[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

JP2002038419A - Steel-made wall handrail and installing method of steel- made wall handrail - Google Patents

Steel-made wall handrail and installing method of steel- made wall handrail

Info

Publication number
JP2002038419A
JP2002038419A JP2000219992A JP2000219992A JP2002038419A JP 2002038419 A JP2002038419 A JP 2002038419A JP 2000219992 A JP2000219992 A JP 2000219992A JP 2000219992 A JP2000219992 A JP 2000219992A JP 2002038419 A JP2002038419 A JP 2002038419A
Authority
JP
Japan
Prior art keywords
plate
steel
fixed
front plate
bolted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000219992A
Other languages
Japanese (ja)
Other versions
JP3376344B2 (en
Inventor
Shinzo Ito
信三 伊藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanken Steel Co Ltd
Original Assignee
Sanken Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sanken Steel Co Ltd filed Critical Sanken Steel Co Ltd
Priority to JP2000219992A priority Critical patent/JP3376344B2/en
Publication of JP2002038419A publication Critical patent/JP2002038419A/en
Application granted granted Critical
Publication of JP3376344B2 publication Critical patent/JP3376344B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PROBLEM TO BE SOLVED: To solve the problem that working in the outside of a bridge needs a protection fence and a scaffold, is inexpensive and involves some risk. SOLUTION: A steel-made wall handrail comprises a steel-made base plate stretching a floor board fixing plate on an opposite front plate and a rear plate and fixing a connection plate connected to the connection plate of a back face plate, a steel-made back face plate fixing the connection plate fixing the top board of a steel-made front plate and the inner face of a connecting top board on the steel-made base plate, and a top board connected to the top board of the steel-made back face plate and a front plate connected to the front plate of the steel-made base plate. The steel-made wall handrail composed by connecting them by bolts and an installing method are provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、橋梁、特に高架道
路の道路橋に設置される鋼製の壁高欄に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bridge, and more particularly to a steel railing installed on a road bridge of an elevated road.

【0002】[0002]

【従来の技術】通常、道路橋には自動車等の車輛や物品
の道路外への飛び出しを防止したり、自動車等の走行に
よる騒音の道路外への漏出を防止するため壁高欄が設置
されている。
2. Description of the Related Art In general, a road bridge is provided with a wall panel to prevent vehicles such as automobiles or articles from jumping out of the road, and to prevent noises caused by running of automobiles from leaking out of the road. I have.

【0003】この壁高欄は、遮音効果や耐久性に鑑み、
コンクリート製によるものが多い。
[0003] In consideration of the sound insulation effect and durability,
Many are made of concrete.

【0004】しかしながら、コンクリート製の壁高欄
は、橋梁にかかる死荷重は相当なものとするばかりでな
く、施工の際の型枠工事やコンクリート養生に期間を要
するため、道路の早期開放を困難にしている。また、鋼
床版とコンクリートとの付着力の心配もある。
[0004] However, the concrete railing not only makes the dead load on the bridge considerable, but also requires time for formwork and concrete curing at the time of construction, making early opening of the road difficult. ing. There is also concern about the adhesive force between the steel slab and the concrete.

【0005】そこで、昨今、鋼製の壁高欄が平成2年実
用新案出願公告第30495号で提案され、実用化され
ている。この壁高欄はコンクリート壁高欄のように型枠
工事やコンクリート養生期間が不要であり、工期の短縮
が計られ、また、中空であるため大幅な死荷重の減少が
計れるためきわめて優れたものである。
[0005] In view of the above, a steel wall column has recently been proposed and commercialized in Utility Model Application Publication No. 30495 in 1990. Unlike the concrete wall balustrade, this wall balustrade does not require any formwork or concrete curing period, shortens the construction period, and is extremely excellent because it is hollow and can greatly reduce dead load. .

