[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2002230372A - Printing business management system, program and storage medium - Google Patents

Printing business management system, program and storage medium

Info

Publication number
JP2002230372A
JP2002230372A JP2001026714A JP2001026714A JP2002230372A JP 2002230372 A JP2002230372 A JP 2002230372A JP 2001026714 A JP2001026714 A JP 2001026714A JP 2001026714 A JP2001026714 A JP 2001026714A JP 2002230372 A JP2002230372 A JP 2002230372A
Authority
JP
Japan
Prior art keywords
information
subcontractor
terminal
notification
change
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001026714A
Other languages
Japanese (ja)
Inventor
和高 ▲吉▼嶺
Kazutaka Yoshimine
Akifumi Higashide
明文 東出
Chigaku Urushibata
知学 漆畑
Hiroshi Ota
博志 太田
Katsumi Namiki
勝美 並木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MACHIDA PRINTING CO Ltd
Fujitsu Ltd
Fujitsu General Ltd
Original Assignee
MACHIDA PRINTING CO Ltd
Fujitsu Ltd
Fujitsu General Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MACHIDA PRINTING CO Ltd, Fujitsu Ltd, Fujitsu General Ltd filed Critical MACHIDA PRINTING CO Ltd
Priority to JP2001026714A priority Critical patent/JP2002230372A/en
Publication of JP2002230372A publication Critical patent/JP2002230372A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

(57)【要約】 【課題】 印刷業の管理システムで、見積り時における
外注業者選択が恣意的になるのを防止し、印刷物の変更
依頼があったときに変更の可能性のある部署に変更の予
備通知をして作業予測の迅速化を図り、印刷会社の作業
管理者によって変更が必要とされた部署には変更の本通
知をして変更内容の閲覧を促す。 【解決手段】 ブラウザの組み込まれた客先端末14、
印刷会社端末18及び外注業者端末22に通信回線網2
6を介してASPセンター28内のサーバ30を結合
し、端末18からの外注業者選択情報で外注業者選択要
件を決定して外注業者を抽出し、外注業者選択要件毎に
順位付けされた外注業者一覧を表示し、その中から見積
り依頼先となる外注業者を決定する。また、端末14か
らの変更依頼情報で変更可能性のある工程に予備通知を
し、作業管理者による端末18からの指示で本通知をす
る。
(57) [Summary] [Problem] A management system for the printing industry prevents selection of a subcontractor at the time of estimation from becoming arbitrary, and changes to a department that can be changed when a change request is made for printed matter In order to speed up the work prediction by making a preliminary notification, the department in need of the change by the work manager of the printing company is notified of the change and is urged to view the details of the change. SOLUTION: A customer terminal 14 with a built-in browser,
The communication network 2 is connected to the printing company terminal 18 and the subcontractor terminal 22.
6, the server 30 in the ASP center 28 is connected, the subcontractor selection requirements are determined based on the subcontractor selection information from the terminal 18, the subcontractors are extracted, and the subcontractors ranked according to the subcontractor selection requirements are ranked. Display the list and determine the subcontractor to be quoted from there. In addition, a preliminary notification is given to a process that may be changed based on the change request information from the terminal 14, and a main notification is made according to an instruction from the terminal 18 by the work manager.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、客先端末、印刷会
社端末及び外注業者端末に通信回線網を介してサーバを
結合してなる印刷業の管理システム、プログラム及び記
憶媒体に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a management system, a program, and a storage medium for a printing business in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network.

【0002】[0002]

【従来の技術】一般に印刷物の見積りから決済までの間
には、企画、プレゼンテーション、製作(デザイン、カ
ンプ作成)、カンプ確認、原稿作成(写植、版下作成、
写真イラスト)、入稿、製版(製版、校正)、校了、印
刷(刷版、印刷)、刷本確認、加工、見本確認、納品
(在庫、発送、配送)、納品受領及び資材購入などの複
数の工程が存在する。従来、印刷会社、外注業者が1つ
の印刷物を分担、独立して製作する場合、見積り時にお
ける外注業者選択、変更時における通知はつぎのように
なされていた。 (1)印刷会社の担当者が客先からの見積り依頼に基づ
いて各工程の見積りを行う場合、この見積り時に各工程
毎の必要に応じて外注業者を選択して見積り依頼を行う
が、この外注業者の選択は担当者の経験や勘に基づいて
行われることが多かった。 (2)印刷物の受注から完成までの工程については、客
先・印刷会社間、印刷会社内の各工程担当部署間、印刷
会社・外注業者間における作業変更指示情報の伝達は、
ジョブチケット(作業指示書)をファクシミリ装置や手
渡しで伝達することによって、又は電話によって行われ
ていた。
2. Description of the Related Art Generally, planning, presentation, production (design, comp creation), comp confirmation, manuscript creation (typesetting, copymaking,
Photo illustration), drafting, plate making (plate making, proofreading), graduation, printing (printing plate, printing), print book confirmation, processing, sample confirmation, delivery (stock, shipping, delivery), delivery receipt, material purchase, etc. There are multiple steps. Conventionally, when a printing company and a subcontractor share one printed matter and produce it independently, a subcontractor selection at the time of estimation and a notification at the time of change have been made as follows. (1) When a person in charge of a printing company makes an estimate for each process based on an estimate request from a customer, at the time of this estimate, a contractor is selected as required for each process and an estimate request is made. Outsourcing companies were often selected based on the experience and intuition of the person in charge. (2) Regarding the process from order receipt to completion of printed materials, the transfer of work change instruction information between customers and printing companies, between departments in charge of each process within the printing company, and between printing companies and subcontractors,
It has been performed by transmitting a job ticket (work instruction) by facsimile machine or handing, or by telephone.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、従来の
見積り時における外注業者選択は経験や勘に基づいて行
われることが多かったので、経験の浅い担当者にとって
は選択が煩雑になり、担当者によっては恣意的な選択が
行われることがあるという問題点があった。また、従来
のファクシミリ装置や電話機による伝達や手渡しによる
伝達では、作業変更指示情報の伝達時に相手担当者が不
在だったり、伝言したとしても確実に伝わらないことが
あり、作業変更指示時と実際の作業時との間にタイムラ
グが発生し、作業のやり直しや付随する作業が発生し、
作業効率が低下してコストアップになるという問題点が
あった。
However, the conventional selection of a subcontractor at the time of estimating is often made based on experience or intuition, so that selection is complicated for inexperienced personnel, and depending on the personnel. Had the problem that arbitrary choices could be made. In addition, in the case of the conventional facsimile machine or telephone or by handing over, when the work change instruction information is transmitted, the person in charge may be absent or may not be reliably transmitted even if the message is transmitted. There is a time lag between the time of work and rework and accompanying work occur,
There is a problem that the working efficiency is reduced and the cost is increased.

【0004】本発明は上述の問題点に鑑みてなされたも
ので、見積り時における外注業者選択を容易にして短納
期化を図るとともに担当者による恣意的な選択を防止し
て合理的な選択を図り、及び/又は、客先・印刷会社
間、印刷会社・外注業者間における作業変更指示時と実
際の作業変更時との間に生じるタイムラグを小さくし
て、作業効率を向上させることのできる印刷業の管理シ
ステム、プログラム及び記憶媒体を提供することを目的
とするものである。
The present invention has been made in view of the above-mentioned problems, and facilitates selection of a subcontractor at the time of quotation, shortens delivery time, and prevents a person in charge from arbitrarily selecting a reasonable selection. Printing that can improve the work efficiency by reducing the time lag that occurs between the work change instruction between the customer and the printing company or between the printing company and the subcontractor and the actual work change. It is an object of the present invention to provide a business management system, a program, and a storage medium.

【0005】[0005]

【課題を解決するための手段】請求項1の発明は、客先
端末、印刷会社端末及び外注業者端末に通信回線網を介
してサーバを結合してなる印刷業の管理システムにおい
て、印刷物の製品種別、印刷部数などのジョブチケット
情報を更新可能に記憶するジョブチケット情報記憶部
と、製品クオリティ、機械種別などの外注業者選択要件
をジョブチケット情報に対応付けて記憶した外注業者選
択要件記憶部と、複数の外注業者を外注業者選択要件に
対応付けて記憶した外注先マスタと、印刷物毎、工程毎
の連絡先情報を客先端末、印刷会社端末、外注業者端末
に対応付けて記憶した連絡先マスタとを設け、サーバが
見積り時における外注業者選択手段と変更時における通
知手段とを具備し、外注業者選択手段が、印刷会社端末
から取得した外注業者選択情報に基づいてジョブチケッ
ト情報記憶部から対応するジョブチケット情報を検索
し、外注業者選択要件記憶部を参照して対応する外注業
者選択要件を決定する選択要件決定手段と、この選択要
件決定手段で決定した外注業者選択要件に基づいて外注
先マスタから対応する外注業者を抽出する外注業者抽出
手段と、選択要件決定手段で決定した外注業者選択要件
と外注業者抽出手段で抽出した外注業者とに基づいて、
外注業者選択要件毎に順位付けされた外注業者一覧を表
示するための情報を作成する外注業者一覧作成手段と、
印刷会社端末から取得した外注業者決定情報に基づいて
外注業者一覧の中から見積り依頼先となる外注業者を決
定する外注業者決定手段とを具備し、通知手段が、客先
端末、印刷会社端末、外注業者端末のいずれかの端末か
ら取得した変更依頼情報に基づいて変更可能性のある工
程を抽出し、連絡先マスタの連絡先を参照して対応する
端末に変更の予備通知をする予備通知手段と、印刷会社
端末から予備通知を是とする情報を取得したときには対
応する端末に変更の本通知をし、印刷会社端末から予備
通知を非とする情報を取得したときには対応する端末に
予備通知の取消しを通知し、予備通知の有無に拘らず本
通知をする旨の情報を取得したときには本通知をする本
通知手段とを具備してなることを特徴とする。
According to the first aspect of the present invention, there is provided a printing business management system in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication line network. A job ticket information storage unit that stores updateable job ticket information such as a type and the number of print copies, and a subcontractor selection requirement storage unit that stores subcontractor selection requirements such as product quality and machine type in association with the job ticket information. , A subcontractor master in which a plurality of subcontractors are stored in association with the subcontractor selection requirements, and contact information in which contact information for each printed material and process is stored in association with a customer terminal, a printing company terminal, and a subcontractor terminal. A master is provided, and the server has a subcontractor selecting means at the time of estimation and a notification means at the time of change, and the subcontractor selecting means obtains the subcontracting business obtained from the printing company terminal. Selection requirement determining means for retrieving corresponding job ticket information from the job ticket information storage section based on the selection information and determining the corresponding subcontractor selection requirement by referring to the subcontractor selection requirement storage section; Subcontractor extraction means for extracting the corresponding subcontractor from the subcontractor master based on the subcontractor selection requirements determined in the above, and subcontractor selection requirements determined by the selection requirement determination means and subcontractors extracted by the subcontractor extraction means. On the basis of,
A subcontractor list creating means for creating information for displaying a subcontractor list ranked according to the subcontractor selection requirements;
A subcontractor determining means for determining a subcontractor to which an estimate is requested from the subcontractor list based on the subcontractor determination information obtained from the printing company terminal, wherein the notifying means is a customer terminal, a printing company terminal, Preliminary notification means for extracting a potentially changeable process based on the change request information obtained from one of the subcontractor terminals, and referring to the contact information of the contact master to make a preliminary notification of the change to the corresponding terminal. When the information that requires preliminary notification is obtained from the printing company terminal, the main terminal notifies the corresponding terminal of the change, and when the information that suppresses the preliminary notification is obtained from the printing company terminal, the corresponding terminal receives the preliminary notification. The present invention is characterized in that it is provided with a notifying means for notifying the cancellation and obtaining this information regardless of the presence or absence of the preliminary notification.

【0006】請求項2の発明は、客先端末、印刷会社端
末及び外注業者端末に通信回線網を介してサーバを結合
してなる印刷業の管理システムにおいて、印刷物の製品
種別、印刷部数などのジョブチケット情報を更新可能に
記憶するジョブチケット情報記憶部と、製品クオリテ
ィ、機械種別などの外注業者選択要件をジョブチケット
情報に対応付けて記憶した外注業者選択要件記憶部と、
複数の外注業者を外注業者選択要件に対応付けて記憶し
た外注先マスタとを設け、サーバが見積り時における外
注業者選択手段を具備し、この外注業者選択手段が、印
刷会社端末から取得した外注業者選択情報に基づいてジ
ョブチケット情報記憶部から対応するジョブチケット情
報を検索し、外注業者選択要件記憶部を参照して対応す
る外注業者選択要件を決定する選択要件決定手段と、こ
の選択要件決定手段で決定した外注業者選択要件に基づ
いて外注先マスタから対応する外注業者を抽出する外注
業者抽出手段と、選択要件決定手段で決定した外注業者
選択要件と外注業者抽出手段で抽出した外注業者とに基
づいて、外注業者選択要件毎に順位付けされた外注業者
一覧を表示するための情報を作成する外注業者一覧作成
手段と、印刷会社端末から取得した外注業者決定情報に
基づいて外注業者一覧の中から見積り依頼先となる外注
業者を決定する外注業者決定手段とを具備してなること
を特徴とする。
According to a second aspect of the present invention, there is provided a printing management system in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication line network. A job ticket information storage unit that stores job ticket information in an updatable manner, a subcontractor selection requirement storage unit that stores outsourced vendor selection requirements such as product quality and machine type in association with the job ticket information,
A subcontractor master storing a plurality of subcontractors in association with the subcontractor selection requirements is provided, and the server is provided with subcontractor selection means at the time of estimation, and the subcontractor selection means is obtained from the printing company terminal. Selection requirement determining means for retrieving corresponding job ticket information from the job ticket information storage section based on the selection information and determining the corresponding subcontractor selection requirement by referring to the subcontractor selection requirement storage section; Subcontractor extraction means for extracting the corresponding subcontractor from the subcontractor master based on the subcontractor selection requirements determined in the above, and subcontractor selection requirements determined by the selection requirement determination means and subcontractors extracted by the subcontractor extraction means. A subcontractor list creating means for creating information for displaying a subcontractor list ranked according to the subcontractor selection requirements based on the subcontractor selection requirements, and a printing company And characterized by being provided with the subcontractors determining means for determining the contractors to be RFQ destination from the contractors list based on the acquired contractors determined information from the end.

【0007】請求項3の発明は、客先端末、印刷会社端
末及び外注業者端末に通信回線網を介してサーバを結合
してなる印刷業の管理システムにおいて、印刷物毎、工
程毎の連絡先情報を客先端末、印刷会社端末、外注業者
端末に対応付けて記憶した連絡先マスタを設け、サーバ
が変更時における通知手段を具備し、この通知手段が、
客先端末、印刷会社端末、外注業者端末のいずれかの端
末から取得した変更依頼情報に基づいて変更可能性のあ
る工程を抽出し、連絡先マスタの連絡先を参照して対応
する端末に変更の予備通知をする予備通知手段と、印刷
会社端末から予備通知を是とする情報を取得したときに
は対応する端末に変更の本通知をし、印刷会社端末から
予備通知を非とする情報を取得したときには対応する端
末に予備通知の取消しを通知し、予備通知の有無に拘ら
ず本通知をする旨の情報を取得したときには本通知をす
る本通知手段とを具備してなることを特徴とする。
According to a third aspect of the present invention, there is provided a printing business management system in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network. Is provided in correspondence with the customer terminal, the printing company terminal, and the subcontractor terminal.
Based on the change request information obtained from any of the customer terminal, printing company terminal, or subcontractor terminal, extract the process that may be changed based on the change request information, and refer to the contact information in the contact master to change to the corresponding terminal Preliminary notification means for preliminary notification of, and when the information for which preliminary notification is required is obtained from the printing company terminal, the corresponding terminal is notified of the change, and information for disabling the preliminary notification is obtained from the printing company terminal. The present invention is characterized by comprising a main notification means for notifying the corresponding terminal of the cancellation of the preliminary notification, and performing the main notification when acquiring information indicating the main notification regardless of the presence or absence of the preliminary notification.

【0008】請求項4の発明は、請求項1又は2の発明
において、より合理的な選択基準で外注業者を選択でき
るようにするために、外注業者選択要件記憶部を、印刷
物の製品クオリティをジョブチケット情報中の製品種別
に対応付けて記憶した製品マスタと、機械種別をジョブ
チケット情報中の予め設定された第1設定情報に対応付
けて記憶した機械種別マスタと、製品クオリティ及び機
械種別以外の予め設定された外注業者選択要件をジョブ
チケット情報中の予め設定された第2設定情報に対応付
けて記憶した統計情報記憶部とで構成し、選択要件決定
手段が、ジョブチケット情報記憶部から検索したジョブ
チケット情報中の製品種別情報、第1設定情報、第2設
定情報のそれぞれに基づいて、製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定す
る構成とする。
According to the invention of claim 4, in the invention of claim 1 or 2, in order to be able to select a subcontractor based on a more rational selection standard, the subcontractor selection requirement storage section is provided with a product quality of printed matter. A product master stored in association with the product type in the job ticket information, a machine type master in which the machine type is stored in association with the first setting information set in advance in the job ticket information, other than the product quality and the machine type And a statistical information storage unit that stores the preset contractor selection requirements of the job ticket information in association with the preset second setting information in the job ticket information. Based on the product type information, the first setting information, and the second setting information in the retrieved job ticket information, a product master, a machine type master, and a statistical information Product quality from each of the parts,
The configuration is such that the information of the machine type and the set outsourcing contractor selection requirement is determined.

【0009】請求項5の発明は、請求項1又は3の発明
において、より速い予備通知を行うことができるように
するために、印刷物毎、工程毎の定型的な変更内容に対
応付けて通知先の工程を記憶した変更パターンマスタ
と、客先毎に印刷物の受注から納品までの各工程の作業
日時情報を更新可能に記憶する受注情報記憶部と、印刷
物毎、工程毎の実施状況情報を更新可能に記憶する工程
別作業管理情報記憶部と、印刷物毎、工程毎の標準的な
作業時間情報を記憶した標準作業時間テーブルと、通知
管理情報を記憶する通知管理情報記憶部とを設け、予備
通知手段は、変更依頼情報のなかに通知する連絡先を指
定する情報が含まれているときには連絡先マスタを参照
して対応する端末を通知管理情報記憶部に記録し、変更
依頼情報が定型的な変更を依頼する情報のときには変更
パターンマスタ及び連絡先マスタを参照して対応する端
末を通知管理情報記憶部に記録し、変更依頼情報に基づ
いて受注情報記憶部から変更が発生した工程の作業日時
情報を検索し、工程別作業管理情報記憶部の実施状況情
報を参照して現在作業実施中の工程以降の工程に関する
作業時間情報を演算し、標準作業時間テーブルの対応す
る標準的作業時間情報と対比して作業を変更する工程を
選択し、連絡先マスタの連絡先を参照して対応する端末
を通知管理情報記憶部に記録し、通知管理情報記憶部に
記録した端末に予備通知をする構成とする。
According to a fifth aspect of the present invention, in the first or the third aspect of the present invention, in order to make it possible to perform faster preliminary notification, the notification is made in association with a fixed change content for each printed material and each process. A change pattern master that stores the previous process, an order information storage unit that stores the work date and time information of each process from ordering to delivery of printed matter for each customer in an updatable manner, and execution status information for each printed matter and process. A work management information storage unit for each process that is stored in an updatable manner, a standard work time table that stores standard work time information for each printed material, and each process, and a notification management information storage unit that stores notification management information are provided. When the change request information includes information designating a contact to be notified, the preliminary notification unit refers to the contact master and records the corresponding terminal in the notification management information storage unit, and the change request information is fixed. Typical In the case of information requesting a change, the corresponding terminal is recorded in the notification management information storage unit with reference to the change pattern master and the contact master, and the work date and time of the process in which the change occurred from the order information storage unit based on the change request information The information is searched, and the operation time information relating to the process after the process currently being executed is calculated by referring to the execution status information in the operation management information storage unit for each process, and the corresponding standard operation time information in the standard operation time table is calculated. A configuration in which a process for changing the work is selected in comparison, the corresponding terminal is recorded in the notification management information storage unit by referring to the contact information of the contact master, and a preliminary notification is sent to the terminal recorded in the notification management information storage unit. And

【0010】請求項6の発明は、客先端末、印刷会社端
末及び外注業者端末に通信回線網を介して結合されたサ
ーバを、見積り時における外注業者選択手段として機能
させるとともに変更時における通知手段として機能させ
るためのプログラムであって、外注業者選択手段が、印
刷会社端末から取得した外注業者選択情報に基づいてジ
ョブチケット情報記憶部から対応するジョブチケット情
報を検索し、外注業者選択要件記憶部を参照して対応す
る外注業者選択要件を決定する選択要件決定手段と、こ
の選択要件決定手段で決定した外注業者選択要件に基づ
いて外注先マスタから対応する外注業者を抽出する外注
業者抽出手段と、選択要件決定手段で決定した外注業者
選択要件と外注業者抽出手段で抽出した外注業者とに基
づいて、外注業者選択要件毎に順位付けされた外注業者
一覧を表示するための情報を作成する外注業者一覧作成
手段と、印刷会社端末から取得した外注業者決定情報に
基づいて外注業者一覧の中から見積り依頼先となる外注
業者を決定する外注業者決定手段とを具備し、通知手段
が、客先端末、印刷会社端末、外注業者端末のいずれか
の端末から取得した変更依頼情報に基づいて変更可能性
のある工程を抽出し、連絡先マスタの連絡先を参照して
対応する端末に変更の予備通知をする予備通知手段と、
印刷会社端末から予備通知を是とする情報を取得したと
きには対応する端末に変更の本通知をし、印刷会社端末
から予備通知を非とする情報を取得したときには対応す
る端末に予備通知の取消しを通知し、予備通知の有無に
拘らず本通知をする旨の情報を取得したときには本通知
をする本通知手段とを具備してなることを特徴とする。
According to a sixth aspect of the present invention, a server coupled to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network functions as a subcontractor selecting means at the time of estimation and a notification means at the time of change. A program for causing the subcontractor selection means to search for corresponding job ticket information from the job ticket information storage unit based on the subcontractor selection information obtained from the printing company terminal, and And a subcontractor extraction means for extracting a corresponding subcontractor from the subcontractor master based on the subcontractor selection requirement determined by the selection requirement determination means. , Based on the subcontractor selection requirements determined by the selection requirement determination means and the subcontractors extracted by the subcontractor extraction means, Subcontractor list creation means that creates information for displaying a list of subcontractor companies ranked according to the selection requirements, and a request for quote from the subcontractor list based on subcontractor determination information obtained from the printing company terminal. Outsourcing contractor determining means for determining the outsourcing contractor, wherein the notifying means may be changed based on the change request information obtained from any one of the customer terminal, the printing company terminal, and the outsourcing contractor terminal. A preliminary notification means for extracting a preliminary notification of the change to the corresponding terminal by referring to the contact information of the contact master,
When the information that requires the preliminary notification is obtained from the printing company terminal, the main terminal notifies the corresponding terminal of the change, and when the information that does not require the preliminary notification is obtained from the printing company terminal, the corresponding terminal cancels the preliminary notification. The present invention is characterized in that it is provided with a main notification means for performing the main notification when the information for performing the main notification is obtained regardless of the presence or absence of the preliminary notification.

