JP2001222312A - Work instruction / results management system - Google Patents
Work instruction / results management systemInfo
- Publication number
- JP2001222312A JP2001222312A JP2000030749A JP2000030749A JP2001222312A JP 2001222312 A JP2001222312 A JP 2001222312A JP 2000030749 A JP2000030749 A JP 2000030749A JP 2000030749 A JP2000030749 A JP 2000030749A JP 2001222312 A JP2001222312 A JP 2001222312A
- Authority
- JP
- Japan
- Prior art keywords
- work
- worker
- delivery date
- work instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 claims abstract description 23
- 238000000034 method Methods 0.000 description 12
- 238000010586 diagram Methods 0.000 description 6
- 238000003860 storage Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Control By Computers (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
(57)【要約】
【課題】スケジュールを正確に再編成することができる
とともに、作業実績により作業者の実績評価を行う。
【解決手段】管理者側の中央管理装置と作業者が携帯す
る無線端末との間で電子メールを送受信する手段と、管
理者側で作成された作業スケジュールに基づいて、作業
者への納期回答依頼、作業者からの納期回答、作業者へ
の作業指示、作業者からの作業着手および作業完了を電
子メールでやりとりするシステム。
(57) [Summary] [Problem] It is possible to accurately reorganize a schedule and evaluate the performance of a worker based on work performance. A means for transmitting / receiving an e-mail between a central management device on the manager side and a wireless terminal carried by the worker, and a delivery date reply to the worker based on a work schedule created on the manager side A system that exchanges requests, delivery date responses from workers, work instructions to workers, work start and work completion from workers by e-mail.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、工場等の生産現場
や物流現場において、作業指示および実績管理を行うた
めのシステムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for performing work instructions and performance management at a production site or a distribution site such as a factory.
【0002】[0002]
【従来の技術】従来、作業指示を文書でやりとりを行う
方法は、帳票の打ち出しに時間がかかる上、配布、管理
に手間がかかるという問題を有し、そのため、特開平9
−134392号公報においては、複数のクライアント
毎にメールボックスを割り当て、作業の依頼を電子メー
ルで依頼先のメールボックスに送信し、業務依頼を受け
取った被クライアントの端末において業務を処理する際
に、当該業務の進捗状況を管理して依頼元のクライアン
トに通知するための業務進捗管理方法を提案している。2. Description of the Related Art Conventionally, a method of exchanging work instructions in a document has a problem that it takes a long time to form a form, and it takes time and effort to distribute and manage the form.
In JP-A-134392, a mailbox is assigned to each of a plurality of clients, a work request is transmitted to a request destination mailbox by e-mail, and a job is processed at a terminal of a client that has received the job request. A business progress management method for managing the progress of the business and notifying the client of the requester is proposed.
【0003】[0003]
【発明が解決しようとする課題】しかしながら、上記従
来のシステムにおいては、クライアントと被クライアン
トがパソコン端末で接続されているオフィス業務に適用
可能なシステムであって、工場等の生産現場のように作
業場内外を自由に移動する被クライアント(作業者)へ
作業指示を行うことは困難である。また、上記システム
においては、作業者側から計画通りに遂行されていない
業務をクライアントに通知することにより、実績管理を
行っているが、作業者毎の能力を評価しておらず、能力
の相違により生じる作業計画の変更ができないという問
題を有している。However, the above-mentioned conventional system is a system applicable to office work in which a client and a client are connected by a personal computer terminal. It is difficult to give a work instruction to a client (operator) who moves freely inside and outside. Also, in the above system, performance management is performed by notifying the client of tasks not performed as planned from the worker side, but the ability of each worker is not evaluated, and The problem is that the work plan cannot be changed due to the above.