【0006】[0006]

【発明が解決しようとする課題】鋼製の壁高欄の場合、
その組立てはボルト結合によるところが多く、橋梁の外
側での作業も必要となる。橋梁の外側での作業は、防護
柵や足場の設置が必要となり、コスト高となる。また、
橋梁の外側での作業は危険を伴うため、作業者に嫌われ
るという課題を有する。
In the case of a steel railing,
The assembling is often done by bolting and requires work outside the bridge. Working outside the bridge requires the installation of protective fences and scaffolding, which increases costs. Also,
Work outside the bridge involves danger and has the problem of being hated by workers.

【0007】また、上述の提案において、前面板と後面
板とが分離していないため、コンクリート後打設工法に
は適さない。
Further, in the above proposal, the front plate and the rear plate are not separated, so that they are not suitable for the concrete post-casting method.

【0008】[0008]

【課題を解決するための手段】詳しくは、向い合う正面
板と背面板とに床版にボルト結合する床版固定板の複数
を一定間隔を設けて架け渡して固定するとともに正面板
と背面板間に鋼製後面板に固設された結合板とボルト結
合する結合板の複数を一定間隔を設けて固設した鋼製ベ
ースプレートと、鋼製前面板の天板とボルト結合する天
板と内面に鋼製ベースプレートに固設された結合板とボ
ルト結合する結合板の複数を一定間隔を設けて固設した
背面板とからなる鋼製後面板と、鋼製後面板の天板とボ
ルト結合する天板と鋼製ベースプレートの正面板にボル
ト結合する正面板とからなる鋼製前面板とにより形成さ
れることを特徴とする鋼製壁高欄を提供する。
More specifically, a plurality of floor slab fixing plates, which are bolted to the floor slab, are fixed to the facing front plate and the rear plate at predetermined intervals, and the front plate and the rear plate are fixed. A steel base plate in which a plurality of connecting plates that are bolted to the connecting plate fixed to the steel rear plate are fixed at fixed intervals and a top plate and an inner surface that are bolted to the top plate of the steel front plate A steel rear plate consisting of a plurality of coupling plates fixed to a steel base plate and a plurality of coupling plates bolted to the steel base plate, and a back plate fixedly provided at a fixed interval, and bolt coupling to a top plate of the steel rear plate. There is provided a steel wall balustrade formed by a steel front plate comprising a top plate and a front plate bolted to a front plate of a steel base plate.

【0009】また、向い合う正面板と背面板とに床版に
ボルト結合する床版固定板の複数を一定間隔を設けて架
け渡して固定するとともに正面板と背面板間に鋼製後面
板に固設された結合板とボルト結合する結合板の複数を
一定間隔を設けて固設した鋼製ベースプレートを床版に
ボルト固定し、天板と背面板とからなり、背面板内面に
結合板を固設した鋼製後面板を鋼製ベースプレートに、
鋼製ベースプレートに固設した結合板と鋼製後面板に固
設した結合板をボルト結合することにより結合し、天板
と正面板とからなる鋼製前面板を、鋼製後面板の天板に
鋼製前面板の天板をボルト結合するとともに鋼製ベース
プレートの正面板に鋼製前面板の正面板をボルト結合す
ることにより、鋼製ベースプレートと鋼製後面板と鋼製
前面板を一体とすることを特徴とする鋼製壁高欄の設置
方法を提供する。
A plurality of floor slab fixing plates, which are bolted to the floor slab, are fixed to the facing front and rear plates at predetermined intervals, and are fixed to the steel rear plate between the front and rear plates. The fixed base plate and bolts are connected to each other by bolts.Steel base plate is fixed to the floor slab with a fixed interval.The base plate consists of a top plate and a back plate. The fixed steel rear plate is attached to the steel base plate,
The connecting plate fixed to the steel base plate and the connecting plate fixed to the steel rear plate are connected by bolting, and the steel front plate consisting of the top plate and the front plate is connected to the steel rear plate top plate. The steel base plate, the steel rear plate and the steel front plate are integrated by bolting the steel front plate top plate to the steel base plate and bolting the steel front plate front plate to the steel base plate front plate. A method for installing a steel wall railing is provided.

【0010】つぎに、本発明の実施の形態を図面に基き
説明する。
Next, an embodiment of the present invention will be described with reference to the drawings.

