FR2633322A1 - Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads - Google Patents
Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads Download PDFInfo
- Publication number
- FR2633322A1 FR2633322A1 FR8808489A FR8808489A FR2633322A1 FR 2633322 A1 FR2633322 A1 FR 2633322A1 FR 8808489 A FR8808489 A FR 8808489A FR 8808489 A FR8808489 A FR 8808489A FR 2633322 A1 FR2633322 A1 FR 2633322A1
- Authority
- FR
- France
- Prior art keywords
- irons
- spacer
- concrete
- notches
- central part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/168—Spacers connecting parts for reinforcements and spacing the reinforcements from the form
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
L'invention a pour objet une entretoise d'écartement de fers pour coffrage formée par une partie centrale longiligne et aux extrémités de laquelle sont disposées deux têtes de raccordement ; elle permet de tenir à distance les armatures par rapport au coffrage de fers à béton de façon régulière et rigide. The subject of the invention is an iron spacing spacer for formwork formed by a slender central part and at the ends of which are arranged two connection heads; it allows the reinforcement to be kept at a distance from the concrete steel formwork in a regular and rigid manner.
Actuellement, les moyens utilisés sont les suivants - Lorsque les fers à béton sont en place, il faut procéder à la pose de cales en béton, puis à la pose des écarteurs en acier. Les écarteurs sont fixés aux fers par des ligatures au moyen de fil de fer. Toutes ces opérations nécessitent du temps, l'utilisation de pièces différentes et une certaine technicité de la part de la personne qui met en place les fers à béton pour coffrage. Currently, the means used are as follows - When the concrete irons are in place, it is necessary to install concrete wedges, then to install the steel spacers. The spacers are attached to the irons by ties using wire. All these operations require time, the use of different parts and a certain technicality on the part of the person who sets up the concrete irons for formwork.
L'état de la technique peut être défini par les brevets suivants
- FR-A-2.576.950 - Dispositif de maintien en place d'un étai de soutènement du coffrage caractérisé en ce qu'il comporte une plaque reliée à sa face inférieure à une tige et au moins une partie saillante ou sur la face supérieure de la plaque.The state of the art can be defined by the following patents
- FR-A-2.576.950 - Device for holding in place a prop for supporting the formwork, characterized in that it comprises a plate connected to its lower face with a rod and at least one projecting part or on the upper face of the plate.
- FR-A-2.043.214 - Un étai pour un coffrage destiné à la coulée du béton comprend une charpente comportant un premier élément de support du coffrage, un second élément décalé par rapport au premier, des éléments de renforcement reliant rigidement le premier et le second éléments, des pivots de liaison disposés à une extrémité ou aux deux extrémités du premier élément et un élément réglable qui est articulé au second élément et qui porte sur le second élément correspondant d'une charpente voisine de sorte que lorsque les premiers éléments de charpentes voisines sont reliés ensemble bout à bout, en réglant la longueur de l'élément réglable, on fait varier l'angle entre lesdits premiers éléments. - FR-A-2.043.214 - A forestay for a formwork intended for pouring concrete comprises a frame comprising a first formwork support element, a second element offset from the first, reinforcing elements rigidly connecting the first and the second element, connecting pivots arranged at one end or at both ends of the first element and an adjustable element which is articulated to the second element and which bears on the corresponding second element of a neighboring frame so that when the first elements of neighboring frames are connected together end to end, by adjusting the length of the adjustable element, the angle between said first elements is varied.
- FR-A-2.254.701 - Le dispositif d'abaissement dont est muni un étai selon l'invention est un levier en U , monté pivotant sur un axe perpendiculaire à l'étai à une extrémité de ce dernier. En position de service, ce levier est vertical et verrouillé par une cheville engagée dans les trous alignés du levier et de l'étai Lorsqu'il faut faire descendre légèrement le coffrage, on déverrouille le levier et on le fait pivoter à la main hors de sa position de point mort verticale. Le coffrage fait pivoter le levier brusquement dès qu'il a quitté la position verticale et tombe sur un rouleau porté par l'axe et situé entre les deux branches du levier en U. En position de service, le coffrage s'appuie sur la partie médiane arrondie reliant les branches du levier en U. - FR-A-2.254.701 - The lowering device with which a forestay is provided according to the invention is a U-shaped lever, pivotally mounted on an axis perpendicular to the forestay at one end of the latter. In the service position, this lever is vertical and locked by a pin engaged in the aligned holes of the lever and the forestay When the formwork is to be lowered slightly, the lever is unlocked and it is pivoted by hand out of its vertical neutral position. The formwork turns the lever abruptly as soon as it leaves the vertical position and falls on a roller carried by the axis and located between the two arms of the U-shaped lever. In the service position, the formwork rests on the part rounded median connecting the arms of the U-shaped lever.
