JP2001338017A - Building information processing apparatus and building information processing method - Google Patents
Building information processing apparatus and building information processing methodInfo
- Publication number
- JP2001338017A JP2001338017A JP2000158015A JP2000158015A JP2001338017A JP 2001338017 A JP2001338017 A JP 2001338017A JP 2000158015 A JP2000158015 A JP 2000158015A JP 2000158015 A JP2000158015 A JP 2000158015A JP 2001338017 A JP2001338017 A JP 2001338017A
- Authority
- JP
- Japan
- Prior art keywords
- building
- construction
- new
- information
- individual parts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000010365 information processing Effects 0.000 title claims description 20
- 238000003672 processing method Methods 0.000 title claims description 6
- 238000010276 construction Methods 0.000 claims abstract description 172
- 239000004566 building material Substances 0.000 claims abstract description 60
- 238000000034 method Methods 0.000 claims description 26
- 230000008569 process Effects 0.000 claims description 23
- 230000006872 improvement Effects 0.000 claims description 6
- 230000000474 nursing effect Effects 0.000 claims description 5
- 238000007634 remodeling Methods 0.000 claims description 3
- 238000009418 renovation Methods 0.000 claims description 3
- 238000009435 building construction Methods 0.000 claims description 2
- 230000015654 memory Effects 0.000 abstract description 29
- 238000012937 correction Methods 0.000 abstract description 2
- 238000012545 processing Methods 0.000 description 21
- 238000004891 communication Methods 0.000 description 20
- 238000013500 data storage Methods 0.000 description 8
- 238000004140 cleaning Methods 0.000 description 6
- 238000012546 transfer Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 230000032683 aging Effects 0.000 description 3
- 238000011960 computer-aided design Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 239000004035 construction material Substances 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000009423 ventilation Methods 0.000 description 2
- 238000005406 washing Methods 0.000 description 2
- 238000003287 bathing Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007717 exclusion Effects 0.000 description 1
- 230000029142 excretion Effects 0.000 description 1
- 230000002431 foraging effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000008520 organization Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000002194 synthesizing effect Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
- 230000003936 working memory Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Medical Treatment And Welfare Office Work (AREA)
Abstract
(57)【要約】 (修正有)
【課題】選択された建築物の費用を演算し、工事する者
を選択して出力し、建築物の個々の部分の選択、建築業
者の選択、建築工事の見積を、相互に関連性をもって効
率的に行う。
【解決手段】建築資材が選択されると05、この建築資
材を示す情報と価格情報とがメモリされる07。工事者
が選択されていれば06、選択された当該工事者が工事
できない部分が除外される08。選択された建築資材の
情報にリンクされている工事者が表示され26、工事者
を選択すると27、当該工事者の情報もメモリされる2
8。「見積」が選択されると11、個々の部分の各価格
が合計され、建築物の見積金額が算出される12。「発
注」が選択されると17、工事可能期間が合う工事者が
選択され、住所の近い工事者が選択され表示される1
9。ここで建築物個々の部分の情報が既に入力されてい
れば18、それに応じて工事できない工事者が除外され
る20。
(57) [Summary] (with correction) [Problem] Calculate the cost of the selected building, select and output the person to be constructed, select individual parts of the building, select a contractor, and perform construction. Estimates are efficiently related to each other. When a building material is selected, information indicating the building material and price information are stored in a memory. If a construction person is selected, 06, and the part which the selected construction person cannot construct is excluded 08. The construction person linked to the information of the selected building material is displayed 26, and when the construction person is selected 27, the information of the construction person is also stored 2
8. When "estimate" is selected 11, the prices of the individual parts are summed up to calculate the estimated price of the building 12. When "Order" is selected 17, a contractor whose workable period is matched is selected, and a contractor whose address is close is selected and displayed 1
9. Here, if the information of each part of the building has already been input 18, the construction worker who cannot perform the construction in accordance therewith is excluded 20.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、建築情報処理装置
及び建築情報処理方法に関する。The present invention relates to a building information processing apparatus and a building information processing method.
【0002】[0002]
【従来の技術】従来、新たに建築する場合、複数の業者
から建築見積をとり、いちばん安価またはいちばん要望
に沿う建築工事をしてくれる業者を選択していた。2. Description of the Related Art Hitherto, when constructing a new building, a construction quotation is obtained from a plurality of contractors, and a contractor who performs construction work most inexpensively or in accordance with a request has been selected.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、このよ
うな建築見積において、建築工事の種類の選択、建築業
者の選択、建築工事の見積は、相互にばらばらに決定さ
れており、迅速で過誤のない作業を行うことができなか
った。本発明の目的は、このような建築工事の種類つま
り建築物の個々の部分の選択、建築業者の選択、建築工
事の見積を関連性をもって効率的に行うことである。However, in such a building estimate, the selection of the type of building work, the selection of the contractor, and the estimate of the building work are determined independently of each other, and are prompt and error-free. Could not do the work. It is an object of the present invention to efficiently perform the selection of the type of building work, that is, the selection of individual parts of the building, the selection of the contractor, and the estimation of the building work in a related manner.
【0004】[0004]
【課題を解決するための手段】上記目的を達成するため
に、本発明は、建築物の個々の部分を示す情報とこれら
の建築物個々の価格とを対応づけて記憶するとともに、
建築物個々の工事を行うことができる工事する者と当該
工事をする者の場所を示す情報とを対応づけて記憶し、
選択された建築物の個々の部分に応じた価格を読み出
し、新たな建築に係る費用を演算し、 入力された新た
な建築の場所に対応する工事する者を所定の条件で選択
して出力する。In order to achieve the above object, the present invention relates to a method of storing information indicating individual parts of a building and the prices of the buildings in association with each other.
The construction person who can perform the construction of each building is stored in association with the information indicating the location of the person performing the construction work,
Reads the price according to the individual part of the selected building, calculates the cost of the new building, selects and outputs the construction worker corresponding to the input new building location under predetermined conditions .
【0005】これにより、建築工事の種類つまり建築物
の個々の部分の選択、建築業者の選択、建築工事の見積
を、相互に関連性をもって効率的に行うことができる。[0005] Thus, the type of construction work, that is, the selection of individual parts of the building, the selection of the contractor, and the estimation of the construction work can be efficiently performed in relation to each other.
【0006】[0006]
【発明の実施の形態】(1)全体システム 図1は建築情報処理装置または建築情報処理方法を実現
する装置の全体システムを示す。新たな建築を依頼する
者は、モバイル1(携帯電話を含む、以下同じ)によっ
て、新たな建築にあたって、建築物の個々の部分が選択
され、さらに、新たな建築の場所または年月日時が入力
される。DESCRIPTION OF THE PREFERRED EMBODIMENTS (1) Overall System FIG. 1 shows an overall system of an apparatus for realizing a building information processing apparatus or a building information processing method. When requesting a new building, the mobile 1 (including the mobile phone, the same applies hereinafter) selects the individual parts of the building when building a new building, and further inputs the location or date of the new building. Is done.
【0007】このモバイル1で選択されまたは入力され
た建築物の個々の部分及び新たな建築の場所または年月
日時は、通信回線を通じてセンター2のコンピュータへ
送られ、これら選択された建築物の個々の部分に応じた
価格に基づいて、新たな建築に係る費用が演算され、ま
たこれら入力された新たな建築の場所または年月日時、
選択された建築物の個々の部分に応じた工事する者が選
択されて出力される。この演算された新たな建築費用及
び選択された工事者は通信回線を通じてモバイル1へ送
られる。The individual parts of the building selected or inputted by the mobile 1 and the place or date of the new building are sent to the computer of the center 2 through a communication line, and the individual building of the selected building is transmitted. Based on the price according to the part, the cost of the new building is calculated, and the entered new building location or date,
A person who works according to each part of the selected building is selected and output. The calculated new construction cost and the selected contractor are sent to the mobile 1 through the communication line.
【0008】上記センター2のコンピュータでは、上記
建築物の個々の部分を示す情報とこれらの建築物個々の
価格とは対応づけて記憶され、建築物の個々の部分を示
す情報とこれらの建築物個々の工事を行うことができる
工事する者とも対応づけて記憶されている。この建築物
の個々の部分を示す情報とこれらの建築物個々の価格と
の対応記憶は、この工事する者ごとに分けて重複して記
憶される。さらに上記センター2のコンピュータでは、
建築物個々の工事を行うことができる工事する者と当該
工事をする者の住所とが対応づけて記憶される。In the computer of the center 2, the information indicating the individual parts of the building and the prices of the individual buildings are stored in association with each other, and the information indicating the individual parts of the building and the information of the individual buildings are stored. It is also stored in association with a person who can perform individual works. Correspondence storage between the information indicating the individual parts of this building and the prices of these buildings is separately stored for each person who works on the construction. Furthermore, in the computer of the above center 2,
The person who can perform the construction of each building and the address of the person who performs the construction are stored in association with each other.
【0009】上記センター2のコンピュータでは、上記
新たな工事の場所に対して所定の条件、例えば新たな工
事の場所に近い住所の工事者が選択され出力されたり、
上記新たな工事の年月日時に工事をすることが可能な工
事者が選択され出力される。この出力された工事者は通
信回線を通じて上記モバイル1へ送られる。The computer of the center 2 selects and outputs predetermined conditions for the new construction site, for example, a construction person whose address is close to the new construction site,
A construction worker who can perform construction on the date and time of the new construction is selected and output. The output worker is sent to the mobile 1 through a communication line.
【0010】上記新たな建築は、立て替えまたは移転に
よる新築、増築、増設、改築、改良、改造である。上記
建築物は、在宅介護の必要な人間またはこれ以外の健常
者が生活、居住、滞在、入院している建築物であって、
個人住宅、共同住宅、共同老人ホーム、共同介護ホー
ム、病院、治療施設、リハビリ施設である。[0010] The new building is a new construction, an extension, an extension, a renovation, an improvement or a remodeling by rebuilding or relocating. The above-mentioned building is a building where a person who needs home care or a healthy person other than this lives, lives, stays, and is hospitalized,
There are private homes, apartment houses, nursing homes, nursing homes, hospitals, treatment facilities, and rehabilitation facilities.