【0011】図1乃至図5において、1は鋼製ベースプ
レート、2は鋼製後面板、3は鋼製前面板である。
1 to 5, reference numeral 1 denotes a steel base plate, 2 denotes a steel rear plate, and 3 denotes a steel front plate.

【0012】鋼製ベースプレート1は、図1に示すよう
に道路の延長方向に一定の長さを有し、向い合う正面板
13と背面板12との間にチャンネル状の床版固定板1
1が一定の間隔毎に複数、その端面を正面板13と背面
板12の内面に溶接等により固設されて架け渡されてい
る。床版固定板11の上下の側板11aにはボルト挿通
孔18が穿孔されている。
As shown in FIG. 1, the steel base plate 1 has a certain length in the direction of extension of the road, and has a channel-like floor slab fixing plate 1 between the facing front plate 13 and back plate 12.
A plurality of reference numerals 1 are provided at predetermined intervals, and their end faces are fixed to the inner surfaces of the front plate 13 and the back plate 12 by welding or the like and are bridged. Bolt insertion holes 18 are formed in the upper and lower side plates 11a of the floor slab fixing plate 11.

【0013】背面板12と正面板13間には、複数の結
合板14が溶接等で固設して立ち上げてある。この結合
板14には、後述する鋼製後面板2の内面に固設されて
いる結合板24とのボルト結合のためのボルト挿通孔1
5が穿孔されている。16は床版固定用のリブである。
17は後述する鋼製前面板3の正面板32とボルト結合
するためのボルト挿通孔である。
A plurality of connecting plates 14 are fixedly provided between the rear plate 12 and the front plate 13 by welding or the like, and stand up. The coupling plate 14 has a bolt insertion hole 1 for bolt coupling with a coupling plate 24 fixed to an inner surface of a steel rear plate 2 described later.
5 are perforated. Reference numeral 16 denotes a floor fixing rib.
Reference numeral 17 denotes a bolt insertion hole for bolting with a front plate 32 of the steel front plate 3 described later.

【0014】鋼製後面板2は、図2に示すように一定の
高さを有するとともに道路方向に鋼製ベースプレート1
と同じ長さを有し、後述する鋼製前面板3の天板31と
結合する天板21と背面板22とからなっている。
The steel rear plate 2 has a constant height as shown in FIG.
And has a top plate 21 and a back plate 22 that are coupled to a top plate 31 of the steel front plate 3 described later.

【0015】天板21には、後述する鋼製前面板3の天
板31をボルト結合するボルト挿通孔26が穿孔され、
鋼製前面板3の天板31を結合し、背面板22の内面に
は、長さ方向に複数の結合板24が垂直に溶接等により
固着されており、この結合板24は、前述した鋼製ベー
スプレート1の結合板14に結合する。この結合板24
には、鋼製ベースプレート1の結合板14にボルト結合
できるようにボルト挿通孔25が穿孔されている。な
お、23は補強板である。結合板24も補強板の役目を
果たす。結合板の高さ方向の長さを伸ばすことによって
より補強の効果を増すことができる。
A bolt insertion hole 26 for bolting a top plate 31 of the steel front plate 3 to be described later is formed in the top plate 21.
The top plate 31 of the steel front plate 3 is connected, and a plurality of connection plates 24 are vertically fixed to the inner surface of the back plate 22 by welding or the like in the length direction. The base plate 1 is connected to the connection plate 14 of the base plate 1. This coupling plate 24
, A bolt insertion hole 25 is drilled so that the bolt can be connected to the connection plate 14 of the steel base plate 1. 23 is a reinforcing plate. The coupling plate 24 also functions as a reinforcing plate. By increasing the length of the coupling plate in the height direction, the effect of reinforcement can be further increased.

