[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2004338830A - Elevator for connecting bridge - Google Patents

Elevator for connecting bridge Download PDF

Info

Publication number
JP2004338830A
JP2004338830A JP2003134946A JP2003134946A JP2004338830A JP 2004338830 A JP2004338830 A JP 2004338830A JP 2003134946 A JP2003134946 A JP 2003134946A JP 2003134946 A JP2003134946 A JP 2003134946A JP 2004338830 A JP2004338830 A JP 2004338830A
Authority
JP
Japan
Prior art keywords
car
weight
main rope
connecting bridge
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2003134946A
Other languages
Japanese (ja)
Inventor
Kazuaki Tomita
和明 富田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2003134946A priority Critical patent/JP2004338830A/en
Publication of JP2004338830A publication Critical patent/JP2004338830A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Types And Forms Of Lifts (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To save labors for maintenance by easily adjusting elongation of main cables 21 of an elevator for connecting bridge suspending two cars 12, 112 by a series of main cables 21. <P>SOLUTION: A first car 12 and a second car 112 installed to a first bridge pier 11 and a second bridge pier 111 supporting a connecting bridge 4, and an adjusting weight 24 are suspended by a series of main cables 21. A take-up machine 22 and a braking machine 23 are interposed between both of the cars 12, 112 so as to wrap the main cables 21. Under a condition that the adjusting weight 24 is locked to a fixing part 11, the take-up machine 22 is actuated, and the cars 12, 112 are elevated in directions opposite to each other. Thereafter, the braking machine 23 is actuated to hold the cars 12, 112 at a predetermined position. When the main cables 21 are elongated, the lock of the adjusting weight 24 is released and lowered under a condition that the braking machine 23 is actuated. Length of the main cable 21 at a portion for suspending the adjusting weight 24, so as to keep the length of the main cable 21 at the portion for suspending both of the cars 12 and 112 within a predetermined range. As a result, even when the main cable is elongated, there is no need of cutting and shortening the main cable, so as to save labors of maintenance. <P>COPYRIGHT: (C)2005,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
この発明は、駅構内の跨線橋や横断歩道橋等の連絡橋の橋脚部に設置される連絡橋用エレベータに関る発明であって、特に、主索の伸びを調整する装置に係るものである。
【0002】
【従来の技術】
従来の連絡橋用エレベータとして、例えば、離れた二地点で跨線橋を支える橋脚部分に、それぞれ第1エレベータと第2エレベータが設置され、各かごが一連の主索で吊持されると共に、両かごの間に巻上機が取り付けられて主索が巻き掛けられ、両かごを相反する方向へ連動して昇降させるようにしたものがある(例えば、特許文献1参照)。
上記従来の連絡橋用エレベータでは、第1エレベータのかごが下乗場で待機しているときは、第2エレベータのかごは上乗場で待機する。このとき、往来客が下乗場で第1エレベータのかごに乗り込んで上昇運転を指令すると、第1エレベータ及び第2エレベータの戸が閉じるのを待って、第1エレベータのかごは下乗場から上昇して上乗場に到着し、第2エレベータのかごは下乗場に到着する。第1エレベータのかごは、往来客が降りると戸を閉じ、下乗場で待っている別の往来客を輸送するために下降する。また、第1エレベータで上乗場に到着した往来客は跨線橋を渡って第2エレベータの上乗場まで歩行する。
【0003】
一方、第2エレベータのかごは、第1エレベータのかごの下降に伴って上昇する。従って、第2エレベータのかごは、往来客が跨線橋を渡り切る前に下乗場を出発して上乗場へ向けて上昇運転中であるか、又は既に上乗場へ到着していることになる。このため、上乗場での往来客の待ち時間が短縮され、跨線橋における交通を円滑化させることができる。
【0004】
【特許文献1】
特開平9−30753号公報(第5頁、第3図及び第4図)
【0005】
【発明が解決しようとする課題】
従来の連絡橋用エレベータは、上記のとおり、2台のかごが一連の主索で吊持されると共に、両かごの間に巻上機が取り付けられて主索が巻き掛けられ、両かごを相反する方向へ昇降させるようにしたものである。
ところで、エレベータの主索は使用によって伸びを生じる。一連の主索で2台のかごを吊持する従来の連絡橋用エレベータで主索が伸びた場合、一方のかごの床面を乗場の床面と合せると、他方のかごの床面が乗場の床面と合わなくなる。連絡橋は、跨線橋や横断歩道橋が具体例であるから、往来客は幅広い年齢層に及び、車椅子利用者も対象となることから、床面の段差はかごへの円滑な乗降に支障となることも想定される。
このため、連絡橋用エレベータでは、主索の伸びは重要な保守点検項目であり、伸びの発生に伴う主索の切詰め作業を頻繁に行う必要があった。この結果、保守に多大な労力を必要とし、また、作業期間中往来客にも不便を強いる、という問題があった。
【0006】
この発明は、上記問題点を解決するためになされたものであり、2台のかごが一連の主索で吊持された連絡橋用エレベータにおいて、主索が伸びた場合、主索を切り詰めることなく両かごの床面を乗場床と合せることができるようにして、保守の労力を省き、また、往来客の不便を軽減することを目的とする。
【0007】
【課題を解決するための手段】
この発明に係る連絡橋用エレベータは、連絡橋を支える第1橋脚と第2橋脚にそれぞれ第1かごと第2かごが設置され、上記両かごと調整錘とを一連の主索で吊持すると共に両かごの間に巻上機と制動機を介在させて主索を巻き掛け、調整錘を固定部に係止させた状態で巻上機を作動させてかごを互いに相反する方向へ昇降させた後制動機を作動させてかごを所定位置に保持し、主索が伸びると制動機を作動させた状態で調整錘の係止を解いて下降させて調整錘を吊持する部分の主索の長さを増大させることにより両かごを吊持する部分の主索の長さを所定の範囲内に保つようにしたものである。
【0008】
【発明の実施の形態】
実施の形態1.
