JP2000328779A - Connecting pin for scaffold vertical frame - Google Patents
Connecting pin for scaffold vertical frameInfo
- Publication number
- JP2000328779A JP2000328779A JP11136645A JP13664599A JP2000328779A JP 2000328779 A JP2000328779 A JP 2000328779A JP 11136645 A JP11136645 A JP 11136645A JP 13664599 A JP13664599 A JP 13664599A JP 2000328779 A JP2000328779 A JP 2000328779A
- Authority
- JP
- Japan
- Prior art keywords
- pin
- pin body
- projection
- scaffolding frame
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、順次上方に連結し
ていくのに適した仮設用足場建枠の連結ピンに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting pin of a temporary scaffolding frame which is suitable for sequentially connecting upward.
【0002】[0002]
【従来の技術】建物の建築現場において、足場建枠を順
次上方に組み立てていくには、上下に対向する足場建枠
を互いに連結するための連結手段が必要となる。この連
結手段として、下方側の足場建枠の左右上端部に連結ピ
ンを突設し、これに上方側の足場建枠の左右上端部を差
し込むようにしている。2. Description of the Related Art In order to assemble scaffolding frames sequentially upward at a building site of a building, connecting means for connecting scaffolding frames facing up and down to each other is required. As this connecting means, connecting pins are protruded from the left and right upper ends of the lower scaffold building frame, and the left and right upper ends of the upper scaffold building frame are inserted into the connecting pins.
【0003】しかして、従来の連結ピンでは、中空状ピ
ン本体の内部に、ばねに付勢されてピン本体の外部に突
出する係合突起を設け、係合突起に、この係合突起をば
ねの付勢力に抗してピン本体の内部に退入力を負荷する
滑り面と、この係合突起をピン本体の内部方向の退入位
置に係合する係合段部とを設けている。In the conventional connecting pin, however, an engaging projection which is urged by a spring and protrudes to the outside of the pin body is provided inside the hollow pin body, and this engaging projection is attached to the spring projection. A sliding surface for applying a regression force to the inside of the pin body against the urging force of the pin body, and an engaging step portion for engaging the engaging protrusion with a retreat position in the inward direction of the pin body.
【0004】この連結ピンの使用において、下方側足場
建枠の縦パイプにその下端側を連結したピン本体に、上
方側足場建枠の縦パイプの下端部を差し込むことによっ
て、その差込み途上で、係合突起の滑り面に縦パイプの
下端が当接し、その当接力により負荷される退入力によ
って係合突起がピン本体内部に退入し、縦パイプの下端
部がピン本体に挿入され、この挿入途上で、係合突起が
ばねに付勢されて縦パイプ下端部の係合孔に係合し、ロ
ック状態となって上下の足場建枠が互いに連結される。
そして、足場建枠を取り外すときは、上方側足場建枠の
縦パイプ下端部から突出している係合突起を作業者の足
先等で退入方向に押圧すれば、その退入途上で係合突起
が係合段部に係合して退入位置、即ち解放位置に保持さ
れるから、上方側足場建枠の縦パイプをピン本体から抜
き出して、足場建枠は取り外すことができる。In the use of this connecting pin, the lower end of the vertical pipe of the upper scaffolding frame is inserted into a pin body having its lower end connected to the vertical pipe of the lower scaffolding frame. The lower end of the vertical pipe abuts on the sliding surface of the engagement projection, and the retraction force applied by the abutting force causes the engagement projection to retreat inside the pin main body, and the lower end of the vertical pipe to be inserted into the pin main body. During the insertion, the engaging projections are urged by the springs to engage with the engaging holes at the lower end of the vertical pipe, and become locked, whereby the upper and lower scaffold building frames are connected to each other.
Then, when removing the scaffolding frame, if the engaging projection protruding from the lower end of the vertical pipe of the upper scaffolding frame is pressed in the retreating direction by the operator's toe or the like, the engaging is performed during the retreating. Since the projection is engaged with the engaging step and is held at the retracted position, that is, the release position, the vertical pipe of the upper scaffolding frame can be pulled out from the pin body and the scaffolding frame can be removed.
【0005】[0005]
【発明が解決しようとする課題】上記従来の連結ピンで
は、上下足場建枠が連結された状態において、上方側足
場建枠の縦パイプ下端部から外部に突出している係合突
起の先端突出部を押圧することによって、係合突起がロ
ック解除位置に保持されることから、作業中に物や作業
者の足が係合突起の先端突出部に当たると、この係合突
起が押されて、知らぬ間に係合突起が解放状態となり、
不測の事態をまねくおそれがあった。In the above-mentioned conventional connecting pin, when the upper and lower scaffolding frames are connected to each other, the tip projecting portions of the engaging projections projecting outward from the lower end of the vertical pipe of the upper scaffolding frame. By pressing the engaging projection, the engaging projection is held at the unlocked position. Therefore, if an object or the foot of an operator hits the tip projecting portion of the engaging projection during the work, the engaging projection is pushed and the information is transmitted. In the meantime, the engagement projections are released,
There was a risk of an unexpected situation.
【0006】本発明は、上記のような課題に鑑み、足場
建枠が相互に連結された状態において係合突起が簡単に
解放状態となることがなく、作業上の安全性を確保でき
るようにした連結ピンを提供することを目的とする。The present invention has been made in view of the above-mentioned problems, and it has been found that the engagement projections do not easily become a released state in a state where the scaffolding frames are connected to each other, so that work safety can be ensured. It is an object of the present invention to provide a connecting pin.