【0011】上記センター2のコンピュータでは、新た
な建築に必要な建築資材の情報が作成され発注される。
この発注情報及び発注された建築資材情報は、センター
2のコンピュータから建築資材供給者4または建築工事
者5のコンピュータに送られる。この建築資材情報は、
必要な建築資材の種類、材質、大きさ、寸法、数量、必
要な日時(納入日、施工日、工事日)、必要な場所であ
る。この建築資材情報は、上記モバイル1から建築資材
供給者4または建築工事者5のコンピュータに直接送ら
れることもあるし、建築資材供給者4または建築工事者
5のコンピュータ自身で作成されることもある。In the computer of the center 2, information on building materials necessary for new construction is created and ordered.
The order information and the ordered building material information are sent from the computer of the center 2 to the computer of the building material supplier 4 or the building worker 5. This building material information,
Necessary types of building materials, materials, sizes, dimensions, quantities, required dates and times (delivery date, construction date, construction date), and necessary locations. This building material information may be sent directly from the mobile 1 to the computer of the building material supplier 4 or the building worker 5, or may be created by the computer of the building material supplier 4 or the building worker 5 itself. is there.
【0012】このような、建築資材情報に基づいた建築
資材は、上記建築工事現場に発送される。この発送は、
上記必要な日時に、必要な場所に対して行われる。いわ
ゆるジャストインタイムで送られる。この工事の工程は
複数段階に分けられ、必要な建築資材が各段階工程ごと
に分別され、各段階工程が終了または終了しそうになっ
たときなどの工事の各工程の進行状況に応じて、当該各
段階工程終了情報が上記モバイル1から建築資材供給者
4または建築工事者5のコンピュータに送られ、次の段
階工程に必要な建築資材の発送が、指定した日時に順次
発送される。The building material based on such building material information is sent to the building construction site. This shipment
The above-mentioned necessary date and time is performed for a necessary place. Sent just in time. This construction process is divided into multiple stages, the necessary building materials are separated for each stage process, and depending on the progress of each stage of the construction, such as when each stage process is completed or about to be completed, The information on the end of each step is sent from the mobile 1 to the computer of the building material supplier 4 or the building worker 5, and the building materials required for the next step are sequentially sent out at the designated date and time.
【0013】上記モバイル1から建築資材供給者4また
は建築工事者5のコンピュータへはインターネット電子
マネーシステムまたは金融機関のオンライン送金を使っ
て、建築工事現場に発送される上記建築資材の代金が支
払われる。この代金は在宅介護者であれば官公庁から介
護保険またはその他の介護者補助金に基づいて支払われ
る。上記センター2などのコンピュータにはCAD(コ
ンピュータエイデッドデザイン)が組み込まれ、このセ
ンター2などのコンピュータに対して、建築設計者(図
示せず)からの上記施設改善情報または在宅介護に関す
る建築設計情報が送られ、CAD処理が実行されて建築
設計情報が建築設計者(図示せず)へ送られる。Using the Internet electronic money system or online remittance of a financial institution, the price of the building material to be sent to the building site is paid from the mobile 1 to the computer of the building material supplier 4 or the building worker 5. . This payment will be paid by the government for home caregivers based on long-term care insurance or other caregiver subsidies. The computer such as the center 2 incorporates CAD (computer aided design), and the computer such as the center 2 includes the facility improvement information from a building designer (not shown) or the building design information regarding home care. Is sent, the CAD processing is executed, and the architectural design information is sent to the architect (not shown).
【0014】上記モバイル1、センター2のコンピュー
タ、建築資材供給者4のコンピュータ、建築工事者5の
コンピュータは、相互に電話回線またはその他の通信回
線で接続され、クローズの通信網またはインターネット
のようなオープンの通信網によって互いに接続されてい
る。モバイル1は建築工事現場または建築依頼者に固定
的に備えられたコンピュータも含む。The computer of the mobile 1, the computer of the center 2, the computer of the building material supplier 4, and the computer of the building worker 5 are mutually connected by telephone lines or other communication lines, and are connected to each other by a closed communication network or the Internet. They are connected to each other by an open communication network. The mobile 1 also includes a computer fixedly provided at a construction site or a construction client.
【0015】(2)モバイル1 上記モバイル1にはデジタルカメラ6が備えられ、この
デジタルカメラ6によって、要介護者または健常者の生
活している施設に関する建築の画像情報も入力される。
この施設に関する建築の画像情報及び上記施設に関する
建築の情報は、室内の段差の高さ、例えば車庫、風呂、
トイレ、玄関または台所の段差の高さ、ベットの床から
の高さ、階段の状況、階段の傾斜角度、段数または高低
差、給水または給湯設備の状況、排水設備の状況、洗濯
設備の状況、掃除/清掃設備の状況、入浴設備の状況、
排泄(トイレ)施設の状況、室内照明の明るさ、窓、
壁、床または天井の色、ドアまたは窓の開閉部分の縦及
び横の寸法、開閉状況または床からの高さ、寝室の配置
及び状況、家電製品のリモコン操作の状況、窓、カーテ
ン、ドアまたはその他の設備のリモコン操作の状況、室
内の障害物の状況、車いすの状況、室内運搬設備、例え
ば室内リフトまたは室内エレベータの状況であり、さら
にこれらの情報の画像である。(2) Mobile 1 The mobile 1 is provided with a digital camera 6, and the digital camera 6 is used to input image information of a building related to a facility where a care recipient or a healthy person lives.
The image information of the building related to this facility and the information of the building related to the above facility are heights of indoor steps, such as a garage, a bath,
The height of steps in the toilet, entrance or kitchen, the height from the floor of the bed, the condition of the stairs, the angle of the stairs, the number of steps or the difference in height, the condition of water supply or hot water supply, the condition of drainage facilities, the condition of laundry facilities, Cleaning / cleaning facilities, bathing facilities,
Excretion (toilet) facilities, brightness of indoor lighting, windows,
The color of the wall, floor or ceiling, the vertical and horizontal dimensions of the opening or closing part of the door or window, the opening / closing status or height from the floor, the arrangement and situation of the bedroom, the status of remote control operation of home appliances, windows, curtains, doors or It is the status of remote control operation of other equipment, the status of obstacles in the room, the status of wheelchairs, the status of indoor transport equipment, for example, the status of indoor lifts or elevators, and furthermore, images of these information.
【0016】建築物の個々の部分のサンプル画像データ
またはその他の文字などのデータがセンター2のコンピ
ュータからモバイル1に供給され、これらのサンプルか
ら所望の物が選択されて、これが上記施設に関する建築
の情報として取り込まれもする。Data such as sample image data or other characters of individual parts of the building is supplied from the computer of the center 2 to the mobile 1, and a desired object is selected from these samples, and this is used for building the building related to the facility. It is also taken in as information.
【0017】上記センター2は、建築組合、建築情報処
理サービス機関、国または地方公共団体の土木課・商工
部などの担当官庁、国または地方公共団体の各種建築関
係の施設、官公庁から委託を受けた公益事業団体または
公共団体の各種建築関係の施設、各種建築団体の施設、
サーバ貸与提供者、その他の建築情報処理施設である。The center 2 is commissioned by a building association, a building information processing service organization, a government agency such as a civil engineering section or a commercial and industrial department of a national or local public entity, various building-related facilities of a national or local public entity, or a government agency. Various utility-related organizations or public organizations related building-related facilities, various building-related facilities,
Server lending provider and other building information processing facilities.
【0018】(3)建築情報を処理する全体回路 図2は建築情報を処理する全体回路を示す。この回路
は、上記センター2、建築資材供給者4、建築工事者5
またはモバイル1のコンピュータ装置の中の回路であ
る。この全体回路は、中央処理演算装置であるCPU1
4を中心に、アドレス信号及びデータ信号が双方向に伝
達されるアドレス/データバスライン10を介してイン
ターフェース部11、入力部12、出力部13等と電気
的に接続されて構成されている。(3) Overall Circuit for Processing Building Information FIG. 2 shows an overall circuit for processing building information. This circuit includes the above center 2, building material supplier 4, building worker 5
Or a circuit in the computing device of the mobile 1. This entire circuit is composed of a CPU 1 as a central processing unit.
4, an interface unit 11, an input unit 12, an output unit 13 and the like are electrically connected via an address / data bus line 10 through which an address signal and a data signal are transmitted bidirectionally.
【0019】入力部12は、音声認識装置又はキーボー
ト等の入力装置と、マウス、デジタイザ、タッチパネル
などのポインティングデバイス等とから構成されてお
り、コンピュータ装置(全体回路)への処理命令の入力
に活用され、上記介護の状況の情報及び要介護者の施設
に関する建築情報などが入力される。出力部13は、デ
ィスプレイ、プリンタ、または可聴音を発する音声合成
部(サウンドカード)などから構成されており、上記建
築資材発注のための発注年月日時指示書、納入先住所/
地図、設計図面、報告書などの表示/印刷と、各種音声
情報の発音などが行われる。The input unit 12 includes an input device such as a voice recognition device or a keyboard, and a pointing device such as a mouse, a digitizer, a touch panel, and the like, and is used for inputting a processing command to a computer device (entire circuit). Then, information on the status of the nursing care and architectural information on the facilities of the care recipient are input. The output unit 13 is composed of a display, a printer, a voice synthesizing unit (sound card) that emits an audible sound, and the like.
Display / print of maps, design drawings, reports, etc., and pronunciation of various audio information are performed.
【0020】画像入力装置15は、上記デジタルカメラ
6、イメージスキャナ、原稿透過ユニットを持つスキャ
ナ等の画像をラスタースキャンして画像データとして取
り込む装置と、そのインターフェースから構成されてお
り、上記介護の状況の情報及び要介護者の施設に関する
建築情報、それらの写真、図面、地図等の取り込みに用
いられる。そして、取り込まれた写真等のデータは、ア
ドレス/データバスライン10を介して情報記憶部3
(外部記憶補助手段)内に保存/蓄積される。The image input device 15 includes a device such as the digital camera 6, an image scanner, and a scanner having a document transmission unit, which raster-scans an image and captures the image as image data, and an interface thereof. Information and architectural information about the facilities of the care recipient, and their photographs, drawings, maps, etc. The captured data such as a photograph is transferred to the information storage unit 3 via the address / data bus line 10.