図1から図6は、この発明の実施の形態1における連絡橋用エレベータを示し、駅構内の跨線橋に設置されたものを示す。
図1は連絡橋用エレベータの全体を示す斜視図である。図において、第1地点である改札側のプラットホーム1には第1橋脚11が立設され、線路3を隔てた第2地点である島側のプラットホーム2には第2橋脚111が立設されている。第1橋脚11と第2橋脚111に支えられて跨線橋からなる連絡橋4が跨設されている。連絡橋4の上部は連絡橋用エレベータの機械室5が設けられている。第1橋脚11には連絡橋用エレベータの第1かご12が設置され、プラットホーム1の第1下部乗場13と連絡橋4の第1上部乗場14の間を昇降して客を搬送するようになっている。第2橋脚111には連絡橋用エレベータの第2かご112が設置され、プラットホーム2の第2下部乗場113と連絡橋4の第2上部乗場114の間を昇降して客を搬送するようになっている。
【0009】
第1かご12と第2かご112は、一連の主索21で連結されて吊持され、更に主索21は第1橋脚11に設置された調整錘24も吊持している。即ち、主索21は、一端が第1かご12に係止されて立ち上がり、第1橋脚11の頂部に取り付けられた巻上機22の綱車に巻き掛けられた後滑車31を介して立ち下げられて調整錘24の頂部に取り付けられた滑車32に巻き掛けられて立ち上がり滑車33を介して横引きされ、第2橋脚111の頂部に取り付けられた滑車34に巻き掛けられて立ち下げられ、他端が第2かご112に係止されている。
ここで、調整錘24は、第1かご12による張力よりも大きい張力を主索21に作用させる重量を有する。従って、調整錘24は少なくとも無負荷の第1かご12の総重量の2倍よりも大きい重量を有し、錘係止手段25によって第1橋脚11に常時係止されており、必要時に上記係止が解除されることにより錘ガイドレール30に沿って下降して第1かご12を上昇させる。
【0010】
第1下部乗場13には第1下部乗場釦13aが設けられ、第1上部乗場14には第1上部乗場釦14aが設けられており、各乗場へ第1かご12を呼び寄せることができる。第2下部乗場113と第2上部乗場114にも同様に第2下部乗場釦113aと第2上部乗場釦114aが設けられていて第2かご112を呼び寄せることができる。
第1橋脚11の第1下部乗場13付近には第1下部着床域検出手段43が取り付けられており、第1かご12は第1下部乗場13の床面に対して所定の着床域内で停止するように制御される。第1上部乗場14付近にも同様に第1上部着床域検出手段44が取り付けられていて着床域内で停止するように制御される。
【0011】
第2橋脚111の第2下部乗場113付近にも同様に第2下部着床域検出手段143が取り付けられており、第2かご112が第2下部乗場113の床面に対して所定の着床域内で停止するように制御される。第2上部乗場114付近にも同様に第2上部着床域検出手段144が取り付けられていて着床域内で停止するように制御される。また、調整錘24の位置を検出するために錘位置検出手段45が設けられている。
【0012】
図2は錘係止手段25の平面図、図3は図2のIII−III線断面を矢視した断面図で、図中、図1と同符号は同一部分を示し、説明を省略する。
錘係止手段25は、調整錘24を抱持する錘枠24aの外周面に固着されており、第1橋脚11に取り付けられた錘ガイドレール30を把持することにより調整錘24を係止するようになっている。
即ち、断面コ字状の溝形枠26の背面が錘枠24aの外周面に固着されている。溝形枠26の一方のフランジ26aの内面には摩擦板26bが固着されており、この摩擦板26bを介して錘ガイドレール30の頭部一側に押圧されている。
【0013】
また、錘ガイドレール30の頭部他側に長手方向に向けて可動片27が延設されており、摩擦板27aを介して錘ガイドレール30の頭部他側に押圧されている。溝形枠26の他方のフランジ部26cと可動片27の間には一対のばね28aが介挿されていて可動片27を錘ガイドレール30側へ常時押圧している。ばね28aが当接する溝形枠26の他方のフランジ部26cには、それぞれ貫通孔26dが明けられており、一対のボルト28が貫通孔26dとばね28aの双方に遊挿されて可動片27に螺着している。
フランジ26cの内側面には電磁石29が取り付けられている。この電磁石29は常時消勢されており、錘ガイドレール30との係止を解く場合に付勢されて、可動片27に固着された鉄心29aを吸引する。この吸引により、ばね28aに抗して可動片27を移動させて錘ガイドレール30と摩擦板26b及び27aとの係止を解除させて調整錘24の移動を可能とする。
【0014】
図4は連絡橋用エレベータの電気回路を示すブロック図である。図中、図1から図3と同符号は同一部分を示す。
制御装置50は、CPU51と、プログラムが書き込まれたROMと、一時的なデータが書き込まれるRAMと、外部装置からの信号が取り込まれる入力回路54と、外部装置へ信号が送出される出力回路55と、錘係止手段25による調整錘24の第1橋脚11への係止及び係止解除を制御する錘係止制御部56と、巻上機22による第1かご12と第2かご112の昇降駆動を制御する巻上機制御部57と、制動機23による主索21の制止及び制止解除を制御する制動機制御部58からなる。
【0015】
第1かご12の戸制御部59は出力回路55に接続されており、制御装置50からの開閉指令を受けて戸を制御し、同様に戸制御部159は第2かご112の戸を制御する。第1下部乗場釦13a、第1上部乗場釦14a、第2下部乗場釦113a及び第2上部乗場釦114aが入力回路54に接続されていて、各乗場で呼びの登録及び戸の開閉を指令することができる。第1かご12に設置された第1かご操作盤12a及び第2かご112に設置された第2かご操作盤112aも入力回路54に接続されている。
【0016】
第1下部着床域検出手段43及び第1上部着床域検出手段44は、第1かご12に取り付けられたカム42によって作動し、その作動信号が入力回路54を介して制御装置50に入力される。同様に、第2下部着床域検出手段143及び第2上部着床域検出手段144は、第2かご112に取り付けられたカム142によって作動し、その作動信号が入力回路54を介して制御装置50に入力される。更に、錘位置検出手段45の作動信号が入力回路54を介して制御装置50に入力される。
【0017】
図5(a)〜(c)は、主索21が伸びた場合の両かご12、112の制御を示す説明用図である。ここで、第1かご12が第2かご112に優先して制御され、第1かご12の床面が第1下部乗場13及び第1上部乗場14の床面と合うように制御される。従って、第1かご12は所定の着床域から外れることはないが、第2かご112は主索21が伸びると着床域から外れることになる。
図5(a)は、連絡橋用エレベータが据え付けられた当初の主索21によって吊持された第1かご12、第2かご112及び調整錘24の停止位置を示す。
即ち、第1かご12は、上方から第1下部乗場13へ近付くと、カム42によって先ず第1下部着床域検出手段43のリミットスイッチ43Dが作動する。続いて床前の距離LU1でリミットスイッチ43Uを作動させると巻上機22が消勢されて制動機23が主索21を制止し始め、距離LU1を過ぎた位置で第1かご12は停止する。このとき、第1かご12の床面は第1下部乗場13の床面と合い、第2かご112の床面は第2上部乗場114の床面と合い、かつ、錘位置検出手段45はカム46の中心位置で係合している。従って、第1かご12は上方へ距離LU1、下方へ距離LD1の着床域を有し、第2かご112は上方へ距離LU2、下方へ距離LD2の着床域を有する。ここでは、LU1=LD1=LU2=LD2とする。
【0018】
図5(b)は、主索21が伸びたために第2かご112が第2上部乗場114の着床域(LU2+LD2)内に停止できない場合を示す。
主索21の伸び量が少ない場合は、第1かご12を着床域(LU1+LD1)内で低めに停止させることにより、両かご12、112を共に着床域内に停止させることができる。しかし、主索21の伸び量が所定値以上になると、着床域(LU1+LD1)内で第1かご12の停止位置を変更しても、第2かご112を着床域(LU2+LD2)内に停止させることができなくなる。