【0007】[0007]
【課題を解決するための手段】請求項1に係る発明の足
場建枠用連結ピンは、中空状ピン本体7の内部に、ピン
本体7の内壁に沿って軸方向に延びる支持杆12と、支
持杆12の上端部及び下端部に設けられて夫々ピン本体
7の外部に突出する係合突起9及び連結用突起11と、
支持杆12を介して前記両突起9,11をピン本体7の
外部に突出させるように付勢するばね13とを設け、ピ
ン本体7には、外部に操作片19を突出したロック部材
20を、支持杆12との間で、ピン本体7の内壁に沿っ
て平行に位置するロック姿勢と、ロック姿勢から部材上
端部側がピン本体7内壁から離れるように傾転した非ロ
ック姿勢とに亘って姿勢変更可能に設け、前記操作片1
9を引き起こしてロック部材20をロック姿勢から非ロ
ック姿勢に傾転させることにより、係合突起9がばね付
勢力に抗してピン本体7内部へ後退するようにしたこと
を特徴とする。According to the first aspect of the present invention, there is provided a connecting pin for a scaffolding frame, comprising: a supporting rod 12 extending in an axial direction along an inner wall of a pin body 7 inside a hollow pin body 7; An engagement projection 9 and a connection projection 11 provided at an upper end and a lower end of the support rod 12 and protruding outside the pin body 7, respectively;
A spring 13 is provided to urge the projections 9 and 11 out of the pin body 7 via the support rod 12. A lock member 20 having an operation piece 19 projecting to the outside is provided on the pin body 7. Between the support rod 12 and the lock position parallel to the inner wall of the pin body 7, and a non-lock position in which the upper end of the member is tilted away from the inner wall of the pin body 7 from the lock position. The operation piece 1 is provided so that the posture can be changed.
9, the locking member 20 is tilted from the locked position to the unlocked position, whereby the engaging projection 9 is retracted into the pin main body 7 against the urging force of the spring.
【0008】請求項2は、請求項1に記載の足場建枠用
連結ピンにおいて、支持杆12下端部の連結用突起11
を、支持杆12に対しその長手方向前後に若干量スライ
ドできるように取り付けてなることを特徴とする。According to a second aspect of the present invention, there is provided the connecting pin for a scaffolding frame according to the first aspect, wherein the connecting projection is provided at a lower end of the support rod.
Is attached to the support rod 12 so as to be able to slide a little in the longitudinal direction.
【0009】請求項3は、請求項1又は2に記載の足場
建枠用連結ピンにおいて、係合突起9の先端部は、ロッ
ク部材20が非ロック姿勢にあって係合突起9がばね付
勢力に抗して後退している時でも、ピン本体7の外側面
から若干突出した状態にあり、しかして係合突起9の先
端部が押圧されて係合突起9が更にピン本体7内に後退
されることにより、ロック部材20は、支持杆12との
押接状態から解放されて、その自重によりロック姿勢に
傾転するようになっていることを特徴としている。According to a third aspect of the present invention, in the connecting pin for a scaffolding frame according to the first or second aspect, the distal end portion of the engaging projection 9 has a locking member 20 in a non-locking posture and the engaging projection 9 has a spring. Even when the pin is retracted against the force, the pin is slightly protruded from the outer surface of the pin body 7, and the tip of the engaging projection 9 is pressed, so that the engaging projection 9 is further inserted into the pin body 7. By being retracted, the lock member 20 is released from the state of being pressed against the support rod 12, and is tilted to the lock position by its own weight.
【0010】[0010]
【発明の実施の形態】図1は、上方側の足場建枠aと下
方側の足場建枠bとの連結前の状態を示す。各足場建枠
a,bは、左右の縦パイプ1,1と両パイプ1,1をつ
なぐ横パイプ2と縦横パイプ1,2間にわたって取り付
けられた補強桟3,3とからなるもので、横パイプ2に
は足場板4が、その爪4aを横パイプ2に掛合すること
によって懸架されている。そして、各縦パイプ1の下端
部には足場板4側に面して係合孔5が穿設されており、
上下足場建枠a,bの対向する縦パイプ1,1間に本発
明に係る連結ピン6が差し込まれるようになっている。DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows a state before an upper scaffolding frame a and a lower scaffolding frame b are connected to each other. Each scaffolding frame a, b is composed of left and right vertical pipes 1, 1 and a horizontal pipe 2 connecting both pipes 1, 1 and reinforcing bars 3, 3 attached between the vertical and horizontal pipes 1, 2. A scaffold plate 4 is suspended from the pipe 2 by hooking its claws 4 a on the horizontal pipe 2. An engagement hole 5 is formed at the lower end of each vertical pipe 1 so as to face the scaffold plate 4 side.
The connecting pin 6 according to the present invention is inserted between the vertical pipes 1 and 1 of the upper and lower scaffolding frames a and b.
【0011】図2は、連結ピン6の外観斜視図で、同図
の(A)は、後述するロック部材20がロック姿勢にあ
って、係合突起9がピン本体7の外部に突出している状
態を示し、(B)は、ロック部材20が非ロック姿勢に
あって、係合突起9がピン本体7内部へ後退している状
態を示す。図3の(A)は、図2の(A)に示される状
態にある連結ピン6の正面図、同図の(B)はその縦断
面図である。また、図4及び図5は、連結ピン6によっ
て下方側足場建枠bに上方側足場建枠aを連結する場合
及び上方側足場建枠aを取り外す場合の作用を示す縦断
面図である。FIG. 2 is a perspective view of the external appearance of the connecting pin 6. FIG. 2A shows a locking member 20, which will be described later, is in a locking position, and an engaging projection 9 projects outside the pin body 7. FIG. (B) shows a state in which the lock member 20 is in the unlocked position and the engagement protrusion 9 is retracted into the pin body 7. FIG. 3A is a front view of the connecting pin 6 in the state shown in FIG. 2A, and FIG. 3B is a longitudinal sectional view thereof. 4 and 5 are longitudinal sectional views showing the operation when the upper scaffolding frame a is connected to the lower scaffolding frame b by the connecting pin 6 and when the upper scaffolding frame a is removed.
【0012】これらの図から分かるように、連結ピン6
は円管状のピン本体7を有し、このピン本体7の軸方向
中央部に短管部材8が嵌合固着されて、この短管部材8
とピン上部7a及びピン下部7bとの間に外周段部8
a,8bを形成し、ピン上部7aに差し込まれる上方側
足場建枠aの縦パイプ1と、ピン下部7bに差し込まれ
る下方側足場建枠bの縦パイプ1とは、それぞれの端面
が上記外周段部8a,8bに当接して位置決めされ、そ
の位置で縦パイプ1下端部の係合孔5にピン本体7から
突出する係合突起9が係合すると共に、下方側足場建枠
bの縦パイプ1上端部の連結孔10にピン本体7の連結
用突起11が係合するようになっている。尚、短管部材
8に代えて、ピン本体7の軸方向中央部を肉厚に一体形
成するようにしてもよい。As can be seen from these figures, the connecting pins 6
Has a tubular pin body 7, and a short tube member 8 is fitted and fixed to an axial center of the pin body 7,
Outer peripheral step 8 between the upper pin 7a and the lower pin 7b
a, 8b, and the vertical pipe 1 of the upper scaffolding frame a inserted into the pin upper part 7a and the vertical pipe 1 of the lower scaffolding frame b inserted into the pin lower part 7b, each end face having the outer periphery Positioned in contact with the steps 8a and 8b, the engaging projection 9 projecting from the pin body 7 engages with the engaging hole 5 at the lower end of the vertical pipe 1 at that position, and the vertical of the lower scaffolding frame b The connection protrusion 11 of the pin body 7 is engaged with the connection hole 10 at the upper end of the pipe 1. Note that, instead of the short pipe member 8, the central portion in the axial direction of the pin body 7 may be integrally formed with a thick wall.
