c through the blowout duct 143b is the side wall passage 132, the side wall, respectively. It flows into the side passage 131.

側壁側通路132、側壁側通路131のそれぞれに流入した空気は、第1内部フィン150A、第2内部フィン150Bの傾斜配置されたフィン部に沿って、底壁112側から天壁111側に向けてスムーズに流れる。側壁側通路132、側壁側通路131のそれぞれは、その長辺に沿って長く延びる断面扁平な通路となっている。各側壁側通路は、空気が流通する際の入口断面積としては他の天壁側通路133、電池間通路134及び底壁側通路135よりも小さくなっている。このため、空気の流速をある程度確保することができ、ここでは、動圧が主体的な場となる。ゆえに、側壁側通路132、側壁側通路131のそれぞれにおいて、流速を伴う空気の熱は、第1内部フィン150A、第2内部フィン150Bに効果的に伝達され、さらに側壁114、側壁113を介して外部に放出される。   The air flowing into each of the side wall passage 132 and the side wall passage 131 is directed from the bottom wall 112 side to the top wall 111 side along the inclined fin portions of the first inner fin 150A and the second inner fin 150B. And flows smoothly. Each of the side wall-side passage 132 and the side wall-side passage 131 is a passage having a flat cross section extending long along its long side. Each side wall side passage is smaller than the other top wall side passage 133, the inter-battery passage 134, and the bottom wall side passage 135 as an inlet cross-sectional area when air flows. For this reason, the air flow rate can be secured to some extent, and the dynamic pressure is the dominant field here. Therefore, in each of the side wall-side passage 132 and the side wall-side passage 131, the heat of the air accompanied by the flow velocity is effectively transmitted to the first inner fin 150A and the second inner fin 150B, and further via the side wall 114 and the side wall 113. Released to the outside.

次に、空気は、第1内部フィン150A、第2内部フィン150Bと連続的に接続される第1内部フィン151A、第2内部フィン151Bのフィン部にスムーズに流れ、このフィン部に沿って天壁側通路133に流入する。天壁111側に流入する際の入口断面積は、側壁側通路132、側壁側通路131のそれぞれに流入する際の入口断面積よりも格段に大きくなっており、流体の流速は小さい。ここでは、静圧が主体的な場となる。ゆえに、側壁側通路132、側壁側通路131のそれぞれから天壁側通路133に流入した空気は、天壁側通路133に均等に行き渡りやすい。   Next, the air smoothly flows to the fin portions of the first internal fins 151A and the second internal fins 151B that are continuously connected to the first internal fins 150A and the second internal fins 150B. It flows into the wall side passage 133. The inlet cross-sectional area when flowing into the top wall 111 side is much larger than the inlet cross-sectional area when flowing into each of the side wall-side passage 132 and the side wall-side passage 131, and the fluid flow velocity is small. Here, static pressure is the dominant field. Therefore, the air flowing into the top wall side passage 133 from each of the side wall side passage 132 and the side wall side passage 131 tends to reach the top wall side passage 133 equally.

図1に示すように、側壁側通路132から天壁側通路133に流入した空気は、主に側壁114側の第1電池スタック120Aの上方に拡がる。側壁側通路131から天壁側通路133に流入した空気は、主に側壁113側の第2電池スタック120Bの上方に拡がる。これらの空気は、混合通路である天壁側通路133で混ざり合うことができる。天壁側通路133に流入したこれらの空気の熱は、第1内部フィン151Aや第2内部フィン151Bから天壁111へ伝達され、あるいは天壁111に直接的に伝達され、外部に放出される。   As shown in FIG. 1, the air that flows into the ceiling wall side passage 133 from the side wall side passage 132 mainly spreads above the first battery stack 120 </ b> A on the side wall 114 side. The air flowing into the top wall side passage 133 from the side wall side passage 131 mainly spreads above the second battery stack 120B on the side wall 113 side. These airs can be mixed in the ceiling wall side passage 133 which is a mixing passage. The heat of the air flowing into the ceiling wall side passage 133 is transmitted from the first internal fin 151A or the second internal fin 151B to the ceiling wall 111, or directly transmitted to the ceiling wall 111 and released to the outside. .

次に天壁側通路133で混ざり合った空気は、各送風装置の吸引力によって各電池間通路134を通り、第1底壁側通路135A、第2底壁側通路135Bに至る。ここで、側壁側通路132、側壁側通路131及び天壁側通路133は、第1送風装置140A及び第2送風装置140Bそれぞれの吹出しによって、陽圧空間となる。第1底壁側通路135A、第2底壁側通路135Bは、第1送風装置140A、第2送風装置140Bのそれぞれの吸込みによって陰圧空間となり、両者の圧力差によって、天壁側通路133側から各底壁側通路側への流体の移動が継続的に行われることになる。空気が電池間通路134を通る際には、各単電池121の熱が流体に伝達される。   Next, the air mixed in the top wall side passage 133 passes through the inter-battery passages 134 by the suction force of each blower, and reaches the first bottom wall side passage 135A and the second bottom wall side passage 135B. Here, the side wall-side passage 132, the side wall-side passage 131, and the top wall-side passage 133 become positive pressure spaces by the respective blowouts of the first blower 140A and the second blower 140B. The first bottom wall side passage 135A and the second bottom wall side passage 135B become negative pressure spaces due to the suction of the first air blower 140A and the second air blower 140B, respectively, and due to the pressure difference between them, the top wall side passage 133 side Therefore, the fluid is continuously moved from the bottom wall side passage side to the bottom wall side passage side. When air passes through the inter-battery passage 134, the heat of each unit cell 121 is transferred to the fluid.

第1底壁側通路135A、第2底壁側通路135Bのそれぞれに流入した空気は、梁と梁との間を底壁112に沿って流下して、第1送風装置140Aの吸込み口143a、第2送風装置140Bの吸込み口143aに至る。各底壁側通路を流下する流体の熱は、底壁112に伝達されて外部に放出される。このように、筐体110内の第1循環通路130A及び第2循環通路130Bのそれぞれを空気が循環することで、側壁113、側壁114、天壁111及び底壁112から空気の熱、すなわち単電池121の熱が外部に放出される。このとき、側壁113、側壁114、天壁111では、各内部フィンによって熱交換が促進される。   The air flowing into each of the first bottom wall side passage 135A and the second bottom wall side passage 135B flows along the bottom wall 112 between the beams, and the suction port 143a of the first blower 140A, It reaches the inlet 143a of the second blower 140B. The heat of the fluid flowing down each bottom wall side passage is transmitted to the bottom wall 112 and released to the outside. In this way, air circulates through each of the first circulation passage 130A and the second circulation passage 130B in the housing 110, so that the heat of the air from the side wall 113, the side wall 114, the top wall 111, and the bottom wall 112, that is, simply The heat of the battery 121 is released to the outside. At this time, in the side wall 113, the side wall 114, and the top wall 111, heat exchange is promoted by each internal fin.

例えば冬場等において単電池121が低温となる場合は、前述したように第1送風装置140A及び第2送風装置140Bの作動に加えて,PTCヒータ2が作動される。このとき、吹出しダクト143b内を流通する空気は、PTCヒータ2によって加熱される。この加熱された空気が筐体110内の各循環通路を循環することで、逆に各単電池121は、加熱された流体によって適正作動可能な温度に昇温され、低温時における性能低下が是正される。   For example, when the unit cell 121 has a low temperature in winter or the like, the PTC heater 2 is operated in addition to the operations of the first blower 140A and the second blower 140B as described above. At this time, the air flowing through the blowout duct 143 b is heated by the PTC heater 2. The heated air circulates in each circulation passage in the housing 110, so that each unit cell 121 is heated to a temperature at which it can be properly operated by the heated fluid, and the performance deterioration at a low temperature is corrected. Is done.

さらに、例えば夏期において、単電池121が高温となる場合は、第1送風装置140A及び第2送風装置140Bの作動に加えて、送風装置172が作動される。この場合は、車室内の空調空気が外部ダクト170の吸込み部から外部ダクト170内に吸い込まれる。   Further, for example, in summer, when the unit cell 121 becomes high temperature, the blower 172 is operated in addition to the operations of the first blower 140A and the second blower 140B. In this case, the conditioned air in the passenger compartment is sucked into the external duct 170 from the suction portion of the external duct 170.

外部ダクト170内に吸い込まれた空調空気は、図8に示すように、風向装置171によって、分流され、外部フィン160の下側と、外部フィン161の筐体110の中央側に向けて分流される。それぞれの流れは、各外部フィン160,161を横切るように通過、合流して、送風装置172の上下部に設けられた吹出し部から吹き出される。   As shown in FIG. 8, the conditioned air sucked into the external duct 170 is diverted by the wind direction device 171 and is diverted toward the lower side of the external fin 160 and the center side of the casing 110 of the external fin 161. The The respective flows pass through and merge with each of the external fins 160 and 161, and are blown out from a blowing portion provided at the upper and lower portions of the blower 172.

このとき、筐体110内の流体の熱は、各内部フィン、側壁113、側壁114、天壁111、各外部フィンを介して空調空気に伝達されて、外部に放出される。よって、筐体110内の流体の熱は、各内部フィンに加えて、各外部フィンによって、熱交換が更に促進される。これにより、各単電池121は、短時間で適切な温度に強制冷却される。   At this time, the heat of the fluid in the housing 110 is transmitted to the conditioned air through the internal fins, the side walls 113, the side walls 114, the top wall 111, and the external fins, and is released to the outside. Therefore, heat exchange of the heat of the fluid in the housing 110 is further promoted by each external fin in addition to each internal fin. Thereby, each cell 121 is forcibly cooled to an appropriate temperature in a short time.

以上のように、電池パック1では、筐体110内に、第1電池スタック120A、第2電池スタック120B、第1循環通路130A、第2循環通路130B、第1送風装置140A及び第2送風装置140Bを設けている。さらにPTCヒータ2や第1内部フィン150A,151A及び第2内部フィン150B,151Bを設けることで第1送風装置140A及び第2送風装置140Bの作動音を車室内に漏らすことなく、各単電池121の温調、加熱を適切に行うことができる。さらには、外部フィン160,161、及び外部ダクト170及び送風装置172を設けることにより、高温時における強制冷却の実施も可能となる。   As described above, in the battery pack 1, the first battery stack 120 </ b> A, the second battery stack 120 </ b> B, the first circulation passage 130 </ b> A, the second circulation passage 130 </ b> B, the first blower 140 </ b> A, and the second blower are provided in the housing 110. 140B is provided. Further, by providing the PTC heater 2, the first internal fins 150A and 151A, and the second internal fins 150B and 151B, each unit cell 121 is not leaked into the vehicle interior without leaking the operating sound of the first blower 140A and the second blower 140B. The temperature can be adjusted and heated appropriately. Furthermore, by providing the external fins 160 and 161, the external duct 170, and the blower 172, forced cooling at high temperatures can be performed.

以上の構成によれば、電池パック1は、図9、図10に図示するように模式化できる第1循環通路130Aと第2循環通路130Bを有する。図9〜図11を参照しながら、第1電池スタック120Aと第2電池スタック120Bのうち、いずれかの電池スタックについて電池冷却性能が低下した場合に、電池パック1が実施する異常時の温調制御について説明する。電池冷却性能が低下した場合とは、後述する実施形態のように、一方の電池スタックに対応する送風装置が送風する送風風量が意に反して低下した場合、または一方の電池スタックに供給される流体が循環する循環通路における流通抵抗が増大した場合が含まれる。一方の電池スタックに対応する送風装置が送風する送風風量が意に反して低下した場合とは、制御装置によって送風風量が低下するように制御されていないにもかかわらず、電池冷却性能が低下した場合である。   According to the above configuration, the battery pack 1 includes the first circulation passage 130A and the second circulation passage 130B that can be schematically illustrated as illustrated in FIGS. With reference to FIG. 9 to FIG. 11, when the battery cooling performance of any one of the first battery stack 120 </ b> A and the second battery stack 120 </ b> B is deteriorated, the temperature control at the time of abnormality performed by the battery pack 1 is performed. Control will be described. When the battery cooling performance is reduced, as in an embodiment described later, the amount of air blown by the blower corresponding to one battery stack is unexpectedly reduced, or is supplied to one battery stack. The case where the flow resistance in the circulation passage through which the fluid circulates is increased is included. When the air flow rate blown by the air blower corresponding to one battery stack is unexpectedly reduced, the battery cooling performance is lowered even though the air flow rate is not controlled by the control device. Is the case.

第1送風装置140A及び第2送風装置140Bのそれぞれの吹出し口143cは、側壁側通路132、側壁側通路132だけに直結されているわけではない。したがって、図9には、第1送風装置140Aから流出した空気と第2送風装置140Bから流出した空気は、筐体110の内部において互いに混合可能なように図示している。   The outlets 143c of the first blower 140A and the second blower 140B are not directly connected only to the side wall passage 132 and the side wall passage 132, respectively. Therefore, FIG. 9 illustrates that the air flowing out from the first blower 140 </ b> A and the air flowing out from the second blower 140 </ b> B can be mixed with each other inside the housing 110.

異常時の温調制御について、その処理手順は、図11のフローチャートにしたがって実行される。図11のフローチャートは、制御装置として機能する電池管理ユニット100によって実行される。以降のフローチャートの説明では、電池管理ユニット100を制御装置と表現する。   Regarding the temperature control at the time of abnormality, the processing procedure is executed according to the flowchart of FIG. The flowchart of FIG. 11 is executed by the battery management unit 100 that functions as a control device. In the following description of the flowcharts, the battery management unit 100 is expressed as a control device.