即ち、主索21の伸び量が増大すると、第1かご12を着床域(LU1+LD1)内の最下位で停止させたとしても、第2かご112のカム142はリミットスイッチ144Dから外れて更に距離δ0だけ下方に位置し、第2かご112は着床域(LU2+LD2)から外れることになる。
【0019】
図5(c)は、主索21が伸びて第2かご112が着床域(LU2+LD2)から外れた場合、制動機23を作動させた状態で錘係止手段25による調整錘24の係止を解いて下降させ、調整錘24を吊持する部分の主索21の長さを増大させることにより主索21の伸びを吸収させた状態を示す。
即ち、第1かご12を着床域(LU1+LD1)の中心位置に停止させた後、錘係止手段25による係止を瞬時解除して錘24を微動下降させることにより、第2かご112を微動上昇させる。この動作を繰り返して第2かご112を着床域(LU2+LD2)の中心位置まで上昇させる。これにより、主索21の伸びを調整錘24を吊持する部分で吸収させて、両かご12、112を吊持する部分の主索21の長さを所定の範囲内に保つことができる。
なお、第1かご12を着床域(LU1+LD1)の中心位置に停止させるには、例えば、第1かご12の移動に伴ってパルス信号を発生させ、このパルス信号を計数することにより、上記中心位置を検知することができる。以下同様であって、その技術は周知されているので具体例は省略する。
【0020】
図6は、連絡橋用エレベータの動作を示す流れ図である。調整錘24は第1橋脚11に係止されているものとする。
手順S11で、かご操作盤12a及び112a又は乗場釦13a、14a、113a及び114aが操作されて呼びが登録されたか否か調べる。登録されていない場合は処理を終了する。登録されている場合は、手順S12で戸が閉じたことを確認する。要すれば戸制御部59及び159によって戸を閉じた後、手順S13で制動機23による制止を解くと共に巻上機22を付勢し、第1かご12及び第2かご112を目的位置まで昇降させる。目的位置に到着すると手順S14で、戸を開いて客を降ろした後戸を閉じる。手順S15で、第1下部着床域検出手段43又は第1上部着床域検出手段44によって第1かご12が着床域(LU1+LD1)内に停止していることを確認する。手順S16で、第2下部着床域検出手段143又は第2上部着床域検出手段144によって第2かご112が着床域(LU2+LD2)内に停止しているか調べる。着床域(LU2+LD2)内に停止しておれば、各かご12及び112は共に各乗場13、14、113及び114の床面に対して着床域内に停止しており、処理を終了する。
【0021】
手順S16で、第2かご112が着床域(LU2+LD2)内に停止していない場合は、手順S17に移り、第1かご12を着床域(LU1+LD1)内で昇降させて第2かご112を移動させる。即ち、図5(b)に示したとおり、リミットスイッチ144Dがカム142から外れたときは、第1かご12を着床域(LU1+LD1)内で下降させる。所定時間が経過した場合は、手順S18を介して手順S19へ移り、第1かご12及び第2かご112が共に着床域内であるか調べる。主索21の伸びが小さい場合は、上記手順S17及び手順S18の処理によって第1かご12及び第2かご112を共に着床域内に停止させることができる。
【0022】
しかし、主索21の伸びが大きい場合は、図5(b)に示したとおり、第1かご12を着床域(LU1+LD1)内で昇降させても第2かご112を着床域(LU2+LD2)内に停止させることができない。このため、手順S19から手順S20へ移り、第1かご12を着床域(LU1+LD1)の中心位置に停止させた後制動機23で主索21を制止させる。中心位置に停止させるには、上記のとおり、第1かご12の移動に伴ってパルス信号を発生させる装置によって行う。手順S21で、錘係止手段25による係止を瞬時解除して調整錘24を少しずつ下降させる。これに伴って第2かご112が上昇する。手順S22で、錘位置検出手段45によって調整錘24の位置を監視しながら第2かご112が着床域(LU2+LD2)内に停止するまで調整錘24を下降させる。即ち、図5(c)に示す状態になる。第2かご112が着床域(LU2+LD2)内に停止すると手順S23から手順S24へ移り、錘係止手段25によって調整錘24を係止して処理を終る。
【0023】
主索21が極端に大きく伸びた場合は、手順S21から手順S23の処理によって第2かご112を着床域(LU2+LD2)内へ移動させる途中で、錘位置検出手段45とカム46の係合が外れる。このため、手順S22から手順S25へ移り、錘係止手段25によって調整錘24を係止させて主索21の伸び調整動作を停止させた後、手順S26で通信回路60を介して外部の表示装置61を作動させ、主索21の伸びを報知して処理を終る。
【0024】
上記実施の形態1によれば、連絡橋を支える第1橋脚11と第2橋脚111にそれぞれ設置された第1かご12と第2かご112の双方を一連の主索21で吊持して互いに逆方向へ昇降させるようにした連絡橋用エレベータにおいて、両かご12、112の間で主索21に調整錘24を吊持させ、錘係止手段25による係止を解いて調整錘24を上下動可能にしたので、主索21が伸びた場合は、制動機23を作動させて第1かご12を着床域(LU1+LD1)に停止させた状態で調整錘24を下降させることにより、第2かご112を上昇させて着床域(LU2+LD2)内に停止させることができる。このため、主索を切り詰めることがないので、保守の労力を省き、また、往来客の不便を軽減させることができる。
【0025】
また、滑車32を介して主索21に調整錘24を吊持させたので、調整錘24の移動距離は主索21の伸び量の半分となり、調整錘24は少ない移動量で主索21の伸び量を吸収することができる。
更に、調整錘24が錘位置検出手段45による検出範囲を外れた場合は通信回路60を介して外部へ通報するようにしたので、主索21が異常に伸びた場合は、早期に対策することができる。
【0026】
実施の形態2.
図7及び図8は、この発明の実施の形態2における連絡橋用エレベータを示す。この実施の形態2は、巻上機22と制動機23を分離し、巻上機22は調整錘24と第1かご12の間で主索21を巻き掛け、制動機23は調整錘24と第2かご112の間で主索21を巻き掛けたものである。
図中、図1から図6と同符号は同一部分を示し、説明を省略する。制動機23は、機械室5に取り付けられた基台23aに立設されたブラケット23b及び23cに綱車23dとブレーキ車23eが回動自在に軸支され、ブレーキ車23eは常時ブレーキシュー23fに把持され、ブレーキレバー23gを介してばね23hによって押圧されて制止している。電磁石23iが付勢されるとばね23hに抗してブレーキシュー23fによる把持を解いてブレーキ車23eを回動自在にする。また、綱車23dと主索21との摩擦力を得るために滑車35が制動機23に対向して設置されている。
【0027】
上記実施の形態2における動作も図6に示した動作と同様であるが、主索21が伸びた場合に、実施の形態1では、調整錘24を下降させることにより第2かご112を上昇させるようにしたが、この実施の形態2では、調整錘24を下降させることにより第1かご12を上昇させるようにしたものである。また、巻上機22を併せて作動させることにより、調整錘24を上昇させ、第1かご12を下降させることもできる。即ち、床合せ動作が可能となる。
【0028】
上記実施の形態2によれば、巻上機22と制動機23を分離し、巻上機22を調整錘24と第1かご12の間に設置し、制動機23を調整錘24と第2かご112の間に設置したので、第2かご112を着床域(LU2+LD2)内に停止させた状態で第1かご12を着床域(LU1+LD1)内に停止させることができる。このため、主索を切り詰めることがないので、保守の労力を省き、また、往来客の不便を軽減させることができる。
また、制動機23で第2かご112を停止させた状態で巻上機22を作動させることにより、第1かご12を上下動させることが可能となり、第1かご12を着床域(LU1+LD1)内の所定位置に正確に停止させることができる。
【0029】
実施の形態3.