【0011】請求項7の発明は、客先端末、印刷会社端
末及び外注業者端末に通信回線網を介して結合されたサ
ーバを、見積り時における外注業者選択手段として機能
させるためのプログラムであって、外注業者選択手段
が、印刷会社端末から取得した外注業者選択情報に基づ
いてジョブチケット情報記憶部から対応するジョブチケ
ット情報を検索し、外注業者選択要件記憶部を参照して
対応する外注業者選択要件を決定する選択要件決定手段
と、この選択要件決定手段で決定した外注業者選択要件
に基づいて外注先マスタから対応する外注業者を抽出す
る外注業者抽出手段と、選択要件決定手段で決定した外
注業者選択要件と外注業者抽出手段で抽出した外注業者
とに基づいて、外注業者選択要件毎に順位付けされた外
注業者一覧を表示するための情報を作成する外注業者一
覧作成手段と、印刷会社端末から取得した外注業者決定
情報に基づいて外注業者一覧の中から見積り依頼先とな
る外注業者を決定する外注業者決定手段とを具備してな
ることを特徴とする。
The invention according to claim 7 is a program for causing a server connected to a customer terminal, a printing company terminal and a subcontractor terminal via a communication network to function as a subcontractor selection means at the time of estimation. The subcontractor selection means retrieves the corresponding job ticket information from the job ticket information storage unit based on the subcontractor selection information obtained from the printing company terminal, and selects the corresponding subcontractor by referring to the subcontractor selection requirement storage unit. Selection requirement determination means for determining the requirements, subcontractor extraction means for extracting the corresponding subcontractor from the subcontractor master based on the subcontractor selection requirements determined by the selection requirement determination means, and subcontract determined by the selection requirement determination means Displays a list of subcontractors ranked according to subcontractor selection requirements based on subcontractor selection requirements and subcontractors extracted by subcontractor extraction means. And a subcontractor determining means for determining a subcontractor to which an estimate is requested from the subcontractor list based on the subcontractor determination information obtained from the printing company terminal. It is characterized by becoming.

【0012】請求項8の発明は、客先端末、印刷会社端
末及び外注業者端末に通信回線網を介して結合されたサ
ーバを、変更時における通知手段として機能させるため
のプログラムであって、通知手段が、客先端末、印刷会
社端末、外注業者端末のいずれかの端末から取得した変
更依頼情報に基づいて変更可能性のある工程を抽出し、
連絡先マスタの連絡先を参照して対応する端末に変更の
予備通知をする予備通知手段と、印刷会社端末から予備
通知を是とする情報を取得したときには対応する端末に
変更の本通知をし、印刷会社端末から予備通知を非とす
る情報を取得したときには対応する端末に予備通知の取
消しを通知し、予備通知の有無に拘らず本通知をする旨
の情報を取得したときには本通知をする本通知手段とを
具備してなることを特徴とする。
The invention according to claim 8 is a program for causing a server connected to a customer terminal, a printing company terminal and a subcontractor terminal via a communication network to function as a notifying means at the time of change. The means extracts a process that may be changed based on the change request information obtained from any one of the customer terminal, the printing company terminal, and the subcontractor terminal,
Preliminary notification means for referring to the contact information in the contact master to make a preliminary notification of the change to the corresponding terminal, and when the information for which the preliminary notification is required is obtained from the printing company terminal, the corresponding terminal is notified of the main change. When the information for which the preliminary notification is not obtained is obtained from the printing company terminal, the corresponding terminal is notified of the cancellation of the preliminary notification, and when the information indicating this notification is obtained regardless of the presence or absence of the preliminary notification, the main notification is made. It is provided with the present notification means.

【0013】請求項9の発明は、請求項6又は7の発明
において、より合理的な選択基準で外注業者を選択でき
るようにするために、外注業者選択要件記憶部を、印刷
物の製品クオリティをジョブチケット情報中の製品種別
に対応付けて記憶した製品マスタと、機械種別をジョブ
チケット情報中の予め設定された第1設定情報に対応付
けて記憶した機械種別マスタと、製品クオリティ及び機
械種別以外の予め設定された外注業者選択要件をジョブ
チケット情報中の予め設定された第2設定情報に対応付
けて記憶した統計情報記憶部とで構成し、選択要件決定
手段が、ジョブチケット情報記憶部から検索したジョブ
チケット情報中の製品種別情報、第1設定情報、第2設
定情報のそれぞれに基づいて、製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定す
る構成とする。
According to a ninth aspect of the present invention, in the invention of the sixth or seventh aspect, in order to enable the selection of a subcontractor on a more rational selection basis, a subcontractor selection requirement storage section is provided for controlling the product quality of the printed matter. A product master stored in association with the product type in the job ticket information, a machine type master in which the machine type is stored in association with the first setting information set in advance in the job ticket information, other than the product quality and the machine type And a statistical information storage unit storing the preset contractor selection requirement of the job ticket information in association with the preset second setting information in the job ticket information. Based on each of the product type information, the first setting information, and the second setting information in the retrieved job ticket information, a product master, a machine type master, and a statistical information record are stored. Product quality from each of the parts,
The configuration is such that the information of the machine type and the set outsourcing contractor selection requirement is determined.

【0014】請求項10の発明は、請求項6又は8の発
明において、より速い予備通知を行うことができるよう
にするために、予備通知手段が、変更依頼情報のなかに
通知する連絡先を指定する情報が含まれているときには
連絡先マスタを参照して対応する端末を通知管理情報記
憶部に記録し、変更依頼情報が定型的な変更を依頼する
情報のときには変更パターンマスタ及び連絡先マスタを
参照して対応する端末を通知管理情報記憶部に記録し、
変更依頼情報に基づいて受注情報記憶部から変更が発生
した工程の作業日時情報を検索し、工程別作業管理情報
記憶部の実施状況情報を参照して現在作業実施中の工程
以降の工程に関する作業時間情報を演算し、標準作業時
間テーブルの対応する標準的作業時間情報と対比して作
業を変更する工程を選択し、連絡先マスタの連絡先を参
照して対応する端末を通知管理情報記憶部に記録し、通
知管理情報記憶部に記録した端末に予備通知をする構成
とする。
According to a tenth aspect of the present invention, in the invention of the sixth or eighth aspect, in order to be able to perform faster preliminary notification, the preliminary notification means sets a contact address to be notified in the change request information. When the information to be specified is included, the corresponding terminal is recorded in the notification management information storage unit by referring to the contact master, and when the change request information is information requesting a standard change, the change pattern master and the contact master And record the corresponding terminal in the notification management information storage unit,
Based on the change request information, search the work date and time information of the process in which the change occurred from the order receiving information storage unit, and refer to the execution status information in the process-specific work management information storage unit to perform the work related to the process after the process currently being performed. Calculate the time information, select the process to change the work in comparison with the corresponding standard work time information in the standard work time table, and refer to the contact in the contact master to notify the corresponding terminal of the notification management information storage unit And a preliminary notification is sent to the terminal recorded in the notification management information storage unit.

【0015】請求項11の発明は、請求項6、7、8、
9又は10記載のプログラムを記録したコンピュータ読
み取り可能な記憶媒体である。
[0015] The invention of claim 11 provides claims 6, 7, 8,
A computer-readable storage medium storing the program according to 9 or 10.

【0016】[0016]

【発明の実施の形態】以下、本発明の実施形態例を図面
により説明する。図1から図34までは本発明による印
刷業の管理システム、プログラム及び記憶媒体の一実施
形態例を示すものである。図1はシステムの構成例を示
すもので、図1において、10、12は一般客先に設け
られた一般客先端末、一般客先連絡デバイス、14、1
6は特定客先に設けられた特定客先端末、特定客先連絡
デバイス、18(1)〜18(n)、20(1)〜20
(n)は印刷会社に設けられた印刷会社端末、印刷会社
連絡デバイス、22(1)〜22(m)、24(1)〜
24(m)は外注業者に設けられた外注業者端末、外注
業者連絡デバイス、25は銀行(この銀行には電子決済
機能を有するコンピュータシステムが設けられてい
る。)、26は通信回線網、28はASP(アプリケー
ションサービスプロバイダ)センター、30はアプリケ
ーションサーバ、32は通信サーバ、34は通知サー
バ、36はASP端末、38はデ−タサーバである。前
記アプリケーションサーバ30、通信サーバ32、通知
サーバ34、ASP端末36及びデータサーバ38は前
記ASPセンター28内に設けられている。
Embodiments of the present invention will be described below with reference to the drawings. FIGS. 1 to 34 show an embodiment of a management system, a program and a storage medium for a printing business according to the present invention. FIG. 1 shows a configuration example of a system. In FIG. 1, reference numerals 10 and 12 denote general customer terminals, general customer contact devices, and 14 and 1 provided at general customers.
Reference numeral 6 denotes a specific customer terminal provided at the specific customer, a specific customer contact device, 18 (1) to 18 (n), 20 (1) to 20
(N) is a printing company terminal provided in the printing company, a printing company communication device, 22 (1) to 22 (m), 24 (1) to
24 (m) is a subcontractor terminal provided in the subcontractor, a subcontractor communication device, 25 is a bank (this bank is provided with a computer system having an electronic settlement function), 26 is a communication network, 28 Is an ASP (application service provider) center, 30 is an application server, 32 is a communication server, 34 is a notification server, 36 is an ASP terminal, and 38 is a data server. The application server 30, communication server 32, notification server 34, ASP terminal 36, and data server 38 are provided in the ASP center 28.

【0017】前記端末10、14、18(1)〜18
(n)、22(1)〜22(m)にはブラウザ(閲覧ソ
フト)が組み込まれ、これらの端末14、18(1)〜
18(n)、22(1)〜22(m)は、それぞれ一般
的なコンピュータと同様にディスプレイ、キーボード、
プリンタ及び本体を具備し、本体はCPUを中心にRO
M、RAM、ディスク装置等が設けられている。前記連
絡デバイス12、16、20(1)〜20(n)、24
(1)〜24(m)は、ファクシミリ装置、固定電話
機、携帯電話機などの連絡デバイスで構成され、前記携
帯電話機はインターネット接続対応の携帯電話機を含
む。前記通信回線網26は、ISDN回線網、公衆回線
網などの回線網を具備しており、直接的にこれらの回線
網を接続する場合と、これらの回線網を利用して間接的
にインターネット接続する場合とを含む。
The terminals 10, 14, 18 (1) to 18
(N), 22 (1) to 22 (m) incorporate a browser (browsing software), and these terminals 14, 18 (1) to
18 (n) and 22 (1) to 22 (m) each have a display, a keyboard,
It has a printer and a main unit.
M, a RAM, a disk device, and the like are provided. The communication devices 12, 16, 20 (1) to 20 (n), 24
(1) to (m) are composed of communication devices such as facsimile machines, fixed telephones, and mobile phones, and the mobile phones include mobile phones compatible with the Internet. The communication line network 26 has a line network such as an ISDN line network or a public line network. When these line networks are directly connected, the Internet connection is made indirectly by using these line networks. And when.

【0018】前記アプリケーションサーバ30は、つぎ
の(1)〜(8)に示すプログラムで実現される機能を
具備し、前記端末10、14、18(1)〜18
(n)、22(1)〜22(m)からの要求を受けて、
前記データサーバ38内のデータベース群40〜86
(図2に記述する。)から対応した情報を読み出して所
定の処理を行うとともに、情報を閲覧可能な情報(例え
ば画像情報)に加工して返却する機能を具備している。 (1)見積りプログラム(内容は後の図10〜図20を
併用した作用の説明で併せて記述する。) (2)受注プログラム(内容は後の図21を併用した作
用の説明で併せて記述する。) (3)製造プログラム(内容は後の図22を併用した作
用の説明で併せて記述する。) (4)納品プログラム(内容は後の図23、図24を併
用した作用の説明で併せて記述する。) (5)決済プログラム(内容は後の図25を併用した作
用の説明で併せて記述する。) (6)通知管理プログラム(内容は後の図26〜図31
を併用した作用で併せて記述する。) (7)進捗管理プログラム(内容は後の作用の説明で併
せて記述する。) (8)営業管理プログラム(内容は後の作用の説明で併
せて記述する。)
The application server 30 has functions realized by the following programs (1) to (8), and the terminals 10, 14, 18 (1) to 18
(N), in response to requests from 22 (1) to 22 (m),
Database groups 40 to 86 in the data server 38
(Described in FIG. 2), it has a function of reading the corresponding information and performing predetermined processing, processing the information into viewable information (for example, image information) and returning it. (1) Estimation program (contents will be described later in the description of the operation using FIG. 10 to FIG. 20). (2) Order receiving program (contents will be described in the description of the operation also using FIG. 21). (3) Manufacturing program (contents will be described later in the description of the operation using FIG. 22 together.) (4) Delivery program (contents will be described in the description of the operation using FIG. 23 and FIG. 24 later.) (5) Settlement program (contents will be described later in the description of the operation using FIG. 25 together) (6) Notification management program (contents will be described later with reference to FIGS. 26 to 31)
Are also described together with the action using. (7) Progress management program (contents will be described later in the description of operation) (8) Sales management program (contents will be described in the description of later operation)

【0019】前記通信サーバ32は、前記通信回線網2
6を介して前記端末10、14、18(1)〜18
(n)、22(1)〜22(m)及び前記連絡デバイス
12、16、20(1)〜20(n)、24(1)〜2
4(m)に結合されるとともに、前記ASPセンター2
8内のアプリケーションサーバ30、通信サーバ32、
通知サーバ34及びデータサーバ38に結合されてい
る。
The communication server 32 is connected to the communication network 2
6, the terminals 10, 14, 18 (1) to 18
(N), 22 (1) to 22 (m) and the communication devices 12, 16, 20 (1) to 20 (n), 24 (1) to 2
4 (m) and the ASP center 2
8, the application server 30, the communication server 32,
It is coupled to a notification server 34 and a data server 38.

【0020】前記通信サーバ32は、前記通信回線網2
6を利用してインターネット接続し、前記端末10、1
4、18(1)〜18(n)及び22(1)〜22
(m)と前記ASPセンター28内のアプリケーション
サーバ30及びデータサーバ38との間の送受信を管理
する機能を具備している。
The communication server 32 is connected to the communication network 2
6 to connect to the Internet and use the terminals 10, 1
4, 18 (1) to 18 (n) and 22 (1) to 22
A function of managing transmission and reception between (m) and the application server 30 and the data server 38 in the ASP center 28 is provided.

【0021】前記通知サーバ34は、前記通信回線網2
6を利用して前記連絡デバイス12、16、20(1)
〜20(n)及び24(1)〜24(m)と前記ASP
センター28内のデータサーバ38との間におけるデ−
タの送受信を管理する機能を具備している。
The notification server 34 is connected to the communication network 2
6, the contact devices 12, 16, 20 (1)
-20 (n) and 24 (1) -24 (m) and the ASP
Data between the data server 38 in the center 28
It has a function to manage data transmission and reception.

【0022】前記データサーバ38は、図2に示すよう
に、顧客DB(データベース)40、ジョブチケットD
B42、通知管理DB44、連絡先マスタ46、工程別
見積りDB48、製品マスタ50、機械種別マスタ5
2、統計DB54、外注先マスタ56、工程別DB5
8、受注DB60、CRM(カスタマー・リレーション
シップ・マネジメント)−DB64、ワークフローDB
66、資材マスタ68、資材発注DB70、資材在庫D
B72、売上集計DB74、製品在庫DB76、機械別
スケジュールDB78、標準作業時間テーブル80、変
更パターンマスタ82、単価マスタ84、見積りパター
ンファイル86、見積りDB88及びその他のデ−タベ
ース(図示省略)を具備している。前記工程別DB58
と前記機械別スケジュールDB78は工程別作業管理情
報記憶部を構成している。
As shown in FIG. 2, the data server 38 includes a customer DB (database) 40, a job ticket D
B42, notification management DB 44, contact master 46, process-based estimation DB 48, product master 50, machine type master 5
2. Statistics DB 54, subcontractor master 56, process-specific DB5
8, Order DB60, CRM (Customer Relationship Management) -DB64, Workflow DB
66, material master 68, material order DB 70, material inventory D
B72, a sales summary DB 74, a product inventory DB 76, a machine-specific schedule DB 78, a standard work time table 80, a change pattern master 82, a unit price master 84, an estimate pattern file 86, an estimate DB 88, and other databases (not shown). ing. DB58 by process
And the machine-specific schedule DB 78 constitute a process-specific work management information storage unit.

【0023】前記顧客DB40には、前記ASPセンタ
ー28とその利用者との契約によって利用者に付与され
たユーザIDが、利用者毎に対応付けた顧客情報として
登録されている。前記ASPセンター28の利用者と
は、前記特定客先端末14及び特定客先連絡デバイス1
6の利用者(すなわち特定客)、前記印刷会社端末18
(1)〜18(n)及び印刷会社連絡デバイス20
(1)〜20(n)の利用者(すなわち印刷会社)、前
記外注業者端末22(1)〜22(m)及び外注業者連
絡デバイス24(1)〜24(m)の利用者(すなわち
外注業者)を指している。
In the customer DB 40, a user ID assigned to a user by a contract between the ASP center 28 and the user is registered as customer information associated with each user. The user of the ASP center 28 is the specific customer terminal 14 and the specific customer contact device 1
6 users (that is, specific customers), the printing company terminal 18
(1) to 18 (n) and the printing company communication device 20
(1) to 20 (n) users (that is, printing companies), users of the above-mentioned subcontractor terminals 22 (1) to 22 (m) and subcontractor communication devices 24 (1) to 24 (m) (that is, subcontractors). Contractor).

【0024】前記ジョブチケットDB42には、図3に
示すようなデ−タ内容を有するジョブチケットデ−タが
記憶されている。このジョブチケットデ−タの内容は、
図3に示すように、(1)製品種別(a種類、b製品サ
イズ、c加工種別、d製品内容、e色数)、(2)納期
(スケジュール)、(3)金額、(4)部数(枚数)、
(5)納品先及び配送先、(6)製版サイズ、(7)紙
サイズ、(8)発生する工程、(9)指定工場(指定業
者)、(10)特別指定(高精度、納期設定、機器タイ
プ)、(11)URL(画像保管先を示すアドレス)の
各デ−タからなっている。 (1)の製品種別から(5)の納品先及び配送先までの
各デ−タと、(9)の指定工場、(10)の特別指定の
各デ−タとは、基本的には見積り工程で客先によって端
末14から入力された見積り依頼情報に基づいて作成さ
れ、適宜更新される。また、(6)の製版サイズ、
(7)の紙サイズ、(8)の発生する工程の各デ−タ
は、基本的には印刷設計工程で印刷会社によって端末1
8から入力された印刷設計情報に基づいて作成され、適
宜更新される。
The job ticket DB 42 stores job ticket data having data contents as shown in FIG. The content of this job ticket data is
As shown in FIG. 3, (1) product type (a type, b product size, c processing type, d product content, number of colors), (2) delivery date (schedule), (3) amount of money, (4) number of copies (Number),
(5) Delivery destination and delivery destination, (6) Plate making size, (7) Paper size, (8) Process to be generated, (9) Designated factory (designated trader), (10) Special designation (high accuracy, delivery date setting, Device data) and (11) URL (address indicating image storage location). Basically, the data from the product type in (1) to the delivery destination and delivery destination in (5), the designated factory in (9), and the specially designated data in (10) are estimated. In the process, it is created based on the estimate request information input from the terminal 14 by the customer, and is updated as appropriate. Also, the plate making size of (6),
The data of the paper size of (7) and the process of generating (8) are basically transmitted to the terminal 1 by the printing company in the printing design process.
8 is created based on the print design information input from step 8 and is updated as appropriate.

【0025】前記通知管理DB44には、前記ASPセ
ンター28側から前記端末10、14、18(1)〜1
8(n)、22(1)〜22(m)又は前記連絡デバイ
ス12、16、20(1)〜20(n)、24(1)〜
24(m)へ通知される情報又は通知された情報を管理
するための情報、すなわち、どの端末又は連絡デバイス
に何を通知するか又は通知したかの情報が、蓄積され、
更新される。
The notification management DB 44 stores the terminals 10, 14, 18 (1) to 1 from the ASP center 28 side.
8 (n), 22 (1) to 22 (m) or the communication devices 12, 16, 20 (1) to 20 (n), 24 (1) to
The information notified to 24 (m) or the information for managing the notified information, that is, information on what terminal or contact device is notified or notified is stored,
Be updated.

【0026】前記連絡先マスタ46には、客先、印刷会
社、外注業者毎の連絡方法(電子メール、ファクシミリ
装置、電話機など)と連絡先(電子メールアドレス、フ
ァクシミリ番号、電話番号など)を示す情報が登録され
ている。
The contact master 46 indicates a contact method (e-mail, facsimile machine, telephone, etc.) and contact information (e-mail address, facsimile number, telephone number, etc.) for each customer, printing company, subcontractor. Information is registered.

【0027】前記工程別見積りDB48には、前記特定
客先端末14、印刷会社端末18(1)〜18(n)か
ら入力する工程別の見積り依頼情報や、前記印刷会社端
末18(1)〜18(n)、外注業者端末22(1)〜
22(m)から入力する工程別の見積り回答情報が、客
先、物件内容毎に蓄積され、更新される。
The process-based estimate DB 48 includes process-based estimate request information input from the specific customer terminal 14 and the printing company terminals 18 (1) to 18 (n), and the printing company terminals 18 (1) to 18 (n). 18 (n), outsourcing contractor terminal 22 (1)-
Estimation response information for each process input from 22 (m) is accumulated and updated for each customer and each property.

【0028】前記製品マスタ50には、図4に示すよう
に、前記ジョブチケットDB42内のジョブチケットデ
−タ中の製品種別(種類、加工種別、製品内容、色数)
に対応して、外注業者選択要件の1つとしての製品クオ
リティが記憶されている。
As shown in FIG. 4, the product master 50 includes a product type (type, processing type, product content, and number of colors) in the job ticket data in the job ticket DB 42, as shown in FIG.
The product quality is stored as one of the requirements for selecting a subcontractor.

【0029】前記機械種別マスタ52には、図5に示す
ように、前記ジョブチケットDB42内のジョブチケッ
トデ−タ中の製品種別(種類、製品サイズ、加工種別、
色数)、印刷部数、製版サイズ及び紙サイズに対応し
て、外注業者選択要件の1つとしての機械種類、機械型
番及びメーカー型番が記憶されている。
As shown in FIG. 5, the machine type master 52 stores product types (type, product size, processing type, job type) in the job ticket data in the job ticket DB 42, as shown in FIG.
A machine type, a machine model number, and a maker model number as one of the selection requirements of the outsourcing company are stored in correspondence with the number of colors), the number of copies, the plate making size, and the paper size.

【0030】前記統計DB54には、前記受注DB60
に蓄積された情報を統計的に見るために、これらの情報
を蓄積した実績デ−タが蓄積される。前記統計DB54
には、また、ジョブチケットデ−タに基づいて外注業者
がどのような作業をしたかを示すデ−タが実績デ−タと
して蓄積される。
The statistical DB 54 includes the order DB 60
In order to statistically look at the information stored in the server, the result data storing the information is stored. The statistics DB 54
In addition, data indicating what kind of work the subcontractor has performed based on the job ticket data is accumulated as performance data.

