GB2273087A - Mooring systems - Google Patents
Mooring systems Download PDFInfo
- Publication number
- GB2273087A GB2273087A GB9321055A GB9321055A GB2273087A GB 2273087 A GB2273087 A GB 2273087A GB 9321055 A GB9321055 A GB 9321055A GB 9321055 A GB9321055 A GB 9321055A GB 2273087 A GB2273087 A GB 2273087A
- Authority
- GB
- United Kingdom
- Prior art keywords
- mooring
- body member
- buoy
- riser pipe
- mooring system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 5
- 238000004873 anchoring Methods 0.000 claims description 4
- 238000005299 abrasion Methods 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 claims description 2
- 230000008878 coupling Effects 0.000 description 9
- 238000010168 coupling process Methods 0.000 description 9
- 238000005859 coupling reaction Methods 0.000 description 9
- 238000005188 flotation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 239000003550 marker Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
- B63B22/021—Buoys specially adapted for mooring a vessel and for transferring fluids, e.g. liquids
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B17/00—Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
- E21B17/02—Couplings; joints
- E21B17/08—Casing joints
- E21B17/085—Riser connections
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Physics & Mathematics (AREA)
- Geochemistry & Mineralogy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Ocean & Marine Engineering (AREA)
- Earth Drilling (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
In a mooring system for tanker vessels at offshore oil fields of the kind in which a flexible riser pipe 4 connected to an underwater well head 1 is supported by an anchored mooring buoy 3 and is connectable to a tanker vessel, the buoy 3 comprises a body member 14 non-rotationally moored at sea bed below the surface of the sea, and supports a surrounding ring member caring a mooring hawser 11 and rotatable about a vertical axis, the riser pipe 4 passing through an opening 21 in the body member 14. Such an arrangement allows substantial rotation of the tanker around the subsea buoy to permit it to weathervane in dependence upon wind and tide conditions. The ring member is formed from a number of blocks 17 and intervening links 18. <IMAGE>
Description
MOORING SYSTEMS
This invention relates to a mooring system for tanker vessels at offshore oil fields of the kind in which a flexible riser pipe connected to an underwater well head is supported by an anchored mooring buoy, and is connectable to a tanker vessel to enable oil to be transferred from the well head to the vessel.
In one form of such a mooring and oil transfer system the buoy is anchored to the sea-bed below the surface of the sea and carries a mooring hawser connected at its free end to a pick-up line supported by a floating buoy to enable a vessel to retrieve and engage the mooring hawser, the flexible riser pipe or an extension thereto extending from the buoy and being similarly connected to the or an individual pick-up line to permit retrieval and connection to a co-operating coupling member on the vessel.
In some cases it is necessary for the tanker to be continuously held on station under power, and this is clearly undesirable, and an object of the invention is to provide a form of "passive" mooring system which permits a degree of rotation of a moored tanker around the subsea buoy.
According, therefore, to the invention, in a mooring system of the kind referred to incorporating an anchored mooring buoy, the buoy comprises a body member arranged to be non-rotationally moored to the sea-bed below the surface of the sea, a ring member rotationally supported by the body member so as to enable it to revolve about a vertical axis when the buoy is moored in its operational position, and a mooring hawser connected to the ring member, the body member having an opening extending through it coaxial with the ring member through which the riser pipe passes.
Such an arrangement allows substantial rotation of the tanker around the subsea buoy to permit it to weathervane in dependence upon wind and tide conditions.
By the use of a swivel connection between the flexible riser pipe and the coupling on the tanker wind-up of the riser pipe can be countered, so permitting continuous rotation of the tanker.
Preferably the ring member runs in a track formed around the outside of the body member, a water lubricated necklace bearing facilitating easy rotation of the ring.
The body member is conveniently anchored to the sea-bed by means of a plurality of mooring lines spaced around the well-head, although three spaced mooring lines is a preferred arrangement. The anchoring points for the mooring lines are preferably spaced uniformly around the well-head.
The flexible riser pipe may be provided with a protective sleeve where it passes through the opening in the body member to avoid damage due to abrasion. Alternatively that section of the riser pipe may be secured within a support member which is itself rotatable within the opening in the body member.