図9は、この発明の実施の形態3における連絡橋用エレベータの電気回路を示すブロック図である。この実施の形態3は、第1かご12を滑車36を介して吊持し、第2かご112を滑車37を介して吊持し、巻上機22及び制動機23を第1かご12と第2かご112の間に介在させ、調整錘24を第1かご12から立ち上がった主索21の反巻上機22側で滑車38を介して吊持したものである。
【0030】
上記実施の形態3における動作も実施の形態2と同様に、主索21が伸びた場合に第1かご12を上昇させるようにしたものである。このため、主索21が伸びた場合でも切り詰める必要がないので、保守の労力を省くことができる。また、往来客の不便を軽減させることもできる。
特に、第1かご12と第2かご112の間の外側で調整錘24を主索21で吊持するようにしたので、調整錘24の配置の多様化に対応することができる。
また、第1かご12は滑車36を介して主索21に吊持されるのに対して、調整錘24は主索21に直接係止されたので、第1かご12は調整錘24の移動距離の2分の1の移動距離になる。このため、主索21の伸びを調整する場合に錘係止手段25の係止を解除して調整錘24を下降させたときの第1かご12の移動距離を小さくすることができ、第1かご12を着床域(LU1+LD1)内の所定位置に正確に停止させることができる。
【0031】
【発明の効果】
この発明に係る連絡橋用エレベータは、上記のとおり構成されているので、以下の効果を奏する。
連絡橋を支える第1橋脚と第2橋脚にそれぞれ第1かごと第2かごが設置され、両かごと調整錘とを一連の主索で吊持すると共に両かごの間に巻上機と制動機を介在させて主索を巻き掛け、調整錘を固定部に係止させた状態で巻上機を作動させてかごを互いに相反する方向へ昇降させた後制動機を作動させてかごを所定位置に保持し、主索が伸びると制動機を作動させた状態で調整錘の係止を解いて下降させて調整錘を吊持する部分の主索の長さを増大させることにより両かごを吊持する部分の主索の長さを所定の範囲内に保つようにしたものである。
このため、主索が伸びた場合、主索を切り詰める必要がないので、保守の労力を省くことができる、という効果を奏する。
【図面の簡単な説明】
【図1】この発明の実施の形態1における連絡橋用エレベータの全体を示す斜視図。
【図2】この発明の実施の形態1における連絡橋用エレベータの錘係止手段25の平面図。
【図3】図2のIII−III線断面を矢視した線断図。
【図4】この発明の実施の形態1における連絡橋用エレベータの電気回路を示すブロック図。
【図5】この発明の実施の形態1における主索21が伸びた場合の動作を示す説明用図。
【図6】この発明の実施の形態1における連絡橋用エレベータの動作を示す流れ図。
【図7】この発明の実施の形態2における連絡橋用エレベータの電気回路を示すブロック図。
【図8】この発明の実施の形態2における連絡橋用エレベータの制動機23の斜視図。
【図9】この発明の実施の形態3における連絡橋用エレベータの電気回路を示すブロック図。
【符号の説明】
1 プラットホーム、 2 プラットホーム、 3 線路、 4 連絡橋、 5 機械室、 11 第1橋脚、 12 第1かご、 13 第1下部乗場、 13a 第1下部乗場釦、 14 第1上部乗場、 14a 第1上部乗場釦、21 主索、 22 巻上機、 23 制動機、 24 調整錘、 25 錘係止手段、 30 錘ガイドレール、 31 滑車、 32 滑車、 33 滑車、 34 滑車、 35 滑車、 36 滑車、 37 滑車、 42 カム、 43 第1下部着床域検出手段、 44 第1上部着床域検出手段、 45錘位置検出手段、 46 カム、 50 制御装置、 56 錘係止制御部、57 巻上機制御部、 58 制動機制御部、 111 第2橋脚、 112第2かご、 113 第2下部乗場、 113a 第2下部乗場釦、 114第2上部乗場、 114a 第2上部乗場釦、 142 カム、 143 第2下部着床域検出手段、 144 第2上部着床域検出手段。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an elevator for a connecting bridge installed on a pier of a connecting bridge such as an overpass or a pedestrian bridge in a station yard, and particularly relates to a device for adjusting the extension of a main rope.
[0002]
[Prior art]
As a conventional connecting bridge elevator, for example, a first elevator and a second elevator are respectively installed on pier portions supporting an overpass at two distant points, and each car is suspended by a series of main ropes, and both cars are suspended. There is a type in which a hoist is attached between the two and a main rope is wound thereon, and both cars are moved up and down in conjunction with opposite directions (for example, see Patent Document 1).
In the above-described conventional elevator for a bridge, when the car of the first elevator is waiting at the lower landing, the car of the second elevator is waiting at the upper landing. At this time, when the passengers enter the car of the first elevator at the lower landing and instruct the ascending operation, the first elevator car rises from the lower landing after waiting for the doors of the first elevator and the second elevator to close. Arrives at the upper landing, and the car of the second elevator arrives at the lower landing. The first elevator car closes the door when the passengers get off and descends to transport another passenger waiting at the landing. In addition, a passenger arriving at the landing at the first elevator walks over the overpass to the landing at the second elevator.
[0003]
On the other hand, the car of the second elevator rises as the car of the first elevator descends. Therefore, the car of the second elevator is either traveling upward from the lower landing to the upper landing before the traffic crosses the overpass, or has already arrived at the upper landing. For this reason, the waiting time of visitors at the landing is reduced, and traffic on the overpass can be smoothed.
[0004]
[Patent Document 1]
JP-A-9-30753 (Page 5, FIGS. 3 and 4)
[0005]
[Problems to be solved by the invention]
As described above, in the conventional elevator for a bridge, two cars are suspended by a series of main ropes, and a hoist is attached between the two cars, and the main ropes are wound around the elevator cars. It is designed to be raised and lowered in opposite directions.
By the way, the main rope of the elevator is elongated by use. If the main ropes are extended by the conventional elevator for a bridge that suspends two cars with a series of main ropes, if the floor of one car is aligned with the floor of the landing, the floor of the other car will be the landing. Will not fit the floor. The overpass and pedestrian overpass are specific examples of the access bridge, so visitors come in a wide range of age groups, and wheelchair users are also eligible.Therefore, steps on the floor may hinder smooth entry / exit to the car. Is also assumed.
Therefore, in the elevator for the connecting bridge, the elongation of the main rope is an important maintenance and inspection item, and it has been necessary to frequently cut down the main rope due to the elongation. As a result, there has been a problem that a large amount of labor is required for maintenance, and inconvenience is also given to visitors during the work period.
[0006]
The present invention has been made in order to solve the above problems, and in an elevator for a connecting bridge in which two cars are suspended by a series of main ropes, when the main ropes are extended, the main ropes are cut off. It is an object of the present invention to make it possible to match the floor surfaces of the two cars with the floor of the landing without the need for maintenance, and to reduce inconvenience for visitors.
