JP2001220890A - Form unit for continuous footing, and method for constructing building foundation using the same - Google Patents

Form unit for continuous footing, and method for constructing building foundation using the same

Info

Publication number
JP2001220890A
JP2001220890A JP2000029416A JP2000029416A JP2001220890A JP 2001220890 A JP2001220890 A JP 2001220890A JP 2000029416 A JP2000029416 A JP 2000029416A JP 2000029416 A JP2000029416 A JP 2000029416A JP 2001220890 A JP2001220890 A JP 2001220890A
Authority
JP
Japan
Prior art keywords
wall
concrete
foundation
cloth foundation
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000029416A
Other languages
Japanese (ja)
Inventor
Yoshiaki Kon
芳明 今
Shuichi Inoue
修一 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Sanyo Homes Corp
Original Assignee
Kubota Corp
Kubota House Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp, Kubota House Co Ltd filed Critical Kubota Corp
Priority to JP2000029416A priority Critical patent/JP2001220890A/en
Publication of JP2001220890A publication Critical patent/JP2001220890A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To shorten a construction period by integrally placing earthen floor concrete together with concrete constituting continuous footing, and to effectively ensure moisture proofness of an underfloor space after construction. SOLUTION: A form unit for continuous footing includes a pair of mutually opposed wall forms 12 for constituting rise wall portions 3 of the continuous footing 4, and support devices 13 supporting the respective wall forms 12 from below such that the wall forms 12 float in respective excavated grooves 6. In this form unit, each support device 13 is comprised of a support member 16 for positioning the set height of each wall form 12 such that either one or both of the wall forms 12 each have a lower edge thereof corresponding to a top board surface of earthen floor concrete 5 placed in a plot enclosed by the continuous footing 4.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、布基礎用型枠ユニ
ットとこれを用いた布基礎の施工方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a form unit for fabric foundation and a method of constructing a fabric foundation using the same.

【0002】[0002]

【従来の技術】一戸建て住宅等の建物の基礎としては、
壁長さ方向に連続した同じ断面を有する布基礎が広く採
用されており、かかる布基礎の断面は、通常、幅広のベ
ース部の上面から立壁部を突出した逆T型やL型等に形
成される。かかる布基礎で囲まれる敷地内は建物の床下
空間を構成することになるが、この敷地内の地盤をその
まま放置しておくと、地盤からの湿気が床下空間に溜ま
ってその空間内の湿度が高くなり、基礎に連結される柱
材や梁材等の構造部材の腐食を早めたり、白蟻等による
虫害を促進する原因にもなり得る。
2. Description of the Related Art As the foundation of a building such as a detached house,
Cloth foundations having the same cross-section that is continuous in the wall length direction are widely used, and the cross-section of such a cloth foundation is usually formed in an inverted T-shape, L-shape, or the like, in which a standing wall portion projects from the upper surface of a wide base portion. Is done. The site surrounded by such a cloth foundation will constitute the underfloor space of the building, but if the ground in this site is left as it is, moisture from the ground will accumulate in the underfloor space and the humidity in that space will decrease As a result, corrosion of structural members such as pillars and beams connected to the foundation may be accelerated, and insect damage by termites and the like may be promoted.

【0003】そこで、従来では、図6(a)に示すよう
に、型枠の脱型が完了した後の布基礎41の周囲の掘削
溝42に土砂43を埋め戻して転圧し、その後、図6
(b)に示すように、布基礎41で囲まれた敷地内の地
盤上に土間コンクリート44を打設することにより、地
盤からの湿気を当該土間コンクリート44で遮断して床
下空間45を防湿処理するようにしている。
Therefore, conventionally, as shown in FIG. 6 (a), earth and sand 43 are back-filled in the excavation grooves 42 around the cloth foundation 41 after the mold release from the mold is completed. 6
As shown in (b), by laying interstitial concrete 44 on the ground in the site surrounded by the cloth foundation 41, moisture from the ground is blocked by the interstitial concrete 44, and the underfloor space 45 is subjected to moisture proof treatment. I am trying to do it.

【0004】[0004]

【発明が解決しようとする課題】上記従来の建物基礎の
施工方法では、型枠の脱型が完了した後の布基礎41の
周囲の掘削溝42を埋め戻してから、土間コンクリート
43を打設するようにしているので、布基礎41を構成
するコンクリートの養生期間が経過した後の別の日程で
ないと敷地内への土間コンクリート44の打設作業を行
うことができず、この点で施工工期が長期化するという
欠点がある。また、従来の施工方法では、既にコンクリ
ートが硬化した後の布基礎41に対して土間コンクリー
ト44を打ち繋ぐことになるので、土間コンクリート4
4の外周縁と布基礎41との間のジョイント強度が弱
く、そのジョイント部分に間隙が発生しやすいため、そ
の隙間から地盤の湿気が逃げて床下空間45の防湿性を
低下させるという恐れがある。
In the above-described conventional method of building a foundation, the excavation groove 42 around the cloth foundation 41 after the mold has been completely removed is filled in, and then the concrete 43 is poured. Since the concrete curing period of the cloth foundation 41 has not been completed, it is not possible to perform the work of placing the concrete 44 between the grounds unless the schedule is different. However, there is a drawback that the time is prolonged. Further, in the conventional construction method, since the slab concrete 44 is connected to the cloth foundation 41 after the concrete has hardened, the slab concrete 4
Since the joint strength between the outer peripheral edge of the base 4 and the cloth foundation 41 is weak and a gap is easily generated in the joint, there is a possibility that moisture in the ground escapes from the gap and the moisture proof property of the underfloor space 45 is reduced. .