Two embodiments of the invention will now be described by way of example with reference to Fgures 1 to 4 of the accompanying schematic drawings, in which
Figure 1 illustrates the general arrangement of a mooring system in accordance with the invention, prior to retrieval of the mooring hawser and riser pipe by a tanker vessel,
Figure 2 shows the arrangement following the retrieval of the mooring hawser and riser pipe by the vessel,
Figures 3 and 4 illustrate alternative forms of mooring buoy for use in the system.
Referring first to Figure 1, this shows diagrammatically, and not to scale, a well head 1, above which is secured, by means of three spaced mooring lines 2 (only two of which are shown), a subsea buoy 3 at about two thirds water depth.
A flexible riser pipe 4 extends upwards fromthe well head and passes, as will subsequently be explained, through a vertically extending opening in the buoy 3 and, being fitted with flotation where required, extends in catenary fashion from the buoy. The terminal end of the riser pipe 4 is fitted with a coupling member 5 which is secured to a pick-up line 6 attached to an anchor 7 on the sea-bed, and a line 8 from the anchor extends upwards to a floating pick-up buoy 9. A further floating marker buoy 10 connected to the subsea buoy 3 indicates the position of the well head.
The coupling member 5 incorporates a valve which forms a closure at the end of the riser pipe until the member is connected to a co-operating coupling member on a tanker vessel.
A mooring hawser 11 attached to the subsea buoy 3, and shown only in part, is similarly attached to a pick-up line which has been omitted from the drawing for simplicity. The length of the riser pipe 4 between the well head 1 and the buoy 3 is greater than the vertical distance between them in order to reduce stresses on the pipe.
In Figure 2 the mooring hawser 11 and the flexible riser pipe 4 have been retrieved by a tanker vessel 12, and secured to it, the riser pipe coupling member 5 being connected to a swivel coupling 13 the purpose of which will be subsequently explained.
One form of subsea mooring buoy for use in the system above described is illustrated in Figure 3. The buoy 3 comprises a cylindrical body member 14 having anchoring points 15 for the three mooring lines 2 which are splayed outwards to clear the riser pipe 4.
The body member 14 carries a pair of radially extending annular flanges 16 forming between them an annular track in which is fitted a ring formed from a number of blocks 17 and intervening links 18 for facilitating assembly. The blocks are faced internally with a water lubricating material so that the ring is effectively in the form of a water lubricated necklace bearing and thus rotates easily around the track of the body member 14.
Two diametrically opposed blocks 17 incorporate anchoring points for the attachment of two bridle wires 19 connected at their opposite end to the mooring hawser 11.
The body member 14 has a vertically extending opening 21 for the passage of the flexible riser pipe 4, the pipe being protected against abrasion where it passes through the opening 21 by an external sleeve 22 or by other protection devices.
With such an arrangement the tanker is enabled to rotate continuously around the mooring buoy, wind-up of the riser pipe being countered by the swivel coupling 13 on the tanker. The swivel coupling is conveniently powered, and emergency breakaway facilities for the riser pipe and mooring hawser are provided on the tanker in the customary way.
In a modification of the mooring buoy illustrated in section in Figure 4, the flexible riser pipe 4 is broken above and below the body member 14 and is connected by liquid tight joints 23 to a rigid section 24 which extends through the opening 21 in the body member. The riser pipe section 24 is fixed centrally within a carrier 25 in the form of a wheel whose rim 26 is rotatable within bearings of any suitable kind in a circular channel 27 within the body member 14. To permit assembly of the carrier the body member in this embodiment is made in separate sections as shown. The outer ring to which the bridle wires 19 are connected have been omitted from this figure for simplicity, but are similar to those illustrated in Figure 3.
Claims (9)
1. A mooring system for tanker vessels at offshore oil fields of the kind in which a flexible riser pipe connected to an underwater well-head is supported by an anchored mooring buoy, and is connectab1eto a tanker vessel to enable oil to be transferred from the well-head to the vessel, wherein the buoy comprises a body member arranged to be non-rotationally moored to the sea-bed below the surface of the sea, and the system incorporates a ring member rotationally supported by the body member so as to enable it to rvolve about a vertical axis when the buoy is moored in its operational position, and a mooring hawser connected to the ring member, the body member having an opening extending through it coaxial with the ring member through which the riser pipe passes.