【0013】係合突起9は、ピン本体7の内壁に沿って
軸方向に延びる支持杆12の上端部に垂直横向きに突設
されており、支持杆12の下端部には連結用突起11が
係合突起9と同じ垂直横向きに突設されてはいるが、こ
の連結用突起11は、支持杆12の長手方向前後に若干
量スライドできるように支持杆12に取り付けられてい
る。支持杆12の背面側にはその長手方向中央部に、両
端部がピン本体7の内壁面に摺動可能に弾接される側面
視円弧状の板ばね13の長手方向中央部が固着され、こ
の板ばね13の付勢力によって、係合突起9及び連結用
突起11がピン上部7aのピン孔14a及びピン下部7
bのピン孔14bから夫々外部に突出するようになって
いる。また、係合突起9の上面側には下方に向かって傾
斜する滑り面17が形成されると共に、この係合突起9
の下面側先端部には上方に向かって傾斜する副滑り面1
8が形成されている。The engaging projection 9 is vertically and horizontally projected at the upper end of a support rod 12 extending in the axial direction along the inner wall of the pin body 7, and the lower end of the support rod 12 has a connecting projection 11. Although projecting in the same vertical and horizontal direction as the engagement projection 9, the connection projection 11 is attached to the support rod 12 so as to be able to slide a little in the longitudinal direction of the support rod 12. On the back side of the support rod 12, a longitudinal center part of a plate spring 13 having an arcuate shape in a side view, both ends of which are slidably elastically contacted with the inner wall surface of the pin body 7, is fixed to the longitudinal center part thereof. The urging force of the leaf spring 13 causes the engaging projection 9 and the connecting projection 11 to move the pin hole 14a and the pin lower
b project from the pin holes 14b to the outside. A sliding surface 17 that is inclined downward is formed on the upper surface side of the engagement protrusion 9.
Sub-sliding surface 1 that slopes upward at the lower end on the lower side
8 are formed.
【0014】支持杆12は、図3、図6及び図7から分
かるように、板状本体12aと両側壁12b,12bと
によって断面略コ字形に形成されたもので、板状本体1
2aの一端部(上端部)に係合突起9が取付軸体30に
よって固着されている。この板状本体12aの他端部
(下端部)には板状本体12aの長手方向に長い長孔3
1が設けてあって、この長孔31に連結用突起11の取
付軸体32が挿通され、これによって連結用突起11は
支持杆12に対し垂直横向き姿勢に保持された状態で支
持杆12長手方向前後に2mm程度スライドできるよう
になっている。また板ばね13は、カシメ材33によっ
て板状本体12aに取付けられている。As can be seen from FIGS. 3, 6, and 7, the support rod 12 is formed in a substantially U-shaped cross section by a plate-like body 12a and both side walls 12b, 12b.
The engaging projection 9 is fixed to one end (upper end) of the 2a by a mounting shaft 30. The other end (lower end) of the plate-shaped main body 12a has a long hole 3 elongated in the longitudinal direction of the plate-shaped main body 12a.
The mounting shaft 32 of the connecting protrusion 11 is inserted into the elongated hole 31, whereby the connecting protrusion 11 is held in a state in which the connecting protrusion 11 is held in a vertically horizontal position with respect to the supporting rod 12. It can slide about 2 mm back and forth in the direction. The leaf spring 13 is attached to the plate-shaped main body 12a by a caulking material 33.
【0015】また、ピン本体7には、外部に操作片19
を突出させたロック部材20が、支持杆12との間にお
いて、図4に示すようにピン本体7の内壁に沿って平行
に位置するロック姿勢と、このロック姿勢から当該部材
12の上端部側がピン本体7の内壁から離れるように傾
転した図5の(A)に示すような非ロック姿勢とに亘っ
て姿勢変更可能に設けられ、上記操作片19を引き起こ
してロック部材20をロック姿勢から非ロック姿勢に傾
転させることにより、係合突起9が板ばね13の付勢力
に抗してピン本体7の内部へ後退するようになってい
る。The pin body 7 has an operation piece 19 externally.
The locking member 20 with the protrusion is positioned between the supporting rod 12 and the locking position parallel to the inner wall of the pin body 7 as shown in FIG. The attitude is provided so as to be changeable over a non-locking posture as shown in FIG. 5A tilted away from the inner wall of the pin main body 7, causing the operation piece 19 to move the locking member 20 from the locking posture. By tilting to the unlocked position, the engagement projection 9 is retracted into the pin body 7 against the urging force of the leaf spring 13.
【0016】ロック部材20は、図3及び図6の(B)
から分かるように、コ字形断面の支持杆12内に嵌合さ
れる矩形体状本体部21の外面側に幅狭の係嵌部22を
介して操作片19を一体に突設すると共に、本体部21
の上端突起部21aと幅狭係嵌部22の上端面との間に
係止用段部26を形成してなるもので、ピン本体7側に
は、図6の(A)に示すように、ロック部材20の操作
片19が挿脱可能な上部側の横長溝部23と幅狭係嵌部
22が係脱可能な縦長溝部24とからなる略T字形のガ
イド溝25が、短管部材8とピン本体7とに亘って貫設
されている。しかして、このロック部材20をピン本体
7に取り付けるにあたっては、図6の(B)に示すよう
に、ロック部材20の本体部21を、支持杆12内にそ
の長手方向中間部よりも係合突起9側に寄った位置に嵌
合した状態でピン本体7内に挿入し、操作片19をT字
形ガイド溝25の横長溝部23から外部へ突出させて、
幅狭係嵌部22を縦長溝部24に係嵌させることによ
り、図2の(A)及び図3の(A)、(B)に示すよう
な状態となる。The lock member 20 is shown in FIGS. 3 and 6B.