(External storage auxiliary means).
【0021】なお、画像入力装置15には、場合によっ
て、ファックス装置、コピー装置、原稿透過ユニットを
持つスキャナなどが代用される。つまり、写真などの紙
面またはフィルム上に記された情報に光を当てたり透過
させたり、その反射光または透過光を2値以上のデジタ
ル電気信号に変換する光電変換素子が具備され、その写
真紙面上の情報をラスタ画像データとして取り込むこと
ができる装置ならば如何なるものでも用いられる。The image input device 15 may be replaced by a facsimile device, a copying device, a scanner having a document transmitting unit, or the like, as the case may be. That is, a photoelectric conversion element is provided which illuminates or transmits information written on a paper or film such as a photograph, or converts reflected light or transmitted light into a binary or more digital electric signal. Any device that can take in the above information as raster image data can be used.
【0022】タイミング発生部19からは、本コンピュ
ータ装置全体(全体回路)の同期を取るためのタイミン
グコントロール信号が各回路(プログラム/データ記憶
部16、画像入力装置15等)に出力される。このタイ
ミングコントロール信号は、基本周期のクロック信号の
ほか、このクロック信号を分周又は倍加した信号等が含
まれる。From the timing generator 19, a timing control signal for synchronizing the entire computer device (entire circuit) is output to each circuit (the program / data storage unit 16, the image input device 15, etc.). The timing control signal includes a clock signal having a basic period, a signal obtained by dividing or doubling the clock signal, and the like.
【0023】プログラム/データ記憶部16(内部記憶
媒体/手段)はフラッシュメモリ、EEPROM、EP
ROM、CD−ROMなどROM等の不揮発性メモリ
と、RAM、キャッシュメモリ、場合によってはハード
ディスク、磁気カード、磁気ディスク、CD−RAM、
DVD(デジタルビデオディスク)等が用いられた一時
記憶メモリという大別して2種類の記憶装置(記憶手
段)から構成されている。The program / data storage section 16 (internal storage medium / means) includes a flash memory, an EEPROM, an EP
ROM, non-volatile memory such as ROM such as CD-ROM, RAM, cache memory, and in some cases, hard disk, magnetic card, magnetic disk, CD-RAM,
It is roughly composed of two types of storage devices (storage means) called a temporary storage memory using a DVD (digital video disk) or the like.
【0024】そして、プログラム/データ記憶部16の
ROMには本コンピュータ装置(全体回路)で実行され
るプログラムや各種処理に使用される汎用データが記憶
される。このプログラムは後述するフローチャートに対
応している。また、プログラム/データ記憶部16の一
時記憶メモリには、プログラム処理中のデータの一時的
な蓄積等、つまりワーキングメモリ若しくはキャッシュ
メモリとして用いられる。The ROM of the program / data storage section 16 stores programs to be executed by the computer device (overall circuit) and general-purpose data used for various processes. This program corresponds to a flowchart described later. Further, the temporary storage memory of the program / data storage unit 16 is used as a temporary storage of data during program processing, that is, as a working memory or a cache memory.
【0025】また、情報記憶部17(外部記憶補助媒体
/手段、補助記憶媒体)は、磁気ディスク、光ディス
ク、フレキシブルディスク(プロッピィーディスク)、
磁気ドラム、磁気テープ、メモリカード、CD−RA
M、CD−ROM、DVDなどの大量情報記憶/保存メ
ディアとそれらのメディアへの情報書き込み/読み出し
装置等(ドライブ装置、インターフェイス回路)から構
成されている。そして、この情報記憶部17に、上記新
たに建築する建築物の個々の部分の情報、新たな建築の
場所及び年月日時の情報、建築資材発注情報、演算され
た新たな建築に係る費用、工事する者などが記憶保存さ
れている。The information storage unit 17 (external storage auxiliary medium / means, auxiliary storage medium) includes a magnetic disk, an optical disk, a flexible disk (proppy disk),
Magnetic drum, magnetic tape, memory card, CD-RA
It is composed of mass information storage / storage media such as M, CD-ROM, DVD, etc., and information writing / reading devices for such media (drive devices, interface circuits). Then, in the information storage unit 17, information on the individual parts of the building to be newly built, information on the location and date of the new building, building material ordering information, the cost of the calculated new building, Construction workers are stored and stored.
【0026】この情報記憶部17には、建築物情報メモ
リ21が設けられている。この建築物情報メモリ21に
は、上記建築物の個々の部分を示す情報とこれらの建築
物個々の価格とが対応づけて記憶され、建築物の個々の
部分を示す情報とこれらの建築物個々の工事を行うこと
ができる工事する者とも対応づけて記憶されている。こ
の建築物の個々の部分を示す情報とこれらの建築物個々
の価格との対応記憶は、この工事する者ごとに分けて重
複して記憶される。The information storage section 17 is provided with a building information memory 21. In the building information memory 21, information indicating the individual parts of the building and the prices of the individual buildings are stored in association with each other, and the information indicating the individual parts of the building and the individual parts of the building are stored. Is also stored in association with the person who can perform the construction work. Correspondence storage between the information indicating the individual parts of this building and the prices of these buildings is separately stored for each person who works on the construction.
【0027】この情報記憶部17には、建築者情報メモ
リ22が設けられている。この建築者情報メモリ22に
は、工事者に関する情報が記憶されている。各工事者が
工事できる上記建築物の個々の部分を示す情報と、この
各工事者それぞれとはリンクされている。The information storage section 17 is provided with a builder information memory 22. The builder information memory 22 stores information on the builder. The information indicating the individual parts of the building that can be constructed by each of the builders is linked to each of the builders.
【0028】なお、場合によって、本コンピュータ装置
(全体回路)は、情報記憶部17のROM内に予め記憶
されたプログラムによって単一の処理が行われる専用装
置とされ、情報記憶部17に保存されたプログラムが、
適宜、プログラム/データ記憶部16のRAM内に呼び
込まれて(起動)される汎用のコンピュータ装置とされ
る。この場合は、情報記憶部17には、CPU14によ
って実行される基本ソフト(オペレーティングソフ
ト)、システムソフト、応用プログラムを含む各プログ
ラムが保存されている。In some cases, the computer device (entire circuit) is a dedicated device that performs a single process by a program stored in advance in the ROM of the information storage unit 17 and is stored in the information storage unit 17. Program
It is a general-purpose computer device that is appropriately called (started) in the RAM of the program / data storage unit 16. In this case, the information storage unit 17 stores programs such as basic software (operating software) executed by the CPU 14, system software, and application programs.
【0029】そして、本コンピュータ装置(全体回路)
の電源立ち上げ時又は、新たなプログラムの起動時等に
おいて、情報記憶部17から読み出され、プログラム/
データ記憶部16のRAM等に一時的に保存されると共
に、CPU14によって実行される。つまり、本コンピ
ュータ装置(全体回路)によって実行されるプログラム
が、情報記憶部17に保存されており、適宜読み出され
てCPU14によって実行される。この場合、新たなプ
ログラムへの変更は、情報記憶部17内に保存されてい
るプログラム自体が置き換えられるか、若しくはプログ
ラムの保存されているCD−ROM、磁気ディスク、フ
ロッピー(登録商標)等が交換される(インストール/
転送される)ことで行われる。Then, the present computer device (entire circuit)
When the power is turned on or when a new program is started, the information is read from the information storage unit 17 and the program /
It is temporarily stored in a RAM or the like of the data storage unit 16 and executed by the CPU 14. That is, a program executed by the computer device (entire circuit) is stored in the information storage unit 17, read out as appropriate, and executed by the CPU. In this case, a change to a new program is performed by replacing the program itself stored in the information storage unit 17 or by replacing a CD-ROM, a magnetic disk, a floppy (registered trademark), or the like in which the program is stored. (Install /
Transfer).
【0030】また、プログラム/データ記憶部16のE
PROMに保存されたプログラムを専用に実行するコン
ピュータ装置の場合には、同じように、CD−ROM、
磁気ディスク、フロッピー等が交換される(インストー
ル/転送される)ことに呼応してEPROM等の書き換
えが行われるか、又はROM自体の交換によって達成さ
れる。The program / data storage unit 16
Similarly, in the case of a computer device that exclusively executes a program stored in a PROM, a CD-ROM,
Rewriting of an EPROM or the like is performed in response to replacement (installation / transfer) of a magnetic disk, a floppy disk, or the like, or achieved by replacing the ROM itself.
【0031】なお、このプログラムの新規置き換えは、
場合によって、インターネット通信回線、公衆回線若し
くはLANを介して接続されている他のコンピュータな
どの外部装置18から送られくる。つまり、コンピュー
タ装置(全体回路)で実行されるプログラムが、情報記
憶部17に対して直接的に交換されたり、通信網を介し
て外部装置18から送られてきたもので交換される。The new replacement of this program is as follows:
In some cases, it is sent from an external device 18 such as an Internet communication line, a public line, or another computer connected via a LAN. That is, the program executed by the computer device (entire circuit) is exchanged directly with the information storage unit 17 or exchanged with the one sent from the external device 18 via the communication network.
【0032】したがって、場合によって、本コンピュー
タ装置(全体回路)において実行されるプログラムが、
起動の度毎に、外部装置18から送られてくる。つま
り、コンピュータ装置(全体回路)の情報記憶部17に
応用プログラムが保存されておらず、外部装置18から
送られてくるプログラムを実行する端末装置の役目のみ
が、本発明のコンピュータ装置(全体回路)に与えられ
る。さらには、外部装置18からプログラムとそのプロ
グラムによって処理されるデータが共に送られてきて、
そのプログラムによってデータ処理がなされた後、その
結果が外部装置18に送り返される。Therefore, in some cases, the program executed in the computer device (entire circuit) is
Each time it is started, it is sent from the external device 18. That is, the application program is not stored in the information storage unit 17 of the computer device (whole circuit), and only the role of the terminal device that executes the program transmitted from the external device 18 is the function of the computer device (whole circuit) of the present invention. ). Further, a program and data processed by the program are sent together from the external device 18,
After data processing is performed by the program, the result is sent back to the external device 18.