2. A mooring system according to Claim 1 wherein the ring member runs in a track formed around the outside of the body member.
3. A mooring system according to jClaim 2 wherein the ring member comprises a water lubricated necklace bearing.
4. A mooring system according to Claim 1, 2 or 3, wherein the body member is anchored to the sea-bed by a plurality of mooring lines spaced around the well-head.
5. A mooring system according to Claim 4, wherein there are three said mooring lines.
6. A mooring system according to Claim 4 or Claim 5, wherein the anchoring points for the mooring lines are spaced uniformly around the well-head.
7. A mooring system according to any preceding claim wherein the flexible riser pipe is provided with a protective sleeve where it passes through the opening in the body member to avoid damage due to abrasion.
8. A mooring system according to any one of Claims 1 to 5 wherein the section of the riser pipe which passes through the opening in the body member is secured within a support member which is itself rotatable within the opening in the body member.
9. A mooring system for tanker vessels at offshore oil fields substantially as shown in and as hereinbefore described with reference to
Figures 1 to 3, or Figures 1, 2 and 4 of the accompanying drawings.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB9321055A GB2273087B (en) | 1992-12-04 | 1993-10-12 | Mooring systems |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB929225437A GB9225437D0 (en) | 1992-12-04 | 1992-12-04 | Mooring systems |
GB9321055A GB2273087B (en) | 1992-12-04 | 1993-10-12 | Mooring systems |
Publications (3)
Publication Number | Publication Date |
---|---|
GB9321055D0 GB9321055D0 (en) | 1993-12-01 |
GB2273087A true GB2273087A (en) | 1994-06-08 |
GB2273087B GB2273087B (en) | 1996-05-29 |
Family
ID=26302103
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB9321055A Expired - Fee Related GB2273087B (en) | 1992-12-04 | 1993-10-12 | Mooring systems |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB2273087B (en) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996011134A1 (en) * | 1994-10-07 | 1996-04-18 | Single Buoy Moorings Inc. | Submerged calm buoy |
EP0796784A1 (en) * | 1996-03-21 | 1997-09-24 | Tecnomare S.p.A. | Mono-mooring method and system for berthing ships in open sea |
US6209650B1 (en) | 1996-08-27 | 2001-04-03 | Den Norske Stats Oljeselskap As | Subsea well |
US6223825B1 (en) | 1996-08-27 | 2001-05-01 | Den Norske Stats Oljeselskap A.S | Swivel |
CN1088023C (en) * | 1994-10-07 | 2002-07-24 | 辛格尔浮筒系船公司 | Submerged calm buoy |
US7025533B1 (en) * | 2004-09-21 | 2006-04-11 | Kellogg Brown & Root, Inc. | Concentrated buoyancy subsea pipeline apparatus and method |
US7717762B2 (en) * | 2006-04-24 | 2010-05-18 | Sofec, Inc. | Detachable mooring system with bearings mounted on submerged buoy |
US7819608B2 (en) | 2004-09-21 | 2010-10-26 | Kellogg Brown & Root Llc | Distributed buoyancy pipeline installation method |
GB2472431A (en) * | 2009-08-06 | 2011-02-09 | Sigma Offshore Ltd | Offshore vessel mooring and riser inboarding system |
WO2011096819A3 (en) * | 2010-02-02 | 2011-11-17 | Framo Engineering As | System for handling a transfer device |
NO20101609A1 (en) * | 2010-11-16 | 2011-11-28 | Framo Eng As | Transmission system and procedures for connecting and disconnecting the transmission system |
GB2493851A (en) * | 2011-08-19 | 2013-02-20 | Axis ltd | A swivelling mooring connector assembly with a conduit guide |