図11に示すように、制御装置は、ステップ10で第1電池スタック120Aの温度と第2電池スタック120Bの温度との差が予め定められた判定値以上であるか否かを判定する。第1電池スタック120Aの温度は、第1温度検出器60によって検出される温度である。第2電池スタック120Bの温度は、第2温度検出器61によって検出される温度である。両方の電池スタックにおける電池冷却性能が正常に機能している場合は、前述した異常時の温度調節制御によって各電池スタック120が発熱量に応じて適正に冷却されるため、両者の温度差は小さな値に収まっている。したがって、ステップ10の判定処理の基準として用いられる判定値は、一方の電池スタックにおいて異常がない状態よりも明らかに電池冷却性能が低下していると判断できる値に設定される。   As shown in FIG. 11, the control device determines in step 10 whether or not the difference between the temperature of the first battery stack 120A and the temperature of the second battery stack 120B is equal to or greater than a predetermined determination value. The temperature of the first battery stack 120 </ b> A is a temperature detected by the first temperature detector 60. The temperature of the second battery stack 120 </ b> B is a temperature detected by the second temperature detector 61. When the battery cooling performance of both battery stacks is functioning normally, each battery stack 120 is appropriately cooled according to the amount of heat generated by the above-described temperature adjustment control at the time of abnormality, so the temperature difference between the two is small. It is within the value. Therefore, the determination value used as the criterion of the determination process in step 10 is set to a value that can be determined that the battery cooling performance is clearly degraded as compared with the state where there is no abnormality in one battery stack.

ステップ10で両者の温度差が判定値未満であると判定すると、電池冷却性能が正常に働いているとみなして本フローチャートを終了する。このフローチャートは、終了後、所定の時間間隔で開始される。   If it is determined in step 10 that the temperature difference between the two is less than the determination value, it is considered that the battery cooling performance is operating normally, and this flowchart is terminated. This flowchart is started at predetermined time intervals after completion.

ステップ10で両者の温度差が判定値以上であると判定すると、どちらかの電池スタックの電池冷却性能が異常であるとみなしてステップ20に進む。ステップ20では、第1電池スタック120Aの温度が第1電池スタック120Aの温度よりも大きいか否かを判定する。第1電池スタック120Aの温度が第2電池スタック120Bの温度よりも高いと判定すると、第1電池スタック120Aについて電池冷却性能が正常に機能していないため、ステップ30に進む。   If it is determined in step 10 that the temperature difference between the two is greater than or equal to the determination value, the battery cooling performance of one of the battery stacks is regarded as abnormal, and the process proceeds to step 20. In step 20, it is determined whether the temperature of the first battery stack 120A is higher than the temperature of the first battery stack 120A. If it is determined that the temperature of the first battery stack 120A is higher than the temperature of the second battery stack 120B, the battery cooling performance of the first battery stack 120A is not functioning normally, and the process proceeds to step 30.

ステップ30では、第1電池スタック120Aについて電池冷却性能が低下状態であると判断する処理を実行する。ここでは、例えば図10に図示するように、側壁114の内側に設けられた第1内部フィン150Aが目詰まり等の理由により通風抵抗が大きく、所望の熱交換性能を発揮できない状態であることが想定できる。つまり、電池パック1は、第1電池スタック120A側に位置する筐体110の側壁114や内部フィンを介した外部への放熱能力が低下した状態である。次のステップ35で制御装置は、第1送風装置140Aによって送風される風量が正常時よりも減少するように第1送風装置140Aを制御し、本フローチャートを終了する。   In step 30, a process for determining that the battery cooling performance of the first battery stack 120A is in a lowered state is executed. Here, for example, as shown in FIG. 10, the first internal fin 150 </ b> A provided inside the side wall 114 has a large ventilation resistance due to clogging or the like and may not be able to exhibit a desired heat exchange performance. Can be assumed. That is, the battery pack 1 is in a state in which the heat dissipation capability to the outside via the side walls 114 and the internal fins of the housing 110 located on the first battery stack 120A side is lowered. In the next step 35, the control device controls the first air blower 140 </ b> A so that the air volume blown by the first air blower 140 </ b> A is smaller than that in the normal state, and ends this flowchart.

すなわち、図10に図示するように、第1送風装置140Aが送風する風量F1は、第2送風装置140Bが送風する風量F2よりも小さくなるように制御される。これにより、図10に太線で示した第2循環通路130Bを循環する空気の風量は、図10に細線で示した第1循環通路130Aを循環する空気の風量よりも相対的に大きくなる。換言すれば、異常がない側の電池スタックに対応する送風装置の方が、異常が生じた側の電池スタックに対応する送風装置よりも相対的に送風風量が大きくなる。   That is, as shown in FIG. 10, the air flow F1 blown by the first blower 140A is controlled to be smaller than the air flow F2 blown by the second blower 140B. As a result, the air volume circulating through the second circulation passage 130B indicated by the thick line in FIG. 10 is relatively larger than the air volume circulating through the first circulation path 130A indicated by the thin line in FIG. In other words, the blower device corresponding to the battery stack on the side where there is no abnormality has a relatively larger air flow rate than the blower device corresponding to the battery stack on the side where abnormality has occurred.

この処理によれば、第1送風装置140Aから流出された風量F1の空気は第1内部フィン150Aであまり放熱できないが、第2送風装置140Bから流出された風量F2の空気は第2内部フィン150Bで十分に放熱できる。そして、風量F1の空気と風量F2の空気とが天壁側通路133で混合するため、第1循環通路130Aを流れる空気の温度を低下させることができる。天壁側通路133で混合された空気は、各電池スタックにおける各電池間通路134を流れるときに単電池121と熱交換するので、第2電池スタック120Bと冷却性能が低下した状態の第1電池スタック120Aとの両方を冷却し続けることができる。したがって、ステップ10、20、30、35の処理によれば、第2内部フィン150B等からの放熱によって相対的に低温である第2送風装置140Bからの冷却風を活用することで、第1電池スタック120Aの冷却性能を確保することができる。   According to this process, the air of the air volume F1 flowing out from the first air blower 140A cannot radiate much heat by the first internal fin 150A, but the air of the air volume F2 flowing out from the second air blower 140B is not the second internal fin 150B. Can sufficiently dissipate heat. Since the air of the air volume F1 and the air of the air volume F2 are mixed in the ceiling wall side passage 133, the temperature of the air flowing through the first circulation passage 130A can be lowered. Since the air mixed in the top wall side passage 133 exchanges heat with the unit cells 121 when flowing through the inter-battery passages 134 in each battery stack, the first battery in a state where the cooling performance of the second battery stack 120B is lowered. Both the stack 120A and the cooling can continue to be cooled. Therefore, according to the processing of Steps 10, 20, 30, and 35, the first battery can be obtained by utilizing the cooling air from the second blower 140B that is relatively low temperature by the heat radiation from the second internal fins 150B and the like. The cooling performance of the stack 120A can be ensured.

ステップ20で、第2電池スタック120Bの温度が第1電池スタック120Aの温度よりも高いと判定すると、第2電池スタック120Bについて電池冷却性能が正常に機能していないため、ステップ40に進む。   If it is determined in step 20 that the temperature of the second battery stack 120B is higher than the temperature of the first battery stack 120A, the battery cooling performance is not functioning normally for the second battery stack 120B, and the process proceeds to step 40.

ステップ40では、第2電池スタック120Bについて電池冷却性能が低下状態であると判断する処理を実行する。ここでは、図10に図示した例とは異なり、側壁113の内側に設けられた第2内部フィン150Bが目詰まり等の理由により通風抵抗が大きく、所望の熱交換性能を発揮できない状態であることが想定できる。つまり、電池パック1は、第2電池スタック120B側に位置する筐体110の側壁113を介した外部への放熱能力が低下した状態である。次のステップ45で制御装置は、第2送風装置140Bによって送風される風量が正常時よりも減少するように第2送風装置140Bを制御し、本フローチャートを終了する。   In step 40, a process for determining that the battery cooling performance of the second battery stack 120B is in a lowered state is executed. Here, unlike the example illustrated in FIG. 10, the second internal fin 150 </ b> B provided inside the side wall 113 has a large ventilation resistance due to clogging or the like and is in a state in which a desired heat exchange performance cannot be exhibited. Can be assumed. That is, the battery pack 1 is in a state in which the heat dissipation capability to the outside through the side wall 113 of the housing 110 located on the second battery stack 120B side is reduced. In the next step 45, the control device controls the second blower 140B so that the amount of air blown by the second blower 140B is smaller than that in the normal state, and ends this flowchart.

すなわち、図10に図示する例とは逆で、第2送風装置140Bが送風する風量F2は、第1送風装置140Aが送風する風量F1よりも小さくなるように制御される。これにより、第1循環通路130Aを循環する空気の風量は、第2循環通路130Bを循環する空気の風量よりも相対的に大きくなる。この場合も、異常がない側の電池スタックに対応する送風装置の方が、異常が生じた側の電池スタックに対応する送風装置よりも相対的に送風風量が大きくなる。   That is, contrary to the example illustrated in FIG. 10, the air volume F2 blown by the second blower 140B is controlled to be smaller than the airflow F1 blown by the first blower 140A. Thereby, the air volume of the air circulating through the first circulation path 130A is relatively larger than the air volume of the air circulating through the second circulation path 130B. Also in this case, the blower device corresponding to the battery stack on the side where there is no abnormality has a relatively larger air flow rate than the blower device corresponding to the battery stack on the side where abnormality has occurred.

この処理によれば、第2送風装置140Bから流出された風量F2の空気は第2内部フィン150Bであまり放熱できないが、第1送風装置140Aから流出された風量F1の空気は第1内部フィン150Aで十分に放熱できる。そして、風量F1の空気と風量F2の空気とが天壁側通路133で混合するため、第2循環通路130Bを流れる空気の温度を低下させることができる。天壁側通路133で混合された空気は、各電池スタックにおける各電池間通路134を流れるときに単電池121と熱交換するので、第1電池スタック120Aと冷却性能が低下した状態の第2電池スタック120Bとの両方を冷却し続けることができる。したがって、ステップ10、20、40、45の処理によれば、第1内部フィン150A等からの放熱によって相対的に低温である第1送風装置140Aからの冷却風を活用することで、第2電池スタック120Bの冷却性能を確保することができる。   According to this process, the air of the air volume F2 flowing out from the second blower 140B cannot radiate much heat by the second internal fin 150B, but the air of the air volume F1 flowing out from the first air blower 140A is not the first internal fin 150A. Can sufficiently dissipate heat. And since the air of the air volume F1 and the air of the air volume F2 mix in the top wall side channel | path 133, the temperature of the air which flows through the 2nd circulation channel | path 130B can be reduced. Since the air mixed in the top wall side passage 133 exchanges heat with the unit cells 121 when flowing through the inter-battery passages 134 in each battery stack, the second battery in a state in which the cooling performance is lowered with the first battery stack 120A. Both the stack 120B can continue to be cooled. Therefore, according to the processing of Steps 10, 20, 40, and 45, the second battery is obtained by utilizing the cooling air from the first air blower 140A that is relatively low temperature by the heat radiation from the first internal fins 150A and the like. The cooling performance of the stack 120B can be ensured.

次に、第1実施形態の電池パック1がもたらす効果について説明する。電池パック1は、少なくとも第1電池スタック120A及び第2電池スタック120Bと、第1電池スタック120Aを冷却する流体を送風する第1送風装置140Aと、第2電池スタック120Bを冷却する流体を送風する第2送風装置140Bと、を備える。電池パック1の筐体110は、第1電池スタック120A及び第2電池スタック120Bと第1送風装置140A及び第2送風装置140Bとを内部に収容する。筐体110の内部には、第1循環通路130Aと第2循環通路130Bとが設けられる。第1循環通路130Aは、第1送風装置140Aから流出した流体が第1壁(側壁114)に接触してから天壁側通路133に流入し、天壁側通路133を流出してから第1電池スタック120Aと熱交換した後、第1送風装置140Aに流入する経路を構成する。第2循環通路130Bは、第2送風装置140Bから流出した流体が第2壁(側壁113)に接触してから天壁側通路133に流入し、天壁側通路133を流出してから第2電池スタック120Bと熱交換した後、第2送風装置140Bに流入する経路を構成する。   Next, the effect which the battery pack 1 of 1st Embodiment brings is demonstrated. The battery pack 1 blows at least the first battery stack 120A and the second battery stack 120B, the first blower 140A that blows the fluid that cools the first battery stack 120A, and the fluid that cools the second battery stack 120B. A second blower 140B. The casing 110 of the battery pack 1 houses the first battery stack 120A and the second battery stack 120B, the first blower 140A and the second blower 140B inside. Inside the casing 110, a first circulation passage 130A and a second circulation passage 130B are provided. The first circulation passage 130A flows into the top wall side passage 133 after the fluid flowing out from the first blower 140A contacts the first wall (side wall 114), and flows out of the top wall side passage 133 after the first flow. After heat exchange with the battery stack 120A, a path that flows into the first blower 140A is configured. The second circulation passage 130 </ b> B flows into the top wall side passage 133 after the fluid flowing out from the second blower 140 </ b> B contacts the second wall (side wall 113), and then flows out of the top wall side passage 133. After exchanging heat with the battery stack 120B, a path that flows into the second blower 140B is configured.

電池パック1の制御装置は、一方の電池スタックの電池冷却性能が正常時よりも低下した場合に、他方の電池スタックに対応する送風装置の方が一方の電池スタックに対応する送風装置と比べて送風する風量が大きくなるように、第1送風装置140A及び第2送風装置140Bの少なくとも一つを制御する。   When the battery cooling performance of one battery stack is lower than normal, the control device of the battery pack 1 has a blower device corresponding to the other battery stack compared to a blower device corresponding to one battery stack. At least one of the first blower 140A and the second blower 140B is controlled so that the amount of air to be blown is increased.