【0004】本発明は、上記従来の問題を解決するもの
であって、作業者に無線端末を携帯させ作業指示、納期
回答、作業着手、作業完了を電子メールでやりとりする
ことにより、スケジュールを正確に再編成することがで
きるとともに、作業実績により作業者の実績評価を行う
ことができる作業指示・実績管理システムを提供するこ
とを目的とする。The present invention has been made to solve the above-mentioned conventional problems, and allows a worker to carry a radio terminal to exchange a work instruction, a delivery date reply, a work start, and a work completion by e-mail so that a schedule can be accurately determined. It is an object of the present invention to provide a work instruction / results management system which can be reorganized and can evaluate the performance of a worker based on the work results.
【0005】[0005]
【課題を解決するための手段】上記目的を達成するため
に、本発明の請求項1記載の作業指示・実績管理システ
ムは、管理者側の中央管理装置と作業者が携帯する無線
端末との間で電子メールを送受信する手段と、管理者側
で作成された作業スケジュールに基づいて、作業者への
納期回答依頼、作業者からの納期回答、作業者への作業
指示、作業者からの作業着手および作業完了を電子メー
ルでやりとりすることを特徴とし、また、請求項2記載
の発明は、請求項1において、作業者からの納期回答メ
ールに基づいて作業スケジュールを再編成することを特
徴とし、また、請求項3記載の発明は、請求項1または
2において、作業者からの作業完了メールに基づいて作
業者の能力係数を修正することを特徴とする。In order to achieve the above object, a work instruction / results management system according to claim 1 of the present invention comprises a central management device on the manager side and a wireless terminal carried by the worker. Request for delivery date reply to worker, delivery date reply from worker, work instruction to worker, work from worker, based on means for sending and receiving e-mail between users and work schedule created by administrator The start and the work completion are exchanged by e-mail, and the invention according to claim 2 is characterized in that, in claim 1, the work schedule is reorganized based on a delivery date reply mail from the worker. The invention according to claim 3 is characterized in that, in claim 1 or 2, the capability coefficient of the worker is corrected based on a work completion mail from the worker.
【0006】[0006]
【発明の実施の形態】以下、本発明の実施の形態を図面
を参照しつつ説明する。図1は、本発明における作業指
示・実績管理システムの1実施形態を示すシステム構成
図である。Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a system configuration diagram showing an embodiment of a work instruction / results management system according to the present invention.
【0007】中央管理装置1は例えば工場内の管理セク
ションに設置され、電子メールサーバ3、複数の現場に
設置される現場管理端末4、無線制御用端末5がネット
ワークにて接続され、無線制御用端末5は、作業者全て
が携帯する携帯電話6または構内PHS7等の無線端末
に接続され、中央管理装置1と現場管理端末4および無
線端末6、7との間で電子メールサーバ3を介して電子
メールの送受信が可能に構成されている。The central management device 1 is installed in a management section in a factory, for example, and an e-mail server 3, a site management terminal 4 installed at a plurality of sites, and a wireless control terminal 5 are connected via a network, The terminal 5 is connected to a wireless terminal such as a mobile phone 6 or a premises PHS 7 carried by all the workers, and via the e-mail server 3 between the central management device 1 and the site management terminal 4 and the wireless terminals 6 and 7. It is configured to be able to send and receive e-mail.
【0008】中央管理装置1は、スケジューリングシス
テムのプログラムを用いて作業スケジュールの作成を行
い、記憶装置2内に記憶された各種データに基づいて作
業者への作業指示を行い、作業者からの作業完了報告に
基づき実績管理システムのプログラムを用いて実績管理
を行う構成になっている。The central management device 1 creates a work schedule using a program of a scheduling system, gives a work instruction to the worker based on various data stored in the storage device 2, and performs a work from the worker. The system is configured to manage the results using the program of the results management system based on the completion report.