【0005】更に、掘削溝42を埋め戻した部分の地盤
はその他の部分に比べて地盤強度が弱くなっているの
で、布基礎41の近傍に位置する土間コンクリート44
の部分に鉄骨作業等の作業員が乗ったときに、当該土間
コンクリート44にクラックが発生することがあり、か
かるクラックも床下空間45の防湿性を低下させる原因
になる。本発明は、このような実情に鑑み、布基礎を構
成するコンクリートに対して土間コンクリートを一体的
に打設できるようにして、施工工期を短縮できかつ施工
後における床下空間の防湿性を有効に確保することがで
きる布基礎用型枠ユニットとこれを用いた布基礎の施工
方法を提供することを目的とする。
Further, the ground in the portion where the excavation groove 42 is backfilled has a lower ground strength than the other portions, and therefore, the interstitial concrete 44 located in the vicinity of the cloth foundation 41.
When a worker, such as a steel frame worker, rides on the portion, cracks may be generated in the soil concrete 44, and such cracks may also reduce the moisture resistance of the underfloor space 45. The present invention has been made in view of the above-described circumstances, and by enabling soil concrete to be cast integrally with the concrete constituting the fabric foundation, the construction period can be shortened, and the moisture resistance of the underfloor space after the construction can be effectively reduced. It is an object of the present invention to provide a form unit for fabric foundation that can be secured and a method of constructing a fabric foundation using the same.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、本発明は次の技術的手段を講じた。すなわち、本発
明の布基礎用型枠ユニットは、布基礎の立壁部を構成す
るための相対向する一対の壁型枠と、この両壁型枠を掘
削溝内に浮いた状態で下方から支持する支持装置と、を
備えており、前記支持装置が、前記両壁型枠のうちのい
ずれか一方又はその双方の下端縁を前記布基礎で囲まれ
る敷地内に打設される土間コンクリートの天端面に一致
するように当該壁型枠の設置高さを位置決めする支持部
材を備えていることを特徴とする。
Means for Solving the Problems In order to achieve the above object, the present invention has taken the following technical means. That is, the fabric foundation form unit of the present invention comprises a pair of opposed wall formwork for forming the standing wall portion of the fabric foundation, and supports the two wall formwork from below while floating in the digging groove. And a supporting device, wherein the supporting device is provided with a top of soil concrete cast at a lower end edge of one or both of the double-walled forms into a site surrounded by the cloth foundation. It is characterized by comprising a support member for positioning the installation height of the wall form so as to coincide with the end face.

【0007】上記の型枠ユニットによれば、前記一対の
壁型枠を、そのうちのいずれか一方又はその双方の下端
縁が当該布基礎で囲まれる敷地内の土間コンクリートの
天端面に一致するように掘削溝内に設置したあと、布基
礎のベース部及び立壁部に相当する部分にコンクリート
を打設するとともに、布基礎で囲まれる敷地内に前記天
端面のレベルまでコンクリートを打設することにより、
布基礎を構成するコンクリートに対して土間コンクリー
トを一体的に打設することができる。このため、布基礎
を構成するコンクリートの養生期間の経過を待たずに土
間コンクリートを打設でき、施工工期を短縮化すること
ができるとともに、土間コンクリートは硬化前の布基礎
のコンクリートに打ち繋がれて一体化するので、土間コ
ンクリートと布基礎との間に間隙が発生することがな
く、床下空間の防湿性を有効に確保することができる。
[0007] According to the above-mentioned formwork unit, the pair of wall forms is formed such that one or both of the lower end edges thereof coincide with the top end surface of the slab concrete in the site surrounded by the cloth foundation. After the concrete is installed in the excavation trench, concrete is poured into the portion corresponding to the base and the standing wall of the cloth foundation, and concrete is poured into the site surrounded by the cloth foundation to the level of the top end face. ,
Soil concrete can be cast integrally with the concrete constituting the fabric foundation. For this reason, it is possible to cast earth concrete without waiting for the curing period of the concrete that composes the cloth foundation to elapse, and to shorten the construction period. As a result, there is no gap between the slab concrete and the cloth foundation, and the moisture proofness of the underfloor space can be effectively secured.

【0008】上記した本発明の型枠ユニットにおいて、
支持装置として、掘削溝内に載置されるベース部材と、
相対向する一対の壁型枠を下方から支持することができ
かつ前記ベース部材に対して高さ調整自在に連結された
支持部材と、を備えたものを採用すれば、支持部材の高
さを調整することで両壁型枠の設置高さを調節できるよ
うになる。そして、上記した高さ調整自在な支持部材に
は、布基礎の内部に埋設される鉄筋枠を支承する受け部
を設けておくことが好ましい。
In the above-described formwork unit of the present invention,
As a support device, a base member placed in a digging trench,
A supporting member capable of supporting a pair of wall molds facing each other from below and being connected to the base member so that the height can be adjusted, the height of the supporting member is reduced. By adjusting, the installation height of the double-walled formwork can be adjusted. And it is preferable to provide a receiving portion for supporting the reinforcing bar buried in the inside of the cloth foundation on the supporting member whose height is adjustable.

