[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2016046989A - Voltage converter control device - Google Patents

Voltage converter control device Download PDF

Info

Publication number
JP2016046989A
JP2016046989A JP2014171787A JP2014171787A JP2016046989A JP 2016046989 A JP2016046989 A JP 2016046989A JP 2014171787 A JP2014171787 A JP 2014171787A JP 2014171787 A JP2014171787 A JP 2014171787A JP 2016046989 A JP2016046989 A JP 2016046989A
Authority
JP
Japan
Prior art keywords
duty
voltage converter
voltage
power running
regeneration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014171787A
Other languages
Japanese (ja)
Other versions
JP6299526B2 (en
Inventor
寛文 加古
Hirobumi Kako
寛文 加古
裕一 甲木
Yuichi Katsuki
裕一 甲木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2014171787A priority Critical patent/JP6299526B2/en
Publication of JP2016046989A publication Critical patent/JP2016046989A/en
Application granted granted Critical
Publication of JP6299526B2 publication Critical patent/JP6299526B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Dc-Dc Converters (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a voltage converter control device capable of detecting an abnormality in a voltage converter without being influenced by error or variations in a voltage sensor.SOLUTION: An abnormality detection part of the voltage converter control device detects the abnormality in the voltage converter by comparing (S15) a differential (Δ integration term) between values of integration terms at power running and regenerative times, the differential being obtained by feedback calculation using a boost control part, with a sum (α+β) of dead time equivalent duties at the power running and regenerative times. Other values than a dead time equivalent component are common for the integration terms at the power running and regenerative times, such that influences caused by error or variations in the voltage sensor are cancelled by calculating the differential between the values of the integration terms at the power running and regenerative times. The abnormality in the voltage converter therefore can be detected without being influenced by the error or variations in the voltage sensor by comparing the differential with the sum of the dead time equivalent duties. Thus, the occurrence of erroneous detection or omission in abnormality detection can be prevented.SELECTED DRAWING: Figure 9

Description

本発明は、電圧コンバータを制御する電圧コンバータ制御装置に関する。   The present invention relates to a voltage converter control device that controls a voltage converter.

従来、バッテリと負荷回路との間に設けられ、高電位側及び低電位側のスイッチング素子の動作により電圧を変換する電圧コンバータの制御装置において、入力電圧センサ又は出力電圧センサの異常を検出する装置が知られている。   2. Description of the Related Art Conventionally, a device for detecting an abnormality of an input voltage sensor or an output voltage sensor in a control device for a voltage converter that is provided between a battery and a load circuit and converts a voltage by operation of switching elements on a high potential side and a low potential side. It has been known.

例えば特許文献1に開示された装置は、入力電圧センサが検出したバッテリ電圧V1、出力電圧センサが検出したインバータ入力電圧V2、及び、電圧コンバータのdutyに基づいて、差電圧ΔV(=V1−V2×duty)を算出し、この差電圧ΔVが異常判定閾値より大きいとき、いずれかの電圧センサが故障していると判定する。   For example, the apparatus disclosed in Patent Document 1 is based on the battery voltage V1 detected by the input voltage sensor, the inverter input voltage V2 detected by the output voltage sensor, and the duty of the voltage converter, and the difference voltage ΔV (= V1−V2). Xduty) is calculated, and when this difference voltage ΔV is larger than the abnormality determination threshold, it is determined that any one of the voltage sensors has failed.

特許第3632657号公報Japanese Patent No. 3632657

特許文献1の従来技術では、入力電圧センサ及び出力電圧センサの検出値を両方用いて異常検出を行っているため、二つの電圧センサの誤差やばらつきを考慮しようとすると、異常判定値の設定が困難になる場合がある。その結果、電圧センサが正常であるのに誤って異常と判定する誤検出や、異常を検出し損なう検出漏れが発生するおそれがある。   In the prior art of Patent Document 1, since abnormality detection is performed using both the detection values of the input voltage sensor and the output voltage sensor, if an error or variation between the two voltage sensors is taken into consideration, the abnormality determination value is set. It can be difficult. As a result, there is a possibility that false detection that erroneously determines that the voltage sensor is normal but that it is abnormal or detection omission that fails to detect the abnormality may occur.

本発明はこのような点に鑑みて創作されたものであり、その目的は、電圧センサの誤差やばらつきの影響を受けることなく、電圧コンバータの異常を検出可能な電圧コンバータ制御装置を提供することにある。   The present invention was created in view of the above points, and an object of the present invention is to provide a voltage converter control device capable of detecting an abnormality of a voltage converter without being affected by errors or variations in the voltage sensor. It is in.

本発明の電圧コンバータ制御装置は、バッテリと負荷回路との間に設けられ、電気エネルギーを蓄積及び放出可能なリアクトル、並びに、交互にオンオフすることでリアクトルにおける電気エネルギーの蓄積及び放出を繰り返す高電位側スイッチング素子及び低電位側スイッチング素子を含む電圧変換部を備え、バッテリ側の入力電圧(Vin)と負荷回路側の出力電圧(Vsys)とを力行方向及び回生方向に変換する電圧コンバータに適用される。   The voltage converter control device of the present invention is provided between a battery and a load circuit, and is a reactor capable of storing and discharging electric energy, and a high potential that repeatedly stores and discharges electric energy in the reactor by alternately turning on and off. The voltage converter includes a side switching element and a low potential side switching element, and is applied to a voltage converter that converts an input voltage (Vin) on the battery side and an output voltage (Vsys) on the load circuit side in a power running direction and a regeneration direction. The

この電圧コンバータ制御装置は、昇圧制御部及び異常検出部を備える。
電圧制御部は、高電位側スイッチング素子のスイッチング周期に対するオン時間比率であるdutyについて、出力電圧に対する目標値である出力電圧指令値(Vsys*)と入力電圧との比に基づいて演算される「フィードフォワード項」、並びに、出力電圧の検出値を出力電圧指令値に一致させるように演算される比例項及び積分項を含む「フィードバック項」を加減算し、電圧変換部へ出力する
異常検出部は、力行時及び回生時において所定の積分期間で算出される積分項の差分値と、力行時及び回生時において電圧変換部のデッドタイム設定値及びキャリア周期に基づいて算出される「デッドタイム相当duty」の絶対値の和とを比較することで、電圧コンバータの異常を検出する
The voltage converter control device includes a boost control unit and an abnormality detection unit.
The voltage control unit calculates the duty, which is the on-time ratio with respect to the switching cycle of the high potential side switching element, based on the ratio between the output voltage command value (Vsys * ) that is the target value for the output voltage and the input voltage. Addition and subtraction of “feed-forward term” and “feedback term” including proportional term and integral term calculated so that the detected value of output voltage matches the output voltage command value, and output to the voltage converter , Calculated based on the difference value of the integral term calculated in a predetermined integration period at the time of power running and regeneration, the dead time setting value of the voltage conversion unit and the carrier cycle at the time of power running and regeneration, and “duty equivalent to dead time” Is detected by comparing the absolute value of "

本発明では、出力電圧が指令値通りとなるように修正するフィードバック制御により、電圧センサの誤差やばらつきの影響は積分項に吸収される。ここで、力行時及び回生時の積分項は、デッドタイム分以外の値が共通であるため、力行時及び回生時の積分項の差分値を算出することにより、電圧センサの誤差やばらつきの影響が打ち消される。したがって、その差分値をデッドタイム相当dutyの絶対値の和と比較することで、電圧センサの誤差やばらつきの影響を受けることなく、電圧コンバータの異常を検出することができる。よって、異常検出における誤検出や検出漏れの発生を防止することができる。   In the present invention, the influence of the error or variation of the voltage sensor is absorbed in the integral term by feedback control that corrects the output voltage to be the command value. Here, since the integral term for power running and regeneration is the same value other than the dead time, calculating the differential value of the integral term for power running and regeneration can affect the error and variation of the voltage sensor. Will be countered. Therefore, by comparing the difference value with the sum of the absolute values of the dead time equivalent duty, the abnormality of the voltage converter can be detected without being affected by the error or variation of the voltage sensor. Therefore, it is possible to prevent erroneous detection and detection omission in abnormality detection.

好ましくは、本発明の異常検出部は、電圧コンバータの異常を検出したとき、さらに、「力行時における積分項の値と力行時におけるデッドタイム相当dutyとの比較」、又は、「回生時における積分項の値と回生時におけるデッドタイム相当dutyとの比較」の少なくとも一方を実行する。より好ましくは、それらをいずれも実行する。   Preferably, when detecting an abnormality of the voltage converter, the abnormality detection unit of the present invention further includes “comparison between the value of the integral term during power running and the dead time equivalent duty during power running” or “integration during regeneration”. At least one of “comparison between term value and dead time equivalent duty during regeneration” is executed. More preferably, both are performed.

これにより、故障した部品が、力行に使われる部品、回生に使われる部品、又は、力行及び回生の両方で使われる部品のいずれであるかを大別することができる。そして、本発明が、例えばハイブリッド自動車のモータジェネレータを駆動するシステムに使用される場合、フェールセーフの観点から、正常に動作する部品だけを使用して、力行異常のときは回生動作のみを行い、回生異常のときは力行動作のみを行うことで、異常時における退避走行を実現することができる。また、電圧コンバータの修理にあたり大別された該当部品のみを交換すればよいため、全ての部品を交換する場合に比べて修理コストを低減することができる。   Thereby, it is possible to roughly classify whether the failed part is a part used for powering, a part used for regeneration, or a part used for both powering and regeneration. And, for example, when the present invention is used in a system for driving a motor generator of a hybrid vehicle, from a fail-safe viewpoint, using only components that operate normally, and performing only regenerative operation when there is a power running abnormality, By performing only the power running operation when the regeneration is abnormal, it is possible to realize the retreat travel at the time of abnormality. Moreover, since it is only necessary to replace only the relevant parts when repairing the voltage converter, the repair cost can be reduced as compared with the case where all the parts are replaced.