【0033】また、コンピュータ装置で実行されるプロ
グラムは、場合によって、OSなどの基本プログラムを
基に、応用プログラムが実行されるような、一般的なコ
ンピュータシステムによるプログラムであり、OSを含
む統一化された一つのプログラムのみが実行される専用
のコンピュータシステムである。よって、それらの統一
化されたプログラムが外部装置18から与えられるし、
応用プログラム又は基本プログラム又はプログラムの一
部のみが外部装置18から送られてきて実行される。The program executed by the computer device is a program of a general computer system in which an application program is executed based on a basic program such as an OS in some cases. It is a dedicated computer system that executes only one program. Therefore, those unified programs are provided from the external device 18,
Only the application program or the basic program or a part of the program is sent from the external device 18 and executed.
【0034】なお、場合によって、本コンピュータ装置
に予め別のオペレーティングシステム、システムプログ
ラム(OS)、その他のプログラムが記憶され、上記プ
ログラムはこれらのOS、その他のプログラムとともに
実行される。このプログラムは本装置(コンピュータ本
体)にインストールされ実行されるときに、別のプログ
ラムとともにまたは単独で請求項(クレーム)に記載さ
れた処理・機能を実行させる。In some cases, another operating system, a system program (OS), and other programs are stored in advance in the computer device, and the above programs are executed together with the OS and other programs. This program, when installed and executed in the present apparatus (computer body), causes the computer to execute the processing and functions described in the claims together with another program or independently.
【0035】また、場合によって、このプログラムの一
部又は全部が本装置以外の1つ以上の別装置に記憶され
て実行され、本装置と別装置との間には通信手段を介し
て、これから処理するデータ/既に処理されたデータ/
プログラムが送受され、本装置及び別装置全体として、
本発明が実行される。これらの通信手段はインターネッ
ト通信システムなどであり、これら本装置及び別装置の
対応関係は、上記センター2、建築資材供給者4、建築
工事者5またはモバイル1の各コンピュータ装置の関係
に当てはまる。In some cases, part or all of the program is stored and executed in one or more other devices other than the present device, and between the present device and the other device via communication means, Data to be processed / Data already processed /
The program is sent and received, and as a whole this device and another device,
The present invention is implemented. These communication means are an Internet communication system and the like, and the correspondence between the present apparatus and another apparatus is applicable to the relationship between the respective computer devices of the center 2, the building material supplier 4, the building worker 5, or the mobile 1.
【0036】(4)建築物情報メモリ21/建築者情報
メモリ22 図3は情報記憶部17内の建築物情報メモリ21を示
す。上記建築物の個々の部分を示す情報とこれらの建築
物個々の価格とこれらの建築物個々の工事を行うことが
できる工事する者とは対応づけて記憶されている。この
建築物の個々の部分は、建築物全体の部屋のレイアウト
(4LDK、5LDK、5DK…、2世帯)、各階の建
坪数、1階/2階/3階建て、台所(キッチン)、収納
部分、ドア・造作材(玄関、窓)、床・壁・天井(屋
根、外壁)、洗面・トイレ、バスルーム、屋根、居間、
寝室、階段、給水または給湯設備、排水設備、洗濯設
備、掃除/清掃設備、ベランダ、車庫、室内運搬設備、
(例えば室内リフトまたは室内エレベータ)、バリアフ
リー、加齢配慮等である。(4) Building information memory 21 / builder information memory 22 FIG. 3 shows the building information memory 21 in the information storage unit 17. The information indicating the individual parts of the building, the prices of these buildings, and the workers who can perform the construction of these buildings are stored in association with each other. The individual parts of this building are the room layout (4LDK, 5LDK, 5DK ... 2 households) of the whole building, the number of floors per floor, 1st / 2nd / 3rd floor, kitchen (kitchen), storage part , Doors and construction materials (entrances, windows), floors, walls, ceilings (roofs, outer walls), washbasins, toilets, bathrooms, roofs, living rooms,
Bedrooms, stairs, water or hot water supply, drainage, washing, cleaning / cleaning, veranda, garage, indoor transport,
(Eg, indoor lift or indoor elevator), barrier-free, aging considerations, and the like.
【0037】これらの建築物の個々の部分について、種
々の価格及び工事に要する日数が対応づけて記憶され
る。同じ部分につき複数種類の設備がある場合には、こ
れら個々の設備ごとに価格及び工事日数が記憶される。
選択された建築物の個々の部分の価格が合計され、さら
に補正処理、重複部分減算などのその他の演算処理が行
われて、建築物の見積金額が算出されモバイル1へ出力
される。上記工事日数に基づいて工事日程が決定され
る。For each part of these buildings, various prices and days required for construction are stored in association with each other. When there are a plurality of types of facilities for the same part, the price and the number of construction days are stored for each of these facilities.
The prices of the individual parts of the selected building are summed up, and other calculation processing such as correction processing and overlapping part subtraction are performed. The estimated price of the building is calculated and output to the mobile 1. The construction schedule is determined based on the construction days.
【0038】この建築物の個々の部分を示す情報と、こ
の部分の工事をできる1以上の工事者とはそれぞれとは
リンクされており、当該リンクデータが建築物の個々の
部分を示す情報に対応されて記憶されている。よって、
建築物の個々の部分を選択した後に、工事可能な工事者
を選択できる。The information indicating the individual part of the building and one or more construction workers who can perform the construction of the part are linked to each other, and the link data is included in the information indicating the individual part of the building. Corresponding and stored. Therefore,
After selecting individual parts of the building, the builders who can do the work can be selected.
【0039】なお、このような建築物の個々の部分を示
す情報とこれらの建築物個々の価格との対応記憶は、こ
の工事する者ごとに分けて重複して多層的に対応づけて
記憶されてもいる。よって、この建築物情報メモリ21
から、各工事者を選択した後に、工事可能な建築物の個
々の部分を選ぶこともできる。The storage of the correspondence between the information indicating the individual parts of such buildings and the prices of these buildings is stored in such a way as to be overlapped in a multi-layered manner for each person who works. I have. Therefore, this building information memory 21
After selecting each builder, one can also select individual parts of the building that can be constructed.
【0040】図4は情報記憶部17内の建築者情報メモ
リ22を示す。この建築者情報メモリ22には、工事者
(本店以外に支店も含む)の名称、郵便番号、住所、電
話番号、FAX番号、電子メールアドレス、得意工事、
工事可能期間が記憶される。この各工事者それぞれと、
各工事者が工事できる上記建築物の個々の部分を示す情
報とはリンクされており、当該リンクデータが各工事者
に対応されて記憶されている。よって、この建築者情報
メモリ22を使っても、各工事者を選択した後に、工事
可能な建築物の個々の部分を選ぶことができる。FIG. 4 shows the builder information memory 22 in the information storage unit 17. The builder information memory 22 stores the name, postal code, address, telephone number, fax number, e-mail address,
The construction possible period is stored. With each of these construction workers,
The information indicating the individual parts of the building that can be constructed by each constructor is linked, and the link data is stored corresponding to each constructor. Therefore, even if this builder information memory 22 is used, individual parts of a building that can be constructed can be selected after selecting each builder.
【0041】上記工事可能期間は、当該工事者が仕事が
空いていて工事できる期間である。この工事可能期間、
工事者の名称、郵便番号、住所、電話番号、FAX番
号、電子メールアドレス、得意工事の各情報は各工事者
から、コンピュータを使い上記通信回線を介して常時書
き加えまたは書き換えられている。上記入力された新た
な建築の年月日時に対して、この工事可能期間の情報に
基づいて、工事できる工事者が選択されモバイル1へ出
力される。上記入力された建築の場所に対して、上記建
築者情報メモリ22に記憶された工事者の住所の近い者
が選択されモバイル1へ出力される。The above-mentioned construction possible period is a period in which the construction worker is available and can perform construction work. This construction period,
Information on the name, postal code, address, telephone number, fax number, e-mail address, and specialty construction of the construction worker is constantly added or rewritten by each construction worker via the communication line using a computer. With respect to the input date and time of the new construction, a construction worker who can perform the construction is selected based on the information on the construction possible period and output to the mobile 1. With respect to the inputted building location, a person whose construction person's address is stored in the builder information memory 22 is selected and output to the mobile 1.
【0042】この建築の場所と工事者の住所との対比
は、同じ町・村、同じ郡・市、同じ選挙区、同じ県の優
先順位で検索される。また、建築の場所の郵便番号と工
事者の住所の郵便番号が対比され、全7桁一致、上6桁
一致、上5桁一致、上4桁一致、上3桁一致、上2桁一
致の優先順位で検索される。さらに、建築の場所の電話
番号と工事者の電話番号が対比され、上位所定桁一致、
市外局番一致の優先順位で検索される。また、これら住
所、郵便番号、電話番号といった、複数の場所を示す情
報に基づいて総合的に1以上の工事者が選択され出力さ
れる。The comparison between the location of the building and the address of the builder is searched by the priority of the same town / village, the same county / city, the same constituency, and the same prefecture. In addition, the postal code of the building location and the postal code of the address of the contractor are compared, and all 7 digits, upper 6 digits, upper 5 digits, upper 4 digits, upper 3 digits, upper 2 digits match Search by priority. In addition, the phone number of the building location and the phone number of the contractor are compared,
Search by area code matching priority. In addition, one or more construction workers are comprehensively selected and output based on information indicating a plurality of places such as an address, a postal code, and a telephone number.
【0043】なお、このような工事者の情報、工事可能
期間、場所を示す情報の対応記憶は、当該工事者が工事
可能な建築物の個々の部分を示す情報ごとに分けて重複
して多層的に対応づけて記憶されてもいる。よって、こ
の建築者情報メモリ22から、各工事者を選択した後
に、工事可能な建築物の個々の部分を選ぶこともでき
る。It should be noted that the correspondence storage of the information of the construction person, the construction possible period, and the information indicating the location is divided into pieces of information indicating the individual parts of the building which the construction work can be performed, and is overlapped in multiple layers. They are also stored in association with each other. Therefore, after selecting each builder from the builder information memory 22, it is also possible to select an individual part of the building that can be constructed.