【0009】この場合、両壁型枠を支持部材に連結する
とともに同支持部材の受け部に鉄筋枠を支承させること
により、当該支持部材の高さを調整するだけで両壁型枠
とともに鉄筋枠の設置高さをも同時に調節できるように
なる。このため、鉄筋枠の上方部分の被り厚を変動させ
ずに壁型枠の設置高を調節でき、その被り厚の変動に伴
う布基礎の品質低下を防止できるようになる。一方、布
基礎で囲まれる敷地内に防湿用の土間コンクリートを設
けた建物基礎の場合、その施工完了後において雨水が土
間コンクリート上に溜まり易くなっているため、鉄骨建
て方等の施工の際に作業員が水たまりに漬かりながら作
業を行わねばならず、この点で作業能率が低下するとい
う問題もある。
In this case, by connecting the double-walled formwork to the support member and supporting the reinforcing frame on the receiving portion of the support member, the height of the support member is adjusted and the double-sided formwork and the reinforcing frame are combined. The installation height can be adjusted at the same time. For this reason, it is possible to adjust the installation height of the wall form without changing the covering thickness of the upper part of the reinforcing bar frame, and it is possible to prevent a decrease in the quality of the cloth foundation due to the variation in the covering thickness. On the other hand, in the case of a building foundation with soil moisture concrete installed on the site surrounded by the cloth foundation, rainwater tends to collect on the soil concrete after the construction is completed. The worker must work while being immersed in the puddle, and there is a problem that the working efficiency is reduced in this respect.

【0010】そこで、本発明は、布基礎の立壁部の下部
をその厚さ方向に貫通する排水孔を形成するためのボイ
ド型枠を壁型枠の下部に連結しておくことを推奨する。
この場合、ボイド型枠によって立壁部の下部を貫通する
排水孔が形成されるので、布基礎で囲まれる敷地内の雨
水をその外部に排水することができる。
Therefore, the present invention recommends that a void form for forming a drain hole penetrating the lower part of the upright wall portion of the cloth foundation in the thickness direction thereof is connected to the lower part of the wall form.
In this case, since the drainage hole penetrating the lower part of the standing wall portion is formed by the void formwork, rainwater in the site surrounded by the fabric foundation can be drained to the outside.

【0011】[0011]

【発明の実施の形態】以下、図面に基づいて本発明の実
施の形態を説明する。図1及び図5に示すように、本実
施形態の建物基礎1は、ベース部2の上面側に立壁部3
を立設してなる布基礎4と、この布基礎4に対してコン
クリートの同時打設によって一体的に打ち繋がれた土間
コンクリート5と、を備えている。上記布基礎4は、地
盤の所定位置に掘削された掘削溝6内に配置されてお
り、この掘削溝6の底部には、栗石を敷設してなる支持
層7と、この支持層7上に打設された捨てコン層8が配
置され、この捨てコン層8の上に当該布基礎4が構築さ
れている。
Embodiments of the present invention will be described below with reference to the drawings. As shown in FIG. 1 and FIG. 5, a building foundation 1 of the present embodiment has a standing wall 3
And a slab concrete 5 that is integrally connected to the cloth foundation 4 by simultaneous casting of concrete. The cloth foundation 4 is disposed in an excavation groove 6 excavated at a predetermined position on the ground, and at the bottom of the excavation groove 6, a support layer 7 laid with chestnut stone and a support layer 7 on the support layer 7 The thrown-out concrete layer 8 is arranged, and the cloth foundation 4 is constructed on the throw-away concrete layer 8.

【0012】一方、土間コンクリート5は、平面方向か
ら見て方形に区画された布基礎4の立壁部3によって囲
まれた敷地内に打設されており、そのコンクリート5の
外周部分はその立壁部3の下部と連続的に繋がってい
る。また、ベース部2の下面側と土間コンクリート5の
下面側には防湿シート9(防蟻剤をも含んだシートであ
ってもよい。)が敷設されている。なお、この防湿ない
し防蟻シート9の外周縁部は、型枠内に打設したコンク
リートが硬化した後でコンクリート釘によって布基礎4
の立壁部3に固定される。また、土間コンクリート5の
内部にはメッシュ鉄筋を埋設するようにしてもよい。更
に、後述のように、本実施形態の型枠ユニット11は壁
型枠12の高さを調節する機能を備えているので、捨て
コン層8を省略して支持層7の上に直接布基礎4を構築
することにしてもよい。
On the other hand, the slab concrete 5 is cast in a site surrounded by the standing wall 3 of the cloth foundation 4 which is sectioned in a rectangular shape when viewed from the plane, and the outer peripheral portion of the concrete 5 is covered by the standing wall. 3 is continuously connected to the lower part. Further, a moisture-proof sheet 9 (a sheet containing a termiticide may be provided) is laid on the lower surface side of the base portion 2 and the lower surface side of the slab concrete 5. The outer peripheral edge of the moisture-proof or termite-proof sheet 9 is fixed to the cloth foundation 4 by concrete nails after the concrete cast in the form is hardened.
Is fixed to the upright wall portion 3. In addition, a mesh reinforcing bar may be embedded in the soil concrete 5. Further, as will be described later, since the form unit 11 of the present embodiment has a function of adjusting the height of the wall form 12, the waste concrete layer 8 is omitted and the cloth base is directly placed on the support layer 7. 4 may be constructed.

【0013】図1及び図2は、上記建物基礎1を構築す
るための布基礎用型枠ユニット11を示しており、この
型枠ユニット11は、布基礎4の立壁部3を構成するた
めの相対向する一対の壁型枠12と、この両壁型枠12
を掘削溝6内に浮いた状態で下方から支持する支持装置
13と、建物基礎1の外周部に位置する布基礎4のベー
ス部2の外周側面を構成するためのベース型枠14と、
を備えている。このうち、壁型枠12は、高さがより大
きい第一型枠12Aと、これより高さが小さい第二型枠
12Bの二種類があり、これらの型枠12A,12Bの
高さ寸法差は、土間コンクリート5の天端面とベース部
2の天端面との設計上のレベル差と同じになるように設
定されている。
FIGS. 1 and 2 show a form unit 11 for fabric foundation for constructing the building foundation 1. The form unit 11 is used to form the upright wall 3 of the fabric foundation 4. A pair of wall forms 12 facing each other;
A support device 13 that supports the base material 2 from below in a state of floating in the excavation groove 6, a base formwork 14 for forming an outer peripheral side surface of the base portion 2 of the cloth foundation 4 located on an outer peripheral portion of the building foundation 1,
It has. Among these, there are two types of wall forms 12, a first form 12A having a larger height, and a second form 12B having a smaller height, and the height dimensional difference between these forms 12A and 12B. Is set so as to be the same as the design level difference between the top end face of the slab concrete 5 and the top end face of the base portion 2.

