MY125603A
(en)
|
2000-02-25 |
2006-08-30 |
Shell Int Research |
Processing seismic data
|
GB0100207D0
(en)
|
2001-01-05 |
2001-02-14 |
Geco Prakla Uk Ltd |
A method of processing seismic data
|
US7203342B2
(en)
|
2001-03-07 |
2007-04-10 |
Schlumberger Technology Corporation |
Image feature extraction
|
US8374974B2
(en)
|
2003-01-06 |
2013-02-12 |
Halliburton Energy Services, Inc. |
Neural network training data selection using memory reduced cluster analysis for field model development
|
US7453766B1
(en)
*
|
2003-11-25 |
2008-11-18 |
Michael John Padgett |
Method for deriving 3D output volumes using summation along flat spot dip vectors
|
US7463552B1
(en)
*
|
2003-11-25 |
2008-12-09 |
Michael John Padgett |
Method for deriving 3D output volumes using filters derived from flat spot direction vectors
|
US7453767B1
(en)
*
|
2003-11-25 |
2008-11-18 |
Michael John Padgett |
Method for deriving a 3D GRAZ seismic attribute file
|
FR2871897B1
(en)
*
|
2004-06-21 |
2006-08-11 |
Inst Francais Du Petrole |
METHOD FOR DEFORMING A SEISMIC IMAGE FOR IMPROVED INTERPRETATION
|
US7587373B2
(en)
|
2005-06-24 |
2009-09-08 |
Halliburton Energy Services, Inc. |
Neural network based well log synthesis with reduced usage of radioisotopic sources
|
US7613665B2
(en)
|
2005-06-24 |
2009-11-03 |
Halliburton Energy Services, Inc. |
Ensembles of neural networks with different input sets
|
US8145463B2
(en)
|
2005-09-15 |
2012-03-27 |
Schlumberger Technology Corporation |
Gas reservoir evaluation and assessment tool method and apparatus and program storage device
|
US8812334B2
(en)
|
2006-02-27 |
2014-08-19 |
Schlumberger Technology Corporation |
Well planning system and method
|
US7877246B2
(en)
|
2006-09-22 |
2011-01-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US7895241B2
(en)
|
2006-10-16 |
2011-02-22 |
Schlumberger Technology Corp. |
Method and apparatus for oilfield data repository
|
CA2665116C
(en)
|
2006-10-30 |
2011-07-19 |
Schlumberger Canada Limited |
System and method for performing oilfield simulation operations
|
FR2909185B1
(en)
*
|
2006-11-27 |
2009-01-09 |
Inst Francais Du Petrole |
METHOD OF STRATIGRAPHIC INTERPRETATION OF SEISMIC IMAGES
|
US8078444B2
(en)
|
2006-12-07 |
2011-12-13 |
Schlumberger Technology Corporation |
Method for performing oilfield production operations
|
US7953584B2
(en)
|
2006-12-07 |
2011-05-31 |
Schlumberger Technology Corp |
Method for optimal lift gas allocation
|
US7606666B2
(en)
|
2007-01-29 |
2009-10-20 |
Schlumberger Technology Corporation |
System and method for performing oilfield drilling operations using visualization techniques
|
WO2008112929A1
(en)
|
2007-03-13 |
2008-09-18 |
Schlumberger Canada Limited |
Method and system for managing information
|
GB2462380B
(en)
|
2007-03-14 |
2012-02-15 |
Halliburton Energy Serv Inc |
Neural-network based surrogate model construction methods and applications thereof
|
US8346695B2
(en)
|
2007-03-29 |
2013-01-01 |
Schlumberger Technology Corporation |
System and method for multiple volume segmentation
|
US8014987B2
(en)
|
2007-04-13 |
2011-09-06 |
Schlumberger Technology Corp. |
Modeling the transient behavior of BHA/drill string while drilling
|
US8688487B2
(en)
|
2007-04-18 |
2014-04-01 |
Schlumberger Technology Corporation |
Method and system for measuring technology maturity
|
US8117016B2
(en)
|
2007-04-19 |
2012-02-14 |
Schlumberger Technology Corporation |
System and method for oilfield production operations
|
US7814989B2
(en)
|
2007-05-21 |
2010-10-19 |
Schlumberger Technology Corporation |
System and method for performing a drilling operation in an oilfield