本発明の実施形態による電圧コンバータ制御装置が適用されるシステムの概略構成図である。1 is a schematic configuration diagram of a system to which a voltage converter control device according to an embodiment of the present invention is applied. 本発明の実施形態による電圧コンバータ制御装置の制御ブロック図である。It is a control block diagram of the voltage converter control apparatus by embodiment of this invention. 力行時に電圧コンバータに流れる電流を示す模式図である。It is a schematic diagram which shows the electric current which flows into a voltage converter at the time of power running. 力行時のデッドタイムを説明するタイムチャートである。It is a time chart explaining the dead time at the time of power running. 回生時に電圧コンバータに流れる電流を示す模式図である。It is a schematic diagram which shows the electric current which flows into a voltage converter at the time of regeneration. 回生時のデッドタイムを説明するタイムチャートである。It is a time chart explaining the dead time at the time of regeneration. 力行/回生時の積分項の値と異常領域との関係を示す図である。It is a figure which shows the relationship between the value of the integral term at the time of power running / regeneration, and an abnormal area | region. 力行/回生時の指令dutyと実dutyとの関係を示す図である。It is a figure which shows the relationship between instruction | command duty at the time of power running / regeneration, and real duty. 本発明の第1実施形態による異常検出処理のフローチャートである。It is a flowchart of the abnormality detection process by 1st Embodiment of this invention. 本発明の第2実施形態による異常部位特定処理のフローチャートである。It is a flowchart of the abnormal region specific process by 2nd Embodiment of this invention.

以下、本発明による電圧コンバータ制御装置の実施形態を図面に基づいて説明する。
最初に、複数の実施形態に共通の構成について説明する。以下、「本実施形態」という場合、後述の第1、第2実施形態を包括する。本実施形態の電圧コンバータ制御装置は、例えば、ハイブリッド自動車や電気自動車の動力源であるモータジェネレータを駆動するシステムの電圧コンバータに適用される。
Embodiments of a voltage converter control device according to the present invention will be described below with reference to the drawings.
First, a configuration common to a plurality of embodiments will be described. Hereinafter, “the present embodiment” includes first and second embodiments described later. The voltage converter control device of the present embodiment is applied to, for example, a voltage converter of a system that drives a motor generator that is a power source of a hybrid vehicle or an electric vehicle.

[電圧コンバータの全体構成]
電圧コンバータを含むシステムの全体構成について、図1を参照して説明する。
図1に示すように、電圧コンバータ20は、バッテリ1と、モータジェネレータ8を駆動する「負荷回路」としてのインバータ7との間に設けられ、バッテリ1側の入力電圧Vinと、インバータ7側の出力電圧Vsysとを変換する装置である。特に本実施形態の電圧コンバータ20は、入力電圧Vinを昇圧してインバータ7に出力する昇圧コンバータである。
[Overall configuration of voltage converter]
The overall configuration of the system including the voltage converter will be described with reference to FIG.
As shown in FIG. 1, the voltage converter 20 is provided between the battery 1 and an inverter 7 as a “load circuit” that drives the motor generator 8, and the input voltage Vin on the battery 1 side and the inverter 7 side This is a device for converting the output voltage Vsys. In particular, the voltage converter 20 of the present embodiment is a boost converter that boosts the input voltage Vin and outputs the boosted voltage to the inverter 7.

先に、電圧コンバータ20の範囲外のシステム構成について説明する。
バッテリ1は、例えばニッケル水素またはリチウムイオン等の充放電可能な蓄電装置によって構成される直流電源である。電気二重層キャパシタ等もバッテリ1の一態様に含むものとする。
First, the system configuration outside the range of the voltage converter 20 will be described.
The battery 1 is a direct current power source configured by a chargeable / dischargeable power storage device such as nickel hydride or lithium ion. An electric double layer capacitor or the like is also included in one embodiment of the battery 1.

インバータ7は、ブリッジ接続される6つのスイッチング素子により構成され、電圧コンバータ20が生成したシステム電圧Vsysが印加される。インバータ7は、PWM制御や位相制御によって各相のスイッチング素子がオンオフされることにより、直流電力を三相交流電力に変換してモータジェネレータ8に供給する。
モータジェネレータ8は、例えば永久磁石式同期型の三相交流電動機である。モータジェネレータ8は、ハイブリッド自動車や電気自動車に搭載されるモータジェネレータ(図中、「MG」と記す。)であり、力行動作により変速機等を介して駆動輪を駆動するトルクを発生する電動機としての機能、及び、エンジンや駆動輪から伝達されるトルクを発電によってエネルギー回収する発電機としての機能を兼ね備える。
The inverter 7 is composed of six switching elements that are bridge-connected, and the system voltage Vsys generated by the voltage converter 20 is applied. The inverter 7 converts the DC power into three-phase AC power and supplies it to the motor generator 8 when the switching element of each phase is turned on / off by PWM control or phase control.
The motor generator 8 is, for example, a permanent magnet type synchronous three-phase AC motor. The motor generator 8 is a motor generator (denoted as “MG” in the figure) mounted on a hybrid vehicle or an electric vehicle, and is an electric motor that generates torque for driving drive wheels via a transmission or the like by a power running operation. And a function as a generator that recovers energy by power generation from torque transmitted from the engine and driving wheels.

車両制御回路40は、図示しないアクセル信号、ブレーキ信号、シフト信号、車速信号等の信号に基づき、モータジェネレータ8に対するトルク指令値を演算する。また、トルク指令値及びモータジェネレータ8の回転数に基づいて、電圧コンバータ20の出力電圧Vsysに対する目標値である出力電圧指令値Vsys*を演算し、電圧コンバータ制御装置50に指令する。 The vehicle control circuit 40 calculates a torque command value for the motor generator 8 based on signals such as an accelerator signal, a brake signal, a shift signal, and a vehicle speed signal (not shown). Further, based on the torque command value and the rotation speed of the motor generator 8, an output voltage command value Vsys * which is a target value for the output voltage Vsys of the voltage converter 20 is calculated and commanded to the voltage converter control device 50.

電圧コンバータ制御装置50は、電圧コンバータ20の入力電圧Vin、出力電圧Vsys、出力電圧指令値Vsys*等に基づいて、スイッチング素子23、24のスイッチング周期に対するオンオフ時間比率であるデューティ指令値を演算し、電圧コンバータ20の昇圧部22に出力する装置であり、詳細な構成については後述する。
なお、他の実施形態では、車両制御回路40が演算した出力電圧指令値Vsys*を電圧コンバータ制御装置50が取得するのでなく、電圧コンバータ制御装置50の内部で出力電圧指令値Vsys*を演算するようにしてもよい。
Based on the input voltage Vin, output voltage Vsys, output voltage command value Vsys *, and the like of the voltage converter 20, the voltage converter control device 50 calculates a duty command value that is an on / off time ratio with respect to the switching cycle of the switching elements 23 and 24. This is a device that outputs to the booster 22 of the voltage converter 20, and the detailed configuration will be described later.
In another embodiment, the output voltage command value Vsys * calculated by the vehicle control circuit 40 is not acquired by the voltage converter control device 50, but the output voltage command value Vsys * is calculated inside the voltage converter control device 50. You may do it.

次に、電圧コンバータ20の構成について説明する。電圧コンバータ20は、リアクトル21、及び、「電圧変換部」としての昇圧部22を含む。
リアクトル21は、電流の変化に伴って発生する誘起電圧による電気エネルギーを蓄積及び放出可能である。
Next, the configuration of the voltage converter 20 will be described. The voltage converter 20 includes a reactor 21 and a booster 22 as a “voltage converter”.
Reactor 21 can store and release electric energy due to an induced voltage generated with a change in current.

昇圧部22は、直列接続された2つのスイッチング素子23、24と、各スイッチング素子23、24に対して並列に接続された還流ダイオード25、26とを含む。高電位側スイッチング素子23は、リアクトル21の出力端である中間点Nとインバータ7の高電位ラインLpとの間に接続され、低電位側スイッチング素子24は、中間点Nとインバータ7の低電位ラインLgとの間に接続されている。還流ダイオード25、26は、低電位側から高電位側への電流を許容する向きに設けられている。   The step-up unit 22 includes two switching elements 23 and 24 connected in series, and freewheeling diodes 25 and 26 connected in parallel to the switching elements 23 and 24. The high potential side switching element 23 is connected between the intermediate point N that is the output end of the reactor 21 and the high potential line Lp of the inverter 7, and the low potential side switching element 24 is connected to the intermediate point N and the low potential of the inverter 7. It is connected between the line Lg. The free-wheeling diodes 25 and 26 are provided in a direction that allows current from the low potential side to the high potential side.