As can be seen from the figure, the operation piece 19 is integrally protruded from the outer surface side of the rectangular main body portion 21 fitted into the support rod 12 having the U-shaped cross section via the narrow engaging portion 22 and the main body. Part 21
The locking step 26 is formed between the upper end protruding portion 21a and the upper end surface of the narrow engaging portion 22. As shown in FIG. A substantially T-shaped guide groove 25 comprising an upper horizontally long groove 23 into which the operation piece 19 of the lock member 20 can be inserted and detached and a vertically long groove 24 from which the narrow engagement portion 22 can be disengaged is formed by the short pipe member 8. And the pin body 7. When attaching the lock member 20 to the pin main body 7, the main body 21 of the lock member 20 is engaged with the support rod 12 more than the intermediate portion in the longitudinal direction, as shown in FIG. The operation piece 19 is inserted into the pin main body 7 in a state where the operation piece 19 is fitted to a position close to the projection 9 side, and is protruded outside from the horizontally long groove portion 23 of the T-shaped guide groove 25.
By engaging the narrow engagement portion 22 with the vertically elongated groove portion 24, a state as shown in FIG. 2A and FIGS. 3A and 3B is obtained.
【0017】図2の(A)及び図3の(A)、(B)は
ロック部材20がロック姿勢となっている状態を示すも
ので、このロック姿勢では、幅狭係嵌部22がT字形ガ
イド溝25の縦長溝部24に傾転可能に係嵌していて、
操作片19が略水平に突出すると共に本体部21がピン
本体7の内壁に沿って平行に位置している。このロック
姿勢の状態から、図5(A)に示すように操作片19を
上向きに引き起こして、本体部21をその上端部側がピ
ン本体7内壁から離れるように傾転させ、ロック部材2
0を非ロック姿勢に姿勢変更することによって、支持杆
12の上端部側、即ち係合突起9側が、ばね13の付勢
力に抗して下端部の連結用突起11を中心に傾倒し、そ
れにより係合突起9は図5(A)のようにピン本体7の
内部側へ後退して解放状態となる。この時、ロック部材
20の係止用段部26がT字形ガイド溝25の横長溝部
23上端とピン本体7内壁との隅角部に係止されると共
に、本体部21の内面側上端部が支持杆12に押接さ
れ、この状態でロック部材20は非ロック姿勢に保持さ
れている。FIGS. 2A, 3A, and 3B show a state in which the lock member 20 is in the locked position. In this locked position, the narrow engagement portion 22 is in the T position. Is engaged with the vertically long groove portion 24 of the V-shaped guide groove 25 so as to be tiltable,
The operation piece 19 projects substantially horizontally, and the main body 21 is located parallel to the inner wall of the pin main body 7. From this locked posture, the operation piece 19 is raised upward as shown in FIG. 5 (A), and the main body 21 is tilted so that the upper end thereof is separated from the inner wall of the pin main body 7, and the lock member 2 is rotated.
By changing the position of the support rod 12 to the unlocked position, the upper end side of the support rod 12, that is, the engagement projection 9 side is tilted about the connection projection 11 at the lower end against the urging force of the spring 13, and As a result, the engagement protrusion 9 retreats to the inside of the pin body 7 as shown in FIG. At this time, the locking step 26 of the lock member 20 is locked at the corner between the upper end of the elongated groove 23 of the T-shaped guide groove 25 and the inner wall of the pin body 7, and the upper end of the inner surface of the main body 21 is The lock member 20 is pressed against the support rod 12, and in this state, the lock member 20 is held in the unlocked position.
【0018】上記のように係合突起9がばね付勢力に抗
して後退した解放状態にあっても、この係合突起9の先
端部は図5の(A)に示すようにピン本体7の外側面か
ら若干突出した状態となっている。しかして、このよう
な状態から係合突起9の先端部を押圧して係合突起9を
更にピン本体7内に後退させることによって、ロック部
材20は、支持杆12との押接状態から解放されて、図
5の(B)に示すように自重によって非ロック姿勢から
ロック姿勢へと傾転するようになっている。As described above, even when the engagement projection 9 is in the released state in which the engagement projection 9 is retracted against the urging force of the spring, the tip end of the engagement projection 9 can be used as shown in FIG. Slightly protruding from the outer side surface. In this state, the locking member 20 is released from the pressed state with the support rod 12 by pressing the distal end of the engagement projection 9 to further retract the engagement projection 9 into the pin body 7. Then, as shown in FIG. 5 (B), the vehicle is tilted from the unlocked position to the locked position by its own weight.
【0019】上述のように構成される足場建枠用連結ピ
ン6の使用に際しては、先ず、ピン孔14bから外部に
突出した連結用突起11を板ばね13の付勢力に抗して
ピン本体7内へ退入させた状態で、ピン本体7のピン下
部7bを下方側足場建枠bの縦パイプ1の上端部に差し
込み、連結用突起11を縦パイプ1の連結孔10に係合
させて図3に示すような状態とする。これによって、ピ
ン本体7は、下方側足場建枠bの縦パイプ1の上端部に
取り付けられ、以後は足場建枠の不使用時でも取り外す
必要はない。このとき、ロック部材20はロック姿勢に
あって、係合突起9は板ばね13の付勢力によりピン本
体7の外部に突出したロック位置に保持されている。When using the connecting pin 6 for a scaffolding frame constructed as described above, first, the connecting projection 11 protruding to the outside from the pin hole 14b is pressed against the pin body 7 against the urging force of the leaf spring 13. In the state of being retracted inside, the pin lower portion 7b of the pin main body 7 is inserted into the upper end of the vertical pipe 1 of the lower scaffolding frame b, and the connection projection 11 is engaged with the connection hole 10 of the vertical pipe 1. The state is as shown in FIG. As a result, the pin body 7 is attached to the upper end of the vertical pipe 1 of the lower scaffolding frame b, and there is no need to remove it thereafter even when the scaffolding frame is not used. At this time, the lock member 20 is in the lock position, and the engagement protrusion 9 is held at the lock position protruding outside the pin main body 7 by the urging force of the leaf spring 13.