|
US9175547B2
(en)
|
2007-06-05 |
2015-11-03 |
Schlumberger Technology Corporation |
System and method for performing oilfield production operations
|
US20080319726A1
(en)
|
2007-06-19 |
2008-12-25 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8775141B2
(en)
|
2007-07-02 |
2014-07-08 |
Schlumberger Technology Corporation |
System and method for performing oilfield simulation operations
|
US8538702B2
(en)
|
2007-07-16 |
2013-09-17 |
Exxonmobil Upstream Research Company |
Geologic features from curvelet based seismic attributes
|
US8046314B2
(en)
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US8332194B2
(en)
|
2007-07-30 |
2012-12-11 |
Schlumberger Technology Corporation |
Method and system to obtain a compositional model of produced fluids using separator discharge data analysis
|
US8073800B2
(en)
|
2007-07-31 |
2011-12-06 |
Schlumberger Technology Corporation |
Valuing future information under uncertainty
|
US8244509B2
(en)
|
2007-08-01 |
2012-08-14 |
Schlumberger Technology Corporation |
Method for managing production from a hydrocarbon producing reservoir in real-time
|
US7900700B2
(en)
|
2007-08-02 |
2011-03-08 |
Schlumberger Technology Corporation |
Method and system for cleat characterization in coal bed methane wells for completion optimization
|
US9070172B2
(en)
|
2007-08-27 |
2015-06-30 |
Schlumberger Technology Corporation |
Method and system for data context service
|
US8156131B2
(en)
|
2007-08-27 |
2012-04-10 |
Schlumberger Technology Corporation |
Quality measure for a data context service
|
US8103493B2
(en)
|
2007-09-29 |
2012-01-24 |
Schlumberger Technology Corporation |
System and method for performing oilfield operations
|
US8140310B2
(en)
|
2007-11-01 |
2012-03-20 |
Schlumberger Technology Corporation |
Reservoir fracture simulation
|
US8024123B2
(en)
|
2007-11-07 |
2011-09-20 |
Schlumberger Technology Corporation |
Subterranean formation properties prediction
|
US7878268B2
(en)
|
2007-12-17 |
2011-02-01 |
Schlumberger Technology Corporation |
Oilfield well planning and operation
|
US8751164B2
(en)
|
2007-12-21 |
2014-06-10 |
Schlumberger Technology Corporation |
Production by actual loss allocation
|
US8099267B2
(en)
|
2008-01-11 |
2012-01-17 |
Schlumberger Technology Corporation |
Input deck migrator for simulators
|
US9074454B2
(en)
|
2008-01-15 |
2015-07-07 |
Schlumberger Technology Corporation |
Dynamic reservoir engineering
|
US9223041B2
(en)
|
2008-01-23 |
2015-12-29 |
Schlubmerger Technology Corporation |
Three-dimensional mechanical earth modeling
|
US8255816B2
(en)
|
2008-01-25 |
2012-08-28 |
Schlumberger Technology Corporation |
Modifying a magnified field model
|
US8073665B2
(en)
|
2008-03-07 |
2011-12-06 |
Schlumberger Technology Corporation |
Analyzing an oilfield network for oilfield production
|
US8285532B2
(en)
|
2008-03-14 |
2012-10-09 |
Schlumberger Technology Corporation |
Providing a simplified subterranean model
|
US8803878B2
(en)
|
2008-03-28 |
2014-08-12 |
Schlumberger Technology Corporation |
Visualizing region growing in three dimensional voxel volumes
|
US8185311B2
(en)
|
2008-04-22 |
2012-05-22 |
Schlumberger Technology Corporation |
Multiuser oilfield domain analysis and data management
|
US7924001B2
(en)
|
2008-05-23 |
2011-04-12 |
Schlumberger Technology Corp. |
Determination of oil viscosity and continuous gas oil ratio from nuclear magnetic resonance logs
|
US9488044B2
(en)
|
2008-06-23 |
2016-11-08 |
Schlumberger Technology Corporation |
Valuing future well test under uncertainty
|
US8670966B2
(en)
|
2008-08-04 |
2014-03-11 |
Schlumberger Technology Corporation |