高電位側スイッチング素子23及び低電位側スイッチング素子24は、電圧コンバータ制御装置50からのデューティ指令により交互に、かつ相補的にオンオフする。
本明細書では、「高電位側スイッチング素子23のスイッチング周期に対するオン時間比率を示すオンデューティ指令値」を「duty」と定義する。以下、「duty」と英文字で記載する場合、「高電位側スイッチング素子23のオンデューティ指令値」を意味する。また、dutyは[%]単位でなく、0以上1以下の無次元数として定義する。
The high potential side switching element 23 and the low potential side switching element 24 are turned on and off alternately and complementarily in response to a duty command from the voltage converter controller 50.
In this specification, “on-duty command value indicating the on-time ratio with respect to the switching period of the high potential side switching element 23” is defined as “duty”. Hereinafter, when “duty” is written in English letters, it means “on-duty command value of the high potential side switching element 23”. Also, duty is defined as a dimensionless number between 0 and 1, not in [%] units.

仮にデッドタイムを無視すれば、低電位側スイッチング素子24のオンデューティ指令値は、「1−duty」と記載される。ただし、一般に、昇圧部22における高電位ラインLpと低電位ラインLgとの短絡を防止する目的で、両スイッチング素子23、24を同時にオフするデッドタイムが設定される。しかも、本発明では、デッドタイムを重要事項として扱うため、これを無視することは適切でない。そのため、図1では、参考記載という意味合いで、(duty)、(1−duty)のように括弧を付して記載する。   If the dead time is ignored, the on-duty command value of the low potential side switching element 24 is described as “1-duty”. However, in general, in order to prevent a short circuit between the high potential line Lp and the low potential line Lg in the boosting unit 22, a dead time for simultaneously turning off both the switching elements 23 and 24 is set. Moreover, in the present invention, since dead time is treated as an important matter, it is not appropriate to ignore it. Therefore, in FIG. 1, parentheses such as (duty) and (1-duty) are given in the sense of reference description.

力行時には、高電位側スイッチング素子23がオフで低電位側スイッチング素子24がオンのとき、バッテリ1からリアクトル21に電流が流れることによりエネルギーが蓄積される。また、高電位側スイッチング素子23がオンで低電位側スイッチング素子24がオフのとき、リアクトル21に蓄積されたエネルギーが放出されることにより、入力電圧Vinに誘起電圧が重畳された出力電圧Vsysがインバータ7側に出力される。   During power running, when the high-potential side switching element 23 is off and the low-potential side switching element 24 is on, energy is accumulated by a current flowing from the battery 1 to the reactor 21. When the high potential side switching element 23 is on and the low potential side switching element 24 is off, the energy accumulated in the reactor 21 is released, so that the output voltage Vsys in which the induced voltage is superimposed on the input voltage Vin is generated. It is output to the inverter 7 side.

回生時には、高電位側スイッチング素子23がオンで低電位側スイッチング素子24がオフのとき、インバータ7側の電力がバッテリ1に回生される。高電位側スイッチング素子23がオフで低電位側スイッチング素子24がオンのとき、インバータ7側からの回生は中断される。
力行時及び回生時において、電圧コンバータ制御装置50が演算したdutyに基づいて、スイッチング素子23、24がオンオフすることにより、電圧コンバータ20が変換する電圧が所望の値に制御される。
During regeneration, when the high potential side switching element 23 is on and the low potential side switching element 24 is off, the power on the inverter 7 side is regenerated to the battery 1. When the high potential side switching element 23 is off and the low potential side switching element 24 is on, regeneration from the inverter 7 side is interrupted.
During power running and regeneration, the voltage converted by the voltage converter 20 is controlled to a desired value by turning on and off the switching elements 23 and 24 based on the duty calculated by the voltage converter control device 50.

以上の他、電圧コンバータ20の入力側には、バッテリ1からの電源ノイズを除去するフィルタコンデンサ27が設けられる。また、入力電圧センサ31は、入力電圧Vinを検出する。電圧コンバータ20の出力側には、インバータ7への出力電圧Vsysを平滑化する平滑コンデンサ28が設けられる。また、出力電圧センサ32は、出力電圧Vsysを検出する。
入力電圧センサ31が検出した入力電圧センサ値Vin、出力電圧センサ32が検出した出力電圧センサ値Vsysは、電圧コンバータ制御装置50に入力される。
In addition to the above, a filter capacitor 27 for removing power supply noise from the battery 1 is provided on the input side of the voltage converter 20. The input voltage sensor 31 detects the input voltage Vin. A smoothing capacitor 28 that smoothes the output voltage Vsys to the inverter 7 is provided on the output side of the voltage converter 20. The output voltage sensor 32 detects the output voltage Vsys.
The input voltage sensor value Vin detected by the input voltage sensor 31 and the output voltage sensor value Vsys detected by the output voltage sensor 32 are input to the voltage converter control device 50.

[電圧コンバータ制御装置の構成]
次に、電圧コンバータ制御装置50の構成について、図2を参照して説明する。電圧コンバータ制御装置50は、マイコン等により構成され、内部にはいずれも図示しないCPU、ROM、I/O、及び、これらの構成を接続するバスライン等を備えている。電圧コンバータ制御装置50は、予め記憶されたプログラムをCPUで実行することによるソフトウェア処理や、専用の電子回路によるハードウェア処理による制御を実行する。
[Configuration of voltage converter controller]
Next, the configuration of the voltage converter control device 50 will be described with reference to FIG. The voltage converter control device 50 is configured by a microcomputer or the like, and includes a CPU, a ROM, an I / O (not shown), a bus line connecting these configurations, and the like. The voltage converter control device 50 executes control by software processing by executing a program stored in advance by the CPU or by hardware processing by a dedicated electronic circuit.

電圧コンバータ制御装置50は、「電圧制御部」としての昇圧制御部55と、電圧コンバータ20の異常を検出する異常検出部60とを備える。
昇圧制御部55は、フィードバック減算器51、PI制御器52、フィードフォワード演算部53及びduty減算器54を有している。
フィードバック減算器51は、出力電圧指令値Vsys*と出力電圧Vsysとの偏差ΔVsysを算出する。PI制御器52は、出力電圧の偏差ΔVsysを0に収束させるように、比例積分演算により、dutyのフィードバック項duty_fbを演算する。
The voltage converter control device 50 includes a boost control unit 55 as a “voltage control unit” and an abnormality detection unit 60 that detects an abnormality of the voltage converter 20.
The boost control unit 55 includes a feedback subtractor 51, a PI controller 52, a feedforward calculation unit 53, and a duty subtractor 54.
The feedback subtractor 51 calculates a deviation ΔVsys between the output voltage command value Vsys * and the output voltage Vsys. The PI controller 52 calculates the feedback term duty_fb of the duty by a proportional integration calculation so that the deviation ΔVsys of the output voltage converges to zero.

このフィードバック項duty_fbは、比例項duty_P及び積分項duty_Iを含む。比例項duty_Pは、出力電圧Vsysと指令値Vsys*との瞬時の偏差ΔVsysに比例し、例えば車両の運転状態の急変によって指令値Vsys*が大きく変化すると追従して変化する。積分項duty_Iは、出力電圧Vsysと指令値Vsys*との偏差ΔVsysが所定の積分期間で累積されて算出される。なお、他の実施形態ではフィードバック項にさらに微分項を含んでもよい。
本実施形態では、運転状態の急変等に伴う比例項duty_Pについては考慮せず、主に、電圧コンバータ20の異常による出力電圧偏差ΔVsysの累積値が反映される積分項duty_Iに注目する。また、力行時の積分項(「積分項_力行」)と回生時の積分項(「積分項_回生」)との両方を制御に用いることを特徴とする。
The feedback term duty_fb includes a proportional term duty_P and an integral term duty_I. The proportional term duty_P is proportional to the instantaneous deviation ΔVsys between the output voltage Vsys and the command value Vsys *, and changes following the command value Vsys * that changes greatly due to a sudden change in the driving state of the vehicle, for example. The integral term duty_I is calculated by accumulating the deviation ΔVsys between the output voltage Vsys and the command value Vsys * over a predetermined integration period. In other embodiments, the feedback term may further include a differential term.
In the present embodiment, the proportional term duty_P associated with a sudden change in the operating state or the like is not considered, and attention is paid mainly to the integral term duty_I that reflects the accumulated value of the output voltage deviation ΔVsys due to the abnormality of the voltage converter 20. Further, both the integral term during power running (“integral term_power running”) and the integral term during regeneration (“integral term_regenerative”) are used for control.

フィードフォワード演算部53は、入力電圧Vinと出力電圧指令値Vsys*との比に基づいて、dutyのフィードフォワード項duty_ffを演算する。
duty減算器54は、フィードフォワード項duty_ff及びフィードバック項duty_fbを加減算し、「duty」として昇圧部22へ出力する。本実施形態では、フィードフォワード項duty_ffからフィードバック項duty_fbを減算した値をdutyとする。そのため、減算するフィードバック項duty_fbの値が大きいほど、出力されるdutyは小さくなる。なお、各項の正負の定義や、それによる加算又は減算の区別は、適宜、実施形態に応じて決定してよい。
The feedforward calculation unit 53 calculates the feedforward term duty_ff of the duty based on the ratio between the input voltage Vin and the output voltage command value Vsys * .
The duty subtractor 54 adds and subtracts the feedforward term duty_ff and the feedback term duty_fb, and outputs the result to the booster 22 as “duty”. In the present embodiment, a value obtained by subtracting the feedback term duty_fb from the feedforward term duty_ff is defined as duty. Therefore, the larger the value of the feedback term duty_fb to be subtracted, the smaller the output duty. In addition, you may determine the positive / negative definition of each term, and the distinction of addition or subtraction by it according to embodiment suitably.