【0044】(5)建築情報処理 図5及び図6は建築情報処理のフローチャートを示す。
このフローチャートは、上記センター2、建築資材供給
者4、建築工事者5またはモバイル1の各コンピュータ
装置の電源を投入したとき、または互いのコンピュータ
装置の間で情報転送(処理指示またはデータ転送)があ
ったときに開始され、電源を切るまで繰り返し継続され
る。(5) Building Information Processing FIGS. 5 and 6 show flowcharts of the building information processing.
This flowchart shows that the information transfer (processing instruction or data transfer) is performed when the power of each computer device of the center 2, the building material supplier 4, the building worker 5, or the mobile 1 is turned on, or between the respective computer devices. It starts when there is, and continues repeatedly until the power is turned off.
【0045】まず、初期状態またはメニュー画面が選択
されれば(ステップ01)、図8のメニュー画面が表示
される(ステップ02)。このメニューの中から建築物
の個々の部分が選択される。上述した建築物全体の部屋
のレイアウト、各階の建坪数、1階/2階/3階建て、
台所(キッチン)、収納部分、ドア・造作材(玄関、
窓)、床・壁・天井(屋根、外壁)、洗面・トイレ、バ
スルーム、屋根、居間、寝室、階段、給水または給湯設
備、排水設備、洗濯設備、掃除/清掃設備、ベランダ、
車庫、室内運搬設備(室内リフトまたは室内エレベー
タ)、バリアフリー、加齢配慮等である。図8にはこの
うち一部だけが表示されているが、実際には画面切り換
えによって全て表示される。First, when an initial state or a menu screen is selected (step 01), a menu screen shown in FIG. 8 is displayed (step 02). From this menu, individual parts of the building are selected. The layout of the room of the whole building mentioned above, the number of floors of each floor, the first floor / the second floor / three floors,
Kitchen (kitchen), storage parts, doors and construction materials (entrance,
Windows), floors / walls / ceilings (roofs, exterior walls), washbasins / toilets, bathrooms, roofs, living rooms, bedrooms, stairs, water or hot water facilities, drainage facilities, washing facilities, cleaning / cleaning facilities, verandas,
Garage, indoor transportation equipment (indoor lift or indoor elevator), barrier-free, aging considerations, etc. FIG. 8 shows only a part of them, but all of them are actually displayed by screen switching.
【0046】次いで、いづれかのメニューが選択される
と(ステップ03)、図9のような当該建築物の個々の
部分の具体的な建築資材・設備が表示される(ステップ
04)。図9はバスルームの例である。ここでは、建築
資材・設備の写真または図面、型番、価格のほか、場合
によって寸法、色、m2当たりの単価なども表示され
る。Next, when one of the menus is selected (step 03), specific building materials and equipment of each part of the building as shown in FIG. 9 are displayed (step 04). FIG. 9 is an example of a bathroom. Here, in addition to photographs or drawings of building materials and equipment, model numbers, prices, and in some cases, dimensions, colors, unit prices per m 2 , and the like are also displayed.
【0047】さらに、これら具体的な建築資材・設備が
クリックされて選択されると(ステップ05)、この建
築資材・設備を示す情報と価格情報とがメモリされる
(ステップ07)。上記ステップ04で他のメニューが
選択されると、図10、図11、図12、図13に示す
ような具体的な建築物の個々の部分が表示される。図1
0乃至図13には価格は表示されていないが実際には表
示される。Further, when these specific building materials / equipment are clicked and selected (step 05), information indicating the building materials / equipment and price information are stored in memory (step 07). When another menu is selected in step 04, individual parts of a specific building as shown in FIGS. 10, 11, 12, and 13 are displayed. FIG.
Although the price is not displayed in 0 to FIG. 13, it is actually displayed.
【0048】もし、ここで、上記ステップ17〜20で
工事者が既に選択されていれば(ステップ06)、この
選択された当該工事者が工事できない建築物個々の部分
がさらに除外される(ステップ08)。こうして、選択
した工事者に整合した建築物個々の部分を選ぶことがで
きる。すなわち、建築工事の種類つまり建築物の個々の
部分の選択、建築業者の選択、建築工事の見積を、相互
に関連性をもって効率的に行うことができる。この除外
では、他の工事者の建築物個々が表示されなかったり、
選択できない旨の記号が表示されて除外される。If a construction person has already been selected in steps 17 to 20 (step 06), individual parts of the building which cannot be constructed by the selected construction person are further excluded (step 06). 08). In this way, it is possible to select individual building parts that match the selected construction worker. In other words, the type of construction work, that is, the selection of individual parts of the building, the selection of the contractor, and the estimation of the construction work can be efficiently performed in relation to each other. This exclusion may not include individual buildings from other builders,
A symbol indicating that it cannot be selected is displayed and excluded.
【0049】図10は床・壁・天井のビームタイプ及び
パネルタイプの具体的な建築資材・設備を示す。図11
は壁・窓・換気設備のビームタイプ及びパネルタイプの
具体的な建築資材・設備を示す。図12はバリアフリー
のための種々の具体的な設備・建築資材を示す。図13
は加齢配慮のための種々の具体的な設備・建築資材を示
す。FIG. 10 shows concrete building materials and equipment of the floor, wall and ceiling beam type and panel type. FIG.
Indicates concrete building materials and equipment of beam type and panel type of walls, windows and ventilation equipment. FIG. 12 shows various specific equipment and building materials for barrier-free use. FIG.
Indicates various concrete equipment and building materials for consideration of aging.
【0050】そして、この選択された建築資材・設備の
情報にリンクされている1以上の工事者が建築物情報メ
モリ21から読み出され表示される(ステップ26)。
これに対していずれかの工事者のアイコンをクリックし
て選択すると(ステップ27)、当該工事者の情報が上
記建築資材・設備を示す情報と価格情報とともにメモリ
される(ステップ28)。こうして、工事をする者の選
択は、選択された建築物の個々の部分ごとに個別に行わ
れる。Then, one or more construction workers linked to the information of the selected building material / equipment are read out from the building information memory 21 and displayed (step 26).
On the other hand, when one of the icons of the construction person is clicked and selected (step 27), the information of the construction person is stored together with the information indicating the building materials and equipment and the price information (step 28). Thus, the choice of the installer is made individually for each individual part of the selected building.
【0051】上記ステップ03〜08の処理が繰り返さ
れ、建築物全体の部屋のレイアウトなど、その他の建築
物の個々の部分が順次入力され(ステップ03〜0
8)、最後に「見積」のアイコン(図示せず)が選択さ
れると(ステップ11)、上記ステップ06でメモリさ
れていた全ての建築物の個々の部分の各価格が合計さ
れ、さらに補正処理、重複部分減算などのその他の演算
処理が行われて、建築物の見積金額が算出される(ステ
ップ12)。こうして所望する建築物の見積金額を正確
かつ迅速に知ることができる。The processes of steps 03 to 08 are repeated, and individual parts of the other building, such as the layout of the room of the whole building, are sequentially input (steps 03 to 0).
8) Finally, when the "estimate" icon (not shown) is selected (step 11), the prices of the individual parts of all the buildings stored in step 06 are summed up and further corrected. Processing and other arithmetic processing such as overlapping part subtraction are performed to calculate an estimated amount of money for the building (step 12). In this way, it is possible to accurately and quickly know the estimated price of the desired building.
【0052】また、新たな建築の場所が入力されると
(ステップ13)、この場所の情報がメモリされる(ス
テップ14)。この場所の情報には、建築物の住所、郵
便番号、電話番号を含み、場所を示す情報となる。When a new building location is input (step 13), the information on this location is stored (step 14). The information on the place includes the address, the postal code, and the telephone number of the building, and is information indicating the place.
【0053】さらに、建築の年月日時が入力されると
(ステップ15)、この年月日時の情報がメモリされる
(ステップ16)。この年月日時の情報は、工事開始の
可能な年月日時と、工事を終了してもらいたい年月日時
である。Further, when the date and time of the building is input (step 15), the information of the date and time is stored in the memory (step 16). The date and time information includes the date and time when the construction can be started and the date and time when the construction is to be completed.
【0054】また、「発注」のアイコン(図示せず)が
選択されると(ステップ17)、上記建築の場所及び建
築の年月日時を示す情報が入力されていることが確認さ
れた後、当該年月日時に対して、上記建築者情報メモリ
22に記憶された工事可能期間が合う工事者が選択さ
れ、さらに当該入力された建築の場所に対して、上記建
築者情報メモリ22に記憶された住所の近い工事者が1
つまたは複数選択され、モバイル1に出力され表示され
る(ステップ19)。When the "order" icon (not shown) is selected (step 17), it is confirmed that the information indicating the location of the building and the date and time of the building has been entered. A construction person whose construction period matches the construction date stored in the builder information memory 22 is selected with respect to the date and time, and further stored in the builder information memory 22 for the input building location. Construction worker whose address is near
One or more are selected, output to the mobile 1 and displayed (step 19).
【0055】なお、場合によって、このステップ19の
後に、上記ステップ05〜08の建築物の個々の部分の
選択が行われる。これにより、建築物の個々の部分の選
択は、選択された工事をする者ごとに個別に行われる。In some cases, after this step 19, the individual parts of the building in steps 05 to 08 are selected. Thereby, the selection of the individual parts of the building is performed individually for each of the selected workers.
【0056】こうして、地理的条件及び時間的条件の合
う工事者が選択され出力される。すなわち、新たな工事
の場所に近い者が工事者として選択され、さらに新たな
工事の日に工事をすることが可能な者が工事者として選
択される。この場合、選択された工事者の名称、郵便番
号、住所、電話番号、FAX番号、電子メールアドレ
ス、得意工事が表示される。上記建築の場所及び建築の
年月日時が入力されていなければ、メッセージが表示さ
れて当該建築の場所の入力が促される。In this way, a construction worker who meets geographical and temporal conditions is selected and output. That is, a person near the new construction site is selected as a construction person, and a person who can perform construction on a new construction day is selected as a construction person. In this case, the name, zip code, address, telephone number, fax number, e-mail address, and specialty construction of the selected construction worker are displayed. If the location of the building and the date and time of the building have not been entered, a message is displayed and the input of the location of the building is prompted.