【0014】そして、図1に示すように、建物基礎1の
外周部に位置する外側壁部(図1の左側の壁部)を構成
する場合には、第一型枠12Aと第二型枠12Bが対向
するように配置され、建物基礎1の中通し部分に位置す
る内側壁部(図1の右側の壁部)を構成する場合には、
第二型枠12B同士が対向するように配置される。本実
施形態の支持装置13は、掘削溝6内の捨てコン層8の
上に載置されるベース部材15と、相対向する一対の壁
型枠12を下方から支持することができかつベース部材
15に対して高さ調整自在に連結された支持部材16
と、を備えている。
As shown in FIG. 1, when forming an outer wall portion (the left wall portion in FIG. 1) located on the outer peripheral portion of the building foundation 1, a first formwork 12A and a second formwork 12A are formed. 12B are arranged so as to face each other and form an inner wall portion (the right wall portion in FIG. 1) which is located in the middle portion of the building foundation 1.
The second molds 12B are arranged so as to face each other. The support device 13 of the present embodiment can support the base member 15 placed on the disposal concrete layer 8 in the excavation groove 6 and the pair of wall molds 12 facing each other from below, and Support member 16 connected to height 15 so as to be freely adjustable
And

【0015】ベース部材15は、長方形の金属製のベー
スプレート17の左右両側に断面角筒状に形成された左
右一対の支持脚18を立設することによって構成され、
ベースプレート17には、捨てコン層8に設けた墨打ち
線19に合致させることで同プレート17の方向を決定
できる前後一対の目印孔20が設けられている。支持部
材16は、壁型枠12の下端縁を上方から着脱自在に嵌
合することができる型枠受け部21A,21Bを両端部
に有する受け金具22と、この受け金具22の両端部に
垂下状に突設された左右一対の螺子棒23と、この各螺
子棒23に外嵌状に螺合された調整ナット24と、を備
えている。また、前記ベース部材15の支持脚18は、
螺子棒23を左右方向にやや遊びがある状態で挿通でき
る断面幅を有し、かつ、調整ナット24の径よりも小さ
い断面高さを有している。
The base member 15 is constituted by erecting a pair of left and right support legs 18 formed in a rectangular cross section on both left and right sides of a rectangular metal base plate 17.
The base plate 17 is provided with a pair of front and rear mark holes 20 that can determine the direction of the plate 17 by matching the ink strike line 19 provided on the throw-away layer 8. The support member 16 has a receiving metal fitting 22 having form receiving parts 21A and 21B at both ends capable of removably fitting a lower end edge of the wall form 12 from above, and a hanging part at both ends of the receiving metal fitting 22. A pair of left and right screw rods 23 projecting in a shape are provided, and an adjusting nut 24 screwed into each of the screw rods 23 so as to be fitted externally. The support legs 18 of the base member 15 are
It has a cross-sectional width that allows the screw bar 23 to be inserted with some play in the left-right direction, and has a cross-sectional height smaller than the diameter of the adjustment nut 24.

【0016】このため、螺子棒23を支持脚18に挿通
させた状態で調整ナット24を回すことにより、支持部
材16の設置高さを調節できるようになっている。ま
た、螺子棒23は支持脚18の幅方向に若干の遊びを持
った状態で挿通されているので、壁型枠12を支持部材
16に連結した後でも同型枠12の中心位置を微調整で
きるようになっている。上記受け金具22は、その両端
部の型枠受け部21A,21Bの高さレベルが異なるも
のとなるように屈曲形成されており、この両型枠受け部
21A,21Bの高さ寸法差は、土間コンクリート5の
天端面とベース部2の天端面との設計上のレベル差と同
じになるように設定されている。
For this reason, the installation height of the support member 16 can be adjusted by turning the adjustment nut 24 with the screw rod 23 inserted through the support leg 18. Further, since the screw rod 23 is inserted with some play in the width direction of the support leg 18, the center position of the wall frame 12 can be finely adjusted even after the wall frame 12 is connected to the support member 16. It has become. The receiving fitting 22 is formed so as to be bent so that the height levels of the form receiving parts 21A and 21B at both ends thereof are different, and the difference in height between the two form receiving parts 21A and 21B is as follows. The level difference is set so as to be the same as the design level difference between the top end surface of the clay concrete 5 and the top end surface of the base portion 2.

【0017】従って、図2に示すように、第一型枠12
Aを低い方の型枠受け部21Aに連結し、かつ、第二型
枠12Bを高い方の型枠受け部21Bに連結することに
より、両壁型枠12A,12Bをその上端縁の高さを揃
えた状態でセットすることができる。なお、図1に示す
ように、建物基礎1の中通し部分に位置する内側壁部
(図1の右側の壁部)を構成する場合には、ベース部2
を構成するためのベース型枠14を使用せず、前記した
ように同じ高さ寸法の第二型枠12B同士を対向させて
配置するので、この部分に使用する支持部材16の場合
には、両端部の型枠受け部21Bの高さレベルが同じに
なっている受け金具22が使用される。
Therefore, as shown in FIG.
A is connected to the lower form receiving part 21A and the second form 12B is connected to the higher form receiving part 21B, so that the double-walled forms 12A and 12B are at the height of the upper edge thereof. Can be set in an aligned state. In addition, as shown in FIG. 1, when forming an inner wall portion (a wall portion on the right side in FIG. 1) located in a through portion of the building foundation 1, the base portion 2 is formed.
Without using the base formwork 14 for constructing the above, the second formwork 12B having the same height dimension is arranged facing each other as described above, so in the case of the support member 16 used for this portion, The receiving metal fittings 22 in which the form receiving parts 21B at both ends have the same height level are used.