ところで、電圧コンバータ20を構成するスイッチング素子23、24や還流ダイオード25、26、或いは、電圧センサ31、32が故障する可能性がある。これらの素子やセンサが故障すると、昇圧制御部55の制御が不安定となったり、制御が成立しなくなったりするおそれがある。そこで本発明の電圧コンバータ制御装置50は、このような電圧コンバータ20の異常を検出する異常検出部60を備える。   By the way, there is a possibility that the switching elements 23 and 24, the freewheeling diodes 25 and 26, or the voltage sensors 31 and 32 constituting the voltage converter 20 may fail. If these elements or sensors fail, the control of the boost control unit 55 may become unstable or the control may not be established. Therefore, the voltage converter control device 50 of the present invention includes an abnormality detection unit 60 that detects such an abnormality of the voltage converter 20.

異常検出部60は、デッドタイム換算部61、反転部62、力行/回生判定部63、切替部64、及び異常判定部65を有している。
デッドタイム換算部61は、素子の耐圧や温度特性のばらつき等によって設定されるデッドタイム設定値T_dead、及び、キャリア周期Tcが入力され、デッドタイム設定値T_deadを時間単位[μs]からduty単位[−]に換算する。
The abnormality detection unit 60 includes a dead time conversion unit 61, a reversing unit 62, a power running / regeneration determination unit 63, a switching unit 64, and an abnormality determination unit 65.
The dead time conversion unit 61 receives a dead time set value T_dead and a carrier cycle Tc that are set according to variations in device breakdown voltage, temperature characteristics, and the like, and changes the dead time set value T_dead from a time unit [μs] to a duty unit [μs]. Convert to-].

換算されたdutyを「デッドタイム相当duty」といい、力行時のデッドタイム相当dutyを「duty_dead_α」と表し、回生時のデッドタイム相当dutyを「duty_dead_β」と表す。また、「duty_dead_α」及び「duty_dead_β」を適宜省略し、「α」、「β」と表す。
力行時のデッドタイム相当duty「α」はそのまま切替部64に入力される。一方、回生時のデッドタイム相当duty「β」は、反転部62で符号が反転された「−β」が切替部64に入力される。
The converted duty is referred to as “dead time equivalent duty”, the dead time equivalent duty during power running is represented as “duty_dead_α”, and the dead time equivalent duty during regeneration is represented as “duty_dead_β”. Further, “duty_dead_α” and “duty_dead_β” are omitted as appropriate, and expressed as “α” and “β”.
The duty “α” corresponding to the dead time during power running is input to the switching unit 64 as it is. On the other hand, the dead time equivalent duty “β” at the time of regeneration is input to the switching unit 64 as “−β” whose sign is inverted by the inverting unit 62.

力行/回生判定部63は、電流IBの正負すなわち方向(図3、図5参照)、或いは、使用している電力から、現在、力行時であるか回生時であるか判定する。切替部64は、力行/回生判定部63の判定結果に基づいて、異常判定部65に出力するデッドタイム相当dutyを「α」又は「−β」に切り替える。異常判定部65は、「α」、「−β」を記憶する。また、力行/回生判定部63の判定結果は、異常判定部65にも通知される。   The power running / regeneration determination unit 63 determines whether it is currently in power running or regeneration based on the sign of the current IB, that is, the direction (see FIGS. 3 and 5) or the power used. The switching unit 64 switches the dead time equivalent duty output to the abnormality determination unit 65 to “α” or “−β” based on the determination result of the power running / regeneration determination unit 63. The abnormality determination unit 65 stores “α” and “−β”. The determination result of the power running / regeneration determination unit 63 is also notified to the abnormality determination unit 65.

異常判定部65は、切替部64から入力された「α」から「−β」を減算し、「α」と「−β」との差分値「α+β」を算出する。以下、「α」と「−β」との差分値を、単純にデッドタイム相当dutyの和「α+β」という。異常判定部65は、昇圧制御部55のフィードバック演算部52から取得した「積分項_力行」と「積分項_回生」との差分値(Δ積分項)と、デッドタイム相当dutyの和「α+β」とを比較し、電圧コンバータ20が正常であるか異常であるかを判定する。この判定方法の詳細は後述する。   The abnormality determination unit 65 subtracts “−β” from “α” input from the switching unit 64 to calculate a difference value “α + β” between “α” and “−β”. Hereinafter, the difference value between “α” and “−β” is simply referred to as the sum “α + β” of the dead time equivalent duty. The abnormality determination unit 65 adds the difference value (Δ integral term) between “integral term_powering” and “integral term_regeneration” acquired from the feedback calculation unit 52 of the boost control unit 55 and the sum “α + β of the dead time equivalent duty” To determine whether the voltage converter 20 is normal or abnormal. Details of this determination method will be described later.

次に、電圧コンバータ20の力行時及び回生時におけるスイッチング素子23、24のスイッチング動作について、図3〜図6を参照して説明する。以下の説明では、高電位側スイッチング素子23を「上アーム23」、低電位側スイッチング素子24を「下アーム24」ともいう。
図3及び図5は、力行時及び回生時に電圧コンバータに流れる電流を示す。なお、バッテリ電流「IB」の記号の添え字「B」は、図中では下付き文字で表し、明細書の文中では通常文字で記載する。
Next, switching operations of the switching elements 23 and 24 at the time of power running and regeneration of the voltage converter 20 will be described with reference to FIGS. In the following description, the high potential side switching element 23 is also referred to as “upper arm 23” and the low potential side switching element 24 is also referred to as “lower arm 24”.
3 and 5 show the current flowing through the voltage converter during power running and regeneration. Note that the subscript “B” of the symbol “IB” of the battery current is represented by a subscript in the drawing, and is represented by a normal character in the text of the specification.

図4及び図6は、昇圧キャリアと指令dutyとの比較によって生成されるPWM信号を説明する図であり、各パルス信号は、上がオン、下がオフを示す。
図4、図6の上段には、指令dutyに対応する「基本キャリアCo」を実線で示し、デッドタイムを生成するための「デッドタイム用キャリアCd」を破線で示す。
デッドタイム用キャリアは、上下アーム23、24のオンタイミングに適用される。上アーム23は、dutyが基本キャリアCoを下回ったときオフし、デッドタイム用キャリアCdを上回ったときオンする。下アーム24は、dutyがデッドタイム用キャリアCdを下回ったときオンし、基本キャリアCoを上回ったときオフする。
4 and 6 are diagrams for explaining a PWM signal generated by comparing the boost carrier and the command duty. Each pulse signal indicates that the top is on and the bottom is off.
4 and 6, the “basic carrier Co” corresponding to the command duty is indicated by a solid line, and the “dead time carrier Cd” for generating a dead time is indicated by a broken line.
The dead time carrier is applied to the on timing of the upper and lower arms 23 and 24. The upper arm 23 is turned off when the duty falls below the basic carrier Co, and turns on when the duty exceeds the dead time carrier Cd. The lower arm 24 turns on when the duty falls below the dead time carrier Cd, and turns off when the duty exceeds the basic carrier Co.

図4、図6の中段には、昇圧制御部55のduty算出部54により演算された「デッドタイムを考慮しない理想duty」(原信号)と、その理想dutyにデッドタイムを生成した結果得られる実dutyとの関係を示す。
デッドタイムを生成するとは、上アーム23のオフから下アーム24のオンまでの間、及び、下アーム24のオフから上アーム23のオンまでの間に、上下アーム23、24が同時にオフする期間を設けることをいう。
例えば、理想dutyを0.5(=50%)とすると、理想dutyにデッドタイムを生成することにより、力行時(図4)には、実dutyは0.5より大きくなり、回生時(図6)には、実dutyは0.5より小さくなる。
4 and 6, “ideal duty not considering dead time” (original signal) calculated by the duty calculation unit 54 of the boost control unit 55 and the result of generating the dead time in the ideal duty are obtained. The relationship with the actual duty is shown.
The generation of the dead time is a period in which the upper and lower arms 23 and 24 are simultaneously turned off between the time when the upper arm 23 is turned off and the lower arm 24 is turned on and between the time when the lower arm 24 is turned off and the upper arm 23 is turned on It means to provide.
For example, assuming that the ideal duty is 0.5 (= 50%), by generating a dead time in the ideal duty, the actual duty becomes larger than 0.5 at the time of power running (FIG. 4), and at the time of regeneration (see FIG. In 6), the actual duty is smaller than 0.5.

図4、図6の下段には、フィードバック(FB)修正後の指令dutyと実dutyとの関係を示す。このフィードバック修正では、デッドタイムを生成した結果得られる実dutyを理想dutyに一致させるように修正する。そのために、理想dutyに対してデッドタイム相当dutyをオフセットさせた値を指令dutyとする。
力行時(図4)には、理想duty(0.5)に対して実dutyが大きくなるため、0.5からデッドタイム相当duty「α」を減算した値を指令dutyとすることで、デッドタイム生成後の実dutyが0.5となるようにする。
回生時(図6)には、理想duty(0.5)に対して実dutyが小さくなるため、0.5にデッドタイム相当duty「β」を加算した値を指令dutyとすることで、デッドタイム生成後の実dutyが0.5となるようにする。
The lower part of FIGS. 4 and 6 shows the relationship between the command duty after feedback (FB) correction and the actual duty. In this feedback correction, the actual duty obtained as a result of generating the dead time is corrected so as to coincide with the ideal duty. Therefore, a value obtained by offsetting the duty equivalent to the dead time with respect to the ideal duty is set as the command duty.
At the time of power running (FIG. 4), since the actual duty becomes larger than the ideal duty (0.5), a value obtained by subtracting the dead time equivalent duty “α” from 0.5 is set as the command duty. The actual duty after time generation is set to 0.5.
At the time of regeneration (FIG. 6), since the actual duty becomes smaller than the ideal duty (0.5), the value obtained by adding the dead time equivalent duty “β” to 0.5 is set as the command duty. The actual duty after time generation is set to 0.5.