L'entretoise, selon l'invention, permet de réaliser les trois opérations citées plus haut en une seule, donc, gain de temps très important (pose de cales, pose des écarteurs, ligature des écarteurs sur les fers à béton). De plus, la pose de l'entretoise, selon l'invention, ne nécessite aucune connaissance particulière. The spacer, according to the invention, makes it possible to carry out the three operations mentioned above in a single one, therefore, very significant time saving (installation of wedges, installation of spacers, binding of spacers on concrete irons). In addition, the installation of the spacer, according to the invention, does not require any particular knowledge.
L'entretoise, selon l'invention, est formée d'une partie centrale longiligne aux extrémités de laquelle est disposée une tête de raccordement. The spacer, according to the invention, is formed by a slender central part at the ends of which is arranged a connection head.
La tête de raccordement est un polyèdre convexe dont au moins une des face est pourvue d'encoche pour l'emboitement latéral des fers à béton. The connection head is a convex polyhedron of which at least one of the faces is provided with a notch for the lateral interlocking of the concrete irons.
Selon d'autres modes de réalisation, chaque face est pourvue d'une encoche pour l'emboitement latéral d'un fer à béton. Lesdites encoches sont décalées symétriquement les unes par rapport aux autres pour permettre le croisement desdits fers et former ainsi un croisillon de raccordement.According to other embodiments, each face is provided with a notch for the lateral nesting of a concrete iron. Said notches are offset symmetrically with respect to each other to allow the crossing of said bars and thus form a connecting spider.
L'entretoise est monobloc. L'entretoise est réalisée en plastique. The spacer is monobloc. The spacer is made of plastic.
L'entrée des encoches comporte un bourrelet de blocage de la sortie desdits fers. The entry of the notches comprises a bead blocking the exit of said irons.
L'entretoise est une pièce monobloc de préférence en matière plastique. The spacer is a single piece, preferably made of plastic.
L'encoche a une hauteur qui varie suivant le diamètre du fer à béton à introduire latéralement. The notch has a height which varies according to the diameter of the concrete reinforcement to be introduced laterally.
La profondeur d'une encoche ne dépasse pas l'âme de l'entretoise pour conserver à celle-ci sa rigidité. The depth of a notch does not exceed the web of the spacer to maintain its rigidity.
Les têtes de raccordement peuvent être biseautées, au niveau de leur face, pour permettre une économie de matière. The connection heads can be bevelled at their face to save material.
Les dessins ci-joints sont donnés à titre d'exemples indicatifs et non limitatifs. Ils représentent un mode de réalisation préféré selon l'invention. Ils permettront de comprendre aisément l'invention. The attached drawings are given as indicative and non-limiting examples. They represent a preferred embodiment according to the invention. They will allow the invention to be easily understood.
La figure 1 est une vue schématique d'un écarteur métallique selon l'état de la technique. Figure 1 is a schematic view of a metal spacer according to the prior art.
La figure 2 est une vue schématique d'une entretoise selon l'invention. Figure 2 is a schematic view of a spacer according to the invention.
La figure 3 est une vue -en perspective de l'entretoise selon l'invention mettant en évidence les faces A et B. Figure 3 is a perspective view of the spacer according to the invention highlighting the faces A and B.
La figure 4 est une vue en perspective de l'entretoise selon l'invention mettant en évidence les faces C et D. Figure 4 is a perspective view of the spacer according to the invention highlighting the faces C and D.
La figure 5 est une vue de côté de l'entretoise suivant la face A. Figure 5 is a side view of the spacer along side A.
La figure 6 est une vue de côté de l'entretoise suivant la face B. Figure 6 is a side view of the spacer along side B.
La figure 7 est une vue de côté de l'entretoise suivant la face C. Figure 7 is a side view of the spacer along side C.
La figure 8 est une vue de côté de l'entretoise suivant la face D. Figure 8 is a side view of the spacer along side D.
La figure 9 est une vue en perspective d'une entretoise mise en place pour maintenir l'écartement entre des fers de coffrage. FIG. 9 is a perspective view of a spacer put in place to maintain the spacing between formwork bars.
L'état de la technique est représenté à la figure 1 ou, les fers à béton 1 étant mis en place, il faut poser des cales à béton 2, puis poser l'écarteur acier 3. Il faut ensuite ligaturer l'écarteur 3 pour le fixer aux fers 1. The state of the art is shown in FIG. 1 or, with the concrete irons 1 being put in place, it is necessary to place concrete wedges 2, then to install the steel spacer 3. It is then necessary to tie up the spacer 3 to attach it to irons 1.