【0009】記憶装置2内には、作業者No、作業者名、
メールアドレス、能力係数を記憶した作業者マスタ、製
品コード、工順、工程Noを記憶した工順マスタ、工程コ
ード、工程名称、標準時間を記憶した工程マスタ、作業
指示No、作業者No、工程コード、着手予定日時、予定納
期を記憶した作業指示ファイル、作業指示No、作業者N
o、作業着手日時、作業完了日時を記憶した作業実績フ
ァイル等が格納されている。In the storage device 2, an operator No, an operator name,
E-mail address, worker master storing ability coefficient, product code, routing, routing master storing process No., process code, process name, process master storing standard time, work instruction No., worker No., process Work instruction file storing code, scheduled start date and time, scheduled delivery date, work instruction No., worker N
o, a work result file storing work start date and time and work completion date and time are stored.
【0010】図2は、上記工順(ジョブ)および工程の
1例を説明するための図であり、例えば、ジョブAは、
工程1(旋盤)、工程2(ボール盤)、工程1(旋盤)
の順に作業が行われ、ジョブBは、工程2、工程3(2
つのフライス盤を用いる)の順に作業が行われ、ジョブ
Cは、工程1、工程3、工程2の順に作業が行われる。
上記した工程マスタに記憶されている標準時間とは、各
工程において単位製品を生産する必要な時間であり、作
業者マスタに記憶されている能力係数とは、(実際の作
業時間)/(標準時間)である。FIG. 2 is a diagram for explaining an example of the above-mentioned routing (job) and steps. For example, job A
Step 1 (Lathe), Step 2 (Drilling Machine), Step 1 (Lathe)
Are performed in this order, and job B is executed in step 2 and step 3 (2
The operation is performed in the order of step 1, step 3, and step 2 for job C.
The standard time stored in the process master is the time required to produce a unit product in each process, and the capacity factor stored in the worker master is (actual working time) / (standard Time).
【0011】図3は、図1のシステムの処理の流れを説
明するための図、図4は、送信される電子メールの内容
を示す図である。先ず、ステップS1で中央管理装置1
にて作業スケジュールの作成が行われ、作成されたスケ
ジュールの納期に基づいて、現場管理端末4および各作
業者が携帯する携帯電話6または構内PHS7に納期回
答依頼を電子メールにて送信する(ステップS2)。納
期回答依頼メールは、図4に示すように、作業者No、作
業者メールアドレス、作業指示No、工程コード、工程
名、着手予定日時、予定納期からなる。FIG. 3 is a view for explaining the processing flow of the system of FIG. 1, and FIG. 4 is a view showing the contents of an e-mail to be transmitted. First, in step S1, the central management device 1
A work schedule is created, and a delivery date reply request is transmitted by e-mail to the site management terminal 4 and the mobile phone 6 or the premises PHS 7 carried by each worker based on the delivery date of the created schedule (step). S2). As shown in FIG. 4, the delivery date reply request mail includes a worker No., a worker email address, a work instruction number, a process code, a process name, a scheduled start date and time, and a scheduled delivery date.
【0012】次に、ステップS3で、作業者から納期回
答メールとして、作業指示No、受諾フラグ、回答納期が
送信される。管理者側においては、各作業者の回答に基
づき作業スケジュールの再編成を行い、再び納期回答依
頼および納期回答の電子メールを送受信し、スケジュー
ルが確定すると、ステップS5で作業者に、着手日時、
確定納期等を入力した作業指示メールを送信する。な
お、このとき、必要に応じて作業に付随する注意事項な
どを添付するようにしてもよい。スケジュールの期限を
過ぎても着手が行われないときは、ステップS6作業者
に督促指示のメールを送信する。Next, in step S3, the worker sends a work instruction No., an acceptance flag, and a reply delivery date as a delivery date reply mail. On the manager's side, the work schedule is reorganized based on each worker's response, and the delivery date response request and the delivery date response e-mail are sent and received again.
A work instruction e-mail in which the confirmed delivery date and the like are input is transmitted. At this time, notes and the like accompanying the work may be attached as necessary. If the start is not performed even after the expiration of the schedule, the e-mail of the dunning instruction is transmitted to the worker in step S6.