まず、力行時について、図3、図4を詳しく参照する。
図3に示す力行時には、電流IB(>0)は、バッテリ1側からインバータ7側に流れる。実線で示すように、上下アームの中間点Nから高電位ラインLpへの電流は、上アーム23がオンのときだけでなく、上アーム23がオフのときにも還流ダイオード25を通って流れる。一方、破線で示すように、中間点Nから低電位ラインLgへの電流は、下アーム24がオンのときのみに流れる。そのため、下アーム24がオフ固着する故障が発生した場合には、力行動作に異常が発生する。一方、仮に上アーム23がオフ固着しても、還流ダイオード25の抵抗による損失等を除き、力行動作への顕著な影響は無い。また、図4に示すように、実dutyは、下アーム24のオフ期間に相当する。
First, FIG. 3 and FIG. 4 will be referred to in detail for powering.
In the power running shown in FIG. 3, the current IB (> 0) flows from the battery 1 side to the inverter 7 side. As indicated by the solid line, the current from the middle point N of the upper and lower arms to the high potential line Lp flows through the freewheeling diode 25 not only when the upper arm 23 is on but also when the upper arm 23 is off. On the other hand, as indicated by the broken line, the current from the intermediate point N to the low potential line Lg flows only when the lower arm 24 is on. Therefore, when a failure occurs in which the lower arm 24 is fixed off, an abnormality occurs in the power running operation. On the other hand, even if the upper arm 23 is fixed off, there is no significant influence on the power running operation except for the loss due to the resistance of the reflux diode 25 and the like. Further, as shown in FIG. 4, the actual duty corresponds to the off period of the lower arm 24.

図4にて、昇圧キャリアの一周期に、理想dutyが基本キャリアCo及びデッドタイム用キャリアCdに交差するタイミングとして、t2、t4、t7、t9を定義する。また、力行時のフィードバック修正後の指令dutyがキャリアCo、Cdに交差するタイミングとして、さらにt1、t3、t8、t10を追加する。   In FIG. 4, t2, t4, t7, and t9 are defined as timings at which the ideal duty intersects the basic carrier Co and the dead time carrier Cd in one cycle of the boost carrier. Further, t1, t3, t8, and t10 are further added as timings when the command duty after feedback correction at the time of power running intersects the carriers Co and Cd.

原信号について、理想dutyのオン期間はt7〜t2であり、上アーム23のオン期間はt9〜t2、下アーム24のオフ期間はt7〜t4である。したがって、実dutyに太線(DT)で示すように、下アーム24がオフするt7から上アーム23がオンするt9までの期間と、上アーム23がオフするt2から下アーム24がオンするt4までの期間とがデッドタイムとして生成される。その結果、下アーム24のオフ期間に相当する実dutyは0.5より大きくなる。   For the original signal, the ideal duty on-period is t7 to t2, the upper arm 23 on-period is t9 to t2, and the lower arm 24 off-period is t7 to t4. Therefore, as indicated by a thick line (DT) in the actual duty, a period from t7 when the lower arm 24 is turned off to t9 when the upper arm 23 is turned on, and from t2 when the upper arm 23 is turned off to t4 when the lower arm 24 is turned on. This period is generated as dead time. As a result, the actual duty corresponding to the off period of the lower arm 24 becomes larger than 0.5.

この実dutyがフィードバックされると、昇圧制御部55は、「理想dutyからデッドタイム相当dutyαを減算した値(0.5−α)」を指令dutyとするように修正する。すると、フィードバック修正後の指令dutyのオン期間はt8〜t1となり、上アーム23のオン期間はt10〜t1、下アーム24のオフ期間はt8〜t3となる。これにより、t8〜t10の期間と、t1〜t3の期間とがデッドタイムとして生成される。また、下アーム24のオフ期間に相当する実dutyは0.5に一致する。   When this actual duty is fed back, the boost control unit 55 corrects so that “the value obtained by subtracting the dead time equivalent duty α from the ideal duty (0.5−α)” becomes the command duty. Then, the ON period of the command duty after feedback correction is t8 to t1, the ON period of the upper arm 23 is t10 to t1, and the OFF period of the lower arm 24 is t8 to t3. Thereby, the period from t8 to t10 and the period from t1 to t3 are generated as dead time. The actual duty corresponding to the off period of the lower arm 24 is equal to 0.5.

次に、回生時について、図5、図6を参照する。
図5に示す回生時には、電流IB(<0)は、インバータ7側からバッテリ1側に流れる。破線で示すように、低電位ラインLgから上下アームの中間点Nへの電流は、下アーム24がオンのときだけでなく、下アーム24がオフのときにも還流ダイオード26を通って流れる。一方、実線で示すように、高電位ラインLpから中間点Nへの電流は、上アーム23がオンのときのみに流れる。そのため、上アーム23がオフ固着する故障が発生した場合には、回生動作に異常が発生する。一方、仮に下アーム24がオフ固着しても、還流ダイオード26の抵抗による損失等を除き、回生動作への顕著な影響は無い。また、図6に示すように、実dutyは、上アーム23のオン期間に相当する。
Next, FIG. 5 and FIG. 6 are referred about at the time of regeneration.
At the time of regeneration shown in FIG. 5, the current IB (<0) flows from the inverter 7 side to the battery 1 side. As indicated by the broken line, the current from the low potential line Lg to the middle point N of the upper and lower arms flows through the freewheeling diode 26 not only when the lower arm 24 is turned on but also when the lower arm 24 is turned off. On the other hand, as indicated by the solid line, the current from the high potential line Lp to the intermediate point N flows only when the upper arm 23 is on. Therefore, when a failure occurs in which the upper arm 23 is stuck off, an abnormality occurs in the regenerative operation. On the other hand, even if the lower arm 24 is fixed off, there is no significant influence on the regenerative operation except for loss due to the resistance of the freewheeling diode 26. Further, as shown in FIG. 6, the actual duty corresponds to the on period of the upper arm 23.

図6にて、昇圧キャリアの一周期に、理想dutyが基本キャリアCo及びデッドタイム用キャリアCdに交差するタイミングとして、図4のt2、t4、t7、t9を援用する。また、回生時のフィードバック修正後の指令dutyがキャリアCo、Cdに交差するタイミングとして、さらにt3、t5、t6、t8を追加する。   In FIG. 6, t2, t4, t7, and t9 of FIG. 4 are used as the timing at which the ideal duty intersects the basic carrier Co and the dead time carrier Cd in one cycle of the boost carrier. Further, t3, t5, t6, and t8 are further added as timings at which the command duty after feedback correction at the time of regeneration intersects the carriers Co and Cd.

原信号について、力行時と逆に表すと、理想dutyのオフ期間はt2〜t7であり、上アーム23のオフ期間はt2〜t9、下アーム24のオフ期間はt4〜t7である。また、実dutyに太線(DT)で示すように、上アーム23がオフするt2から下アーム24がオンするt4までの期間と、下アーム24がオフするt7から上アーム23がオンするt9までの期間とがデッドタイムとして生成される。その結果、上アーム23のオン期間に相当する実dutyは0.5より小さくなる。   When the original signal is expressed in reverse to the power running, the ideal duty off period is t2 to t7, the off period of the upper arm 23 is t2 to t9, and the off period of the lower arm 24 is t4 to t7. In addition, as indicated by a thick line (DT) in the actual duty, a period from t2 when the upper arm 23 is turned off to t4 when the lower arm 24 is turned on, and from t7 when the lower arm 24 is turned off to t9 when the upper arm 23 is turned on. This period is generated as dead time. As a result, the actual duty corresponding to the ON period of the upper arm 23 is smaller than 0.5.

この実dutyがフィードバックされると、昇圧制御部55は、「理想dutyにデッドタイム相当dutyβを加算した値(0.5+β)」を指令dutyとするように修正する。すると、フィードバック修正後の指令dutyのオフ期間はt3〜t6となり、上アーム23のオフ期間はt3〜t8、下アーム24のオン期間はt5〜t6となる。これにより、t3〜t5の期間と、t6〜t8の期間とがデッドタイムとして生成される。また、上アーム23のオン期間に相当する実dutyは0.5に一致する。   When this actual duty is fed back, the boost control unit 55 corrects “the value obtained by adding the dead time equivalent duty β to the ideal duty (0.5 + β)” as the command duty. Then, the off period of the command duty after feedback correction is t3 to t6, the off period of the upper arm 23 is t3 to t8, and the on period of the lower arm 24 is t5 to t6. Thereby, the period from t3 to t5 and the period from t6 to t8 are generated as dead time. Further, the actual duty corresponding to the ON period of the upper arm 23 is equal to 0.5.