Methods and systems for performing oilfield production operations
|
US9514388B2
(en)
|
2008-08-12 |
2016-12-06 |
Halliburton Energy Services, Inc. |
Systems and methods employing cooperative optimization-based dimensionality reduction
|
US8499829B2
(en)
|
2008-08-22 |
2013-08-06 |
Schlumberger Technology Corporation |
Oilfield application framework
|
US8280709B2
(en)
|
2008-10-03 |
2012-10-02 |
Schlumberger Technology Corporation |
Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations
|
US9228415B2
(en)
|
2008-10-06 |
2016-01-05 |
Schlumberger Technology Corporation |
Multidimensional data repository for modeling oilfield operations
|
US8706541B2
(en)
|
2008-10-06 |
2014-04-22 |
Schlumberger Technology Corporation |
Reservoir management linking
|
US9008972B2
(en)
|
2009-07-06 |
2015-04-14 |
Exxonmobil Upstream Research Company |
Method for seismic interpretation using seismic texture attributes
|
CA2776930C
(en)
|
2009-11-05 |
2021-04-27 |
Exxonmobil Upstream Research Company |
Method for creating a hierarchically layered earth model
|
US8380435B2
(en)
|
2010-05-06 |
2013-02-19 |
Exxonmobil Upstream Research Company |
Windowed statistical analysis for anomaly detection in geophysical datasets
|
US9243476B2
(en)
|
2010-05-19 |
2016-01-26 |
Schlumberger Technology Corporation |
System and method for simulating oilfield operations
|
AU2011258764B2
(en)
|
2010-05-28 |
2014-10-23 |
Exxonmobil Upstream Research Company |
Method for seismic hydrocarbon system analysis
|
EP2431767A3
(en)
|
2010-09-17 |
2016-11-30 |
Services Pétroliers Schlumberger |
Dynamic subsurface engineering
|
US10534871B2
(en)
|
2011-03-09 |
2020-01-14 |
Schlumberger Technology Corporation |
Method and systems for reservoir modeling, evaluation and simulation
|
US8983141B2
(en)
|
2011-03-17 |
2015-03-17 |
Exxonmobile Upstream Research Company |
Geophysical data texture segmentation using double-windowed clustering analysis
|
US9176247B2
(en)
|
2011-10-06 |
2015-11-03 |
Exxonmobil Upstream Research Company |
Tensor-based method for representation, analysis, and reconstruction of seismic data
|
US10450860B2
(en)
|
2011-11-01 |
2019-10-22 |
Schlumberger Technology Corporation |
Integrating reservoir modeling with modeling a perturbation
|
WO2013081708A1
(en)
|
2011-11-29 |
2013-06-06 |
Exxonmobil Upstream Research Company |
Method for quantitative definition of direct hydrocarbon indicators
|
US9523782B2
(en)
|
2012-02-13 |
2016-12-20 |
Exxonmobile Upstream Research Company |
System and method for detection and classification of seismic terminations
|
AU2013266865B2
(en)
|
2012-05-23 |
2015-05-21 |
Exxonmobil Upstream Research Company |
Method for analysis of relevance and interdependencies in geoscience data
|
US9261615B2
(en)
*
|
2012-06-15 |
2016-02-16 |
Exxonmobil Upstream Research Company |
Seismic anomaly detection using double-windowed statistical analysis
|
EP2914984B1
(en)
|
2012-11-02 |
2019-02-20 |
Exxonmobil Upstream Research Company |
Analyzing seismic data
|
US10234583B2
(en)
|
2012-12-20 |
2019-03-19 |
Exxonmobil Upstream Research Company |
Vector based geophysical modeling of subsurface volumes
|
US9348047B2
(en)
|
2012-12-20 |
2016-05-24 |
General Electric Company |
Modeling of parallel seismic textures
|
WO2014099201A1
(en)
|
2012-12-20 |
2014-06-26 |
Exxonmobil Upstream Research Company |
Geophysical modeling of subsurface volumes based on horizon extraction
|
US9915742B2
(en)
|
2012-12-20 |
2018-03-13 |
Exxonmobil Upstream Research Company |
Method and system for geophysical modeling of subsurface volumes based on label propagation
|
US10073190B2