【0018】受け金具22の中央部には、同中央部を正
面視でほぼ上向きのコの字状に屈曲することにより、布
基礎4の内部に埋設される鉄筋枠25を支承する鉄筋受
け部26が形成されている。なお、本実施形態の鉄筋枠
25は、ベース部2に埋設される横鉄筋27と、立壁部
3に埋設される縦鉄筋28とからなり、これらの各鉄筋
27,28は溶接等によって互いに連結されている。本
実施形態の型枠ユニット1は、更に、布基礎4の立壁部
3の下部をその厚さ方向に貫通する排水孔30を形成す
るためのボイド型枠31を備えている。図3〜図5に示
すように、このボイド型枠31は、板金を上方開口状の
中空ボックス形状に形成してなるボックス枠32と、こ
のボックス枠32の側面に設けた円形孔に着脱自在に連
結される円筒紙管製の筒部材33と、を備えている。
A reinforcing bar receiving portion for supporting a reinforcing bar frame 25 buried inside the cloth foundation 4 is formed by bending the central portion of the receiving metal fitting 22 in a substantially upward U-shape in a front view. 26 are formed. The reinforcing bar frame 25 according to the present embodiment includes a horizontal reinforcing bar 27 buried in the base portion 2 and a vertical reinforcing bar 28 buried in the standing wall portion 3. These reinforcing bars 27, 28 are connected to each other by welding or the like. Have been. The form unit 1 of the present embodiment further includes a void form 31 for forming a drain hole 30 that penetrates a lower portion of the upright wall portion 3 of the cloth base 4 in a thickness direction thereof. As shown in FIGS. 3 to 5, the void mold 31 is detachable from a box frame 32 formed by forming a sheet metal into a hollow box shape having an upper opening, and a circular hole provided on a side surface of the box frame 32. And a cylindrical member 33 made of a cylindrical paper tube.

【0019】ボックス枠32は、周囲の四側面が下方に
向かって先細りとなるテーパー状に形成され、第二型枠
12Bの下端縁を構成するフランジ部に対して螺子止め
可能な連結プレート34を上端開口縁に備えている。ま
た、ボックス枠32の内部には、当該ボックス枠32を
上方へ抜き取る際の手持ち部として機能する把手バー3
5が架設されている。なお、この把手バー35は、ボッ
クス枠32に挿通された筒部材33を上から押さえてそ
の固定を確実にする機能も有する。図3及び図5に示す
ように、上記ボイド型枠31は、第二型枠12Bの下端
縁のフランジ部に連結プレート34を螺子止めすること
によって当該第二型枠12Aの下方に配置され、この
際、筒部材33の突出端が第一型枠12Aの内面に当接
するようにセットされる。
The box frame 32 is formed in a tapered shape with four peripheral sides tapering downward, and includes a connection plate 34 that can be screwed to a flange portion forming a lower edge of the second mold frame 12B. It is provided on the upper opening edge. Also, inside the box frame 32, a handle bar 3 functioning as a hand-held portion when the box frame 32 is pulled out upward.
5 are installed. Note that the handle bar 35 also has a function of pressing the cylindrical member 33 inserted through the box frame 32 from above to ensure its fixation. As shown in FIGS. 3 and 5, the void form 31 is disposed below the second form 12A by screwing the connection plate 34 to a flange portion at a lower edge of the second form 12B. At this time, it is set so that the protruding end of the cylindrical member 33 contacts the inner surface of the first mold frame 12A.

【0020】このため、コンクリートの硬化後に壁型枠
12を脱型してから、ボックス枠32を上方へ抜き取る
とともに、紙製の筒部材33を破って取り出すことによ
り、布基礎4の立壁部3の下部をその厚さ方向に貫通す
る排水孔30が形成されることになる。なお、この排水
孔30は、適当な時期にコンクリートで埋めることにし
てもよいし、図外のエルボー管を通して床下空間の排水
口として残しておくことにしてもよい。
For this reason, after concrete is hardened, the wall form 12 is removed, and then the box frame 32 is withdrawn upward, and the paper tubular member 33 is broken and taken out, so that the standing wall 3 of the cloth foundation 4 is removed. A drain hole 30 penetrating through the lower part of the base in the thickness direction is formed. The drain hole 30 may be filled with concrete at an appropriate time, or may be left as a drain hole in the underfloor space through an elbow pipe (not shown).

【0021】次に、上記型枠ユニット11を用いた建物
基礎1の施工方法を説明する。すなわち、当該建物基礎
1を施工するには、まず、布基礎4を配置すべき地盤の
所定位置に掘削溝6を掘削し、その掘削溝6の底部に、
栗石を敷き詰めて捨てコンクリートを打設する。次に、
その捨てコン層8の上面に布基礎4の中心位置を正確に
墨打ちし、その墨打ち線に合わせてベース部材15を適
当な間隔で載置し、そのベース部材15の支持脚18に
支持部材16の螺子棒23を挿通して、同支持部材16
をベース部材15側に連結する。
Next, a method of constructing the building foundation 1 using the formwork unit 11 will be described. That is, in order to construct the building foundation 1, first, the excavation groove 6 is excavated at a predetermined position on the ground where the cloth foundation 4 is to be arranged, and at the bottom of the excavation groove 6,
The stone is laid and the concrete is thrown away. next,
The center position of the cloth base 4 is accurately ink-printed on the upper surface of the disposal concrete layer 8, and the base members 15 are placed at appropriate intervals in accordance with the black ink lines, and are supported on the support legs 18 of the base member 15. The screw member 23 of the member 16 is inserted through the support member 16.
Is connected to the base member 15 side.