以上のように、電圧コンバータ20の正常駆動時には、力行時及び回生時に、それぞれ理想dutyにデッドタイム相当duty「α」、「β」を減算又は加算することにより、適正なデッドタイムを確保しつつ、上下アーム23、24を操作して昇圧制御を行う。
しかし、仮に、上アーム23又は下アーム24、或いは、還流ダイオード25、26や電圧センサ31、32等に異常が発生すると、実dutyと指令dutyとのずれが、想定したデッドタイム相当duty「α」、「β」に相当する量よりも大きくなる。
As described above, when the voltage converter 20 is normally driven, the dead time equivalent duty “α” and “β” are subtracted or added to the ideal duty during power running and regeneration, respectively, while ensuring an appropriate dead time. The pressure control is performed by operating the upper and lower arms 23 and 24.
However, if an abnormality occurs in the upper arm 23 or the lower arm 24, or the return diodes 25 and 26, the voltage sensors 31 and 32, etc., the deviation between the actual duty and the command duty is equivalent to the assumed dead time equivalent duty “α ”And“ β ”.

続いて、電圧コンバータ20の異常時を示す「異常領域」について、図7、図8を参照して説明する。
図7の横軸は電流であり、正のとき力行時を示し、負のとき回生時を示す。図7の縦軸は、所定の積分期間で算出された積分項duty_I(以下、「duty_I」の記載を適宜省略する。)であり、duty算出部54(図2参照)にてフィードフォワード項duty_ffから減算される方向を正と定義する。
力行時には、積分項_力行の値(>0)が0からαまでの領域が正常であり、積分項_力行の値がαより大きい領域が異常である。回生時には、積分項_回生の値(<0)が0から(−β)までの領域が正常であり、積分項_回生の値が(−β)より小さい領域が異常である。
Next, the “abnormal region” indicating the abnormality of the voltage converter 20 will be described with reference to FIGS.
The horizontal axis in FIG. 7 represents current, and when positive, indicates powering, and when negative, indicates regeneration. The vertical axis in FIG. 7 is an integral term duty_I (hereinafter, “duty_I” will be omitted as appropriate) calculated in a predetermined integration period. The duty calculation unit 54 (see FIG. 2) feeds the feedforward term duty_ff. The direction subtracted from is defined as positive.
During powering, the region where the integral term_powering value (> 0) is 0 to α is normal, and the region where the integral term_powering value is greater than α is abnormal. During regeneration, the region where the integral term_regeneration value (<0) is from 0 to (−β) is normal, and the region where the integral term_regeneration value is smaller than (−β) is abnormal.

図8は、図7の内容を、dutyをパラメータとして表した図である。図8の横軸(x軸)は、フィードフォワード項duty_ffを示し、縦軸(y軸)は、フィードフォワード項duty_ffから積分項duty_Iを減算したdutyを示す。つまり、図8の下方向が積分項duty_Iの正の方向として表される。なお、フィードバック項の比例項duty_P(図2参照)は無視するものとする。
フィードフォワード項duty_ffは、出力電圧指令値Vsys*と入力電圧Vinとによって決まる「指令duty」に相当すると考えられる。一方、フィードフォワード項duty_ffから積分項duty_Iを減算したdutyは、電圧コンバータ20の実際挙動が積分項duty_Iに反映された「実duty」に相当すると考えられる。また、基準線Sは、「積分項duty_I=0」のときを示す線である。
FIG. 8 is a diagram showing the contents of FIG. 7 with duty as a parameter. The horizontal axis (x-axis) in FIG. 8 represents the feedforward term duty_ff, and the vertical axis (y-axis) represents the duty obtained by subtracting the integral term duty_I from the feedforward term duty_ff. That is, the downward direction in FIG. 8 is represented as the positive direction of the integral term duty_I. The proportional term duty_P (see FIG. 2) of the feedback term is ignored.
The feedforward term duty_ff is considered to correspond to a “command duty” determined by the output voltage command value Vsys * and the input voltage Vin. On the other hand, the duty obtained by subtracting the integral term duty_I from the feedforward term duty_ff is considered to correspond to the “real duty” in which the actual behavior of the voltage converter 20 is reflected in the integral term duty_I. The reference line S is a line indicating when “integration term duty_I = 0”.

なお、現実に図8のマップを作成する場合には、有限個の指令dutyにおけるデッドタイム相当duty「α」、「β」の実測値から散布図を作成し、下記のように定義される一次関数の近似式を求めてもよい。
力行時・・・y=kpx−α0(kp:傾き、−α0:切片)
回生時・・・y=krx+β0(kr:傾き、β0:切片)
When the map of FIG. 8 is actually created, a scatter diagram is created from actually measured values of dead times equivalent duty “α” and “β” in a finite number of command duties, and a primary order defined as follows: An approximate expression of the function may be obtained.
During power running: y = kpx−α0 (kp: inclination, −α0: intercept)
During regeneration: y = krx + β0 (kr: slope, β0: intercept)

力行時には、フィードフォワード項duty_ffから正の積分項_力行が減算されるため、dutyは基準線Sより下側にシフトする(duty<duty_ff)。減算される正の積分項_力行の値がα以下ならば正常、αを超えると異常である。
回生時には、フィードフォワード項duty_ffから負の積分項_回生が減算されるため、dutyは基準線Sより上側にシフトする(duty>duty_ff)。減算される負の積分項_回生の絶対値がβ以下ならば正常、βを超えると異常である。
During power running, since the positive integral term_power running is subtracted from the feedforward term duty_ff, the duty shifts below the reference line S (duty <duty_ff). If the value of the positive integral term_powering to be subtracted is α or less, it is normal, and if it exceeds α, it is abnormal.
At the time of regeneration, since the negative integral term_regeneration is subtracted from the feedforward term duty_ff, the duty is shifted upward from the reference line S (duty> duty_ff). It is normal if the absolute value of the negative integral term_regeneration to be subtracted is less than or equal to β, and abnormal if it exceeds β.

したがって、仮に出力電圧Vsysの正確な値に基づいてフィードバック制御が実行されれば、積分項の値を図8の境界線(閾値)と比較し、正常領域又は異常領域のいずれにあるかを評価することで、電圧コンバータ20の異常検出ができると考えられる。
ところで、電圧コンバータ20の異常検出に関し、例えば特許文献1の従来技術では、入力電圧センサ及び出力電圧センサの検出値と、電圧コンバータのdutyとから算出した差電圧に基づいて、電圧センサの故障を検出している。この従来技術では、二つの電圧センサの誤差やばらつきを考慮しようとすると、異常判定値の設定が困難になる場合があり、その結果、誤検出や検出漏れが発生するおそれがある。
Therefore, if feedback control is executed based on the exact value of the output voltage Vsys, the value of the integral term is compared with the boundary line (threshold value) in FIG. 8 to evaluate whether it is in the normal region or the abnormal region. By doing so, it is considered that the abnormality of the voltage converter 20 can be detected.
By the way, regarding the abnormality detection of the voltage converter 20, for example, in the prior art of Patent Document 1, the failure of the voltage sensor is detected based on the difference voltage calculated from the detected values of the input voltage sensor and the output voltage sensor and the duty of the voltage converter. Detected. In this conventional technique, when an error or variation between two voltage sensors is taken into account, it may be difficult to set an abnormality determination value. As a result, there is a possibility that erroneous detection or detection omission may occur.

このように、電圧センサの誤差やばらつきがあると、その影響は、フィードバック制御により積分項に吸収される。例えば電圧センサのオフセット誤差を想定すると、図8における正常/異常の境界線は、ブロック矢印で示すように平行移動することとなる。
すると、力行時の点Qpは、本来、正常領域にあるにもかかわらず異常領域にあると誤って判断されることになる。一方、回生時の点Qrは、本来、異常領域にあるにもかかわらず正常領域にあると誤って判断されることになる。したがって、力行時又は回生時のいずれか一方の積分項の値に基づいて異常検出しようとすると、電圧センサ32の誤差やばらつきによっては、誤検出や検出漏れが発生するおそれがある。
Thus, if there is an error or variation in the voltage sensor, the influence is absorbed by the integral term by feedback control. For example, assuming an offset error of the voltage sensor, the normal / abnormal boundary line in FIG. 8 is translated as indicated by a block arrow.
Then, the point Qp at the time of power running is erroneously determined to be in the abnormal region although it is originally in the normal region. On the other hand, the point Qr at the time of regeneration is erroneously determined to be in the normal region even though it is originally in the abnormal region. Therefore, if an abnormality is to be detected based on the value of one of the integral terms during power running or regeneration, erroneous detection or omission of detection may occur depending on the error or variation of the voltage sensor 32.

そこで本発明の異常検出部60は、「力行時及び回生時の積分項の差分値(Δ積分項)」に基づいて異常検出することを特徴とする。力行時及び回生時の積分項は、デッドタイム分以外の値が共通であるため、力行時及び回生時の積分項の差分値を算出することにより、電圧センサ32の誤差やばらつきの影響が打ち消される。したがって、力行時及び回生時の積分項の差分値と、デッドタイム相当dutyの和「α+β」とを比較することで、電圧センサ32の誤差やばらつきの影響を受けることなく、電圧コンバータ20の異常を検出することができる。よって、異常検出における誤検出や検出漏れの発生を防止することができる。   Therefore, the abnormality detection unit 60 according to the present invention is characterized in that an abnormality is detected based on “a difference value (integral term) between integral terms during power running and regeneration”. Since the integral term other than the dead time is common for power running and regeneration, calculating the differential value of the integral term during power running and regeneration cancels the influence of errors and variations in the voltage sensor 32. It is. Therefore, by comparing the difference value of the integral term during power running and regeneration with the sum “α + β” of the dead time equivalent duty, the abnormality of the voltage converter 20 is not affected by the error or variation of the voltage sensor 32. Can be detected. Therefore, it is possible to prevent erroneous detection and detection omission in abnormality detection.