(en)
|
2012-12-20 |
2018-09-11 |
Exxonmobil Upstream Research Company |
Method and system for geophysical modeling of subsurface volumes based on computed vectors
|
US9297918B2
(en)
|
2012-12-28 |
2016-03-29 |
General Electric Company |
Seismic data analysis
|
US9952340B2
(en)
|
2013-03-15 |
2018-04-24 |
General Electric Company |
Context based geo-seismic object identification
|
US9733391B2
(en)
|
2013-03-15 |
2017-08-15 |
Exxonmobil Upstream Research Company |
Method and system for geophysical modeling of subsurface volumes
|
US9995844B2
(en)
|
2013-03-15 |
2018-06-12 |
Exxonmobil Upstream Research Company |
Method and system for geophysical modeling of subsurface volumes
|
CN104101902B
(en)
*
|
2013-04-10 |
2016-10-26 |
中国石油天然气股份有限公司 |
seismic attribute clustering method and device
|
US9824135B2
(en)
|
2013-06-06 |
2017-11-21 |
Exxonmobil Upstream Research Company |
Method for decomposing complex objects into simpler components
|
US9804282B2
(en)
|
2014-02-17 |
2017-10-31 |
General Electric Company |
Computer-assisted fault interpretation of seismic data
|
GB2528129A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume
|
GB2528130A
(en)
|
2014-07-11 |
2016-01-13 |
Total E&P Uk Ltd |
Method of constraining an inversion in the characterisation of the evolution of a subsurface volume
|
US9951601B2
(en)
|
2014-08-22 |
2018-04-24 |
Schlumberger Technology Corporation |
Distributed real-time processing for gas lift optimization
|
US10443358B2
(en)
|
2014-08-22 |
2019-10-15 |
Schlumberger Technology Corporation |
Oilfield-wide production optimization
|
US10379244B2
(en)
|
2015-01-06 |
2019-08-13 |
Total S.A. |
Method for obtaining estimates of a model parameter so as to characterise the evolution of a subsurface volume over a time period
|
WO2016118223A1
(en)
|
2015-01-22 |
2016-07-28 |
Exxonmobil Upstream Research Company |
Adaptive structure-oriented operator
|
GB2554175A
(en)
*
|
2015-03-24 |
2018-03-28 |
Landmark Graphics Corp |
Cluster analysis for selecting reservoir models from multiple geological realizations
|
US10139507B2
(en)
|
2015-04-24 |
2018-11-27 |
Exxonmobil Upstream Research Company |
Seismic stratigraphic surface classification
|
CN105223609B
(en)
*
|
2015-09-18 |
2017-09-19 |
电子科技大学 |
3-D seismics image holostrome position method for automatic tracking based on matching search
|
CN105785442B
(en)
*
|
2016-04-18 |
2018-05-04 |
中国石油天然气股份有限公司 |
Method and device for determining petroleum spatial distribution under configuration constraint of stratum source reservoir cover
|
CN106597547A
(en)
*
|
2016-12-28 |
2017-04-26 |
中国石油化工股份有限公司 |
Method for accurately describing earthquake in thin reservoir
|
US10914852B2
(en)
|
2017-03-16 |
2021-02-09 |
International Business Machines Corporation |
Unsupervised identification of seismic horizons using swarms of cooperating agents
|
CN107219555B
(en)
*
|
2017-05-31 |
2018-09-14 |
吉林大学 |
The strong industrial frequency noise drawing method of parallel focus seismic prospecting data based on principal component analysis
|
CN112578446B
(en)
*
|
2019-09-30 |
2023-04-11 |
中国石油化工股份有限公司 |
Method and system for depicting formation reflection disorder degree
|
WO2021081706A1
(en)
|
2019-10-28 |
2021-05-06 |
Schlumberger Technology Corporation |
Drilling activity recommendation system and method
|
CN113138407B
(en)
*
|
2020-01-20 |
2024-05-03 |
中国石油天然气集团有限公司 |
Multi-scale fracture earthquake prediction method and system for deep shale gas
|
CN112882095B
(en)
*
|
2021-01-15 |
2022-08-02 |
中国海洋石油集团有限公司 |
Lithology identification method and system for lake-facies carbonate rock under salt
|