【0013】作業者が作業に着手した場合は、ステップ
S7で作業者から作業指示No、着手済みフラグを入力し
た作業着手メールを管理者側に送信する。この場合、着
手時刻は電子メールのタイムスタンプを利用し、作業者
ID(識別)はメールアドレスを利用する。作業者が作
業を完了した場合は、ステップS8で作業者から作業指
示No、作業完了フラグを入力した作業完了メールを管理
者側に送信する。この場合、完了時刻は電子メールのタ
イムスタンプを利用し、作業者ID(識別)はメールア
ドレスを利用する。If the worker has started the work, a work start mail in which the work instruction No. and the started flag are inputted from the worker is transmitted to the manager in step S7. In this case, the start time uses the time stamp of the electronic mail, and the worker ID (identification) uses the mail address. When the worker has completed the work, the work completion mail in which the work instruction No. and the work completion flag have been input from the worker is transmitted to the manager in step S8. In this case, the completion time uses the time stamp of the e-mail, and the worker ID (identification) uses the mail address.
【0014】管理者側においては、ステップS9、S1
0で計画に対する実績の進捗状況を画面上に表示し、作
業者毎の実績を集計、管理し、ステップS11で作業者
毎の能力係数および工程毎の標準時間データを修正す
る。そして、ステップS12で修正された標準時間デー
タおよび能力係数を作業スケジュールの作成にフィード
バックし、また、ステップS13で修正された能力係数
に基づいて各作業者の実績評価を行う。On the administrator side, steps S9 and S1
At 0, the progress status of the results with respect to the plan is displayed on the screen, the results of each worker are totaled and managed, and at step S11, the capacity coefficient for each worker and the standard time data for each process are corrected. Then, the standard time data and the capacity coefficient corrected in step S12 are fed back to the creation of the work schedule, and the performance of each worker is evaluated based on the capacity coefficient corrected in step S13.
【0015】[0015]
【発明の効果】以上の説明から明らかなように、本発明
によれば、作業者が携帯する無線端末との間で作業指
示、納期回答、作業着手、作業完了を電子メールでやり
とりすることにより、作業指示に対する納期の回答に応
じてスケジュールを正確に再編成することができるとと
もに、作業実績により作業者の実績評価を行うことがで
き、また、これを次回のスケジュール作成にフィードバ
ックすることができる。また、作業指示に対する納期の
回答、調整が個人ベースで管理できるため、メールを用
いた責任の所在が明確な契約関係をベースにした作業管
理を行うことができる。As is apparent from the above description, according to the present invention, the work instruction, the delivery date response, the work start, and the work completion are exchanged with the wireless terminal carried by the worker by e-mail. In addition to being able to accurately reorganize the schedule according to the response of the delivery date to the work instruction, the work performance can be evaluated based on the work performance, and this can be fed back to the next schedule creation. . In addition, since the response and adjustment of the delivery date to the work instruction can be managed on an individual basis, work management based on a contract relationship in which responsibility is clearly defined using email can be performed.
【図1】本発明における作業指示・実績管理システムの
1実施形態を示すシステム構成図である。FIG. 1 is a system configuration diagram showing an embodiment of a work instruction / results management system according to the present invention.
【図2】図1の工順(ジョブ)および工程の1例を説明
するための図である。FIG. 2 is a diagram for explaining an example of a routing (job) and a process in FIG. 1;
【図3】図1のシステムの処理の流れを説明するための
図である。FIG. 3 is a diagram for explaining a processing flow of the system in FIG. 1;
【図4】図3で送信される電子メールの内容を示す図で
ある。FIG. 4 is a diagram showing the contents of an e-mail transmitted in FIG.