【0020】次に、上方側足場建枠aの縦パイプ1を、
下方側足場建枠bに取り付けたピン本体のピン上部7a
に差し込むと、その差し込み途上で、係合突起9の滑り
面17に縦パイプ1の下端部が当接し、その当接力によ
り負荷される退入力によって、係合突起9は図4の
(A)に示すようにピン本体7の内部側へ後退して解放
状態となる。このとき、ロック部材20は、同図のよう
なロック姿勢にある。Next, the vertical pipe 1 of the upper scaffolding frame a is
Pin upper part 7a of the pin body attached to lower side scaffolding frame b
4A, the lower end of the vertical pipe 1 abuts on the sliding surface 17 of the engagement projection 9 during the insertion, and the engagement projection 9 is moved by the retreat force applied by the contact force. As shown in (1), the pin is retracted into the inside of the pin body 7 to be in a released state. At this time, the lock member 20 is in the lock posture as shown in FIG.
【0021】そして、係合突起9の先端部が、上方側足
場建枠aの縦パイプ1内側面に当接した状態で更に下動
し、図4の(B)に示すように縦パイプ1の下端がピン
上部7aの外周段部8aに当接すると、この縦パイプ1
の係合孔5に係合突起9が対向位置することになって、
係合突起9は板ばね13の付勢力により突出して縦パイ
プ1の係合孔5に係合し、これによって上方側足場建枠
aと下方側足場建枠bとが互いに連結されることにな
る。Then, the distal end of the engaging projection 9 is further moved downward in a state of contact with the inner surface of the vertical pipe 1 of the upper scaffolding frame a, and as shown in FIG. When the lower end of the vertical pipe abuts on the outer peripheral step 8a of the pin upper part 7a, this vertical pipe 1
The engagement protrusion 9 is positioned opposite to the engagement hole 5 of
The engaging projection 9 projects by the urging force of the leaf spring 13 and engages with the engaging hole 5 of the vertical pipe 1, whereby the upper scaffolding frame a and the lower scaffolding frame b are connected to each other. Become.
【0022】上方側足場建枠aを下方側足場建枠bから
取り外す場合には、図4(B)のようにロック姿勢にあ
るロック部材20の操作片19を図5の(A)に示すよ
うに引き起こして、このロック部材20をロック姿勢か
ら非ロック姿勢へと傾転させることにより、係合突起9
が板ばね13の付勢力に抗してピン本体7内へ後退し、
解放されるから、この状態で上方側足場建枠aの縦パイ
プ1を下方側足場建枠bの縦パイプ1に取り付けられた
ピン本体7から抜き出せばよい。When removing the upper scaffolding frame a from the lower scaffolding frame b, the operation piece 19 of the lock member 20 in the locked position as shown in FIG. 4B is shown in FIG. 5A. In this manner, the lock member 20 is tilted from the locked position to the non-locked position, so that
Retreats into the pin body 7 against the urging force of the leaf spring 13,
In this state, the vertical pipe 1 of the upper scaffolding frame a may be pulled out from the pin body 7 attached to the vertical pipe 1 of the lower scaffolding frame b.
【0023】この際、図5の(A)に示すように係合突
起9の先端部がピン本体7外側面から若干突出している
が、この係合突起9の下面側先端部には上方に向かって
傾斜する副滑り面18が形成されているから、縦パイプ
1の抜き取り時にこの縦パイプ1の係合孔5の下端縁部
が副滑り面18に当接し、それによって係合突起9は板
ばね13の付勢力に抗してピン本体7内部へ更に後退
し、縦パイプ1の抜き取りに支障を来すことがない。At this time, as shown in FIG. 5A, the distal end of the engaging projection 9 slightly protrudes from the outer surface of the pin main body 7, but the distal end of the engaging projection 9 on the lower surface side faces upward. Since the sub-sliding surface 18 inclined toward the vertical pipe 1 is formed, the lower end edge of the engaging hole 5 of the vertical pipe 1 comes into contact with the sub-sliding surface 18 when the vertical pipe 1 is withdrawn. Against the urging force of the leaf spring 13, it is further retracted into the pin main body 7, so that there is no hindrance to extracting the vertical pipe 1.
【0024】また、上記のように係合突起9がピン本体
7内部へ更に後退する時に、ロック部材20は、支持杆
12との押接状態から解放されて、図5の(B)に示す
ように自重により非ロック姿勢からロック姿勢へと傾転
して、自動的に元の状態(初期状態)に復帰する。この
ため、次回使用時に、元の状態に戻してやる必要がな
く、ロックし忘れることがない。When the engaging projection 9 is further retracted into the pin body 7 as described above, the lock member 20 is released from the state of being pressed against the supporting rod 12, and is shown in FIG. 5B. As described above, the vehicle is tilted from the unlocked position to the locked position by its own weight, and automatically returns to the original state (initial state). Therefore, there is no need to return to the original state at the next use, and there is no forgetting to lock.
【0025】また、上方側足場建枠aの縦パイプ1を下
方側足場建枠bの縦パイプ1に取り付けられたピン本体
7から抜き取る際に、上方側足場建枠aの縦パイプ1が
ピン本体7に対し真に平行状態で差し込まれている時は
問題ないのであるが、縦パイプ1がピン本体7に対し傾
いた状態で差し込まれている場合には、普通の構造であ
れば、操作片19の引起し操作が困難となって、抜き取
りができなくなることがある。斯かる場合には、既に説
明したように、連結用突起11が支持杆12に対し垂直
横向き姿勢に保持された状態で支持杆12長手方向前後
に2mm程度スライドできるようになっていることか
ら、そのような場合でも操作片19の引起し操作を容易
に行えて、縦パイプ1の抜き取りが可能となる。When the vertical pipe 1 of the upper scaffolding frame a is pulled out from the pin body 7 attached to the vertical pipe 1 of the lower scaffolding frame b, the vertical pipe 1 of the upper scaffolding frame a is pinned. There is no problem when the vertical pipe 1 is inserted in a state of being parallel to the main body 7, but when the vertical pipe 1 is inserted in a state of being inclined with respect to the pin main body 7, if a normal structure is used, In some cases, the raising operation of the piece 19 becomes difficult, and the piece 19 cannot be pulled out. In such a case, as described above, since the connecting projection 11 can be slid about 2 mm back and forth in the longitudinal direction of the support rod 12 in a state in which the connection projection 11 is held in the vertical and horizontal posture with respect to the support rod 12. Even in such a case, the raising operation of the operation piece 19 can be easily performed, and the vertical pipe 1 can be extracted.