【0022】その後、支持部材16の高さをレベル測量
しながら調整ナット24を調整することにより、支持部
材16を所定の高さにセットしたあと、鉄筋枠25を支
持部材16の鉄筋受け部26に載せ、かつ、各壁型枠1
2を支持部材16の両型枠受け部21にそれぞれ連結す
る。そして、壁型枠12をの設置高さと通りをもう一度
チェックしてから、同壁型枠12の上端同士を図外の連
結部材て互いに連結し、更に、同壁型枠12をターンバ
ックル等で地盤側に固定する。また、図1及び図5に示
すように、建物基礎1の外周部に位置する布基礎4につ
いては、ベース型枠14を捨てコン層8の所定位置に立
設するようにする。
Thereafter, by adjusting the adjusting nut 24 while measuring the height of the support member 16, the support member 16 is set at a predetermined height, and then the reinforcing bar frame 25 is connected to the reinforcing bar receiving portion 26 of the support member 16. And each wall form 1
2 are connected to both the mold receiving portions 21 of the support member 16. Then, once again checking the installation height and the street of the wall formwork 12, the upper ends of the wall formwork 12 are connected to each other by a connecting member (not shown), and the wall formwork 12 is further turned by a turnbuckle or the like. Fix to the ground side. As shown in FIGS. 1 and 5, the base formwork 14 of the cloth foundation 4 located on the outer peripheral portion of the building foundation 1 is erected at a predetermined position of the disposal concrete layer 8.

【0023】このようにして型枠ユニット11のセット
が全て完了すると、その型枠の内部にコンクリートを打
設する。このさい、コンクリートの打設順序は、布基礎
4の概ねベース部2に相当する部分がコンクリートで満
たされるように型枠全体を一巡し、その後、布基礎4の
立壁部3に相当する部分をコンクリートで満たすように
型枠全体を一巡するようにする。そして、最後に、布基
礎4の立壁部3で囲まれた範囲の敷地内に、土間の設計
天端面と同じレベルに位置決めされている前記第二型枠
12Bの下端縁に到達するまで、土間コンクリート5を
打設する。
When the setting of the form unit 11 is completed, concrete is poured into the form. At this time, the concrete placing order is such that the portion corresponding to the base portion 2 of the cloth foundation 4 is made to go around the entire formwork so as to be filled with concrete, and then the portion corresponding to the standing wall portion 3 of the cloth foundation 4 is Make a full round of the formwork to fill it with concrete. And finally, in the site surrounded by the standing wall portion 3 of the cloth foundation 4, until the lower edge of the second formwork 12B positioned at the same level as the design top end surface of the soil is reached, Concrete 5 is poured.

【0024】上記のようにしてコンクリートの打設作業
が終了した後は、そのコンクリートが硬化した後に壁型
枠12、ベース型枠14及びボイド型枠31をそれぞれ
脱型し、建物基礎1の外周部の掘削溝6を土砂で埋め戻
せばよい。このように、本実施形態の型枠ユニット11
によれば、相対向する一対の壁型枠12のうちのいずれ
か一方又はその双方の下端縁が土間コンクリート5の天
端面に一致するように当該壁型枠12をセットすること
ができるので、布基礎4を構成するコンクリートに対し
て土間コンクリート5を一体的に打設することができ
る。
After the concrete casting operation is completed as described above, after the concrete has hardened, the wall formwork 12, the base formwork 14 and the void formwork 31 are respectively removed from the mold, and the outer periphery of the building foundation 1 is removed. The excavation groove 6 of the part may be backfilled with earth and sand. Thus, the form unit 11 of the present embodiment
According to this, the wall formwork 12 can be set such that the lower end edge of one or both of the pair of wall formworks 12 facing each other coincides with the top end surface of the concrete slab 5, Soil concrete 5 can be cast integrally with concrete constituting the cloth foundation 4.

【0025】このため、布基礎4を構成するコンクリー
トの養生期間の経過を待たずに土間コンクリート5を打
設でき、施工工期を短縮化することができるとともに、
土間コンクリート5は硬化前の布基礎4のコンクリート
に打ち繋がれて一体化するので、土間コンクリート5と
布基礎4との間に間隙が発生するのを防止することがで
きる。なお、本発明は上記した実施形態に限定されるも
のではない。例えば、支持部材16に鉄筋受け部26を
設けないで、鉄筋枠25を壁型枠12とは別個に掘削溝
6内に固定することにしてもよい。
For this reason, it is possible to cast the earth concrete 5 without waiting for the curing period of the concrete constituting the cloth foundation 4 to elapse, and the construction period can be shortened.
Since the interstitial concrete 5 is connected to and integrated with the concrete of the cloth foundation 4 before hardening, it is possible to prevent the occurrence of a gap between the interstitial concrete 5 and the cloth foundation 4. Note that the present invention is not limited to the above embodiment. For example, the reinforcing bar frame 25 may be fixed in the excavation groove 6 separately from the wall formwork 12 without providing the reinforcing bar receiving portion 26 on the support member 16.