【0016】鋼製前面板3は、図3に示すように鋼製後
面板2と同程度の高さを有するとともに道路方向に鋼製
ベースプレート1と同じ長さを有し、前述した鋼製後面
板2の天板21と結合する天板31と正面板32とから
なり、天板31には、前述した鋼製後面板2の天板21
にボルトを介して結合するボルト挿通孔36が穿孔さ
れ、正面板32には、前述した鋼製ベースプレート1の
正面板13とのボルト結合のためのボルト挿通孔37が
穿孔されている。
As shown in FIG. 3, the steel front plate 3 has the same height as the steel rear plate 2 and has the same length as the steel base plate 1 in the road direction. The front plate 31 includes a top plate 31 connected to the top plate 21 of the face plate 2 and a front plate 32. The top plate 31 includes the top plate 21 of the steel rear plate 2 described above.
In the front plate 32, a bolt insertion hole 37 for bolt connection with the front plate 13 of the steel base plate 1 described above is drilled.

【0017】このようにしてなる各部は、ボルト結合さ
れて、全体として鋼製壁高欄を形成する。
The parts thus formed are bolted together to form a steel railing as a whole.

【0018】図4は、コンクリート後打設工法の床版に
設置された鋼製壁高欄を示す。この図に基き設置手順を
説明する。
FIG. 4 shows a steel wall railing installed on the floor slab of the post-concrete casting method. The installation procedure will be described based on this figure.

【0019】まず、鋼製ベースプレート1を床版4の先
付け金物に位置させ床版固定板11の上下の側板11a
に穿孔されたボルト挿通孔18を介してボルト5により
固定する。
First, the steel base plate 1 is positioned on the metal fitting of the floor slab 4, and the upper and lower side plates 11a of the floor slab fixing plate 11 are placed.
Is fixed by the bolt 5 through the bolt insertion hole 18 formed in the hole.

【0020】ついで、鋼製後面板2を鋼製ベースプレー
ト1に、鋼製ベースプレート1に固設した結合板14と
鋼製後面板2に固設した結合板24をそれぞれのボルト
挿通孔15、25を介してボルト6で結合する。結合
後、コンクリートを開放されている前面より鋼製ベース
プレート1上方より後打ちする。
Next, the steel rear plate 2 is connected to the steel base plate 1, and the connecting plate 14 fixed to the steel base plate 1 and the connecting plate 24 fixed to the steel rear plate 2 are connected to the bolt insertion holes 15, 25, respectively. And bolts 6 through After joining, concrete is struck from above the open front surface from above the steel base plate 1.

【0021】引き続き、鋼製前面板3を鋼製後面板2の
天板21に鋼製前面板3の天板31をそれぞれのボルト
挿通孔26、36を介してボルト7で結合するとともに
鋼製ベースプレート1の正面板13に鋼製前面板3の正
面板32をそれぞれのボルト挿通孔17、37を介して
ボルト8で結合する。
Subsequently, the steel front plate 3 is connected to the top plate 21 of the steel rear plate 2 with the top plate 31 of the steel front plate 3 by bolts 7 through the respective bolt insertion holes 26 and 36, and the steel front plate 3 is made of steel. The front plate 32 of the steel front plate 3 is connected to the front plate 13 of the base plate 1 with bolts 8 through respective bolt insertion holes 17 and 37.

【0022】なお、ボルト結合は、ナットとともに締め
付けてなるものであることは当然である。
The bolt connection is naturally tightened together with the nut.

【0023】このようにして鋼製ベースプレート1、鋼
製後面板2、鋼製前面板3とが結合されて床版4上に鋼
製壁高欄が形成される。
In this way, the steel base plate 1, the steel rear plate 2, and the steel front plate 3 are connected to form a steel wall rail on the floor slab 4.

【0024】つぎに、別の実施の形態を図5に示す。Next, another embodiment is shown in FIG.

【0025】この実施の形態は、タイヤ支承部10aと
水路部10bとからなり、タイヤ支承部10aは、水路
部10bに対して開閉可能となっている公知の鋼製縁石
兼排水溝を一体としたもので、鋼製ベースプレート1の
正面板13と鋼製前面板3の正面板32と鋼製縁石兼排
水溝10の水路部10bの背面板10cをボルト8で結
合してある。その他の組立て手順は先の実施の形態と同
じである。
This embodiment comprises a tire support 10a and a water channel 10b, and the tire support 10a integrally includes a well-known steel curb and drain groove which can be opened and closed with respect to the water channel 10b. The front plate 13 of the steel base plate 1, the front plate 32 of the steel front plate 3, and the back plate 10 c of the water channel portion 10 b of the steel curb and drain groove 10 are connected by bolts 8. Other assembling procedures are the same as in the previous embodiment.