次に、本発明の異常検出処理の具体例について、第1実施形態及び第2実施形態に分けて説明する。
(第1実施形態)
第1実施形態の異常検出処理について、図9のフローチャートを参照して説明する。以下のフローチャートの説明で、記号「S」はステップを意味する。このルーチンは、例えば制御周期毎に実行される。
Next, specific examples of the abnormality detection process of the present invention will be described separately for the first embodiment and the second embodiment.
(First embodiment)
The abnormality detection process of the first embodiment will be described with reference to the flowchart of FIG. In the description of the flowchart below, the symbol “S” means a step. This routine is executed, for example, every control cycle.

S11では、力行/回生判定部63(図2参照)からの情報に基づき、現在、力行時であるか回生時であるか判断する。
力行時(S11:YES)には「積分項_力行(>0)」を記憶し(S12)、回生時(S11:NO)には「積分項_回生(<0)」を記憶する(S13)。
S14では、力行時の積分項と回生時の積分項との差分値「Δ積分項(=積分項_力行−積分項_回生)」を算出する。
In S11, based on the information from the power running / regeneration determination unit 63 (see FIG. 2), it is determined whether the current time is power running or regeneration.
“Integral term_power running (> 0)” is stored during power running (S11: YES) (S12), and “integral term_regeneration (<0)” is stored during regeneration (S11: NO) (S13). ).
In S14, a difference value “Δ integral term (= integral term_power running−integral term_regeneration)” between the integral term during power running and the integral term during regeneration is calculated.

S15では、積分項差分値(Δ積分項)と、力行時及び回生時のデッドタイム相当dutyの和「α+β」とを比較する。積分項差分値(Δ積分項)が「α+β」より大きければ(S15:YES)、電圧コンバータ20のいずれかの部品が異常と判定し(S16)、積分項差分値(Δ積分項)が「α+β」以下であれば(S15:NO)、電圧コンバータ20は正常と判定する(S17)。
なお、デッドタイム相当dutyα、βの符号の定義によっては、積分項差分値と比較される閾値を「デッドタイム相当dutyの絶対値の和」と定義することが有効である。
In S15, the integral term difference value (Δ integral term) is compared with the sum “α + β” of the dead time equivalent duty during power running and regeneration. If the integral term difference value (Δ integral term) is larger than “α + β” (S15: YES), it is determined that any component of the voltage converter 20 is abnormal (S16), and the integral term difference value (Δ integral term) is “ If “α + β” or less (S15: NO), it is determined that the voltage converter 20 is normal (S17).
Depending on the definition of the signs of dead time equivalent duty α and β, it is effective to define the threshold value to be compared with the integral term difference value as “the sum of absolute values of dead time equivalent duty”.

(第2実施形態)
次に、本発明の第2実施形態について、図10のフローチャートを参照して説明する。
第1実施形態の図9のフローチャートにおいて電圧コンバータ20の異常が検出されたとき(S16)、いずれかの部位が故障していることはわかるが、どの部位が故障しているかはわからない。そこで第2実施形態では、さらに異常部位を特定する処理を行う。
その思想としては、「力行時における積分項の値と力行時におけるデッドタイム相当dutyとの比較」、及び、「回生時における積分項の値と回生時におけるデッドタイム相当dutyとの比較」を個別に実行し、その結果に基づいて判定する。
(Second Embodiment)
Next, a second embodiment of the present invention will be described with reference to the flowchart of FIG.
When an abnormality of the voltage converter 20 is detected in the flowchart of FIG. 9 of the first embodiment (S16), it can be seen that any part has failed, but it is not known which part has failed. Therefore, in the second embodiment, processing for further specifying an abnormal part is performed.
The idea is “Comparison of the value of the integral term at power running and the duty equivalent to dead time at power running” and “Comparison of the value of the integral term at power regeneration and dead time equivalent duty at regeneration” And determine based on the result.

S21は、図9のS16に続くステップである。S21では、積分項_力行が力行時のデッドタイム相当duty「α」より大きく、且つ、積分項_回生が回生時のデッドタイム相当dutyの反転値「−β」より小さければ(S21:YES)、力行、回生の両方が異常と判定する(S24)。
S21でNOの場合、S22では、積分項_力行がαより大きく、且つ、積分項_回生が(−β)以上であれば(S22:YES)、力行が異常と判定する(S25)。力行が異常のとき、例えば下アーム24のオフ固着(断線)故障の可能性が疑われる。
S22でNOの場合、S23では、積分項_力行がα以下であり、且つ、積分項_回生が(−β)より小さければ(S23:YES)、回生が異常と判定する(S26)。回生が異常のとき、例えば上アーム23のオフ固着(断線)故障の可能性が疑われる。
S21 is a step following S16 of FIG. In S21, if the integral term_power running is greater than the dead time equivalent duty “α” during power running and the integral term_regeneration is smaller than the inverted value “−β” of the dead time equivalent duty during regeneration (S21: YES). Both power running and regeneration are determined to be abnormal (S24).
If NO in S21, in S22, if the integral term_power running is larger than α and the integral term_regeneration is equal to or greater than (−β) (S22: YES), it is determined that the power running is abnormal (S25). When the power running is abnormal, for example, there is a possibility that the lower arm 24 is off-fixed (disconnected).
If NO in S22, in S23, if the integral term_powering is less than or equal to α and the integral term_regeneration is smaller than (−β) (S23: YES), it is determined that regeneration is abnormal (S26). When the regeneration is abnormal, for example, the possibility of an off-sticking (disconnection) failure of the upper arm 23 is suspected.

S16による「いずれかの部位が異常」という判定が正しければ、S21〜S23までで必ずS24〜S26のいずれかに判別されるはずである。しかし、仮にS16の判定が誤っていた場合には、S23でNOと判断され、電圧コンバータ20は正常との判定に修正される(S27)。   If the determination that “any part is abnormal” in S16 is correct, S21 to S23 are surely determined to be any of S24 to S26. However, if the determination in S16 is incorrect, it is determined NO in S23, and the voltage converter 20 is corrected to a normal determination (S27).

このように、第2実施形態では、故障した部品が、力行に使われる部品、回生に使われる部品、又は、力行及び回生の両方で使われる部品のいずれであるかを大別することができる。そして、特にハイブリッド自動車に適用される場合、フェールセーフの観点から、正常に動作する部品だけを使用して、力行異常のときは回生動作のみを行い、回生異常のときは力行動作のみを行うことで、異常時における退避走行を実現することができる。また、電圧コンバータ20の修理にあたり大別された該当部品のみを交換すればよいため、全ての部品を交換する場合に比べて修理コストを低減することができる。   As described above, in the second embodiment, it is possible to roughly classify whether a failed part is a part used for powering, a part used for regeneration, or a part used for both powering and regeneration. . And especially when applied to hybrid vehicles, from the viewpoint of fail-safe, use only parts that operate normally, perform only regenerative operation when power running is abnormal, and perform only power running operation when regenerative abnormality occurs Thus, it is possible to realize evacuation travel at the time of abnormality. Moreover, since it is only necessary to replace only the relevant parts when repairing the voltage converter 20, the repair cost can be reduced as compared with the case where all the parts are replaced.

また、第2実施形態の変形例として、「少なくとも力行が異常であるか」ということのみを知りたい場合には、「力行時における積分項の値と力行時におけるデッドタイム相当dutyとの比較」のみを実行してもよい。一方、「少なくとも回生が異常であるか」ということのみを知りたい場合には、「回生時における積分項の値と回生時におけるデッドタイム相当dutyとの比較」のみを実行してもよい。   As a modification of the second embodiment, when it is desired to know only “at least power running is abnormal”, “comparison between the value of the integral term during power running and the dead time equivalent duty during power running” May only be performed. On the other hand, when only “whether at least regeneration is abnormal” is desired to be known, only “comparison between the value of the integral term during regeneration and the dead time equivalent duty during regeneration” may be executed.

(その他の実施形態)
(ア)本発明の制御装置が適用される「電圧コンバータ」は、入力電圧を昇圧する昇圧コンバータに限らず、入力電圧を降圧する降圧コンバータであってもよい。それに対応して、「電圧制御部」及び「電圧変換部」は、昇圧制御部55、昇圧部22ではなく、降圧制御部、降圧部であってもよい。
(Other embodiments)
(A) The “voltage converter” to which the control device of the present invention is applied is not limited to the step-up converter that steps up the input voltage, but may be a step-down converter that steps down the input voltage. Correspondingly, the “voltage control unit” and the “voltage conversion unit” may be a step-down control unit and a step-down unit instead of the step-up control unit 55 and the step-up unit 22.

(イ)上記実施形態では、電圧コンバータ20の負荷回路として、直流電圧を三相交流電圧に変換してモータジェネレータ8を駆動するインバータ7を例示した。その他、電圧コンバータ20の負荷回路として、例えば直流電動機を駆動するHブリッジ回路を用いてもよい。また、1つの電圧コンバータ20に対し、複数の負荷回路が接続されてもよい。   (A) In the above embodiment, the inverter 7 that drives the motor generator 8 by converting a DC voltage into a three-phase AC voltage is illustrated as the load circuit of the voltage converter 20. In addition, as a load circuit of the voltage converter 20, for example, an H bridge circuit that drives a DC motor may be used. A plurality of load circuits may be connected to one voltage converter 20.