[0007]
[Means for Solving the Problems]
In the elevator for a connecting bridge according to the present invention, a first car and a second car are respectively installed on a first pier and a second pier supporting the connecting bridge, and the both cars and the adjusting weight are suspended by a series of main ropes. At the same time, the main rope is wound around the hoist and brake between both cars, and the hoist is operated with the adjusting weight locked on the fixed part to raise and lower the cars in opposite directions. After that, the brake is activated to hold the car in place, and when the main rope is extended, the adjustment weight is unlocked and lowered while the brake is activated, and the main rope at the part where the adjustment weight is suspended By increasing the length of the main rope, the length of the main rope of the portion where both cars are suspended is kept within a predetermined range.
[0008]
BEST MODE FOR CARRYING OUT THE INVENTION
Embodiment 1 FIG.
FIGS. 1 to 6 show an elevator for a connecting bridge according to Embodiment 1 of the present invention, which is installed on an overpass in a station yard.
FIG. 1 is a perspective view showing the whole of an elevator for a connecting bridge. In the figure, a first pier 11 is erected on a platform 1 on a ticket gate side which is a first point, and a second pier 111 is erected on a platform 2 on an island side which is a second point across a track 3. I have. The connecting bridge 4 composed of an overpass is supported by the first pier 11 and the second pier 111 and is laid. At the upper part of the connecting bridge 4, a machine room 5 for the connecting bridge elevator is provided. A first car 12 of a connecting bridge elevator is installed on the first pier 11, and lifts and lowers between a first lower landing 13 of the platform 1 and a first upper landing 14 of the connecting bridge 4 to transport customers. ing. The second pier 111 is provided with a second car 112 of a connecting bridge elevator. The second car 112 is moved up and down between a second lower landing 113 of the platform 2 and a second upper landing 114 of the connecting bridge 4 to transport customers. ing.
[0009]
The first car 12 and the second car 112 are connected and suspended by a series of main ropes 21, and the main ropes 21 also suspend an adjustment weight 24 installed on the first pier 11. That is, the main rope 21 rises with one end locked to the first car 12, is wound around the sheave of the hoisting machine 22 attached to the top of the first pier 11, and then falls down via the pulley 31. And is wrapped around a pulley 32 attached to the top of the adjustment weight 24 and pulled up sideways via a pulley 33, wrapped around a pulley 34 attached to the top of the second pier 111, lowered, and the like. The end is locked to the second car 112.
Here, the adjustment weight 24 has a weight that causes a tension greater than the tension due to the first car 12 to act on the main rope 21. Therefore, the adjustment weight 24 has a weight at least larger than twice the total weight of the unloaded first car 12, and is constantly locked to the first pier 11 by the weight locking means 25. When the stop is released, the first car 12 is moved down along the weight guide rail 30 and raised.
[0010]
The first lower landing 13 is provided with a first lower landing button 13a, and the first upper landing 14 is provided with a first upper landing button 14a, so that the first car 12 can be called to each landing. Similarly, the second lower landing 113 and the second upper landing 114 are also provided with the second lower landing button 113a and the second upper landing button 114a, so that the second car 112 can be called.
The first lower landing area detecting means 43 is attached near the first lower landing 13 of the first pier 11, and the first car 12 moves within a predetermined landing area with respect to the floor surface of the first lower landing 13. It is controlled to stop. Similarly, the first upper landing area detecting means 44 is attached near the first upper landing 14, and is controlled so as to stop within the landing area.
[0011]
Similarly, the second lower landing area detecting means 143 is attached to the vicinity of the second lower landing 113 of the second pier 111, and the second car 112 makes a predetermined landing on the floor of the second lower landing 113. It is controlled to stop in the area. Similarly, the second upper landing area detecting means 144 is attached near the second upper landing 114, and is controlled so as to stop in the landing area. Further, a weight position detecting means 45 is provided to detect the position of the adjustment weight 24.
[0012]
2 is a plan view of the weight locking means 25, and FIG. 3 is a cross-sectional view taken along the line III-III of FIG. 2, in which the same reference numerals as in FIG. 1 denote the same parts, and a description thereof will be omitted.
The weight locking means 25 is fixed to the outer peripheral surface of the weight frame 24 a that holds the adjustment weight 24, and locks the adjustment weight 24 by gripping the weight guide rail 30 attached to the first pier 11. It has become.
That is, the back surface of the channel frame 26 having a U-shaped cross section is fixed to the outer peripheral surface of the weight frame 24a. A friction plate 26b is fixed to the inner surface of one flange 26a of the channel frame 26, and is pressed against one side of the head of the weight guide rail 30 via the friction plate 26b.
[0013]
A movable piece 27 extends in the longitudinal direction on the other side of the head of the weight guide rail 30, and is pressed against the other side of the head of the weight guide rail 30 via the friction plate 27a. A pair of springs 28a is interposed between the other flange 26c of the channel frame 26 and the movable piece 27, and constantly presses the movable piece 27 toward the weight guide rail 30 side. A through hole 26d is formed in the other flange portion 26c of the channel frame 26 with which the spring 28a contacts, and a pair of bolts 28 are loosely inserted into both the through hole 26d and the spring 28a, and It is screwed.
An electromagnet 29 is attached to the inner surface of the flange 26c. The electromagnet 29 is always deenergized, and is energized when releasing the engagement with the weight guide rail 30 to suck the iron core 29 a fixed to the movable piece 27. By this suction, the movable piece 27 is moved against the spring 28a to release the engagement between the weight guide rail 30 and the friction plates 26b and 27a, and the adjustment weight 24 can be moved.
[0014]
FIG. 4 is a block diagram showing an electric circuit of the connecting bridge elevator. In the drawing, the same reference numerals as those in FIGS. 1 to 3 indicate the same parts.
The control device 50 includes a CPU 51, a ROM in which a program is written, a RAM in which temporary data is written, an input circuit 54 for receiving a signal from an external device, and an output circuit 55 for sending a signal to the external device. And a weight locking control unit 56 that controls locking and unlocking of the adjustment weight 24 to the first pier 11 by the weight locking means 25, and the first car 12 and the second car 112 by the hoisting machine 22. The hoisting machine control unit 57 controls the hoisting drive, and the brake control unit 58 controls the braking and release of the main rope 21 by the brake 23.
[0015]
The door control unit 59 of the first car 12 is connected to the output circuit 55, and controls the door in response to an opening / closing command from the control device 50. Similarly, the door control unit 159 controls the door of the second car 112. . The first lower landing button 13a, the first upper landing button 14a, the second lower landing button 113a, and the second upper landing button 114a are connected to the input circuit 54, and command registration of a call and opening and closing of a door at each landing. be able to. The first car operation panel 12 a installed on the first car 12 and the second car operation panel 112 a installed on the second car 112 are also connected to the input circuit 54.
[0016]
The first lower landing area detecting means 43 and the first upper landing area detecting means 44 are operated by the cam 42 attached to the first car 12, and the operation signals are input to the control device 50 via the input circuit 54. Is done. Similarly, the second lower landing area detecting means 143 and the second upper landing area detecting means 144 are operated by the cam 142 attached to the second car 112, and the operation signal is transmitted via the input circuit 54 to the control device. 50 is input. Further, an operation signal of the weight position detecting means 45 is input to the control device 50 via the input circuit 54.