【0057】もし、ここで、上記ステップ05〜08で
建築物個々の部分の情報が既に入力されていれば(ステ
ップ18)、この建築物個々の部分を工事できない工事
者がさらに除外される(ステップ20)。こうして、選
択した建築物個々の部分に整合した工事者を選ぶことが
できる。すなわち、建築工事の種類つまり建築物の個々
の部分の選択、建築業者の選択、建築工事の見積を、相
互に関連性をもって効率的に行うことができる。If the information of each part of the building has already been input in the steps 05 to 08 (step 18), construction workers who cannot construct each part of this building are further excluded (step 18). Step 20). In this way, it is possible to select a construction worker matching the individual parts of the selected building. In other words, the type of construction work, that is, the selection of individual parts of the building, the selection of the contractor, and the estimation of the construction work can be efficiently performed in relation to each other.
【0058】この工事者のリストの中から所望の工事者
を選ぶと(ステップ21)、建築物個々の部分情報が入
力されていることが確認された後、建築物個々の部分の
工事の順番が決定され(ステップ22)、上記建築物個
々の部分の工事日数に基づいて、各建築物個々の部分の
工事日程が決定され出力され表示される(ステップ2
3)。When a desired contractor is selected from the list of the contractors (step 21), it is confirmed that the information on the individual parts of the building has been input, and then the order of the operations on the individual parts of the building is confirmed. Is determined (step 22), and the construction schedule of each part of each building is determined, output and displayed based on the number of construction days of each part of the building (step 2).
3).
【0059】この建築物個々の部分は、基礎、柱、屋
根、天井、壁、内装、設備据え付けのどの工事に該当す
るか分類されており、この基礎、柱、屋根、天井、壁、
内装、設備据え付けの順番で、上記建築物個々の部分の
工事の順番、つまり複数の建築工事の工程が決定され
る。The individual parts of the building are classified according to the construction of foundation, pillar, roof, ceiling, wall, interior, and installation of equipment. The foundation, pillar, roof, ceiling, wall,
The order of construction of individual parts of the building, that is, the steps of a plurality of construction works are determined by the order of interior and installation of equipment.
【0060】上述の処理の最後にはその他の処理が行わ
れる(ステップ25)。以上のような建築物の個々の部
分、工事日程、建築の場所、建築資材、見積価格の各情
報は、建築資材供給者4及び建築工事者5のコンピュー
タに通信回線を介して送られる。建築資材供給者4は、
工事日程に合わせて、その時々に必要な建築資材・設備
を順次ジャストインタイムで発送する。At the end of the above processing, other processing is performed (step 25). Information such as the individual parts of the building, the construction schedule, the location of the building, the building material, and the estimated price are sent to the computers of the building material supplier 4 and the building worker 5 via a communication line. The building material supplier 4
The necessary building materials and equipment are sent out just in time according to the construction schedule.
【0061】図14は、工事の見積、選択した工事者、
工事日程、建築場所(工事場所)などの情報の出力画面
を示す。この画面には、上述のようにして出力または入
力された各種の情報が表示される。この画面には、各工
事ごとの見積、合計見積、各工事ごとに選択した工事
者、工事日程、各工程工事、建築場所(工事場所)、施
工主、発注者、工事名、坪数、坪単価、各工程ごとの見
積価格などが表示される。FIG. 14 shows a construction estimate, a selected construction worker,
3 shows an output screen of information such as a construction schedule and a construction place (construction place). Various information output or input as described above is displayed on this screen. On this screen, the estimate for each construction, the total estimate, the contractor selected for each construction, the construction schedule, each process construction, the construction site (construction site), the contractor, the orderer, the construction name, the number of tsubo, the unit price per tsubo , An estimated price for each process and the like are displayed.
【0062】(6)発注処理 図7は建築資材または設備の発注処理のフローチャート
を示す。このフローチャートは、上記センター2、建築
資材供給者4、建築工事者5またはモバイル1の各コン
ピュータ装置の電源を投入したとき、または互いのコン
ピュータ装置の間で情報転送(処理指示またはデータ転
送)があったときに開始され、電源を切るまで繰り返し
継続される。またこの発注処理は上記ステップ25のそ
の他の処理の中でも実行される。(6) Order Processing FIG. 7 shows a flowchart of an order processing for building materials or equipment. This flowchart shows that the information transfer (processing instruction or data transfer) is performed when the power of each computer device of the center 2, the building material supplier 4, the building worker 5, or the mobile 1 is turned on, or between the respective computer devices. It starts when there is, and continues repeatedly until the power is turned off. This ordering process is also executed among the other processes in step 25.
【0063】この発注処理は建築工事者5から建築資材
供給者4に対して行われ、建築工事者5は建築の場所
(建築現場)でモバイル1を使って発注処理を行い、こ
の発注情報は通信回線を介して建築資材供給者4のコン
ピュータへ送られる。This order processing is performed from the building contractor 5 to the building material supplier 4, and the building contractor 5 performs an order processing using the mobile 1 at a building place (building site). It is sent to the computer of the building material supplier 4 via the communication line.
【0064】まず、初期状態またはメニュー画面が選択
されれば(ステップ31)、図14のような上記複数建
築の工事日程が表示される(ステップ32)。この上記
複数建築の工事日程に沿って、各工事の工程の終了が明
確になるごとに、終了する工程工事(図14の年月の部
分)のアイコンをクリックして、終了までの日数・時間
を入力し、終了または発注のアイコン(図示せず)をク
リックすると(ステップ33)、次の工程工事のアイコ
ンが識別表示される(ステップ34)。この識別表示は
表示色、表示輝度を変えたり、補色反転などである。First, when the initial state or the menu screen is selected (step 31), the construction schedule of the plurality of buildings as shown in FIG. 14 is displayed (step 32). In accordance with the construction schedule of the plural buildings, each time the completion of each construction process becomes clear, click the icon of the completed construction work (the portion of the date in FIG. 14), and the number of days and hours until the completion. Is input and an end or order icon (not shown) is clicked (step 33), and the icon of the next process construction is identified and displayed (step 34). This identification display includes a change in display color and display luminance, and complementary color inversion.
【0065】そして、次の工程工事に必要な建築資材・
設備の情報が、必要な数量、必要な日時、必要な場所の
情報とともに、建築資材供給者4のコンピュータへ送ら
れる(ステップ35)。この次の工程工事に必要な建築
資材・設備の情報は、上記複数建築の工事日程に基づい
て決定される。また、必要な数量は、上記ステップ07
または08で入力されている。必要な日時は、現在日時
に対して上記終了までの日数・時間が加算されて求めら
れる。必要な場所は、上記ステップ14で入力された建
築の場所である。The building materials and materials necessary for the next process
The equipment information is sent to the computer of the building material supplier 4 together with the necessary quantity, the required date and time, and the required location information (step 35). Information on building materials and equipment necessary for the next process construction is determined based on the construction schedule of the plurality of buildings. Also, the required quantity is determined in step 07 above.
Or 08 has been entered. The required date and time are obtained by adding the number of days and time until the end to the current date and time. The necessary place is the place of the building input in step 14 above.
【0066】なお、上記ステップ33では各工事の工程
の終了ごとにクリックが行われることもある。こうし
て、新たな建築に必要な建築資材が必要な日時に順次ジ
ャストインタイムで発注される。In step 33, a click may be made each time each construction process is completed. In this way, building materials necessary for new construction are ordered sequentially just-in-time at the required date and time.
【0067】本発明は上記各実施例に限定されず、本発
明の趣旨を逸脱しない範囲で種々変更可能である。例え
ば、上記図5、図6及び図7のフローチャートの一部ま
たは全部は、場合によってコンピュータ(CPU14)
によって行われず、手作業によって行われる。上記改善
情報は、改善のための付加工事のほか、段差を削除する
削除工事も含まれる。建築資材には、ユニットバス、ユ
ニットトイレ、ユニット洗面所、システムキッチン等の
設備も含まれる。The present invention is not limited to the above embodiments, but can be variously modified without departing from the spirit of the present invention. For example, some or all of the flowcharts in FIGS. 5, 6, and 7 may be partially (computer) (CPU 14).
Not done manually, but done manually. The improvement information includes not only additional work for improvement but also deletion work for deleting steps. Building materials include equipment such as unit baths, unit toilets, unit washrooms, and system kitchens.
【0068】本発明はプログラムを記憶した記憶媒体、
当該プログラムの通信媒体/通信方法/通信装置として
も成立する。詳しくは以下の通りである。 [a] 建築物の個々の部分を示す情報とこれらの建築
物個々の価格とを対応づけて記憶するとともに、建築物
個々の工事を行うことができる工事する者と当該工事を
する者の場所を示す情報とを対応づけて記憶する記憶手
段に対して、新たな建築にあたって、建築物の個々の部
分を選択させる処理と、 これら選択された建築物の個
々の部分に応じた価格を上記記憶手段から読み出しさ
せ、上記新たな建築に係る費用を演算させる処理と、
上記新たな建築の場所を入力させる処理と、 これら入
力された新たな建築の場所に対応する工事する者を所定
の条件で上記記憶手段から選択して出力させる処理とを
コンピュータに実行させるためのプログラムを記憶した
媒体であって、コンピュータが読み取り可能な建築情報
処理のためのコンピュータプログラムを記憶した媒体。The present invention provides a storage medium storing a program,
The present invention is also realized as a communication medium / communication method / communication device of the program. The details are as follows. [A] Information indicating individual parts of buildings and prices of these buildings are stored in association with each other, and a person who can perform construction of each building and a place of the person who performs the construction The storage means for storing the information indicating the respective parts of the building in the new construction, and the price corresponding to the individual parts of the selected building are stored in the storage means. Processing to read from the means and calculate the cost related to the new building,
A process for causing the computer to execute a process of inputting the new building location and a process of selecting and outputting a construction worker corresponding to the input new building location from the storage means under predetermined conditions. A medium storing a program, the medium storing a computer program for computer-readable architectural information processing.