【0026】かくして、鋼製壁高欄と鋼製縁石兼排水溝
とが組合わされて床版上に設置される。
Thus, the steel wall railing and the steel curb / drain are combined and installed on the floor slab.

【0027】[0027]

【発明の効果】本発明は上述のようにしてなるのでつぎ
の効果を有する。
The present invention has the following effects because it is constructed as described above.

【0028】鋼製前面板の組み付け方は、前面が解放さ
れているので、コンクリート後打設工法においても有効
である。
The method of assembling the steel front plate is effective in the post-concrete casting method since the front surface is opened.

【0029】鋼製ベースプレート、鋼製後面板、鋼製前
面板の組立て作業は、すべて床版上で行うことができ、
橋梁の外側での作業をなくすことができるので、防護柵
や足場の設置を必要としないので、非常に経済的であ
る。また、作業者にとっても足場上での作業がないの
で、その分安全である。
The assembly work of the steel base plate, the steel rear plate, and the steel front plate can all be performed on the floor slab.
It is very economical because work outside the bridge can be eliminated and no guard fences or scaffolds are required. In addition, since there is no work on the scaffold for the worker, it is safer.

【0030】鋼製壁高欄は、中空を有する構造であるか
ら、コンクリート壁高欄に比し、死荷重の減少が計れ
る。鋼製壁高欄であることにより型枠工事やコンクリー
ト養生期間が不要となり、工期の短縮が計れる。また、
鋼床版とコンクリートとの付着力の心配をする必要もな
い。
Since the steel railing has a hollow structure, the dead load can be reduced as compared with the concrete wall railing. The steel wall railing eliminates the need for formwork and concrete curing periods, thus shortening the construction period. Also,
There is no need to worry about the adhesion between the steel deck and concrete.

【図面の簡単な説明】[Brief description of the drawings]

【図1】鋼製壁高欄を形成する鋼製ベースプレートの一
部切欠斜視図である。
FIG. 1 is a partially cutaway perspective view of a steel base plate forming a steel wall railing.

【図2】鋼製壁高欄を形成する鋼製後面板の斜視図であ
る。
FIG. 2 is a perspective view of a steel rear plate forming a steel wall railing.

【図3】鋼製壁高欄を形成する鋼製前面板の斜視図であ
る。
FIG. 3 is a perspective view of a steel front plate forming a steel wall railing.

【図4】床版に設置された鋼製壁高欄の断面図である。FIG. 4 is a cross-sectional view of a steel wall railing installed on a floor slab.

【図5】床版に設置された鋼製壁高欄の別の実施の形態
を示す断面図である。
FIG. 5 is a cross-sectional view showing another embodiment of a steel wall balustrade installed on a floor slab.

【符号の説明】[Explanation of symbols]

1 鋼製ベースプレート 11 床版固定板 11a 側板 12 背面板 13 正面板 14 結合板 15 ボルト挿通孔 17 ボルト挿通孔 18 ボルト挿通孔 2 鋼製後面板 21 天板 22 背面板 23 補強板 24 結合板 25 ボルト挿通孔 26 ボルト挿通孔 3 鋼製前面板 31 天板 32 正面板 37 ボルト挿通孔 4 床版 5 ボルト 6 ボルト 7 ボルト 8 ボルト Reference Signs List 1 steel base plate 11 floor slab fixing plate 11a side plate 12 back plate 13 front plate 14 connecting plate 15 bolt insertion hole 17 bolt insertion hole 18 bolt insertion hole 2 steel rear plate 21 top plate 22 rear plate 23 reinforcing plate 24 connection plate 25 Bolt insertion hole 26 Bolt insertion hole 3 Steel front plate 31 Top plate 32 Front plate 37 Bolt insertion hole 4 Floor slab 5 Bolt 6 Bolt 7 Bolt 8 Bolt