【0026】即ち、縦パイプ1がピン本体7に対し傾い
た状態で差し込まれている時には、縦パイプ1の係合孔
5が係合突起9に対し食い付いた状態となって、支持杆
12がピン本体7と一体化しているような状態にあるか
ら、操作片19によるロック部材20の傾転操作ができ
なくなる。然るに、上記のように場合には、連結用突起
11が支持杆12に対し支持杆12長手方向前後に2m
m程度スライドできるようになっていることにより、連
結用突起11が支持杆12長手方向前後に適宜にスライ
ドして、縦パイプ1の係合孔5が係合突起9に食い付く
ようなことがなく、そのため操作片19の引起し操作が
容易に行え、係合突起9をピン本体7内部へ後退させて
縦パイプ1の抜き取りを行うことができる。That is, when the vertical pipe 1 is inserted in an inclined state with respect to the pin body 7, the engaging hole 5 of the vertical pipe 1 bites against the engaging projection 9, and the support rod 12 is inserted. Is in a state of being integrated with the pin main body 7, so that the tilting operation of the lock member 20 by the operation piece 19 cannot be performed. However, in the case described above, the connecting projection 11 is positioned 2 m in the longitudinal direction of the supporting rod 12 with respect to the supporting rod 12.
By being slidable by about m, the connecting projection 11 may be slid appropriately back and forth in the longitudinal direction of the support rod 12, and the engaging hole 5 of the vertical pipe 1 may bite into the engaging protrusion 9. Therefore, the raising operation of the operation piece 19 can be easily performed, and the engagement pipe 9 can be retracted into the pin main body 7 to extract the vertical pipe 1.
【0027】以上説明したような足場建枠用連結ピン6
によれば、上方側足場建枠aの縦パイプ1を下方側足場
建枠bに取り付けたピン本体のピン上部7aに差し込む
だけで、係合突起9がピン本体7の内部側へ後退して解
放状態となった後、板ばね13の付勢力により突出して
縦パイプ1の係合孔5に係合し、これによって上方側足
場建枠aが下方側足場建枠bに自動的に連結されること
になる。The connecting pins 6 for scaffolding frames as described above
According to the above, by simply inserting the vertical pipe 1 of the upper scaffolding frame a into the pin upper portion 7a of the pin body attached to the lower scaffolding frame b, the engaging projection 9 retreats to the inside of the pin main body 7. After being released, it is projected by the urging force of the leaf spring 13 and engages with the engagement hole 5 of the vertical pipe 1, whereby the upper scaffolding frame a is automatically connected to the lower scaffolding frame b. Will be.
【0028】また、上方側足場建枠aを下方側足場建枠
bから取り外す場合には、係合突起9のピン本体7内部
への後退によって、ロック部材20が支持杆12との押
接状態から解放されて、自重により非ロック姿勢からロ
ック姿勢へと傾転し、自動的に元の状態(初期状態)に
復帰するため、次回使用時に、元の状態に戻してやる必
要がなく、ロックし忘れるようなことがない。When the upper scaffolding frame a is detached from the lower scaffolding frame b, the locking member 20 is pressed into contact with the support rod 12 by the retreat of the engaging projection 9 into the pin body 7. From the unlocked position to the locked position due to its own weight, and automatically return to the original state (initial state), so there is no need to return to the original state the next time it is used. Never forget.
【0029】また、上方側足場建枠aの縦パイプ1を下
方側足場建枠bの縦パイプ1に取り付けられたピン本体
7から抜き取る時に、上方側足場建枠aの縦パイプ1が
ピン本体7に対し傾いた状態で差し込まれている場合に
は、操作片19の引起し操作が困難となって、抜き取り
ができなくなることがあるが、連結用突起11が支持杆
12に対し垂直横向き姿勢に保持された状態で支持杆1
2長手方向前後に若干量スライドできるようになってい
るから、斯かる場合でも操作片19の引起し操作が可能
で、縦パイプ1の抜き取りを容易に行うことができる。When the vertical pipe 1 of the upper scaffolding frame a is removed from the pin body 7 attached to the vertical pipe 1 of the lower scaffolding frame b, the vertical pipe 1 of the upper scaffolding frame a is If the connection projection 11 is inclined with respect to the support rod 7, it may be difficult to raise the operation piece 19 and the removal may not be possible. Support rod 1 held in
(2) Since the slider can be slightly slid back and forth in the longitudinal direction, even in such a case, the operation piece 19 can be raised and the vertical pipe 1 can be easily removed.
【0030】[0030]
【発明の効果】請求項1に係る発明の足場建枠用連結ピ
ンによると、操作片によってロック部材をロック姿勢に
しておけば、係合突起をピン本体の外部に突出するロッ
ク状態に保持でき、連結ピンの使用中に、物や作業者の
足が係合突起の先端突出部に当たっても、係合突起は解
放状態とならず、作業上の安全を確保できる。また、上
方側足場建枠の縦パイプを下方側足場建枠に取り付けた
ピン本体のピン上部に差し込むだけで、係合突起がピン
本体の内部側へ後退して解放状態となった後、ばねの付
勢力により突出して縦パイプの係合孔に係合し、これに
よって上方側足場建枠を下方側足場建枠に自動的に連結
させることができる。According to the connecting pin for scaffolding frame of the invention according to the first aspect, if the lock member is in the locked position by the operation piece, the engaging projection can be held in the locked state protruding outside the pin body. Even if an object or an operator's foot hits the projecting end of the engaging projection during use of the connecting pin, the engaging projection is not released, and safety in operation can be ensured. Also, by simply inserting the vertical pipe of the upper scaffolding frame into the upper part of the pin of the pin body attached to the lower scaffolding frame, the engaging projection retreats to the inner side of the pin body and is released, and then the spring is released. And the upper scaffolding frame can be automatically connected to the lower scaffolding frame.