[0017]
5A to 5C are explanatory diagrams illustrating control of the two cars 12, 112 when the main rope 21 is extended. Here, the first car 12 is controlled in preference to the second car 112, and the floor of the first car 12 is controlled so as to match the floors of the first lower landing 13 and the first upper landing 14. Therefore, the first car 12 does not deviate from the predetermined landing area, but the second car 112 deviates from the landing area when the main rope 21 extends.
FIG. 5A shows the stop positions of the first car 12, the second car 112, and the adjusting weight 24 suspended by the main ropes 21 at the time when the connecting bridge elevator is installed.
That is, when the first car 12 approaches the first lower landing 13 from above, the cam 42 first activates the limit switch 43D of the first lower landing area detecting means 43. Subsequently, when the limit switch 43U is operated at the distance LU1 in front of the floor, the hoisting machine 22 is deenergized, and the brake 23 starts to stop the main rope 21, and the first car 12 stops at a position beyond the distance LU1. . At this time, the floor of the first car 12 matches the floor of the first lower landing 13, the floor of the second car 112 matches the floor of the second upper landing 114, and the weight position detecting means 45 It is engaged at the center position of 46. Accordingly, the first car 12 has a landing area with a distance LU1 upward and a distance LD1 downward, and the second car 112 has a landing area with a distance LU2 upward and a distance LD2 downward. Here, it is assumed that LU1 = LD1 = LU2 = LD2.
[0018]
FIG. 5B shows a case where the second car 112 cannot be stopped within the landing area (LU2 + LD2) of the second upper landing 114 because the main rope 21 is extended.
When the amount of extension of the main rope 21 is small, both the cars 12 and 112 can be stopped in the landing area by stopping the first car 12 lower in the landing area (LU1 + LD1). However, when the amount of extension of the main rope 21 exceeds a predetermined value, the second car 112 stops in the landing area (LU2 + LD2) even if the stop position of the first car 12 is changed in the landing area (LU1 + LD1). You can not let it.
That is, when the amount of extension of the main rope 21 increases, even if the first car 12 is stopped at the lowest position in the landing area (LU1 + LD1), the cam 142 of the second car 112 is disengaged from the limit switch 144D and further extended. The second car 112 is located below by δ0, and comes out of the landing area (LU2 + LD2).
[0019]
FIG. 5C shows that when the main rope 21 is extended and the second car 112 is out of the landing area (LU2 + LD2), the adjustment weight 24 is locked by the weight locking means 25 with the brake 23 operated. Is released and lowered to increase the length of the main rope 21 where the adjustment weight 24 is suspended, thereby absorbing the extension of the main rope 21.
That is, after the first car 12 is stopped at the center position of the landing area (LU1 + LD1), the locking by the weight locking means 25 is instantaneously released, and the weight 24 is finely moved down, so that the second car 112 is finely moved. To raise. This operation is repeated to raise the second car 112 to the center position of the landing area (LU2 + LD2). Thereby, the extension of the main rope 21 is absorbed by the portion where the adjustment weight 24 is suspended, and the length of the main rope 21 in the portion where both the cars 12 and 112 are suspended can be kept within a predetermined range.
In order to stop the first car 12 at the center position of the landing area (LU1 + LD1), for example, a pulse signal is generated in accordance with the movement of the first car 12, and the pulse signal is counted. The position can be detected. The same applies to the following, and since the technique is well known, a specific example is omitted.
[0020]
FIG. 6 is a flowchart showing the operation of the connecting bridge elevator. The adjustment weight 24 is assumed to be locked to the first pier 11.
In step S11, it is checked whether the car operation panels 12a and 112a or the hall buttons 13a, 14a, 113a and 114a have been operated to register the call. If not registered, the process ends. If registered, it is confirmed in step S12 that the door has been closed. If necessary, after the doors are closed by the door control units 59 and 159, in step S13, the braking by the brake 23 is released and the hoisting machine 22 is energized, and the first car 12 and the second car 112 are raised and lowered to the target positions. Let it. When the vehicle arrives at the destination, in step S14, the door is opened, the customer is dropped down, and the rear door is closed. In step S15, the first lower landing area detecting means 43 or the first upper landing area detecting means 44 confirms that the first car 12 has stopped in the landing area (LU1 + LD1). In step S16, the second lower landing area detecting means 143 or the second upper landing area detecting means 144 checks whether the second car 112 is stopped in the landing area (LU2 + LD2). If the vehicle is stopped in the landing area (LU2 + LD2), the cars 12 and 112 are both stopped in the landing area with respect to the floors of the landings 13, 14, 113, and 114, and the process ends.
[0021]
If the second car 112 has not stopped in the landing area (LU2 + LD2) in step S16, the process proceeds to step S17, where the first car 12 is moved up and down in the landing area (LU1 + LD1) to move the second car 112. Move. That is, as shown in FIG. 5B, when the limit switch 144D comes off the cam 142, the first car 12 is lowered in the landing area (LU1 + LD1). If the predetermined time has elapsed, the process proceeds to step S19 via step S18, and it is checked whether both the first car 12 and the second car 112 are within the landing area. When the elongation of the main rope 21 is small, both the first car 12 and the second car 112 can be stopped in the landing area by the processes of the steps S17 and S18.
[0022]
However, when the extension of the main rope 21 is large, as shown in FIG. 5B, even if the first car 12 is moved up and down in the landing area (LU1 + LD1), the second car 112 is moved in the landing area (LU2 + LD2). Can not be stopped inside. For this reason, the procedure moves from step S19 to step S20, where the first car 12 is stopped at the center position of the landing area (LU1 + LD1), and then the main rope 21 is stopped by the brake 23. As described above, the stop at the center position is performed by the device that generates a pulse signal as the first car 12 moves. In step S21, the locking by the weight locking means 25 is instantaneously released, and the adjustment weight 24 is gradually lowered. Accordingly, the second car 112 rises. In step S22, while the position of the adjustment weight 24 is monitored by the weight position detection means 45, the adjustment weight 24 is lowered until the second car 112 stops in the landing area (LU2 + LD2). That is, the state shown in FIG. When the second car 112 stops in the landing area (LU2 + LD2), the procedure moves from step S23 to step S24, in which the adjusting weight 24 is locked by the weight locking means 25, and the process ends.
[0023]
When the main rope 21 is extremely extended, the engagement between the weight position detecting means 45 and the cam 46 is caused during the movement of the second car 112 into the landing area (LU2 + LD2) by the processing from step S21 to step S23. Come off. For this reason, the procedure shifts from step S22 to step S25, in which the adjusting weight 24 is locked by the weight locking means 25 to stop the elongation adjusting operation of the main rope 21, and in step S26, an external display is performed via the communication circuit 60. By operating the device 61, the extension of the main rope 21 is notified, and the processing ends.
[0024]
According to the first embodiment, both the first car 12 and the second car 112 installed on the first pier 11 and the second pier 111 supporting the connecting bridge are suspended by the series of In the elevator for the connecting bridge which is lifted and lowered in the opposite direction, the adjusting weight 24 is hung on the main rope 21 between the two cars 12 and 112, and the adjusting weight 24 is lifted up and down by releasing the locking by the weight locking means 25. Since the main rope 21 is extended, the brake 23 is operated to stop the first car 12 in the landing area (LU1 + LD1). The car 112 can be raised and stopped in the landing area (LU2 + LD2). For this reason, the main rope is not cut off, so that the maintenance work can be omitted and the inconvenience of visitors can be reduced.