【0026】もっとも、鉄筋枠25とは別に壁型枠12
だけを支持部材16で高さ調節するようにした場合、そ
の調節によって壁型枠12の鉄筋枠25に対する相対高
さも変化してしまい、鉄筋枠25の上方におけるコンク
リートの被り厚が変動して布基礎4の品質が低下する恐
れがある。従って、壁型枠12を高さ調節する場合に
は、上記実施形態のように同壁型枠12と同時に鉄筋枠
25も高さ調節する方が好ましい。また、本発明は、鉄
筋枠25を有しない無鉄筋の布基礎4を構築する場合に
も採用することができる。
However, separately from the reinforcing frame 25, the wall form 12
When only the height is adjusted by the support member 16, the relative height of the wall form 12 with respect to the reinforcing frame 25 also changes due to the adjustment, and the concrete covering thickness above the reinforcing frame 25 fluctuates, and The quality of the foundation 4 may be reduced. Therefore, when adjusting the height of the wall formwork 12, it is preferable to adjust the height of the reinforcing bar frame 25 simultaneously with the wall formwork 12 as in the above embodiment. Further, the present invention can also be adopted when constructing a non-reinforced fabric base 4 having no reinforcing bar frame 25.

【0027】[0027]

【発明の効果】以上説明したように、本発明によれば、
布基礎を構成するコンクリートに対して土間コンクリー
トを一体的に打設できるので、施工工期を短縮できると
ともに、施工後における床下空間の防湿性を有効に確保
することができる。
As described above, according to the present invention,
Since the soil concrete can be cast integrally with the concrete constituting the cloth foundation, the construction period can be shortened, and the moisture resistance of the underfloor space after the construction can be effectively secured.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の建物基礎及びこれを構築するための型
枠ユニットの断面図である。
FIG. 1 is a sectional view of a building foundation and a formwork unit for constructing the same according to the present invention.

【図2】同型枠ユニットの組み立て斜視図である。FIG. 2 is an assembled perspective view of the same formwork unit.

【図3】同建物基礎及び型枠ユニットにおけるボイド型
枠を設置する部分の断面図である。
FIG. 3 is a sectional view of a portion where a void form is installed in the building foundation and the form unit.

【図4】ボイド型枠の斜視図である。FIG. 4 is a perspective view of a void formwork.

【図5】同建物基礎と型枠ユニットのコーナー部分の斜
視図である。
FIG. 5 is a perspective view of corners of the building foundation and the formwork unit.

【図6】従来の土間コンクリートの施工方法を示す概略
図である。
FIG. 6 is a schematic view showing a conventional method of constructing earth concrete.

【符号の説明】[Explanation of symbols]

1 建物基礎 2 ベース部 3 立壁部 4 布基礎 5 土間コンクリート 6 掘削溝 13 支持装置 15 ベース部材 16 支持部材 26 鉄筋受け部 30 排水孔 31 ボイド型枠 DESCRIPTION OF SYMBOLS 1 Building foundation 2 Base part 3 Standing wall part 4 Fabric foundation 5 Soil concrete 6 Excavation groove 13 Supporting device 15 Base member 16 Support member 26 Reinforcement receiving part 30 Drainage hole 31 Void formwork

───────────────────────────────────────────────────── フロントページの続き (72)発明者 井上 修一 大阪府大阪市中央区南船場3丁目12番12号 クボタハウス株式会社内 Fターム(参考) 2D046 BA00 BA01 BA11 BA41 2E177 EA05  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Shuichi Inoue 3-12-12 Minamisenba, Chuo-ku, Osaka-shi, Osaka Kubota House Co., Ltd. F-term (reference) 2D046 BA00 BA01 BA11 BA41 2E177 EA05

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 布基礎(4)の立壁部(3)を構成する
ための相対向する一対の壁型枠(12)と、この両壁型
枠(12)を掘削溝(6)内に浮いた状態で下方から支
持する支持装置(13)と、を備えている布基礎用型枠
ユニットにおいて、 前記支持装置(13)は、前記両壁型枠(12)のうち
のいずれか一方又はその双方の下端縁を前記布基礎
(4)で囲まれる敷地内に打設される土間コンクリート
(5)の天端面に一致するように当該壁型枠(12)の
設置高さを位置決めする支持部材(16)を備えている
ことを特徴とする布基礎用型枠ユニット。
1. A pair of opposed wall forms (12) for forming an upright wall (3) of a cloth foundation (4), and the two wall forms (12) are placed in a digging groove (6). A support device (13) for supporting the device from below in a floating state, wherein the support device (13) is one of the double-walled formwork (12) or A support for positioning the installation height of the wall formwork (12) so that both lower edges thereof coincide with the top end face of the slab concrete (5) cast in a site surrounded by the cloth foundation (4). A form unit for fabric foundation, comprising a member (16).
【請求項2】 支持装置(13)は、掘削溝(6)内に
載置されるベース部材(15)と、相対向する一対の壁
型枠(12)を下方から支持することができかつ前記ベ
ース部材(15)に対して高さ調整自在に連結された支
持部材(16)と、を備えている請求項1に記載の布基
礎用型枠ユニット。
2. The support device (13) is capable of supporting a base member (15) placed in the excavation groove (6) and a pair of wall forms (12) opposed to each other from below, and The form unit according to claim 1, further comprising a support member (16) connected to the base member (15) so as to be adjustable in height.
【請求項3】 支持部材(16)は、布基礎(4)の内
部に埋設される鉄筋枠(25)を支承する受け部(2
6)を備えている請求項2に記載の布基礎用型枠ユニッ
ト。
3. A receiving member (2) for supporting a reinforcing steel frame (25) embedded in a cloth foundation (4).
3. The fabric foundation form unit according to claim 2, comprising (6).
【請求項4】 布基礎(4)の立壁部(3)の下部をそ
の厚さ方向に貫通する排水孔(30)を形成するための
ボイド型枠(31)が壁型枠(12)の下端部に連結さ
れている請求項1〜3のいずれかに記載の布基礎用型枠
ユニット。
4. A void form (31) for forming a drain hole (30) penetrating a lower part of an upright wall (3) of a cloth foundation (4) in a thickness direction thereof is provided on the wall form (12). The form unit for a cloth foundation according to any one of claims 1 to 3, which is connected to a lower end portion.
【請求項5】 次の各工程(a)〜(c)を有する建物
基礎の施工方法(a) 地盤の所定位置に掘削溝(6)
を掘削する掘削工程 (b) 布基礎(4)の立壁部(3)を構成するための
相対向する一対の壁型枠(12)を、そのうちのいずれ
か一方又はその双方の下端縁が当該布基礎(4)で囲ま
れる敷地内の土間コンクリート(5)の天端面に一致す
るように、前記掘削溝(6)内に設置する型枠設置工程 (c) 前記布基礎(4)のベース部(2)及び立壁部
(3)に相当する部分にコンクリートを打設するととも
に、前記布基礎(4)で囲まれる敷地内に前記天端面の
レベルまでコンクリートを打設するコンクリート打設工
5. A method for constructing a building foundation having the following steps (a) to (c): (a) a digging trench (6) at a predetermined position on the ground;
(B) A pair of opposing wall formwork (12) for forming the upright wall (3) of the cloth foundation (4), the lower edge of one or both of which is the lower edge. Formwork setting step of setting in the excavation groove (6) so as to coincide with the top end surface of the slab concrete (5) in the site surrounded by the cloth foundation (4) (c) Base of the cloth foundation (4) Concrete casting step of placing concrete in a portion corresponding to the section (2) and the standing wall section (3), and placing concrete to the level of the top end surface in a site surrounded by the cloth foundation (4).
JP2000029416A 2000-02-07 2000-02-07 Form unit for continuous footing, and method for constructing building foundation using the same Pending JP2001220890A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000029416A JP2001220890A (en) 2000-02-07 2000-02-07 Form unit for continuous footing, and method for constructing building foundation using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000029416A JP2001220890A (en) 2000-02-07 2000-02-07 Form unit for continuous footing, and method for constructing building foundation using the same

