JP2011144611A - Two-storied tunnel - Google Patents
Two-storied tunnel Download PDFInfo
- Publication number
- JP2011144611A JP2011144611A JP2010008547A JP2010008547A JP2011144611A JP 2011144611 A JP2011144611 A JP 2011144611A JP 2010008547 A JP2010008547 A JP 2010008547A JP 2010008547 A JP2010008547 A JP 2010008547A JP 2011144611 A JP2011144611 A JP 2011144611A
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- passage
- evacuation
- persons
- wall surface
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Emergency Lowering Means (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
[背景技術]
トンネル掘削機を用いた車道トンネルの建設は、経済的な理由および環境に関する理由の双方から、漸増している問題解決策である。この技術によれば、掘削機で表土を掘り進み、セグメント化されたプレキャスト・タイプの外構材を配設し、トンネルの壁面を形成して円形にしてゆく。これに続いて、並設対面通行ができる車輌走行用プラットフォームを造るために、トンネル底部にフィリングが施工される。
[Background technology]
The construction of road tunnels using tunnel excavators is an increasing problem solution for both economic and environmental reasons. According to this technology, the excavator excavates the top soil, disposes the segmented precast type exterior material, forms the wall surface of the tunnel and makes it circular. Following this, a filling is constructed at the bottom of the tunnel in order to build a vehicle travel platform that allows side-by-side traffic.
片側1車線以上のトンネルでは、必要な径を既存のトンネル掘削機では処理できない。更に、長いトンネルの場合も、安全上の理由からこの解決策には問題があり、一般的に一方向ごとに別々のトンネルを二本造ることが必要である。また、トンネル内での事故や火災に際して人員が避難できるようにするために、トンネルに沿って一定間隔で避難路及び/又は縦坑を造ることも必要である。 In tunnels with more than one lane on one side, the required diameter cannot be handled by existing tunnel excavators. In addition, even for long tunnels, this solution is problematic for safety reasons, and it is generally necessary to build two separate tunnels for each direction. It is also necessary to build evacuation paths and / or shafts at regular intervals along the tunnel so that personnel can evacuate in the event of an accident or fire in the tunnel.
WO2004/094785は、二本の独立した車線を有する円形トンネルに関するものであり、それぞれが通行路となっているが、これらは非常に異なっており、依然として第二のトンネルを造る必要が有る。EP1191186A1も、分離壁が設けられた二階建ての円形の車道トンネルに関するものであるが、各レベルが、一方向1車線であり、車の乗客が通行できるのは上側レベルのみである。
本発明は、円形断面を持ち、両面交通の車道トンネンル建設のための革新的な解決策を構成するものであり、あらゆる通行形態のための、独立した、2本の同一車線を提供するとともに、トンネル内での事故や火災が生じたときの個人用のローカルアクセスと、人々の避難路を確保するために、上記車道と相互に連結したサービス通路を提供する。 The present invention constitutes an innovative solution for the construction of double-sided traffic road tunnels with a circular cross-section, providing two independent and identical lanes for all modes of traffic, In order to secure personal local access in the event of an accident or fire in the tunnel and a evacuation route for people, a service passage interconnected with the above roadway is provided.
本発明は、図1、2、3、4及び5に図解されている。
トンネル掘削機で表土を掘り、互いにクランプされているプレキャストセグメントを配設して、円形形状であるトンネル(1)の壁面を形成する。 A top surface is dug with a tunnel excavator, and precast segments clamped to each other are arranged to form a wall surface of the tunnel (1) having a circular shape.
トンネルの内側に、全幅にわたって二枚のスラブ(2)、(3)が形成される。一方はトンネルのほぼ半分の高さに配置し、他方はトンネル底部のやや上方に配置して、それぞれが隔離されて独立した三重層の通路を形成している。2本は、それぞれ車両通行用の同一の車道(4)、(5)であり、一本はサービス通路(6)である。 Inside the tunnel, two slabs (2), (3) are formed over the entire width. One is located approximately half the height of the tunnel and the other is located slightly above the bottom of the tunnel, each being isolated to form an independent triple layer passage. Two are the same roadways (4) and (5) for vehicle traffic, respectively, and one is a service passage (6).
スラブ(2)、(3)には、トンネル(1)の円形壁面近くの片側あるいは両側に、一定間隔で開口部(7)が設けられており、この開口部(7)は避難用ドアの付いたボックスタイプの防火装置(8)によって防護されている。それぞれの側の防火装置(8)は、閉鎖された縦方向の連絡通路(10)に連結されている。この通路には、車道(4)、(5)とサービス通路(6)との間に人が安全に通ることができる内階段が設けられている。縦方向の連絡通路(10)は、トンネル(1)の円形の壁を通って延在させてもよい。 The slabs (2) and (3) are provided with openings (7) at regular intervals on one or both sides near the circular wall surface of the tunnel (1). It is protected by a box-type fire protection device (8) attached. The fire protection device (8) on each side is connected to a closed longitudinal communication passage (10). This passage is provided with an inner stairway through which people can safely pass between the roadways (4), (5) and the service passage (6). The longitudinal communication passage (10) may extend through the circular wall of the tunnel (1).