L'entretoise, selon l'invention, est formée d'une partie centrale 4 avec une tête de raccordement 5, 6 disposée à chacune de ses extrémités. The spacer, according to the invention, is formed of a central part 4 with a connection head 5, 6 disposed at each of its ends.
La tête de raccordement 5, 6 est un polyèdre convexe dont chaque face 7 est pourvue d'une encoche 8 pour l'emboftement latéral des fers à béton 9. Lesdites encoches 8 se croisent d'une face à l'autre et sont décalées symétriquement, les unes par rapport aux autres, pour permettre le croisement desdits fers à béton 9 et former ainsi un croisillon de raccordement. Selon un mode de réalisation préféré, la tête de raccordement 5 ou 6 a-quatre faces 7. The connection head 5, 6 is a convex polyhedron of which each face 7 is provided with a notch 8 for the lateral fitting of the concrete irons 9. Said notches 8 cross from one face to the other and are offset symmetrically , relative to each other, to allow the crossing of said concrete irons 9 and thus form a connecting spider. According to a preferred embodiment, the connection head 5 or 6 has four faces 7.
Bien entendu, une tête de raccordement peut comporter une, deux, trois ou quatre encoches et ce, en fonction du nombre de face. De même, la profondeur des encoches dépend du nombre d'encoches et ce, pour éviter que la tête de raccordement soit trop fragilisée par la perte de matière. Of course, a connection head can have one, two, three or four notches, depending on the number of faces. Similarly, the depth of the notches depends on the number of notches and this, to avoid that the connection head is too weakened by the loss of material.
L'entrée des encoches 8 comporte un bourrelet de blocage 10 de la sortie desdits fers 9. L'emboftement des fers à béton 9 avec les encoches 8 de l'entretoise se fait naturellement avec rapidité par simple pression. The entry of the notches 8 comprises a bead 10 for blocking the exit of the said irons 9. The embedding of the concrete irons 9 with the notches 8 of the spacer is done naturally with rapidity by simple pressure.
Le bourrelet 10 empêche le retrait de l'entretoise lors du bétonnage.The bead 10 prevents the removal of the spacer during concreting.
Les têtes de raccordement 5, 6 peuvent être biseautées sur leurs faces de manière à économiser de la matière. La tête de raccordement peut ainsi être formée par l'assemblage de deux troncs de pyramides réguliers ou irréguliers. The connection heads 5, 6 can be bevelled on their faces so as to save material. The connection head can thus be formed by the assembly of two trunks of regular or irregular pyramids.
Dans la figure 9, l'entretoise maintient les fers 9 d'un premier élément de coffrage et les fers 11 du second élément de coffrage. In FIG. 9, the spacer maintains the bars 9 of a first formwork element and the bars 11 of the second formwork element.
L'entretoise a des dimensions variables en épaisseur et en longueur suivant les standards béton. The spacer has variable dimensions in thickness and length according to concrete standards.
- Exemple, pour un mur en béton de 15 cm, la longueur de la pièce est de 15 cm. - Example, for a 15 cm concrete wall, the length of the room is 15 cm.
LISTE DES REFERENCES 1. FER A BETON 2. CALE A BETON 3. ECARTEUR 4. PARTIE CENTRALE DE L'ENTRETOISE 5, 6. UNE TETE DE RACCORDEMENT 7. FACES DU POLYEDRE CONVIEZ DE LA TETE DE RACCORDEMENT 8. ENCOCHES 9. FERS A BETON 10. BOURRELET DE BLOCAGE 11. FERS LIST OF REFERENCES 1. CONCRETE IRON 2. CONCRETE SHIM 3. SPREADER 4. CENTRAL PART OF THE SPACER 5, 6. A CONNECTION HEAD 7. POLYEDER FACES CONVISE THE CONNECTION HEAD 8. NOTCHES 9. IRONS CONCRETE 10. LOCKING BAND 11. IRONS
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8808489A FR2633322A1 (en) | 1988-06-22 | 1988-06-22 | Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8808489A FR2633322A1 (en) | 1988-06-22 | 1988-06-22 | Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads |
Publications (1)
Publication Number | Publication Date |
---|---|
FR2633322A1 true FR2633322A1 (en) | 1989-12-29 |
Family
ID=9367664
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR8808489A Withdrawn FR2633322A1 (en) | 1988-06-22 | 1988-06-22 | Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads |
Country Status (1)
Country | Link |
---|---|
FR (1) | FR2633322A1 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4337523A1 (en) * | 1993-11-01 | 1994-05-19 | Emmanuel Ouranos | Distance piece in concrete shuttering - incorporates plastics covering with conical pieces at ends |
US5588263A (en) * | 1994-09-21 | 1996-12-31 | Hem Trading | Double adaptor bar for single inserts used in casting concrete |