[0025]
Further, since the adjusting weight 24 is hung on the main rope 21 via the pulley 32, the moving distance of the adjusting weight 24 is half of the extension amount of the main rope 21, and the adjusting weight 24 is moved by a small amount of movement. The amount of elongation can be absorbed.
Further, when the adjustment weight 24 is out of the detection range of the weight position detection means 45, the notification is made to the outside via the communication circuit 60. Therefore, if the main rope 21 is abnormally elongated, a measure should be taken at an early stage. Can be.
[0026]
Embodiment 2 FIG.
7 and 8 show a connecting bridge elevator according to a second embodiment of the present invention. In the second embodiment, the hoist 22 and the brake 23 are separated, and the hoist 22 wraps the main rope 21 between the adjusting weight 24 and the first car 12. The main rope 21 is wound around the second car 112.
In the figure, the same reference numerals as those in FIGS. In the brake 23, a sheave 23d and a brake wheel 23e are rotatably supported by brackets 23b and 23c erected on a base 23a attached to the machine room 5, and the brake wheel 23e is constantly supported by a brake shoe 23f. It is gripped and pressed by a spring 23h via a brake lever 23g to stop it. When the electromagnet 23i is biased, the grip by the brake shoe 23f is released against the spring 23h to make the brake wheel 23e rotatable. A pulley 35 is provided to face the brake 23 in order to obtain a frictional force between the sheave 23 d and the main rope 21.
[0027]
The operation in the second embodiment is the same as the operation shown in FIG. 6. However, in the first embodiment, when the main rope 21 is extended, the second car 112 is raised by lowering the adjusting weight 24. As described above, in the second embodiment, the first car 12 is raised by lowering the adjustment weight 24. By operating the hoisting machine 22 together, the adjusting weight 24 can be raised and the first car 12 can be lowered. That is, a floor matching operation can be performed.
[0028]
According to the second embodiment, the hoisting machine 22 and the brake 23 are separated, the hoist 22 is installed between the adjusting weight 24 and the first car 12, and the brake 23 is connected to the adjusting weight 24 and the second The first car 12 can be stopped in the landing area (LU1 + LD1) in a state where the second car 112 is stopped in the landing area (LU2 + LD2) because it is installed between the cars 112. For this reason, the main rope is not cut off, so that the maintenance work can be omitted and the inconvenience of visitors can be reduced.
Further, by operating the hoisting machine 22 in a state where the second car 112 is stopped by the brake 23, the first car 12 can be moved up and down, and the first car 12 can be moved to the landing area (LU1 + LD1). Can be accurately stopped at a predetermined position in the inside.
[0029]
Embodiment 3 FIG.
FIG. 9 is a block diagram showing an electric circuit of a connecting bridge elevator according to Embodiment 3 of the present invention. In the third embodiment, the first car 12 is suspended via a pulley 36, the second car 112 is suspended via a pulley 37, and the hoist 22 and the brake 23 are connected to the first car 12 and the first car 12. The adjusting weight 24 is interposed between the two cars 112 and is suspended via a pulley 38 on the side of the main rope 21 rising from the first car 12 on the side opposite to the hoisting machine 22.
[0030]
As in the second embodiment, the operation of the third embodiment is such that the first car 12 is raised when the main rope 21 is extended. For this reason, even if the main rope 21 is extended, it is not necessary to cut it down, so that maintenance labor can be saved. In addition, it is possible to reduce inconvenience of visitors.
In particular, since the adjustment weight 24 is hung by the main rope 21 outside between the first car 12 and the second car 112, the arrangement of the adjustment weight 24 can be diversified.
Further, while the first car 12 is suspended from the main rope 21 via the pulley 36, the adjustment weight 24 is directly locked to the main rope 21. Therefore, the first car 12 moves the adjustment weight 24. The moving distance is one half of the distance. For this reason, when adjusting the extension of the main rope 21, it is possible to reduce the moving distance of the first car 12 when releasing the locking of the weight locking means 25 and lowering the adjusting weight 24, The car 12 can be accurately stopped at a predetermined position in the landing area (LU1 + LD1).
[0031]
【The invention's effect】
The connecting bridge elevator according to the present invention has the following effects because it is configured as described above.
A first car and a second car are respectively installed on the first pier and the second pier supporting the connecting bridge, and both cars and an adjusting weight are suspended by a series of main ropes, and a hoist and a control are provided between the two cars. The main rope is wound around with the motive, the hoist is operated with the adjusting weight locked on the fixed part, the car is raised and lowered in the opposite direction, and then the brake is operated to set the car When the main ropes are stretched and the brakes are activated, release the locking of the adjustment weight and lower it to increase the length of the main ropes at the part where the adjustment weights are suspended. The length of the main rope of the suspended portion is kept within a predetermined range.
For this reason, when the main rope is elongated, it is not necessary to cut off the main rope, so that there is an effect that labor for maintenance can be saved.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an entire elevator for a connecting bridge according to a first embodiment of the present invention.
FIG. 2 is a plan view of the weight locking means 25 of the connecting bridge elevator according to the first embodiment of the present invention.
FIG. 3 is a sectional view taken along a line III-III in FIG. 2;
FIG. 4 is a block diagram showing an electric circuit of the connecting bridge elevator according to the first embodiment of the present invention.
FIG. 5 is an explanatory diagram showing an operation when the main rope 21 is extended according to the first embodiment of the present invention.
FIG. 6 is a flowchart showing the operation of the connecting bridge elevator according to the first embodiment of the present invention.
FIG. 7 is a block diagram showing an electric circuit of a connecting bridge elevator according to a second embodiment of the present invention.
FIG. 8 is a perspective view of a brake 23 of the connecting bridge elevator according to the second embodiment of the present invention.
FIG. 9 is a block diagram showing an electric circuit of a connecting bridge elevator according to a third embodiment of the present invention.
[Explanation of symbols]
1 platform, 2 platform, 3 tracks, 4 connecting bridge, 5 machine room, 11 1st pier, 12 1st car, 13 1st lower landing, 13a 1st lower landing button, 14 1st upper landing, 14a 1st upper Landing button, 21 main rope, 22 hoisting machine, 23 brake, 24 adjusting weight, 25 weight locking means, 30 weight guide rail, 31 pulley, 32 pulley, 33 pulley, 34 pulley, 35 pulley, 36 pulley, 37 Pulley, 42 cam, 43 first lower landing area detecting means, 44 first upper landing area detecting means, 45 weight position detecting means, 46 cam, 50 controller, 56 weight locking control section, 57 hoisting machine control Part, 58 brake control part, 111 second pier, 112 second car, 113 second lower landing, 113a second lower landing button, 114 second upper landing, 114a second upper landing button, 142 cars , 143 second lower landing zone detecting means, 144 a second upper floor alignment zone detector.