Claims (3)
る無線端末との間で電子メールを送受信する手段を備
え、管理者側で作成された作業スケジュールに基づい
て、作業者への納期回答依頼、作業者からの納期回答、
作業者への作業指示、作業者からの作業着手および作業
完了を電子メールでやりとりすることを特徴とする作業
指示・実績管理システム。An electronic mail is transmitted and received between a central management device on the manager side and a wireless terminal carried by the worker. Request a delivery date response, answer a delivery date from a worker,
A work instruction / results management system characterized by exchanging work instructions to workers, work start and completion of work from workers by e-mail.
て作業スケジュールを再編成することを特徴とする請求
項1記載の作業指示・実績管理システム。2. The work instruction / results management system according to claim 1, wherein a work schedule is reorganized based on a delivery date reply mail from said worker.
て作業者の能力係数を修正することを特徴とする請求項
1または2記載の作業指示・実績管理システム。3. The work instruction / results management system according to claim 1, wherein the capability coefficient of the worker is corrected based on a work completion mail from the worker.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000030749A JP2001222312A (en) | 2000-02-08 | 2000-02-08 | Work instruction / results management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000030749A JP2001222312A (en) | 2000-02-08 | 2000-02-08 | Work instruction / results management system |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2001222312A true JP2001222312A (en) | 2001-08-17 |
Family
ID=18555726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000030749A Pending JP2001222312A (en) | 2000-02-08 | 2000-02-08 | Work instruction / results management system |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2001222312A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007112541A (en) * | 2005-10-18 | 2007-05-10 | Toshiba Elevator Co Ltd | Movement management system for maintenance person |
JP2008134797A (en) * | 2006-11-28 | 2008-06-12 | Asahi Kasei Homes Kk | Support system for forming remodeling construction schedule |
JP2010271815A (en) * | 2009-05-20 | 2010-12-02 | Nec Corp | Work management device, program, and work management method |
-
2000
- 2000-02-08 JP JP2000030749A patent/JP2001222312A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007112541A (en) * | 2005-10-18 | 2007-05-10 | Toshiba Elevator Co Ltd | Movement management system for maintenance person |
JP2008134797A (en) * | 2006-11-28 | 2008-06-12 | Asahi Kasei Homes Kk | Support system for forming remodeling construction schedule |
JP2010271815A (en) * | 2009-05-20 | 2010-12-02 | Nec Corp | Work management device, program, and work management method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6587831B1 (en) | System and method for online scheduling and shift management | |
WO2000041104A2 (en) | A method and system for managing mobile workers | |
EP0919912B1 (en) | Multiserver workflow system | |
JP2000315234A (en) | Work flow server and work flow system control method | |
CN106952383B (en) | System and method for queuing in service hall of power material supplier | |
JPH08123767A (en) | Schedule adjusting system using mail system | |
US7493343B2 (en) | Data delivery device and alteration method of data delivery time | |
EP1179928A2 (en) | Information Routing | |
JP2001222312A (en) | Work instruction / results management system | |
CN112907077A (en) | Construction task order dispatching method and system | |
CN115297509B (en) | A method and system for secondary splitting of edge computing | |
JP4115097B2 (en) | Schedule reception system | |
CN111080197B (en) | Material performance system and method | |
CN101267406A (en) | A method and system for realizing company office service based on SMS exchange telephone | |
JP2001216408A (en) | Job support system | |
EP1172746A2 (en) | Method, system, and software for workflow event organization | |
JP2000347957A (en) | Remote maintenance system | |
JP3985996B2 (en) | Automatic delivery date inquiry system, method, and program | |
JP3358641B2 (en) | Information processing system and information processing method | |
KR20040014297A (en) | Virtual operation center system | |
JPH10187859A (en) | Business processing method, business processing system, business processing device, and storage medium storing business processing program | |
JPH07141439A (en) | Group work supporting system | |
JP4232109B2 (en) | Real-time processing system, processing apparatus, real-time processing method, and program | |
JPH0929921A (en) | Plate making process advance control apparatus | |
JP2002149747A (en) | Process control method using electronic process table |