【0031】前記外注先マスタ56には、図6に示すよ
うに、外注情報(会社CD、会社名)に対応して、外注
業者選択要件としての製品クオリティ、所有機械情報
(機械種類、機械型番、メーカー型番、付帯設備、メン
テナンス状況及び設置年月日)、ISO取得情報、信頼
度などが記憶されている。
As shown in FIG. 6, the subcontractor master 56 stores product quality as a subcontractor selection requirement and owned machine information (machine type, machine model number) in accordance with subcontract information (company CD, company name). , Manufacturer model number, incidental equipment, maintenance status and installation date), ISO acquisition information, reliability, and the like.

【0032】前記工程別DB58には、物件毎の工程別
の作業予定情報・作業実績情報が蓄積され、更新され
る。
The process-specific DB 58 accumulates and updates work schedule information and work performance information for each process for each property.

【0033】前記受注DB60には次ぎの(1)(2)
(3)に示すような情報が受注情報として蓄積される。 (1)客先、物件内容(カタログやパンフレットな
ど)、工程(受注から納品までのそれぞれの作業工程)
毎に誰(客先、印刷会社、外注業者)が誰(客先、印刷
会社、外注業者)に依頼し、誰(外注業者、印刷会社の
社内担当部署)が実施するのかを示す情報。 (2)何日の何時から何日の何時まで(From/T
o)に実施するのかを示す情報。 (3)担当営業(連絡先を含めて)及び必須の連絡先を
示す情報(これらの情報は通知の内容により制限可能と
する。)。 以上の情報(1)(2)(3)は複数登録可能とし、プ
ライオリティ設定可能とする。また、各工程の製造にあ
たっての管理者を示す情報を受注情報に含めてもよい。
The order DB 60 has the following items (1) and (2).
Information as shown in (3) is stored as order information. (1) Customer, property contents (catalogs and pamphlets, etc.), process (each work process from order receipt to delivery)
Information indicating who (customer, printing company, subcontractor) requests who (customer, printing company, subcontractor), and who (subcontractor, department in charge of the printing company) implements each time. (2) From what time of the day to what time of the day (From / T
Information indicating whether or not to execute in o). (3) Information indicating the sales person in charge (including the contact information) and the required contact information (these information can be limited by the contents of the notification.). The above information (1), (2), and (3) can be registered in a plurality, and the priority can be set. Further, information indicating a manager in manufacturing each process may be included in the order information.

【0034】前記CRM−DB64には、前記ASPセ
ンター28の提供するサービスを受けた特定客先、印刷
会社、外注業者の一人一人の取引の履歴情報を一元管理
し、それぞれのニーズに合った対応で顧客満足を向上さ
せるのに適するように配置された情報が蓄積される。
The CRM-DB 64 centrally manages transaction history information of each of a specific customer, a printing company, and a subcontractor who received the service provided by the ASP center 28, and responds to each needs. The information arranged so as to improve customer satisfaction is accumulated.

【0035】前記ワークフローDB66には、全体工程
の流れを管理するためのデ−タが記憶されている。
The workflow DB 66 stores data for managing the flow of the entire process.

【0036】前記資材マスタ68には、印刷物製作のた
めに使用されるインクや紙等の印刷資材に関する情報が
予め登録されている。
In the material master 68, information on printing materials such as ink and paper used for producing printed matter is registered in advance.

【0037】前記資材発注DB70には、資材発注先毎
に、何時、どのような資材をいくつ発注したかを示す情
報が蓄積され、更新される。
The material order DB 70 stores and updates information indicating when, what kind of material and how many materials are ordered for each material ordering party.

【0038】前記資材在庫DB72には、印刷会社、外
注業者毎の印刷資材の在庫数や在庫場所に関する情報が
蓄積され、更新される。
The material stock DB 72 stores and updates information on the number and location of stock of printing materials for each printing company and subcontractor.

【0039】前記売上集計DB74には、特定客先、印
刷会社、外注業者毎の受注物件別の請求情報や納品情報
などの請求管理に使うための情報が蓄積され、更新され
る。
The sales summary DB 74 stores and updates information used for billing management, such as billing information and delivery information for each property ordered by a specific customer, a printing company, and a subcontractor.

【0040】前記製品在庫DB76には、特定客先毎の
物件(製品、仕掛品など)の在庫数や在庫場所に関する
情報が蓄積され、更新される。
The product stock DB 76 stores and updates information on the number of stocks and stock locations of properties (products, work in process, etc.) for each specific customer.

【0041】前記機械別スケジュールDB78には、機
械別のスケジュール管理に使用される情報が記憶され、
具体的には機械毎の物件別、作業別の作業予定情報・作
業実績情報が蓄積され、更新される。
The machine-specific schedule DB 78 stores information used for machine-specific schedule management.
Specifically, work schedule information and work result information for each property and each work for each machine are accumulated and updated.

【0042】前記標準作業時間テーブル80には、図7
に示すように、各工程の作業内容(工程、作業内容及び
製品内容)に対応して、各工程において標準的に必要な
作業時間の情報が予め記憶されている。
FIG. 7 shows the standard work time table 80.
As shown in (1), information on the work time required as a standard in each process is stored in advance corresponding to the work content (process, work content and product content) of each process.

【0043】前記変更パターンマスタ82には、図8に
示すように、変更発生工程と変更内容の組み合わせパタ
ーンに対応して、予備通知先工程が登録されている。例
えば、工程「印刷」と変更内容「設計変更」の組み合わ
せパターンに対しては、予備通知先の工程として「製
作」、「原稿」、「製版」、「印刷」、「加工」、「発
送」及び「納品」の各工程が登録され、工程「印刷」と
変更内容「仕様変更」の組み合わせパターンに対して
は、予備通知先の工程として「原稿」、「製版」、「印
刷」、「加工」、「発送」及び「納品」の各工程が登録
され、工程「印刷」と変更内容「作業変更」の組み合わ
せパターンに対しては、予備通知先の工程として「印
刷」、「加工」、「発送」及び「納品」の印刷以降の各
工程が登録されている。
As shown in FIG. 8, a preliminary notification destination process is registered in the change pattern master 82 in correspondence with a combination pattern of a change occurrence process and a change content. For example, for a combination pattern of a process “printing” and a change content “design change”, as a preliminary notification destination process, “production”, “document”, “plate making”, “printing”, “processing”, “shipping” And “delivery” processes are registered. For the combination pattern of the process “printing” and the change content “specification change”, as the preliminary notification destination process, “document”, “plate making”, “printing”, “processing” , "Shipment" and "delivery" are registered, and for the combination pattern of the process "printing" and the change content "work change", "printing", "processing", " Each process after printing of “shipping” and “delivery” is registered.

【0044】前記単価マスタ84には、製品別、工程別
の単価情報が予め登録されている。この場合、客先毎に
単価情報を異ならせてもよい。
In the unit price master 84, unit price information for each product and each process is registered in advance. In this case, the unit price information may be different for each customer.

【0045】前記見積りパターンファイル86には、テ
ンプレート(見積り依頼内容のひな形)の情報やスケル
トン(印刷物を例示するための商品見本)の情報が登録
されている。
In the estimation pattern file 86, information of a template (a template for estimating request contents) and information of a skeleton (a sample product for illustrating a printed matter) are registered.

【0046】前記見積りDB88には、物件別の全ての
見積り情報が蓄積され、更新される。
In the estimation DB 88, all estimation information for each property is stored and updated.

【0047】つぎに図1、図2の作用を図3以下を併用
して説明する。特定客先、印刷会社、外注業者には、予
めASPセンター28から所定のサービスを受けるため
のユーザIDが付与され、このユーザIDによってAS
Pセンター28との契約で利用可能なサービスが制限さ
れている。この制限は、具体的には、サービス開始時に
表示されるメニュー画面の内容、各入力・照会・出力項
目の内容又は表示内容・チェック内容に現れている。一
般客先には、ASPセンター28から上述のようなユー
ザIDが付与されていない。ユーザIDが付与された特
定客先、印刷会社、外注業者は、ASPセンター28の
契約会社(又は契約者)である。説明の便宜上、まずA
でシステム全体の処理の流れについて説明し、B以下で
そのうちの主な処理(B:見積り処理、C:受注処理、
D:製造処理、E:納品処理、F:決済処理、G:通知
管理)について説明し、最後にH:その他の処理に分け
て作用を説明する。
Next, the operation of FIGS. 1 and 2 will be described with reference to FIGS. A user ID for receiving a predetermined service from the ASP center 28 is given to the specific customer, the printing company, and the outsourcing company in advance.
Available services are restricted by contract with the P center 28. Specifically, this limitation appears in the contents of the menu screen displayed at the start of the service, the contents of each input / inquiry / output item, or the display contents / check contents. The general customer is not given the above-mentioned user ID from the ASP center 28. The specific customer, the printing company, and the subcontractor to which the user ID has been assigned are contract companies (or contractors) of the ASP center 28. For convenience of explanation, A
The processing flow of the entire system will be described in Section B, and the main processing (B: estimation processing, C: order receiving processing,
D: Manufacturing process, E: Delivery process, F: Settlement process, G: Notification management), and finally, H: Other processes will be described.

【0048】A:システム全体の処理の流れ 図9に示すように、見積り、受注、製造、納品、決済の
順に処理が行われ、これらの処理全体の進捗状況が管理
され、全体の処理の流れの全てにおいて常に通知管理が
行われている。また、図9中の営業管理は、個人のスケ
ジュールなどの業務とは直接関連しない機能で、当シス
テムで行うことができる。
A: Process Flow of the Entire System As shown in FIG. 9, the processes are performed in the order of quote, order, manufacture, delivery and settlement, the progress of these processes is managed, and the flow of the entire process is performed. Notification management is always performed in all of the above. The business management in FIG. 9 is a function that is not directly related to business such as a personal schedule, and can be performed by this system.

【0049】B:見積り処理 B−1:全体的な見積り処理 図10に示すようなフローチャートに従って、つぎの
(1)〜(5)に示すように処理される。 (1)特定客先は、その端末14からユーザIDを入力
することによって、通信回線網26、通信サーバ32を
経由してASPセンター28のサイトに入り、メニュー
画面を表示してASPセンター28のサービスを利用す
ることができる。このユーザIDの認証には顧客DB4
0内の顧客情報が参照される。
B: Estimation Processing B-1: Overall Estimation Processing Processing is performed as shown in the following (1) to (5) according to a flowchart shown in FIG. (1) The specific customer enters the site of the ASP center 28 via the communication line network 26 and the communication server 32 by inputting the user ID from the terminal 14, and displays the menu screen to display the menu of the ASP center 28. Services can be used. This user ID is authenticated by the customer DB4
The customer information in 0 is referred to.

【0050】(2)特定客先が、その端末14のメニュ
ー画面中の見積り処理を選択すると、見積りパターンフ
ァイル86に登録されているテンプレートやスケルトン
が読み出されて画面に表示される。特定客先が画面内の
所定の項目についての情報を入力することによって概算
見積りが作成され、更に端末14から印刷会社に対する
見積り依頼を指示すると、この見積り依頼情報は、見積
り情報とともに見積りDB88に蓄積され、ジョブチケ
ット情報の一部としてジョブチケットDB42に蓄積さ
れる(「客先見積り依頼の受信」)。このとき、特定客
先が指定できる印刷会社はASPセンター28と契約し
た印刷会社に限定される。ASPセンター28は、その
通信サーバ32、通知サーバ34、デ−タサーバ38を
用いて、指定された印刷会社の連絡デバイス20(k)
(kは1からnまでのうちの数値で、以下説明の便宜上
20と記述する。)へ正式な見積り依頼があったことを
通知する。この通知情報は通知管理DB44に蓄積さ
れ、管理される。
(2) When the specific customer selects the estimation processing in the menu screen of the terminal 14, the templates and skeletons registered in the estimation pattern file 86 are read and displayed on the screen. A rough estimate is created by the specific customer inputting information on a predetermined item on the screen, and when an estimate request is issued from the terminal 14 to the printing company, the estimate request information is stored in the estimate DB 88 together with the estimate information. Then, the information is stored in the job ticket DB 42 as a part of the job ticket information (“reception of customer quote request”). At this time, the printing company that can specify the specific customer is limited to the printing company contracted with the ASP center 28. The ASP center 28 uses the communication server 32, the notification server 34, and the data server 38 to communicate with the communication device 20 (k) of the designated printing company.
(K is a numerical value from 1 to n and is described as 20 for the sake of convenience in the following description). This notification information is stored in the notification management DB 44 and managed.

【0051】(3)ASPセンター28から通知を受け
た印刷会社は、その端末18(k)(以下説明の便宜上
18と記述する。)でジョブチケットDB42及び見積
りDB88から見積り依頼情報を読み出して閲覧し、特
定客先からの見積り依頼内容を確認し、発注印刷物の見
積りから決済までの各工程毎の必要に応じて1又は複数
の外注業者を選択して見積り依頼を行う(「印刷会社の
見積り処理」:後述のB−2で記述する。)。この見積
り依頼は、印刷会社端末18からの入力によって行われ
るが、その際、外注業者に対する見積り依頼内容は、ジ
ョブチケットDB42及び見積りDB88内に蓄積され
た特定客先からの見積り依頼情報に連携して作成され
る。このとき、印刷会社が指定できる外注業者はASP
センター28と契約した外注業者に限定される。また、
ASPセンター28は、前記(2)と同様に、指定され
た外注業者の連絡デバイス24(s)(sは1からmま
でのうちの数値で、以下説明の便宜上24と記述す
る。)へ見積り依頼があったことを通知し、この通知情
報が通知管理DB44に蓄積され、管理される。
(3) The printing company that has received the notification from the ASP center 28 reads out and requests the quote request information from the job ticket DB 42 and the quote DB 88 at the terminal 18 (k) (hereinafter referred to as 18 for the sake of convenience). Check the contents of the quote request from the specific customer, and select one or more subcontractors as necessary for each process from quote of the ordered printed matter to settlement, and make a quote request ("Printer's quote Process ": described in B-2 described later.) This quote request is made by input from the printing company terminal 18. At this time, the quote request content to the subcontractor is linked with the quote request information from the specific customer accumulated in the job ticket DB 42 and the quote DB 88. Created. At this time, the contractor that can be specified by the printing company is ASP
Limited to outsourcing contractors with the center 28. Also,
The ASP center 28, like the above (2), estimates the communication device 24 (s) of the designated subcontractor (s is a numerical value from 1 to m, and is described as 24 for the convenience of the description below). The request is notified, and this notification information is stored in the notification management DB 44 and managed.

【0052】(4)印刷会社による前記(3)の「印刷
会社の見積り処理」が完了し、その見積り情報を客先に
対する正式な見積り情報として印刷会社端末18から入
力すると、この見積り情報がASPセンター28内のジ
ョブチケットDB42、工程別見積りDB48及び見積
りDB88に蓄積、更新される。また、ASPセンター
28は、前記(2)と同様に、見積り依頼のあった特定
客先の連絡デバイス16へ見積り完了を通知する(「客
先への提出」)とともに、見積り金額等の簡単な見積り
情報も通知し、この通知情報が通知管理DB44に蓄積
され、管理される。また、ASPセンター28は、前記
(2)と同様に、見積り依頼のあった印刷会社の連絡デ
バイス20へ見積り完了を通知し、この通知情報が通知
管理DB44に蓄積され、管理される。
(4) When the printing company completes the above (3) “Printing company estimation process” and inputs the estimation information from the printing company terminal 18 as formal estimation information for the customer, this estimation information is The information is accumulated and updated in the job ticket DB 42, the process-based estimation DB 48, and the estimation DB 88 in the center 28. Further, the ASP center 28 notifies the contact device 16 of the specific customer who has requested the estimation of the completion of the estimation (“submission to the customer”), as well as the above (2), as well as simple information such as the estimated amount of money. Estimation information is also notified, and this notification information is accumulated and managed in the notification management DB 44. Further, the ASP center 28 notifies the communication device 20 of the printing company that has requested the estimation of the completion of the estimation, as in the case of (2), and this notification information is stored in the notification management DB 44 and managed.

【0053】(5)ASPセンター28から通知を受け
た特定客先は、その端末16でジョブチケットDB4
2、見積りDB88から見積り情報を読み出して閲覧
し、その内容を確認する。「見積りOK?」がYESの
ときに、特定客先が端末14又は連絡デバイス16から
発注情報(承認の情報)を入力すると、この発注情報が
ASPセンター28に送信される。ASPセンター28
は、前記(2)と同様に、正式な見積りを出した印刷会
社の連絡デバイス20に特定客先からの発注があったこ
とを通知する。印刷会社がASPセンター28からの通
知を受けると(「見積り承認の受信」)、見積り処理が
終了し、後述のC:受注処理につづく。このとき、プリ
ンタによる見積書の印刷も可能である。また「見積りO
K?」がNOのときには、前記(2)の「客先見積り依
頼の受信」に戻る。
(5) The specific customer received the notification from the ASP center 28 uses the terminal 16 for the job ticket DB 4
2. Estimate information is read from the estimate DB 88, browsed, and its contents are confirmed. When “estimate OK?” Is YES, when the specific customer inputs order information (information of approval) from the terminal 14 or the contact device 16, the order information is transmitted to the ASP center 28. ASP Center 28
Notifies the contact device 20 of the printing company that issued the formal quotation that there is an order from a specific customer, as in (2) above. When the printing company receives the notification from the ASP center 28 ("reception of estimation approval"), the estimation processing ends, and the processing follows C: order receiving processing described later. At this time, it is also possible to print an estimate using a printer. "Estimate O
K? Is NO, the process returns to (2) “Reception of customer quote request”.

【0054】B−2:印刷会社の見積り処理 図11に示すフローチャートに従って、つぎの(1)〜
(3)に示すように処理される。 (1)客先からの見積り依頼によって印刷設計処理(後
述のB−3:印刷設計処理で記述する。)が行われる。 (2)「印刷設計処理」完了後、「工程担当は?」で工
程担当が社内か外注かが判断され、社内のときには「社
内見積り処理」が行われ、外注のときには「外注業者選
択処理」処理(後述のB−4:外注業者選択処理で記述
する。)を経た後に「外注見積り処理」(後述のB−
5:外注見積りで記述する。)が行われる。 (3)前記(2)の「社内見積り処理」又は「外注見積
り処理」が完了すると、「見積り作成処理」が行われて
印刷会社の見積り処理が完了し、前記B−1、(4)の
「客先への提出」処理につづく。
B-2: Estimation Processing of Printing Company According to the flowchart shown in FIG.
The processing is performed as shown in (3). (1) Print design processing (described in B-3: print design processing described later) is performed in response to an estimate request from a customer. (2) After the “print design processing” is completed, it is determined whether the person in charge of the process is in-house or outsourcing by “Who is the person in charge of the process?”. After the processing (described in B-4: Outsourcer selection processing described later), the “outsourcing estimation processing” (B-described later)
5: Described by outsourcing estimate. ) Is performed. (3) When the above (2) “in-house quotation processing” or “outsourcing quotation processing” is completed, “estimation creation processing” is performed, and the quotation processing of the printing company is completed. Continue to "Submit to Customer" process.

【0055】B−3:印刷設計処理図12に示すフロー
チャートに従って、つぎの(1)〜(3)に示すように
処理される。 (1)客先からの見積り依頼がスケルトンやテンプレー
トによって行われたときには、「お客様がスケルトン・
テンプレート見積り利用か?」がYESとなり、スケル
トンやテンプレートによる印刷設計が行われ、スケルト
ンやテンプレートによって行われていないときには、
「お客様がスケルトン・テンプレート見積り利用か?」
がNOとなり、「印刷会社がスケルトン・テンプレート
見積り利用か?」が判断される。 (2)「印刷会社がスケルトン・テンプレート見積り利
用か?」がYESのときには、予め設定された「標準見
積り処理」による印刷設計が行われ、NOのときには
「個別の印刷設計処理」による印刷設計処理が行われ
る。 (3)印刷設計処理が完了すると前記B−2、(2)の
「工程担当は?」の判断につづく。
B-3: Print Design Processing According to the flowchart shown in FIG. 12, processing is performed as shown in the following (1) to (3). (1) When a request for quote from a customer is made using a skeleton or a template,
Use template quote? Is YES, and the print design using the skeleton or the template is performed, and when the print design is not performed using the skeleton or the template,
"Do you use skeleton template quote?"
Is NO, and it is determined "is the printing company using the skeleton template estimate?" (2) When "is printing company using skeleton template estimate?" Is YES, print design is performed by a preset "standard estimate process". When NO, print design process is performed by "individual print design process". Is performed. (3) When the print design processing is completed, the determination of "What is the person in charge of the process?" Of B-2 and (2) is continued.

【0056】B−4:外注業者選択処理 外注業者選択処理は、図13に示すフローチャートに従
って、つぎの(1)〜(12)に示すように処理され
る。 (1)印刷会社が端末18から外注業選択のための情報
を入力し、通信回線26を介してASPセンター28へ
送信されると、ASPセンター28では、ジョブチケッ
トDB42から対応した製品種別、印刷部数、製版サイ
ズ、紙サイズ、発生工程、納期、金額、納品先などのジ
ョブチケット情報が読み出される。
B-4: Subcontractor Selection Process The subcontractor selection process is performed as shown in the following (1) to (12) according to the flowchart shown in FIG. (1) When the printing company inputs information for selecting an outsourcing business from the terminal 18 and transmits the information to the ASP center 28 via the communication line 26, the ASP center 28 outputs the corresponding product type and printing from the job ticket DB 42. Job ticket information such as the number of copies, plate making size, paper size, generation process, delivery date, amount, and delivery destination is read.

【0057】(2)ついで、ASPセンター28では、
ジョブチケットDB42から読み出された製品種別によ
り、製品マスタ50から外注業者選択要件の1つとして
の製品クオリティが決定される。例えば、図4に示すよ
うに、製品種別「種類がチラシ、加工種別が製本、製品
内容が自動車、色数が4色」により製品クオリティ「A
A」が決定される。
(2) Next, at the ASP center 28,
Based on the product type read from the job ticket DB 42, the product quality as one of the requirements for selecting a subcontractor is determined from the product master 50. For example, as shown in FIG. 4, the product quality “A” is determined by the product type “type is leaflet, processing type is bookbinding, product content is automobile, color number is 4 colors”.
A "is determined.

【0058】(3)ついで、ASPセンター28では、
ジョブチケットDB42から読み出された製品種別、印
刷部数、製版サイズ、紙サイズ(第1設定情報の一例)
により、機械種別マスタ52から外注業者選択要件の1
つとしての「必要な機械」が決定される。例えば、図5
に示すように、製品種別「種類がチラシ、製品サイズが
A4、…」、印刷部数「10万部」、…により機械種類
「加工」、機械型番「ZZZZ」、…が決定される。
(3) Next, at the ASP center 28,
Product type, number of copies, plate making size, paper size read from job ticket DB (an example of first setting information)
From the machine type master 52, one of the requirements for selecting a subcontractor is
One "necessary machine" is determined. For example, FIG.
, The machine type “machining” and the machine model number “ZZZZ” are determined based on the product type “type is flyer, product size is A4,.

【0059】(4)ついで、ASPセンター28では、
ジョブチケットDB42から読み出された指定工場、特
別指定、発生工程、納期、金額、納品先(第2設定情報
の一例)により、外注業者選択要件が決定される。
(4) Next, at the ASP center 28,
The contractor selection requirement is determined based on the designated factory, special designation, generation process, delivery date, amount, and delivery destination (an example of the second setting information) read from the job ticket DB 42.

【0060】(5)ついで、ASPセンター28では、
前記(2)〜(4)で決定された製品クオリティ、必要
な機械、ISO、信頼度などの外注業者選択要件によ
り、外注先マスタ56から外注業者が抽出される。
(5) Next, at the ASP center 28,
An outsourcing company is extracted from the outsourcing master 56 according to outsourcing company selection requirements such as product quality, required machine, ISO, and reliability determined in (2) to (4).

【0061】(6)ついで、ASPセンター28では、
前記(2)〜(4)で決定された製品クオリティ、必要
な機械、ISO、信頼度などの外注業者選択要件と、前
記(5)で抽出された外注業者とに基づいて、外注業者
選択要件毎に順位付けされた外注業者一覧を表示するた
めの情報が作成される。このため、印刷会社の端末18
からの工程別作業依頼先一覧要求に基づいて工程別DB
58から対応する情報が読み出され、その端末18で図
14に示すような工程別作業依頼先一覧が表示されたと
きに、この表示中に外注業者一覧が表示される。この一
覧表では、見積り発生工程中の製版から配送までの工程
が外注依頼工程を表し、対応した印刷会社Aから倉庫会
社Aまでの会社が外注業者を表す。
(6) Next, at the ASP center 28,
Subcontractor selection requirements based on the subcontractor selection requirements such as product quality, required machine, ISO, and reliability determined in (2) to (4) and the subcontractor extracted in (5). Information for displaying a list of outsourced contractors ranked for each is created. Therefore, the terminal 18 of the printing company
DB by process based on work request destination list by process
When the corresponding information is read from 58 and the terminal 18 displays a list of work request destinations by process as shown in FIG. 14, a list of outsourcing contractors is displayed during this display. In this list, the process from plate making to delivery in the estimate generation process represents an outsourcing request process, and the corresponding company from the printing company A to the warehouse company A represents an outsourcing company.

【0062】(7)ついで、図14において、印刷会社
が端末18で見積り発生工程中の印刷を選択してASP
センター28に対応した情報の閲覧を要求すると、図1
5に示すような印刷工程の外注業者一覧が端末18で表
示される。この一覧表では、外注業者である印刷会社A
〜Iの9社が、最上段のAから優先順に下方へ向かって
B、C、D、E、F、G、H、Iの順に表示され、クオ
リティ、ISOなどの複数の外注業者選択要件が横方向
に左から右に向かって1、2、…、7の優先順に表示さ
れ、各外注業者選択要件が縦方向に上から下に向かって
優先順(例えばクオリティについては「AA」、「A
A」、…、「B」の順)に表示される。このとき、最優
先の外注業者選択要件(例えばクオリティ)について
は、その列項目(図中2点鎖線で囲んだ項目)中の文字
又は記号を赤色で表示し、条件に合わない外注業者選択
要件(例えば信頼度C以下)については、その項目(図
中点線で囲んだ項目)中の文字又は記号を青色で表示す
る。この赤色表示、青色表示は、以下の図16、図1
7、図19においても同様とする。
(7) Next, in FIG. 14, the printing company selects printing during the estimation generating process on the
When a request is made to browse information corresponding to the center 28, FIG.
A list of outsourcing companies in the printing process as shown in FIG. In this list, the printing company A, which is a subcontractor,
~ I are displayed in the order of B, C, D, E, F, G, H, and I in descending order of priority from A at the top row. .., 7 are displayed from left to right in the horizontal direction, and each subcontractor selection requirement is displayed in the vertical order from top to bottom (for example, “AA”, “A” for quality).
A ”,...,“ B ”). At this time, for the highest priority subcontractor selection requirement (for example, quality), the characters or symbols in the column items (items enclosed by a two-dot chain line in the figure) are displayed in red, and the subcontractor selection requirement that does not meet the conditions is displayed. Regarding (for example, the reliability is equal to or less than C), the characters or symbols in the item (the item enclosed by a dotted line in the figure) are displayed in blue. The red display and the blue display are shown in FIGS.
7, and FIG.

【0063】(8)ついで、図15において、印刷会社
が端末18で外注業者選択要件の信頼度を優先させて
「並替え」を選択してASPセンター28に対応した情
報の閲覧を要求すると、図16に示すような外注業者一
覧が端末18で表示される。この一覧表では、外注業者
である印刷会社A〜Iの9社については、A、C、F、
…、Eの順に順位付けして表示され、図15と同様に、
最優先の外注業者選択要件(例えばクオリティ)につい
ては赤色で表示され、条件に合わない外注業者選択要件
(例えば信頼度C以下)については青色で表示される。
(8) Next, in FIG. 15, when the printing company selects “rearrangement” at the terminal 18 with priority given to the reliability of the contractor selection requirement and requests the ASP center 28 to browse the corresponding information, A list of outsourcing companies as shown in FIG. In this list, nine printing companies A to I, which are subcontractors, are A, C, F,
.., And are displayed in the order of E. As in FIG.
Outsourcer selection requirements (eg, quality) with the highest priority are displayed in red, and outsourcer selection requirements that do not meet the conditions (eg, reliability C or less) are displayed in blue.

【0064】(9)また、図15又は図16において、
印刷会社が端末18でクオリティ「AA」という条件付
加をして絞り込みをするために、「フィルタ」を選択し
てASPセンター28に対応した情報の閲覧を要求する
と、図17に示すような外注業者一覧が端末18で表示
される。この一覧表では、9社ある印刷会社A〜Iのう
ちのA、B、C、D、Eの5社のみが縦方向に優先順に
順位付けて表示される。
(9) In FIG. 15 or FIG.
When the printing company selects “filter” and requests browsing of information corresponding to the ASP center 28 in order to narrow down by adding a condition of quality “AA” at the terminal 18, the outsourcing business as shown in FIG. The list is displayed on the terminal 18. In this list, only the five printing companies A, B, C, D, and E among the nine printing companies A to I are displayed in the vertical order in priority order.

【0065】(10)また、図15、図16又は図17
において、「条件変更」を選択してASPセンター28
に対応した情報の閲覧を要求すると、図18に示すよう
な外注業者選択条件を変更するための画面が表示され
る。この画面には、優先順位を表す1から12までの数
字を上段に示した12のブロック画面が表示され、各ブ
ロック画面内の表示部には、信頼度、クオリティ、IS
Oなどの外注業者選択要件が選択可能に表示される。
(10) FIG. 15, FIG. 16 or FIG.
, "Change Condition" is selected and ASP Center 28
Is displayed, a screen for changing the contractor selection conditions as shown in FIG. 18 is displayed. On this screen, twelve block screens are displayed in which numbers from 1 to 12 representing priority are shown in the upper row, and the display unit in each block screen shows reliability, quality, IS
Outsourcer selection requirements such as O are displayed to be selectable.

【0066】(11)ついで、図18において所定のブ
ロック画面内の表示部の外注業者選択要件を適宜に選択
し、例えば図示のように順位1(最優先)のブロック画
面では信頼度を、順位2のブロック画面ではクオリティ
を、…のように選択し、ついで「実行」を選択してAS
Pセンター28に対応した情報の閲覧を要求すると、図
19に示すような条件変更実行処理後の外注業者一覧が
表示される。
(11) Next, in FIG. 18, the requirement for selecting a subcontractor on the display section in a predetermined block screen is appropriately selected. For example, as shown in FIG. In the block screen of No.2, select the quality like…, then select “Execute” and select AS
When a request to browse the information corresponding to the P center 28 is made, a list of outsourcing contractors after the condition change execution processing as shown in FIG. 19 is displayed.

【0067】(12)前記(7)〜(11)のいずれか
で表示された外注業者一覧をみて、印刷会社が端末18
で見積り依頼先となる外注業者を選択し、対応した情報
がASPセンター28へ送信されると、ASPセンター
28は選択された外注業者に対して見積り依頼情報を送
信する。
(12) Referring to the list of outsourcing companies displayed in any of the above (7) to (11), the printing company
When the contractor to be the quote request destination is selected and the corresponding information is transmitted to the ASP center 28, the ASP center 28 transmits the quote request information to the selected subcontractor.

【0068】B−5:外注見積り処理 外注見積り処理は、図20に示すフローチャートに従っ
て、つぎの(1)(2)に示すように処理される。 (1)ASPセンター28から外注見積り依頼の通知を
受けた外注業者は、その端末22(s)(以下説明の便
宜上22と記述する。)でASPセンター28に対応し
た情報を送信して閲覧要求をすると、ジョブチケットD
B42及び見積りDB88から読み出された見積り依頼
情報を表示して印刷会社からの見積り依頼内容を確認す
ることができる。そして、依頼された工程の見積りを実
施し、見積り情報を外注業者端末22から入力する。こ
の見積り情報はASPセンター28内のジョブチケット
DB42、工程別見積りDB48、見積りDB88に蓄
積される。また、ASPセンター28は、見積り依頼の
あった印刷会社の連絡デバイス20へ見積り完了を通知
し、この通知情報が通知管理DB44に蓄積され、管理
される。 (2)ASPセンター28から通知を受けた印刷会社
は、その端末18でASPセンター28に対応した情報
を送信して閲覧要求をすると、ジョブチケットDB4
2、工程別見積りDB48、見積りDB88から読み出
された見積り情報を表示して外注業者からの見積り内容
を確認することができる。
B-5: Outsourcing Estimation Process The outsourcing estimation process is performed as shown in the following (1) and (2) according to the flowchart shown in FIG. (1) The outsourcing contractor, which has been notified of the outsourcing quote request from the ASP center 28, transmits information corresponding to the ASP center 28 at the terminal 22 (s) (hereinafter referred to as 22 for convenience of explanation) and requests for browsing. , The job ticket D
B42 and the estimate request information read from the estimate DB 88 can be displayed to confirm the details of the estimate request from the printing company. Then, estimation of the requested process is performed, and the estimation information is input from the outsourcing contractor terminal 22. This estimation information is stored in the job ticket DB 42, the step-by-step estimation DB 48, and the estimation DB 88 in the ASP center 28. Further, the ASP center 28 notifies the communication device 20 of the printing company that has requested the estimation that the estimation has been completed, and this notification information is accumulated and managed in the notification management DB 44. (2) The printing company that has received the notification from the ASP center 28 transmits information corresponding to the ASP center 28 at the terminal 18 and makes a browsing request.
2. It is possible to display the estimation information read out from the step-by-step estimation DB 48 and the estimation DB 88 and confirm the contents of the estimation from the subcontractor.

【0069】C:受注処理 受注処理は、図21に示すフローチャートのように、
「お客様発注の受信」処理、「印刷会社の受注」処理に
よって行われる。具体的には、つぎのように処理され
る。前記Bの見積り処理で見積り依頼をした特定客先
が、その端末14から見積り承認の情報を入力し、AS
Pセンター28が対応した情報を受信し、印刷会社がそ
の端末18で受注処理のための情報を入力してASPセ
ンター28に対応した情報を送信すると、ASPセンタ
ー28が対応した処理を行う。すなわち、ジョブチケッ
トDB42及び見積りDB88からジョブチケット情報
が受注DB60に転送、蓄積され、統計DB54、工程
別DB58、CRM−DB64、ワークフローDB6
6、機械別スケジュールDB78のそれぞれに受注物件
についての対応した情報が蓄積される。
C: Order Processing The order processing is performed as shown in the flowchart of FIG.
The process is performed by a process of “receiving a customer order” and a process of receiving an order from a printing company. Specifically, the processing is performed as follows. The specific customer who has made the estimate request in the estimate processing of B inputs the estimate approval information from the terminal 14 and
When the P center 28 receives the corresponding information and the printing company inputs information for order processing at the terminal 18 and transmits the information corresponding to the ASP center 28, the ASP center 28 performs the corresponding processing. That is, the job ticket information from the job ticket DB 42 and the estimation DB 88 is transferred and stored in the order receiving DB 60, and the statistics DB 54, the process-specific DB 58, the CRM-DB 64, and the workflow DB 6
6. Corresponding information on the ordered property is stored in each of the machine-specific schedule DBs 78.

【0070】D:製造処理 製造処理は、図22に示すフローチャートに従って、つ
ぎの(1)〜(4)に示すように処理される。 (1)印刷会社、外注業者による端末18、22からの
入力に基づいて作業指示処理(後述のD−1:作業指示
処理で記述する。)が行われる。 (2)「担当は?」によって作業担当が社内か、外注か
が判断され、社内のときには社内担当者による進捗情報
収集処理(後述のD−2:進捗情報収集処理で記述す
る。)が行われ、外注のときには外注業者の担当者によ
る進捗情報収集処理(後述のD−2:進捗情報収集処理
で記述する。)が行われる。 (3)印刷会社、外注業者により作業が開始すると、資
材調達処理(後述のD−3:資材調達処理で記述す
る。)が行われる。 (4)印刷会社、外注業者により作業が終了すると、進
捗情報収集処理(後述のD−2:進捗情報収集処理で記
述する。)が行われる。
D: Manufacturing Process The manufacturing process is performed as shown in the following (1) to (4) according to the flowchart shown in FIG. (1) A work instruction process (described in D-1: work instruction process to be described later) is performed based on inputs from the terminals 18 and 22 by a printing company and a subcontractor. (2) It is determined whether the person in charge is in-house or outsourced according to "Who is the person in charge?". If the person is in-house, progress information collection processing (described in D-2: progress information collection processing to be described later) is performed by an in-house person. In the case of outsourcing, a progress information collecting process (described in D-2: progress information collecting process described later) is performed by a person in charge of the outsourcing company. (3) When work is started by a printing company or a subcontractor, a material procurement process (described in D-3: material procurement process described later) is performed. (4) When the printing company and the subcontractor complete the work, a progress information collecting process (described in D-2: progress information collecting process described later) is performed.

【0071】D−1:作業指示処理 作業指示処理は、図23に示すフローチャートに従っ
て、つぎの(1)(2)に示すように処理される。 (1)印刷会社、外注業者による端末18、22からの
入力で作業指示が行われ、対応した情報がASPセンタ
ー28に送信されると、ASPセンター28では「担当
は?」によって作業担当が社内か外注かが判断される。 (2)社内のときには、社内の担当部署に作業指示情報
が送信され、外注のときには対応する外注業者に対して
発注情報が送信される。
D-1: Work Instruction Processing The work instruction processing is performed as shown in the following (1) and (2) according to the flowchart shown in FIG. (1) When a work instruction is given by the input from the terminals 18 and 22 by the printing company and the subcontractor, and the corresponding information is transmitted to the ASP center 28, the ASP center 28 asks the "in charge?" Or outsourcing. (2) In the case of a company, work instruction information is transmitted to a department in charge of the company, and in the case of subcontracting, order information is transmitted to a corresponding subcontractor.

【0072】D−2:進捗情報収集処理 進捗情報収集処理は、図24に示すフローチャートに従
って、つぎの(1)〜(4)に示すように処理される。 (1)印刷会社、外注業者からASPセンター28に対
して情報収集の要求があると、ASPセンター28では
「担当は?」によって作業担当が社内か外注かが判断さ
れる。 (2)作業担当が社内の場合も外注の場合も、「自動収
集か?」によって進捗情報収集がセンサーなどを用いた
自動収集か否かが判断される。 (3)自動収集でないときには印刷会社、外注業者が端
末18、22から各工程内の作業について、作業の開
始、終了、変更などの進捗情報を入力してASPセンタ
ー28で受信され、自動収集のときには、センサーなど
で収集された進捗情報がASPセンター28で受信され
る。 (4)ASPセンター28で受信された進捗情報は、A
SPセンター28内の工程別DB58、受注DB60、
機械別スケジュールDB62に蓄積される。
D-2: Progress Information Collection Process The progress information collection process is performed as shown in the following (1) to (4) according to the flowchart shown in FIG. (1) When a printing company or a subcontractor requests information collection to the ASP center 28, the ASP center 28 determines whether the person in charge of the work is in-house or outsourced by "What is the person in charge?" (2) Whether the worker is in-house or outsourced, whether or not progress information collection is automatic collection using a sensor or the like is determined based on “automatic collection?”. (3) When the automatic collection is not performed, the printing company and the subcontractor input the progress information such as the start, the end, and the change of the work in each process from the terminals 18 and 22 and the progress information is received by the ASP center 28, and is received by the ASP center 28. Sometimes, the ASP center 28 receives the progress information collected by a sensor or the like. (4) The progress information received by the ASP center 28 is A
Process-specific DB 58 in SP center 28, order DB 60,
It is stored in the machine-specific schedule DB 62.

【0073】D−3:資材調達処理 資材調達処理は、図25に示すフローチャートに従っ
て、つぎの(1)〜(4)に示すように処理される。 (1)印刷会社内の担当部署又は外注業者の担当者が、
その端末18、22によって資材マスタ68を参照して
発注品目の登録が行われ、資材メーカ(外注業者の一
例)に対する発注処理が行われる。この発注情報は資材
発注DB70に蓄積される。 (2)ASPセンター28は、受注した資材メーカの連
絡デバイスに印刷会社から発注があった旨を通知し、通
知を受けた資材メーカは、その端末で資材発注DB70
から発注情報を読み出して閲覧し、印刷会社からの発注
内容を確認して受注処理とすることができる。 (3)発注した資材が印刷会社に納品され、印刷会社で
資材の納品検収が行われると、発注情報が資材情報とし
て資材在庫DB72に蓄積され、更新される。 (4)印刷会社は、その端末18でASPセンター28
内の資材在庫DB72から読み出された資材情報を閲覧
し、資材の在庫状況を確認できる。この発注物件に対す
る納品情報を端末18から入力することによって、資材
の納品情報が資材発注DB70、売上集計DB74、資
材在庫DB72に蓄積され、更新される。
D-3: Material Procurement Process The material procurement process is performed as shown in the following (1) to (4) according to the flowchart shown in FIG. (1) The department in charge of the printing company or the person in charge of the subcontractor
The order items are registered by the terminals 18 and 22 with reference to the material master 68, and an order process is performed for a material maker (an example of a subcontractor). This order information is stored in the material order DB 70. (2) The ASP center 28 notifies the contact device of the material maker that has received the order that the printing company has placed an order, and the material maker that has received the notification sends the material order DB 70 using its terminal.
The order information can be read and browsed, and the contents of the order from the printing company can be confirmed, and the order can be processed. (3) When the ordered material is delivered to the printing company and the delivery inspection of the material is performed by the printing company, the order information is accumulated and updated in the material inventory DB 72 as material information. (4) The printing company uses the terminal 18 for the ASP center 28
By browsing the material information read from the material inventory DB 72 in the inside, the stock status of the material can be confirmed. By inputting the delivery information for the ordered property from the terminal 18, the delivery information of the material is accumulated and updated in the material order DB 70, the sales total DB 74, and the material inventory DB 72.

【0074】E:納品処理 納品処理は、図26に示すフローチャートに従って、つ
ぎの(1)〜(3)に示すように処理される。 (1)客先、印刷会社がその端末14、18から納品場
所、納品日時などの納品指示情報を入力してASPセン
ター28へ送信すると、これらの情報が受注DB60及
び製品在庫DB76に蓄積され、ASPセンター28側
から外注業者(例えば配送業者)に配送指示情報が送信
され、納品の実施処理(後のE−1:納品の実施処理で
記述する。)が行われる。 (2)納品が完了し、客先、印刷会社の端末14、18
から納品検収情報が入力しASPセンター28へ送信す
ると、この情報がジョブチケットDB42、受注DB6
0及び製品在庫DB76に蓄積され、納品完了となる。 (3)前記(1)(2)の納品形態には、作成物の納品
(一部納品、完全納品)、在庫品の納品、一部在庫など
がある。
E: Delivery Processing The delivery processing is performed as shown in the following (1) to (3) according to the flowchart shown in FIG. (1) When a customer or a printing company inputs delivery instruction information such as a delivery place and a delivery date from the terminals 14 and 18 and transmits the information to the ASP center 28, the information is accumulated in the order receiving DB 60 and the product inventory DB 76, Delivery instruction information is transmitted from the ASP center 28 to an outsourcing company (for example, a delivery company), and a delivery execution process (described later in E-1: delivery execution process) is performed. (2) Delivery is completed, customer terminals, printing company terminals 14, 18
When the delivery acceptance information is input from the server and transmitted to the ASP center 28, the information is transmitted to the job ticket DB 42, the order DB 6
0 and stored in the product inventory DB 76, and the delivery is completed. (3) The delivery modes described in (1) and (2) above include delivery of created products (partial delivery, complete delivery), delivery of inventory, and partial inventory.

【0075】E−1:納品の実施処理 納品の実施処理は、図27に示すフローチャートに従っ
て、つぎの(1)〜(3)に示すように処理される。 (1)「梱包等が有か?」によって梱包等が必要か否か
が判断され、必要なときには内職作業によって梱包等が
行われる。 (2)ついで、「引取りか?」によって配送する納品物
件を外注先に引取りにいく必要があるか否かが判断さ
れ、必要なときには引取りが行われる。 (3)このときの納品形態には、在庫状態での納品、多
数個所への発送、配送がある。
E-1: Delivery Delivery Processing Delivery delivery processing is performed as shown in the following (1) to (3) according to the flowchart shown in FIG. (1) It is determined whether packing or the like is necessary based on "whether there is packing or the like?", And when necessary, packing or the like is performed by internal work. (2) Next, it is determined whether or not it is necessary to pick up the delivered article to be delivered to the subcontractor based on “Do you pick up?”, And if necessary, the pickup is performed. (3) Delivery modes at this time include delivery in stock, shipment to many locations, and delivery.

【0076】F:決済処理 決済処理は、図28に示すフローチャートに従って、つ
ぎの(1)〜(4)に示すように処理される。 (1)請求締めになったら、ASPセンター28で売上
集計DB74から対応する請求情報が読み出されて閲覧
可能な情報に加工され、客先、印刷会社の対応する連絡
デバイス16、20に請求締めが通知される。 (2)通知を受けた客先、印刷会社は、その端末14、
18から対応した情報を入力してASPセンター28に
閲覧を要求すると、売上集計DB74から読み出された
請求情報を閲覧し(照会し)、請求金額を確認すること
ができる。 (3)請求金額を確認した客先、印刷会社が銀行25に
入金することによって決済が行われる。すなわち、銀行
25での決済方法を確定しEC(電子商取引)と連携し
て決済を行うことができる。 (4)印刷会社、外注業者は、銀行25からの通知(F
AX、インターネット)により(入金情報の受信によ
り)、客先、印刷会社からの入金を確認することができ
る。
F: Settlement Processing Settlement processing is performed as shown in the following (1) to (4) according to the flowchart shown in FIG. (1) When the billing is closed, the corresponding billing information is read from the sales aggregation DB 74 at the ASP center 28 and processed into viewable information, and the billing is closed to the corresponding contact devices 16 and 20 of the customer and the printing company. Is notified. (2) The customer and the printing company that have received the notification
When the corresponding information is input from 18 and the reading is requested to the ASP center 28, the billing information read out from the sales totaling DB 74 is browsed (inquired), and the billing amount can be confirmed. (3) The settlement is performed when the customer and the printing company that have confirmed the billing amount deposit money in the bank 25. That is, the settlement method at the bank 25 is determined, and the settlement can be performed in cooperation with EC (electronic commerce). (4) The printing company and the subcontractor send a notice (F
(AX, Internet) (by receiving payment information), payment from a customer or a printing company can be confirmed.

【0077】G:通知管理 通知管理は、図29に示すフローチャートに従って、つ
ぎの(1)〜(8)に示すように処理される。通知には
通常の通知と印刷内容等の変更通知が有り、通常の通知
には予約通知と予約以外の通常通知がある。予約通知は
週報、月報等の予め決められたスケジュールで処理が行
われるもので、時間起動で自動的に行われる。これに対
して印刷内容等の変更通知や予約以外の通常通知は端末
14、18、22からの手入力に基づいて行われる。
G: Notification Management Notification management is performed as shown in the following (1) to (8) in accordance with the flowchart shown in FIG. The notification includes a normal notification and a change notification such as print content, and the normal notification includes a reservation notification and a normal notification other than the reservation. The reservation notification is performed according to a predetermined schedule such as a weekly report or a monthly report, and is automatically performed at time activation. On the other hand, a change notification such as a print content and a normal notification other than the reservation are performed based on manual input from the terminals 14, 18, and 22.

【0078】(1)客先、印刷会社、外注業者がその端
末14、18、22から見積り依頼、見積り回答、発
注、作業変更依頼などの情報を入力(すなわち手入力)
すると、ASPセンター28で通知処理が起動し、通知
の受信が行われる。 (2)ASPセンター28では、「通知発生元は?」に
よって通知発生元が客先又は外注業者か、印刷会社かが
判断される。 (3)ASPセンター28で通知発生元が客先又は外注
業者と判断されたときには、「通知内容は?」によって
通知内容が通常の通知か変更指示かが判断される。 (4)ASPセンター28で通知発生元が印刷会社と判
断されたときにも、「通知内容は?」によって通知内容
が通常の通知か変更指示かが判断される。
(1) A customer, a printing company, or a subcontractor inputs information such as a quote request, a quote reply, an order, and a work change request from the terminals 14, 18, and 22 (ie, manual input).
Then, the notification process is started in the ASP center 28, and the notification is received. (2) The ASP center 28 determines whether the notification source is a customer, a subcontractor, or a printing company based on "What is the source of the notification?" (3) When the ASP center 28 determines that the notification source is a customer or a subcontractor, it is determined whether the notification content is a normal notification or a change instruction by "What is the notification content?" (4) Even when the ASP center 28 determines that the notification source is a printing company, it is determined whether the notification content is a normal notification or a change instruction based on “What is the notification content?”.

【0079】(5)前記(3)の「通知内容は?」で通
知内容が通常の通知と判断されたとき(前記(1)で端
末から見積り依頼、見積り回答などの情報を入力したと
き又は予約通知のときに対応する。)には、ASPセン
ター28から印刷会社の端末18又は連絡デバイス20
へ対応した情報が送信される。通知を受けた印刷会社
は、客先から見積り依頼があったこと、外注業者から見
積り回答があったこと等を知ることができ、端末18に
よる閲覧で通知の内容を確認することができる。 (6)前記(3)の「通知内容は?」で通知内容が変更
指示の通知と判断されたとき(前記(1)で端末から作
業変更依頼などの情報を入力したときに対応する。)に
は、ASPセンター28から印刷会社、外注業者への変
更指示送信が行われ、後述の変更通知処理(後のG−
1:変更通知処理で記述する。)が行われる。
(5) When it is determined that the notification content is a normal notification in (3) “What is the notification content?” (When information such as a quote request and a quote reply is input from the terminal in (1) above, or This corresponds to the case of a reservation notification.), From the ASP center 28 to the printing company terminal 18 or the contact device 20.
The information corresponding to is transmitted. The printing company that has received the notification can know that there has been a request for quote from the customer, that there has been a reply to the quote from a subcontractor, and that the content of the notification can be confirmed by browsing through the terminal 18. (6) When the notification content is determined to be a change instruction notification in "(3)" What is the notification content? "(Corresponds to input of information such as a work change request from the terminal in (1)). Is transmitted from the ASP center 28 to the printing company and the subcontractor, and a change notification process described later (G-
1: Described in the change notification process. ) Is performed.

【0080】(7)前記(4)の「通知内容は?」で通
知内容が通常の通知と判断されたときには、「通知先
?」によって通知先が客先、印刷会社内、外注業者のい
ずれであるかが判断され、ASPセンター28から端末
14、18、22又は連絡デバイス16、20、24の
うちの対応した端末又は連絡デバイスへ通知情報が送信
される。通知を受けた客先、印刷会社、外注業者は、印
刷会社から見積り回答があったこと、外注業者から見積
り回答があったこと等を知ることができ、端末14、1
8、22による閲覧で通知の内容を確認することができ
る。 (8)前記(4)の「通知内容は?」で通知内容が変更
指示の通知と判断されたときには、ASPセンター28
から印刷会社、外注業者への変更指示送信が行われ、後
述の変更通知処理(後のG−1:変更通知処理で記述す
る。)が行われる。
(7) When it is determined that the notification content is a normal notification in the above “(4)“ What is the notification content? ”, The notification destination can be any of a customer, a printing company, and a subcontractor according to“ notification destination? ”. Is determined, and the ASP center 28 transmits the notification information to the terminal 14, 18, 22 or the corresponding one of the contact devices 16, 20, 24 or the corresponding contact device. The customer, the printing company, and the subcontractor that have received the notification can know that there has been an estimate response from the printing company and that the subcontractor has received the estimate response.
The contents of the notification can be confirmed by browsing by 8, 22. (8) When it is determined in (4) "What is the notification content?"
, A change instruction is transmitted to the printing company and the subcontractor, and a change notification process (described later in G-1: change notification process) is performed.

【0081】G−1:変更通知処理 (1)客先、印刷会社、外注業者は、それぞれの端末1
4、18、22に表示された一覧画面を見て、作業変更
が発生した物件を選択し、選択した物件に対する変更内
容の指示入力を行う。この指示入力は、端末14、1
8、22で表示された変更指示書フォーマット形式で行
われる。この変更指示書フォーマット形式では、入力内
容のうち、写真変更指示や部数変更など内容が定型的な
ものについては選択指示入力とし、それ以外のものにつ
いては変更内容をコメントとして入力する。また、緊急
度、必須連絡先、通知方法についての指示入力も可能と
する。
G-1: Change Notification Processing (1) The customer, the printing company, and the subcontractor
By looking at the list screens displayed on 4, 18, and 22, a property in which a work change has occurred is selected, and an instruction to change the selected property is input. This instruction is input to the terminals 14, 1
This is performed in the format of the change instruction document displayed in steps 8 and 22. In this change instruction form format, a selection instruction input is provided for input contents having a fixed content such as a photo change instruction or a change in the number of copies, and a change content is input as a comment for other items. In addition, it is also possible to input an instruction regarding an urgency, a required contact, and a notification method.

【0082】(2)ついで、アプリケーションサーバ3
0の予備通知機能、本通知機能によって、予備通知処理
(後のG−2:予備通知処理で記述する。)、本通知処
理(後のG−3:本通知処理で記述する。)が行われ
る。説明の便宜上、B印刷社(印刷会社の一例)が端末
18で受注一覧画面を参照し、客先の変更内容に対応し
た受注物件「カタログ印刷」を選択し、受注物件の進捗
状況が図28(a)に示すような進捗状況画面に対応し
た状況であるとする。この進捗状況画面は、客先端末1
4、外注業者端末22から閲覧要求があったときにも、
それぞれで閲覧可能となる。図28(a)中の項目「受
注物件」、「発注元」、「受注工程内容」、「依頼
元」、「依頼先」、「作業開始日時」及び「作業終了日
時」は受注DB60から読み出され、項目「連絡方法」
は連絡先マスタ46から読み出され、項目「作業予定時
間」は受注DB60内の「作業開始日時」と「作業終了
日時」のデ−タを用いた演算で求められ、項目「実施」
は工程別DB58、機械別スケジュールDB78を参照
して求められる。
(2) Next, the application server 3
The preliminary notification processing (described later in G-2: preliminary notification processing) and the main notification processing (described in later G-3: main notification processing) are performed by the preliminary notification function 0 and the main notification function. Will be For convenience of explanation, the B printing company (an example of a printing company) refers to the order list screen on the terminal 18 and selects the ordered property “catalog print” corresponding to the change of the customer, and the progress of the ordered property is shown in FIG. It is assumed that the status corresponds to the progress status screen as shown in FIG. This progress screen is displayed on the customer terminal 1
4. When there is a browsing request from the subcontractor terminal 22,
Each can be viewed. In FIG. 28A, the items “ordered property”, “orderer”, “contents of order process”, “requester”, “requester”, “work start date and time” and “work end date and time” are read from the order DB 60. Issued, item "Contact Method"
Is read from the contact master 46, and the item "Scheduled work time" is obtained by calculation using data of "Work start date and time" and "Work end date and time" in the order DB 60, and the item "Execute"
Is obtained by referring to the process-specific DB 58 and the machine-specific schedule DB 78.

【0083】G−2:予備通知処理 予備通知処理は、図30に示すフローチャートに従って
つぎの(1)〜(8)に示すように行われる。 (1)印刷会社端末18からの指示入力で作業変更依頼
情報が発生してASPセンター28へ送信されると、A
SPセンター28では、「指定の連絡先が存在するか
?」によって作業変更依頼情報の中に変更を通知する連
絡先が指定されているか否かが判断される。 (2)前記(1)で連絡先が指定されているときには、
連絡先マスタ46から対応する連絡先の作業担当が抽出
され、通知管理DB44に記録される。
G-2: Preliminary Notification Processing The preliminary notification processing is performed as shown in the following (1) to (8) according to the flowchart shown in FIG. (1) When work change request information is generated by an instruction input from the printing company terminal 18 and transmitted to the ASP center 28,
The SP center 28 determines whether or not a contact for notifying the change is specified in the work change request information based on “is a designated contact existing?”. (2) When a contact is specified in (1) above,
The person in charge of the corresponding contact is extracted from the contact master 46 and recorded in the notification management DB 44.

【0084】(3)ついで、ASPセンター28では、
受注DB60を参照して変更対象となる印刷物と、その
工程の作業日時とを検索し、印刷会社からの変更指示入
力情報と、工程別DB58及び機械別スケジュールDB
78からの進捗情報(工程1が実施済み、工程2が実施
中、工程3から工程6までが未実施)とを参照して、現
在作業実施中の工程以降の工程の作業時間を演算する。
例えば、B印刷社がその端末18で進捗状況画面を参照
し、受注物件「カタログ印刷」の変更内容に対応した指
示情報を端末18から入力し、この変更指示情報が受注
物件「カタログ印刷」の6工程(受注から納品までの全
工程又は一部の工程)のうちの第2番目の工程の作業時
間を単純に2時間追加するための情報であるとすると、
まず図28(b)に示すように、工程2の作業終了時間
が単純に2時間伸び(作業予定時間も2時間長くな
り)、工程3から工程6までの作業開始時間及び作業終
了時間が下線を付したように単純に2時間伸び、その作
業予定時間が演算される。
(3) Next, at the ASP center 28,
The printed matter to be changed and the work date and time of the process are searched with reference to the order receiving DB 60, change instruction input information from the printing company, the process-specific DB 58, and the machine-specific schedule DB.
With reference to the progress information from step 78 (the step 1 has been performed, the step 2 is being performed, and the steps 3 to 6 have not been performed), the operation time of the steps after the step currently being performed is calculated.
For example, B printing company refers to the progress screen on the terminal 18 and inputs instruction information corresponding to the change content of the ordered property “catalog print” from the terminal 18, and the change instruction information is displayed for the ordered property “catalog print”. Assuming that it is information for simply adding the work time of the second process of the six processes (all or a part of processes from receiving an order to delivery) by two hours,
First, as shown in FIG. 28B, the work end time of the step 2 is simply extended by 2 hours (the planned work time is also extended by 2 hours), and the work start time and the work end time of the steps 3 to 6 are underlined. The work is scheduled for 2 hours, and the scheduled work time is calculated.

【0085】(4)ついで、ASPセンター28では、
実施中の工程2と、未実施の工程3から工程6までの作
業予定時間が演算され、これらの演算値が標準作業時間
テーブル80内の対応する工程の標準作業時間と対比さ
れ、図28(c)に示すように、未実施の工程3から工
程6までの作業予定時間が標準作業時間と一致するよう
に作業開始日時と作業終了日時が演算される。この未実
施の工程についての作業開始日時と作業終了日時の演算
は、図28(c)に示すように、作業終了日時が初期の
作業終了日時以前となる工程5まで続けられる。
(4) Next, at the ASP center 28,
The scheduled work times of the currently executed process 2 and the unexecuted processes 3 to 6 are calculated, and these calculated values are compared with the standard work times of the corresponding processes in the standard work time table 80, and FIG. As shown in c), the work start date and time and the work end date and time are calculated so that the scheduled work time from step 3 to step 6 that has not been performed matches the standard work time. The calculation of the work start date and time and the work end date and time for the unexecuted process is continued until step 5 where the work end date and time is earlier than the initial work end date and time as shown in FIG.

【0086】(5)ついで、ASPセンター28では、
作業開始日時と作業終了日時の少なくとも一方が演算さ
れた工程2、3、4、5の依頼先(外注業者)の「C
社」、「D社」、「E社」、「F社」が、図28(d)
に示すように予備通知の通知範囲に選択され、選択され
た工程の作業担当を連絡先マスタ46から抽出し、通知
管理DB44に記録する。
(5) Next, at the ASP center 28,
“C” of the request destination (outsourcing contractor) of steps 2, 3, 4, and 5 for which at least one of the work start date and time and the work end date and time was calculated
"Company", "Company D", "Company E", and "Company F" are shown in FIG.
As shown in (2), the notification area of the preliminary notification is selected, the person in charge of the selected process is extracted from the contact master 46, and recorded in the notification management DB 44.

【0087】(6)ついで、ASPセンター28では、
「定型的な変更依頼か?」によって印刷会社端末18か
らの指示入力による作業変更依頼が定型的な変更依頼か
否かが判断される。定型的な変更依頼のときには、AS
Pセンター28は、変更パターンマスタ82を参照し、
指定された工程の作業担当を抽出し、通知管理DB44
に記録する。
(6) Next, at the ASP center 28,
It is determined whether or not the work change request based on the instruction input from the printing company terminal 18 is a fixed change request based on “is a fixed change request?”. When making a standard change request, AS
The P center 28 refers to the change pattern master 82,
The worker in charge of the designated process is extracted, and the notification management DB 44
To record.

【0088】(7)ついで、ASPセンター28では、
前記(3)、(5)、(6)で通知管理DB44に記録
した作業担当に対して予備通知を行う。例えば、前記
(6)の場合には、外注業者「C社」、「D社」、「E
社」、「F社」に予備通知がなされる。具体的には、
「C社」に対しては対応するファクシミリ装置へのファ
クシミリ送信によって予備通知がなされ、「D社」に対
しては対応する端末への電子メールによって予備通知が
なされ、「E社」に対しては対応する携帯電話機へのi
モード送信によって予備通知がなされ、「F社」に対し
ては対応する固定電話機への電話によって予備通知がな
される。この予備通知を受けた外注業者「C社」、「D
社」、「E社」、「F社」は、それぞれ対応する連絡デ
バイス、端末によって自らの担当する工程の作業に変更
の可能性があることを認識できる。また、依頼元のB印
刷社は、対応する端末による電子メール開封確認によっ
て、又は通話の正常終了やiモード通信後の返信等によ
って、連絡先が予備通知を受け取ったことを確認するこ
とができる。また、予備通知を受けた連絡先の外注業者
は、その端末22のブラウザを用いてASPセンター2
8へ受注DB60内の受注情報の閲覧を要求し、受注情
報を閲覧することによって作業変更内容を再度確認する
ことができる。
(7) Next, at the ASP center 28,
A preliminary notification is made to the worker in charge recorded in the notification management DB 44 in (3), (5), and (6). For example, in the case of (6) above, the outsourcing companies “Company C”, “Company D”, “E
Company and Company F are notified in advance. In particular,
Preliminary notice is given to "Company C" by facsimile transmission to the corresponding facsimile machine, preliminary notice is given to "Company D" by e-mail to the corresponding terminal, and "Company E" is Is i to the corresponding mobile phone
A preliminary notification is made by mode transmission, and a preliminary notification is made to "Company F" by calling a corresponding fixed telephone. Subcontractors "Company C" and "D
"Company", "Company E", and "Company F" can recognize that there is a possibility that the work of the process in charge of themselves may be changed by the corresponding contact device and terminal. In addition, the requesting B printing company can confirm that the contact has received the preliminary notification by confirming the opening of the e-mail by the corresponding terminal, or by the normal end of the call or the reply after the i-mode communication. . Further, the outsourcing contractor of the contact who received the preliminary notification can use the browser of the terminal 22 to use the ASP center 2.
Requesting the user 8 to view the order information in the order DB 60, and viewing the order information makes it possible to confirm the work change details again.

【0089】(8)前記(7)の予備通知を作業変更通
知管理画面で表すと、図30に示すようになる。すなわ
ち、図30の依頼元のA社は図28(a)の発注元A社
に対応し、図30の印刷工程を担当する印刷会社Aは図
28(a)のC、D、E、F社のいずれか1社に対応す
る。また、図30を表示している印刷会社端末は図28
(a)のB印刷社の端末に対応する。
(8) FIG. 30 shows the preliminary notification of (7) on the work change notification management screen. That is, the requesting company A in FIG. 30 corresponds to the ordering company A in FIG. 28A, and the printing company A in charge of the printing process in FIG. Corresponds to any one of the companies. Also, the printing company terminal displaying FIG.
(A) It corresponds to the terminal of B printing company.

【0090】G−3:本通知処理 (1)依頼元であるB印刷社の工程管理者が変更内容を
確認し、予備通知の連絡先に対して本通知をするか否か
を決定する。すなわち、B印刷社の工程管理者が、その
端末18のブラウザを用いて受注DB60内の受注情報
を閲覧して変更内容を確認し、通知管理DB44内の予
備通知情報を閲覧して予備通知の連絡先を確認し、作業
変更内容を決定し、本通知をするか否かを決定する。具
体的には、図28(c)、(d)に示すような変更内
容、予備通知範囲を確認し、予備通知をした連絡先「C
社」、「D社」、「E社」、「F社」に本通知をするか
否かを決定する。すなわち、工程3、4については、図
29(b)に示すように、作業予定時間を「3時間」、
「2時間」と決定する。そして、工程3、4の作業開始
日時及び作業終了日時と工程5の作業開始日時を図29
(b)に示すように決定する。このように工程管理者に
よって決定された作業変更のための情報が端末18から
入力する。同時にB印刷社の工程管理者によって決定さ
れた図29(c)に示すような本通知をするか否かの情
報も端末18から入力する。
G-3: Main Notification Process (1) The process manager of B-Printing Company, the requester, confirms the details of the change and determines whether or not to make the main notification to the contact for the preliminary notification. That is, the process manager of the B printing company uses the browser of the terminal 18 to browse the order information in the order DB 60 to confirm the changed content, and browses the preliminary notification information in the notification management DB 44 to view the preliminary notification. Check the contact information, determine the content of the work change, and determine whether to give this notification. Specifically, the change contents and the preliminary notification range as shown in FIGS. 28C and 28D are checked, and the contact “C
Company, Company D, Company E, Company F to determine whether or not to give this notice. That is, as for the processes 3 and 4, as shown in FIG.
"2 hours" is determined. Then, the work start date and time and the work end date and time of steps 3 and 4 and the work start date and time of step 5 are shown in FIG.
The determination is made as shown in FIG. Information for the work change determined by the process manager is input from the terminal 18 in this manner. At the same time, the terminal 18 also inputs information on whether or not to make this notification as shown in FIG.

【0091】(2)すると、ASPセンター28側で
は、前記(1)で図29(b)に示すように決定された
作業開始日時及び作業終了日時の情報が所定の記憶領域
に記憶される。また、図29(c)に示すような本通知
をするか否かの情報が通知管理DB44の本通知記憶領
域に記憶される。
(2) Then, on the ASP center 28 side, the information of the work start date and time and the work end date and time determined in (1) as shown in FIG. 29B are stored in a predetermined storage area. Further, information as to whether or not to make a main notification as shown in FIG. 29C is stored in the main notification storage area of the notification management DB 44.

【0092】(3)すると、図29(d)に示すような
本通知が、通信サーバ32、通知サーバ34の通信機能
によって通信回線網26を介して対応する端末22、連
絡デバイス24に通知される。すなわち、この本通知
は、通知管理DB44内の予備通知記憶領域と本通知記
憶領域の内容を比較し、両者共に通知有りのときと後者
のみ通知有りのときは通知有りとし、前者が通知有りで
後者が通知無しのときは予備通知を取り消すキャンセル
とし、それ以外のときは通知無しとする。具体的には、
「C社」にはファクシミリ装置24(1)によるファク
シミリ送信によって本通知がなされ、「D社」には端末
22(2)による電子メール(Eメール)によって本通
知がなされ、「E社」には携帯電話機24(3)による
iモード送信によってそれぞれ本通知がなされ、「F
社」には固定の電話機24(4)による電話によって予
備通知のキャンセル通知がなされる。上述の通知先(連
絡先)のデバイス形態、電話番号等は、連絡先マスタ4
6から取得される。
(3) Then, this notification as shown in FIG. 29 (d) is sent to the corresponding terminal 22 and contact device 24 via the communication network 26 by the communication functions of the communication server 32 and the notification server 34. You. That is, this main notification compares the contents of the preliminary notification storage area and the main notification storage area in the notification management DB 44, and when both are notified and when only the latter is notified, it is determined that there is a notification. If the latter is not notified, the preliminary notification is cancelled. Otherwise, no notification is issued. In particular,
“Company C” is notified by facsimile transmission by the facsimile machine 24 (1), “Company D” is notified by e-mail (e-mail) by the terminal 22 (2), and “Company E” is notified. Is notified by i-mode transmission by the mobile phone 24 (3), and "F
The company is notified of the cancellation of the preliminary notification by telephone using the fixed telephone 24 (4). The device form, telephone number, and the like of the notification destination (contact) described above are stored in the contact master 4
6 is obtained.

【0093】(4)前記(3)の本通知を受けた連絡先
「C社」、「D社」、「E社」は、自らの担当する工程
の作業に変更があることを認識でき、端末22(1)、
22(2)、22(3)のブラウザを用いてASPセン
ター28に受注DB60内の受注情報の閲覧を要求し、
この受注情報を閲覧することによって作業変更内容を知
ることができる。また、依頼元のB印刷社は、「C社」
によるファクシミリ装置24(1)の正常終了を確認す
ることによって、端末18で「D社」が電子メールを開
封したことを確認することによって、「E社」によるi
モード通信後の返信を確認することによって、連絡先
「C社」、「D社」、「E社」がそれぞれ本通知を受け
取ったことを確認することができる。
(4) The contacts “Company C”, “Company D”, and “Company E” that have received the notice in (3) above can recognize that there is a change in the work of the process in charge of themselves. Terminal 22 (1),
Using the browsers 22 (2) and 22 (3), the ASP center 28 is requested to browse the order information in the order DB 60,
By browsing this order information, it is possible to know the contents of the work change. The requesting B printing company is "Company C"
Confirms that the facsimile machine 24 (1) has been normally completed, and confirms that the "company D" has opened the e-mail at the terminal 18, thereby confirming that the "e company"
By confirming the reply after the mode communication, it is possible to confirm that the contacts “Company C”, “Company D”, and “Company E” have each received this notice.

【0094】(5)前記(4)の本通知後の端末18で
の表示画面を作業変更通知管理画面で表すと、図31に
示すようになる。この図31において、右側の3つの欄
「対象」、「本通知」及び「本通知確認」の表示は、本
通知の対象として工程管理者に刷版、印刷、加工の3工
程が選択され、これら3工程の作業担当に本通知を済ま
せたが、印刷会社Aは未読の状態であることを表してい
る(加工会社Aは確認済みを表す。)。
(5) The display screen on the terminal 18 after the main notification in (4) above is represented by a work change notification management screen as shown in FIG. In FIG. 31, the display of the three columns on the right side, “target”, “final notice”, and “confirmation of this notice” indicate that three steps of plate printing, printing, and processing are selected by the process manager as the subject of this notice. Although this notice has been sent to the person in charge of these three processes, it indicates that the printing company A is in an unread state (the processing company A indicates that it has been confirmed).

【0095】前記G−1からG−3までの予備通知及び
本通知の説明では、説明の便宜上、印刷会社端末18か
ら作業変更指示入力がある場合について説明したが、本
発明はこれに限るものでなく、客先端末14や外注業者
端末22から作業変更指示入力がある場合についても同
様に作用する。
In the description of the preliminary notices G-1 to G-3 and this notice, for convenience of explanation, the case where a work change instruction is input from the printing company terminal 18 has been described, but the present invention is not limited to this. The same applies to the case where a work change instruction is input from the customer terminal 14 or the contractor terminal 22 instead.

【0096】H:その他の処理: (1)契約会社(ASPセンター28と契約している印
刷会社、外注業者、客先、以下同様である。)は、自己
の売上実績の管理及び粗利の管理を行うことができる。
例えば、印刷会社は、その端末18でASPセンター2
8に売上げ実績情報の閲覧を要求して、売上集計DB7
4から読み出された各種の売上実績の情報を閲覧するこ
とができる。また、ASPセンター28は、売上計上時
の売上実績の情報として物件毎の作業単位の標準原価金
額を単価マスタ84から読み出して物件毎の粗利益情報
を更新できる。このため、売上実績の管理及び粗利の管
理を行うことができる。
H: Other processing: (1) A contract company (a printing company, a subcontractor, a customer, and the like, which has contracted with the ASP center 28, hereinafter the same) manages its own sales performance and collects gross profit. Can manage.
For example, the printing company may use the terminal 18 for the ASP center 2
8 requests browsing of the sales result information, and the sales totaling DB 7
4 can be browsed. Further, the ASP center 28 can read the standard cost amount of the work unit for each property from the unit price master 84 as information of the sales performance at the time of recording the sales, and can update the gross profit information for each property. Therefore, it is possible to manage the sales performance and the gross profit.

【0097】(2)契約会社は、自己の受注履歴などの
受注先管理をすることができる。例えば、外注業者は、
その端末22でASPセンター28に受注履歴情報の閲
覧を要求して、統計DB54から読み出された受注履歴
情報を一覧に表示し、この一覧の中から該当物件を選択
することで詳細内容を確認し、物件毎の受注履歴を確認
することができる。また、外注業者は、その端末22で
ASPセンター28に品目別の履歴情報の閲覧を要求し
て、統計DB54から読み出された受注物件の品目別の
履歴情報を一覧に表示し、この一覧の中から該当品目を
選択することで詳細内容を確認し、受注物件毎の品目別
の履歴を確認することができる。
(2) The contract company can manage the order receiving party such as its own order history. For example, a subcontractor
The terminal 22 requests the ASP center 28 to view the order history information, displays the order history information read from the statistics DB 54 in a list, and selects the relevant property from the list to confirm the details. Then, the order history of each property can be confirmed. The contractor requests the ASP center 28 to view the history information for each item at the terminal 22 and displays the history information for each item of the ordered property read from the statistical DB 54 in a list. By selecting the applicable item from among them, the detailed contents can be confirmed, and the history for each item for each ordered property can be confirmed.

【0098】(3)契約会社は、物件別・工程別・作業
別の進捗状況を把握し、的確な作業を進めることができ
る。例えば、外注業者は、その端末22でASPセンタ
ー28に進捗情報の閲覧を要求して、受注DB60、ワ
ークフローDB66、工程別DB58、機械別スケジュ
ールDB78から読み出された進捗情報を閲覧し、社内
工程及び受注作業の進捗スケジュールを把握し、的確な
作業を進めることができる。
(3) The contract company can grasp the progress status of each property, each process, and each work, and can proceed with an accurate work. For example, the outsourcer requests the ASP center 28 to view the progress information at the terminal 22, browses the progress information read from the order receiving DB 60, the workflow DB 66, the process-specific DB 58, and the machine-specific schedule DB 78, and In addition, it is possible to grasp the progress schedule of the order receiving work and to carry out an accurate work.

【0099】(4)契約会社は、各工程の作業担当者毎
に個人情報を把握し、的確な作業を進めることができ
る。例えば、印刷会社は、その端末18から各工程の詳
細作業情報、進捗情報を入力することによって、個人ス
ケジュール管理DB(図示省略)に個人単位の情報を蓄
積、更新することができ、個人単位のスケジュール管理
ができる。例えば、印刷会社端末18から日報情報を入
力することによって個人スケジュール管理DBに蓄積、
更新される。この入力した日報情報は、個人スケジュー
ル管理DBを介して印刷会社内の関連部署で参照するこ
とができる。この印刷会社についての作用は、外注業者
においても同様である。
(4) The contract company can grasp personal information for each person in charge of each process, and can proceed with proper work. For example, the printing company can accumulate and update individual information in an individual schedule management DB (not shown) by inputting detailed work information and progress information of each process from the terminal 18, and Schedule management is possible. For example, by inputting daily report information from the printing company terminal 18, it is stored in the personal schedule management DB,
Be updated. The input daily report information can be referred to by a related department in the printing company via the personal schedule management DB. The operation of the printing company is the same for the subcontractor.

【0100】(5)契約会社は、機械別、工場別に実稼
働状況を把握し、的確な作業を進めることができ、リア
ルタイムな照会ができる。例えば、印刷会社は、その端
末18から機械別の生産状況(稼働状況)情報を入力す
ることによって、統計DB54に統計情報を蓄積、更新
することができる。この作用は、外注業者においても同
様である。また、機械に対して稼働状況を集計するため
のセンサー及びその制御端末を取付け、印刷会社端末1
8及び外注業者端末22と連携することによって、機械
の稼働状況情報を統計DB54に蓄積、更新することが
できる。このため、印刷会社、外注業者は、それぞれ印
刷会社端末18、外注業者端末22で統計DB54から
稼働状況情報を読み出して閲覧し、機械別、工場別の稼
働状況を確認することができる。
(5) The contract company can grasp the actual operation status for each machine and each factory, can proceed with an accurate operation, and can make a real-time inquiry. For example, the printing company can accumulate and update statistical information in the statistical DB 54 by inputting production status (operating status) information for each machine from the terminal 18. This effect is the same for a subcontractor. Further, a sensor for counting the operation status and a control terminal thereof are attached to the machine, and the printing company terminal 1 is installed.
8 and the outsourcing contractor terminal 22, the operating status information of the machine can be accumulated and updated in the statistics DB 54. Therefore, the printing company and the subcontractor can read and view the operation status information from the statistical DB 54 at the printing company terminal 18 and the subcontractor terminal 22, respectively, and confirm the operation status for each machine and each factory.

【0101】(6)契約会社は、ステッカー等の社内帳
票の印刷をすることができる。例えば、印刷会社は、そ
の印刷会社端末18で受注DB60と帳票フォーマット
DB(図示省略)から所定の情報を読み出して参照し、
ステッカー等の社内帳票の印刷をすることができる。
(6) The contract company can print in-house forms such as stickers. For example, the printing company reads and refers to predetermined information from the order receiving DB 60 and a form format DB (not shown) at the printing company terminal 18, and
You can print in-house forms such as stickers.

【0102】(7)契約会社は、一般客先の状況を把握
し、的確な作業を進めることができ、リアルタイムな照
会ができる。ASPセンター28と契約をしていない一
般客先は、ポータルサイトを経由してASPセンター2
8のサイトに入り、特定客先と同様に、そのサービスを
受けることができる。これにより、印刷会社は、一般客
先の見積り依頼情報や発注情報の動向やニーズを把握す
ることができる。すなわち、一般客先が端末10から印
刷会社に対する見積り依頼情報、発注情報等を入力する
と、これらの情報がASPセンター28に送信されて見
積り依頼処理、発注処理が行われ、CRM−DB64に
蓄積され、更新される。これにより、印刷会社は、その
端末18でCRM−DB64から読み出された見積り依
頼情報、発注情報を表示し、見積り依頼内容、発注内容
等を参照して一般客先の利用状況を照会し、一般客先の
ニーズや動向を把握することができる。することができ
る。
(7) The contracting company can grasp the situation of the general customer, can proceed with accurate work, and can make a real-time inquiry. General customers who do not have a contract with the ASP Center 28 can use the ASP Center 2 via the portal site.
8, you can get the same service as the specific customer. Thus, the printing company can grasp the trends and needs of the estimate request information and the order information of the general customer. That is, when a general customer inputs estimation request information, order information, and the like to the printing company from the terminal 10, the information is transmitted to the ASP center 28, where the estimation request processing and order processing are performed, and the information is stored in the CRM-DB 64. Will be updated. Accordingly, the printing company displays the quote request information and the order information read from the CRM-DB 64 on the terminal 18, and refers to the quote request content, the order content, and the like, and inquires about the usage status of the general customer, The needs and trends of general customers can be grasped. can do.

【0103】(8)カタログ配信サービスをすることが
できる。一般客先、特定客先は、その端末10、14で
商品マスタ(図示省略)からカタログ情報を画像情報と
一緒に読み出して一覧に表示し、その中から希望するカ
タログを選択するための情報を入力して印刷会社に対す
るカタログの要求を行うと、この情報がASPセンター
28に送信され、受注情報として受注DB60に蓄積さ
れ、請求情報として売上集計DB74に蓄積される。A
SPセンター28は、要求された印刷会社の連絡デバイ
ス20に一般客先、特定客先からカタログ要求があった
旨を通知する。通知を受けた印刷会社は、要求のあった
一般客先、特定客先に対してカタログを印刷して提供す
る(例えば郵送する。)。
(8) A catalog distribution service can be provided. The general customer and the specific customer read the catalog information together with the image information from the product master (not shown) at the terminals 10 and 14 and display the catalog information in a list. When a catalog is requested to the printing company by inputting the information, this information is transmitted to the ASP center 28 and stored in the order DB 60 as order information, and is stored in the sales totaling DB 74 as billing information. A
The SP center 28 notifies the contact device 20 of the requested printing company that there is a catalog request from a general customer or a specific customer. Upon receiving the notification, the printing company prints and provides the catalog to the requested general customer or specific customer (for example, mails it).

【0104】(9)前記(6)〜(8)の作用におい
て、CRM−DB64、顧客DB40、ログファイル
(図示省略)、統計DB54、個人スケジュール管理D
Bのそれぞれに対応した情報が実績情報として蓄積さ
れ、更新される。
(9) In the operations of (6) to (8), the CRM-DB 64, the customer DB 40, the log file (not shown), the statistics DB 54, and the personal schedule management D
Information corresponding to each of B is accumulated and updated as performance information.

【0105】前記実施形態例では、「作業変更依頼情報
(作業変更指示情報)のなかに通知する連絡先が指定さ
れているとき」、「作業変更依頼情報が定型的な変更依
頼のとき」、「標準作業時間テーブルと変更パターンマ
スタを利用したとき」の3つの全ての場合に予備通知を
した場合について説明したが、本発明はこれに限るもの
でなく、変更の可能性のある工程の作業担当者に対して
予備通知をする構成であればよい。例えば、「作業変更
依頼情報のなかに通知する連絡先が指定されていると
き」、と「標準作業時間テーブルと変更パターンマスタ
を利用したとき」の2つの場合に予備通知をするように
した場合についても利用することができる。
In the above embodiment, “when a contact to be notified is specified in the work change request information (work change instruction information)”, “when the work change request information is a standard change request”, The case where the preliminary notification is given in all three cases of “when the standard work time table and the change pattern master are used” has been described. However, the present invention is not limited to this case. Any configuration may be used as long as a preliminary notification is given to the person in charge. For example, when a preliminary notification is made in two cases, "when a contact to be notified in the work change request information is specified" and "when a standard work time table and a change pattern master are used". Can also be used.

【0106】前記実施形態例では、本通知手段は、印刷
会社端末から予備通知を是とする情報を取得したときに
は対応する端末に変更の本通知をし、印刷会社端末から
予備通知を非とする情報を取得したときには対応する端
末に予備通知の取消しを通知する構成の場合について説
明したが、本発明はこれに限るものでなく、印刷会社端
末から予備通知を是とする情報を取得したときには対応
する端末に変更の本通知をし、印刷会社端末から予備通
知を非とする情報を取得したときには対応する端末に予
備通知の取消しを通知し、予備通知の有無に拘らず本通
知をする旨の情報を取得したときには本通知をする構成
の場合についても利用することができる。すなわち、予
備通知と無関係に印刷会社の工程管理者によって本通知
をすることができるように構成した場合についても利用
することができる。
In the above-described embodiment, when the information for obtaining the preliminary notification is acquired from the printing company terminal, the present notification means sends the main notification of the change to the corresponding terminal, and cancels the preliminary notification from the printing company terminal. Although the configuration in which the corresponding terminal is notified of the cancellation of the preliminary notification when the information is obtained has been described, the present invention is not limited to this. To the terminal that performs the preliminary notification, and when the information that disallows the preliminary notification is obtained from the printing company terminal, the corresponding terminal is notified of the cancellation of the preliminary notification. The present invention can also be used for a configuration in which this notification is issued when information is acquired. In other words, the present invention can also be used in a case where the main notice can be given by the process manager of the printing company irrespective of the preliminary notice.

【0107】前記実施形態例では、客先、印刷会社、外
注業者のそれぞれに、客先端末及び客先連絡デバイス、
印刷会社端末及び印刷会社連絡デバイス、外注業者端末
及び外注業者連絡デバイスを設け、印刷会社の複数の担
当部署(例えば図28のB印刷者の担当1と6)には対
応する端末に電子メールで作業変更通知を行い、ある外
注業者(例えば図28のD社)には対応する端末に電子
メールで作業変更通知を行い、その他の外注業者(例え
ば図28のC、E、F社)には対応する連絡デバイス
(例えばファクシミリ装置、携帯電話機、電話機)に作
業変更通知を行う場合について説明したが、本発明はこ
れに限るものでなく、客先連絡デバイス、印刷会社連絡
デバイス及び外注業者連絡デバイスを省略して客先端
末、印刷会社端末及び外注業者端末に電子メールで作業
変更通知を行うようにした場合、又は客先端末、印刷会
社端末、外注業者端末のそれぞれに設けられた連絡デバ
イスだけに作業変更通知を行う場合についても利用する
ことができる。このとき、端末だけに作業変更通知を行
うようにした場合には、連絡デバイスを省略することが
できる。また、連絡デバイスだけに作業変更通知を行う
ようにした場合には、作業変更通知のより速い認識を期
待できる。
In the above embodiment, a customer terminal, a customer contact device, a customer contact device,
A printing company terminal and a printing company communication device, a subcontractor terminal and a subcontractor communication device are provided, and a plurality of departments in charge of the printing company (for example, person 1 and 6 in charge of B printer in FIG. 28) send e-mail to corresponding terminals. A work change notice is sent, a certain subcontractor (for example, company D in FIG. 28) is notified of the work change by e-mail to a corresponding terminal, and other subcontractors (for example, companies C, E, and F in FIG. 28) are notified. A case has been described in which a work change notification is sent to a corresponding contact device (for example, a facsimile machine, a mobile phone, or a telephone). However, the present invention is not limited to this. Is omitted and the work change notification is sent by e-mail to the customer terminal, printing company terminal and subcontractor terminal, or customer terminal, printing company terminal, subcontractor terminal For When working change notification only contact devices provided in each it can be utilized. At this time, if the work change notification is performed only to the terminal, the communication device can be omitted. In addition, when the work change notification is performed only to the contact device, faster recognition of the work change notification can be expected.

【0108】前記実施形態例では、本発明を印刷業の管
理システムに利用した場合について説明したが、本発明
はこれに限るものでなく、このシステム内のコンピュー
タ(サーバ)に所定の機能を実現させるためのプログラ
ムに利用した場合や、このシステム内のコンピュータ
(サーバ)に所定の機能を実現させるためのプログラム
を記録したコンピュータ読み取り可能な記憶媒体に利用
した場合についても利用することができる。
In the above-described embodiment, the case where the present invention is applied to a printing business management system has been described. However, the present invention is not limited to this, and a computer (server) in this system realizes a predetermined function. The present invention can also be used in a case where the program is used for a program for causing a computer (server) in the system to realize a predetermined function, or in a case where the program is used for a computer-readable storage medium in which a program for realizing a predetermined function is recorded.

【0109】前記実施形態例では、客先端末(例えば1
0、14)、印刷会社端末(例えば18)、外注業者端
末(例えば22)が、それぞれブラウザが組み込まれた
端末の場合について説明したが、本発明はこれに限るも
のでなく、ブラウザ以外の表示ソフトウエアを保有する
機器(例えばPDA(携帯情報端末)、携帯電話機)の
場合についても利用することができる。
In the above embodiment, the customer terminal (for example, 1
0, 14), the printing company terminal (for example, 18), and the outsourcing contractor terminal (for example, 22) have been described as terminals incorporating a browser, but the present invention is not limited to this. The present invention can also be used for a device having software (for example, a PDA (Personal Digital Assistant), a mobile phone).

【0110】[0110]

【発明の効果】請求項1の発明は、印刷業の管理システ
ムにおいてジョブチケット情報記憶部、外注業者選択要
件記憶部及び外注先マスタを具備し、外注業者選択手段
が選択要件決定手段、外注業者抽出手段、外注業者一覧
作成手段及び外注業者決定手段を具備し、印刷会社端末
からの外注業者選択情報で対応するジョブチケット情報
を検索して対応する外注業者選択要件を決定し、外注先
マスタから対応する外注業者を抽出し、外注業者選択要
件毎に順位付けされた外注業者一覧を表示し、印刷会社
端末から取得した外注業者決定情報で外注業者一覧の中
から見積り依頼先となる外注業者を決定する構成とし
た。このため、外注業者の選択を容易にすることができ
るとともに、担当者による恣意的な選択を防止すること
ができる。請求項1の発明は、さらに、通知手段が予備
通知手段と本通知手段を具備し、客先端末等から取得し
た変更依頼情報で変更可能性のある工程を抽出し、連絡
先マスタの連絡先を参照して対応する端末に変更の予備
通知をし、印刷会社端末から予備通知を是とする情報を
取得したときには変更の本通知をし、予備通知を非とす
る情報を取得したときには予備通知の取消しを通知し、
予備通知の有無に拘らず本通知をする旨の情報を取得し
たときには本通知をする構成とした。このため、客先等
から印刷物の変更依頼があったときに、変更の可能性の
ある部署に変更の予備通知をして作業予測やスケジュー
ル管理の迅速化を図ることができるとともに、印刷会社
の作業管理者によって変更が必要とされた部署には変更
の本通知をして変更内容の閲覧を促し、変更が不要な部
署には変更取消しの本通知をして作業予測やスケジュー
ル管理の安定化を図ることができる。また、客先・印刷
会社間、印刷会社・外注業者間における変更依頼時と実
際の変更時との間に生じるタイムラグを小さくして、作
業効率を向上させることができる。
According to a first aspect of the present invention, a printing business management system includes a job ticket information storage unit, a subcontractor selection requirement storage unit, and a subcontractor master, wherein the subcontractor selection unit is a selection requirement determination unit, a subcontractor. An extraction unit, a subcontractor list creation unit, and a subcontractor determination unit are provided, and the corresponding job ticket information is searched by the subcontractor selection information from the printing company terminal, the corresponding subcontractor selection requirement is determined, and the subcontractor master is determined. Extract the corresponding subcontractor, display a list of subcontractors ranked according to the subcontractor selection requirements, and use the subcontractor determination information obtained from the printing company terminal to select the subcontractor that will be the quote request destination from the subcontractor list. The configuration was determined. For this reason, the selection of the outsourcing contractor can be facilitated, and arbitrary selection by the person in charge can be prevented. According to the first aspect of the present invention, the notifying unit further includes a preliminary notifying unit and a main notifying unit, and extracts a process that may be changed by the change request information acquired from the customer terminal or the like, and stores the contact information in the contact master. To the corresponding terminal by referring to, make a main notification of the change when the information that requires the preliminary notification is obtained from the printing company terminal, and obtain a preliminary notification when the information that does not require the preliminary notification is obtained. Notice of cancellation of
The main notification is made when the information for the main notification is obtained regardless of the presence or absence of the preliminary notification. For this reason, when there is a request to change the printed matter from a customer or the like, a preliminary notification of the change can be given to a department that may be changed to speed up work prediction and schedule management, and the printing company can Departments that need to be changed by the work manager will be notified of the change and will be prompted to view the details of the change, and departments that do not need the change will be notified of the cancellation of the change and will stabilize work prediction and schedule management. Can be achieved. Further, it is possible to reduce a time lag that occurs between a change request between a customer and a printing company and between a printing company and a subcontractor and an actual change, thereby improving work efficiency.

【0111】請求項2の発明は、印刷業の管理システム
においてジョブチケット情報記憶部、外注業者選択要件
記憶部及び外注先マスタを具備し、外注業者選択手段が
選択要件決定手段、外注業者抽出手段、外注業者一覧作
成手段及び外注業者決定手段を具備し、印刷会社端末か
らの外注業者選択情報で対応するジョブチケット情報を
検索して対応する外注業者選択要件を決定し、外注先マ
スタから対応する外注業者を抽出し、外注業者選択要件
毎に順位付けされた外注業者一覧を表示し、印刷会社端
末から取得した外注業者決定情報で外注業者一覧の中か
ら見積り依頼先となる外注業者を決定する構成とした。
このため、外注業者の選択を容易にすることができると
ともに、担当者による恣意的な選択を防止することがで
きる。
According to a second aspect of the present invention, a printing business management system includes a job ticket information storage unit, a subcontractor selection requirement storage unit, and a subcontractor master, wherein the subcontractor selection unit is a selection requirement determination unit and a subcontractor extraction unit. , A subcontractor list creation unit and a subcontractor determination unit, and searches the corresponding job ticket information by the subcontractor selection information from the printing company terminal to determine the corresponding subcontractor selection requirement, and responds from the subcontractor master. Extracts outsourcing companies, displays a list of outsourcing companies ranked according to outsourcing company selection requirements, and uses the outsourcing company determination information obtained from the printing company terminal to determine the outsourcing company to be requested for an estimate from the outsourcing company list. The configuration was adopted.
For this reason, the selection of the outsourcing contractor can be facilitated, and arbitrary selection by the person in charge can be prevented.

【0112】請求項3の発明は、印刷業の管理システム
において連絡先マスタを設け、サーバが変更時における
通知手段を具備し、この通知手段が予備通知手段と本通
知手段を具備し、客先端末等から取得した変更依頼情報
で変更可能性のある工程を抽出し、連絡先マスタの連絡
先を参照して対応する端末に変更の予備通知をし、印刷
会社端末から予備通知を是とする情報を取得したときに
は変更の本通知をし、予備通知を非とする情報を取得し
たときには予備通知の取消しを通知し、予備通知の有無
に拘らず本通知をする旨の情報を取得したときには本通
知をする構成とした。このため、客先等から印刷物の変
更依頼があったときに、変更の可能性のある部署に変更
の予備通知をして作業予測やスケジュール管理の迅速化
を図ることができるとともに、印刷会社の作業管理者に
よって変更が必要とされた部署には変更の本通知をして
変更内容の閲覧を促し、変更が不要な部署には変更取消
しの本通知をして作業予測やスケジュール管理の安定化
を図ることができる。また、客先・印刷会社間、印刷会
社・外注業者間における変更依頼時と実際の変更時との
間に生じるタイムラグを小さくして、作業効率を向上さ
せることができる。
According to a third aspect of the present invention, in the printing business management system, a contact master is provided, the server is provided with a notifying unit when the change is made, the notifying unit is provided with a preliminary notifying unit and the present notifying unit, The process that may be changed is extracted from the change request information obtained from the terminal, etc., the preliminary notification of the change is made to the corresponding terminal by referring to the contact information of the contact master, and the preliminary notice is taken from the printing company terminal. When the information is obtained, the main notification of the change is made. The notification is configured. For this reason, when there is a request to change the printed matter from a customer or the like, a preliminary notification of the change can be given to a department that may be changed to speed up work prediction and schedule management, and the printing company can Departments that need to be changed by the work manager will be notified of the change and will be prompted to view the details of the change, and departments that do not need the change will be notified of the cancellation of the change and will stabilize work prediction and schedule management. Can be achieved. Further, it is possible to reduce a time lag that occurs between a change request between a customer and a printing company and between a printing company and a subcontractor and an actual change, thereby improving work efficiency.

【0113】請求項4の発明は、請求項1又は2の発明
において、外注業者選択要件記憶部を製品マスタ、機械
種別マスタ及び統計情報記憶部で構成し、選択要件決定
手段が、ジョブチケット情報記憶部から検索したジョブ
チケット情報中の製品種別情報、第1設定情報、第2設
定情報のそれぞれに基づいて、製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定す
る構成としたので、より合理的な選択基準で外注業者を
選択することができる。
According to a fourth aspect of the present invention, in the first or second aspect of the present invention, the subcontractor selection requirement storage section is constituted by a product master, a machine type master, and a statistical information storage section, and the selection requirement determination means is provided with job ticket information. Based on each of the product type information, the first setting information, and the second setting information in the job ticket information retrieved from the storage unit, the product quality,
Since the configuration is such that the information of the machine type and the set outsourcing contractor selection requirements is determined, the outsourcing contractor can be selected based on more rational selection criteria.

【0114】請求項5の発明は、請求項1又は3の発明
において、変更パターンマスタ、受注情報記憶部、工程
別作業管理情報記憶部、標準作業時間テーブル及び通知
管理情報記憶部を設け、予備通知手段が、変更依頼情報
のなかに通知する連絡先を指定する情報が含まれている
ときには連絡先マスタを参照して対応する端末を通知管
理情報記憶部に記憶し、変更依頼情報が定型的な変更を
依頼する情報のときには変更パターンマスタ及び連絡先
マスタを参照して対応する端末を通知管理情報記憶部に
記憶し、変更依頼情報に基づいて受注情報記憶部から変
更が発生した工程の作業日時情報を検索し、工程別作業
管理情報記憶部の実施状況情報を参照して現在作業実施
中の工程以降の工程に関する作業時間情報を演算し、標
準作業時間テーブルの対応する標準的作業時間情報と対
比して作業を変更する工程を選択し、連絡先マスタの連
絡先を参照して対応する端末を通知管理情報記憶部に記
憶し、通知管理情報記憶部に記憶した端末に予備通知を
する構成としたので、より速い予備通知を行うことがで
きる。
According to a fifth aspect of the present invention, in the first or third aspect, a change pattern master, an order information storage unit, a work management information storage unit for each process, a standard work time table, and a notification management information storage unit are provided. When the change request information includes information designating a contact to be notified in the change request information, the notifying means refers to the contact master and stores the corresponding terminal in the notification management information storage unit, and the change request information is a routine. In the case of information for requesting a change, the corresponding terminal is stored in the notification management information storage unit by referring to the change pattern master and the contact master, and the work of the process in which the change has occurred from the order reception information storage unit based on the change request information Retrieve the date and time information, calculate the operation time information on the processes after the process currently being executed by referring to the execution status information in the operation management information storage unit for each process, and use the standard operation time table. Select the process of changing the work in comparison with the corresponding standard work time information, store the corresponding terminal in the notification management information storage unit by referring to the contact information of the contact master, and store the corresponding terminal in the notification management information storage unit. Since the preliminary notification is provided to the stored terminal, a faster preliminary notification can be performed.

【0115】請求項6の発明は、サーバを見積り時にお
ける外注業者選択手段として機能させるとともに変更時
における通知手段として機能させるためのプログラムで
あって、外注業者選択手段が選択要件決定手段、外注業
者抽出手段、外注業者一覧作成手段及び外注業者決定手
段を具備し、通知手段が予備通知手段と本通知手段を具
備し、請求項1の発明と同様な作用をする構成としたの
で、請求項1の発明と同一の効果を達成することができ
る。
According to a sixth aspect of the present invention, there is provided a program for causing a server to function as a subcontractor selecting means at the time of estimating and to function as a notifying means at the time of change. The system includes an extracting unit, a subcontractor list creating unit, and a subcontractor determining unit, and the notifying unit includes a preliminary notifying unit and a main notifying unit. The same effect as that of the invention can be achieved.

【0116】請求項7の発明は、サーバを見積り時にお
ける外注業者選択手段として機能させるためのプログラ
ムであって、外注業者選択手段が選択要件決定手段、外
注業者抽出手段、外注業者一覧作成手段及び外注業者決
定手段を具備し、請求項2の発明と同様な作用をする構
成としたので、請求項2の発明と同一の効果を達成する
ことができる。
The invention according to claim 7 is a program for causing a server to function as a subcontractor selecting means at the time of estimating, wherein the subcontractor selecting means includes selection requirement determining means, subcontractor extracting means, subcontractor list creating means, Since the system includes the outsourcing contractor determining means and operates in the same manner as the second aspect of the invention, the same effect as that of the second aspect of the invention can be achieved.

【0117】請求項8の発明は、サーバを変更時におけ
る通知手段として機能させるためのプログラムであっ
て、通知手段が予備通知手段と本通知手段を具備し、請
求項3の発明と同様な作用をする構成としたので、請求
項3の発明と同一の効果を達成することができる。
An eighth aspect of the present invention is a program for causing a server to function as a notifying unit at the time of change, wherein the notifying unit includes a preliminary notifying unit and a main notifying unit. Therefore, the same effect as the third aspect of the invention can be achieved.

【0118】請求項9の発明は、請求項6又は7の発明
において、外注業者選択要件記憶部を製品マスタ、機械
種別マスタ及び統計情報記憶部で構成し、選択要件決定
手段が、ジョブチケット情報記憶部から検索したジョブ
チケット情報中の製品種別情報、第1設定情報、第2設
定情報のそれぞれに基づいて、製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定す
る構成としたので、より合理的な選択基準で外注業者を
選択できる。
According to a ninth aspect of the present invention, in the invention of the sixth or seventh aspect, the subcontractor's selection requirement storage section is constituted by a product master, a machine type master, and a statistical information storage section, and the selection requirement determination means includes a job ticket information. Based on each of the product type information, the first setting information, and the second setting information in the job ticket information retrieved from the storage unit, the product quality,
Since the configuration is such that the information of the machine type and the set outsourcing contractor selection requirement is determined, the outsourcing contractor can be selected based on more rational selection criteria.

【0119】請求項10の発明は、請求項6又は8の発
明において、予備通知手段が、変更依頼情報のなかに通
知する連絡先を指定する情報が含まれているときには連
絡先マスタを参照して対応する端末を通知管理情報記憶
部に記録し、変更依頼情報が定型的な変更を依頼する情
報のときには変更パターンマスタ及び連絡先マスタを参
照して対応する端末を通知管理情報記憶部に記録し、変
更依頼情報に基づいて受注情報記憶部から変更が発生し
た工程の作業日時情報を検索し、工程別作業管理情報記
憶部の実施状況情報を参照して現在作業実施中の工程以
降の工程に関する作業時間情報を演算し、標準作業時間
テーブルの対応する標準的作業時間情報と対比して作業
を変更する工程を選択し、連絡先マスタの連絡先を参照
して対応する端末を通知管理情報記憶部に記録し、通知
管理情報記憶部に記録した端末に予備通知をする構成と
したので、より速い予備通知を行うことができる。
According to a tenth aspect of the present invention, in the invention of the sixth or eighth aspect, the preliminary notification means refers to the contact master when the change request information includes information designating the contact to be notified. The corresponding terminal is recorded in the notification management information storage unit, and when the change request information is information requesting a standard change, the corresponding terminal is recorded in the notification management information storage unit by referring to the change pattern master and the contact master. Then, based on the change request information, search the work date / time information of the process in which the change occurred from the order information storage unit, and refer to the execution status information in the process-specific work management information storage unit to execute the process after the process currently being performed. Calculate the work time information related to the terminal, select the process to change the work in comparison with the corresponding standard work time information in the standard work time table, and refer to the contacts in the contact master to correspond to the terminal. Notification management information recorded in the storage unit, since the structure of the pre-notification to the recording in the notification management information storage unit terminal, it is possible to perform a faster pre-notification.

【0120】請求項11の発明は、請求項6、7、8、
9又は10記載のプログラムを記録したコンピュータ読
み取り可能な記憶媒体としたので、請求項6、7、8、
9又は10の発明と同一の効果を達成することができ
る。
The invention according to claim 11 is the invention according to claims 6, 7, 8,
A computer-readable storage medium on which the program according to claim 9 or 10 is recorded.
The same effect as that of the ninth or tenth invention can be achieved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による印刷業の管理システム、プログラ
ム及び記憶媒体の第1実施形態例を示すブロック図であ
る。
FIG. 1 is a block diagram showing a first embodiment of a printing business management system, a program, and a storage medium according to the present invention.

【図2】図1中のデ−タサーバ38の内容を示すブロッ
ク図である。
FIG. 2 is a block diagram showing the contents of a data server 38 in FIG.

【図3】図2中のジョブチケットDB42内のジョブチ
ケットデ−タの形成方式を示す説明図である。
FIG. 3 is an explanatory diagram showing a method of forming job ticket data in a job ticket DB in FIG. 2;

【図4】図2中の製品マスタ50のデ−タ内容を示す説
明図である。
FIG. 4 is an explanatory diagram showing data contents of a product master 50 in FIG. 2;

【図5】図2中の機械種別マスタ52のデ−タ内容を示
す説明図である。
FIG. 5 is an explanatory diagram showing data contents of a machine type master 52 in FIG. 2;

【図6】図2中の外注先マスタ56のデ−タ内容を示す
説明図である。
FIG. 6 is an explanatory diagram showing data contents of a subcontractor master 56 in FIG. 2;

【図7】図2中の標準作業時間テーブルのデ−タ内容を
示す説明図である。
FIG. 7 is an explanatory diagram showing data contents of a standard work time table in FIG. 2;

【図8】図2中の変更パターンマスタ82のデ−タ内容
を示す説明図である。
8 is an explanatory diagram showing data contents of a change pattern master 82 in FIG.

【図9】図1のシステム全体の処理の流れを示すフロー
チャートである。
FIG. 9 is a flowchart showing a flow of processing of the entire system of FIG. 1;

【図10】図1中のアプリケーションサーバ30に見積
り処理機能を実現させるためのプログラムの手順を示す
フローチャートである。
FIG. 10 is a flowchart showing a procedure of a program for causing the application server 30 in FIG. 1 to implement the estimation processing function.

【図11】図10中の印刷会社の見積り処理を示すフロ
ーチャートである。
FIG. 11 is a flowchart showing an estimation process of the printing company in FIG. 10;

【図12】図11中の印刷設計処理を示すフローチャー
トである。
FIG. 12 is a flowchart illustrating a print design process in FIG. 11;

【図13】図11中の外注業者選択処理を示すフローチ
ャートである。
13 is a flowchart showing a subcontractor selection process in FIG.

【図14】図1中の印刷会社端末18で、図13中の外
注業者一覧表示を表示した画面を示す図である。
14 is a diagram showing a screen on the printing company terminal 18 in FIG. 1 displaying a list of outsourced contractors in FIG. 13;

【図15】図14中で見積り発生工程「印刷」を選択し
たときの、印刷工程の外注業者一覧を表示した画面を示
す図である。
FIG. 15 is a diagram showing a screen on which a list of subcontractors in the printing process is displayed when the estimation generating process “print” is selected in FIG. 14;

【図16】図15中で「並替え」を選択したときの、並
替え処理後の外注業者一覧を表示した画面を示す図であ
る。
FIG. 16 is a diagram showing a screen displaying a list of outsourced contractors after the rearrangement processing when “rearrangement” is selected in FIG.

【図17】図15又は図16中で「フィルタ」を選択し
たときの、フィルタ処理後の外注業者一覧を表示した画
面を示す図である。
FIG. 17 is a diagram showing a screen displaying a list of outsourcing companies after filtering when “Filter” is selected in FIG. 15 or FIG.

【図18】図15、図16又は図17中で「条件変更」
を選択したときの、条件変更処理後の一覧を表示した画
面を示す図である。
FIG. 18 shows “condition change” in FIG. 15, FIG. 16 or FIG.
FIG. 11 is a diagram showing a screen displaying a list after the condition change processing when “!” Is selected.

【図19】図18で「実行」を選択したときの、条件変
更実行処理後の外注業者一覧を表示した画面を示す図で
ある。
FIG. 19 is a diagram showing a screen displaying a list of outsourcing contractors after the condition change execution processing when “execute” is selected in FIG. 18;

【図20】図11中の外注見積り処理を示すフローチャ
ートである。
FIG. 20 is a flowchart showing an outsourcing estimation process in FIG. 11;

【図21】図1中のアプリケーションサーバ30に受注
処理機能を実現させるための受注プログラムの手順を示
すフローチャートである。
FIG. 21 is a flowchart illustrating a procedure of an order receiving program for causing the application server 30 in FIG. 1 to realize an order receiving function.

【図22】図1中のアプリケーションサーバ30に製造
処理機能を実現させるための製造プログラムの手順を示
すフローチャートである。
FIG. 22 is a flowchart showing a procedure of a manufacturing program for causing the application server 30 in FIG. 1 to realize a manufacturing processing function.

【図23】図22中の作業指示処理を示すフローチャー
トである。
FIG. 23 is a flowchart showing a work instruction process in FIG. 22;

【図24】図22中の進捗情報収集処理を示すフローチ
ャートである。
24 is a flowchart showing a progress information collecting process in FIG. 22.

【図25】図22中の資材調達処理を示すフローチャー
トである。
FIG. 25 is a flowchart showing a material procurement process in FIG. 22.

【図26】図1中のアプリケーションサーバ30に納品
処理機能を実現させるための納品プログラムの手順を示
すフローチャートである。
26 is a flowchart showing a procedure of a delivery program for causing the application server 30 in FIG. 1 to realize a delivery processing function.

【図27】図26中の納品の実施処理を示すフローチャ
ートである。
FIG. 27 is a flowchart showing delivery processing in FIG. 26;

【図28】図1中のアプリケーションサーバ30に決済
処理機能を実現させるための決済プログラムの手順を示
すフローチャートである。
FIG. 28 is a flowchart showing a procedure of a payment program for causing the application server 30 in FIG. 1 to realize a payment processing function.

【図29】図1中のアプリケーションサーバ30に通知
管理処理機能を実現させるための通知管理プログラムの
手順を示すフローチャートである。
29 is a flowchart showing a procedure of a notification management program for causing the application server 30 in FIG. 1 to realize a notification management processing function.

【図30】図29中の変更指示送信処理のうちの予備通
知処理を示すフローチャートである。
FIG. 30 is a flowchart showing a preliminary notification process of the change instruction transmission process in FIG. 29;

【図31】図30の予備通知処理中の作用を示す説明図
である。
FIG. 31 is an explanatory diagram showing an operation during the preliminary notification processing of FIG. 30;

【図32】図1中のアプリケーションサーバ30による
本通知作用を示す説明図である。
FIG. 32 is an explanatory diagram showing a main notification operation by the application server 30 in FIG. 1;

【図33】図1中の印刷会社端末18で、予備通知後の
作業変更通知管理一覧を表示した画面を示す図である。
FIG. 33 is a diagram showing a screen displaying a work change notification management list after preliminary notification on the printing company terminal 18 in FIG. 1;

【図34】図1中の印刷会社端末18で、本通知後の作
業変更通知管理一覧を表示した画面を示す図である。
34 is a diagram showing a screen on the printing company terminal 18 in FIG. 1 on which a work change notification management list after this notification is displayed.

【符号の説明】[Explanation of symbols]

10…一般客先端末、 12…一般客先連絡デバイス、
14…特定客先端末、 16…特定客先連絡デバイ
ス、 18(1)〜18(n)…印刷会社端末、20
(1)〜20(n)…印刷会社連絡デバイス、 22
(1)〜22(m)…外注業者端末、 24(1)〜2
4(m)…外注業者連絡デバイス、 26…通信回線
網、 28…ASPセンター、 30…アプリケーショ
ンサーバ、 32…通信サーバ、 34…通知サーバ、
38…データサーバ、 40…顧客DB(データベー
ス)、 42…ジョブチケットDB、 44…通知管理
DB、46…連絡先マスタ、 48…工程別見積りD
B、 50…製品マスタ、 52…機械種別マスタ、
54…統計DB、 56…外注先マスタ、 58…工程
別DB、 60…受注DB、 64…CRM−DB、
66…ワークフローDB、68…資材マスタ、 70…
資材発注DB、 72…資材在庫DB、 74…売上集
計DB、 76…製品在庫DB、 78…機械別スケジ
ュールDB、 80…標準作業時間テーブル、 82…
変更パターンマスタ、 84…単価マスタ、 86…見
積りパターンファイル、 88…見積りDB。
10 ... General customer terminal, 12 ... General customer contact device,
14 specific customer terminal 16 specific contact device 18 (1) to 18 (n) printing company terminal 20
(1) to 20 (n): Printing company communication device, 22
(1) to 22 (m) ... outsourcing contractor terminal, 24 (1) to 2
4 (m): contractor communication device, 26: communication network, 28: ASP center, 30: application server, 32: communication server, 34: notification server,
38: Data server, 40: Customer DB (database), 42: Job ticket DB, 44: Notification management DB, 46: Contact master, 48: Estimation D by process
B, 50: Product master, 52: Machine type master,
54: statistical DB, 56: subcontractor master, 58: DB by process, 60: order DB, 64: CRM-DB,
66: Workflow DB, 68: Material master, 70:
Material order DB, 72: Material inventory DB, 74: Sales summary DB, 76: Product inventory DB, 78: Machine-specific schedule DB, 80: Standard working time table, 82:
Change pattern master, 84: Unit price master, 86: Estimation pattern file, 88: Estimation DB.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 ▲吉▼嶺 和高 東京都港区元赤坂1丁目6番6号 第二安 全ビル 株式会社富士通ゼネラル内 (72)発明者 東出 明文 東京都港区元赤坂1丁目6番6号 第二安 全ビル 株式会社富士通ゼネラル内 (72)発明者 漆畑 知学 神奈川県川崎市高津区末長1116番地 株式 会社富士通ゼネラル内 (72)発明者 太田 博志 神奈川県川崎市中原区上小田中4丁目1番 1号 富士通株式会社内 (72)発明者 並木 勝美 東京都中央区新富1丁目9番6号 新富1 丁目ビル 町田印刷株式会社内 ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor ▲ Yoshi ▼ Mine Kadaka 1-6-6 Moto-Akasaka, Minato-ku, Tokyo 2nd Security Building Fujitsu General Co., Ltd. (72) Inventor Akifumi Higashide Tokyo 1-6-6 Moto-Akasaka, Minato-ku Dai-Ichi Zen Building, Fujitsu General Co., Ltd. Fujitsu, Ltd. 4-1-1, Kamidadanaka, Nakahara-ku, Kawasaki-shi, Japan (72) Inventor Katsumi Namiki 1-9-6 Shintomi, Chuo-ku, Tokyo Shintomi 1-chome Building Machida Printing Co., Ltd.

Claims (11)

【特許請求の範囲】[Claims] 【請求項1】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介してサーバを結合してなる印刷業の管
理システムにおいて、印刷物の製品種別、印刷部数など
のジョブチケット情報を更新可能に記憶するジョブチケ
ット情報記憶部と、製品クオリティ、機械種別などの外
注業者選択要件をジョブチケット情報に対応付けて記憶
した外注業者選択要件記憶部と、複数の外注業者を外注
業者選択要件に対応付けて記憶した外注先マスタと、印
刷物毎、工程毎の連絡先情報を前記客先端末、印刷会社
端末、外注業者端末に対応付けて記憶した連絡先マスタ
とを設け、前記サーバが見積り時における外注業者選択
手段と変更時における通知手段とを具備し、前記外注業
者選択手段が、前記印刷会社端末から取得した外注業者
選択情報に基づいて前記ジョブチケット情報記憶部から
対応するジョブチケット情報を検索し、前記外注業者選
択要件記憶部から対応する外注業者選択要件を決定する
選択要件決定手段と、この選択要件決定手段で決定した
外注業者選択要件に基づいて前記外注先マスタから対応
する外注業者を抽出する外注業者抽出手段と、前記選択
要件決定手段で決定した外注業者選択要件と前記外注業
者抽出手段で抽出した外注業者とに基づいて、外注業者
選択要件毎に順位付けされた外注業者一覧を表示するた
めの情報を作成する外注業者一覧作成手段と、前記印刷
会社端末から取得した外注業者決定情報に基づいて外注
業者一覧の中から見積り依頼先となる外注業者を決定す
る外注業者決定手段とを具備し、前記通知手段が、前記
客先端末、印刷会社端末、外注業者端末のいずれかの端
末から取得した変更依頼情報に基づいて変更可能性のあ
る工程を抽出し、前記連絡先マスタの連絡先を参照して
対応する端末に変更の予備通知をする予備通知手段と、
前記印刷会社端末から予備通知を是とする情報を取得し
たときには対応する端末に変更の本通知をし、前記印刷
会社端末から予備通知を非とする情報を取得したときに
は対応する端末に予備通知の取消しを通知し、予備通知
の有無に拘らず本通知をする旨の情報を取得したときに
は本通知をする本通知手段とを具備してなることを特徴
とする印刷業の管理システム。
1. In a printing business management system in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network, job ticket information such as a product type of a printed matter and the number of copies is updated. A job ticket information storage unit that stores as much as possible, a subcontractor selection requirement storage unit that stores subcontractor selection requirements such as product quality and machine type in association with job ticket information, and a plurality of subcontractors as subcontractor selection requirements. A subcontractor master stored in association with a contact master storing contact information for each printed matter and each process in association with the customer terminal, the printing company terminal, and the subcontractor terminal is provided. Outsourcing company selection means and notification means at the time of change, wherein the outsourcing company selection means is based on outsourcing company selection information obtained from the printing company terminal. Selection requirement determining means for retrieving the corresponding job ticket information from the job ticket information storage section and determining the corresponding subcontractor selection requirement from the subcontractor selection requirement storage section, and subcontractor selection determined by the selection requirement determination means Based on the subcontractor extraction means for extracting a corresponding subcontractor from the subcontractor master based on the requirements, and the subcontractor extracted by the subcontractor extraction means and the subcontractor extraction means determined by the selection requirement determination means, Subcontractor list creation means for creating information for displaying a list of subcontractor companies ranked for each subcontractor selection requirement, and an estimate from the subcontractor list based on the subcontractor determination information obtained from the printing company terminal Subcontractor determining means for determining a subcontractor to be requested, wherein the notifying means includes the customer terminal, printing company terminal, subcontractor A preliminary notification means for extracting a process that may be changed based on the change request information obtained from any one of the terminals, and making a preliminary notification of the change to the corresponding terminal by referring to the contact information of the contact master; and ,
When the information for the preliminary notification is acquired from the printing company terminal, the main terminal notifies the corresponding terminal of the change, and when the information for disabling the preliminary notification is acquired from the printing company terminal, the corresponding terminal receives the preliminary notification. A management system for a printing business, comprising: a notification unit for notifying cancellation, and notifying the main notification when information indicating that the main notification is obtained irrespective of the presence or absence of the preliminary notification.
【請求項2】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介してサーバを結合してなる印刷業の管
理システムにおいて、印刷物の製品種別、印刷部数など
のジョブチケット情報を更新可能に記憶するジョブチケ
ット情報記憶部と、製品クオリティ、機械種別などの外
注業者選択要件をジョブチケット情報に対応付けて記憶
した外注業者選択要件記憶部と、複数の外注業者を外注
業者選択要件に対応付けて記憶した外注先マスタとを設
け、前記サーバが見積り時における外注業者選択手段を
具備し、この外注業者選択手段が、前記印刷会社端末か
ら取得した外注業者選択情報に基づいて前記ジョブチケ
ット情報記憶部から対応するジョブチケット情報を検索
し、前記外注業者選択要件記憶部を参照して対応する外
注業者選択要件を決定する選択要件決定手段と、この選
択要件決定手段で決定した外注業者選択要件に基づいて
前記外注先マスタから対応する外注業者を抽出する外注
業者抽出手段と、前記選択要件決定手段で決定した外注
業者選択要件と前記外注業者抽出手段で抽出した外注業
者とに基づいて、外注業者選択要件毎に順位付けされた
外注業者一覧を表示するための情報を作成する外注業者
一覧作成手段と、前記印刷会社端末から取得した外注業
者決定情報に基づいて外注業者一覧の中から見積り依頼
先となる外注業者を決定する外注業者決定手段とを具備
してなることを特徴とする印刷業の管理システム。
2. In a printing business management system in which a server is connected to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network, job ticket information such as a product type of a printed matter and the number of copies is updated. A job ticket information storage unit that stores as much as possible, a subcontractor selection requirement storage unit that stores subcontractor selection requirements such as product quality and machine type in association with job ticket information, and a plurality of subcontractors as subcontractor selection requirements. The server includes a subcontractor master stored in association with the subcontractor, and the server includes subcontractor selecting means for estimating the job ticket based on the subcontractor selecting information obtained from the printing company terminal. The corresponding job ticket information is retrieved from the information storage unit, and the corresponding subcontractor selection requirement is referred to by referring to the subcontractor selection requirement storage unit. Selection requirement determination means to be specified, subcontractor extraction means for extracting a corresponding subcontractor from the subcontractor master based on the subcontractor selection requirement determined by the selection requirement determination means, and subcontractor determined by the selection requirement determination means A subcontractor list creating means for creating information for displaying a subcontractor list ranked for each subcontractor selection requirement based on the contractor selection requirements and the subcontractor extracted by the subcontractor extraction means, and the printing A management system for a printing business, comprising: a subcontractor determining means for determining a subcontractor to which an estimate is requested from a list of subcontractors based on subcontractor determination information obtained from a company terminal.
【請求項3】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介してサーバを結合してなる印刷業の管
理システムにおいて、印刷物毎、工程毎の連絡先情報を
前記客先端末、印刷会社端末、外注業者端末に対応付け
て記憶した連絡先マスタを設け、前記サーバが変更時に
おける通知手段を具備し、この通知手段が、前記客先端
末、印刷会社端末、外注業者端末のいずれかの端末から
取得した変更依頼情報に基づいて変更可能性のある工程
を抽出し、前記連絡先マスタの連絡先を参照して対応す
る端末に変更の予備通知をする予備通知手段と、前記印
刷会社端末から予備通知を是とする情報を取得したとき
には対応する端末に変更の本通知をし、前記印刷会社端
末から予備通知を非とする情報を取得したときには対応
する端末に予備通知の取消しを通知し、予備通知の有無
に拘らず本通知をする旨の情報を取得したときには本通
知をする本通知手段とを具備してなることを特徴とする
印刷業の管理システム。
3. A printing business management system comprising a server connected to a customer terminal, a printing company terminal and a subcontractor terminal via a communication network, wherein the contact information for each printed material and each process is stored in the customer terminal. A printing company terminal, a contact master stored in association with a subcontractor terminal, the server is provided with a notifying means at the time of change, this notifying means, the customer terminal, printing company terminal, subcontractor terminal Preliminary notification means for extracting a process that may be changed based on the change request information obtained from any of the terminals, making a preliminary notification of the change to the corresponding terminal with reference to the contact information of the contact master, When the information that requires the preliminary notification is obtained from the printing company terminal, the corresponding terminal is notified of the change, and when the information that does not require the preliminary notification is obtained from the printing company terminal, the corresponding terminal is notified of the preliminary notification. Printing industry management system which notifies of cancellation, and characterized by being provided with the present notifying means for this notification when acquiring the information indicating that this notification or without preliminary notification.
【請求項4】外注業者選択要件記憶部は、印刷物の製品
クオリティをジョブチケット情報中の製品種別に対応付
けて記憶した製品マスタと、機械種別をジョブチケット
情報中の予め設定された第1設定情報に対応付けて記憶
した機械種別マスタと、前記製品クオリティ及び機械種
別以外の予め設定された外注業者選択要件をジョブチケ
ット情報中の予め設定された第2設定情報に対応付けて
記憶した統計情報記憶部とからなり、選択要件決定手段
は、ジョブチケット情報記憶部から検索したジョブチケ
ット情報中の製品種別情報、第1設定情報、第2設定情
報のそれぞれに基づいて、前記製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定し
てなる請求項1又は2記載の印刷業の管理システム。
4. A subcontractor selection requirement storage unit stores a product master in which a product quality of a printed matter is stored in association with a product type in the job ticket information, and a first setting in which the machine type is stored in the job ticket information. Machine type master stored in association with the information, and statistical information in which preset contractor selection requirements other than the product quality and the machine type are stored in association with the preset second setting information in the job ticket information. A storage unit, wherein the selection requirement determination unit is configured to determine the product master and the machine type based on each of the product type information, the first setting information, and the second setting information in the job ticket information retrieved from the job ticket information storage unit. Product quality from each of the master and statistical information storage units,
3. The printing business management system according to claim 1, wherein information on the machine type and the set outsourcer selection requirement is determined.
【請求項5】印刷物毎、工程毎の定型的な変更内容に対
応付けて通知先の工程を記憶した変更パターンマスタ
と、客先毎に印刷物の受注から納品までの各工程の作業
日時情報を更新可能に記憶する受注情報記憶部と、印刷
物毎、工程毎の実施状況情報を更新可能に記憶する工程
別作業管理情報記憶部と、印刷物毎、工程毎の標準的な
作業時間情報を記憶した標準作業時間テーブルと、通知
管理情報を記憶する通知管理情報記憶部とを設け、予備
通知手段は、変更依頼情報のなかに通知する連絡先を指
定する情報が含まれているときには連絡先マスタを参照
して対応する端末を前記通知管理情報記憶部に記録し、
前記変更依頼情報が定型的な変更を依頼する情報のとき
には前記変更パターンマスタ及び連絡先マスタを参照し
て対応する端末を前記通知管理情報記憶部に記録し、前
記変更依頼情報に基づいて前記受注情報記憶部から変更
が発生した工程の作業日時情報を検索し、前記工程別作
業管理情報記憶部の実施状況情報を参照して現在作業実
施中の工程以降の工程に関する作業時間情報を演算し、
前記標準作業時間テーブルの対応する標準的作業時間情
報と対比して作業を変更する工程を選択し、前記連絡先
マスタの連絡先を参照して対応する端末を前記通知管理
情報記憶部に記録し、前記通知管理情報記憶部に記録し
た端末に予備通知をしてなる請求項1又は3記載の印刷
業の管理システム。
5. A change pattern master in which a notification destination process is stored in association with a fixed change content for each printed material and each process, and work date and time information for each process from order receipt to delivery of the printed material for each customer. An order information storage unit that stores updatable information, a work management information storage unit for each process that stores update status information for each printed material and each process, and standard work time information for each printed material and each process. A standard work time table and a notification management information storage unit for storing notification management information are provided, and the preliminary notification unit stores a contact master when information for designating a contact to be notified is included in the change request information. Reference and record the corresponding terminal in the notification management information storage unit,
When the change request information is information for requesting a standard change, the corresponding terminal is recorded in the notification management information storage unit by referring to the change pattern master and the contact master, and the order is received based on the change request information. Retrieve the work date and time information of the process where the change has occurred from the information storage unit, and calculate the operation time information on the processes after the process in which the current operation is being performed with reference to the execution status information of the operation management information storage unit by process,
Select the step of changing the work in comparison with the corresponding standard work time information of the standard work time table, record the corresponding terminal in the notification management information storage unit by referring to the contact of the contact master. 4. The printing business management system according to claim 1, wherein a preliminary notification is sent to a terminal recorded in the notification management information storage unit.
【請求項6】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介して結合されたサーバを、見積り時に
おける外注業者選択手段として機能させるとともに変更
時における通知手段として機能させるためのプログラム
であって、前記外注業者選択手段が、前記印刷会社端末
から取得した外注業者選択情報に基づいてジョブチケッ
ト情報記憶部から対応するジョブチケット情報を検索
し、外注業者選択要件記憶部から対応する外注業者選択
要件を決定する選択要件決定手段と、この選択要件決定
手段で決定した外注業者選択要件に基づいて外注先マス
タから対応する外注業者を抽出する外注業者抽出手段
と、前記選択要件決定手段で決定した外注業者選択要件
と前記外注業者抽出手段で抽出した外注業者とに基づい
て、外注業者選択要件毎に順位付けされた外注業者一覧
を表示するための情報を作成する外注業者一覧作成手段
と、前記印刷会社端末から取得した外注業者決定情報に
基づいて外注業者一覧の中から見積り依頼先となる外注
業者を決定する外注業者決定手段とを具備し、前記通知
手段が、前記客先端末、印刷会社端末、外注業者端末の
いずれかの端末から取得した変更依頼情報に基づいて変
更可能性のある工程を抽出し、連絡先マスタの連絡先を
参照して対応する端末に変更の予備通知をする予備通知
手段と、前記印刷会社端末から予備通知を是とする情報
を取得したときには対応する端末に変更の本通知をし、
前記印刷会社端末から予備通知を非とする情報を取得し
たときには対応する端末に予備通知の取消しを通知し、
予備通知の有無に拘らず本通知をする旨の情報を取得し
たときには本通知をする本通知手段とを具備してなるこ
とを特徴とするプログラム。
6. A server coupled to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network to function as a subcontractor selecting means at the time of estimation and as a notifying means at the time of change. The program, wherein the subcontractor selection means searches the job ticket information storage unit for corresponding job ticket information based on the subcontractor selection information obtained from the printing company terminal, and responds from the subcontractor selection requirement storage unit. Selection requirement determination means for determining a subcontractor selection requirement, subcontractor extraction means for extracting a corresponding subcontractor from a subcontractor master based on the subcontractor selection requirement determined by the selection requirement determination means, and the selection requirement determination means Based on the subcontractor selection requirements determined in the above and the subcontractor extracted by the subcontractor extraction means, Outsourcing agent list creation means for creating information for displaying the outsourcing agent list ranked in the order of outsourcing, and outsourcing to be a quote request destination from the outsourcing agent list based on the outsourcing agent determination information obtained from the printing company terminal Outsourcing contractor determining means for determining a trader, wherein the notifying means may change based on change request information obtained from any of the customer terminal, the printing company terminal, and the subcontractor terminal. A preliminary notification means for extracting the preliminary notification of the change to the corresponding terminal by referring to the contact information of the contact master, and changing to the corresponding terminal when the information indicating the preliminary notification is obtained from the printing company terminal. Of this book notice,
When the information that makes the preliminary notification non-obtained from the printing company terminal, the corresponding terminal is notified of the cancellation of the preliminary notification,
A program comprising: a main notification unit for performing main notification when information indicating that main notification is to be performed regardless of the presence or absence of a preliminary notification.
【請求項7】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介して結合されたサーバを、見積り時に
おける外注業者選択手段として機能させるためのプログ
ラムであって、前記外注業者選択手段が、前記印刷会社
端末から取得した外注業者選択情報に基づいてジョブチ
ケット情報記憶部から対応するジョブチケット情報を検
索し、外注業者選択要件記憶部から対応する外注業者選
択要件を決定する選択要件決定手段と、この選択要件決
定手段で決定した外注業者選択要件に基づいて外注先マ
スタから対応する外注業者を抽出する外注業者抽出手段
と、前記選択要件決定手段で決定した外注業者選択要件
と前記外注業者抽出手段で抽出した外注業者とに基づい
て、外注業者選択要件毎に順位付けされた外注業者一覧
を表示するための情報を作成する外注業者一覧作成手段
と、前記印刷会社端末から取得した外注業者決定情報に
基づいて外注業者一覧の中から見積り依頼先となる外注
業者を決定する外注業者決定手段とを具備してなること
を特徴とするプログラム。
7. A program for causing a server coupled to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network to function as subcontractor selection means at the time of estimation. Means for retrieving the corresponding job ticket information from the job ticket information storage unit based on the subcontractor selection information obtained from the printing company terminal, and determining the corresponding subcontractor selection requirement from the subcontractor selection requirement storage unit Determination means, subcontractor extraction means for extracting a corresponding subcontractor from the subcontractor master based on the subcontractor selection requirements determined by the selection requirement determination means, subcontractor selection requirements determined by the selection requirement determination means, and Based on the subcontractor extracted by the subcontractor extraction means, a list of subcontractors ranked according to the subcontractor selection requirements is displayed. Outsourcing company list creating means for creating a report, and outsourcing company determining means for determining an outsourcing company to which an estimate is requested from the outsourcing company list based on the outsourcing company determination information obtained from the printing company terminal. A program characterized by becoming.
【請求項8】客先端末、印刷会社端末及び外注業者端末
に通信回線網を介して結合されたサーバを、変更時にお
ける通知手段として機能させるためのプログラムであっ
て、前記通知手段が、前記客先端末、印刷会社端末、外
注業者端末のいずれかの端末から取得した変更依頼情報
に基づいて変更可能性のある工程を抽出し、連絡先マス
タの連絡先を参照して対応する端末に変更の予備通知を
する予備通知手段と、前記印刷会社端末から予備通知を
是とする情報を取得したときには対応する端末に変更の
本通知をし、前記印刷会社端末から予備通知を非とする
情報を取得したときには対応する端末に予備通知の取消
しを通知し、予備通知の有無に拘らず本通知をする旨の
情報を取得したときには本通知をする本通知手段とを具
備してなることを特徴とするプログラム。
8. A program for causing a server coupled to a customer terminal, a printing company terminal, and a subcontractor terminal via a communication network to function as a notifying means when a change is made, wherein the notifying means comprises: Based on the change request information obtained from any of the customer terminal, printing company terminal, or subcontractor terminal, extract the process that may be changed based on the change request information, and refer to the contact information in the contact master to change to the corresponding terminal Preliminary notification means for performing preliminary notification of, and, when the information for which preliminary notification is required is obtained from the printing company terminal, a main notification of the change is sent to the corresponding terminal, and information for disabling the preliminary notification from the printing company terminal. When the information is obtained, the corresponding terminal is notified of the cancellation of the preliminary notification, and this information means for performing the main notification is obtained, regardless of the presence or absence of the preliminary notification. Program to butterflies.
【請求項9】外注業者選択要件記憶部は、印刷物の製品
クオリティをジョブチケット情報中の製品種別に対応付
けて記憶した製品マスタと、機械種別をジョブチケット
情報中の予め設定された第1設定情報に対応付けて記憶
した機械種別マスタと、前記製品クオリティ及び機械種
別以外の予め設定された外注業者選択要件をジョブチケ
ット情報中の予め設定された第2設定情報に対応付けて
記憶した統計情報記憶部とからなり、選択要件決定手段
は、ジョブチケット情報記憶部から検索したジョブチケ
ット情報中の製品種別情報、第1設定情報、第2設定情
報のそれぞれに基づいて、前記製品マスタ、機械種別マ
スタ、統計情報記憶部のそれぞれから製品クオリティ、
機械種別、設定された外注業者選択要件の情報を決定し
てなる請求項6又は7記載のプログラム。
9. A subcontractor selection requirement storage unit stores a product master storing a product quality of a printed matter in association with a product type in the job ticket information, and a preset first setting in a job type in the job ticket information. The machine type master stored in association with the information, and the statistical information in which preset requirements for selecting a subcontractor other than the product quality and the machine type are stored in association with the preset second setting information in the job ticket information. A storage unit, wherein the selection requirement determination unit is configured to determine the product master and the machine type based on each of the product type information, the first setting information, and the second setting information in the job ticket information retrieved from the job ticket information storage unit. Product quality from each of the master and statistical information storage units,
8. The program according to claim 6, wherein information of the machine type and the set outsourcer selection requirement is determined.
【請求項10】予備通知手段は、変更依頼情報のなかに
通知する連絡先を指定する情報が含まれているときには
連絡先マスタを参照して対応する端末を通知管理情報記
憶部に記録し、前記変更依頼情報が定型的な変更を依頼
する情報のときには変更パターンマスタ及び連絡先マス
タを参照して対応する端末を前記通知管理情報記憶部に
記録し、前記変更依頼情報に基づいて受注情報記憶部か
ら変更が発生した工程の作業日時情報を検索し、工程別
作業管理情報記憶部の実施状況情報を参照して現在作業
実施中の工程以降の工程に関する作業時間情報を演算
し、標準作業時間テーブルの対応する標準的作業時間情
報と対比して作業を変更する工程を選択し、前記連絡先
マスタの連絡先を参照して対応する端末を前記通知管理
情報記憶部に記録し、前記通知管理情報記憶部に記録し
た端末に予備通知をしてなる請求項6又は8記載のプロ
グラム。
10. When the change request information includes information designating a contact to be notified, the preliminary notification means refers to the contact master to record the corresponding terminal in the notification management information storage unit, When the change request information is information requesting a standard change, a corresponding terminal is recorded in the notification management information storage unit with reference to a change pattern master and a contact master, and order information is stored based on the change request information. Section to retrieve the work date and time information of the process that has been changed, refer to the execution status information in the work management information storage unit for each process, calculate the work time information for the processes following the process currently being performed, and calculate the standard work time. Select a step of changing the work in comparison with the corresponding standard work time information in the table, record the corresponding terminal in the notification management information storage unit with reference to the contact of the contact master. The notification management information recorded terminal in the storage unit formed by the pre-notification claim 6 or 8, wherein the program.
【請求項11】請求項6、7、8、9又は10記載のプ
ログラムを記録したコンピュータ読み取り可能な記憶媒
体。
11. A computer-readable storage medium in which the program according to claim 6, 7, 8, 9 or 10 is recorded.
JP2001026714A 2001-02-02 2001-02-02 Printing business management system, program and storage medium Pending JP2002230372A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001026714A JP2002230372A (en) 2001-02-02 2001-02-02 Printing business management system, program and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001026714A JP2002230372A (en) 2001-02-02 2001-02-02 Printing business management system, program and storage medium

Publications (1)

Publication Number Publication Date
JP2002230372A true JP2002230372A (en) 2002-08-16

Family

ID=18891485

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001026714A Pending JP2002230372A (en) 2001-02-02 2001-02-02 Printing business management system, program and storage medium

Country Status (1)

Country Link
JP (1) JP2002230372A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008009863A (en) * 2006-06-30 2008-01-17 Fuji Xerox Co Ltd Printing order receiving device, method and program
JP2008040878A (en) * 2006-08-08 2008-02-21 Fuji Xerox Co Ltd Print order acceptance device, method, and program
JP2008522294A (en) * 2004-11-30 2008-06-26 シーベル・システムズ・インコーポレイテッド Method and apparatus for providing hosted tailored vertical applications
JP2017215925A (en) * 2016-05-25 2017-12-07 株式会社Nvt Estimation support device, calculation method, and program

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008522294A (en) * 2004-11-30 2008-06-26 シーベル・システムズ・インコーポレイテッド Method and apparatus for providing hosted tailored vertical applications
JP2008009863A (en) * 2006-06-30 2008-01-17 Fuji Xerox Co Ltd Printing order receiving device, method and program
JP2008040878A (en) * 2006-08-08 2008-02-21 Fuji Xerox Co Ltd Print order acceptance device, method, and program
JP2017215925A (en) * 2016-05-25 2017-12-07 株式会社Nvt Estimation support device, calculation method, and program

Similar Documents

Publication Publication Date Title
KR100819827B1 (en) A storage medium storing a computer program for executing the parts billing system, the parts billing method, and the parts billing method.
US20020013734A1 (en) Universal internet smart delivery agent
WO2007148437A1 (en) Intellectual property managing system, intellectual property managing method, and its program
CN102812462A (en) Database, data management server and data management program
US20100125464A1 (en) System and Method for Entering a List of Insured Items for Valuation
JP7592318B2 (en) Scrap metal trading system, scrap metal trading method, and scrap metal trading program
US20010032166A1 (en) System and method for planning and tracking the manufacture of tooling for machinery
JP4927375B2 (en) Package delivery notification method
EP1244041A2 (en) Simplified order-placement and reception processing method and system
JP2013210840A (en) Repair request mediation system, server provided in system, repair request mediation method, computer program to cause server to execute repair request mediation method and portable recording medium recording computer program
JP2009288986A (en) High-mix low-volume production support system for electronic equipment, and high-mix low-volume production support program for electronic equipment
JP2003067608A (en) Replenishing article order acceptance managing method, replenishing article order acceptance managing system and program
JP2002230372A (en) Printing business management system, program and storage medium
JP2004280610A (en) Order reception/ordering support system, management server, and order reception/ordering support program
JP5011899B2 (en) Document issuing system
JP3844299B2 (en) Accident car repair status management device
JP2008065539A (en) Document issuing system
EP1229474A2 (en) Method and system for providing information pertaining to secondhand articles and machines via a network
JP2002297935A (en) Trial calculation, estimate and order receiving and placing processing system for receiving and placing order for printed matter
JP7651304B2 (en) Order management program and web ordering system
JP2002074184A (en) Business aiding system, its method and data base
JP7193190B1 (en) Manufacturing consignment support system, manufacturing consignment support program, manufacturing consignment support method
JP2005284881A (en) Business progress management system
JP4134594B2 (en) Theme management system and program
JP2003122963A (en) Arrangement work support system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041102

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070316

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070424

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20070904