Claims (6)

所定距離を隔てて立設された第1橋脚と第2橋脚に支えられた連絡橋の上記第1橋脚に第1かごが設置され、上記第2橋脚に第2かごが設置されて上記各橋脚の基部と上記連絡橋の間を昇降する客を搬送する連絡橋用エレベータにおいて、一方で上記第1かごを吊持し他方で上記第2かごを吊持する一連の主索と、上記第1かごと上記第2かごの間で上記主索が巻き掛けられて上記かごを相反する方向へ昇降駆動する巻上機と、上記第1かごと上記第2かごの間で上記主索の移動を制止する制動機と、上記主索に吊持された調整錘と、この調整錘を固定部に係止させる錘係止手段と、上記主索が所定値以上伸びたときに作動する主索伸び検出手段とを備え、上記錘係止手段で上記調整錘を上記固定部に係止させた状態で上記巻上機を付勢して上記第1かご及び上記第2かごを昇降させて上記客を搬送し、上記主索伸び検出手段が作動すると上記巻上機を消勢し、かつ、上記制動機を作動させた状態で錘係止手段による係止を解いて上記調整錘を下降させることにより上記主索の伸びを調整するようにした連絡橋用エレベータ。A first car is installed on the first pier of the connecting bridge supported by a first pier and a second pier that are erected at a predetermined distance, and a second car is installed on the second pier. An elevator for a connecting bridge for transporting a customer ascending and descending between the base of the connecting bridge and the connecting bridge, wherein a series of main ropes suspending the first car on the one hand and suspending the second car on the other hand; A hoist that winds the main rope between the car and the second car and drives the car up and down in opposite directions; and moves the main rope between the first car and the second car. A brake for stopping, an adjustment weight suspended on the main rope, weight locking means for locking the adjustment weight to a fixed portion, and a main rope extension operated when the main rope extends by a predetermined value or more. Detecting means, and biasing the hoist in a state where the adjusting weight is locked to the fixed portion by the weight locking means The first car and the second car are raised and lowered to convey the customer, and when the main rope elongation detecting means operates, the hoist is deenergized, and the weight control is performed in a state where the brake is operated. An elevator for a connecting bridge wherein the extension of the main rope is adjusted by lowering the adjusting weight by releasing the locking by the stopping means. 調整錘は、頂部に回動自在な滑車が取り付けられ、第1かごと第2かごの間で上記滑車に主索が巻き掛けられて吊持されたものとした請求項1に記載の連絡橋用エレベータ。The connecting bridge according to claim 1, wherein the adjustable weight has a rotatable pulley attached to the top thereof, and the main rope is wound around the pulley between the first car and the second car. Elevator. 第1かご及び第2かごは、いずれも滑車を介して主索に吊持されたものとし、巻上機は、上記第1かごと上記第2かごの間で上記主索が巻き掛けられて上記かごを相反する方向へ昇降駆動するものとし、調整錘は、上記第1かご及び上記第2かごから立ち上げられた反巻上機側の上記主索のいずれか一方に吊持されたものとした請求項1に記載の連絡橋用エレベータ。The first car and the second car are both hung on a main rope via pulleys, and the hoist is such that the main rope is wound around the first car and the second car. The car is to be driven up and down in opposite directions, and the adjusting weight is hung on one of the main ropes on the side of the anti-winding machine that has been raised from the first car and the second car. The connecting bridge elevator according to claim 1, wherein: 第1かご及び第2かごは、いずれも橋脚の基部又は連絡橋の床面に対して所定の範囲内で停止するように制御されるものとし、主索伸び検出手段は、上記第1かご及び上記第2かごの内、いずれか一方を上記範囲内に停止させたときに、いずれか他方が上記範囲外となるときに作動するものとした請求項1に記載の連絡橋用エレベータ。Both the first car and the second car are controlled so as to stop within a predetermined range with respect to the base of the pier or the floor of the connecting bridge, and the main rope elongation detecting means includes the first car and the second car. The connecting bridge elevator according to claim 1, wherein when one of the second cars is stopped within the range, the other car is activated when the other is out of the range. 調整錘は、少なくとも無負荷のかごによる張力よりも大きい張力を主索に作用させる重量を有するものとした請求項1に記載の連絡橋用エレベータ。2. The elevator according to claim 1, wherein the adjusting weight has a weight that exerts a tension on the main rope at least greater than a tension caused by an unloaded car. 3. 調整錘が所定の範囲を超えて移動したときに作動して外部へ通報する錘位置検出手段を備えた請求項1に記載の連絡橋用エレベータ。The elevator for a connecting bridge according to claim 1, further comprising a weight position detecting means that operates when the adjusting weight moves beyond a predetermined range and notifies the outside of the adjustment weight.
JP2003134946A 2003-05-13 2003-05-13 Elevator for connecting bridge Pending JP2004338830A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003134946A JP2004338830A (en) 2003-05-13 2003-05-13 Elevator for connecting bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003134946A JP2004338830A (en) 2003-05-13 2003-05-13 Elevator for connecting bridge

Publications (1)

Publication Number Publication Date
JP2004338830A true JP2004338830A (en) 2004-12-02

Family

ID=33525360

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003134946A Pending JP2004338830A (en) 2003-05-13 2003-05-13 Elevator for connecting bridge

Country Status (1)

Country Link
JP (1) JP2004338830A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102060228A (en) * 2010-12-08 2011-05-18 长安大学 Pedestrian crossing machine
JP2014528392A (en) * 2011-10-07 2014-10-27 オーチス エレベータ カンパニーOtis Elevator Company Elevator braking system
JP2016204125A (en) * 2015-04-24 2016-12-08 株式会社日立ビルシステム Both car elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102060228A (en) * 2010-12-08 2011-05-18 长安大学 Pedestrian crossing machine
JP2014528392A (en) * 2011-10-07 2014-10-27 オーチス エレベータ カンパニーOtis Elevator Company Elevator braking system
JP2016204125A (en) * 2015-04-24 2016-12-08 株式会社日立ビルシステム Both car elevator

Similar Documents

Publication Publication Date Title
TW200934717A (en) Operating method for a lift with two lift cages and a counterweight
JP2016044078A (en) Elevator door closing method and mechanism
JP4190626B2 (en) Elevator safety device
JP2012096899A (en) Elevator apparatus
EP3351498A1 (en) Elevator hover mode operation using sensor-based potential load change detection
JP2004338830A (en) Elevator for connecting bridge
CN114599598B (en) Elevator device and door position detection device for elevator device
JP2004010174A (en) Mutual space variable double-deck elevator
JP2002284469A (en) Elevator car device
EP3587324A1 (en) Elevator system
WO2005105648A1 (en) Elevator apparatus
JP2002020046A (en) Leveling device for elevator
JP6580275B2 (en) Elevator interlock device
JP4795124B2 (en) Elevator control device
JPH07237847A (en) Installation method of elevator
JP2002145558A (en) Elevator car device dedicated for small cargo
JP6954411B1 (en) elevator
JP2003292273A (en) Elevator cage door apparatus with locking apparatus
JP3238621B2 (en) Elevator safety equipment
JP2003081558A (en) Elevator device for connecting bridge
JP2002167140A (en) Vertical elevator and safety device for the same
WO2010089868A1 (en) Elevator device
JP2010095355A (en) Elevator safety device
JP3313021B2 (en) Elevator control device
KR200461555Y1 (en) elevator landing door opening and closing apparatus