【0069】[b] 建築物の個々の部分を示す情報と
これらの建築物個々の価格とを対応づけて記憶するとと
もに、建築物個々の工事を行うことができる工事する者
と当該工事をする者の場所を示す情報とを対応づけて記
憶する記憶手段に対して、新たな建築にあたって、建築
物の個々の部分を選択させる処理と、 これら選択され
た建築物の個々の部分に応じた価格を上記記憶手段から
読み出しさせ、上記新たな建築に係る費用を演算させる
処理と、 上記新たな建築の場所を入力させる処理と、
これら入力された新たな建築の場所に対応する工事す
る者を所定の条件で上記記憶手段から選択して出力させ
る処理とをコンピュータに実行させるためのプログラム
を通信媒体、通信装置または通信方法。[B] The information indicating the individual parts of the buildings and the prices of these buildings are stored in association with each other, and a person who can perform the construction of each of the buildings is engaged in the work with a worker who can perform the construction. A storage means for storing information indicating the location of the person in association with the storage means for selecting individual parts of the building when constructing a new building; and a price corresponding to the individual parts of the selected building. From the storage means, to calculate the cost of the new building, and to input the location of the new building,
A communication medium, a communication device, or a communication method for causing a computer to execute a process of selecting and outputting, from a storage unit, a person who works on a construction site corresponding to the input new building location under predetermined conditions.
【0070】本件特許出願の出願時の特許請求の範囲は
以下のとおりである。 [A] 建築物の個々の部分を示す情報とこれらの建築
物個々の価格とを対応づけて記憶するとともに、建築物
個々の工事を行うことができる工事する者と当該工事を
する者の場所を示す情報とを対応づけて記憶する記憶手
段と、 新たな建築にあたって、建築物の個々の部分を
選択する手段と、 これら選択された建築物の個々の部
分に応じた価格を上記記憶手段から読み出し、上記新た
な建築に係る費用を演算する手段と、 上記新たな建築
の場所を入力する手段と、 これら入力された新たな建
築の場所に対応する工事する者を所定の条件で上記記憶
手段から選択して出力する手段と、を備えた建築情報処
理装置。The claims at the time of filing the present patent application are as follows. [A] Information indicating individual parts of a building and the prices of these buildings are stored in association with each other, and a person who can perform construction of each building and a place of a person who performs the construction Means for storing the information indicating the respective parts of the building in association with the new building, and a price corresponding to the individual parts of the building selected from the storage means. Means for reading and calculating the cost of the new building; means for inputting the location of the new building; and storage means for the person who works on the input location of the new building under predetermined conditions. Means for selecting and outputting from the list.
【0071】[B] 建築物の個々の部分を示す情報と
これらの建築物個々の価格とを対応づけて記憶するとと
もに、建築物個々の工事を行うことができる工事する者
と当該工事をする者の場所を示す情報とを対応づけて記
憶する記憶手段に対して、新たな建築にあたって、建築
物の個々の部分を選択させ、これら選択された建築物の
個々の部分に応じた価格を上記記憶手段から読み出しさ
せ、上記新たな建築に係る費用を演算させ、 上記新た
な建築の場所を入力させ、 これら入力された新たな建
築の場所に対応する工事する者を所定の条件で上記記憶
手段から選択して出力させる建築情報処理方法。[B] The information indicating the individual parts of the building and the prices of these buildings are stored in association with each other, and the person who can perform the construction of each building is involved with the person who works. In the new construction, the storage means, which stores the information indicating the location of the person in association, selects individual parts of the building, and sets the price according to the individual parts of the selected building as described above. Read out from the storage means, calculate the cost of the new building, input the location of the new building, and perform construction work corresponding to the input location of the new building under predetermined conditions. An architectural information processing method for selecting and outputting from the list.
【0072】[C] 建築物の個々の部分を示す情報と
これらの建築物個々の工事を行う者とが対応して記憶さ
れ、または建築物の個々の部分を示す情報とこれらの建
築物個々の価格との対応記憶は、上記工事する者ごとに
分けて重複して記憶され、上記記憶されている建築物の
個々の部分の情報と、上記記憶されている建築物の個々
の工事を行う者とは対応づけられており、これにより建
築物の個々の部分または工事を行う者の一方を選択した
後に他方を選択できる、すなわち記憶されている建築物
の個々の部分を選択した後に、建築物の個々の工事を行
う者を選択したり、または建築物の個々の工事を行う者
を選択した後に、記憶されている建築物の個々の部分を
選択でき、 上記工事をする者の選択は、上記選択され
た建築物の個々の部分ごとに個別に行われ、または、上
記建築物の個々の部分の選択は、上記選択された工事を
する者ごとに個別に行われ、 この建築物の個々の部分
を示す情報に応じた工事者に基づいて、工事者が選択さ
れて出力され、 上記新たな建築は、立て替えまたは移
転による新築、増築、増設、改築、改良、改造であり、
上記建築物は、在宅介護の必要な人間が生活している
建築物であって、個人住宅、共同住宅、共同老人ホー
ム、共同介護ホーム、病院、治療施設、リハビリ施設で
あり、 当該建築情報処理装置は、当該新たな建築に必
要な建築資材を必要な日時に順次発注し、 当該新たな
建築は複数の建築工事の工程に分けられ、この建築資材
の発注は各工程の進行状況または終了に応じて順次実行
され、当該新たな建築に必要な建築資材の情報は、必要
な数量、必要な日時、必要な場所とともに送られ、 上
記新たな建築の場所とともに、日も入力され、この新た
な建築の日は年月日または日時であり、 上記新たな工
事の場所に近い者が上記工事する者として選択され、ま
たは上記新たな工事の日に工事をすることが可能な者が
工事する者として選択される請求項A記載の建築情報処
理装置。[C] Information indicating the individual parts of the buildings and the persons who perform the individual works of these buildings are stored in association with each other, or the information indicating the individual parts of the buildings and the individual parts of these buildings are stored. Is stored separately for each person who performs the above-mentioned construction, and the information of the individual parts of the stored building and the individual construction of the stored building are performed. Associated with the building, which allows the selection of one of the individual parts of the building or the person performing the construction and then the other, i.e. the selection of the memorized individual parts of the building, After selecting the individual to perform the individual construction of the building, or selecting the individual to perform the individual construction of the building, you can select the memorized individual parts of the building. Individual parts of the building selected above Is performed individually for each building, or the selection of individual parts of the building is performed individually for each person who performs the above selected works, and the construction worker according to the information indicating the individual parts of this building The new construction is a new construction, extension, expansion, renovation, improvement, remodeling by rebuilding or relocating,
The above-mentioned building is a building in which a person who needs home care lives, and is a private house, a shared house, a shared nursing home, a shared care home, a hospital, a treatment facility, and a rehabilitation facility. The equipment will order the necessary building materials for the new building at the required date and time, and the new building will be divided into multiple construction work processes.The ordering of this building material will depend on the progress or completion of each process. The information on the building materials necessary for the new building is sent together with the required quantity, the required date and time, and the required location, and the date is entered along with the new building location and the new building information is entered. The date of construction is the date or date and time, and the person who is near the new construction site is selected as the person who will perform the above-mentioned work, or the person who can do the work on the day of the new work above Selected as The building information processing apparatus according to claim A.
【0073】[0073]
【発明の効果】以上詳述したように、本発明は、建築物
の個々の部分を示す情報とこれらの建築物個々の価格と
を対応づけて記憶するとともに、建築物個々の工事を行
うことができる工事する者と当該工事をする者の住所と
を対応づけて記憶し、 選択された建築物の個々の部分
に応じた価格を読み出し、新たな建築に係る費用を演算
し、 入力された新たな建築の場所に対応する工事する
者を所定の条件で選択して出力する。したがって、建築
工事の種類つまり建築物の個々の部分の選択、建築業者
の選択、建築工事の見積を、相互に関連性をもって効率
的に行うことができる等の効果を奏する。As described above in detail, according to the present invention, information indicating each part of a building and the price of each of these buildings are stored in association with each other, and construction of each building is performed. The construction worker who can perform the construction and the address of the construction worker are stored in association with each other, the price corresponding to each part of the selected building is read out, the cost of the new building is calculated, and the input is performed. A person who works on a new building is selected under predetermined conditions and output. Therefore, there is an effect that the type of building work, that is, the selection of individual parts of the building, the selection of the contractor, and the estimation of the building work can be efficiently performed in relation to each other.
【図1】 建築情報処理装置または建築情報処理方法を
実現する装置の全体システムを示す。FIG. 1 shows an entire system of a building information processing apparatus or an apparatus for realizing a building information processing method.
【図2】 センター2、建築資材供給者4、建築工事者
5またはモバイル1の全体回路を示す。FIG. 2 shows an entire circuit of a center 2, a building material supplier 4, a building worker 5, or a mobile 1.
【図3】 建築物情報メモリ21の記憶内容を示す。3 shows the contents stored in a building information memory 21. FIG.
【図4】 建築者情報メモリ22の記憶内容を示す。4 shows the contents stored in a builder information memory 22. FIG.
【図5】 建築情報処理のフローチャートを示す。FIG. 5 shows a flowchart of building information processing.
【図6】 建築情報処理のフローチャートを示す。FIG. 6 shows a flowchart of building information processing.
【図7】 建築資材または設備の発注処理のフローチャ
ートを示す。FIG. 7 shows a flowchart of an order processing of building materials or equipment.
【図8】 出力部13に表示されるメニュー画面を示
す。8 shows a menu screen displayed on the output unit 13. FIG.
【図9】 バスルームにおける建築物の個々の部分の建
築資材・設備の表示状態を示す。FIG. 9 shows a display state of building materials and equipment of individual parts of a building in a bathroom.
【図10】 床・壁・天井のビームタイプ及びパネルタ
イプの具体的な建築資材・設備を示す。FIG. 10 shows concrete building materials and equipment of floor / wall / ceiling beam type and panel type.
【図11】壁・窓・換気設備のビームタイプ及びパネル
タイプの具体的な建築資材・設備を示す。FIG. 11 shows concrete building materials and equipment of a beam type and a panel type of walls, windows and ventilation equipment.
【図12】バリアフリーのための種々の具体的な設備・
建築資材を示す。FIG. 12: Various specific facilities for barrier-free
Indicates building materials.
【図13】加齢配慮のための種々の具体的な設備・建築
資材を示す。FIG. 13 shows various specific equipment and building materials for aging considerations.
【図14】工事の見積、選択した工事者、工事日程、建
築場所(工事場所)などの情報の出力画面を示す。FIG. 14 shows an output screen of information such as an estimate of construction, a selected construction person, a construction schedule, a construction place (construction place), and the like.