WO1999007958A1 (en) * | 1997-08-05 | 1999-02-18 | Nemis Establishment | Spacer |
US5996297A (en) * | 1998-02-04 | 1999-12-07 | H.K. Composites, Inc. | Connectors and brackets used in making insulated composite wall structures |
US6276108B1 (en) * | 1999-10-19 | 2001-08-21 | Gopa Enterprises | Device for supporting and connecting reinforcing elements for concrete structures |
EP3040495A1 (en) * | 2014-05-23 | 2016-07-06 | Andrew Fry | A floor screed reinforcement a method of using such reinforcement to produce a screeded floor |
US11555315B2 (en) * | 2017-10-19 | 2023-01-17 | G.B.E. | Tool for the in situ construction of a sandwich wall, and method applying same |
-
1988
- 1988-06-22 FR FR8808489A patent/FR2633322A1/en not_active Withdrawn
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4337523A1 (en) * | 1993-11-01 | 1994-05-19 | Emmanuel Ouranos | Distance piece in concrete shuttering - incorporates plastics covering with conical pieces at ends |
US5588263A (en) * | 1994-09-21 | 1996-12-31 | Hem Trading | Double adaptor bar for single inserts used in casting concrete |
WO1999007958A1 (en) * | 1997-08-05 | 1999-02-18 | Nemis Establishment | Spacer |
US5996297A (en) * | 1998-02-04 | 1999-12-07 | H.K. Composites, Inc. | Connectors and brackets used in making insulated composite wall structures |
US6276108B1 (en) * | 1999-10-19 | 2001-08-21 | Gopa Enterprises | Device for supporting and connecting reinforcing elements for concrete structures |
EP3040495A1 (en) * | 2014-05-23 | 2016-07-06 | Andrew Fry | A floor screed reinforcement a method of using such reinforcement to produce a screeded floor |
US11555315B2 (en) * | 2017-10-19 | 2023-01-17 | G.B.E. | Tool for the in situ construction of a sandwich wall, and method applying same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0402197A1 (en) | Prefabricated moulding elements for constructing walls | |
FR2706882A1 (en) | ||
FR2633322A1 (en) | Spreader for irons in formworking, consisting of an elongate central part and, arranged at the ends of this, two connection heads | |
EP0003087B1 (en) | Device for connecting elongated elements of a reinforced concrete framework and framework comprising elements connected by such a device. | |
FR2941480A1 (en) | Stud for safety balustrade on acroterion of terrace of building, has movable arm provided with bar whose length allows bar to be supported on vertical face of acroterion and arranged in bottom of external edge of acroterion | |
FR2487410A1 (en) | Climbing shutter for casting concrete wall - has single jack to raise brackets retaining shutter sections on shoes detachably fixed to wall | |
FR2470220A1 (en) | Concrete wall shuttering construction - comprises largely interchangeable units forming compact entity for transport | |
BE491207A (en) | ||
FR2745840A1 (en) | SUPPORT DEVICE FOR FLOOR FORM MOUNTING | |
EP0465303B1 (en) | Improvements in cable-stayed bridges, especially in their cables and pillars | |
EP0214028B1 (en) | Method for the realization of a windscreen and waggon for carrying out said method | |
FR2772411A1 (en) | Protective system for falling objects | |
FR2673434A1 (en) | CANOPY SUPPORT. | |
FR2636999A2 (en) | Device for measuring the dimensions of a gable wall, such as a gable gauge rod | |
FR2469526A1 (en) | Ground beam stabiliser for vertical shutter concrete wall - is tied double cantilever and retracts by sliding in plugged shutter toe notches | |
CA1277847C (en) | Anchoring system for handling a heavy concrete slab | |
FR2776004A1 (en) | Shuttering panel forming openings in concrete | |
FR2931500A1 (en) | Internal and external formwork shutters fixation device for forming swimming pool basin, has connection element connecting bottom and top spacers and associated with length adjustment unit to permit clamping of shutters between spacers | |
CH654872A5 (en) | Device for bracing a prop for a slab formwork element | |
FR3047503A1 (en) | DEVICE FOR FIXING A GUARD RAIL TO A PREFABRICATED WALL AND ASSOCIATED GARDEN-BODY | |
FR2576355A1 (en) | Formwork for building tunnels | |
FR2726841A1 (en) | Fixing of guard rail slides | |
FR2614343A2 (en) | Device for the perpendicularity of corners and alignments | |
FR2607536A1 (en) | Device for attaching a pair of formwork panels shuttering the same face of a wall and with which panels the complementary parts of this device are associated and formwork panels provided with the complementary parts of at least one such device | |
CH510190A (en) | Console for maintaining and adjusting the position of a panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
ST | Notification of lapse |