サービス通路(6)内には、スラブ(3)に吊られているシャトル・タイプの緊急用車輌(9)が設置されており、これはトンネル内で事故や火災が生じた場合の個人用のローカルアクセスと、人々の避難手段を提供するものである。 Within the service aisle (6) there is a shuttle type emergency vehicle (9) suspended on the slab (3) for personal use in the event of an accident or fire in the tunnel. It provides local access and a means of evacuating people.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010008547A JP2011144611A (en) | 2010-01-18 | 2010-01-18 | Two-storied tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2010008547A JP2011144611A (en) | 2010-01-18 | 2010-01-18 | Two-storied tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2011144611A true JP2011144611A (en) | 2011-07-28 |
Family
ID=44459687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2010008547A Pending JP2011144611A (en) | 2010-01-18 | 2010-01-18 | Two-storied tunnel |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2011144611A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105201258A (en) * | 2015-10-16 | 2015-12-30 | 魏嘉 | Movable modularized antiaircraft, explosion-proof, and anti-nucleation bio-protection unit cabin |
CN106640184A (en) * | 2016-12-27 | 2017-05-10 | 长安大学 | Multifunctional suspension track platform for road tunnel |
CN107630713A (en) * | 2017-08-18 | 2018-01-26 | 中铁隧道勘测设计院有限公司 | A kind of shield tunnel lower floor fire escape of growing up ensures the method for ventilation of malleation |
CN109681230A (en) * | 2019-01-22 | 2019-04-26 | 中铁第四勘察设计院集团有限公司 | A kind of double-layer shield tunnel upper and lower level garage's service channel and its setting method |
CN114320451A (en) * | 2021-12-28 | 2022-04-12 | 武汉理工大学 | Urban tunnel pedestrian emergency refuge system |
-
2010
- 2010-01-18 JP JP2010008547A patent/JP2011144611A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105201258A (en) * | 2015-10-16 | 2015-12-30 | 魏嘉 | Movable modularized antiaircraft, explosion-proof, and anti-nucleation bio-protection unit cabin |
CN106640184A (en) * | 2016-12-27 | 2017-05-10 | 长安大学 | Multifunctional suspension track platform for road tunnel |
CN107630713A (en) * | 2017-08-18 | 2018-01-26 | 中铁隧道勘测设计院有限公司 | A kind of shield tunnel lower floor fire escape of growing up ensures the method for ventilation of malleation |
CN109681230A (en) * | 2019-01-22 | 2019-04-26 | 中铁第四勘察设计院集团有限公司 | A kind of double-layer shield tunnel upper and lower level garage's service channel and its setting method |
CN109681230B (en) * | 2019-01-22 | 2024-05-03 | 中铁第四勘察设计院集团有限公司 | Double-layer shield tunnel upper and lower layer vehicle-mounted communication channel and setting method thereof |
CN114320451A (en) * | 2021-12-28 | 2022-04-12 | 武汉理工大学 | Urban tunnel pedestrian emergency refuge system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2317074B1 (en) | Tunnel multi-storey | |
CN104912004B (en) | Hold rail-type track transportation bridge evacuation maintenance platform | |
KR101772362B1 (en) | A Great deep metro station structure | |
JP2011144611A (en) | Two-storied tunnel | |
WO2013147652A2 (en) | Metro station and method for constructing same | |
CN201581920U (en) | Emergency evacuation and rescue system of side gallery arranged on single-line rail transportation tunnel | |
MX2008006718A (en) | Traffic control intersection. | |
CN107558494A (en) | A kind of Underground Station structure and its method of construction | |
KR20170109472A (en) | Evacuation structure of metrorail of deep underground space | |
JP2010531400A (en) | Multi-passage tunnel | |
CN101886359A (en) | Solution to series of problems of urban road traffic in saturated condition of total number of private cars | |
US20110103893A1 (en) | Tunnel multi floor | |
RU2503560C2 (en) | Method of super-high-speed in-megapolis passenger and freight conveyance of higher anti-terrorism security | |
JP4186061B2 (en) | Shield tunnel subway with double cross-section wiring | |
EP1191186B1 (en) | Tunnel for road transport | |
CN109398371A (en) | A kind of staged evacuation platform with cable bearer | |
KR20080112176A (en) | The structure of tunnel in unban railway or monorail | |
CN210264723U (en) | Single-hole double-layer mine method tunnel vehicle evacuation system | |
CN210264722U (en) | Single-hole double-layer tunnel vehicle evacuation system | |
KR20110047528A (en) | Tunnel with multi floor | |
CN105714855A (en) | Open-cut method tunnel structure | |
CN106114523A (en) | Hanging type passage of train system | |
CN213331101U (en) | Mine method double-layer double-hole tunnel suitable for municipal traffic | |
RU146088U1 (en) | STATION COMPLEX OF THE METRO WITH ONE VESTIBULE SEPARATED BY THE FIRE PARTITION | |
CN210343357U (en) | Vehicle transverse passage with personnel passing function in tunnel |