(ウ)インバータ等の負荷回路から電力を供給される駆動対象は、ハイブリッド自動車や電気自動車の動力源として用いられるモータジェネレータに限らず、車両の補機用や、車両以外の電車、昇降機、一般機械等に用いられる回転機であってもよい。また、放電管やX線発生装置等の高電圧を用いる装置であってもよい。
以上、本発明は、上記実施形態になんら限定されるものではなく、発明の趣旨を逸脱しない範囲において種々の形態で実施可能である。
(C) The driving target to which power is supplied from a load circuit such as an inverter is not limited to a motor generator used as a power source of a hybrid vehicle or an electric vehicle, but is used for auxiliary equipment of vehicles, trains other than vehicles, elevators, etc. It may be a rotating machine used in a machine or the like. Also, a device using a high voltage such as a discharge tube or an X-ray generator may be used.
As mentioned above, this invention is not limited to the said embodiment at all, In the range which does not deviate from the meaning of invention, it can implement with a various form.

1 ・・・バッテリ、
20・・・電圧コンバータ、
21・・・リアクトル、
22・・・昇圧部(電圧変換部)、
23・・・高電位側スイッチング素子(上アーム)、
24・・・低電位側スイッチング素子(下アーム)、
50・・・電圧コンバータ制御装置、
55・・・昇圧制御部(電圧制御部)、
60・・・異常検出部、
7 ・・・インバータ(負荷回路)。
1 ... battery,
20 ... Voltage converter,
21: Reactor,
22 ... Booster (voltage converter),
23 ... high potential side switching element (upper arm),
24 ... low potential side switching element (lower arm),
50 ... Voltage converter control device,
55 ... Boost control unit (voltage control unit),
60: Anomaly detection unit,
7: Inverter (load circuit).

Claims (3)

バッテリ(1)と負荷回路(7)との間に設けられ、電気エネルギーを蓄積及び放出可能なリアクトル(21)、並びに、交互にオンオフすることで前記リアクトルにおける電気エネルギーの蓄積及び放出を繰り返す高電位側スイッチング素子(23)及び低電位側スイッチング素子(24)を含む電圧変換部(22)を備え、前記バッテリ側の入力電圧(Vin)と前記負荷回路側の出力電圧(Vsys)とを力行方向及び回生方向に変換する電圧コンバータ(20)に適用される電圧コンバータ制御装置(50)であって、
前記高電位側スイッチング素子のスイッチング周期に対するオン時間比率であるdutyについて、前記出力電圧に対する目標値である出力電圧指令値(Vsys*)と前記入力電圧との比に基づいて演算されるフィードフォワード項、並びに、前記出力電圧の検出値を前記出力電圧指令値に一致させるように演算される比例項及び積分項を含むフィードバック項を加減算し、前記電圧変換部へ出力する電圧制御部(55)と、
力行時及び回生時において所定の積分期間で算出される前記積分項の差分値と、力行時及び回生時において前記電圧変換部のデッドタイム設定値及びキャリア周期に基づいて算出されるデッドタイム相当dutyの絶対値の和とを比較することで、前記電圧コンバータの異常を検出する異常検出部(60)と、
を備えることを特徴とする電圧コンバータ制御装置。
A reactor (21) provided between the battery (1) and the load circuit (7) and capable of storing and releasing electric energy, and a high and repeating electric energy storage and discharging in the reactor by alternately turning on and off. A voltage converter (22) including a potential side switching element (23) and a low potential side switching element (24) is provided, and the battery side input voltage (Vin) and the load circuit side output voltage (Vsys) are powered. A voltage converter control device (50) applied to a voltage converter (20) for converting into a direction and a regeneration direction,
A feed-forward term calculated based on a ratio between an output voltage command value (Vsys * ) that is a target value for the output voltage and the input voltage with respect to a duty that is an on-time ratio with respect to a switching cycle of the high potential side switching element. And a voltage control unit (55) for adding and subtracting a feedback term including a proportional term and an integral term calculated so as to make the detected value of the output voltage coincide with the output voltage command value, and outputting the result to the voltage converting unit. ,
The difference value of the integral term calculated during a predetermined integration period during power running and regeneration, and the dead time equivalent duty calculated based on the dead time setting value and carrier cycle of the voltage conversion unit during power running and regeneration An abnormality detection unit (60) for detecting an abnormality of the voltage converter by comparing the sum of absolute values of
A voltage converter control device comprising:
前記異常検出部は、
前記電圧コンバータの異常を検出したとき、さらに、力行時における前記積分項の値と力行時における前記デッドタイム相当dutyとの比較、又は、回生時における前記積分項の値と回生時における前記デッドタイム相当dutyとの比較の少なくとも一方を実行することを特徴とする請求項1に記載の電圧コンバータ制御装置。
The abnormality detection unit
When an abnormality of the voltage converter is detected, a comparison between the value of the integral term during power running and the duty equivalent to the dead time during power running, or the value of the integral term during regeneration and the dead time during regeneration The voltage converter control device according to claim 1, wherein at least one of the comparison with the equivalent duty is executed.
前記異常検出部は、
前記電圧コンバータの異常を検出したとき、さらに、力行時における前記積分項の値と力行時における前記デッドタイム相当dutyとの比較、及び、回生時における前記積分項の値と回生時における前記デッドタイム相当dutyとの比較をいずれも実行することを特徴とする請求項2に記載の電圧コンバータ制御装置。
The abnormality detection unit
When an abnormality of the voltage converter is detected, the value of the integral term during power running is compared with the duty equivalent to the dead time during power running, and the value of the integral term during regeneration and the dead time during regeneration 3. The voltage converter control device according to claim 2, wherein any comparison with the equivalent duty is executed.
JP2014171787A 2014-08-26 2014-08-26 Voltage converter controller Active JP6299526B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014171787A JP6299526B2 (en) 2014-08-26 2014-08-26 Voltage converter controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014171787A JP6299526B2 (en) 2014-08-26 2014-08-26 Voltage converter controller

Publications (2)

Publication Number Publication Date
JP2016046989A true JP2016046989A (en) 2016-04-04
JP6299526B2 JP6299526B2 (en) 2018-03-28

Family

ID=55637059

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014171787A Active JP6299526B2 (en) 2014-08-26 2014-08-26 Voltage converter controller

Country Status (1)

Country Link
JP (1) JP6299526B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018179716A (en) * 2017-04-11 2018-11-15 新電元工業株式会社 Switching loss evaluation device
CN117148123A (en) * 2023-10-31 2023-12-01 锦浪科技股份有限公司 Open circuit fault self-checking method, system and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009159689A (en) * 2007-12-25 2009-07-16 Toyota Motor Corp Fuel cell system
JP2010148192A (en) * 2008-12-17 2010-07-01 Honda Motor Co Ltd Dc-dc converter device
JP2014033566A (en) * 2012-08-06 2014-02-20 Denso Corp Controller for rotary machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009159689A (en) * 2007-12-25 2009-07-16 Toyota Motor Corp Fuel cell system
JP2010148192A (en) * 2008-12-17 2010-07-01 Honda Motor Co Ltd Dc-dc converter device
JP2014033566A (en) * 2012-08-06 2014-02-20 Denso Corp Controller for rotary machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018179716A (en) * 2017-04-11 2018-11-15 新電元工業株式会社 Switching loss evaluation device
CN117148123A (en) * 2023-10-31 2023-12-01 锦浪科技股份有限公司 Open circuit fault self-checking method, system and storage medium

Also Published As

Publication number Publication date
JP6299526B2 (en) 2018-03-28

Similar Documents

Publication Publication Date Title
JP6149884B2 (en) Voltage converter controller
JP6335040B2 (en) Vehicle control device
JP5867297B2 (en) Power conversion system and its voltage detection device
US9438116B2 (en) Control unit for a boost converter device
JP6730515B2 (en) Power converter
JP2005192314A (en) Power converter
JP2006278210A (en) Failure diagnosing device and failure diagnosis method
JP2009017665A (en) Failure detection device and method for power converter
US9522606B2 (en) Boost-buck converter control system
CN114113994B (en) Power switch fault detection method and detection circuit thereof
JP2015177609A (en) Voltage conversion apparatus
JP2007244104A (en) Ground fault detecting method
JP2010154679A (en) Power supply apparatus of vehicle
JP6299526B2 (en) Voltage converter controller
JP5799761B2 (en) Abnormality detection device for battery pack
JP2012060786A (en) Device and method for controlling vehicle
JP4356476B2 (en) Voltage conversion device, voltage conversion device failure determination method, and computer-readable recording medium storing a program for causing a computer to execute the method
JP2011167011A (en) Dc-dc converter system
JP2009148116A (en) Vehicular power supply system and its control method
JP2006033966A (en) Motor drive unit
JP6785520B2 (en) Power conversion device and power conversion control device
JP2011055676A (en) Motor controller
JP6493046B2 (en) Current sensor abnormality diagnosis device
JP6642296B2 (en) Converter error determination method
JP5169865B2 (en) Power converter

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170316

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180124

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180130

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180212

R151 Written notification of patent or utility model registration

Ref document number: 6299526

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250