【0031】請求項2に記載のように、支持杆下端部の
連結用突起を支持杆に対しその長手方向前後に若干量ス
ライドできるように取り付けることにより、上方側足場
建枠の縦パイプを下方側足場建枠の縦パイプに取り付け
られたピン本体から抜き取る際に、上方側足場建枠の縦
パイプがピン本体に対し傾いた状態で差し込まれていて
も、操作片の引起し操作が可能となって、縦パイプの抜
き取りを容易に行うことができる。According to the second aspect of the present invention, the connecting pipe at the lower end of the supporting rod is attached to the supporting rod so as to be able to slide slightly in the longitudinal direction of the supporting rod, thereby lowering the vertical pipe of the upper scaffolding frame. When pulling out from the pin body attached to the vertical pipe of the side scaffolding frame, it is possible to raise the operation piece even if the vertical pipe of the upper scaffolding frame is inserted in a state inclined to the pin body As a result, the vertical pipe can be easily extracted.
【0032】請求項3に記載のよれば、係合突起の先端
部は、ロック部材が非ロック姿勢にあって係合突起がば
ね付勢力に抗して後退している時でも、ピン本体の外側
面から若干突出した状態にあって、係合突起の先端部が
押圧されて係合突起が更にピン本体内に後退されること
により、ロック部材が支持杆との押接状態から解放され
て、自重によりロック姿勢に傾転するようになっている
から、上方側足場建枠を下方側足場建枠から取り外す場
合には、係合突起のピン本体内部への後退によって、ロ
ック部材が支持杆との押接状態から解放されて、自重に
より非ロック姿勢からロック姿勢へと傾転し、自動的に
元の状態(初期状態)に復帰するため、次回使用時に、
元の状態に戻してやる必要がなく、ロックし忘れるよう
なことがない。According to the third aspect of the present invention, even when the locking member is in the unlocked position and the engaging protrusion is retracted against the biasing force of the spring, the tip end of the engaging protrusion can be fixed to the pin body. The locking member is released from the state of being pressed against the support rod by being slightly protruded from the outer side surface, the tip of the engagement protrusion being pressed, and the engagement protrusion being further retracted into the pin body. When the upper scaffolding frame is detached from the lower scaffolding frame, the locking member is retracted into the pin main body so that the locking member is supported by the support rod. Is released from the pushing state, and it tilts from the unlocked position to the locked position due to its own weight, and automatically returns to the original state (initial state).
There is no need to return to the original state, and you will never forget to lock.
【図1】 上方側の足場建枠と下方側の足場建枠との連
結前の状態を示す斜視図である。FIG. 1 is a perspective view showing a state before connection between an upper scaffolding frame and a lower scaffolding frame.
【図2】 連結ピンを示す外観斜視図で、(A)は、ロ
ック部材がロック姿勢にあって、係合突起がピン本体の
外部に突出している状態を示し、(B)は、ロック部材
が非ロック姿勢にあって、係合突起がピン本体内部へ後
退している状態を示す。FIGS. 2A and 2B are external perspective views showing a connection pin, in which FIG. 2A shows a state in which a lock member is in a lock position and an engagement protrusion projects outside the pin body, and FIG. Shows a state in which the engagement protrusion is retracted into the pin main body in the unlocked posture.
【図3】 (A)は図2の(A)に示される状態にある
連結ピンの正面図、(B)はその縦断面図である。3A is a front view of a connecting pin in a state shown in FIG. 2A, and FIG. 3B is a longitudinal sectional view thereof.
【図4】 (A)は上方側足場建枠の縦パイプをピン本
体に差し込んでいる途中の状態を示す連結ピンの縦断面
図、(B)は同縦パイプをピン本体に差し込み終えた状
態を示す連結ピンの縦断面図である。FIG. 4A is a longitudinal sectional view of a connecting pin showing a state in which a vertical pipe of an upper scaffolding frame is being inserted into a pin body, and FIG. 4B is a state in which the vertical pipe has been completely inserted into the pin body. It is a longitudinal cross-sectional view of the connecting pin shown in FIG.
【図5】 (A)は上方側足場建枠の縦パイプをピン本
体から抜き出すに際し、ロック部材をロック姿勢から非
ロック姿勢へ傾転している状態を示す縦断面図、(B)
は縦パイプをピン本体から抜き出す際に、ロック部材が
元の状態に復帰する状態を示す縦断面図である。FIG. 5A is a longitudinal sectional view showing a state in which a lock member is tilted from a lock position to a non-lock position when the vertical pipe of the upper scaffolding frame is pulled out from the pin body;
FIG. 6 is a longitudinal sectional view showing a state where the lock member returns to an original state when the vertical pipe is pulled out from the pin main body.
【図6】 (A)はピン本体の一部を示すもので、T字
状のガイド溝を示す斜視図、(B)は支持杆の両端部に
突設された係合突起及び連結用突起と、支持杆に係合す
るロック部材とを示す斜視図である。6A is a perspective view showing a T-shaped guide groove showing a part of a pin body, and FIG. 6B is an engagement projection and a connection projection projected from both ends of a support rod. FIG. 5 is a perspective view showing a lock member engaged with a support rod.
【図7】 (A)は支持杆と、これに取り付けられた係
合突起、連結用突起及び板ばねを支持杆の正面側から見
た正面図、(B)はその側面図である。FIG. 7A is a front view of a support rod, and an engaging projection, a connecting projection, and a leaf spring attached thereto, as viewed from the front side of the support rod, and FIG. 7B is a side view thereof.
a 上方側足場建枠 b 下方側足場建枠 1 縦パイプ 5 係合孔 6 連結ピン 7 ピン本体 9 係合突起 11 連結用突起 12 支持杆 13 板ばね 17 滑り面 18 副滑り面 19 操作片 20 ロック部材 a Upper scaffolding frame b Lower scaffolding frame 1 Vertical pipe 5 Engagement hole 6 Connection pin 7 Pin body 9 Engagement projection 11 Connection projection 12 Support rod 13 Leaf spring 17 Sliding surface 18 Subsliding surface 19 Operation piece 20 Lock member
Claims (3)
壁に沿って軸方向に延びる支持杆と、支持杆の上端部及
び下端部に設けられて夫々ピン本体の外部に突出する係
合突起及び連結用突起と、支持杆を介して前記両突起を
ピン本体の外部に突出させるように付勢するばねとを設
け、ピン本体には、外部に操作片を突出したロック部材
を、支持杆との間で、ピン本体の内壁に沿って平行に位
置するロック姿勢と、ロック姿勢から部材上端部側がピ
ン本体内壁から離れるように傾転した非ロック姿勢とに
亘って姿勢変更可能に設け、前記操作片を引き起こして
ロック部材をロック姿勢から非ロック姿勢に傾転させる
ことにより、係合突起がばね付勢力に抗してピン本体内
部へ後退するようにした足場建枠用連結ピン。1. A support rod extending in an axial direction along an inner wall of a pin body inside a hollow pin body, and engagements provided at an upper end and a lower end of the support rod and projecting outside the pin body, respectively. A projection and a coupling projection are provided, and a spring is provided for urging the projections to project outside the pin body via a support rod, and the pin body supports a lock member projecting an operation piece to the outside. Between the rod and the lock, the posture can be changed between a locked posture parallel to the inner wall of the pin body and a non-locked posture in which the upper end of the member is tilted away from the inner wall of the pin body from the locked posture. A connecting pin for a scaffolding frame, wherein the operating piece is caused to tilt the lock member from the locked position to the unlocked position so that the engaging projection retreats into the pin main body against the urging force of the spring.