WO2014060717A2 (en) | 2012-10-15 | 2014-04-24 | Subsea 7 Limited | Improvements relating to buoyancy-supported risers |
WO2017102596A1 (en) * | 2015-12-15 | 2017-06-22 | Peter Kelemen | Anchor device and floating device |
WO2020153849A1 (en) * | 2019-01-22 | 2020-07-30 | Egersund Herøy As | Apparatus and method for connecting a buoy to a mooring line |
WO2021104588A1 (en) * | 2019-11-25 | 2021-06-03 | Maersk Supply Service A/S | A mooring buoy |
GB202105912D0 (en) | 2021-04-26 | 2021-06-09 | Acergy France SAS | Mooring renewable energy systems |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1312544A (en) * | 1970-07-08 | 1973-04-04 | Snam Progetti | Anchoring system with mooring buoys |
-
1993
- 1993-10-12 GB GB9321055A patent/GB2273087B/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1312544A (en) * | 1970-07-08 | 1973-04-04 | Snam Progetti | Anchoring system with mooring buoys |
Cited By (38)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5816183A (en) * | 1994-10-07 | 1998-10-06 | Single Buoy Moorings Inc. | Submerged CALM buoy |
CN1088023C (en) * | 1994-10-07 | 2002-07-24 | 辛格尔浮筒系船公司 | Submerged calm buoy |
WO1996011134A1 (en) * | 1994-10-07 | 1996-04-18 | Single Buoy Moorings Inc. | Submerged calm buoy |
EP0796784A1 (en) * | 1996-03-21 | 1997-09-24 | Tecnomare S.p.A. | Mono-mooring method and system for berthing ships in open sea |
US5772483A (en) * | 1996-03-21 | 1998-06-30 | Tecnomare S.P.A. | Mono-mooring method and system for berthing ships in open sea |
US6209650B1 (en) | 1996-08-27 | 2001-04-03 | Den Norske Stats Oljeselskap As | Subsea well |
US6223825B1 (en) | 1996-08-27 | 2001-05-01 | Den Norske Stats Oljeselskap A.S | Swivel |
US7963721B2 (en) | 2004-09-21 | 2011-06-21 | Kellogg Brown & Root Llc | Distributed buoyancy subsea pipeline apparatus and method |
US7025533B1 (en) * | 2004-09-21 | 2006-04-11 | Kellogg Brown & Root, Inc. | Concentrated buoyancy subsea pipeline apparatus and method |
US7819608B2 (en) | 2004-09-21 | 2010-10-26 | Kellogg Brown & Root Llc | Distributed buoyancy pipeline installation method |
US7717762B2 (en) * | 2006-04-24 | 2010-05-18 | Sofec, Inc. | Detachable mooring system with bearings mounted on submerged buoy |
GB2472431A (en) * | 2009-08-06 | 2011-02-09 | Sigma Offshore Ltd | Offshore vessel mooring and riser inboarding system |
GB2472431B (en) * | 2009-08-06 | 2013-12-04 | Sigma Offshore Ltd | Offshore vessel mooring and riser inboarding |
WO2011096819A3 (en) * | 2010-02-02 | 2011-11-17 | Framo Engineering As | System for handling a transfer device |
CN102869567B (en) * | 2010-02-02 | 2015-05-20 | 弗拉姆工程公司 | System for handling a transfer device |
US8944871B2 (en) | 2010-02-02 | 2015-02-03 | Framo Engineering As | System for handling a transfer device |
CN102869567A (en) * | 2010-02-02 | 2013-01-09 | 弗拉姆工程公司 | System for handling a transfer device |
GB2498900A (en) * | 2010-11-16 | 2013-07-31 | Framo Eng As | Transfer system |
WO2012066031A1 (en) | 2010-11-16 | 2012-05-24 | Framo Engineering As | Transfer system |
NO20101609A1 (en) * | 2010-11-16 | 2011-11-28 | Framo Eng As | Transmission system and procedures for connecting and disconnecting the transmission system |
GB2498900B (en) * | 2010-11-16 | 2015-12-23 | Framo Eng As | A transfer system comprising a transfer element supported by a moored buoyancy element |
US9302744B2 (en) | 2010-11-16 | 2016-04-05 | Framo Engineering As | Transfer system |
AU2012298371B2 (en) * | 2011-08-19 | 2016-06-09 | Axis Energy Projects Ltd. | Mooring system and connector assembly |