1…モバイル、2…センター、4…建築資材供給者、5
…建築工事者、6…デジタルカメラ、10…アドレス/
データバスライン、11…インターフェイス部、12…
入力部、13…出力部、14…CPU、15…画像入力
装置、16…プログラム/データ記憶部、17…情報記
憶部、18…外部装置、19…タイミング発生部、21
…建築物情報メモリ、22…建築者情報メモリ。1 ... mobile 2 ... center 4 ... building material supplier 5
... Constructor, 6 ... Digital camera, 10 ... Address /
Data bus line, 11 interface unit, 12
Input unit, 13: output unit, 14: CPU, 15: image input device, 16: program / data storage unit, 17: information storage unit, 18: external device, 19: timing generation unit, 21
... building information memory, 22 ... builder information memory.
フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) G06F 17/50 608 G06F 17/50 608G 680 680B (72)発明者 岩田 憲明 愛知県名古屋市中川区西伏屋3丁目702番 地 Fターム(参考) 5B046 AA03 BA08 KA01 5B049 AA06 BB05 CC05 CC11 CC32 GG06 Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat II (Reference) G06F 17/50 608 G06F 17/50 608G 680 680B (72) Inventor Noriaki Iwata 3-702 Nishifushiya, Nakagawa-ku, Nagoya-shi, Aichi Prefecture. Address F-term (reference) 5B046 AA03 BA08 KA01 5B049 AA06 BB05 CC05 CC11 CC32 GG06
Claims (3)
の建築物個々の価格とを対応づけて記憶するとともに、
建築物個々の工事を行うことができる工事する者と当該
工事をする者の場所を示す情報とを対応づけて記憶する
記憶手段と、 新たな建築にあたって、建築物の個々の部分を選択する
手段と、 これら選択された建築物の個々の部分に応じた価格を上
記記憶手段から読み出し、上記新たな建築に係る費用を
演算する手段と、 上記新たな建築の場所を入力する手段と、 これら入力された新たな建築の場所に対応する工事する
者を所定の条件で上記記憶手段から選択して出力する手
段と、を備えた建築情報処理装置。Claims 1. Information indicating individual parts of buildings and prices of these buildings are stored in association with each other.
A storage means for associating a construction worker who can perform individual construction work with information indicating a location of the construction worker, and a means for selecting individual parts of the building in a new construction Means for reading the price corresponding to each part of the selected building from the storage means and calculating the cost of the new building; means for inputting the location of the new building; Means for selecting and outputting from the storage means, under predetermined conditions, a construction worker corresponding to the newly constructed building location.
の建築物個々の価格とを対応づけて記憶するとともに、
建築物個々の工事を行うことができる工事する者と当該
工事をする者の場所を示す情報とを対応づけて記憶する
記憶手段に対して、 新たな建築にあたって、建築物の個々の部分を選択さ
せ、 これら選択された建築物の個々の部分に応じた価格を上
記記憶手段から読み出しさせ、上記新たな建築に係る費
用を演算させ、 上記新たな建築の場所を入力させ、 これら入力された新たな建築の場所に対応する工事する
者を所定の条件で上記記憶手段から選択して出力させる
建築情報処理方法。2. The information indicating individual parts of buildings and the prices of these buildings are stored in association with each other,
For new construction, select individual parts of the building for the storage means that associates and stores construction workers who can perform individual construction work and information indicating the location of the construction worker. The prices corresponding to the individual parts of the selected building are read out from the storage means, the cost relating to the new building is calculated, and the location of the new building is input. A building information processing method in which a construction worker corresponding to a different building location is selected and output from the storage means under predetermined conditions.
の建築物個々の工事を行う者とが対応して記憶され、ま
たは建築物の個々の部分を示す情報とこれらの建築物個
々の価格との対応記憶は、上記工事する者ごとに分けて
重複して記憶され、 上記記憶されている建築物の個々の部分の情報と、上記
記憶されている建築物の個々の工事を行う者とは対応づ
けられており、これにより建築物の個々の部分または工
事を行う者の一方を選択した後に他方を選択できる、す
なわち記憶されている建築物の個々の部分を選択した後
に、建築物の個々の工事を行う者を選択したり、または
建築物の個々の工事を行う者を選択した後に、記憶され
ている建築物の個々の部分を選択でき、 上記工事をする者の選択は、上記選択された建築物の個
々の部分ごとに個別に行われ、 または、上記建築物の
個々の部分の選択は、上記選択された工事をする者ごと
に個別に行われ、 この建築物の個々の部分を示す情報に応じた工事者に基
づいて、工事者が選択されて出力され、 上記新たな建築は、立て替えまたは移転による新築、増
築、増設、改築、改良、改造であり、 上記建築物は、在宅介護の必要な人間が生活している建
築物であって、個人住宅、共同住宅、共同老人ホーム、
共同介護ホーム、病院、治療施設、リハビリ施設であ
り、 当該建築情報処理装置は、当該新たな建築に必要な建築
資材を必要な日時に順次発注し、 当該新たな建築は複数の建築工事の工程に分けられ、こ
の建築資材の発注は各工程の進行状況または終了に応じ
て順次実行され、 当該新たな建築に必要な建築資材の情報は、必要な数
量、必要な日時、必要な場所とともに送られ、 上記新たな建築の場所とともに、日も入力され、この新
たな建築の日は年月日または日時であり、 上記新たな工事の場所に近い者が上記工事する者として
選択され、または上記新たな工事の日に工事をすること
が可能な者が工事する者として選択される請求項1記載
の建築情報処理装置。3. The information indicating the individual parts of the building and the person who performs the construction of each of these buildings are stored in correspondence with each other, or the information indicating the individual parts of the building and the individual of these buildings are stored. The correspondence with the price is separately stored for each person who performs the above-mentioned construction, and is redundantly stored. The information on the individual parts of the stored building and the person who performs the individual construction of the stored building are stored. By which one of the individual parts of the building or the person performing the construction can be selected and then the other, i.e. after selecting the memorized individual parts of the building, the building After selecting the person who will perform the individual works of the building, or after selecting the person who performs the individual works of the building, the individual parts of the stored building can be selected. For each individual part of the building selected above Individually, or the selection of the individual parts of the building is made individually for each of the above selected construction workers, based on the construction worker according to the information indicating the individual parts of this building. The new building is a new building, extension, expansion, renovation, improvement, or remodeling by rebuilding or relocating, and the building is used by people who need home care. Buildings, such as private homes, apartments, nursing homes,
The building information processing device sequentially orders building materials necessary for the new building at the required date and time, and the new building consists of multiple building construction processes. The ordering of building materials is executed sequentially according to the progress or completion of each process, and information on building materials required for the new building is sent together with the required quantity, required date and time, and required location. The date of the new construction is also entered along with the date of the new construction, and the date of the new construction is the date or date and the person near the new construction site is selected as the person who performs the construction, or The building information processing apparatus according to claim 1, wherein a person who can perform construction on a new construction day is selected as a person who performs construction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000158015A JP2001338017A (en) | 2000-05-29 | 2000-05-29 | Building information processing apparatus and building information processing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000158015A JP2001338017A (en) | 2000-05-29 | 2000-05-29 | Building information processing apparatus and building information processing method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2001338017A true JP2001338017A (en) | 2001-12-07 |
Family
ID=18662551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000158015A Pending JP2001338017A (en) | 2000-05-29 | 2000-05-29 | Building information processing apparatus and building information processing method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2001338017A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010055528A (en) * | 2008-08-29 | 2010-03-11 | Computer System Kenkyusho:Kk | Welfare-oriented building design support system and welfare-oriented building design support server |
CN115009943A (en) * | 2022-05-12 | 2022-09-06 | 通力电梯有限公司 | Method, device and system for tracking target object in building |
-
2000
- 2000-05-29 JP JP2000158015A patent/JP2001338017A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010055528A (en) * | 2008-08-29 | 2010-03-11 | Computer System Kenkyusho:Kk | Welfare-oriented building design support system and welfare-oriented building design support server |
CN115009943A (en) * | 2022-05-12 | 2022-09-06 | 通力电梯有限公司 | Method, device and system for tracking target object in building |
CN115009943B (en) * | 2022-05-12 | 2024-03-29 | 通力电梯有限公司 | Method, apparatus and system for tracking target objects within a building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11494794B1 (en) | Estimating the cost of residential remodeling projects | |
AU2015101964A4 (en) | Construction management system | |
US20060085322A1 (en) | Internet-based method for construction bid and contract management | |
US20130179206A1 (en) | System And Method For Multi-Verifiable, As-Built Construction Modeling | |
KR20190081197A (en) | Management system for total interior service using mobile device | |
JP7139565B2 (en) | REAL ESTATE PROPERTY VALUATION VALUE CALCULATION PROGRAM, INFORMATION PROCESSING DEVICE, AND REAL ESTATE PROPERTY VALUATION VALUE CALCULATION METHOD | |
JP2009116840A (en) | Device, method and program for estimating construction cost | |
JP2001338017A (en) | Building information processing apparatus and building information processing method | |
Bielefeld | Basics construction scheduling | |
KR100441978B1 (en) | Building cost survey and analysis system using the actual cost | |
KR102086459B1 (en) | Integrating collaboration type architecture project management system, and method thereof | |
JP2001338016A (en) | Architecture information processing apparatus and architecture information processing method for home care | |
KR102539088B1 (en) | Method for providing a user interface for remodeling of a building and device for performing the same | |
JP2024073009A (en) | Loss Compensation System | |
JP7378291B2 (en) | Building development system and building development method using the same | |
Farah | Review of current estimating capabilities of the 3D Building Information Model software to support design for production/construction | |
JP2001147946A (en) | Building designing device | |
CN108665128A (en) | Engineering management system | |
JP6905030B2 (en) | Repair work support system | |
JP5479161B2 (en) | Housing and housing management system and housing management program | |
Radziejowska | The assessment of the social performance of residential buildings | |
JP2006011957A (en) | Housing reformer introduction system | |
JP4037180B2 (en) | Housing reform support device and support method | |
JP7219490B2 (en) | Quotation Support Method, Quotation Support Program, and Quotation Support System | |
US20230215291A1 (en) | System and method for determining the location and installation techniques of accessibility features |