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成13年9月19日(2001.9.1
9)
[Submission date] September 19, 2001 (2001.9.1)
9)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0010[Correction target item name] 0010

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0010】[0010]

【発明の実施の形態】つぎに、本発明の実施の形態を図
面に基き説明する。
Next, embodiments of the present invention will be described with reference to the drawings.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 向い合う正面板と背面板とに床版にボル
ト結合する床版固定板の複数を一定間隔を設けて架け渡
して固定するとともに正面板と背面板間に鋼製後面板に
固設された結合板とボルト結合する結合板の複数を一定
間隔を設けて固設した鋼製ベースプレートと、鋼製前面
板の天板とボルト結合する天板と内面に鋼製ベースプレ
ートに固設された結合板とボルト結合する結合板の複数
を一定間隔を設けて固設した背面板とからなる鋼製後面
板と、鋼製後面板の天板とボルト結合する天板と鋼製ベ
ースプレートの正面板にボルト結合する正面板とからな
る鋼製前面板とにより形成されることを特徴とする鋼製
壁高欄。
1. A plurality of floor slab fixing plates, which are bolted to a floor slab, are fixed to a facing front plate and a rear plate at predetermined intervals, and fixed to a steel rear plate between the front plate and the rear plate. A steel base plate in which a plurality of connection plates that are bolted to the fixed connection plate are fixed at fixed intervals, and a top plate that is bolted to the top plate of the steel front plate and a steel base plate that is fixed to the inner surface A rear plate made of a rear plate in which a plurality of connecting plates to be bolted and a plurality of connecting plates to be bolted are fixedly provided at fixed intervals, and a top plate and a steel base plate to be bolted to the top plate of the steel rear plate. A steel wall balustrade formed of a steel front plate comprising a front plate bolted to the front plate.
【請求項2】 向い合う正面板と背面板とに床版にボル
ト結合する床版固定板の複数を一定間隔を設けて架け渡
して固定するとともに正面板と背面板間に鋼製後面板に
固設された結合板とボルト結合する結合板の複数を一定
間隔を設けて固設した鋼製ベースプレートを床版にボル
ト固定し、天板と背面板とからなり、背面板内面に結合
板を固設した鋼製後面板を鋼製ベースプレートに、鋼製
ベースプレートに固設した結合板と鋼製後面板に固設し
た結合板をボルト結合することにより結合し、天板と正
面板とからなる鋼製前面板を、鋼製後面板の天板に鋼製
前面板の天板をボルト結合するとともに鋼製ベースプレ
ートの正面板に鋼製前面板の正面板をボルト結合するこ
とにより、鋼製ベースプレートと鋼製後面板と鋼製前面
板を一体とすることを特徴とする鋼製壁高欄の設置方
法。
2. A plurality of floor slab fixing plates, which are bolted to the floor slab, are fixed to a facing rear plate and a facing rear plate at predetermined intervals, and are fixed to a steel rear plate between the front plate and the rear plate. The fixed base plate and bolts are connected to each other by bolts.Steel base plate is fixed to the floor slab with a fixed interval.The base plate consists of a top plate and a back plate. The fixed steel rear plate is connected to the steel base plate by connecting the connecting plate fixed to the steel base plate and the connecting plate fixed to the steel rear plate by bolting, and the top plate and the front plate are formed. The steel front plate is bolted to the steel rear plate, and the steel front plate is bolted to the steel base plate. And steel rear plate and steel front plate are integrated The installation method of the steel wall balustrade characterized by the above-mentioned.
JP2000219992A 2000-07-21 2000-07-21 Installation method of steel wall railing and steel wall railing Expired - Fee Related JP3376344B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000219992A JP3376344B2 (en) 2000-07-21 2000-07-21 Installation method of steel wall railing and steel wall railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000219992A JP3376344B2 (en) 2000-07-21 2000-07-21 Installation method of steel wall railing and steel wall railing

Publications (2)

Publication Number Publication Date
JP2002038419A true JP2002038419A (en) 2002-02-06
JP3376344B2 JP3376344B2 (en) 2003-02-10