GB2493851A (en) * | 2011-08-19 | 2013-02-20 | Axis ltd | A swivelling mooring connector assembly with a conduit guide |
GB2493851B (en) * | 2011-08-19 | 2014-04-09 | Axis Energy Projects Ltd | Mooring system and connector assembly |
WO2013027036A1 (en) * | 2011-08-19 | 2013-02-28 | Axis Limited | Mooring system and connector assembly |
US9032892B2 (en) | 2011-08-19 | 2015-05-19 | Axis Energy Products Ltd. | Mooring system and connector assembly |
US9422773B2 (en) | 2012-10-15 | 2016-08-23 | Subsea 7 Limited | Relating to buoyancy-supported risers |
WO2014060717A2 (en) | 2012-10-15 | 2014-04-24 | Subsea 7 Limited | Improvements relating to buoyancy-supported risers |
WO2017102596A1 (en) * | 2015-12-15 | 2017-06-22 | Peter Kelemen | Anchor device and floating device |
WO2020153849A1 (en) * | 2019-01-22 | 2020-07-30 | Egersund Herøy As | Apparatus and method for connecting a buoy to a mooring line |
GB2595149A (en) * | 2019-01-22 | 2021-11-17 | Egersund Heroy As | Apparatus and method for connecting a buoy to a mooring line |
GB2595149B (en) * | 2019-01-22 | 2022-09-28 | Egersund Heroy As | Apparatus and method for connecting a buoy to a mooring line |
EP3914508A4 (en) * | 2019-01-22 | 2023-01-11 | Egersund Herøy AS | Apparatus and method for connecting a buoy to a mooring line |
WO2021104588A1 (en) * | 2019-11-25 | 2021-06-03 | Maersk Supply Service A/S | A mooring buoy |
GB202105912D0 (en) | 2021-04-26 | 2021-06-09 | Acergy France SAS | Mooring renewable energy systems |
GB2606147A (en) | 2021-04-26 | 2022-11-02 | Acergy France SAS | Mooring renewable energy systems |
WO2022229699A1 (en) | 2021-04-26 | 2022-11-03 | Acergy France SAS | Mooring renewable energy systems |
Also Published As
Publication number | Publication date |
---|---|
GB2273087B (en) | 1996-05-29 |
GB9321055D0 (en) | 1993-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2273087A (en) | Mooring systems | |
US5288253A (en) | Single point mooring system employing a submerged buoy and a vessel mounted fluid swivel | |
EP2074015B1 (en) | Loading system | |
US9302744B2 (en) | Transfer system | |
EP2744703B1 (en) | Mooring system and connector assembly | |
JPH0534198B2 (en) | ||
EP1796958A1 (en) | Offshore vessel mooring and riser inboarding system | |
US4915416A (en) | Underwater oil production | |
US5820429A (en) | Arrangement in a loading/unloading buoy for use in shallow waters | |
US7927041B2 (en) | Deep water flexible riser protection | |
Rutkowski | A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore | |
US4279047A (en) | Fluid transfer buoy | |
WO1993024732A1 (en) | A system for use in offshore petroleum production | |
US5237948A (en) | Mooring system for oil tanker storage vessel or the like | |
US3908576A (en) | Floating mooring arrangement | |
GB2206144A (en) | Underwater oil production | |
CA2003726A1 (en) | System for transferring fluids from a piping system in a ship's hull to a turning device, and vice versa | |
US4310937A (en) | Mooring terminal with top mounted fluid swivel | |
AU2013248193B2 (en) | Loading system | |
WO2011042535A1 (en) | Calm buoy | |
GB2244463A (en) | Loading/anchoring system for a tanker at an offshore location | |
US4335979A (en) | Offshore tower with ball and socket joint having fluid flow passage | |
EP0820927A2 (en) | Mooring systems | |
US4457728A (en) | Storage transfer and production marine platform | |
GB2107663A (en) | Improvements in and relating to offshore terminals |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PCNP | Patent ceased through non-payment of renewal fee |
Effective date: 19981012 |