この制御によれば、電池冷却性能が低下した一方の電池スタックに対応する送風装置よりも他方の電池スタックに対応する送風装置の方が相対的に送風風量が大きくなるように電池パック1の送風装置を制御する。これにより、相対的に風量が大きくなった他方の送風装置から送風される流体を天壁側通路133を通じて一方の電池スタックにも供給することができる。このため、電池パック1は、電池冷却性能が低下した方の電池スタックについて電池冷却性能を回復させることができる。以上のように、従来の電池パックに比べて、電池パック全体としての送風風量が著しく低下することを回避できる電池パック1を提供できる。   According to this control, the blower of the battery pack 1 is blown so that the blower device corresponding to the other battery stack has a larger amount of blown air than the blower device corresponding to the one battery stack whose battery cooling performance is reduced. Control the device. Thereby, the fluid blown from the other blower with the relatively large air volume can be supplied to one battery stack through the top wall side passage 133. For this reason, the battery pack 1 can recover the battery cooling performance of the battery stack whose battery cooling performance is reduced. As described above, it is possible to provide the battery pack 1 capable of avoiding a significant decrease in the amount of blown air as the whole battery pack as compared with the conventional battery pack.

また、電池パック1の制御装置は、一方の電池スタックについて電池冷却性能が正常時よりも低下した場合に、一方の電池スタックに対応する送風装置を、送風風量が正常時の送風風量よりも低下するように制御する。この場合、電池冷却性能が正常時よりも低下した一方の電池スタックに対応する送風装置について、送風風量を正常時レベル以上に制御しても電池冷却性能の回復が期待できず、無駄なエネルギ消費になってしまう。そこで、電池冷却性能が低下した電池スタックに対応する送風装置を、送風風量が正常時よりも低下するように制御することで、消費エネルギを抑制しつつ他方の電池スタックに対応する送風装置の方が相対的に送風風量が大きくなる制御を実現できる。   In addition, when the battery cooling performance of one battery stack is lower than that in the normal state, the control device of the battery pack 1 causes the air blower corresponding to the one battery stack to be lower than the air flow rate in the normal state. Control to do. In this case, for the air blower corresponding to one battery stack whose battery cooling performance is lower than normal, recovery of the battery cooling performance cannot be expected even if the air flow rate is controlled above the normal level, and wasteful energy consumption is expected. Become. Therefore, the air blower corresponding to the other battery stack is controlled while controlling the air blower corresponding to the battery stack whose battery cooling performance is lowered so that the air flow rate is lower than that in the normal state. However, it is possible to realize the control that relatively increases the air flow rate.

また一方の電池スタックについて電池冷却性能が低下した場合とは、一方の電池スタックに対応する送風装置が送風する送風風量が意に反して低下した場合、または一方の電池スタックに供給される流体が循環する循環通路における流通抵抗が増大した場合である。これによれば、電池冷却性能の低下した原因が、送風装置の異常にある場合や、循環通路における目詰まりや障害物の存在等によるものである場合に、電池パック全体の電池冷却性能の確保を実現できる。   In addition, when the battery cooling performance of one battery stack is decreased, the amount of air blown by the blower corresponding to one battery stack is unexpectedly decreased, or the fluid supplied to one battery stack is This is a case where the circulation resistance in the circulating passage is increased. According to this, when the cause of the deterioration of the battery cooling performance is due to the abnormality of the blower or due to clogging or the presence of obstacles in the circulation passage, ensuring the battery cooling performance of the entire battery pack Can be realized.

また、電池パック1は、第1循環通路130A及び第2循環通路130Bのそれぞれには、筐体110の壁を介した外部への放熱を促進する熱交換促進部である各内部フィン150A,150B,151A,151Bが設けられている。制御装置は、一方の熱交換促進部に近い位置にある電池スタックの温度と他方の熱交換促進部に近い位置にある電池スタックの温度との温度差が、判定値以上である場合に、温度の高い方の電池スタックについて電池冷却性能が正常時よりも低下したと判断する。これによれば、各電池スタックにおける電池温度を検出するための第1温度検出器60、第2温度検出器61を活用して、電池冷却性能が低下した電池スタックを検出することができ、検出装置にかかるコストを軽減できる。   Further, in the battery pack 1, each of the first circulation passage 130A and the second circulation passage 130B has internal fins 150A and 150B that are heat exchange promotion portions that promote heat radiation to the outside through the wall of the housing 110. , 151A, 151B are provided. When the temperature difference between the temperature of the battery stack near the one heat exchange promoting part and the temperature of the battery stack located near the other heat exchange promoting part is equal to or higher than the determination value, the control device It is determined that the battery cooling performance of the higher battery stack is lower than normal. According to this, it is possible to detect a battery stack whose battery cooling performance has deteriorated by utilizing the first temperature detector 60 and the second temperature detector 61 for detecting the battery temperature in each battery stack. The cost for the apparatus can be reduced.

一方の電池スタックに対応する送風装置による送風風量が意に反して低下した場合とは、送風装置に与えた回転数変更指令に対して、送風装置における回転数変更完了時間が所定の変更完了時間よりも長い場合としてもよい。所定の変更完了時間は、制御装置が送風装置に対して回転数を変更するための信号を出力し、出力後に送風装置が正常時に回転数を変更完了するまでの時間に比べて、普通でない明らかに長い時間に設定される。電池パック1は、筐体110の内部に閉じられた内部空間に、送風装置、電池スタック、循環通路を有する。このため、電池パック1によれば、送風装置の回転数を大きく変更しても騒音が外部に漏れにくいことを利用して、送風装置の異常を検出しやすい方法を提供できる。   When the amount of air blown by the air blower corresponding to one battery stack is unexpectedly reduced, the rotation speed change completion time in the air blower is a predetermined change completion time in response to the speed change command given to the air blower It may be longer than that. The predetermined change completion time is not normal compared to the time until the control device outputs a signal for changing the rotational speed to the blower and the blower completes changing the rotational speed when the blower is normal after the output. Set to a long time. The battery pack 1 has a blower, a battery stack, and a circulation path in an internal space closed inside the housing 110. For this reason, according to the battery pack 1, it is possible to provide a method for easily detecting an abnormality of the air blower by utilizing the fact that noise hardly leaks to the outside even if the rotational speed of the air blower is greatly changed.

電池パック1は、筐体110の底壁112に一体に設けられて電池スタック120を下方から支える複数の梁3,4をさらに備える。各底壁側通路135は、少なくとも梁3,4、底壁112及び各電池スタック120の下端部1211で囲まれる通路である。この構成によれば、底壁112には複数の梁3,4が設けられているので、各梁3,4が補強部材となって筐体110の強度を向上することができる。各電池スタック120は、各梁3,4の上に設置されているので、仮に、筐体110の外部から衝撃が加わった場合でも、各梁3,4によって衝撃を受けることが可能であり、電池を衝撃から保護することが可能である。   The battery pack 1 further includes a plurality of beams 3 and 4 that are integrally provided on the bottom wall 112 of the housing 110 and support the battery stack 120 from below. Each bottom wall side passage 135 is a passage surrounded by at least the beams 3 and 4, the bottom wall 112, and the lower end portion 1211 of each battery stack 120. According to this configuration, since the plurality of beams 3 and 4 are provided on the bottom wall 112, the strength of the housing 110 can be improved by using the beams 3 and 4 as reinforcing members. Since each battery stack 120 is installed on each beam 3, 4, even if an impact is applied from the outside of the housing 110, it is possible to receive an impact by each beam 3, 4. It is possible to protect the battery from impact.

さらに各底壁側通路135は、補強用の各梁3,4を形成する壁と底壁112とを用いて区画される。このため、補強のための梁部材を通路形成に活用でき、部材点数の低減が図れ、簡易な形状の梁を活用することによるコスト低減も図れる。したがって、筐体110の内部に別体のダクトを設置することなく、各底壁側通路135を構築できる。   Further, each bottom wall side passage 135 is partitioned by using the walls forming the reinforcing beams 3 and 4 and the bottom wall 112. For this reason, the beam member for reinforcement can be utilized for passage formation, the number of members can be reduced, and the cost can be reduced by utilizing a beam having a simple shape. Therefore, each bottom wall side passage 135 can be constructed without installing a separate duct inside the housing 110.

また、各梁3,4は、底壁側通路135の一部を形成するための部材として用いられるため、単に筐体110を補強するためだけに梁を設ける場合に比べて、電池パック1の大型化を抑制できる。   Further, each beam 3, 4 is used as a member for forming a part of the bottom wall side passage 135, and therefore, compared with the case where the beam is provided only for reinforcing the housing 110, Increase in size can be suppressed.

複数の梁3,4のうち少なくとも一つは、筐体110の内部において、長手方向の端部が両方の電池スタック120よりも筐体110の壁に接近するように設けられる。この構成によれば、第1の梁3や第2の梁4の長手方向の端部は、各電池スタック120が配置される領域よりも外側に向けて延設されている。これによれば、電池パック1に衝撃が加わった場合に、梁によって衝撃を吸収する領域を大きくすることができるので、より効果的に電池を保護することができる。   At least one of the plurality of beams 3 and 4 is provided in the housing 110 such that the end portion in the longitudinal direction is closer to the wall of the housing 110 than both the battery stacks 120. According to this configuration, the longitudinal ends of the first beam 3 and the second beam 4 are extended outward from the region where each battery stack 120 is disposed. According to this, when an impact is applied to the battery pack 1, it is possible to increase a region where the impact is absorbed by the beam, and thus it is possible to protect the battery more effectively.

また、複数の梁3,4のうち少なくとも一つは、長手方向の端部が筐体110の壁に接触するように設けられている。この構成によれば、第1の梁3や第2の梁4の長手方向の端部と筐体110の壁との間に隙間が形成されない構造にすることができる。これにより、電池パック1に衝撃が加わった場合に、梁がもたらす強度向上の効果により筐体110が大きく変形する範囲を抑制することができる。例えば、筐体110内の電気部品や電池の損傷を抑制することが可能である。   Further, at least one of the plurality of beams 3 and 4 is provided such that an end portion in the longitudinal direction is in contact with the wall of the housing 110. According to this structure, it can be set as the structure where a clearance gap is not formed between the edge part of the longitudinal direction of the 1st beam 3 or the 2nd beam 4, and the wall of the housing | casing 110. FIG. Thereby, when an impact is applied to the battery pack 1, it is possible to suppress a range in which the housing 110 is largely deformed due to the strength improvement effect provided by the beam. For example, it is possible to suppress damage to electrical components and batteries in the housing 110.

(第2実施形態)
第2実施形態では、第1実施形態に対して他の形態である異常時の温度調節制御について図12を参照して説明する。図12において、第1実施形態の図面中と同一符号を付したステップは、同様の処理であり、同様の作用効果を奏するものである。
(Second Embodiment)
In the second embodiment, temperature adjustment control at the time of abnormality, which is another form of the first embodiment, will be described with reference to FIG. In FIG. 12, steps denoted by the same reference numerals as those in the drawing of the first embodiment are the same processing and have the same operational effects.

図12に示すように、ステップ30で第1電池スタック120Aについて電池冷却性能が低下状態であると判断する処理を実行すると、次にステップ35Aに進む。ステップ35Aでは、先のステップ35における第1送風装置140Aの送風風量を減少する処理に加え、第2送風装置140Bの送風風量を正常時よりも増加するように第2送風装置140Bを制御する処理を行い、本フローチャートを終了する。   As shown in FIG. 12, when the process of determining in step 30 that the battery cooling performance of the first battery stack 120A is in a degraded state is performed, the process proceeds to step 35A. In step 35A, in addition to the process of reducing the blown air volume of the first blower 140A in the previous step 35, the process of controlling the second blower 140B so as to increase the blown air volume of the second blower 140B from the normal time. To end this flowchart.

これにより、第2送風装置140Bが送風する風量F2と第1送風装置140Aが送風する風量F1との差が先の第1実施形態の作動よりも大きくなるように制御される。したがって、第2循環通路130Bを循環する空気の風量F2は、第1循環通路130Aを循環する空気の風量F1よりも、第1実施形態の作動に比べてさらに相対的に大きくなる。換言すれば、異常がない側の電池スタックに対応する送風装置の方が、異常が生じた側の電池スタックに対応する送風装置よりも送風風量が第1実施形態の作動に比べてさらに相対的に大きくなる。   Thereby, the difference between the air volume F2 blown by the second air blower 140B and the air flow F1 blown by the first air blower 140A is controlled to be larger than the operation of the first embodiment. Therefore, the air volume F2 circulating through the second circulation path 130B is relatively larger than the air volume F1 circulating through the first circulation path 130A compared to the operation of the first embodiment. In other words, the blowing device corresponding to the battery stack on the side where there is no abnormality is more relative to the operation of the first embodiment than the blowing device corresponding to the battery stack on which the abnormality occurs. Become bigger.

ステップ10、20、30、35Aの処理によれば、第2内部フィン150B等からの放熱量をさらに増大させることで、相対的に低温である第2送風装置140Bからの冷却風を活用し、第1電池スタック120Aの冷却性能を効率的に確保することができる。   According to the processing of Steps 10, 20, 30, and 35A, by further increasing the amount of heat released from the second internal fin 150B and the like, the cooling air from the second blower 140B that is relatively low temperature is utilized, The cooling performance of the first battery stack 120A can be efficiently ensured.

一方、ステップ40で第2電池スタック120Bについて電池冷却性能が低下状態であると判断する処理を実行すると、次にステップ45Aに進む。ステップ45Aでは、先のステップ45における第2送風装置140Bの送風風量を減少する処理に加え、第1送風装置140Aの送風風量を正常時よりも増加するように第1送風装置140Aを制御する処理を行い、本フローチャートを終了する。   On the other hand, if it is determined in step 40 that the battery cooling performance of the second battery stack 120B is in a degraded state, the process proceeds to step 45A. In step 45A, in addition to the process of reducing the blown air volume of the second blower 140B in the previous step 45, the process of controlling the first blower 140A so as to increase the blown air volume of the first blower 140A from the normal time. To end this flowchart.

これにより、第1送風装置140Aが送風する風量F1と第2送風装置140Bが送風する風量F2との差が先の第1実施形態の作動よりも大きくなるように制御される。したがって、第1循環通路130Aを循環する空気の風量F1は、第2循環通路130Bを循環する空気の風量F2よりも、第1実施形態の作動に比べてさらに相対的に大きくなる。この場合も、異常がない側の電池スタックに対応する送風装置の方が、異常が生じた側の電池スタックに対応する送風装置よりも送風風量が第1実施形態の作動に比べてさらに相対的に大きくなる。   Thereby, the difference between the air volume F1 blown by the first air blower 140A and the air flow F2 blown by the second air blower 140B is controlled to be larger than the operation of the first embodiment. Therefore, the air volume F1 circulating through the first circulation path 130A is relatively larger than the air volume F2 circulating through the second circulation path 130B as compared with the operation of the first embodiment. Also in this case, the blowing device corresponding to the battery stack on the side where there is no abnormality is more relative to the operation of the first embodiment than the blowing device corresponding to the battery stack on which the abnormality occurs. Become bigger.

ステップ10、20、40、45Aの処理によれば、第1内部フィン150A等からの放熱量をさらに増大させることで、相対的に低温である第1送風装置140Aからの冷却風を活用し、第2電池スタック120Bの冷却性能を効率的に確保することができる。   According to the processing of Steps 10, 20, 40, and 45A, by further increasing the heat radiation amount from the first internal fin 150A and the like, the cooling air from the first blower 140A that is relatively low temperature is utilized, The cooling performance of the second battery stack 120B can be efficiently ensured.

(第3実施形態)
第3実施形態では、第1実施形態に対して他の形態である異常時の温度調節制御について図13を参照して説明する。図13において、第1実施形態の図面中と同一符号を付した構成要素は、同様の構成であり同様の作用効果を奏するものである。
(Third embodiment)
In the third embodiment, temperature adjustment control at the time of abnormality, which is another form of the first embodiment, will be described with reference to FIG. In FIG. 13, the constituent elements having the same reference numerals as those in the drawing of the first embodiment have the same configuration and the same operational effects.

図13を参照して、第1電池スタック120Aと第2電池スタック120Bのうち、いずれかの電池スタックに対応する送風装置に異常が発生し、電池冷却性能が低下した場合に実施する異常時の温調制御について説明する。送風装置に異常が発生したか否かは、例えば、消費電力、電流、ファンの回転数等を検出することによって判定することができる。   Referring to FIG. 13, when an abnormality occurs in the air blower corresponding to one of the first battery stack 120 </ b> A and the second battery stack 120 </ b> B and the battery cooling performance is deteriorated, the abnormality is performed. The temperature control will be described. Whether or not an abnormality has occurred in the blower can be determined, for example, by detecting power consumption, current, fan speed, and the like.

図13に図示する場合は、第1送風装置140Aによる送風が不可能である異常時を想定している。このとき制御装置は、第1送風装置140Aを制御することはできないが第2送風装置140Bを制御することにより電池パック1全体の電池冷却性能を確保しようとする。   In the case illustrated in FIG. 13, an abnormal time is assumed in which the air blowing by the first air blower 140A is impossible. At this time, the control device cannot control the first air blower 140A, but tries to ensure the battery cooling performance of the entire battery pack 1 by controlling the second air blower 140B.

具体的には、制御装置は、第1送風装置140Aと第2送風装置140Bのうち、第1送風装置140Aに異常が発生したと判定すると、第1電池スタック120Aについて電池冷却性能が正常に機能していないとみなす。この異常状態は、一方の電池スタックである第1電池スタック120Aに対応する第1送風装置140Aが送風する送風風量が正常時よりも低下したことになる。送風風量が正常時よりも低下した状態は、第1送風装置140Aが停止して全く送風できない場合も含むものである。   Specifically, when the control device determines that an abnormality has occurred in the first air blowing device 140A out of the first air blowing device 140A and the second air blowing device 140B, the battery cooling performance functions normally for the first battery stack 120A. Consider it not. This abnormal state means that the amount of air blown by the first air blower 140A corresponding to the first battery stack 120A, which is one battery stack, is lower than normal. The state in which the amount of blown air is lower than normal includes the case where the first blower 140A stops and cannot blow air at all.

制御装置は、第2送風装置140Bによって送風される風量が正常時よりも増加するように第2送風装置140Bを制御する。これにより、第2循環通路130Bを循環する空気の流量は、第1電池スタック120Aの電池間通路134を通過する空気の流量よりも相対的に大きくなる。   The control device controls the second air blower 140B so that the amount of air blown by the second air blower 140B is increased as compared with the normal time. Thereby, the flow rate of the air circulating through the second circulation passage 130B is relatively larger than the flow rate of the air passing through the inter-battery passage 134 of the first battery stack 120A.

この処理によれば、第2送風装置140Bによる送風風量F2によって、第1送風装置140Aから第1電池スタック120Aへ流れる空気の流れが生じ、第1電池スタック120Aの電池間通路134を流出した空気は、天壁側通路133に流出する。天壁側通路133では、第2循環通路130Bを循環する空気(図13図示の太線)が混合するため、第1電池スタック120Aと熱交換して温度上昇した空気を冷却することができる。第2内部フィン150B等での放熱により冷却した空気との混合により天壁側通路133で冷却された空気は、さらに第1内部フィン150A等で放熱して温度低下する。温度低下した空気は、第2送風装置140Bの吹き出し風とともに側壁側通路131に流入し、第2内部フィン150Bを経由して天壁側通路133に至る。天壁側通路133に流入した空気は、第1電池スタック120Aの電池間通路134を流出してきた空気と合流して、一部が側壁側通路132に流入して第1内部フィン150A等で放熱する。空気の残部は、第2電池スタック120Bの電池間通路134を通過するときに単電池121から吸熱し、第2送風装置140Bを経て、第2内部フィン150B等で放熱して冷却される。   According to this process, the flow of air flowing from the first blower 140A to the first battery stack 120A is generated by the blown air volume F2 by the second blower 140B, and the air that has flowed out of the inter-battery passage 134 of the first battery stack 120A. Flows out to the ceiling wall side passage 133. In the ceiling wall side passage 133, the air (thick line in FIG. 13) circulating through the second circulation passage 130B is mixed, so that the air whose temperature has increased by heat exchange with the first battery stack 120A can be cooled. The air cooled in the top wall side passage 133 by mixing with the air cooled by the heat radiation at the second internal fin 150B etc. further radiates heat at the first internal fin 150A etc. and decreases in temperature. The temperature-decreased air flows into the side wall side passage 131 together with the blown air from the second blower 140B, and reaches the top wall side passage 133 via the second internal fin 150B. The air that flows into the top wall side passage 133 merges with the air that flows out through the inter-battery passage 134 of the first battery stack 120A, and part of the air flows into the side wall side passage 132 to radiate heat by the first internal fins 150A and the like. To do. The remaining part of the air absorbs heat from the unit cells 121 when passing through the inter-battery passage 134 of the second battery stack 120B, passes through the second blower 140B, and is radiated and cooled by the second internal fins 150B and the like.

このように、第1内部フィン150Aを流れる空気は流量が小さいので、第1内部フィン150Aであまり放熱できない。しかしながら、流量が大きい第2内部フィン150Bを流れる空気は十分な放熱によって温度低下するため、天壁側通路133での混合により、第1電池スタック120Aへ供給される空気の温度を低下させることができる。したがって、第1電池スタック120Aにおける電池冷却性能を、このように温度低下された、第2送風装置140Bから送風される空気によって確保することができる。   Thus, since the air flowing through the first internal fin 150A has a small flow rate, the first internal fin 150A cannot radiate much heat. However, since the temperature of the air flowing through the second internal fin 150B having a large flow rate is lowered by sufficient heat dissipation, the temperature of the air supplied to the first battery stack 120A can be lowered by mixing in the top wall side passage 133. it can. Therefore, the battery cooling performance in the first battery stack 120A can be ensured by the air blown from the second blower 140B having the temperature lowered in this way.

一方、第2送風装置140Bによる送風が不可能である異常時の場合は、制御装置は、第2送風装置140Bを制御することはできないが第1送風装置140Aを制御することにより電池パック1全体の電池冷却性能を確保しようとする。   On the other hand, in the case of an abnormality in which air cannot be blown by the second blower 140B, the control device cannot control the second blower 140B, but the battery pack 1 as a whole by controlling the first blower 140A. Try to ensure battery cooling performance.

制御装置は、第2送風装置140Bに異常が発生したと判定すると、第2電池スタック120Bについて電池冷却性能が正常に機能していないとみなす。制御装置は、第1送風装置140Aによって送風される風量が正常時よりも増加するように第1送風装置140Aを制御する。これにより、第1循環通路130Aを循環する空気の流量は、第2電池スタック120Bの電池間通路134を通過する空気の流量よりも相対的に大きくなる。   When the control device determines that an abnormality has occurred in the second blower device 140B, the control device regards that the battery cooling performance is not functioning normally for the second battery stack 120B. The control device controls the first air blower 140A so that the amount of air blown by the first air blower 140A is increased compared to the normal time. Thereby, the flow rate of air circulating through the first circulation passage 130A is relatively larger than the flow rate of air passing through the inter-battery passage 134 of the second battery stack 120B.

この処理によれば、第1送風装置140Aによる送風風量F1によって、第2送風装置140Bから第2電池スタック120Bへ流れる空気の流れが生じ、第2電池スタック120Bの電池間通路134を流出した空気は、天壁側通路133に流出する。天壁側通路133では、第1循環通路130Aを循環する空気が混合するため、第2電池スタック120Bと熱交換して温度上昇した空気を冷却することができる。第1内部フィン150A等での放熱により冷却した空気との混合により天壁側通路133で冷却された空気は、さらに第2内部フィン150B等で放熱して温度低下する。温度低下した空気は、第1送風装置140Aの吹き出し風とともに側壁側通路132に流入し、第1内部フィン150Aを経由して天壁側通路133に至る。天壁側通路133に流入した空気は、第2電池スタック120Bの電池間通路134を流出してきた空気と合流して、一部が側壁側通路131に流入して第2内部フィン150B等で放熱する。空気の残部は、第1電池スタック120Aの電池間通路134を通過するときに単電池121から吸熱し、第1送風装置140Aを経て、第1内部フィン150A等で放熱して冷却される。   According to this process, the flow of air flowing from the second blower 140B to the second battery stack 120B is generated by the blown air volume F1 by the first blower 140A, and the air that has flowed out of the inter-battery passage 134 of the second battery stack 120B. Flows out to the ceiling wall side passage 133. In the ceiling wall side passage 133, the air circulating through the first circulation passage 130A is mixed, so that the air whose temperature has risen due to heat exchange with the second battery stack 120B can be cooled. The air cooled by the ceiling wall side passage 133 by mixing with the air cooled by the heat radiation by the first internal fin 150A or the like is further radiated by the second internal fin 150B or the like and the temperature is lowered. The temperature-decreased air flows into the side wall side passage 132 together with the blown air from the first blower 140A, and reaches the top wall side passage 133 via the first internal fin 150A. The air that has flowed into the top wall side passage 133 merges with the air that has flowed out through the inter-battery passage 134 of the second battery stack 120B, and part of the air flows into the side wall side passage 131 to radiate heat through the second internal fins 150B or the like. To do. The remaining part of the air absorbs heat from the unit cells 121 when passing through the inter-battery passage 134 of the first battery stack 120A, passes through the first blower 140A, and is radiated and cooled by the first internal fins 150A and the like.

このように、第2内部フィン150Bを流れる空気は流量が小さいので、第2内部フィン150Bであまり放熱できない。しかしながら、流量が大きい第1内部フィン150Aを流れる空気は十分な放熱によって温度低下するため、天壁側通路133での混合により、第2電池スタック120Bへ供給される空気の温度を低下させることができる。したがって、第2電池スタック120Bにおける電池冷却性能をこのように温度低下された、第1送風装置140Aから送風される空気によって確保することができる。   Thus, since the air flowing through the second internal fin 150B has a small flow rate, the second internal fin 150B cannot radiate much heat. However, since the temperature of the air flowing through the first internal fin 150A having a large flow rate is lowered by sufficient heat dissipation, the temperature of the air supplied to the second battery stack 120B can be lowered by mixing in the top wall side passage 133. it can. Therefore, the battery cooling performance in the second battery stack 120B can be ensured by the air blown from the first blower 140A having the temperature lowered in this way.

また、一方の電池スタックに対応する送風装置が送風する送風風量が意に反して低下した場合とは、送風装置の実際の回転数が、送風装置の停止に相当する所定の回転数よりも低い場合としてもよい。この判定方法によれば、送風装置が停止している異常状態を確実に検出可能な電池パック1を提供できる。   Moreover, when the air flow rate which the air blower corresponding to one battery stack blows unexpectedly falls, the actual rotational speed of an air blower is lower than the predetermined rotational speed equivalent to a stop of an air blower. It may be a case. According to this determination method, it is possible to provide the battery pack 1 that can reliably detect the abnormal state in which the blower is stopped.

第3実施形態の電池パック1によれば、制御装置は、一方の電池スタック120に対応する送風装置が停止した場合に、他方の電池スタック120に対応する送風装置を、送風風量が正常時の風量よりも増加するように制御する。この制御により、他方の電池スタック120に対応する送風装置から流出した空気を第1電池スタック120A及び第2電池スタック120Bのそれぞれに供給する。この電池パック1によれば、正常である方の送風装置の冷却性能を活用して、第1電池スタック120A及び第2電池スタック120Bの両方を冷却できる。これにより、異常が発生した方の電池スタックの冷却性能が著しく低下することなく、さらに電池パック全体において電池温度の大きなばらつきが発生することも回避することができる。   According to the battery pack 1 of 3rd Embodiment, when the air blower corresponding to one battery stack 120 stops, the control device changes the air blower corresponding to the other battery stack 120 when the air flow rate is normal. Control to increase more than the air volume. By this control, air that has flowed out from the blower corresponding to the other battery stack 120 is supplied to each of the first battery stack 120A and the second battery stack 120B. According to this battery pack 1, both the first battery stack 120A and the second battery stack 120B can be cooled by utilizing the cooling performance of the normal blower. Thereby, the cooling performance of the battery stack in which an abnormality has occurred is not significantly reduced, and it is also possible to avoid the occurrence of large variations in battery temperature throughout the battery pack.

(第4実施形態)
第4実施形態では、第1実施形態に対して他の形態である異常時の温度調節制御について図14を参照して説明する。図14において、第1実施形態の図面中と同一符号を付した構成要素は、同様の構成であり同様の作用効果を奏するものである。ここでは、第1実施形態との相違点のみ以下に説明する。
(Fourth embodiment)
In the fourth embodiment, temperature adjustment control at the time of abnormality, which is another form of the first embodiment, will be described with reference to FIG. In FIG. 14, components denoted by the same reference numerals as those in the drawing of the first embodiment have the same configuration and the same operational effects. Here, only differences from the first embodiment will be described below.

図14に図示する筐体110の内部に形成される第1循環通路130Aと第2循環通路130Bは、天壁側通路133のみで連通する構成である。つまり、第4実施形態の電池パックは、第1実施形態と異なり、第1送風装置140A及び第2送風装置140Bのそれぞれの吹出し口143cが側壁側通路132、側壁側通路132だけに直結されている構成である。   The first circulation passage 130 </ b> A and the second circulation passage 130 </ b> B formed inside the housing 110 illustrated in FIG. 14 are configured to communicate with each other only through the top wall side passage 133. That is, in the battery pack of the fourth embodiment, unlike the first embodiment, the outlets 143c of the first air blower 140A and the second air blower 140B are directly connected only to the side wall side passage 132 and the side wall side passage 132, respectively. It is the composition which is.

第4実施形態の電池パックでは、第1実施形態で図11を参照して説明した異常時の温度調節制御と同様の制御を行う。異常時の温度調節制御では、図14に示すように、第1送風装置140Aを流出した風量F1の第1循環通路130Aを循環する空気と、第2送風装置140Bを流出した風量F2の第2循環通路130Bを循環する空気は、天壁側通路133でのみ混合する。   In the battery pack of the fourth embodiment, the same control as the temperature adjustment control at the time of abnormality described in the first embodiment with reference to FIG. 11 is performed. In the temperature control at the time of abnormality, as shown in FIG. 14, the air circulating through the first circulation passage 130A of the air volume F1 flowing out of the first blower 140A and the second of the air volume F2 flowing out of the second fan 140B. The air circulating in the circulation passage 130B is mixed only in the ceiling wall side passage 133.

(第5実施形態)
第5実施形態では、第1実施形態の電池パック1の他の形態である電池パック101について図15〜図17を参照して説明する。各図において、第1実施形態の図面中と同一符号を付した構成要素は、同様の構成要素であり、同様の作用効果を奏するものである。以下、第1実施形態と相違する内容について説明する。
(Fifth embodiment)
In the fifth embodiment, a battery pack 101 which is another form of the battery pack 1 of the first embodiment will be described with reference to FIGS. 15 to 17. In each figure, the component which attached | subjected the same code | symbol as drawing of 1st Embodiment is a similar component, and there exists the same effect. Hereinafter, content different from the first embodiment will be described.

電池パック101は、電池パック1に対して、左右方向に並ぶ2個の電池スタックのそれぞれに対応する第1底壁側通路135Aと第2底壁側通路135Bとが互いに連通する連通通路8を備える点が相違する。電池パック101は、この構成上の相違に伴い、異常時の温度調節制御の処理手順、及び筐体110の内部における空気流通経路が相違する。   The battery pack 101 has a communication passage 8 in which the first bottom wall side passage 135 </ b> A and the second bottom wall side passage 135 </ b> B corresponding to each of the two battery stacks arranged in the left-right direction communicate with the battery pack 1. The point to prepare is different. The battery pack 101 is different in the processing procedure of the temperature adjustment control at the time of abnormality and the air flow path inside the housing 110 due to the difference in configuration.

図15に示すように、第2の梁104の内面と底壁112とで囲まれる内側空間は、一方側である車両右側にある第1底壁側通路135Aと他方側である車両左側にある第2底壁側通路135Bとを連絡する連通通路8を構成する。第2の梁104には、図15に図示するように、第2の梁104の両側の位置する第1底壁側通路135A及び第2底壁側通路135Bに面する第2の梁104の側壁のそれぞれを貫通する貫通穴104aが設けられている。前述の内側空間は、各貫通穴104aによって第1底壁側通路135A及び第2底壁側通路135Bに繋がることで連通通路8を構成する。したがって、連通通路8は、電池スタックの下方に位置する二つの底壁側通路135の一部として機能する。   As shown in FIG. 15, the inner space surrounded by the inner surface of the second beam 104 and the bottom wall 112 is on the first bottom wall side passage 135A on the right side of the vehicle on one side and on the left side of the vehicle on the other side. A communication passage 8 is formed to communicate with the second bottom wall side passage 135B. As shown in FIG. 15, the second beam 104 includes the second beam 104 facing the first bottom wall side passage 135 </ b> A and the second bottom wall side passage 135 </ b> B located on both sides of the second beam 104. A through hole 104a penetrating each of the side walls is provided. The aforementioned inner space constitutes the communication passage 8 by being connected to the first bottom wall side passage 135A and the second bottom wall side passage 135B by the respective through holes 104a. Accordingly, the communication passage 8 functions as a part of the two bottom wall side passages 135 located below the battery stack.

この連通通路8を備えることにより、車両の左右に並ぶ二つの底壁側通路135を互いに連通可能な状態にできるので、電池間通路134よりも下流に位置する底壁側通路135の通路断面積を大きく形成でき、流通抵抗を低減することができる。   By providing this communication passage 8, the two bottom wall side passages 135 arranged on the left and right sides of the vehicle can communicate with each other, so that the cross-sectional area of the bottom wall side passage 135 positioned downstream of the inter-battery passage 134 is provided. The flow resistance can be reduced.

さらに、各第1の梁3と各電池スタック120の下端部1211との間には、電池スタック120の電池積層方向長さ全体にわたって設けられる弾性変形可能な帯状のシール部材7が設けられる。この帯状のシール部材7は、第2の梁4と各電池スタック120の下端部1211との間にもそれぞれ1個ずつ設けられる。各シール部材7は、弾性変形することで電池スタック120及び各梁3、4に対する密着性を高め、流体が出入りしないように側壁側通路と底壁側通路とを分離することに寄与する。シール部材7は、天然ゴム、合成ゴム、各種のパッキン材料等により形成することができる。   Further, between each first beam 3 and the lower end portion 1211 of each battery stack 120, an elastically deformable belt-like seal member 7 provided over the entire length of the battery stack 120 in the battery stacking direction is provided. One strip-shaped seal member 7 is also provided between the second beam 4 and the lower end portion 1211 of each battery stack 120. Each seal member 7 is elastically deformed, thereby improving adhesion to the battery stack 120 and the beams 3 and 4 and contributing to separating the side wall side passage and the bottom wall side passage so that fluid does not enter and exit. The seal member 7 can be formed of natural rubber, synthetic rubber, various packing materials, or the like.

このように電池パック101は、第1の梁3及び第2の梁4と各電池スタック120との間に流体の流通を阻止するシール部材7を備える。第1の梁3と電池スタック120との間に介在するシール部材7は、側壁側通路132や側壁側通路131から第1底壁側通路135Aや第2底壁側通路135Bへの流体の流入を阻止する。この構成によれば、側壁側通路132、側壁側通路131のそれぞれと第1底壁側通路135A、第2底壁側通路135Bとの間の流体の流通が確実に遮断されるため、各側壁側通路から各底壁側通路に空気が漏れ出ることを防止できる。したがって、各循環通路130を循環する空気が余分な場所に分流して流通抵抗が増大することを抑制できるので、空気の流速低下を抑制して筐体放熱の効率化を図ることができる。   As described above, the battery pack 101 includes the seal member 7 that prevents the fluid from flowing between the first beam 3 and the second beam 4 and each battery stack 120. The seal member 7 interposed between the first beam 3 and the battery stack 120 allows fluid to flow from the side wall side passage 132 or the side wall side passage 131 to the first bottom wall side passage 135A or the second bottom wall side passage 135B. To prevent. According to this configuration, the flow of fluid between each of the side wall-side passage 132 and the side wall-side passage 131 and the first bottom wall-side passage 135A and the second bottom wall-side passage 135B is reliably blocked. Air can be prevented from leaking from the side passages to the bottom wall side passages. Therefore, since it is possible to suppress the air flowing through each circulation passage 130 from being shunted to an extra place and increasing the flow resistance, it is possible to suppress the decrease in the flow velocity of the air and to increase the efficiency of heat dissipation from the casing.

以上の構成によれば、電池パック101は、図16、図17に図示するように模式化できる第1循環通路130A、第2循環通路130B及び連通通路8を有する。図16及び図17を参照しながら、第1電池スタック120Aと第2電池スタック120Bのうち、いずれかの電池スタックについて電池冷却性能が低下した場合に、電池パック101が実施する異常時の温調制御について説明する。   According to the above configuration, the battery pack 101 includes the first circulation passage 130A, the second circulation passage 130B, and the communication passage 8 that can be schematically illustrated as illustrated in FIGS. With reference to FIG. 16 and FIG. 17, when the battery cooling performance of any one of the first battery stack 120A and the second battery stack 120B is deteriorated, the temperature control at the time of abnormality performed by the battery pack 101 is performed. Control will be described.

第1実施形態で図10を参照した説明と同様に、第1電池スタック120Aについて電池冷却性能が低下状態である場合、制御装置は、第1送風装置140Aによって送風される風量F1が正常時よりも減少するように第1送風装置140Aを制御する。これにより、図17に太線で示した第2循環通路130Bを循環する空気の風量は、図17に細線で示した第1循環通路130Aを循環する空気の風量よりも相対的に大きくなる。この制御に加えて、制御装置は、第2送風装置140Bによって送風される風量F2が正常時よりも増加するように第2送風装置140Bを制御することが好ましい。   Similarly to the description with reference to FIG. 10 in the first embodiment, when the battery cooling performance of the first battery stack 120A is in a lowered state, the control device determines that the air volume F1 blown by the first blower 140A is normal. 140 A of 1st air blowers is controlled so that it may also decrease. As a result, the air volume circulating through the second circulation passage 130B indicated by the thick line in FIG. 17 is relatively larger than the air volume circulating through the first circulation path 130A indicated by the thin line in FIG. In addition to this control, it is preferable that the control device controls the second blower 140B so that the air volume F2 blown by the second blower 140B is increased as compared with the normal time.

この処理によれば、第2送風装置140Bを流出した空気は、二つの循環する経路を流れるようになる。一つは、第2内部フィン150B、天壁側通路133、第2電池スタック120B及び第2送風装置140Bに流れる経路である。もう一つは、天壁側通路133から第1電池スタック120A、第1底壁側通路135A、連通通路8、第2底壁側通路135B及び第2送風装置140Bに流れる経路である。このような経路が形成できることにより、第2送風装置140Bからの増大させた風量の送風空気を両方の電池スタックに供給できる。すなわち、電池冷却性能が低下した状態の第1電池スタック120Aを冷却してきた空気を第2内部フィン150Bで十分に放熱させることができる。したがって、第2内部フィン150B等からの放熱によって相対的に低温である第2送風装置140Bからの冷却風を両方の電池スタックに供給することで、第1電池スタック120Aの冷却を継続的に実施することが可能になる。   According to this process, the air that has flowed out of the second blower 140B flows through two circulating paths. One is a path that flows to the second internal fin 150B, the top wall side passage 133, the second battery stack 120B, and the second blower 140B. The other is a path that flows from the top wall side path 133 to the first battery stack 120A, the first bottom wall side path 135A, the communication path 8, the second bottom wall side path 135B, and the second blower 140B. Since such a path can be formed, it is possible to supply an increased amount of blown air from the second blower 140B to both battery stacks. That is, the air that has cooled the first battery stack 120A in a state where the battery cooling performance is lowered can be sufficiently dissipated by the second internal fins 150B. Therefore, the cooling of the first battery stack 120A is continuously performed by supplying the cooling air from the second air blowing device 140B having a relatively low temperature to both battery stacks by the heat radiation from the second internal fins 150B and the like. It becomes possible to do.

一方、第2内部フィン150Bの目詰まり等により、第2電池スタック120Bについて電池冷却性能が低下状態である場合、制御装置は、第2送風装置140Bによって送風される風量F2が正常時よりも減少するように第2送風装置140Bを制御する。これにより、第1循環通路130Aを循環する空気の風量は、第2循環通路130Bを循環する空気の風量よりも相対的に大きくなる。この制御に加えて、制御装置は、第1送風装置140Aによって送風される風量F1が正常時よりも増加するように第1送風装置140Aを制御することが好ましい。   On the other hand, when the battery cooling performance of the second battery stack 120B is in a lowered state due to clogging of the second internal fins 150B, etc., the control device reduces the air volume F2 blown by the second blower 140B from the normal time. The second air blower 140B is controlled to do so. Thereby, the air volume of the air circulating through the first circulation path 130A is relatively larger than the air volume of the air circulating through the second circulation path 130B. In addition to this control, it is preferable that the control device controls the first air blower 140A so that the air volume F1 blown by the first air blower 140A is increased as compared with the normal time.

この処理によれば、第1送風装置140Aを流出した空気は、二つの循環する経路を流れるようになる。一つは、第1内部フィン150A、天壁側通路133、第1電池スタック120A及び第1送風装置140Aに流れる経路である。もう一つは、天壁側通路133から第2電池スタック120B、第2底壁側通路135B、連通通路8、第1底壁側通路135A及び第1送風装置140Aに流れる経路である。このような経路が形成できることにより、第1送風装置140Aからの増大させた風量の送風空気を両方の電池スタックに供給できる。すなわち、電池冷却性能が低下した状態の第2電池スタック120Bを冷却してきた空気を第1内部フィン150Aで十分に放熱させることができる。したがって、第1内部フィン150A等からの放熱によって相対的に低温である第1送風装置140Aからの冷却風を両方の電池スタックに供給することで、第2電池スタック120Bの冷却を継続的に実施することが可能になる。   According to this process, the air that has flowed out of the first blower 140A flows through two circulating paths. One is a path that flows to the first internal fin 150A, the top wall side passage 133, the first battery stack 120A, and the first blower 140A. The other is a route that flows from the top wall side passage 133 to the second battery stack 120B, the second bottom wall side passage 135B, the communication passage 8, the first bottom wall side passage 135A, and the first blower 140A. Since such a path can be formed, it is possible to supply the blast air of the increased air volume from the first blower 140A to both battery stacks. That is, the air that has cooled the second battery stack 120B in a state where the battery cooling performance is lowered can be sufficiently dissipated by the first internal fins 150A. Therefore, the cooling of the second battery stack 120B is continuously performed by supplying the cooling air from the first blower 140A having a relatively low temperature to both battery stacks by the heat radiation from the first internal fins 150A and the like. It becomes possible to do.

連通通路8は、第1循環通路130Aにおいて空気が第1電池スタック120Aと熱交換後、第1送風装置140Aに流入するまでに流れる通路と、第2循環通路130Bにおいて空気が第2電池スタック120Bと熱交換後、第2送風装置140Bに流入するまでに流れる通路と、を連絡する。電池パック101によれば、相対的に送風風量が大きくなるように制御された送風装置に、筐体110内のすべての電池スタックを冷却した後の空気を連通通路8を通じて吸入させることが可能になる。したがって、電池パック101は、特定の電池スタックについて電池冷却性能が低下したとしても、電池パック全体の電池冷却性能の確保を図ることができる。   The communication passage 8 includes a passage through which air flows in the first circulation passage 130A until the air flows into the first air blower 140A after heat exchange with the first battery stack 120A, and air passes through the second battery stack 120B in the second circulation passage 130B. After the heat exchange, the passage that flows until it flows into the second blower 140B is communicated. According to the battery pack 101, it is possible to cause the air blower controlled so as to have a relatively large air flow to suck air after cooling all the battery stacks in the housing 110 through the communication passage 8. Become. Therefore, the battery pack 101 can ensure the battery cooling performance of the entire battery pack even if the battery cooling performance of the specific battery stack is lowered.

(第6実施形態)
第6実施形態では、第5実施形態に対して他の形態である異常時の温度調節制御について図18及び図19を参照して説明する。図18及び図19において、前述の実施形態の図面中と同一符号を付した構成要素やステップは、同様の構成や処理であり、同様の作用効果を奏するものである。
(Sixth embodiment)
In the sixth embodiment, temperature adjustment control at the time of abnormality, which is another form with respect to the fifth embodiment, will be described with reference to FIGS. 18 and 19. In FIG. 18 and FIG. 19, the components and steps denoted by the same reference numerals as those in the drawings of the above-described embodiment are the same configurations and processes, and have the same operational effects.

図18及び図19を参照して、第1電池スタック120Aと第2電池スタック120Bのうち、いずれかの電池スタックに対応する送風装置に異常が発生し、電池冷却性能が低下した場合に実施する異常時の温調制御について説明する。   Referring to FIG. 18 and FIG. 19, it is performed when an abnormality occurs in the air blower corresponding to one of the first battery stack 120 </ b> A and the second battery stack 120 </ b> B and the battery cooling performance is deteriorated. The temperature control at the time of abnormality will be described.

図18に図示する場合は、第1送風装置140Aによる送風が不可能である異常時を想定している。この場合、制御装置は、第1送風装置140Aを制御することはできないが第2送風装置140Bを制御することにより電池パック1全体の電池冷却性能を確保しようとする。   In the case illustrated in FIG. 18, an abnormal time is assumed in which the air blowing by the first air blower 140A is impossible. In this case, the control device cannot control the first blower 140A, but tries to ensure the battery cooling performance of the entire battery pack 1 by controlling the second blower 140B.

異常時の温調制御について、その処理手順は、図19のフローチャートにしたがって実行される。図19に示すように、制御装置は、ステップ100で第1送風装置140Aに異常が発生しているか否かを判定する。ステップ100やステップ120では、送風装置に異常が発生したか否かは、例えば、消費電力、電流、ファンの回転数等を検出し、その検出値が正常状態の値とはかけ離れた値である場合に異常発生であると判定する。   Regarding the temperature control at the time of abnormality, the processing procedure is executed according to the flowchart of FIG. As shown in FIG. 19, the control device determines in step 100 whether or not an abnormality has occurred in the first air blower 140A. In Step 100 and Step 120, whether or not an abnormality has occurred in the blower is, for example, detected power consumption, current, fan speed, etc., and the detected value is far from the normal value. It is determined that an abnormality has occurred.

ステップ100で第1送風装置140Aに異常が発生していると判定すると、次にステップ110で制御装置は、第2送風装置140Bによって送風される風量が正常時よりも増加するように第2送風装置140Bを制御し、本フローチャートを終了する。   If it is determined in step 100 that an abnormality has occurred in the first blower 140A, then in step 110, the control device causes the second blower so that the amount of air blown by the second blower 140B increases from the normal time. The apparatus 140B is controlled and this flowchart is complete | finished.

これにより、第2循環通路130Bを循環する空気の流量は、第1内部フィン150Aを通過する空気の流量よりも相対的に大きくなる。この処理によれば、第2送風装置140Bによる増大した送風風量F2によって、複数の循環経路が形成できる。第1は、第2送風装置140B、第2内部フィン150B、天壁側通路133及び第2電池スタック120Bを順に経由して第2送風装置140Bに戻る経路である。第2は、天壁側通路133で第1の経路から分岐して、第1電池スタック120A、連通通路8を順に経由して第2送風装置140Bに戻る経路である。第3は、第2送風装置140B、第1送風装置140A、及び連通通路8を順に経由して第2送風装置140Bに戻る経路である。第4は、第2送風装置140B、第1内部フィン150A、天壁側通路133、第1電池スタック120A、連通通路8を順に経由して第2送風装置140Bに戻る経路である。   Thereby, the flow rate of the air circulating through the second circulation passage 130B becomes relatively larger than the flow rate of the air passing through the first internal fin 150A. According to this process, a plurality of circulation paths can be formed by the increased blowing air amount F2 by the second blowing device 140B. The first is a path that returns to the second blower 140B through the second blower 140B, the second internal fin 150B, the ceiling wall side passage 133, and the second battery stack 120B in order. The second is a path that branches from the first path in the ceiling wall side passage 133 and returns to the second blower 140B through the first battery stack 120A and the communication path 8 in order. 3rd is a path | route which returns to the 2nd air blower 140B through the 2nd air blower 140B, the 1st air blower 140A, and the communicating path 8 in order. The fourth is a path that returns to the second blower 140B through the second blower 140B, the first internal fin 150A, the top wall side passage 133, the first battery stack 120A, and the communication passage 8 in this order.

このように第1電池スタック120A及び第2電池スタック120Bを流出した空気は、第2送風装置140Bに吸入され、一部が第1内部フィン150Aで放熱し、大部分が第2内部フィン150Bで放熱するので、十分に冷却されることになる。   The air that has flowed out of the first battery stack 120A and the second battery stack 120B in this manner is sucked into the second blower 140B, part of which is radiated by the first internal fins 150A, and most of the air is discharged by the second internal fins 150B. Since it dissipates heat, it is sufficiently cooled.

天壁側通路133では、第2循環通路130Bを循環する空気(図18図示の太線)と第1内部フィン150Aを通過してきた空気とが混合するため、第1内部フィン150Aを通過後の空気を冷却することができる。第1内部フィン150Aを流れる空気は流量が小さいので、第1内部フィン150Aであまり放熱できないが、流量が大きい第2内部フィン150Bを流れる空気は十分な放熱によって温度低下する。このため、天壁側通路133での混合により、第1電池スタック120Aへ供給される空気の温度を低下させることができる。このように、第2送風装置140Bを流出した空気が各内部フィン、各電池スタックを経由して、第2送風装置140Bに集まる流れを形成することにより、第1電池スタック120Aにおける電池冷却性能を継続的に確保することができる。   In the ceiling wall side passage 133, the air circulating through the second circulation passage 130B (thick line in FIG. 18) and the air that has passed through the first internal fin 150A are mixed, so the air after passing through the first internal fin 150A. Can be cooled. Since the air flowing through the first internal fins 150A has a small flow rate, the first internal fins 150A cannot radiate much heat, but the air flowing through the second internal fins 150B having a large flow rate decreases in temperature due to sufficient heat dissipation. For this reason, the temperature of the air supplied to the first battery stack 120 </ b> A can be lowered by mixing in the top wall side passage 133. In this way, by forming a flow in which the air that has flowed out of the second air blower 140B gathers in the second air blower 140B via each internal fin and each battery stack, the battery cooling performance in the first battery stack 120A is improved. It can be secured continuously.

一方、ステップ100で第1送風装置140Aに異常が発生していないと判定すると、次にステップ120で第2送風装置140Bに異常が発生しているか否かを判定する。   On the other hand, if it is determined in step 100 that no abnormality has occurred in the first blower 140A, it is next determined in step 120 whether or not an abnormality has occurred in the second blower 140B.

ステップ120で第2送風装置140Bに異常が発生していると判定すると、次にステップ125で制御装置は、第1送風装置140Aによって送風される風量が正常時よりも増加するように第1送風装置140Aを制御し、本フローチャートを終了する。   If it is determined in step 120 that an abnormality has occurred in the second air blower 140B, then in step 125, the control device causes the first air blow so that the amount of air blown by the first air blower 140A increases from the normal time. The apparatus 140A is controlled, and this flowchart ends.

これにより、第1循環通路130Aを循環する空気の流量は、第2内部フィン150Bを通過する空気の流量よりも相対的に大きくなる。この処理によれば、第1送風装置140Aによる増大した送風風量F1によって、複数の循環経路が形成できる。第1は、第1送風装置140A、第1内部フィン150A、天壁側通路133及び第1電池スタック120Aを順に経由して第1送風装置140Aに戻る経路である。第2は、天壁側通路133で第1の経路から分岐して、第2電池スタック120B、連通通路8を順に経由して第1送風装置140Aに戻る経路である。第3は、第1送風装置140A、第2送風装置140B、及び連通通路8を順に経由して第1送風装置140Aに戻る経路である。第4は、第1送風装置140A、第2内部フィン150B、天壁側通路133、第2電池スタック120B、連通通路8を順に経由して第1送風装置140Aに戻る経路である。   Thereby, the flow rate of the air circulating through the first circulation passage 130A is relatively larger than the flow rate of the air passing through the second internal fin 150B. According to this process, a plurality of circulation paths can be formed by the increased air flow F1 from the first air blower 140A. The first is a path that returns to the first air blower 140A through the first air blower 140A, the first internal fin 150A, the top wall side passage 133, and the first battery stack 120A in this order. The second is a path that branches from the first path in the ceiling wall side passage 133 and returns to the first air blower 140A through the second battery stack 120B and the communication path 8 in order. 3rd is a path | route which returns to 140 A of 1st air blowers through the 1st air blower 140A, the 2nd air blower 140B, and the communicating path 8 in order. The fourth is a path that returns to the first air blower 140A through the first air blower 140A, the second internal fin 150B, the top wall side passage 133, the second battery stack 120B, and the communication passage 8 in this order.

このように第1電池スタック120A及び第2電池スタック120Bを流出した空気は、第1送風装置140Aに吸入され、一部が第2内部フィン150Bで放熱し、大部分が第1内部フィン150Aで放熱するので、十分に冷却されることになる。   Thus, the air that has flowed out of the first battery stack 120A and the second battery stack 120B is sucked into the first blower 140A, part of it is radiated by the second internal fins 150B, and most of the air is discharged by the first internal fins 150A. Since it dissipates heat, it is sufficiently cooled.

天壁側通路133では、第1循環通路130Aを循環する空気と第2内部フィン150Bを通過してきた空気とが混合するため、第2内部フィン150Bを通過後の空気を冷却することができる。第2内部フィン150Bを流れる空気は流量が小さいので、第2内部フィン150Bであまり放熱できないが、流量が大きい第1内部フィン150Aを流れる空気は十分な放熱によって温度低下する。このため、天壁側通路133での混合により、第2電池スタック120Bへ供給される空気の温度を低下させることができる。このように、第1送風装置140Aを流出した空気が各内部フィン、各電池スタックを経由して、第1送風装置140Aに集まる流れを形成することにより、第2電池スタック120Bにおける電池冷却性能を継続的に確保することができる。   In the ceiling wall side passage 133, the air circulating through the first circulation passage 130A and the air passing through the second internal fin 150B are mixed, so that the air after passing through the second internal fin 150B can be cooled. Since the air flowing through the second internal fin 150B has a small flow rate, the second internal fin 150B cannot radiate much heat, but the temperature of the air flowing through the first internal fin 150A having a large flow rate is lowered by sufficient heat dissipation. For this reason, the temperature of the air supplied to the 2nd battery stack 120B can be reduced by the mixing in the ceiling wall side channel | path 133. FIG. In this way, by forming a flow in which the air that has flowed out of the first air blower 140A gathers in the first air blower 140A via each internal fin and each battery stack, the battery cooling performance in the second battery stack 120B is improved. It can be secured continuously.

第6実施形態の電池パックによれば、制御装置は、一方の電池スタック120に対応する送風装置が停止した場合に、他方の電池スタック120に対応する送風装置を、送風風量が正常時の風量よりも増加するように制御する。この制御により、他方の電池スタック120に対応する送風装置から流出した空気を連通通路8を介して第1電池スタック120A及び第2電池スタック120Bのそれぞれに供給することができる。したがって、第6実施形態によれば、異常が発生した方の電池スタックの冷却性能が著しく低下することなく、さらに電池パック全体において電池温度の大きなばらつきが発生することも回避することができる。   According to the battery pack of the sixth embodiment, when the air blower corresponding to one battery stack 120 stops, the control device changes the air blower corresponding to the other battery stack 120 to the air flow when the air flow rate is normal. Control to increase more. By this control, the air that has flowed out from the blower corresponding to the other battery stack 120 can be supplied to each of the first battery stack 120A and the second battery stack 120B via the communication passage 8. Therefore, according to the sixth embodiment, the cooling performance of the battery stack in which an abnormality has occurred is not significantly reduced, and it is also possible to avoid the occurrence of large variations in battery temperature throughout the battery pack.

(第7実施形態)
第7実施形態では、第5実施形態に対して他の形態である異常時の温度調節制御について図20を参照して説明する。図20において、第5実施形態の図面中と同一符号を付した構成要素は、同様の構成であり同様の作用効果を奏するものである。ここでは、第5実施形態との相違点のみ以下に説明する。
(Seventh embodiment)
In the seventh embodiment, temperature adjustment control at the time of abnormality, which is another form of the fifth embodiment, will be described with reference to FIG. In FIG. 20, the component which attached | subjected the same code | symbol as drawing of 5th Embodiment has the same structure, and there exists the same effect. Here, only differences from the fifth embodiment will be described below.

図20に図示する筐体110の内部に形成される第1循環通路130Aと第2循環通路130Bは、天壁側通路133と連通通路8とでのみで連通する構成である。つまり、第7実施形態の電池パックは、第5実施形態と異なり、第1送風装置140A及び第2送風装置140Bのそれぞれの吹出し口143cが側壁側通路132、側壁側通路132だけに直結されている構成である。   The first circulation passage 130 </ b> A and the second circulation passage 130 </ b> B formed inside the housing 110 illustrated in FIG. 20 are configured to communicate with each other only through the top wall side passage 133 and the communication passage 8. That is, in the battery pack of the seventh embodiment, unlike the fifth embodiment, the outlets 143c of the first blower 140A and the second blower 140B are directly connected only to the side wall side passage 132 and the side wall side passage 132, respectively. It is the composition which is.

第7実施形態の電池パックでは、第5実施形態で図17を参照して説明した異常時の温度調節制御と同様の制御を行う。異常時の温度調節制御では、第1送風装置140Aを流出した風量F1の第1循環通路130Aを循環する空気と、第2送風装置140Bを流出した風量F2の第2循環通路130Bを循環する空気は、天壁側通路133と連通通路8でのみ混合する。   In the battery pack of the seventh embodiment, the same control as the temperature adjustment control at the time of abnormality described in the fifth embodiment with reference to FIG. 17 is performed. In the temperature adjustment control at the time of abnormality, the air circulating through the first circulation passage 130A of the air volume F1 flowing out of the first blower 140A and the air circulating through the second circulation passage 130B of the air volume F2 flowing out of the second air blowing device 140B. Is mixed only in the ceiling wall side passage 133 and the communication passage 8.

(第8実施形態)
第8実施形態では、第7実施形態に開示する筐体110の内部の通路構成において、いずれかの電池スタックに対応する送風装置に異常が発生して電池冷却性能が低下した場合に実施する異常時の温調制御について説明する。
(Eighth embodiment)
In the eighth embodiment, in the passage configuration inside the housing 110 disclosed in the seventh embodiment, an abnormality that is performed when an abnormality occurs in the air blower corresponding to any of the battery stacks and the battery cooling performance is deteriorated. The temperature control at the time will be described.

図21に図示する場合は、第1送風装置140Aによる送風が不可能である異常時を想定している。この場合、制御装置は、第1送風装置140Aを制御することはできないが第2送風装置140Bを制御することにより電池パック1全体の電池冷却性能を確保する。   In the case illustrated in FIG. 21, an abnormal time is assumed in which the air blowing by the first air blower 140A is impossible. In this case, the control device cannot control the first blower 140A, but ensures the battery cooling performance of the entire battery pack 1 by controlling the second blower 140B.

制御装置は、第1送風装置140Aに異常が発生していると判定すると、第2送風装置140Bによって送風される風量が正常時よりも増加するように第2送風装置140Bを制御する。これにより、第2送風装置140Bによる増大した送風風量F2によって、複数の循環経路が形成できる。第1は、第2送風装置140B、第2内部フィン150B、天壁側通路133及び第2電池スタック120Bを順に経由して第2送風装置140Bに戻る通常の第2循環通路130Bにしたがう経路である。第2は、途中の天壁側通路133で第1の経路から分岐して、第1電池スタック120A、連通通路8を順に経由して第2送風装置140Bに戻る経路である。   If it determines with abnormality having generate | occur | produced in 1st air blower 140A, a control apparatus will control 2nd air blower 140B so that the air volume ventilated by 2nd air blower 140B may increase rather than the normal time. Thereby, a plurality of circulation paths can be formed by the increased air flow F2 by the second blower 140B. The first is a path according to a normal second circulation passage 130B that returns to the second blower 140B through the second blower 140B, the second internal fin 150B, the top wall side passage 133, and the second battery stack 120B in order. is there. The second is a path that branches from the first path in the midway ceiling wall path 133 and returns to the second blower 140B through the first battery stack 120A and the communication path 8 in order.

すなわち、天壁側通路133は、第1電池スタック120Aの電池間通路134と第2電池スタック120Bの電池間通路134との両方に連通する。このため、第1電池スタック120A及び第2電池スタック120Bを流出した空気は、ともに第2送風装置140Bに吸入され、すべて第2内部フィン150Bで放熱して冷却されることになる。このように、流量が大きい空気がすべて第2内部フィン150Bを通過することによって、十分な放熱を促して電池パック全体を効率的、かつ継続的に冷却することができる。   That is, the top wall side passage 133 communicates with both the inter-battery passage 134 of the first battery stack 120A and the inter-battery passage 134 of the second battery stack 120B. For this reason, the air that flows out of the first battery stack 120A and the second battery stack 120B is both sucked into the second blower 140B, and is all radiated and cooled by the second internal fins 150B. As described above, all the air having a large flow rate passes through the second internal fins 150 </ b> B, so that sufficient heat dissipation is promoted, and the entire battery pack can be efficiently and continuously cooled.

一方、制御装置は、第2送風装置140Bに異常が発生していると判定すると、第1送風装置140Aによって送風される風量が正常時よりも増加するように第1送風装置140Aを制御する。これにより、第1送風装置140Aによる増大した送風風量F1によって、複数の循環経路が形成できる。第1は、第1送風装置140A、第1内部フィン150A、天壁側通路133及び第1電池スタック120Aを順に経由して第1送風装置140Aに戻る通常の第1循環通路130Aにしたがう経路である。第2は、途中の天壁側通路133で第1の経路から分岐して、第2電池スタック120B、連通通路8を順に経由して第1送風装置140Aに戻る経路である。   On the other hand, when the control device determines that an abnormality has occurred in the second air blower 140B, the control device controls the first air blower 140A so that the amount of air blown by the first air blower 140A is increased compared to the normal time. Thereby, a plurality of circulation paths can be formed by the increased air flow F1 by the first air blower 140A. The first is a path according to a normal first circulation passage 130A that returns to the first blower 140A through the first blower 140A, the first internal fins 150A, the ceiling wall side passage 133, and the first battery stack 120A in this order. is there. The second is a path that branches off from the first path at the midway ceiling wall path 133 and returns to the first blower 140A via the second battery stack 120B and the communication path 8 in order.

この場合も、天壁側通路133は、第1電池スタック120Aの電池間通路134と第2電池スタック120Bの電池間通路134との両方に連通する。このため、第1電池スタック120A及び第2電池スタック120Bを流出した空気は、ともに第1送風装置140Aに吸入され、すべて第1内部フィン150Aで放熱して冷却されることになる。このように、流量が大きい空気がすべて第1内部フィン150Aを通過することによって、十分な放熱を促して電池パック全体を効率的、かつ継続的に冷却することができる。   Also in this case, the top wall side passage 133 communicates with both the inter-battery passage 134 of the first battery stack 120A and the inter-battery passage 134 of the second battery stack 120B. For this reason, the air that has flowed out of the first battery stack 120A and the second battery stack 120B is both sucked into the first blower 140A, and is all radiated and cooled by the first internal fins 150A. Thus, all the air with a large flow rate passes through the first internal fins 150A, so that sufficient heat dissipation can be promoted to cool the entire battery pack efficiently and continuously.

(他の実施形態)
この明細書の開示は、例示された実施形態に制限されない。開示は、例示された実施形態と、それらに基づく当業者による変形態様を包含する。例えば、開示は、実施形態において示された部品、要素の組み合わせに限定されず、種々変形して実施することが可能である。開示は、多様な組み合わせによって実施可能である。開示は、実施形態に追加可能な追加的な部分をもつことができる。開示は、実施形態の部品、要素が省略されたものを包含する。開示は、ひとつの実施形態と他の実施形態との間における部品、要素の置き換え、または組み合わせを包含する。開示される技術的範囲は、実施形態の記載に限定されない。開示される技術的範囲は、特許請求の範囲の記載によって示され、さらに特許請求の範囲の記載と均等の意味及び範囲内での全ての変更を含むものと解されるべきである。
(Other embodiments)
The disclosure of this specification is not limited to the illustrated embodiments. The disclosure encompasses the illustrated embodiments and variations by those skilled in the art based thereon. For example, the disclosure is not limited to the combination of components and elements shown in the embodiments, and various modifications can be made. The disclosure can be implemented in various combinations. The disclosure may have additional parts that can be added to the embodiments. The disclosure includes those in which the components and elements of the embodiment are omitted. The disclosure encompasses parts, element replacements, or combinations between one embodiment and another. The technical scope disclosed is not limited to the description of the embodiments. The technical scope disclosed is indicated by the description of the claims, and should be understood to include all modifications within the meaning and scope equivalent to the description of the claims.

前述の実施形態では、電池パックに含まれる電池スタックは、2個であるが、この個数に限定されない。すなわち、電池パックに含まれる電池スタックは、筐体110の内部において、少なくとも第1電池スタック120Aと第2電池スタック120Bとを備えるものである。   In the above-described embodiment, there are two battery stacks included in the battery pack, but the number is not limited to this. That is, the battery stack included in the battery pack includes at least the first battery stack 120A and the second battery stack 120B inside the housing 110.

前述の実施形態では、筐体110は6面体、直方体を形成するが、この明細書の実施形態に含まれる筐体はこの形状に限定されない。例えば、筐体110は、6面を超える多面体であってもよいし、少なくとも一つの面が曲面を含む面であってもよい。また、筐体110は、天壁が湾曲面を含むドーム状に形成されてもよいし、筐体の縦断面形状が台形状を呈するものでもよい。また、筐体110において天壁は、底壁に対して対向する位置関係にある壁であり、その形状は平面、曲面のいずれの形状を含むものでもよい。また、筐体110において側壁は、底壁に対して交差する方向に底壁から延びる壁であってもよいし、天壁に対して交差する方向に天壁から延びる壁であってもよい。筐体110における天壁と側壁との境界部は角部を形成してもよいし、曲面を形成してもよい。筐体110における底壁と側壁との境界部は角部を形成してもよいし、曲面を形成してもよい。   In the above-described embodiment, the housing 110 forms a hexahedron and a rectangular parallelepiped, but the housing included in the embodiment of this specification is not limited to this shape. For example, the casing 110 may be a polyhedron having more than six surfaces, or at least one surface may include a curved surface. Moreover, the housing | casing 110 may be formed in the dome shape in which a top wall contains a curved surface, and the longitudinal cross-sectional shape of a housing | casing may exhibit trapezoid shape. Further, in the case 110, the top wall is a wall having a positional relationship facing the bottom wall, and the shape thereof may include either a flat surface or a curved surface. Further, in the case 110, the side wall may be a wall extending from the bottom wall in a direction intersecting the bottom wall, or may be a wall extending from the top wall in a direction intersecting the top wall. The boundary between the top wall and the side wall of the housing 110 may form a corner or a curved surface. The boundary between the bottom wall and the side wall in the housing 110 may form a corner or a curved surface.

前述の実施形態において、梁は3本用いるものとしたが、電池スタックの個数によっては梁を2本や4本以上としてもよい。   In the above-described embodiment, three beams are used. However, two beams or four or more beams may be used depending on the number of battery stacks.

前述の実施形態において、各梁3,4は、中空の部材、中実の部材のいずれで構成してもよい。また、各梁3,4は、底壁とは別部材を底壁や側壁に固定して一体に形成してもよいし、底壁を筐体内に突出する凸部を形成することで各梁3,4を形成するようにしてもよい。   In the above-described embodiment, each of the beams 3 and 4 may be a hollow member or a solid member. In addition, each beam 3, 4 may be formed integrally by fixing a member different from the bottom wall to the bottom wall or side wall, or by forming a convex portion that projects the bottom wall into the housing. 3 and 4 may be formed.

また、電池パックが備える各送風装置のファンには、シロッコファンの他、軸流式ファン、ターボファン等を用いることができる。   In addition to a sirocco fan, an axial flow fan, a turbo fan, or the like can be used as the fan of each blower provided in the battery pack.

前述の実施形態における内部フィン及び外部フィンは、筐体110の壁に対して別体の部品であるフィンを固定したものでもよいし、筐体110の壁の一部をフィン形状に形成してフィンとするものでもよい。   The inner fin and the outer fin in the above-described embodiment may be those in which fins that are separate parts are fixed to the wall of the housing 110, or a part of the wall of the housing 110 is formed in a fin shape. It may be a fin.

100…電池管理ユニット(制御装置)
110…筐体、 113…側壁(第2壁)、 114…側壁(第2壁)
120A…第1電池スタック、 120B…第2電池スタック
121…単電池
130A…第1循環通路、 130B…第2循環通路
133…天壁側通路(混合通路)
140A…第1送風装置、 140B…第2送風装置
100: Battery management unit (control device)
110: Housing, 113: Side wall (second wall), 114: Side wall (second wall)
DESCRIPTION OF SYMBOLS 120A ... 1st battery stack, 120B ... 2nd battery stack 121 ... Single cell 130A ... 1st circulation path, 130B ... 2nd circulation path 133 ... Top wall side path (mixing path)
140A ... 1st air blower, 140B ... 2nd air blower

Claims (9)

それぞれ複数の単電池(121)の集合体である第1電池スタック(120A)及び第2電池スタック(120B)と、
前記第1電池スタックを冷却する流体を送風する第1送風装置(140A)と、
前記第2電池スタックを冷却する流体を送風する第2送風装置(140B)と、
前記第1電池スタック及び前記第2電池スタックと前記第1送風装置及び前記第2送風装置とを少なくとも内部に収容する筐体(110)と、
前記筐体の内部に形成される流体の循環通路であって、前記第1送風装置から流出した流体が前記筐体の内壁面に接触してから前記第1電池スタックと熱交換した後、前記第1送風装置に流入する一連の流体の流通経路をなす第1循環通路(130A)と、
前記筐体の内部に形成される流体の循環通路であって、前記第2送風装置から流出した流体が前記筐体の内壁面に接触してから前記第2電池スタックと熱交換した後、前記第2送風装置に流入する一連の流体の流通経路をなす第2循環通路(130B)と、
前記第1送風装置及び前記第2送風装置のそれぞれを制御する制御装置(100)と、
を備え、
前記第1循環通路は、前記第1送風装置から流出した流体が前記筐体の第1壁(114)に接触してから混合通路(133)に流入し、前記混合通路を流出してから前記第1電池スタックと熱交換した後、前記第1送風装置に流入する一連の経路を構成し、
前記第2循環通路は、前記第2送風装置から流出した流体が前記筐体の第2壁(113)に接触してから前記混合通路に流入し、前記混合通路を流出してから前記第2電池スタックと熱交換した後、前記第2送風装置に流入する一連の経路を構成し、
前記制御装置は、前記第1電池スタック及び前記第2電池スタックのうち、一方の電池スタックについて電池冷却性能が正常時よりも低下した場合に、他方の電池スタックに対応する送風装置の方が前記一方の電池スタックに対応する送風装置と比べて送風する風量が大きくなるように、前記第1送風装置及び前記第2送風装置の少なくとも一つを制御する電池パック。
A first battery stack (120A) and a second battery stack (120B), each of which is an aggregate of a plurality of single cells (121);
A first blower (140A) for blowing a fluid for cooling the first battery stack;
A second blower (140B) for blowing a fluid for cooling the second battery stack;
A housing (110) that houses at least the first battery stack, the second battery stack, the first blower, and the second blower;
A fluid circulation path formed inside the housing, wherein the fluid that has flowed out of the first air blower contacts the inner wall surface of the housing and then exchanges heat with the first battery stack. A first circulation passage (130A) forming a flow path for a series of fluids flowing into the first blower;
A fluid circulation passage formed inside the housing, and after the fluid flowing out of the second blower device contacts the inner wall surface of the housing and exchanges heat with the second battery stack, A second circulation passage (130B) that forms a flow path for a series of fluids flowing into the second blower;
A control device (100) for controlling each of the first blower and the second blower;
With
The first circulation passage flows into the mixing passage (133) after the fluid flowing out from the first blower contacts the first wall (114) of the housing, and flows out of the mixing passage after the fluid flows out of the mixing passage. After exchanging heat with the first battery stack, configure a series of paths that flow into the first blower,
The second circulation passage enters the mixing passage after the fluid flowing out from the second blower comes into contact with the second wall (113) of the housing, and flows out from the mixing passage before the second circulation passage. After exchanging heat with the battery stack, configure a series of paths that flow into the second blower,
When the battery cooling performance of one of the first battery stack and the second battery stack is lower than that of the normal battery stack, the control device has the air blower corresponding to the other battery stack. A battery pack that controls at least one of the first blower and the second blower so that the amount of air blown is larger than that of a blower corresponding to one battery stack.
前記制御装置は、前記一方の電池スタックについて電池冷却性能が正常時よりも低下した場合に、前記一方の電池スタックに対応する送風装置を、送風風量が正常時の送風風量よりも低下するように制御する請求項1に記載の電池パック。   When the battery cooling performance of the one battery stack is lower than that in the normal state, the control device causes the air blower corresponding to the one battery stack to be lower than the air flow rate in the normal state. The battery pack according to claim 1 to be controlled. 前記制御装置は、さらに前記他方の電池スタックに対応する前記送風装置を、送風風量が正常時の送風風量よりも増加するように制御する請求項2に記載の電池パック。   3. The battery pack according to claim 2, wherein the control device further controls the air blower corresponding to the other battery stack so that the air flow rate is larger than a normal air flow rate. 前記一方の電池スタックについて電池冷却性能が正常時よりも低下した場合とは、前記一方の電池スタックに対応する送風装置が送風する送風風量が意に反して低下した場合、または前記一方の電池スタックに供給される流体が循環する循環通路における流通抵抗が増大した場合である請求項1に記載の電池パック。   The case where the battery cooling performance of the one battery stack is lower than normal means that the amount of air blown by the blower corresponding to the one battery stack is unexpectedly reduced, or the one battery stack The battery pack according to claim 1, wherein the flow resistance in the circulation passage through which the fluid supplied to the battery increases is increased. 前記第1循環通路及び前記第2循環通路のそれぞれには、前記筐体の壁を介した外部への放熱を促進する熱交換促進部(150A,150B,151A,151B)が設けられ、
前記制御装置は、一方の前記熱交換促進部に近い位置にある電池スタックの温度と他方の前記熱交換促進部に近い位置にある電池スタックの温度との温度差が、予め定めた判定値以上である場合に、温度の高い方の電池スタックについて前記電池冷却性能が正常時よりも低下したと判断する請求項1から請求項4のいずれか一項に記載の電池パック。
Each of the first circulation passage and the second circulation passage is provided with a heat exchange promoting portion (150A, 150B, 151A, 151B) that promotes heat radiation to the outside through the wall of the housing.
In the control device, a temperature difference between the temperature of the battery stack located near one of the heat exchange promoting portions and the temperature of the battery stack located near the other heat exchange promoting portion is equal to or greater than a predetermined determination value. 5, the battery pack according to claim 1, wherein the battery cooling performance of the battery stack having a higher temperature is determined to be lower than normal.
前記一方の電池スタックに対応する前記送風装置が送風する送風風量が意に反して低下した場合とは、前記送風装置に与えた回転数変更指令に対して、前記送風装置における回転数変更完了時間が所定の変更完了時間よりも長い場合である請求項4に記載の電池パック。   The case where the amount of blown air blown by the blower corresponding to the one battery stack is unintentionally reduced means that the rotational speed change completion time in the blower is in response to the rotational speed change command given to the blower The battery pack according to claim 4, wherein is longer than a predetermined change completion time. 前記一方の電池スタックに対応する前記送風装置が送風する送風風量が意に反して低下した場合とは、前記送風装置の実際の回転数が前記送風装置の停止に相当する所定の回転数よりも低い場合である請求項4に記載の電池パック。   When the amount of air blown by the air blower corresponding to the one battery stack is unexpectedly reduced, the actual rotational speed of the air blower is higher than a predetermined rotational speed corresponding to the stop of the air blower. The battery pack according to claim 4, wherein the battery pack is low. 前記制御装置は、前記第1電池スタック及び前記第2電池スタックのうち、前記一方の電池スタックに対応する送風装置が停止した場合に、前記他方の電池スタックに対応する送風装置を、送風風量が正常時の風量よりも増加するように制御して、前記他方の電池スタックに対応する前記送風装置から流出した流体を前記第1電池スタック及び前記第2電池スタックのそれぞれに供給する請求項1に記載の電池パック。   When the air blower corresponding to the one battery stack of the first battery stack and the second battery stack is stopped, the control device causes the air blower corresponding to the other battery stack to The control according to claim 1, wherein the fluid flowing out from the blower device corresponding to the other battery stack is supplied to each of the first battery stack and the second battery stack by controlling so as to increase the air volume at a normal time. The battery pack described. 前記第1循環通路において流体が前記第1電池スタックと熱交換した後、前記第1送風装置に流入するまでに流れる通路と、前記第2循環通路において流体が前記第2電池スタックと熱交換した後、前記第2送風装置に流入するまでに流れる通路と、を連絡する連通通路(8)を備える請求項1から請求項8のいずれか一項に記載の電池パック。   After the fluid exchanges heat with the first battery stack in the first circulation passage, the fluid exchanges heat with the second battery stack in the second circulation passage until the fluid flows into the first blower. The battery pack according to any one of claims 1 to 8, further comprising a communication passage (8) that communicates with a passage that flows until the air flows into the second blower afterwards.
JP2015175916A 2015-09-07 2015-09-07 Battery pack Active JP6507951B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015175916A JP6507951B2 (en) 2015-09-07 2015-09-07 Battery pack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015175916A JP6507951B2 (en) 2015-09-07 2015-09-07 Battery pack

Publications (2)

Publication Number Publication Date
JP2017054604A true JP2017054604A (en) 2017-03-16
JP6507951B2 JP6507951B2 (en) 2019-05-08

Family

ID=58317049

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015175916A Active JP6507951B2 (en) 2015-09-07 2015-09-07 Battery pack

Country Status (1)

Country Link
JP (1) JP6507951B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108511649A (en) * 2018-04-19 2018-09-07 合肥工业大学 The circulating cooling system and the battery case of a kind of high wall carbon fiber battery case
CN110626159A (en) * 2018-06-22 2019-12-31 株式会社斯巴鲁 Battery pack storage structure
WO2022029446A1 (en) * 2020-08-06 2022-02-10 Hyperdrive Innovation Limited Battery pack

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030087148A1 (en) * 2001-11-06 2003-05-08 Panasonic Ev Energy Co., Ltd. Method and apparatus for controlling cooling and detecting abnormality in battery pack system
JP2003307194A (en) * 2002-04-15 2003-10-31 Oki Electric Ind Co Ltd Abnormality detecting device for fan rotation speed
US20100239892A1 (en) * 2009-03-20 2010-09-23 Dennis Kramer Heavy vehicle battery pack with improved cooling scheme
JP2013020497A (en) * 2011-07-12 2013-01-31 Mitsubishi Motors Corp Temperature control device for battery pack
US20130122338A1 (en) * 2011-11-14 2013-05-16 Honda Motor Co., Ltd. Electric vehicle battery pack
JP2014203609A (en) * 2013-04-03 2014-10-27 矢崎総業株式会社 Cooling device
EP2797158A1 (en) * 2012-02-08 2014-10-29 Hitachi, Ltd. Cell system
US20150037632A1 (en) * 2013-08-01 2015-02-05 Denso Corporation Battery cooling system
JP2015028885A (en) * 2013-07-30 2015-02-12 株式会社デンソー Battery cooling device
JP2015032429A (en) * 2013-08-01 2015-02-16 株式会社デンソー Battery cooling device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030087148A1 (en) * 2001-11-06 2003-05-08 Panasonic Ev Energy Co., Ltd. Method and apparatus for controlling cooling and detecting abnormality in battery pack system
JP2003142167A (en) * 2001-11-06 2003-05-16 Panasonic Ev Energy Co Ltd Method and device for controlling cooling and sensing failure of battery pack system
JP2003307194A (en) * 2002-04-15 2003-10-31 Oki Electric Ind Co Ltd Abnormality detecting device for fan rotation speed
US20100239892A1 (en) * 2009-03-20 2010-09-23 Dennis Kramer Heavy vehicle battery pack with improved cooling scheme
JP2013020497A (en) * 2011-07-12 2013-01-31 Mitsubishi Motors Corp Temperature control device for battery pack
US20130122338A1 (en) * 2011-11-14 2013-05-16 Honda Motor Co., Ltd. Electric vehicle battery pack
JP2013105618A (en) * 2011-11-14 2013-05-30 Honda Motor Co Ltd Battery pack for electric vehicle
EP2797158A1 (en) * 2012-02-08 2014-10-29 Hitachi, Ltd. Cell system
JP2014203609A (en) * 2013-04-03 2014-10-27 矢崎総業株式会社 Cooling device
JP2015028885A (en) * 2013-07-30 2015-02-12 株式会社デンソー Battery cooling device
US20150037632A1 (en) * 2013-08-01 2015-02-05 Denso Corporation Battery cooling system
JP2015032429A (en) * 2013-08-01 2015-02-16 株式会社デンソー Battery cooling device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108511649A (en) * 2018-04-19 2018-09-07 合肥工业大学 The circulating cooling system and the battery case of a kind of high wall carbon fiber battery case
CN110626159A (en) * 2018-06-22 2019-12-31 株式会社斯巴鲁 Battery pack storage structure
CN110626159B (en) * 2018-06-22 2023-08-11 株式会社斯巴鲁 Battery pack storage structure
WO2022029446A1 (en) * 2020-08-06 2022-02-10 Hyperdrive Innovation Limited Battery pack

Also Published As

Publication number Publication date
JP6507951B2 (en) 2019-05-08

Similar Documents

Publication Publication Date Title
JP6384423B2 (en) Battery pack
JP6330757B2 (en) Battery pack
JP6390550B2 (en) Battery pack
JP6308188B2 (en) Battery pack
JP6256439B2 (en) Battery pack
CN107851868B (en) Battery pack
JP6405912B2 (en) Battery pack
JP6390548B2 (en) Battery pack
JP6507951B2 (en) Battery pack
JP6507920B2 (en) Battery pack
JP6040843B2 (en) Battery cooling device
JP6493166B2 (en) Battery pack
JP5835394B2 (en) Battery cooling device
JP6458709B2 (en) Battery pack
JP6507921B2 (en) Battery pack
JP2017076481A (en) Battery pack
JP6443298B2 (en) Battery pack
JP6519443B2 (en) Battery pack
KR100627312B1 (en) Secondary Battery Module

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171114

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180606

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180731

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180925

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190318

R151 Written notification of patent or utility model registration

Ref document number: 6507951

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250