対しその長手方向前後に若干量スライドできるように取
り付けてなる請求項1に記載の足場建枠用連結ピン。2. The connecting pin for a scaffolding frame according to claim 1, wherein the connecting projection at the lower end of the supporting rod is attached to the supporting rod so as to be able to slide a little in the longitudinal direction.
ック姿勢にあって係合突起がばね付勢力に抗して後退し
ている時でも、ピン本体の外側面から若干突出した状態
にあり、しかして係合突起の先端部が押圧されて係合突
起が更にピン本体内に後退されることにより、ロック部
材は、支持杆との押接状態から解放されて、その自重に
よりロック姿勢に傾転するようになっている請求項1又
は2に記載の足場建枠用連結ピン。3. The tip of the engaging projection projects slightly from the outer surface of the pin body even when the locking member is in the unlocked position and the engaging projection is retracted against the urging force of the spring. When the tip of the engaging projection is pressed and the engaging projection is further retracted into the pin body, the locking member is released from the state of being pressed against the supporting rod, and the locking member is locked by its own weight. The connecting pin for a scaffolding frame according to claim 1 or 2, wherein the connecting pin is tilted to a posture.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13664599A JP3443035B2 (en) | 1999-05-18 | 1999-05-18 | Connecting pins for scaffolding frames |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP13664599A JP3443035B2 (en) | 1999-05-18 | 1999-05-18 | Connecting pins for scaffolding frames |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2000328779A true JP2000328779A (en) | 2000-11-28 |
JP3443035B2 JP3443035B2 (en) | 2003-09-02 |
Family
ID=15180171
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP13664599A Expired - Fee Related JP3443035B2 (en) | 1999-05-18 | 1999-05-18 | Connecting pins for scaffolding frames |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP3443035B2 (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090026013A1 (en) * | 2004-07-27 | 2009-01-29 | Daniel Grenon | Adjustable and transportable scaffolding |
JP2009024478A (en) * | 2007-06-18 | 2009-02-05 | Gop Kk | Portable workbench |
JP2009524784A (en) * | 2006-01-24 | 2009-07-02 | コンビセイフ インターナショナル アクチボラゲット | Safety pile |
JP2015034398A (en) * | 2013-08-08 | 2015-02-19 | 信和株式会社 | Connector for scaffold |
JP7460987B2 (en) | 2020-10-27 | 2024-04-03 | 日本電信電話株式会社 | Pipe joining equipment and pipe joining equipment assembly |
-
1999
- 1999-05-18 JP JP13664599A patent/JP3443035B2/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090026013A1 (en) * | 2004-07-27 | 2009-01-29 | Daniel Grenon | Adjustable and transportable scaffolding |
JP2009524784A (en) * | 2006-01-24 | 2009-07-02 | コンビセイフ インターナショナル アクチボラゲット | Safety pile |
US8246267B2 (en) * | 2006-01-24 | 2012-08-21 | Combisafe International Ab | Safety post |
JP2009024478A (en) * | 2007-06-18 | 2009-02-05 | Gop Kk | Portable workbench |
JP2015034398A (en) * | 2013-08-08 | 2015-02-19 | 信和株式会社 | Connector for scaffold |
JP7460987B2 (en) | 2020-10-27 | 2024-04-03 | 日本電信電話株式会社 | Pipe joining equipment and pipe joining equipment assembly |
Also Published As
Publication number | Publication date |
---|---|
JP3443035B2 (en) | 2003-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5309329B2 (en) | drawer | |
JPS6012847Y2 (en) | drawer latch device | |
TW200914741A (en) | Fixture, fixing structure of fixed member, fixing method of fixed member and fixation-releasing method of fixture | |
JP2000328779A (en) | Connecting pin for scaffold vertical frame | |
JPH09302922A (en) | Pipe joint | |
JP7003270B2 (en) | Rail struts for drawers | |
JP2653975B2 (en) | Pipe joint | |
JP3306001B2 (en) | Connecting pins for scaffolding frames | |
JP2002045255A (en) | Connecting implement | |
JPH07292958A (en) | Joint of scaffolding frame | |
JP2530773B2 (en) | Scaffolding frame | |
CN117916476A (en) | Folding length adjusting mechanism | |
JP2543644B2 (en) | Connecting pin for scaffolding frame | |
JP3005535U (en) | Handle expansion and contraction adjustment device for the trunk with casters | |
TWI802041B (en) | Fitting component, fitting assembly and carrier | |
JP2543651B2 (en) | Connecting pin for scaffolding frame | |
JP3631400B2 (en) | Scaffolding frame connector | |
JP3025886B1 (en) | Connector lock release mechanism | |
JP2548893B2 (en) | Connecting pin for scaffolding frame | |
JPH0316949Y2 (en) | ||
JP4096788B2 (en) | Ceiling frame | |
JP2570167B2 (en) | Fall prevention mechanism for floor-standing equipment | |
JP4488816B2 (en) | Door plate hanging device | |
JP4864748B2 (en) | Slide shower hook device | |
JP2530774B2 (en) | Connection device for building frame for scaffolding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20030521 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080620 Year of fee payment: 5 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090620 Year of fee payment: 6 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100620 Year of fee payment: 7 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110620 Year of fee payment: 8 |
|
LAPS | Cancellation because of no payment of annual fees |