Publications (1)

Publication Number Publication Date
JP2001220890A true JP2001220890A (en) 2001-08-17

Family

ID=18554681

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000029416A Pending JP2001220890A (en) 2000-02-07 2000-02-07 Form unit for continuous footing, and method for constructing building foundation using the same

Country Status (1)

Country Link
JP (1) JP2001220890A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023587A (en) * 2003-06-30 2005-01-27 Sekisui Chem Co Ltd Drainage structure of building foundation
JP2014200986A (en) * 2013-04-04 2014-10-27 株式会社Nsp Ks Finishing sheet for concrete structure, and concrete structure finishing method using the same
JP2016056510A (en) * 2014-09-05 2016-04-21 大和ハウス工業株式会社 Foundation structure of building, and construction method for foundation of building
CN106436732A (en) * 2016-01-21 2017-02-22 苏州中固建筑科技股份有限公司 Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
JP2020066941A (en) * 2018-10-25 2020-04-30 吉川化成株式会社 Drain plug of foundation

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005023587A (en) * 2003-06-30 2005-01-27 Sekisui Chem Co Ltd Drainage structure of building foundation
JP2014200986A (en) * 2013-04-04 2014-10-27 株式会社Nsp Ks Finishing sheet for concrete structure, and concrete structure finishing method using the same
JP2016056510A (en) * 2014-09-05 2016-04-21 大和ハウス工業株式会社 Foundation structure of building, and construction method for foundation of building
CN106436732A (en) * 2016-01-21 2017-02-22 苏州中固建筑科技股份有限公司 Reinforcing method and reinforcing structure for replacing strip foundations by raft foundations
CN106436732B (en) * 2016-01-21 2019-03-12 苏州中固建筑科技股份有限公司 A kind of strip footing is replaced as the reinforcement means and ruggedized construction of raft foundation
JP2020066941A (en) * 2018-10-25 2020-04-30 吉川化成株式会社 Drain plug of foundation

Similar Documents

Publication Publication Date Title
US4843658A (en) Swimming pool and method of construction
KR101600845B1 (en) The horizontal structural frame and the underground construction methods using it
KR20190022132A (en) Top-down method using precast-concrete colum
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
JP2001220890A (en) Form unit for continuous footing, and method for constructing building foundation using the same
JP3107716B2 (en) Soil retaining wall
JP3251567B2 (en) Construction method of open caisson bottom
JP4611113B2 (en) Integrated construction method of pile and column
JP3026131B2 (en) Retaining wall structure and its construction method
JP5280150B2 (en) Yamadome retaining wall and method of forming Yamadome retaining wall
JP2020094443A (en) Method for constructing foundation of building
JP2003105777A (en) Foundation constructing method
JP2002227410A (en) Form unit for building foundation, method for executing building foundation and building foundation
JP4332651B2 (en) Foundation reinforcement device and foundation construction method
JP4611108B2 (en) Integrated construction method of pile and column
JPH11241349A (en) Mat foundation for dwelling house, and construction method thereof
JPH07279184A (en) Floating underground beam foundation for building
JP2547497Y2 (en) Precast foundation material for rectangular section concrete cloth foundation
JP2719648B2 (en) Pillar foundation structure and pillar pier foundation method
JP3567387B2 (en) How to build an underground skeleton
JPH07233534A (en) Precast concrete foundation construction, precast concrete foundation, and construction method for foundation
JP2584324Y2 (en) Permeation storage tank
KR200241078Y1 (en) A pillar for interception
JPH09228395A (en) Retaining wall structure
JPH04143322A (en) Forming method for concrete foundation