Family

ID=18714675

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000219992A Expired - Fee Related JP3376344B2 (en) 2000-07-21 2000-07-21 Installation method of steel wall railing and steel wall railing

Country Status (1)

Country Link
JP (1) JP3376344B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101864744A (en) * 2010-06-03 2010-10-20 河南省公路工程局集团有限公司 Construction method of novel wall fence for highway
JP2011021384A (en) * 2009-07-16 2011-02-03 Sho-Bond Corp Structure and method for widening road bridge
JP2011174372A (en) * 2011-05-02 2011-09-08 Krt:Kk Steel balustrade
CN103882818A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Construction method for SS (standard specification) level guard bar and guard bar reserved concrete platform
JP2017133184A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Attachment structure for concrete balustrade wall
JP2017133186A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Installing structure of steel land covering part
JP6268324B1 (en) * 2017-08-29 2018-01-24 株式会社シラヤマ Steel wall railing
CN108560417A (en) * 2018-05-24 2018-09-21 中交路桥华南工程有限公司 The rapid constructing method and positioning moulding bed of guardrail

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011021384A (en) * 2009-07-16 2011-02-03 Sho-Bond Corp Structure and method for widening road bridge
CN101864744A (en) * 2010-06-03 2010-10-20 河南省公路工程局集团有限公司 Construction method of novel wall fence for highway
JP2011174372A (en) * 2011-05-02 2011-09-08 Krt:Kk Steel balustrade
CN103882818A (en) * 2013-12-26 2014-06-25 浙江金筑交通建设有限公司 Construction method for SS (standard specification) level guard bar and guard bar reserved concrete platform
JP2017133184A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Attachment structure for concrete balustrade wall
JP2017133186A (en) * 2016-01-26 2017-08-03 株式会社奥村組 Installing structure of steel land covering part
JP6268324B1 (en) * 2017-08-29 2018-01-24 株式会社シラヤマ Steel wall railing
JP2019044343A (en) * 2017-08-29 2019-03-22 株式会社シラヤマ Steel wall balustrade
CN108560417A (en) * 2018-05-24 2018-09-21 中交路桥华南工程有限公司 The rapid constructing method and positioning moulding bed of guardrail
CN108560417B (en) * 2018-05-24 2024-02-06 中交路桥华南工程有限公司 Quick construction method and positioning jig frame for guardrail

Also Published As

Publication number Publication date
JP3376344B2 (en) 2003-02-10

Similar Documents

Publication Publication Date Title
JP2002038419A (en) Steel-made wall handrail and installing method of steel- made wall handrail
JP2009121077A (en) Steel wall balustrade
KR20110048634A (en) Precast concrete barrier of bridge and method of construction the same
JP5725596B2 (en) Staircase structure and its construction method
KR20070107495A (en) Concrete-mold assembly and construction method using the same
KR100381724B1 (en) Inspection plate for a pier
JPH0230495Y2 (en)
JP2013155519A (en) Mold form of wall balustrade
KR100452977B1 (en) Joint structure and construction method of RC beam and slab for slim floor system
JP3328626B2 (en) Temporary guardrail parts
JP2003096718A (en) Steel wall balustrade
JP2000234410A (en) Driven form and slab construction method making use thereof
JPH11222812A (en) Changing method of height of structure
KR20020062245A (en) assembly type steel frame ladder of reinforcement concrete building and construction method thereof
JP2001254495A (en) Internal stairway for building, and building method therefor
JPH11166294A (en) Steel frame-contained concrete beam and floor construction method using the concrete beam
KR200298061Y1 (en) divided supporter structure for supporting a mould for forming a concrete united wall
JP2000129953A (en) Fitting method of base isolation device to foundation
JPH0892923A (en) Guard fence
JP3082851B2 (en) Construction method of sound absorbing scaffold under viaduct
JPH03176505A (en) Execution method of steel plate concrete wall balustrade
JP3202101B2 (en) Construction method of balustrade in concrete structure with balustrade
KR100560105B1 (en) Bridge Railing System for Cellular Tube Decks
JP4044676B2 (en) Unit building
FI76401C (en) Composite beam construction

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20021022

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees