FR2682080A1 - Method for automatic handling of large-capacity bottles, particularly bottles of liquified gas, and installation for implementing the method - Google Patents

Method for automatic handling of large-capacity bottles, particularly bottles of liquified gas, and installation for implementing the method Download PDF

Info

Publication number
FR2682080A1
FR2682080A1 FR9112109A FR9112109A FR2682080A1 FR 2682080 A1 FR2682080 A1 FR 2682080A1 FR 9112109 A FR9112109 A FR 9112109A FR 9112109 A FR9112109 A FR 9112109A FR 2682080 A1 FR2682080 A1 FR 2682080A1
Authority
FR
France
Prior art keywords
bottles
container
bottle
unloading
empty
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR9112109A
Other languages
French (fr)
Other versions
FR2682080B1 (en
Inventor
Lamotte Roland
Barcelo Pierre
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Butagaz SAS
Original Assignee
Butagaz SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Butagaz SAS filed Critical Butagaz SAS
Priority to FR9112109A priority Critical patent/FR2682080B1/en
Publication of FR2682080A1 publication Critical patent/FR2682080A1/en
Application granted granted Critical
Publication of FR2682080B1 publication Critical patent/FR2682080B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B21/00Packaging or unpacking of bottles
    • B65B21/02Packaging or unpacking of bottles in or from preformed containers, e.g. crates
    • B65B21/04Arranging, assembling, feeding, or orientating the bottles prior to introduction into, or after removal from, containers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65BMACHINES, APPARATUS OR DEVICES FOR, OR METHODS OF, PACKAGING ARTICLES OR MATERIALS; UNPACKING
    • B65B21/00Packaging or unpacking of bottles
    • B65B21/02Packaging or unpacking of bottles in or from preformed containers, e.g. crates
    • B65B21/08Introducing or removing single bottles, or groups of bottles, e.g. for progressive filling or emptying of containers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C13/00Details of vessels or of the filling or discharging of vessels
    • F17C13/002Details of vessels or of the filling or discharging of vessels for vessels under pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C5/00Methods or apparatus for filling containers with liquefied, solidified, or compressed gases under pressures
    • F17C5/002Automated filling apparatus
    • F17C5/005Automated filling apparatus for gas bottles, such as on a continuous belt or on a merry-go-round
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2205/00Vessel construction, in particular mounting arrangements, attachments or identifications means
    • F17C2205/01Mounting arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2223/00Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel
    • F17C2223/01Handled fluid before transfer, i.e. state of fluid when stored in the vessel or before transfer from the vessel characterised by the phase
    • F17C2223/0146Two-phase
    • F17C2223/0153Liquefied gas, e.g. LPG, GPL
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F17STORING OR DISTRIBUTING GASES OR LIQUIDS
    • F17CVESSELS FOR CONTAINING OR STORING COMPRESSED, LIQUEFIED OR SOLIDIFIED GASES; FIXED-CAPACITY GAS-HOLDERS; FILLING VESSELS WITH, OR DISCHARGING FROM VESSELS, COMPRESSED, LIQUEFIED, OR SOLIDIFIED GASES
    • F17C2270/00Applications
    • F17C2270/05Applications for industrial use
    • F17C2270/059Mass bottling, e.g. merry belts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • De-Stacking Of Articles (AREA)

Abstract

The invention relates to a method and an installation for automatic handling of large-capacity bottles, particularly bottles of liquidified gas. The method of the invention consists in: a) discharging en bloc, at a discharging station (PDG), the empty bottles which are arranged in a rack by transferring them in a lying-down position on a lateral container (CDG); b) destacking, one by one, the empty bottles which are lying down, using a manipulator robot (600), each bottle being deposited on a filling carriage (trolley) (CE) in order to be transferred to a filling and checking station; c) stacking, one by one, the full bottles which are lying down on the carriage (CE), using a manipulator robot (700), each full bottle being deposited in the lying-down position on a lateral container (CCG); d) transferring en bloc the full bottles which are lying down in an empty stand-by rack (C) on the palletisation line (100) at a charging (loading) station (PCG).

Description

La présente invention concerne la manutention des bouteilles de grande capacité, en particulier de bouteilles de gaz liquéfié (GPL par exemple). The present invention relates to the handling of large capacity cylinders, in particular of liquefied gas cylinders (LPG for example).

A titre indicatif, les bouteilles GPL de grande capacité présentent une longueur d'environ 1,4 mètre, leur poids étant de ltordre de 35 kg à vide et 70 kg lorsque les bouteilles sont pleines. As an indication, large capacity LPG cylinders have a length of around 1.4 meters, their weight being around 35 kg when empty and 70 kg when the cylinders are full.

La manutention de telles bouteilles doit donc être organisée, autant que faire se peut, par des moyens mécaniques, afin de limiter les interventions manuelles du personnel concerné, en particulier lors des opérations d'emplissage et de contrôle des bouteilles. The handling of such bottles must therefore be organized, as far as possible, by mechanical means, in order to limit the manual intervention of the personnel concerned, in particular during filling and checking of the bottles.

On utilisera dans la présente description le terme général de "manutention" pour englober les diverses opérations intervenant mécaniquement ou manuellement, lors du traitement de bouteilles de grande capacité disposées dans un casier, l'étape finale étant la palettisation de bouteilles pleines. In the present description, the general term "handling" will be used to encompass the various operations intervening mechanically or manually, during the treatment of large capacity bottles arranged in a rack, the final step being the palletization of full bottles.

Les techniques de manutention utilisées pour les petites bouteilles de gaz, dans lesquelles les bouteilles restent toujours debout, et comportant deux postes séparés de déchargement et de chargement ou un poste unique de déchargement / chargement, telles que celle qui est décrite dans le document FR-A-2 223 277, ne donnent pas entièrement satisfaction pour les bouteilles de grande capacité En effet, la longueur et la section de ces bouteilles font que la position debout est peu stable lors des manoeuvres de transfert comportant un poussage mécanique des bouteilles vides ou pleines. The handling techniques used for small gas cylinders, in which the bottles always remain upright, and comprising two separate unloading and loading stations or a single unloading / loading station, such as that described in the document FR- A-2 223 277, are not entirely satisfactory for large capacity bottles Indeed, the length and the section of these bottles make that the standing position is not very stable during transfer maneuvers comprising a mechanical pushing of empty or full bottles .

I1 existe par ailleurs plusieurs techniques de manutention spécialement adaptées aux bouteilles de grande capacité, les bouteilles étant disposées en position couchée (sur au moins une couche) dans un casier, mais d'une façon générale ces techniques comportent la plupart du temps des opérations de transfert effectuées manuellement. I1 also exist several handling techniques specially adapted to large capacity bottles, the bottles being placed in the supine position (on at least one layer) in a rack, but generally these techniques usually involve operations of transfer performed manually.

On a ainsi proposé et utilisé une technique utilisant un casier spécial recevant des bouteilles couchées sur des plans inclinés, ledit casier étant associé à un berceau pivotant permettant de basculer la première bouteille de la file extraite du casier pour la disposer en position debout (axe vertical), les opérations de déchargement des bouteilles vides et de chargement des bouteilles pleines se faisant au niveau d'un poste unique.  We have thus proposed and used a technique using a special rack receiving bottles lying on inclined planes, said rack being associated with a pivoting cradle making it possible to tilt the first bottle from the queue extracted from the rack to place it in a standing position (vertical axis ), the operations of unloading empty bottles and loading full bottles being done at a single station.

Outre la nécessité de prévoir un casier spécial (avec extraction par le bas du casier de la première bouteille de la file et chargement par le haut du casier) impliquant la présence d'élévateurs, cette technique présente les inconvénients inhérents au transfert en vertical (difficultés lorsqu'une bouteille a été chargée à l'envers dans le casier, et se retrouve alors tête en bas après basculement, ce qui oblige à prévoir des détrompeurs, instabilité des bouteilles en position debout), auxquels s'ajoutent la complexité de l'installation et une limitation des cadences (les cadences sont d'ailleurs à la fois limitées par la faible capacité des casiers spéciaux utilisés - en général six bouteilles au maximum - et par la présence d'un poste unique avec cadre basculant à 90" servant à la fois au déchargement et au chargement). In addition to the need to provide a special rack (with extraction from the bottom of the rack of the first bottle in the queue and loading from the top of the rack) involving the presence of elevators, this technique has the drawbacks inherent in vertical transfer (difficulties when a bottle has been loaded upside down in the rack, and then finds itself upside down after tilting, which requires providing polarizers, instability of the bottles in the standing position), to which are added the complexity of the installation and a limitation of the rates (the rates are besides at the same time limited by the low capacity of the special racks used - in general six bottles at most - and by the presence of a single station with tilting frame to 90 "being used for both unloading and loading).

On a par ailleurs proposé et utilisé une technique permettant d'utiliser des casiers de type traditionnel (dont la capacité est de l'ordre de neuf à onze bouteilles allongées de type GPL), avec une installation comportant un poste unique de chargement / déchargement sur table réceptrice basculante, comme illustré par exemple dans le document
FR-A-2 561 619.
We have also proposed and used a technique allowing the use of traditional type lockers (whose capacity is of the order of nine to eleven LPG type elongated bottles), with an installation comprising a single loading / unloading station on tilting receiving table, as illustrated for example in the document
FR-A-2 561 619.

Une installation de ce type comporte une ligne de palettisation avec dispositif de convoyage (un chemin de transfert à vérins et deux chaînes d'alimentation et d'évacuation des bouteilles pleines ou vides), un ensemble poussoir unique de déchargement / chargement, un plateau récepteur basculant ayant la capacité du casier (par exemple neuf bouteilles, dont sept "en canon" - axe orienté transversalement - et deux "en roule" - axe orienté longitudinalement), et un chariot basculant monté sur rail permettant d'ajouter ou de récupérer les deux bouteilles disposées en roule
Après transfert des bouteilles vides du casier sur le plateau récepteur, le plateau chargé est amené au poste basculant pour l'enlèvement manuel des deux bouteilles en roule et leur mise en place sur le chariot basculant, après quoi le plateau récepteur est basculé à 90" avec ses sept bouteilles disposées en canon pour amener ces bouteilles en position verticale.
An installation of this type comprises a palletizing line with conveying device (a transfer path with jacks and two supply and discharge chains for full or empty bottles), a single pusher assembly for unloading / loading, a receiving tray tilting with the capacity of the rack (for example nine bottles, of which seven "in barrel" - axis oriented transversely - and two "in roll" - axis oriented longitudinally), and a tilting carriage mounted on rail allowing to add or recover the two bottles arranged in rolls
After transfer of the empty bottles from the rack to the receiving tray, the loaded tray is brought to the tilting station for the manual removal of the two rolled bottles and their positioning on the tilting trolley, after which the receiving tray is tilted to 90 " with its seven bottles arranged in a barrel to bring these bottles to the vertical position.

Un ou deux opérateurs doivent alors transférer unitairement les bouteilles vides, en les faisant rouler sur leur base, vers la chaîne d'évacuation des bouteilles vides, puis ramener une à une les bouteilles pleines, toujours en les faisant rouler, et les replacer sur le plateau récepteur encore basculé, après quoi le plateau ainsi chargé est ramené à l'horizontale pour la mise en place des deux bouteilles disposées en roule, et enfin le transfert est effectué pour le chargement d'un casier vide. One or two operators must then transfer the empty bottles individually, by rolling them on their base, to the empty bottles evacuation chain, then bring the full bottles one by one, still rolling them, and replace them on the receiver tray still tilted, after which the tray thus loaded is brought back to the horizontal for the positioning of the two bottles arranged in rolls, and finally the transfer is carried out for the loading of an empty rack.

Une telle technique peut sans doute permettre des cadences relativement élevées (surtout si l'on prévoit d'empiler les casiers sur deux niveaux), mais elle présente encore les inconvénients déjà cités inhérents au positionnement vertical des bouteilles (notamment les risques d'erreurs avec des bouteilles se retrouvant la tête en bas), et implique en outre de nombreuses opérations effectuées manuellement (en pratique, au moins deux hommes sont nécessaires si l'on veut atteindre une cadence satisfaisante). Such a technique can undoubtedly allow relatively high rates (especially if it is planned to stack the racks on two levels), but it still has the disadvantages already mentioned inherent to the vertical positioning of the bottles (in particular the risks of errors with bottles ending up upside down), and also involves numerous operations carried out manually (in practice, at least two men are necessary if we want to reach a satisfactory rate).

L'invention a pour objet de concevoir un procédé de manutention et une installation de mise en oeuvre permettant de supprimer les inconvénients précités des techniques connues, grâce à un niveau d'automatisation élevé limitant considérablement les interventions manuelles. The object of the invention is to design a handling method and an installation making it possible to eliminate the aforementioned drawbacks of known techniques, thanks to a high level of automation considerably limiting manual intervention.

L'invention a également pour objet de concevoir un procédé et une installation permettant d'utiliser des casiers traditionnels pour bouteilles couchées, sans que la disposition de bouteilles en roule pose problème, tout en s'affranchissant totalement des risques d'erreurs de positionnement initial des bouteilles vides dans le casier. The object of the invention is also to design a method and an installation making it possible to use traditional racks for coated bottles, without the arrangement of rolled bottles being problematic, while completely eliminating the risks of errors in initial positioning. empty bottles in the rack.

L'invention a aussi pour objet de concevoir un procédé et une installation d'utilisation simple et fiable, avec la présence en toute sécurité d'un seul opérateur, lequel n'a aucune tâche pénible de manipulation à assurer. The object of the invention is also to design a method and an installation which is simple and reliable to use, with the safe presence of a single operator, who has no strenuous handling task to perform.

Il s'agit plus particulièrement d'un procédé de manutention automatique de bouteilles de grande capacité, en particulier de gaz liquéfié, dans lequel les bouteilles sont disposées en position couchée sur au moins une couche dans un casier, ledit casier pouvant être déplacé sur une ligne de palettisation par un dispositif de convoyage au niveau d'un poste de déchargement de bouteilles vides ou d'un poste de chargement de bouteilles pleines, caractérisé par le fait qu'il consiste à a) décharger en bloc au niveau du poste de déchargement les bouteilles
vides disposées dans un casier en les transférant en position couchée sur
un conteneur de déchargement global disposé latéralement au voisinage
de la ligne de palettisation b) désempiler une à une les bouteilles vides couchées sur le conteneur de
déchargement global au moyen d'un robot manipulateur, chaque
bouteille vide étant déposée automatiquement, en position couchée, sur
un chariot d'emplissage disposé entre le poste de déchargement et le
poste de chargement pour être transférée à un poste d'emplissage et de
contrôle c) empiler une à une les bouteilles pleines couchées sur le chariot
d'emplissage ramené à sa place initiale, au moyen d'un robot manipula
teur, chaque bouteille pleine étant déposée automatiquement, en
position couchée, sur un conteneur de chargement global disposé
latéralement au voisinage de la ligne de palettisation d) transférer en bloc les bouteilles pleines couchées sur le conteneur de
chargement global afin de les charger dans un casier vide en attente sur
la ligne de palettisation au niveau du poste de chargement.
It is more particularly a process for automatic handling of large capacity bottles, in particular liquefied gas, in which the bottles are placed in the supine position on at least one layer in a rack, said rack being able to be moved on a palletizing line by a conveyor device at an empty bottle unloading station or a full bottle loading station, characterized by the fact that it consists of a) unloading in bulk at the unloading station bottles
boxes arranged in a rack by transferring them to the supine position
a global unloading container disposed laterally in the vicinity
of the palletizing line b) unstack one by one the empty bottles lying on the container
global unloading by means of a manipulator robot, each
empty bottle being placed automatically, in the supine position, on
a filling trolley arranged between the unloading station and the
loading station to be transferred to a filling and
control c) stack the full bottles lying on the cart one by one
filling returned to its original place by means of a robot manipulated
tor, each full bottle being deposited automatically, in
lying down, on a global load container arranged
laterally in the vicinity of the palletizing line d) bulk transfer the full bottles lying on the container
global loading in order to load them in an empty locker waiting on
the palletizing line at the loading station.

De préférence, lorsqu'il s'agit d'un procédé dans lequel les bouteilles vides à décharger du casier sont disposées pour partie en canon (transversalement) et pour partie en roule (longitudinalement), le désempilage effectué lors de l'étape b) comporte une rotation préalable d'environ 90 , dans un plan horizontal, du conteneur de déchargement global pour désempiler les bouteilles disposées en roule sans avoir à modifier la position du chariot d'emplissage. Preferably, when it is a process in which the empty bottles to be unloaded from the rack are arranged partly in barrel (transversely) and partly in rolls (longitudinally), the destacking carried out during step b) comprises a preliminary rotation of approximately 90, in a horizontal plane, of the overall unloading container to unstack the bottles arranged in rolls without having to modify the position of the filling carriage.

Avantageusement encore, lorsqu'il s'agit d'un procédé dans lequel les bouteilles pleines à charger dans un casier sont à disposer pour partie en canon (transversalement) et pour partie en roule (longitudinalement), l'empilage effectué lors de l'étape c) comporte pour les bouteilles en roule une rotation drenviron 90" dans un plan horizontal, de chaque bouteille saisie par le robot manipulateur associé, puis un positionnement en roule de cette bouteille sur le conteneur de chargement global.De préférence alors, le positionnement en roule des bouteilles pleines sur le conteneur de chargement global est effectué en déposant chaque bouteille sur ce conteneur, puis en la faisant rouler sur ledit conteneur jusqu a sa position finale en utilisant à cet effet les moyens servant au transfert en bloc des bouteilles pleines dans un casier vide. Advantageously also, when it is a process in which the full bottles to be loaded in a rack are to be disposed partly in barrel (transversely) and partly in rolls (longitudinally), the stacking carried out during the step c) involves, for the bottles in rolls, a rotation of about 90 "in a horizontal plane, of each bottle gripped by the associated manipulator robot, then a roll positioning of this bottle on the global loading container. Preferably then, the positioning rolling full bottles on the global loading container is carried out by depositing each bottle on this container, then rolling it on said container to its final position using for this purpose the means used for the bulk transfer of full bottles into an empty locker.

I1 est également intéressant que le robot manipulateur ayant saisi une bouteille vide désempilée amène automatiquement cette bouteille au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage, ladite bouteille étant alors suspendue en position couchée (horizontale). I1 is also interesting that the manipulator robot having seized an empty unstacked bottle automatically brings this bottle to an intermediate waiting station near the filling cart, said bottle then being suspended in the supine (horizontal) position.

De façon analogue, il est avantageux que le robot manipulateur ayant déposé une bouteille pleine sur le conteneur de chargement global revienne automatiquement au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage. Similarly, it is advantageous for the manipulator robot having deposited a full bottle on the overall loading container to automatically return to an intermediate waiting station near the filling trolley.

De préférence encore, le casier de bouteilles vides est initialement mis en place sur la ligne de palettisation au niveau d'un poste de pose prévu en amont du poste de déchargement, et le casier de bouteilles pleines est finalement déplacé sur la ligne de palettisation au niveau d'un poste de dépose prévu en aval du poste de chargement, au moins un poste intermédiaire d'attente ou de pose / dépose de casier vide étant en outre prévu entre le poste de déchargement et le poste de chargement. More preferably, the empty bottle rack is initially placed on the palletizing line at a laying station provided upstream of the unloading station, and the full bottle rack is finally moved on the palletizing line at level of a depositing station provided downstream of the loading station, at least one intermediate waiting or laying / depositing empty bin station being also provided between the unloading station and the loading station.

L'invention concerne également une installation pour la mise en oeuvre d'un procédé de manutention automatique présentant l'une au moins des caractéristiques précitées, installation du type comportant une ligne de palettisation équipée d'un dispositif de convoyage pour assurer la circulation de casiers à bouteilles, avec un poste de déchargement de bouteilles vides et un poste de chargement de bouteilles pleines, ladite installation étant caractérisée par le fait qu'elle comporte en outre - un conteneur de déchargement global et un conteneur de chargement
global disposés latéralement au voisinage de la ligne de palettisation, et
d'un même côté de celle-ci - des premiers moyens pousseurs permettant de décharger en bloc les
bouteilles vides du casier sur le conteneur de déchargement global par
transfert direct desdites bouteilles en position couchée ;; - des seconds moyens pousseurs permettant de charger en bloc les
bouteilles pleines, en position couchée, du conteneur de chargement
global sur un casier vide en attente sur la ligne de palettisation - un portique de manutention agencé au-dessus des conteneurs de
déchargement global et de chargement global ; - des moyens robotisés de manutention portés par le portique, permettant
d'une part de désempiler une à une les bouteilles vides du conteneur de
déchargement global en les transférant, en position couchée, au niveau
d'un poste intermédiaire associé à un chariot d'emplissage, et d'autre
part d'empiler une à une les bouteilles pleines, en les transférant en
position couchée sur le conteneur de chargement global.
The invention also relates to an installation for the implementation of an automatic handling process having at least one of the above characteristics, installation of the type comprising a palletizing line equipped with a conveyor device for ensuring the circulation of racks bottle, with an empty bottle unloading station and a full bottle loading station, said installation being characterized by the fact that it further comprises - a global unloading container and a loading container
overall arranged laterally in the vicinity of the palletizing line, and
on the same side of the latter - first pusher means enabling the bulk unloading of
empty bottles from the rack on the overall unloading container by
direct transfer of said bottles in the supine position; - second pusher means making it possible to load the
full bottles, in the supine position, of the loading container
overall on an empty rack waiting on the palletizing line - a handling gantry arranged above the containers
global unloading and global loading; - robotic handling means carried by the gantry, allowing
on the one hand to unstack the empty bottles from the container one by one
overall unloading by transferring them, in the supine position, to the level
an intermediate station associated with a filling cart, and other
part of stacking the full bottles one by one, transferring them
lying position on the global loading container.

De préférence, le conteneur de déchargement global est équipé d'une barrière d'extrémité pivotante formant butée pour certaines au moins des bouteilles vides transférées en bloc sur ledit conteneur ; en particulier, la barrière d'extrémité comporte une partie inférieure fixe formant butée pour les bouteilles de la couche inférieure, et une partie supérieure basculante formant butée pour les bouteilles de la ou des couches supérieures, ladite partie supérieure étant mobile entre une position abaissée de butée et une position relevée de dégagement au moyen d'un vérin associé ou analogue. Preferably, the overall unloading container is equipped with a pivoting end barrier forming a stop for at least some of the empty bottles transferred as a whole to said container; in particular, the end barrier has a fixed lower part forming a stop for the bottles of the lower layer, and a tilting upper part forming a stop for the bottles of the upper layer or layers, said upper part being movable between a lowered position of stop and a raised release position by means of an associated jack or the like.

Selon une autre caractéristique avantageuse, le conteneur de déchargement global est monté tournant autour d'un axe vertical, et peut tourner d'environ 90" dans son plan pour faciliter le désempilage des bouteilles disposées en roule. According to another advantageous characteristic, the overall unloading container is mounted rotating about a vertical axis, and can rotate about 90 "in its plane to facilitate the unstacking of the bottles arranged in rolls.

De préférence, les premiers moyens pousseurs comportent au moins un poussoir disposé de l'autre côté de la ligne de palettisation et actionné par des moyens associés, et une barre transversale de poussage en particulier, la barre transversale de poussage est amovible, de façon à pouvoir laisser la barre de fermeture habituellement associée à la fermeture latérale du casier, ladite barre de poussage étant portée soit par un support basculant indépendant du poussoir, soit par le poussoir lui-même lorsque celui-ci est actionné et passe sous la barre de fermeture, la liaison séparable de la barre amovible audit support basculant ou audit poussoir étant de préférence assurée au moyen d'aimants.  Preferably, the first pusher means comprise at least one pusher disposed on the other side of the palletizing line and actuated by associated means, and a pushing crossbar in particular, the pushing crossbar is removable, so as to ability to leave the closing bar usually associated with the lateral closing of the locker, the said pushing bar being carried either by a tilting support independent of the pusher, or by the pusher itself when the latter is actuated and passes under the closing bar , the separable connection of the removable bar to said tilting support or to said pusher being preferably provided by means of magnets.

Avantageusement encore, les seconds moyens pousseurs comportent au moins un poussoir disposé en arrière du conteneur de chargement global et actionné par des moyens associes. Advantageously also, the second pusher means comprise at least one pusher disposed behind the overall loading container and actuated by associated means.

De préférence alors, le poussoir est supplémentairement agencé pour pouvoir éventuellement positionner en roule au moins une bouteille sur le conteneur de chargement global, lors de l'empilage des bouteilles pleines couchées sur ledit conteneur ; en particulier, le poussoir porte un bras de blocage pouvant pivoter autour d'un axe horizontal, par actionnement de moyens associés, entre une position relevée d'escamotage et une position abaissée de prise sur une bouteille en roule. Preferably then, the pusher is additionally arranged in order to be able to optionally position at least one bottle in rolls on the overall loading container, when stacking the full bottles lying on said container; in particular, the pusher carries a blocking arm which can pivot about a horizontal axis, by actuation of associated means, between a raised retraction position and a lowered position for gripping a rolled bottle.

Selon une autre caractéristique avantageuse de l'installation, les moyens robotisés de manutention comportent un premier robot manipulateur associé au désempilage des bouteilles vides du conteneur de déchargement global, et un second robot manipulateur, indépendant du premier, associé à l'empilage des bouteilles pleines sur le conteneur de chargement global. According to another advantageous characteristic of the installation, the robotic handling means comprise a first handling robot associated with the destacking of the empty bottles from the overall unloading container, and a second handling robot, independent of the first, associated with the stacking of the full bottles on the global loading container.

De préférence alors, chaque robot manipulateur comporte un chariot déplaçable sur le portique de support dans une direction essentiellement parallèle à la direction de déplacement de la ligne de palettisation, et un organe de préhension porté par ledit chariot, ledit organe de préhension étant déplaçable verticalement par des moyens motorisés associés également portés par ledit chariot. En particulier, l'organe de préhension peut en outre tourner autour de son axe vertical, sur un angle d'environ 90" ou 1800, selon qu'il s'agit respectivement de l'empilage des bouteilles pleines en roule ou du désempilage des bouteilles vides mal orientées, grâce à un vérin rotatif associé. Preferably then, each robot manipulator comprises a carriage movable on the support gantry in a direction essentially parallel to the direction of movement of the palletizing line, and a gripping member carried by said carriage, said gripping member being movable vertically by associated motorized means also carried by said carriage. In particular, the gripping member can also rotate around its vertical axis, by an angle of approximately 90 "or 1800, depending on whether it is the stacking of the full bottles in rolls or the unstacking of the empty bottles wrongly oriented, thanks to an associated rotary actuator.

Avantageusement encore, les moyens motorisés précités comportent un moteur à commande pneumatique, agissant sur une vis sans fin assurant le déplacement vertical de l'organe de préhension. Advantageously also, the aforementioned motorized means comprise a pneumatically controlled motor, acting on an endless screw ensuring the vertical displacement of the gripping member.

Selon une caractéristique particulièrement avantageuse, l'organe de préhension est une plaque incurvée connectée à des moyens d'aspiration, de façon à assurer la préhension d'une bouteille lorsque lesdits moyens sont actionnés. I1 est alors intéressant que chaque robot manipulateur comporte un organe de sécurité (réserve de vide) maintenant la charge en cas de coupure de l'alimentation pneumatique de l'installation.  According to a particularly advantageous characteristic, the gripping member is a curved plate connected to suction means, so as to ensure the gripping of a bottle when said means are actuated. It is therefore advantageous for each manipulator robot to include a safety device (vacuum reserve) maintaining the load in the event of the pneumatic supply to the installation being cut off.

Selon une autre caractéristique avantageuse, l'installation comporte en outre une structure fixe de guidage disposée sous le portique de support, entre les conteneurs de déchargement global et de chargement global, ladite structure fixe permettant de garantir un positionnement correct et constant pour le chariot d'emplissage. According to another advantageous characteristic, the installation further comprises a fixed guide structure disposed under the support gantry, between the overall unloading and overall loading containers, said fixed structure making it possible to guarantee correct and constant positioning for the carriage. filling.

D'autres caractéristiques et avantages de l'invention apparaîtront plus clairement à la lumière de la description qui va suivre et des dessins annexés, concernant un mode de réalisation particulier, en référence aux figures ou - la figure 1 est une vue en perspective d'une installation conforme à
l'invention, permettant la mise en oeuvre du procédé de manutention
automatique selon l'invention, la situation représentée correspondant à la
fin de l'empilage des bouteilles pleines (par le robot manipulateur
associé) sur le conteneur de chargement global, avant le transfert en bloc
de ces bouteilles dans le casier vide qui est en attente sur la ligne de
palettisation - la figure 2 est une vue de dessus schématique des postes de l'installation
de la figure 1 (le portique de manutention et les deux robots
manipulateurs qu'il supporte n'étant pas représentés) - la figure 3 est une vue en bout de l'installation précitée (au poste de
déchargement global), telle qu'elle se présente juste après le décharge
ment en bloc des bouteilles vides sur le conteneur de déchargement
global (qui est ici tournant), et la figure 4 illustre la même vue avec le
recul du poussoir de transfert global et le relèvement de la barrière
d'extrémité pivotante ayant servi de butée lors du déchargement global - les figures 3a à 3c sont des vues partielles illustrant l'utilisation d'une
barre transversale amovible associée au poussoir lors du déchargement
global aboutissant à la situation illustrée en figure 3, avec respective
ment une position de repos, une position de prise de barre par le poussoir
avançant dans le casier, et une position de déchargement global à l'aide
du poussoir équipé de sa barre transversale de poussage - la figure 5 est une vue latérale de l'installation (prise selon la flèche A
de la figure 4), telle qu'elle se présente après le déchargement global des
bouteilles vides, permettant de mieux distinguer le portique et les deux
robots manipulateurs (la barrière d'extrémité pivotante précitée et la
bouteille vide frontale en roule d'une part, et le poussoir de chargement
global d'autre part, n'étant pas représentés) - les figures 6 à 8 sont des vues en bout de l'installation précitée (au poste
de chargement global), illustrant l'empilage unitaire des deux premières
bouteilles (en roule) sur le conteneur de chargement global, avec
respectivement la dépose d'une bouteille sur le conteneur, le relevage de
l'organe de préhension (plaque aspirante), et l'actionnement du poussoir de chargement global équipé ' z à cet effet d'un bras pivotant de blocage) - la figure 9 est une vue latérale de l'installation (prise selon la flèche A
de la figure 4), telle qu'elle se présente en cours de désempilage /
empilage unitaire, l'un des robots manipulateurs étant au niveau du
chariot d'emplissage, pour l'enlèvement d'une bouteille pleine disposée
sur ledit chariot, tandis que l'autre est en position d'attente avant la
dépose d'une bouteille vide sur ce chariot d'emplissage.
Other characteristics and advantages of the invention will appear more clearly in the light of the description which follows and of the appended drawings, relating to a particular embodiment, with reference to the figures or - Figure 1 is a perspective view of installation in accordance with
the invention, enabling the handling method to be implemented
automatic according to the invention, the situation represented corresponding to the
end of stacking of full bottles (by the robot manipulator
associated) on the global loading container, before the bulk transfer
of these bottles in the empty rack which is waiting on the line
palletizing - Figure 2 is a schematic top view of the installation posts
of figure 1 (the handling gantry and the two robots
manipulators that it supports not being shown) - Figure 3 is an end view of the above installation (at the position of
overall unloading), as it occurs just after the unloading
empty bottles in bulk on the unloading container
global (which is here rotating), and Figure 4 illustrates the same view with the
backward movement of the overall transfer pusher and raising of the barrier
pivoting end having served as a stop during overall unloading - Figures 3a to 3c are partial views illustrating the use of a
removable crossbar associated with the pusher during unloading
overall leading to the situation illustrated in figure 3, with respective
a rest position, a helm position by the pusher
advancing into the locker, and an overall unloading position using
of the pusher equipped with its transverse pusher bar - Figure 5 is a side view of the installation (taken along arrow A
in Figure 4), as it appears after the overall unloading of
empty bottles, to better distinguish the gantry and the two
manipulator robots (the aforementioned pivoting end barrier and the
empty front bottle on the one hand, and the loading pusher
overall on the other hand, not being shown) - Figures 6 to 8 are end views of the above installation (at the station
overall loading), illustrating the unit stacking of the first two
bottles (rolls) on the global loading container, with
respectively the removal of a bottle on the container, the lifting of
the gripping member (suction plate), and the actuation of the global loading pusher equipped 'z for this purpose with a pivoting locking arm) - Figure 9 is a side view of the installation (taken along the arrow AT
in Figure 4), as it appears during destacking /
unitary stacking, one of the manipulator robots being at the level of the
filling trolley, for removing a full bottle arranged
on the said carriage, while the other is in the waiting position before the
placing an empty bottle on this filling cart.

La figure 1 illustre une installation de manutention automatique IMA conforme à l'invention, installation qui permet la mise en oeuvre du procédé de manutention automatique selon l'invention. FIG. 1 illustrates an IMA automatic handling installation according to the invention, an installation which allows the implementation of the automatic handling method according to the invention.

L'installation IMA comporte, de façon connue en soi, une ligne de palettisation 100 équipée d'un dispositif de convoyage pour assurer la circulation de casiers à bouteilles C de type traditionnel, avec un poste de déchargement de bouteilles vides et un poste de chargement de bouteilles pleines. On distingue sur la figure 1 la structure longitudinale de support 101 de la ligne de palettisation 100, les deux chaînes de convoyage 102, 103, qui sont entraînées par un moteur d'actionnement 105, qui est de préférence un moto-réducteur électrique, par l'intermédiaire d'un arbre d'extrémité 104.Les chaînes 102, 103 tournent continûment, et la ligne de palettisation 100 est équipée latéralement de patins relevables (en général au moyen de boudins gonflables), qui permettent de soulever légèrement un casier C, rempli ou non de bouteilles de grande capacité, afin de dégager ledit casier des chaînes d'entraînement pour l'arrêter au niveau de l'un quelconque des postes de l'installation de manutention automatique. Un butoir 107 est en outre prévu à l'extrémité aval de la ligne de palettisation 100, pour arrêter le casier C qui est normalement rempli de bouteilles pleines.Les casiers C peuvent être arrêtés au-dessus de l'un ou l'autre de deux peignes fixes 106, chaque peigne fixe constituant une plate-forme de support pouvant être élevée en s'insérant dans le plancher du casier pour soulever légèrement les bouteilles couchées dans ledit casier, en vue d'une mise à niveau avec le conteneur correspondant visant à faciliter le transfert global desdites bouteilles. Sur les figures 3 et 4, on a représenté schématiquement une telle plate-forme de support 106' et son vérin élévateur 106", ladite plate-forme étant en position haute sur la figure 3 (pour le déchargement global) et en position basse sur la figure 4 (après déchargement global).Les moyens d'arrêt des casiers au niveau de l'un ou l'autre des peignes 106 sont par exemple constitués par des barrettes longitudinales (non représentées), disposées au voisinage de chacune des chaînes de convoyage et associées à des vérins souples (tels que des boudins gonflables), avec éventuellement aussi des doigts d'arrêt escamotables pour avoir un arrêt précis des casiers. The IMA installation comprises, in a manner known per se, a palletizing line 100 equipped with a conveyor device for ensuring the circulation of bottle racks C of traditional type, with an unloading station for empty bottles and a loading station full bottles. We can see in Figure 1 the longitudinal support structure 101 of the palletizing line 100, the two conveyor chains 102, 103, which are driven by an actuating motor 105, which is preferably an electric gear motor, by via an end shaft 104. The chains 102, 103 rotate continuously, and the palletizing line 100 is fitted laterally with lifting shoes (generally by means of inflatable tubes), which allow a rack C to be slightly raised. , whether or not filled with large capacity bottles, in order to disengage said rack from the drive chains to stop it at any one of the stations of the automatic handling installation. A stopper 107 is also provided at the downstream end of the palletizing line 100, to stop the rack C which is normally filled with full bottles. The lockers C can be stopped above either of two fixed combs 106, each fixed comb constituting a support platform which can be raised by inserting it in the floor of the rack to slightly lift the bottles lying in said rack, with a view to leveling with the corresponding container aimed to facilitate the overall transfer of said bottles. In FIGS. 3 and 4, there is shown schematically such a support platform 106 ′ and its lifting cylinder 106 ", said platform being in the high position in FIG. 3 (for overall unloading) and in the low position on FIG. 4 (after overall unloading). The means for stopping the racks at one or other of the combs 106 are for example constituted by longitudinal bars (not shown), arranged in the vicinity of each of the chains of conveying and associated with flexible cylinders (such as inflatable tubes), with possibly also retractable stop fingers to have a precise stop of the lockers.

La figure 1 permet de distinguer les éléments constitutifs essentiels de l'installation IMA, dont la structure sera décrite pour chacun d'eux plus en détail dans la description qui suivra. L'installation IMA comporte ainsi - un conteneur de déchargement global CDG et un conteneur de
chargement global CCG disposés latéralement au voisinage de la ligne de
palettisation 100, et d'un même côté de celle-ci - des premiers moyens pousseurs 200 permettant de décharger en bloc les
bouteilles vides B, B' du casier C sur le conteneur de déchargement
global CDG par transfert direct desdites bouteilles en position couchée - des seconds moyens pousseurs 400 permettant de charger en bloc les
bouteilles pleines B, B', en position couchée, du conteneur de chargement
global CCG sur un casier vide C en attente sur la ligne de palettisation
100 - un portique de manutention P agencé au-dessus des conteneurs de
déchargement global CDG et de chargement global CCG - des moyens robotisés de manutention 600, 700 portés par le portique P,
permettant d'une part de désempiler une à une les bouteilles vides B, B'
du conteneur de déchargement global CDG en les transférant, en position
couchée, au niveau d'un poste intermédiaire PEC associé à un chariot
d'emplissage CE, et d'autre part d'empiler une à une les bouteilles
pleines B, B', en les transférant, en position couchée, sur le conteneur de
chargement global CCG.
FIG. 1 makes it possible to distinguish the essential constituent elements of the IMA installation, the structure of which will be described for each of them in more detail in the description which follows. The IMA installation thus comprises - a global unloading container CDG and a container of
CCG global loading arranged laterally in the vicinity of the line of
palletizing 100, and on the same side thereof - first pusher means 200 making it possible to unload the whole
empty bottles B, B 'from rack C on the unloading container
global CDG by direct transfer of said bottles in the supine position - second pusher means 400 enabling the bulk loading of the
full bottles B, B ', in the supine position, of the loading container
global CCG on an empty rack C waiting on the palletizing line
100 - a handling gantry P arranged above the containers of
CDG global unloading and CCG global loading - robotic handling means 600, 700 carried by gantry P,
allowing on the one hand to unstack one by one the empty bottles B, B '
of the CDG global unloading container by transferring them, in position
lying down, at a PEC intermediate station associated with a trolley
filling machine, and on the other hand to stack the bottles one by one
full B, B ', by transferring them, in the supine position, onto the container
CCG global loading.

On constate ainsi que l'installation de manutention automatique IMA comporte fondamentalement un poste de déchargement global des bouteilles vides PDG et un poste de chargement global des bouteilles pleines PCG en aval du premier poste. L'agencement successif de tels postes, avec l'organisation d'un transfert global des bouteilles vides au niveau du premier et des bouteilles pleines au niveau du second, permet des cadences satisfaisantes. De plus, les bouteilles de gaz B, B' sont en permanence en position couchée (c'est-à-dire que leur axe est essentiellement horizontal), de sorte que l'on évite ainsi toute manutention de bouteilles debout, et on parvient à un niveau d'automatisation élevé limitant considérablement les interventions manuelles.Une telle structure rend ainsi possible la présence en toute sécurité d'un seul opérateur, lequel n'a en réalité aucune tâche pénible de manipulation à assurer. Par ailleurs, les casiers C sont de type traditionnel pour le transport de bouteilles en position couchée (on a représenté ici des casiers permettant de disposer onze bouteilles, dont neuf sont disposées en canon, selon deux couches superposées, et deux sont disposées en roule de chaque côté de l'empilage de bouteilles en canon). It can thus be seen that the IMA automatic handling installation basically comprises a global unloading station for empty PDG bottles and a global loading station for full PCG bottles downstream from the first station. The successive arrangement of such stations, with the organization of a global transfer of empty bottles at the level of the first and full bottles at the level of the second, allows satisfactory rates. In addition, the gas cylinders B, B 'are permanently in the supine position (that is to say that their axis is essentially horizontal), so that this avoids any handling of upright bottles, and we reach to a high level of automation considerably limiting manual intervention. Such a structure thus makes possible the safe presence of a single operator, who in reality has no painful handling task to perform. Furthermore, racks C are of the traditional type for transporting bottles in the supine position (racks have been shown here allowing eleven bottles to be placed, nine of which are arranged in barrel, in two superposed layers, and two are arranged in rolls of each side of the stack of barrel bottles).

On reviendra ultérieurement sur la question de la disposition des bouteilles de gaz dans les casiers et sur l'un ou l'autre des conteneurs de déchargement global CDG et de chargement global CCG : pour simplifier la description, on a référencé B les bouteilles disposées en canon (axe longitudinal orienté transversalement par rapport à la direction de convoyage des casiers sur la ligne de palettisation), et B' les bouteilles disposées eh roule (axe longitudinal orienté parallèlement à la direction de convoyage précitée). We will come back later to the issue of the arrangement of gas cylinders in the lockers and on one or other of the CDG global unloading and CCG global loading containers: to simplify the description, reference is made to B the cylinders arranged in barrel (longitudinal axis oriented transversely to the racking direction of the racks on the palletizing line), and B 'the bottles arranged to roll (longitudinal axis oriented parallel to the aforementioned conveying direction).

L'installation IMA permet ainsi la mise en oeuvre du procédé de manutention automatique de bouteilles de grande capacité conforme à l'invention, procédé dans lequel les bouteilles sont disposées en position couchée, sur au moins une couche, dans un casier de type traditionnel, ledit procédé étant remarquable en ce qu'il comporte les étapes successives consistant à décharger en bloc au niveau du poste de déchargement PDG les bouteilles
vides B, B' disposées dans un casier C en les transférant en position
couchée sur le conteneur de déchargement global CDG disposé
latéralement au voisinage de la ligne de palettisation 100 désempiler une à une les bouteilles vides B, B' couchées sur le conteneur
de déchargement global CDG au moyen d'un robot manipulateur 600,
chaque bouteille vide étant déposée automatiquement, en position
couchée, sur un chariot d'emplissage CE disposé entre le poste de
déchargement global PDG et le poste de chargement global PCG pour
être transférée à un poste extérieur d'emplissage et de contrôle empiler une à une les bouteilles pleines B, B' couchées sur le chariot
d'emplissage CE ramené à sa place initiale, au moyen d'un robot
manipulateur 700, chaque bouteille pleine étant déposée automatique
ment, en position couchée, sur le conteneur de chargement global CCG
également disposé latéralement au voisinage de la ligne de palettisation
100 ;; transférer en bloc les bouteilles pleines B, B' couchées sur le conteneur
de chargement global CCG, afin de les charger dans un casier vide C en
attente sur la ligne de palettisation 100 au niveau du poste de
chargement PCG.
The IMA installation thus allows the implementation of the automatic handling process of large capacity bottles according to the invention, process in which the bottles are placed in the supine position, on at least one layer, in a traditional type rack, said method being remarkable in that it comprises the successive stages consisting in unloading in a block at the level of the PDG unloading station the bottles
empty B, B 'arranged in a rack C by transferring them into position
lying on the CDG global unloading container
laterally in the vicinity of the palletizing line 100 unstack one by one the empty bottles B, B 'lying on the container
CDG global unloading by means of a robot manipulator 600,
each empty bottle being deposited automatically, in position
lying down, on a CE filling cart placed between the
PDG global unloading and the PCG global loading station for
be transferred to an external filling and control station stack one by one the full bottles B, B 'lying on the trolley
filling machine returned to its original place by means of a robot
manipulator 700, each full bottle being deposited automatically
lying down on the CCG global loading container
also arranged laterally in the vicinity of the palletizing line
100 ;; bulk transfer the full bottles B, B 'lying on the container
of CCG global loading, in order to load them in an empty compartment C in
waiting on the palletizing line 100 at the post of
PCG loading.

La vue schématique de la figure 2 permet de mieux comprendre l'organisation des différents postes de l'installation IMA. The schematic view of FIG. 2 makes it possible to better understand the organization of the different stations of the IMA installation.

On distingue sur la figure 2 une succession de cinq postes qui comportent les deux postes fondamentaux de déchargement global PDG et de chargement global PCG précédemment mentionnés. Si l'on considère la direction (et le sens) de circulation de casier C sur la ligne de palettisation 100, direction notée A, on trouve successivement un poste de pose d'un casier de bouteilles vides PPC, le poste de déchargement global de ces bouteilles vides PDG, un poste intermédiaire d'attente ou de pose / dépose de casiers vides PPDC, le poste de chargement global des bouteilles pleines
PCG, et enfin un poste de dépose de casiers de bouteilles pleines PDC.I1 est important de noter la disposition latérale des deux conteneurs de l'installation, c'est-à-dire d'abord du conteneur de déchargement global
CDG, et ensuite du conteneur de chargement global CCG, respectivement au niveau des postes de déchargement global PDG et de chargement global PCG. I1 va de soi cependant que l'on pourra encore augmenter le nombre des postes d'attente en prévoyant des postes intermédiaires supplémentaires, par exemple entre les postes PPC et PDG, et/ou entre les postes
PDG et PCG, et/ou entre les postes PCG et PDC.
We distinguish in Figure 2 a succession of five stations which include the two basic PDG global unloading stations and PCG global loading previously mentioned. If we consider the direction (and direction) of bin circulation C on the palletizing line 100, direction denoted A, we successively find a station for installing an empty bottle rack PPC, the overall unloading station for these empty PDG bottles, an intermediate station for waiting or placing / depositing empty PPDC racks, the global loading station for full bottles
PCG, and finally a station for depositing full bottle racks PDC.I1 is important to note the lateral arrangement of the two containers of the installation, that is to say first of the overall unloading container
CDG, and then from the global loading container CCG, respectively at the level of the global unloading stations PDG and global loading PCG. It goes without saying, however, that the number of waiting positions can be further increased by providing additional intermediate positions, for example between PPC and CEO positions, and / or between positions.
PDG and PCG, and / or between PCG and PDC extensions.

Les étapes successives du procédé de manutention automatique sont schématisées sur la figure 2 à l'aide de différentes flèches, organisées comme suit - un casier C de bouteilles vides est tout d'abord mis en place au niveau du
poste PPC, comme schématisé par la flèche 10, et l'on dépose la barre de
fermeture latérale (non représentée sur cette figure) qui est du côté des
conteneurs de déchargement global et de chargement global - ce casier de bouteilles vides est alors transféré par le dispositif de
convoyage de la ligne de palettisation 100 au niveau du poste de
déchargement global PDG, pour un transfert en bloc de toutes les
bouteilles vides B, B', sur le conteneur de déchargement global CDG,
comme schématisé par la flèche Il, grâce aux moyens pousseurs 200,
dont on a représenté le double poussoir 201 avec les extrémités de
poussage associées 202 - le premier robot manipulateur (non visible sur la figure 2) permet alors
un transfert unitaire des bouteilles B, B' du conteneur de déchargement
global CDG sur le chariot d'emplissage CE au niveau du poste PEC,
comme schématisé par la flèche 15 - l'opérateur n'a alors quTà déplacer le chariot CE portant une bouteille B
ou B' couchée sur ledit chariot, afin de l'amener au niveau d'organes
d'emplissage et de contrôle connus en soi (non représentés ici), comme
schématisé par la double flèche 16, chaque bouteille vide désempilée
étant ainsi successivement amenée pour être remplie et contrôlée, puis
ramenée au poste PEC pour l'empilage suivant - un autre robot manipulateur effectue alors l'empilage unitaire des
bouteilles pleines sur le conteneur de chargement global CCG, comme
schématisé par la flèche 17 - une fois l'empilage des bouteilles B, B' terminé, les moyens pousseurs 400
effectuent le transfert global de toutes les bouteilles pleines B, B' sur un
casier vide en attente sur la ligne de palettisation, comme schématisé
par la flèche 18 - le casier C chargé de bouteilles pleines B, B' est alors transféré au
niveau du poste PDC, où l'on replace sur le casier la barre latérale de
fermeture, pour une dépose dudit casier rempli, comme schématisé par la
flèche 19, ce qui libère la place au niveau du poste PCG pour un autre
casier vide à charger de bouteilles pleines.
The successive stages of the automatic handling process are shown diagrammatically in FIG. 2 using different arrows, organized as follows - a rack C of empty bottles is first put in place at the level of the
PPC station, as shown by arrow 10, and the bar is removed
side closure (not shown in this figure) which is on the side of the
bulk unloading and bulk loading containers - this empty bottle rack is then transferred by the
conveying of the palletizing line 100 at the level of the
global PDG unloading, for a bulk transfer of all
empty bottles B, B ', on the overall unloading container CDG,
as shown by the arrow Il, thanks to the pusher means 200,
which has been shown the double pusher 201 with the ends of
associated pushing 202 - the first manipulator robot (not visible in FIG. 2) then allows
a unit transfer of the bottles B, B 'from the unloading container
global CDG on the CE filling cart at the PEC station,
as shown by arrow 15 - the operator then only has to move the cart CE carrying a bottle B
or B 'lying on said carriage, in order to bring it to the level of organs
filling and control known per se (not shown here), such as
shown schematically by the double arrow 16, each empty bottle unstacked
being successively brought in to be filled and checked, then
brought back to the PEC station for the next stacking - another robot manipulator then performs the unitary stacking of
full bottles on the CCG global load container, such as
shown schematically by the arrow 17 - once the stacking of the bottles B, B 'is finished, the pusher means 400
carry out the global transfer of all the full bottles B, B 'to a
empty rack waiting on the palletizing line, as shown
by arrow 18 - the rack C loaded with full bottles B, B 'is then transferred to
level of the PDC station, where the side bar is replaced on the locker
closing, for removal of said filled locker, as shown schematically by the
arrow 19, which frees up space at the PCG station for another
empty rack to load full bottles.

Après déchargement global des bouteilles vides au niveau du poste PDG, le casier vidé C est automatiquement transféré au niveau du poste PPDC, comme schématisé par la flèche 12 qui est un poste d'attente, des casiers pouvant être éventuellement posés ou déposés au niveau de ce poste PPDC, comme schématisé par les flèches 13 et 14. After overall unloading of the empty bottles at the PDG station, the emptied rack C is automatically transferred to the PPDC station, as shown by arrow 12 which is a waiting station, racks can possibly be placed or deposited at this PPDC item, as shown by arrows 13 and 14.

La figure 2 illustre une disposition de bouteilles vides sur le casier C avec des bouteilles B en canon et des bouteilles B' en roule. Après le déchargement global de ces bouteilles vides, les bouteilles en canon B se trouvent automatiquement sous le portique, disposées selon la ligne de transfert référencée B, qui est parallèle à la direction A de circulation des casiers sur la ligne de palettisation. I1 n'en va cependant pas de même pour les deux bouteilles en roule B', pour lesquelles le désempilage nécessite de prévoir une organisation particulière de l'installation de manutention automatique. On pourrait prévoir des robots manipulateurs comportant une possibilité de mouvements dans les trois directions orthogonales d'un trièdre xyz (ce trièdre a été représenté sur la figure 1).Cependant, la structure de l'installation est considérablement simplifiée si l'on utilise des robots manipulateurs comportant seulement une possibilité de déplacement parallèlement à l'axe x du trièdre, selon la ligne horizontale B précitée, avec naturellement une possibilité de déplacement vertical (axe z) pour aller saisir les bouteilles vides couchées et les relever avant de les transférer unitairement.On parvient à une telle organisation en prévoyant que le conteneur de déchargement global CDG est monté tournant autour d'un axe vertical (axe 350 sur les figures 3 et 4) et peut tourner d'environ 90" dans son plan, pour faciliter le désempilage des bouteilles vides B' disposées en roule, comme cela est schématisé sur la figure 2 par les flèches 20 : après rotation de 90 , les deux bouteilles en roule B' se trouvent alors dans la même position que les bouteilles B en canon avant rotation dudit conteneur (cette position du conteneur de déchargement global CDG est illustrée en pointillés).Le robot manipulateur assurant les opérations d'empilage unitaire sur le conteneur de chargement global CCG est également de préférence du même type que le précédent, avec un déplacement du robot selon la ligne horizontale B, et un déplacement vertical du moyen de préhension des bouteilles : ceci suppose alors un aménagement particulier de l'installation pour pouvoir positionner les deux bouteilles en roule B, B' sur ce conteneur de chargement global CCG, et l'on verra par la suite que l'on peut avantageusement utiliser à cet effet les moyens pousseurs 400 qui assurent dans ce cas une fonction supplémentaire en plus de leur fonction première de transfert global des bouteilles pleines du casier de chargement global CCG sur un casier vide en attente sur la ligne de palettisation. FIG. 2 illustrates an arrangement of empty bottles on rack C with bottles B in barrel and bottles B 'in rolls. After the overall unloading of these empty bottles, the barrel bottles B are automatically located under the gantry, arranged according to the transfer line referenced B, which is parallel to the direction A of circulation of the racks on the palletizing line. However, the same does not apply to the two rolled bottles B ′, for which the destacking requires providing for a particular organization of the automatic handling installation. We could provide manipulating robots with the possibility of movement in the three orthogonal directions of an xyz trihedron (this trihedron has been represented in FIG. 1). However, the structure of the installation is considerably simplified if we use manipulator robots with only one possibility of movement parallel to the x-axis of the trihedron, along the above-mentioned horizontal line B, with naturally a possibility of vertical movement (z-axis) to go and grab the empty bottles lying down and lift them before transferring them individually .We achieve such an organization by providing that the CDG overall unloading container is mounted rotating around a vertical axis (axis 350 in Figures 3 and 4) and can rotate by about 90 "in its plane, to facilitate the destacking of empty bottles B 'arranged in rolls, as shown diagrammatically in FIG. 2 by arrows 20: after rotation of 90, the two rolled bottles B 'are then in the same position as the bottles B in barrel before rotation of said container (this position of the overall unloading container CDG is illustrated in dotted lines). The robotic manipulator ensuring the stacking operations unitary on the global loading container CCG is also preferably of the same type as the previous one, with a displacement of the robot along the horizontal line B, and a vertical displacement of the means for gripping the bottles: this then supposes a particular arrangement of the installation to be able to position the two rolled bottles B, B ′ on this global loading container CCG, and it will be seen later that it is advantageous to use the pushing means 400 for this purpose which in this case perform a function additional in addition to their primary function of global transfer of full bottles from the CCG global loading rack to an empty rack waiting s on the palletizing line.

On va maintenant décrire plus en détail les différents organes de l'installation de manutention automatique IMA, au niveau des deux postes fondamentaux de déchargement global PDG et de chargement global
PCG.
We will now describe in more detail the various organs of the automatic handling installation IMA, at the level of the two fundamental stations of global unloading PDG and global loading
PCG.

On va tout d'abord décrire les organes de l'installation prévus au niveau du poste de déchargement global PDG en se référant aux figures 3 et 4, certains de ces organes étant également visibles sur la vue générale de l'installation IMA de la figure 1. We will first of all describe the installation organs provided at the level of the global unloading station PDG with reference to FIGS. 3 and 4, some of these organs also being visible in the general view of the installation IMA in FIG. 1.

La figure 3 est une vue de l'installation telle qu'elle se présente juste après le déchargement en bloc des bouteilles vides sur le conteneur de déchargement global CDG (qui est ici tournant autour de son axe vertical 350), et la figure 4 illustre la même vue avec un recul du poussoir de transfert global 201 et le relèvement d'une barrière d'extrémité pivotante 305 ayant servi de butée lors du déchargement global. FIG. 3 is a view of the installation as it appears just after the unloading of the empty bottles en bloc on the overall unloading container CDG (which is here rotating around its vertical axis 350), and FIG. 4 illustrates the same view with a retreat of the global transfer pusher 201 and the raising of a pivoting end barrier 305 which served as a stop during the overall unloading.

On distingue sur les figures 3 et 4 la structure schématique des moyens pousseurs 200, avec le double poussoir 201 actionné par des moyens associés 203 (par exemple des moyens motorisés avec pignons et crémaillères) disposés sur une structure fixe 205 adjacente à la structure de ligne de palettisation, mais de l'autre côté par rapport au conteneur de déchargement global CDG. Ces moyens comportent également un capteur 204 (figure 3) correspondant aux fins de course du double poussoir 201. Sur la figure 3, le double poussoir 201 est en position d'extension maximale, l'extrémité de poussage 202 ayant poussé en bloc les bouteilles B, B' initialement disposées sur le casier C, en agissant tant sur l'étage inférieur de bouteilles par l'intermédiaire de la première bouteille en roule B' que sur l'étage supérieur de bouteilles B disposé en canon.Le conteneur de déchargement global CDG est équipé d'une barrière d'extrémité pivotante 305 formant butée pour certaines au moins des bouteilles vides B, B' transférées en bloc sur ledit conteneur. Cette barrière d'extrémité 305 comporte ici une partie inférieure fixe 306 formant butée pour les bouteilles de la couche inférieure, et une partie supérieure basculante 307 formant butée pour les bouteilles de la ou des couches supérieures, ladite partie supérieure étant mobile entre une position abaissée de butée (position de la figure 3) et une position relevée de dégagement (position de la figure 4) au moyen d'un vérin associé 308 ou analogue.Ainsi, les bouteilles vides B, B' transférées en bloc depuis le casier C sur le conteneur de déchargement global CDG, comme schématisé par la flèche Il (la position finale de transfert correspondant à la figure 3) sont mises à niveau (longitudinalement) ; ensuite, le double poussoir 201 est reculé, comme schématisé par la flèche 11', et la barrière 305 est relevée, comme schématisé par la flèche 310 (cette position des éléments mobiles étant alors illustrée en figure 4). On a représenté en outre sur la figure 4 un capteur 309 associé au mouvement de basculement de la partie mobile 307 de la barrière d'extrémité pivotante 305. On reviendra par ailleurs ultérieurement, en regard des figures 3a à 3c, sur la structure particulière de l'extrémité 202 du double poussoir 201, dont l'agencement est prévu pour que l'ensemble de poussage 201, 202 puisse pénétrer dans un casier C de type conventionnel et organiser le poussage global de toutes les bouteilles vides à transférer. We can see in Figures 3 and 4 the schematic structure of the pusher means 200, with the double pusher 201 actuated by associated means 203 (for example motorized means with pinions and racks) arranged on a fixed structure 205 adjacent to the line structure palletizing, but on the other side with respect to the CDG global unloading container. These means also include a sensor 204 (FIG. 3) corresponding to the limit switches of the double pusher 201. In FIG. 3, the double pusher 201 is in the maximum extension position, the pushing end 202 having pushed the bottles together B, B 'initially arranged on the rack C, acting both on the lower stage of bottles by means of the first rolled bottle B' than on the upper stage of bottles B arranged in barrel. global CDG is equipped with a pivoting end barrier 305 forming a stop for at least some of the empty bottles B, B ′ transferred as a whole to said container. This end barrier 305 here comprises a fixed lower part 306 forming a stop for the bottles of the lower layer, and a tilting upper part 307 forming a stop for the bottles of the upper layer or layers, said upper part being movable between a lowered position stop (position in Figure 3) and a raised release position (position in Figure 4) by means of an associated cylinder 308 or the like. Thus, the empty bottles B, B 'transferred as a whole from the rack C to the overall unloading container CDG, as shown diagrammatically by the arrow II (the final transfer position corresponding to FIG. 3) are leveled (longitudinally); then, the double pusher 201 is moved back, as shown schematically by the arrow 11 ', and the barrier 305 is raised, as shown schematically by the arrow 310 (this position of the mobile elements then being illustrated in FIG. 4). FIG. 4 also shows a sensor 309 associated with the tilting movement of the movable part 307 of the pivoting end barrier 305. We will also return later, with reference to FIGS. 3a to 3c, to the particular structure of the end 202 of the double pusher 201, the arrangement of which is provided so that the pusher assembly 201, 202 can enter a rack C of conventional type and organize the overall pushing of all the empty bottles to be transferred.

Ainsi que cela a été dit plus haut, le conteneur de déchargement global CDG est agencé en étant ici monté tournant autour de son axe vertical 350, en pouvant tourner d'environ 90" dans son plan, pour faciliter le désempilage des bouteilles B' disposées en roule sur ledit conteneur. Le conteneur CDG comporte ainsi une plate-forme 300 sur laquelle est prévu un ensemble de lattes 301 constituant la face supérieure du conteneur sur laquelle sont transférées les bouteilles vides. La plate-forme pivotante 300 est montée sur une semelle fixe 302 par l'intermédiaire d'une tourelle comportant un élément inférieur fixe 303 et un élément supérieur 304 mobile, ce dernier élément étant solidaire en rotation de la plate-forme 300. L'ensemble de support tournant associé au conteneur de déchargement global CDG est globalement référencé 315. As has been said above, the overall unloading container CDG is arranged here being mounted rotating about its vertical axis 350, being able to rotate about 90 "in its plane, to facilitate the destacking of the bottles B 'arranged rolls on said container. The CDG container thus comprises a platform 300 on which is provided a set of slats 301 constituting the upper face of the container on which the empty bottles are transferred. The pivoting platform 300 is mounted on a soleplate fixed 302 by means of a turret comprising a fixed lower element 303 and a mobile upper element 304, the latter element being rotatably integral with the platform 300. The rotating support assembly associated with the overall unloading container CDG is generally referenced 315.

Les moyens pousseurs 200 comportent au moins un poussoir 201 disposé de l'autre côté de la ligne de palettisation 100 par rapport au conteneur de déchargement global et actionné par des moyens associés 203, 204, comme cela a été dit plus haut, et comportent de préférence en outre une barre transversale de poussage. I1 convient cependant de - prévoir un agencement particulier des moyens pousseurs de façon à pouvoir laisser en place la barre de fermeture habituellement associée à la fermeture latérale des casiers traditionnels, et un tel agencement sera mieux compris en se référant aux figures 3a à 3c. The pusher means 200 comprise at least one pusher 201 disposed on the other side of the palletizing line 100 relative to the overall unloading container and actuated by associated means 203, 204, as has been said above, and comprise preferably additionally a pushing cross bar. I1 should however - provide a particular arrangement of the pusher means so as to be able to leave in place the closing bar usually associated with the lateral closing of traditional lockers, and such an arrangement will be better understood by referring to Figures 3a to 3c.

On distingue sur la figure 3a un support basculant 220 monté tournant autour d'un axe 221 porté par la structure fixe 205, le pivotement de ce support 220 étant obtenu ici au moyen d'un vérin pneumatique 222 articulé en 223 sur ladite structure fixe 205. Le support basculant 220, qui est indépendant du poussoir 201, présente une forme en U de façon à pouvoir envelopper la barre de fermeture T du casier C, ledit support basculant 220 étant ainsi mobile entre une position relevée (illustrée en trait continu) extérieure à la face latérale du casier C, et une position abaissée (illustrée en traits mixtes), après rotation d'environ 90 , dans laquelle une branche dudit support basculant pénètre à l'intérieur du casier en enjambant la barre de fermeture T.Cette branche du support basculant 220 comporte ici un ou plusieurs aimants 224 qui permettent de maintenir en place une barre transversale de poussage 210. En position relevée du support basculant 220, la barre de poussage est ainsi extérieure au casier
C, et en position abaissée dudit support, ladite barre de poussage 210 est amenée sur le chemin de l'extrémité avant 202 du double poussoir 201 (l'actionnement du vérin 222 est schématisé par la flèche 231, et la rotation du support basculant 220 portant la barre de poussage 210 est schématisée par la flèche 230).
We can see in Figure 3a a tilting support 220 mounted rotating around an axis 221 carried by the fixed structure 205, the pivoting of this support 220 being obtained here by means of a pneumatic cylinder 222 articulated at 223 on said fixed structure 205 The tilting support 220, which is independent of the pusher 201, has a U shape so as to be able to wrap the closing bar T of the rack C, said tilting support 220 thus being movable between a raised position (illustrated in solid line) outside at the lateral face of the locker C, and a lowered position (illustrated in dashed lines), after rotation of about 90, in which a branch of said tilting support penetrates inside the locker by spanning the closing bar T. This branch of the tilting support 220 here comprises one or more magnets 224 which make it possible to hold in place a transverse push bar 210. In the raised position of the tilting support 220, the louse bar ssage is thus external to the locker
C, and in the lowered position of said support, said push bar 210 is brought to the path of the front end 202 of the double pusher 201 (the actuation of the jack 222 is shown diagrammatically by the arrow 231, and the rotation of the tilting support 220 carrying the push bar 210 is shown diagrammatically by the arrow 230).

Après le positionnement de la barre transversale de poussage 210, le double poussoir 201 est avancé (flèche 11) jusqu'à ce que son extrémité 202, également équipée d'aimants 206, arrive au contact de la barre de poussage 210 jusque-là portée par le support 220 : cette position est illustrée sur la figure 3b, l'avancement ultérieur du poussoir avec la barre de poussage transversale 210 alors portée par ledit poussoir étant illustré en traits mixtes. Sur la figure 3c, l'extrémité 202 du double poussoir 201 contacte les bouteilles B, B' disposées dans le casier C, avec d'une part un contact par un rouleau 207 avec la bouteille en roule B', et d'autre part un contact par la barre transversale de poussage 210 avec les bouteilles en canon B de la couche supérieure.Ces moyens permettent de réaliser aisément le déchargement global des bouteilles vides, pour arriver à la position illustrée à la figure 3. Lors du retour du double poussoir 201, la barre transversale 210 est alors reculée jusqu'à ce qu'elle vienne en contact des aimants 224 portés par le support pivotant 220, ledit support portant alors la barre 210 tandis que le double poussoir continue à reculer sans la barre qu'il portait ; le support pivotant 220 est ensuite relevé avec la barre qu'il porte par actionnement du vérin associé 222, jusqu'à sa position de départ illustrée en figure 3a. After positioning the transverse pusher bar 210, the double pusher 201 is advanced (arrow 11) until its end 202, also equipped with magnets 206, comes into contact with the pusher bar 210 hitherto carried by the support 220: this position is illustrated in FIG. 3b, the subsequent advancement of the pusher with the transverse pusher bar 210 then carried by said pusher being illustrated in phantom. In FIG. 3c, the end 202 of the double pusher 201 contacts the bottles B, B 'arranged in the rack C, with on the one hand contact by a roller 207 with the rolled bottle B', and on the other hand contact by the pushing transverse bar 210 with the barrel bottles B of the upper layer. These means make it possible to easily carry out the overall unloading of the empty bottles, to arrive at the position illustrated in FIG. 3. When the double pusher returns 201, the transverse bar 210 is then moved back until it comes into contact with the magnets 224 carried by the pivoting support 220, said support then carrying the bar 210 while the double pusher continues to move back without the bar it wore; the pivoting support 220 is then raised with the bar which it carries by actuation of the associated jack 222, to its starting position illustrated in FIG. 3a.

Lorsque les bouteilles vides B, B' ont été transférées en bloc sur le conteneur de déchargement global CDG, il convient d'organiser leur désempilage au moyen du robot manipulateur 600 dont on va maintenant décrire les éléments constitutifs. When the empty bottles B, B ′ have been transferred as a whole to the overall unloading container CDG, it is advisable to organize their unstacking by means of the robot manipulator 600 whose constituent elements will now be described.

On aurait pu prévoir un robot manipulateur unique chargé d'assurer à la fois le désempilage des bouteilles vides disposées sur le conteneur de déchargement global CDG, et l'empilage des bouteilles pleines à disposer sur le conteneur de chargement global CCG. I1 est cependant préférable, comme cela a été illustré ici, de prévoir un premier robot manipulateur associé au désempilage des bouteilles vides B, B', et un second robot manipulateur identique au premier, associé à l'empilage des bouteilles pleines : ceci confère en effet souplesse et rapidité pour le procédé de manutention, grâce à l'indépendance des opérations de désempilage et d'empilage.  One could have provided a single manipulator robot responsible for ensuring both the destacking of the empty bottles placed on the overall unloading container CDG, and the stacking of full bottles to be placed on the overall loading container CCG. It is however preferable, as has been illustrated here, to provide a first handling robot associated with the destacking of the empty bottles B, B ', and a second handling robot identical to the first, associated with the stacking of the full bottles: this gives flexibility and speed effect for the handling process, thanks to the independence of the destacking and stacking operations.

Le robot manipulateur 600 comporte un chariot 601 déplaçable sur le portique de support P dans une direction B (représentée sur la figure 2) qui est parallèle à l'axe x du trièdre représenté en figure 1, et donc parallèle à la direction de déplacement A de la ligne de palettisation, ainsi qu'un organe de préhension 610 porté par ledit chariot, ledit organe de préhension étant déplaçable verticalement (c'est-à-dire selon l'axe z du trièdre précité) par des moyens motorisés associés également portés par le chariot 601. Sur les figures 3 et 4, on a représenté deux rails longitudinaux 50 solidaires du portique P, sur lesquels se déplace le chariot 601 du robot manipulateur 600 par l'intermédiaire de galets latéraux 602.Le chariot 601 porte une structure 603 mobile en translation verticale, avec des guides associés 606 qui coulissent à travers ledit chariot, ladite structure portant supérieurement un moteur 604, qui est de préférence un moteur pneumatique (on pourrait naturellement prévoir un moteur à commande hydraulique ou électrique), agissant sur une vis sans fin 605 qui assure le déplacement vertical de l'organe de préhension 610 porté par une structure inférieure 607 solidaire de la structure 603 précitée. The robot manipulator 600 comprises a carriage 601 movable on the support gantry P in a direction B (shown in FIG. 2) which is parallel to the x axis of the trihedron shown in FIG. 1, and therefore parallel to the direction of movement A of the palletizing line, as well as a gripping member 610 carried by said carriage, said gripping member being movable vertically (that is to say along the z axis of the abovementioned trihedron) by associated motorized means also carried by the carriage 601. In Figures 3 and 4, there are shown two longitudinal rails 50 integral with the gantry P, on which the carriage 601 of the manipulator robot 600 moves by means of lateral rollers 602. The carriage 601 carries a structure 603 movable in vertical translation, with associated guides 606 which slide through said carriage, said structure carrying a motor 604 above, which is preferably a pneumatic motor (one could naturally provide a motor with hydraulic or electric control), acting on an endless screw 605 which ensures the vertical displacement of the gripping member 610 carried by a lower structure 607 integral with the above-mentioned structure 603.

L'actionnement du moteur 604 permet ainsi un mouvement vertical de l'organe de préhension 610 selon l'axe 650 dudit moteur, ledit organe de préhension étant ainsi mobile entre des positions basses de préhension unitaire des bouteilles B (ou B' après rotation du conteneur de déchargement global CDG), et une position haute de transfert de la bouteille saisie vers le chariot d'emplissage CE.Il est en outre intéressant de prévoir que l'organe de préhension 610 peut tourner, d'un angle de 1800, autour de l'axe vertical 650 : en effet, dans le cas d'une bouteille incorrectement positionnée sur le conteneur de déchargement global CDG (comme c'est le cas sur la figure 5 où l'on distingue quatre bouteilles vides présentant leur chapeau et non leur pied), la bouteille saisie par Organe de préhension peut alors être ramenée à sa position correcte (le pied de la bouteille étant du côté de l'opérateur) avant d'être déposée sur le chariot d'emplissage CE.The actuation of the motor 604 thus allows a vertical movement of the gripping member 610 along the axis 650 of said motor, said gripping member being thus movable between low positions of unitary gripping of the bottles B (or B 'after rotation of the CDG global unloading container), and a high position for transferring the seized bottle to the CE filling trolley. It is also advantageous to provide that the gripping member 610 can rotate, around an angle of 1800, around of the vertical axis 650: in fact, in the case of a bottle incorrectly positioned on the overall unloading container CDG (as is the case in FIG. 5 where there are four empty bottles with their caps and not their foot), the bottle gripped by the gripping member can then be brought back to its correct position (the foot of the bottle being on the operator's side) before being placed on the CE filling trolley.

Un tel mouvement de rotation de l'organe de préhension 610 est assuré par un vérin rotatif 608 porté par la structure 607, lequel vérin est de préférence équipé intérieurement de moyens d'amortissement de fin de course, afin d'éviter un choc brutal en butée. Si l'on se reporte à la figure 1, on peut en outre distinguer les câbles 611 de commande du moteur pneumatique 604, câbles dont l'autre extrémité passe dans un chemin de câbles associé 612 supporté par une goulotte horizontale 51 du portique P.Such a rotational movement of the gripping member 610 is ensured by a rotary actuator 608 carried by the structure 607, which actuator is preferably fitted internally with end-of-stroke damping means, in order to avoid a sudden impact in stop. Referring to Figure 1, we can further distinguish the cables 611 for controlling the pneumatic motor 604, cables the other end of which passes through an associated cable tray 612 supported by a horizontal chute 51 of the gantry P.

On distingue également un chemin de câbles analogue 618 associé au mouvement vertical du support d'organe de préhension. On distingue enfin un bloc 609 porté par le chariot 601, qui est un organe de sécurité (réserve de vide) maintenant la charge en cas de coupure de l'alimentation pneumatique de l'installation (ce pour le cas où on utilise une plaque de préhension par aspiration, comme cela sera décrit plus loin), ledit bloc comportant également un avertisseur sonore permettant d'alerter l'opérateur d'une situation anormale.There is also a similar cable tray 618 associated with the vertical movement of the gripping member support. Finally, there is a block 609 carried by the carriage 601, which is a safety device (vacuum reserve) maintaining the load in the event of a cut in the pneumatic supply to the installation (this for the case where a plate is used. gripping by aspiration, as will be described later), said block also comprising an audible warning device making it possible to alert the operator of an abnormal situation.

Le deuxième robot manipulateur 700, qui assure l'empilage unitaire des bouteilles pleines depuis le chariot d'emplissage CE jusqu'au conteneur de chargement global CCG, présente ici une structure exactement identique à celle du robot manipulateur 600 précédemment décrit associé aux opérations de désempilage unitaire des bouteilles vides. The second robot manipulator 700, which ensures the unitary stacking of the full bottles from the filling cart CE to the global loading container CCG, has here a structure exactly identical to that of the robot manipulator 600 previously described associated with the destacking operations. unit of empty bottles.

Les moyens homologues de ce second robot manipulateur 700 sont, pour simplifier, affectés des mêmes références que ceux du premier robot manipulateur 600, en étant augmentées de cent, et ne seront donc pas à nouveau décrits.The homologous means of this second manipulator robot 700 are, for simplicity, assigned the same references as those of the first manipulator robot 600, being increased by one hundred, and will therefore not be described again.

L'organe de préhension 610 ou 710 du robot manipulateur 600 ou 700 pourrait être constitué par un ensemble d'aimants anti-déflagrants (ADF), mais il apparaît plus simple, compte tenu du fonctionnement pneumatique de l'installation, de prévoir un système d'aspiration par le vide fonctionnant à la manière d'une ventouse : chaque organe de préhension 610 ou 710 se présente alors sous la forme d'une plaque incurvée connectée à des moyens d'aspiration, ladite plaque comportant un bourrelet périphérique de contact, de façon à assurer la préhension d'une bouteille B ou B' lorsque lesdits moyens d'aspiration sont actionnés. The gripping member 610 or 710 of the manipulator robot 600 or 700 could consist of a set of explosion-proof magnets (ADF), but it appears simpler, taking into account the pneumatic operation of the installation, to provide a system vacuum suction operating like a suction cup: each gripping member 610 or 710 is then in the form of a curved plate connected to suction means, said plate comprising a peripheral contact bead, so as to ensure the gripping of a bottle B or B 'when said suction means are actuated.

On va maintenant se référer à la figure 5, qui est une vue latérale de l'installation (prise selon la flèche A de la figure 4), telle qu'elle se présente après le déchargement global des bouteilles vides sur le conteneur de déchargement global CDG.  We will now refer to FIG. 5, which is a side view of the installation (taken according to arrow A in FIG. 4), as it appears after the overall unloading of the empty bottles on the overall unloading container CDG.

On distingue en particulier les organes constitutifs de chacun des robots manipulateurs 600 et 700 précédemment décrits, avec en plus, des capteurs de commande 614, 714 associés au mouvement horizontal du chariot correspondant (601 ou 701), et des capteurs 615, 715 associés au mouvement vertical de l'organe de préhension correspondant (610 ou 710). A distinction is made in particular between the constituent parts of each of the robot manipulators 600 and 700 described above, with, in addition, control sensors 614, 714 associated with the horizontal movement of the corresponding carriage (601 or 701), and sensors 615, 715 associated with the vertical movement of the corresponding gripping member (610 or 710).

Les bouteilles B disposées en canon reposent sur la surface 301 du conteneur de déchargement global CDG, des barrières latérales 320 étant prévues dans le prolongement des bords du casier déchargé. On distingue également le chariot d'emplissage CE disposé au niveau d'un poste PEC, entre les conteneurs de déchargement global CDG et de chargement global CCG. Tel qu'illustré ici à titre d'exemple, le chariot d'emplissage CE comporte une structure 31 montée sur des roulettes 32, et présente supérieurement un berceau de réception 33 sur lequel peut être déposée une bouteille B ou B' au moyen du robot manipulateur 600 précédemment décrit.La structure du chariot CE est mieux visible sur la figure 1, où l'on distingue en particulier le berceau de réception 33 (constitué par exemple de barrettes longitudinales à billes et galets d'extrémité), ledit berceau étant inclinable grâce à une articulation autour d'un axe 34 de la structure 31. Un levier de verrouillage / déverrouillage 35 permet à l'opérateur de bloquer le berceau 33 dans la position angulaire désirée.A titre indicatif, un tel berceau inclinable présente en général un débattement angulaire de l'ordre de 100 , dont 70" en abaissant l'extrémité du berceau saisi par l'opérateur et 300 en relevant cette extrémité (il est cependant possible de prévoir un débattement angulaire encore plus grand, si l'on souhaite pouvoir basculer le berceau jusqu'à la verticale lors des opérations d'emplissage et/ou de contrôle) ; la position de transport ou de remplissage de la bouteille transportée sera de préférence légèrement inclinée en abaissant le berceau 33 de 10 par rapport à l'horizontale, la bouteille étant alors de préférence en appui par son pied contre une butée d'extrémité dudit berceau (lorsque la bouteille vide se présente "chapeau devant", l'opérateur la fait tourner de 1800 en commandant la rotation de l'organe de préhension 610, pour l'amener "pied devant"). On distingue également sur la figure 1 une structure fixe de guidage 40 disposée sous le portique de support P, entre les conteneurs de déchargement global CDG et de chargement global CCG, ladite structure fixe permettant de garantir un positionnement correct et constant pour le chariot d'emplissage CE.La structure de guidage 40 permet en outre, en plus du positionnement correct et constant du chariot de remplissage CE, la possibilité de positionner un chariot supplémentaire (non représenté ici), adjacent latéralement au chariot d'emplissage CE, pour faciliter le relevage du berceau dans une position horizontale. L'opérateur revenant avec une bouteille pleine B ou B' portée par le chariot CE, après les opérations d'emplissage et de contrôle, peut ainsi aisément positionner à nouveau le chariot CE dans une position parfaitement centrée par rapport au portique P, de sorte que l'organe de préhension 710 du robot manipulateur 700 arrive automatiquement dans une position correcte pour la saisie de la bouteille, en vue de l'emplissage unitaire sur le conteneur de chargement global CCG.On distingue enfin sur la figure 1 un pupitre de commande 30, permettant à l'opérateur de commander la dépose, par le premier robot manipulateur 600, d'une bouteille vide B ou B? sur le chariot d'emplissage CE, ou l'enlèvement, par le deuxième robot manipulateur 700, d'une bouteille pleine B ou B' pour l'empilage unitaire sur le conteneur de chargement global CCG. Le tableau de commande 30 permet également à l'opérateur de suivre les différentes opérations de déchargement global, de désemplissage du conteneur CDG, d'emplissage du conteneur CCG, et de chargement global, toutes ces opérations étant effectuées automatiquement. The bottles B arranged in a barrel rest on the surface 301 of the overall unloading container CDG, lateral barriers 320 being provided in the extension of the edges of the unloaded crate. A distinction is also made between the CE filling cart located at a PEC station, between the CDG global unloading containers and the CCG global loading containers. As illustrated here by way of example, the CE filling trolley has a structure 31 mounted on casters 32, and has a receiving cradle 33 on which a bottle B or B ′ can be placed by means of the robot. manipulator 600 previously described. The structure of the trolley CE is better visible in FIG. 1, where there is in particular a receiving cradle 33 (consisting for example of longitudinal bars with balls and end rollers), said cradle being tiltable thanks to an articulation around an axis 34 of the structure 31. A locking / unlocking lever 35 allows the operator to lock the cradle 33 in the desired angular position. As an indication, such a tilting cradle generally has a angular travel of the order of 100, including 70 "by lowering the end of the cradle grasped by the operator and 300 by raising this end (it is however possible to provide a d angular flapping even greater, if it is desired to tilt the cradle to the vertical during filling operations and / or control); the transport or filling position of the transported bottle will preferably be slightly inclined by lowering the cradle 33 by 10 relative to the horizontal, the bottle then preferably being supported by its foot against an end stop of said cradle ( when the empty bottle is "hat in front", the operator rotates it 1800 by controlling the rotation of the gripping member 610, to bring it "foot in front"). We also distinguish in FIG. 1 a fixed guide structure 40 disposed under the support gantry P, between the overall unloading containers CDG and overall loading CCG, said fixed structure making it possible to guarantee correct and constant positioning for the carriage. CE filling. The guide structure 40 also allows, in addition to the correct and constant positioning of the CE filling cart, the possibility of positioning an additional cart (not shown here), laterally adjacent to the CE filling cart, to facilitate the lifting the cradle in a horizontal position. The operator returning with a full bottle B or B 'carried by the CE trolley, after the filling and checking operations, can thus easily position the CE trolley again in a perfectly centered position relative to the gantry P, so that the gripping member 710 of the robot manipulator 700 automatically arrives in a correct position for gripping the bottle, with a view to unit filling on the global loading container CCG. Finally, in FIG. 1, a control console is distinguished 30, allowing the operator to order the removal, by the first robot manipulator 600, of an empty bottle B or B? on the filling cart CE, or the removal, by the second handling robot 700, of a full bottle B or B 'for unit stacking on the global loading container CCG. The control panel 30 also allows the operator to follow the various operations of global unloading, of filling the CDG container, of filling the CCG container, and of global loading, all these operations being carried out automatically.

On va maintenant décrire un mode possible de désempilage des bouteilles disposées sur le conteneur de déchargement global CDG, en se référant à la figure 5
On distingue sur cette figure une barrette 613 associée au robot manipulateur 600, en étant disposée au voisinage de l'organe de préhension par aspiration 610 : cette barrette, montée pivotante, sert de capteur pour détecter la présence d'une bouteille. Le désempilage des bouteilles commence alors en amenant l'organe de préhension 610 au droit d'une bouteille disposée en canon à une extrémité de la couche supérieure (par exemple celle de l'extrémité gauche).L'organe de préhension 610 est alors abaissé, jusqu'à un niveau intermédiaire: si la barrette 613 a détecté la présence d'une bouteille (de la couche supérieure), l'abaissement est poursuivi jusqu'à la prise de cette bouteille par l'organe de préhension 610, auquel cas l'organe de préhension est ensuite relevé pour un transfert de ladite bouteille vers le chariot d'emplissage CE. De préférence, le robot manipulateur 600 ayant saisi une bouteille vide amène automatiquement cette bouteille au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage CE, ladite bouteille étant alors suspendue en position couchée (horizontale). L'opérateur peut alors, à la demande, terminer le transfert en commandant la dépose de cette bouteille sur le chariot d'emplissage CE (avec une réorientation de la bouteille si nécessaire pour l'amener "pied devant").Le robot manipulateur 600 retourne ensuite en arrière à la même position que précédemment, puis effectue un balayage horizontal au niveau de la première couche de bouteilles jusqu'à ce que la barrette détecte la présence d'une bouteille à désempiler, afin d'effectuer ainsi un désempilage unitaire de chacune des bouteilles disposées en canon de cette couche. La poursuite du désempilage s'effectue de la même façon pour les bouteilles B disposées en canon, appartenant à la couche inférieure.
We will now describe a possible mode of destacking of the bottles placed on the overall unloading container CDG, with reference to FIG. 5
This figure shows a bar 613 associated with the manipulator robot 600, being arranged in the vicinity of the gripping member by suction 610: this bar, pivotally mounted, serves as a sensor for detecting the presence of a bottle. The destacking of the bottles then begins by bringing the gripping member 610 to the right of a bottle arranged in barrel at one end of the upper layer (for example that of the left end) .The gripping member 610 is then lowered , to an intermediate level: if the bar 613 has detected the presence of a bottle (from the upper layer), the lowering is continued until the bottle is taken up by the gripping member 610, in which case the gripping member is then raised for a transfer from said bottle to the filling cart CE. Preferably, the robotic manipulator 600 having grasped an empty bottle automatically brings this bottle to an intermediate waiting station near the filling cart CE, said bottle then being suspended in the supine (horizontal) position. The operator can then, on request, complete the transfer by ordering the removal of this bottle on the CE filling cart (with a reorientation of the bottle if necessary to bring it "foot in front"). The robot manipulator 600 then goes back to the same position as before, then performs a horizontal scan at the level of the first layer of bottles until the bar detects the presence of a bottle to be unstacked, in order to thus perform a unitary unstacking of each of the bottles arranged in barrel of this layer. Continued destacking is carried out in the same way for bottles B arranged in a barrel, belonging to the lower layer.

Une fois toutes les bouteilles en canon désempilées, il faut alors organiser le désempilage des deux bouteilles B' disposées en roule : le conteneur de déchargement global CDG est à cet effet automatiquement tourné de 90" autour de son axe 350, comme schématisé par la flèche 351, ce qui permet d'amener ces deux bouteilles dans une position correspondant à une position en canon, de sorte que la descente et la translation horizontale de l'organe de préhension 610 permettent de détecter la présence de l'une ou l'autre de ces bouteilles, et de réaliser son désempilage.Lorsque la barrette 613 ne détecte plus de bouteilles, ce qui signifie que les bouteilles en roule ont été également désempilées, le robot manipulateur retourne dans sa position d'attente, et le conteneur de déchargement global CDG est tourné en arrière de 90" pour revenir dans sa position initiale. Once all the barrel bottles have been unstacked, it is then necessary to organize the unstacking of the two bottles B 'arranged in rolls: the overall unloading container CDG is for this purpose automatically rotated 90 "around its axis 350, as shown by the arrow 351, which allows these two bottles to be brought into a position corresponding to a barrel position, so that the descent and the horizontal translation of the gripping member 610 make it possible to detect the presence of one or the other When the bar 613 no longer detects bottles, which means that the rolled bottles have also been unstacked, the manipulator robot returns to its standby position, and the overall unloading container CDG is turned back 90 "to return to its original position.

On va maintenant décrire les opérations d'empilage des bouteilles pleines, assurées au moyen du robot manipulateur 700. De préférence, le robot manipulateur 700, avant de saisir une bouteille pleine
B, B' sur le chariot d'emplissage CE, est amené automatiquement au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage CE.
We will now describe the operations for stacking full bottles, performed by means of the handling robot 700. Preferably, the handling robot 700, before gripping a full bottle
B, B 'on the CE filling cart, is automatically brought to the level of an intermediate waiting station near the CE filling cart.

La figure 5 permet de distinguer la structure du conteneur de chargement global CCG, avec sa plate-forme 500 (non tournante), surmontée de lattes de support 501 analogues à celles 301 du conteneur de déchargement global CDG. Des barrières latérales 520 sont également prévues sur la plate-forme 500, pour supporter les bouteilles disposées en canon de la couche supérieure. FIG. 5 makes it possible to distinguish the structure of the global loading container CCG, with its platform 500 (not rotating), surmounted by support slats 501 similar to those 301 of the global unloading container CDG. Lateral barriers 520 are also provided on the platform 500, to support the bottles arranged in barrel of the upper layer.

Ainsi que cela est aisé à comprendre, il est nécessaire d'organiser les opérations d'empilage des bouteilles pleines de façon à retrouver la disposition de ces bouteilles qui était celle déjà prévue pour les bouteilles vides (avec ici neuf bouteilles disposées en canon et deux bouteilles disposées en roule). As is easy to understand, it is necessary to organize the operations of stacking the full bottles so as to find the arrangement of these bottles which was that already provided for the empty bottles (with here nine bottles arranged in barrel and two bottles arranged in rolls).

I1 convient dès lors d'organiser les opérations préliminaires d'empilage qui concernent les deux premières bouteilles pleines B' disposées en roule sur le conteneur de chargement global CCG, ainsi que cela va être maintenant décrit en se référant aux figures 6 à 8 - figure 6 :: le robot manipulateur 700 ayant amené la bouteille B ou B'
dans une position centrale (l'axe vertical de l'organe de préhension 710
étant calé sur l'axe central 550 de la plate-forme 500) on procède alors à
une rotation d'environ 90" dans un plan horizontal de la bouteille saisie
par l'organe de préhension, afin d'amener la bouteille B' dans une
position qui correspond à une disposition en roule, puis on procède à la
dépose de cette bouteille sur le conteneur CCG (la position de dépose
correspondant à celle illustrée en figure 6) ; - figure 7 l'organe de préhension 710 est remonté, la bouteille B' restant
dans sa position en roule au centre du conteneur CCG - figure 8 : on fait rouler la bouteille B' sur le conteneur jusqu'à sa
position finale (arrière ou avant), de préférence en utilisant à cet effet
les moyens pousseurs 400 prévus pour assurer le transfert en bloc des
bouteilles pleines B, B' dans un casier vide C. Ces moyens pousseurs 400
comportent un poussoir 402 disposé en arrière du conteneur de
chargement global CCG, en étant monté sur une structure fixe 401, le
mouvement de translation dudit poussoir, dans une direction transversale,
étant obtenu par des moyens associés (par exemple un groupe
moto-réducteur 404, qui peut être pneumatique (un groupe hydraulique ou
électrique pourrait naturellement être envisagé), associé à un capteur de
fin de course 405), l'extrémité 403 du poussoir 402 étant alors
supplémentairement agencée pour pouvoir positionner en roule l'une ou
l'autre des deux bouteilles B' sur le conteneur de chargement global
CCG, grâce à un bras de blocage 410 pouvant pivoter autour d'un axe
horizontal, par actionnement de moyens associés (un capteur de
commande 412 est illustré sur la figure 8), entre une position relevée
d'escamotage (et de transfert global pour le poussoir) et une position
abaissée de prise sur une bouteille en roule B'.
It is therefore appropriate to organize the preliminary stacking operations which relate to the first two full bottles B 'arranged in rolls on the global loading container CCG, as will now be described with reference to FIGS. 6 to 8 - FIG. 6 :: the manipulator robot 700 having brought the bottle B or B '
in a central position (the vertical axis of the gripping member 710
being wedged on the central axis 550 of the platform 500) we then proceed to
a rotation of approximately 90 "in a horizontal plane of the seized bottle
by the gripping member, in order to bring the bottle B 'into a
position which corresponds to a layout in rolls, then we proceed to the
removal of this bottle on the CCG container (the removal position
corresponding to that illustrated in Figure 6); - Figure 7 the gripping member 710 is reassembled, the bottle B 'remaining
in its rolled position in the center of the CCG container - Figure 8: the bottle B 'is rolled on the container until it
final position (rear or front), preferably using for this purpose
the pusher means 400 provided for ensuring the bulk transfer of
full bottles B, B 'in an empty rack C. These pusher means 400
have a pusher 402 disposed behind the container
CCG global loading, by being mounted on a fixed structure 401, the
translational movement of said pusher, in a transverse direction,
being obtained by associated means (for example a group
404 gear motor, which can be pneumatic (a hydraulic unit or
naturally could be considered), associated with a
limit switch 405), the end 403 of the pusher 402 then being
additionally arranged to be able to position one or more
the other of the two bottles B 'on the global loading container
CCG, thanks to a locking arm 410 which can pivot around an axis
horizontal, by actuation of associated means (a
command 412 is illustrated in FIG. 8), between a raised position
retraction (and global transfer for the pusher) and a position
lowered grip on a rolled bottle B '.

Ainsi, lorsque la bouteille B' est déposée dans la position illustrée à la figure 7, on procède à l'avancement du poussoir 402 jusqu'à une position centrale illustrée à la figure 8, le bras de blocage 410 étant ensuite abaissé pour bloquer la bouteille en roule B': le poussoir 402 est alors avancé ou reculé (la bouteille concernée par ce recul étant alors bloquée contre un bloc d'appui 411 porté par la structure 402) de façon à faire rouler chacune des deux bouteilles B' jusqu'à sa position finale. Thus, when the bottle B 'is placed in the position illustrated in FIG. 7, the pusher 402 is advanced to a central position illustrated in FIG. 8, the blocking arm 410 then being lowered to block the bottle rolls B ': the pusher 402 is then advanced or moved back (the bottle concerned by this recoil then being blocked against a support block 411 carried by the structure 402) so as to roll each of the two bottles B' up to to its final position.

Une fois les deux bouteilles B' disposées en roule dans leur position définitive sur le conteneur de chargement global CCG, il suffit de procéder à l'empilage des bouteilles B disposées en canon grâce au robot manipulateur 700, ces opérations d'empilage unitaire étant alors effectuées par couches successives de la même façon que les opérations de désempilage des bouteilles vides disposées en canon (mais dans ce cas selon une succession automatique préétablie sans balayage à détection), opérations effectuées par le robot manipulateur 600 et précédemment décrites
La figure 9 est une vue analogue à celle de la figure 5, montrant l'installation de manutention automatique selon l'invention, telle qu'elle se présente en cours de désempilage / empilage unitaire.
Once the two bottles B ′ arranged in rolls in their final position on the global loading container CCG, it suffices to stack the bottles B arranged in barrel with the manipulator robot 700, these unitary stacking operations then being carried out in successive layers in the same way as the operations of destacking of empty bottles arranged in a barrel (but in this case according to a pre-established automatic succession without detection scanning), operations carried out by the robot manipulator 600 and previously described
FIG. 9 is a view similar to that of FIG. 5, showing the automatic handling installation according to the invention, as it occurs during unstacking / unitary stacking.

Chaque robot manipulateur 600, 700 est illustré avec ses chemins de câbles 612, 618 et 712, 718, et les possibilités de mouvement de chacun d'eux sont illustrées par les flèches 620, 720 pour un déplacement selon l'axe horizontal x, et les flèches 630, 730 pour un déplacement selon l'axe vertical z. Sur cette figure, l'un des robots manipulateurs (le robot 700) est au niveau du chariot d'emplissage CE, pour l'enlèvement d'une bouteille pleine B, B' disposée sur ledit chariot, tandis que l'autre (le robot manipulateur 600) est en position d'attente avant la dépose d'une bouteille vide B, B' sur ce chariot d'emplissage.La flèche 751 schématise le mouvement de rotation sur un angle de 90" qui est imprimé à l'organe de préhension 710 lorsqu'il s'agit d'une bouteille B' devant être empilée avec une disposition en roule sur le conteneur de chargement global CCG (la rotation se fait selon l'axe 750 de l'organe de préhension 710, lequel est confondu avec l'axe de la vis sans fin 706 du moteur d'actionnement 704). Each robot manipulator 600, 700 is illustrated with its cable trays 612, 618 and 712, 718, and the possibilities of movement of each of them are illustrated by the arrows 620, 720 for movement along the horizontal axis x, and arrows 630, 730 for a displacement along the vertical axis z. In this figure, one of the manipulating robots (the robot 700) is at the level of the filling cart CE, for the removal of a full bottle B, B 'disposed on said cart, while the other (the robot manipulator 600) is in the waiting position before depositing an empty bottle B, B 'on this filling cart. The arrow 751 shows schematically the rotational movement at an angle of 90 "which is printed on the organ gripper 710 in the case of a bottle B 'to be stacked with a roll arrangement on the global loading container CCG (the rotation takes place along the axis 750 of the gripping member 710, which is coincides with the axis of the worm 706 of the actuating motor 704).

I1 est intéressant de noter que l'arrêt de l'un ou l'autre des robots manipulateurs 600, 700 en position d'attente laisse totalement libre l'accès au poste PEC, ne gênant ainsi en rien l'opérateur chargé de manipuler le chariot d'emplissage CE pour emmener une bouteille vide B,
B' vers un poste d'emplissage et de contrôle extérieur à l'installation, ou ramener une bouteille pleine B, B' après emplissage et contrôle, pour l'empilage de celle-ci sur le conteneur de déchargement global CDG. De plus, tout risque d'accident en cas de panne est écarté pour l'opérateur.
It is interesting to note that the stopping of one or the other of the manipulator robots 600, 700 in the standby position leaves completely free access to the PEC station, thus in no way hampering the operator responsible for handling the CE filling trolley to take an empty bottle B,
B 'to a filling and control station outside the installation, or bring a full bottle B, B' after filling and control, for stacking it on the overall unloading container CDG. In addition, any risk of accident in the event of a breakdown is eliminated for the operator.

L'installation qui vient d'être décrite comporte de multiples avantages qui ont déjà été mentionnés plus haut, et l'on peut en particulier noter la sécurité et la souplesse de fonctionnement, ainsi que les cadences très satisfaisantes pouvant être atteintes. The installation which has just been described has multiple advantages which have already been mentioned above, and one can in particular note the safety and the flexibility of operation, as well as the very satisfactory rates which can be achieved.

On est ainsi parvenu à un procédé de manutention automatique et à une installation de mise en oeuvre procurant un niveau d'automatisation élevé, limitant considérablement les interventions manuelles (interventions sur le chariot d'emplissage seulement), tout en permettant d'utiliser des casiers traditionnels pour bouteilles couchées, et sans que la disposition de bouteilles en roule pose problème. De plus, on s'affranchit totalement des risques d'erreur de positionnement de bouteilles vides dans les casiers, celles-ci pouvant être aisément ramenées dans la position correcte sur le chariot d'emplissage, avant d'être ultérieurement empilées sur le conteneur de chargement global. On dispose ainsi d'un procédé et d'une installation d'utilisation à la fois souple et fiable, avec une présence suffisante, et en toute sécurité, d'un opérateur unique, lequel n'a de surcroît aucune tâche pénible de manipulation à assurer. This resulted in an automatic handling process and an installation facility providing a high level of automation, considerably limiting manual interventions (interventions on the filling cart only), while allowing the use of lockers. traditional for coated bottles, and without the arrangement of bottles in rolls causing problems. In addition, the risks of positioning errors of empty bottles in the racks are completely eliminated, these can be easily brought back to the correct position on the filling trolley, before being subsequently stacked on the container. global loading. There is thus a method and an installation for use that is both flexible and reliable, with a sufficient presence, and in complete safety, of a single operator, who moreover has no painful task of handling at ensure.

L'invention n'est pas limitée au mode de réalisation qui vient d'être décrit, mais englobe au contraire toute variante reprenant, avec des moyens équivalents, les caractéristiques essentielles du procédé ou de l'installation énoncées plus haut.  The invention is not limited to the embodiment which has just been described, but on the contrary encompasses any variant incorporating, with equivalent means, the essential characteristics of the process or of the installation set out above.

Claims (23)

REVENDICATIONS 1/ Procédé de manutention automatique de bouteilles de grande capacité, en particulier de gaz liquéfié, dans lequel les bouteilles sont disposées en position couchée sur au moins une couche dans un casier, ledit casier pouvant être déplacé sur une ligne de palettisation par un dispositif de convoyage au niveau d'un poste de déchargement de bouteilles vides ou d'un poste de chargement de bouteilles pleines, caractérisé par le fait qu'il consiste à a) décharger en bloc au niveau du poste de déchargement (PDG) les 1 / Process for automatic handling of large capacity bottles, in particular liquefied gas, in which the bottles are placed in the supine position on at least one layer in a rack, said rack being able to be moved on a palletizing line by a conveying at an empty bottle unloading station or a full bottle loading station, characterized in that it consists of a) unloading in bulk at the unloading station (PDG) the bouteilles vides (B, B') disposées dans un casier (C) en les transférant en empty bottles (B, B ') arranged in a rack (C) by transferring them position couchée sur un conteneur de déchargement global (CDG) lying on a global unloading container (CDG) disposé latéralement au voisinage de la ligne de palettisation (100) b) désempiler une à une les bouteilles vides (B, B') couchées sur le arranged laterally in the vicinity of the palletizing line (100) b) unstack one by one the empty bottles (B, B ') lying on the conteneur de déchargement global (CDG) au moyen d'un robot global unloading container (CDG) by means of a robot manipulateur (600), chaque bouteille vide étant déposée automatique manipulator (600), each empty bottle being deposited automatically ment, en position couchée, sur un chariot d'emplissage (CE) disposé lying down on a filling trolley (CE) arranged entre le poste de déchargement (PDG) et le poste de chargement (PCG) between the unloading station (PDG) and the loading station (PCG) pour être transférée à un poste d'emplissage et de contrôle (PEC) c) empiler une à une les bouteilles pleines (B, B') couchées sur le chariot to be transferred to a filling and control station (PEC) c) stack one by one the full bottles (B, B ') lying on the trolley d'emplissage (CE) ramené à sa place initiale, au moyen d'un robot filling (CE) brought back to its original place, using a robot manipulateur (700), chaque bouteille pleine étant déposée automatique manipulator (700), each full bottle being deposited automatically ment, en position couchée, sur un conteneur de chargement global (CCG) lying down on a global load container (CCG) disposé latéralement au voisinage de la ligne de palettisation (100) d) transférer en bloc les bouteilles pleines (B, B') couchées sur le conteneur arranged laterally in the vicinity of the palletizing line (100) d) bulk transfer the full bottles (B, B ') lying on the container de chargement global (CCG) afin de les charger dans un casier vide (C) of global loading (CCG) in order to load them in an empty rack (C) en attente sur la ligne de palettisation (100) au niveau du poste de waiting on the palletizing line (100) at the post of chargement (PCG). loading (PCG). 2/ Procédé de manutention automatique selon la revendication 1, dans lequel les bouteilles vides à décharger du casier sont disposées pour partie (B) en canon (transversalement) et pour partie (B') en roule (longitudinalement), caractérisé par le fait que le désempilage effectué lors de l'étape b) comporte une rotation préalable d'environ 90 , dans un plan horizontal, du conteneur de déchargement global (CDG) pour désempiler les bouteilles disposées en roule (B') sans avoir à modifier la position du chariot d'emplissage (CE). 2 / A method of automatic handling according to claim 1, in which the empty bottles to be unloaded from the rack are arranged partly (B) in barrel (transversely) and partly (B ') in roll (longitudinally), characterized in that the unstacking carried out during step b) comprises a prior rotation of about 90, in a horizontal plane, of the overall unloading container (CDG) to unstack the bottles arranged in rolls (B ') without having to modify the position of the filling cart (CE). 3/ Procédé de manutention automatique selon la revendication 1 ou 2, dans lequel les bouteilles pleines à charger dans un casier sont disposées pour partie (B) en canon (transversalement) et pour partie (B') en roule (longitudinalement), caractérisé par le fait que l'empilage effectué lors de l'étape c) comporte pour les bouteilles en roule (B') une rotation d'environ 90" dans un plan horizontal, de chaque bouteille saisie par le robot manipulateur associé (700), puis un positionnement en roule de cette bouteille sur le conteneur de chargement global (CCG). 3 / A method of automatic handling according to claim 1 or 2, in which the full bottles to be loaded into a rack are arranged partly (B) in barrel (transversely) and partly (B ') in roll (longitudinally), characterized by the fact that the stacking carried out during step c) comprises, for the rolled bottles (B '), a rotation of approximately 90 "in a horizontal plane, of each bottle gripped by the associated manipulator robot (700), then a roll positioning of this bottle on the global loading container (CCG). 4/ Procédé de manutention automatique selon la revendication 3, caractérisé par le fait que le positionnement en roule des bouteilles pleines (B') sur le conteneur de chargement global (CCG) est effectué en déposant chaque bouteille sur ce conteneur, puis en la faisant rouler sur ledit conteneur jusqu'à sa position finale en utilisant à cet effet les moyens (400) servant au transfert en bloc des bouteilles pleines (B, B') dans un casier vide (C). 4 / Automatic handling method according to claim 3, characterized in that the positioning in rolls of the full bottles (B ') on the global loading container (CCG) is carried out by depositing each bottle on this container, then making it roll on said container to its final position using for this purpose the means (400) used for the bulk transfer of full bottles (B, B ') in an empty rack (C). 5/ Procédé de manutention automatique selon l'une des revendications 1 à 4, caractérisé par le fait que le robot manipulateur (600) ayant saisi une bouteille vide (B, B') désempilée amène automatiquement cette bouteille au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage (CE), ladite bouteille étant alors suspendue en position couchée (horizontale). 5 / Automatic handling method according to one of claims 1 to 4, characterized in that the manipulator robot (600) having entered an empty bottle (B, B ') unstacked automatically brings this bottle at an intermediate station waiting near the filling cart (CE), said bottle then being suspended in the supine position (horizontal). 6/ Procédé de manutention automatique selon l'une des revendications 1 à 5, caractérisé par le fait que le robot manipulateur (700) ayant déposé une bouteille pleine (B, B') sur le conteneur de chargement global (CCG) revient automatiquement au niveau d'un poste intermédiaire d'attente proche du chariot d'emplissage (CE). 6 / Automatic handling method according to one of claims 1 to 5, characterized in that the manipulator robot (700) having deposited a full bottle (B, B ') on the global loading container (CCG) automatically returns to level of an intermediate waiting station near the filling cart (CE). 7/ Procédé de manutention automatique selon l'une des revendications 1 à 6, caractérisé par le fait que le casier (C) de bouteilles vides est initialement mis en place sur la ligne de palettisation (100) au niveau d'un poste de pose (PPC) prévu en amont du poste de déchargement (PDG), et le casier (C) de bouteilles pleines est finalement déplacé sur la ligne de palettisation (100) au niveau d'un poste de dépose (PDC) prévu en aval du poste de chargement (PCG), au moins un poste intermédiaire d'attente ou de pose / dépose de casier vide (PPDC) étant en outre prévu entre le poste de déchargement (PDG) et le poste de chargement (PCG). 7 / automatic handling method according to one of claims 1 to 6, characterized in that the rack (C) of empty bottles is initially set up on the palletizing line (100) at a laying station (PPC) provided upstream of the unloading station (PDG), and the rack (C) of full bottles is finally moved on the palletizing line (100) at a deposition station (PDC) provided downstream of the station loading (PCG), at least one intermediate station for waiting or placing / depositing an empty rack (PPDC) being furthermore provided between the unloading station (PDG) and the loading station (PCG). 8/ Installation pour la mise en oeuvre du procédé de manutention automatique selon l'une des revendications 1 à 7, comportant une ligne de palettisation équipée d'un dispositif de convoyage pour assurer la circulation de casiers à bouteilles, avec un poste de déchargement de bouteilles vides et un poste de chargement de bouteilles pleines, caractérisée par le fait qu'elle comporte en outre - un conteneur de déchargement global (CDG) et un conteneur de 8 / Installation for the implementation of the automatic handling process according to one of claims 1 to 7, comprising a palletizing line equipped with a conveyor device for ensuring the circulation of bottle racks, with an unloading station for empty bottles and a full bottle loading station, characterized in that it further comprises - a global unloading container (CDG) and a container for chargement global (CCG) disposés latéralement au voisinage de la ligne global load (CCG) arranged laterally in the vicinity of the line de palettisation (100), et d'un même côté de celle-ci ;; - des premiers moyens pousseurs (200) permettant de décharger en bloc les palletizing (100), and on the same side thereof; - first pusher means (200) enabling the bulk unloading of bouteilles vides (B, B') du casier (C) sur le conteneur de déchargement empty bottles (B, B ') from the rack (C) on the unloading container global (CDG) par transfert direct desdites bouteilles en position global (CDG) by direct transfer of said bottles to position couchée - des seconds moyens pousseurs (400) permettant de charger en bloc les lying down - second pusher means (400) making it possible to load the bouteilles pleines (B, B'), en position couchée, du conteneur de full bottles (B, B '), in the supine position, of the container chargement global (CCG) sur un casier vide (C) en attente sur la ligne de global load (CCG) on an empty rack (C) waiting on the line palettisation (100);; - un portique de manutention (P) agencé au-dessus des conteneurs de palletizing (100) ;; - a handling gantry (P) arranged above the containers déchargement global (CDG) et de chargement global (CCG) - des moyens robotisés de manutention (600, 700) portés par le portique global unloading (CDG) and global loading (CCG) - robotic handling means (600, 700) carried by the gantry (P), permettant d'une part de désempiler une à une les bouteilles vides (P), allowing on the one hand to unstack the empty bottles one by one (B, B') du conteneur de déchargement global (CDG) en les transférant, en (B, B ') of the overall unloading container (CDG) by transferring them, position couchée, au niveau d'un poste intermédiaire (PEC) associé à un prone position, at an intermediate position (PEC) associated with a chariot d'emplissage (CE), et d'autre part d'empiler une à une les filling cart (CE), and on the other hand to stack them one by one bouteilles pleines (B, B'), en les transférant en position couchée sur le full bottles (B, B '), transferring them in the supine position on the conteneur de chargement global (CCG). global loading container (CCG). 9/ Installation selon la revendication 8, caractérisée par le fait que le conteneur de déchargement global (CDG) est équipé d'une barrière d'extrémité pivotante (305) formant butée pour certaines au moins des bouteilles vides (B, B') transférées en bloc sur ledit conteneur.  9 / installation according to claim 8, characterized in that the overall unloading container (CDG) is equipped with a pivoting end barrier (305) forming a stop for at least some of the empty bottles (B, B ') transferred en bloc on said container. 10/Installation selon la revendication 9, caractérisée par le fait que la barrière d'extrémité (305) comporte une partie inférieure fixe (306) formant butée pour les bouteilles de la couche inférieure, et une partie supérieure basculante (307) formant butée pour les bouteilles de la ou des couches supérieures, ladite partie supérieure étant mobile entre une position abaissée de butée et une position relevée de dégagement au moyen d'un vérin associé (308) ou analogue. 10 / Installation according to claim 9, characterized in that the end barrier (305) comprises a fixed lower part (306) forming a stop for the bottles of the lower layer, and a tilting upper part (307) forming a stop for the bottles of the upper layer or layers, said upper part being movable between a lowered stop position and a raised release position by means of an associated jack (308) or the like. 11/ Installation selon l'une des revendications 8 à 10, caractérisée par le fait que le conteneur de déchargement global (CDG) est monté tournant autour d'un axe vertical (350), et peut tourner d'environ 90" dans son plan pour faciliter le désempilage des bouteilles (B') disposées en roule. 11 / Installation according to one of claims 8 to 10, characterized in that the overall unloading container (CDG) is mounted rotating about a vertical axis (350), and can rotate by about 90 "in its plane to facilitate the destacking of the bottles (B ') arranged in rolls. 12/ Installation selon l'une des revendications 8 à 11, caractérisée par le fait que les premiers moyens pousseurs (200) comportent au moins un poussoir (201) disposé de l'autre côté de la ligne de palettisation (100) et actionné par des moyens associés (203, 204), et une barre transversale de poussage (210). 12 / Installation according to one of claims 8 to 11, characterized in that the first pusher means (200) comprise at least one pusher (201) disposed on the other side of the palletizing line (100) and actuated by associated means (203, 204), and a transverse push bar (210). 13/ Installation selon la revendication 12, caractérisée par le fait que la barre transversale de poussage (210) est amovible, de façon à pouvoir laisser la barre de fermeture (T) habituellement associée à la fermeture latérale du casier (C), ladite barre de poussage (210) étant portée soit par un support basculant (220) indépendant du poussoir (201), soit par le poussoir (201) lui-même lorsque celui-ci est actionné et passe sous la barre de fermeture (T), la liaison séparable de la barre amovible (210) audit support basculant (220) ou audit poussoir (201) étant de préférence assurée au moyen d'aimants (224 ; 206). 13 / installation according to claim 12, characterized in that the transverse push bar (210) is removable, so as to be able to leave the closing bar (T) usually associated with the lateral closing of the rack (C), said bar of pushing (210) being carried either by a tilting support (220) independent of the pusher (201), or by the pusher (201) itself when the latter is actuated and passes under the closing bar (T), the separable connection of the removable bar (210) to said tilting support (220) or to said pusher (201) being preferably ensured by means of magnets (224; 206). 14/ Installation selon l'une des revendications 8 à 13, caractérisée par le fait que les seconds moyens pousseurs (400) comportent un poussoir (402) disposé en arrière du conteneur de chargement global (CCG) et actionné par des moyens associés (404, 405). 14 / Installation according to one of claims 8 to 13, characterized in that the second pusher means (400) comprise a pusher (402) disposed behind the global loading container (CCG) and actuated by associated means (404 , 405). 15/ Installation selon la revendication 14, caractérisée par le fait que le poussoir (402) est supplémentairement agencé pour pouvoir éventuellement positionner en roule au moins une bouteille (B') sur le conteneur de chargement global (CCG), lors de l'empilage des bouteilles pleines couchées sur ledit conteneur.  15 / Installation according to claim 14, characterized in that the pusher (402) is additionally arranged to be able to optionally position in roll at least one bottle (B ') on the overall loading container (CCG), during stacking full bottles lying on said container. 16/ Installation selon la revendication 15, caractérisée par le fait que le poussoir (402) porte un bras de blocage (410) pouvant pivoter autour d'un axe horizontal, par actionnement de moyens associés (412), entre une position relevée d'escamotage et une position abaissée de prise sur une bouteille en roule (B'). 16 / installation according to claim 15, characterized in that the pusher (402) carries a locking arm (410) which can pivot about a horizontal axis, by actuation of associated means (412), between a raised position of retraction and a lowered position of grip on a rolled bottle (B '). 17/ Installation selon l'une des revendications 8 à 16, caractérisée par le fait que les moyens robotisés de manutention comportent un premier robot manipulateur (600) associé au désempilage des bouteilles vides (B, B') du conteneur de déchargement global (CDG), et un second robot manipulateur (700), indépendant du premier, associé à l'empilage des bouteilles pleines (B, B') sur le conteneur de chargement global (CCG). 17 / Installation according to one of claims 8 to 16, characterized in that the robotic handling means comprise a first handling robot (600) associated with the destacking of empty bottles (B, B ') of the overall unloading container (CDG ), and a second manipulator robot (700), independent of the first, associated with the stacking of full bottles (B, B ') on the global loading container (CCG). 18/ Installation selon la revendication 17, caractérisée par le fait que chaque robot manipulateur (600 ; 700) comporte un chariot (601 701) déplaçable sur le portique de support (P) dans une direction (B) essentiellement parallèle à la direction de déplacement (A) de la ligne de palettisation (100), et un organe de préhension (610 ; 710) porté par ledit chariot, ledit organe de préhension étant déplaçable verticalement par des moyens motorisés associés (604, 605 ; 704, 705) également portés par ledit chariot. 18 / Installation according to claim 17, characterized in that each manipulator robot (600; 700) comprises a carriage (601 701) movable on the support gantry (P) in a direction (B) essentially parallel to the direction of movement (A) of the palletizing line (100), and a gripping member (610; 710) carried by said carriage, said gripping member being vertically movable by associated motorized means (604, 605; 704, 705) also carried by said carriage. 19/ Installation selon la revendication 18, caractérisée par le fait que l'organe de préhension (710 ; 610) peut en outre tourner autour de son axe vertical (750 ; 650), sur un angle d'environ 90" ou 1800, selon qu'il s'agit respectivement de l'empilage des bouteilles pleines en roule (B') ou du désempilage des bouteilles vides (B, B'), grâce à un vérin rotatif associé (708 ; 608). 19 / Installation according to claim 18, characterized in that the gripping member (710; 610) can also rotate around its vertical axis (750; 650), at an angle of about 90 "or 1800, depending that it is respectively the stacking of the full rolled bottles (B ') or the destacking of the empty bottles (B, B'), thanks to an associated rotary actuator (708; 608). 20/ Installation selon la revendication 18 ou 19, caractérisée par le fait que les moyens motorisés comportent un moteur (604 ; 704) à commande pneumatique, agissant sur une vis sans fin (605 ; 705) assurant le déplacement vertical de l'organe de préhension (610 ; 710). 20 / Installation according to claim 18 or 19, characterized in that the motorized means comprise a motor (604; 704) pneumatically controlled, acting on an endless screw (605; 705) ensuring the vertical movement of the member grip (610; 710). 21/ Installation selon l'une des revendications 18 à 20, caractérisée par le fait que l'organe de préhension (610 ; 710) est une plaque incurvée connectée à des moyens d'aspiration, de façon à assurer la préhension d'une bouteille (B, B') lorsque lesdits moyens sont actionnés.  21 / Installation according to one of claims 18 to 20, characterized in that the gripping member (610; 710) is a curved plate connected to suction means, so as to ensure the gripping of a bottle (B, B ') when said means are actuated. 22/ Installation selon les revendications 20 et 21, caractérisée par le fait que chaque robot manipulateur (600 ; 700) comporte un organe de sécurité (609 ; 709) (réserve de vide) maintenant la charge en cas de coupure de l'alimentation pneumatique de ladite installation. 22 / Installation according to claims 20 and 21, characterized in that each manipulator robot (600; 700) includes a safety member (609; 709) (vacuum reserve) maintaining the load in the event of a cut in the pneumatic supply of said installation. 23/ Installation selon l'une des revendications 8 à 22, caractérisée par le fait qu'elle comporte en outre une structure fixe de guidage (40) disposés sous le portique de support (P), entre les conteneurs de déchargement global (CDG) et de chargement global (CCG), ladite structure- fixe (40) permettant de garantir un positionnement correct et constant pour le chariot d'emplissage (CE).  23 / Installation according to one of claims 8 to 22, characterized in that it further comprises a fixed guide structure (40) arranged under the support gantry (P), between the overall unloading containers (CDG) and global loading (CCG), said fixed structure (40) making it possible to guarantee correct and constant positioning for the filling trolley (CE).
FR9112109A 1991-10-02 1991-10-02 PROCESS FOR THE AUTOMATIC HANDLING OF BOTTLES OF LARGE CAPACITY, PARTICULARLY LIQUEFIED GAS, AND INSTALLATION FOR IMPLEMENTING THE PROCESS. Expired - Fee Related FR2682080B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR9112109A FR2682080B1 (en) 1991-10-02 1991-10-02 PROCESS FOR THE AUTOMATIC HANDLING OF BOTTLES OF LARGE CAPACITY, PARTICULARLY LIQUEFIED GAS, AND INSTALLATION FOR IMPLEMENTING THE PROCESS.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9112109A FR2682080B1 (en) 1991-10-02 1991-10-02 PROCESS FOR THE AUTOMATIC HANDLING OF BOTTLES OF LARGE CAPACITY, PARTICULARLY LIQUEFIED GAS, AND INSTALLATION FOR IMPLEMENTING THE PROCESS.

Publications (2)

Publication Number Publication Date
FR2682080A1 true FR2682080A1 (en) 1993-04-09
FR2682080B1 FR2682080B1 (en) 1994-01-14

Family

ID=9417502

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9112109A Expired - Fee Related FR2682080B1 (en) 1991-10-02 1991-10-02 PROCESS FOR THE AUTOMATIC HANDLING OF BOTTLES OF LARGE CAPACITY, PARTICULARLY LIQUEFIED GAS, AND INSTALLATION FOR IMPLEMENTING THE PROCESS.

Country Status (1)

Country Link
FR (1) FR2682080B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2896870A1 (en) * 2014-01-20 2015-07-22 Air Liquide Deutschland GmbH Method and device for automatic serial filling of pressure bottles with gas
CN109911281A (en) * 2019-03-27 2019-06-21 安徽荣泰玻璃制品有限公司 Beer bottle processing conveys packing mechanism with high stability

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110131571B (en) * 2019-06-05 2020-11-03 徐州工程学院 Automatic gas filling robot suitable for gas filling places

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3250371A (en) * 1964-06-29 1966-05-10 Ceson Containers Mfg Corp Apparatus for transferring articles
FR2561619A1 (en) * 1984-03-20 1985-09-27 Totalgaz Cie Fse Automatic large-capacity bottle palletising method and installation implementing this method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3250371A (en) * 1964-06-29 1966-05-10 Ceson Containers Mfg Corp Apparatus for transferring articles
FR2561619A1 (en) * 1984-03-20 1985-09-27 Totalgaz Cie Fse Automatic large-capacity bottle palletising method and installation implementing this method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2896870A1 (en) * 2014-01-20 2015-07-22 Air Liquide Deutschland GmbH Method and device for automatic serial filling of pressure bottles with gas
CN109911281A (en) * 2019-03-27 2019-06-21 安徽荣泰玻璃制品有限公司 Beer bottle processing conveys packing mechanism with high stability

Also Published As

Publication number Publication date
FR2682080B1 (en) 1994-01-14

Similar Documents

Publication Publication Date Title
EP0354873B1 (en) Depalletizer for parcels of labels
CA2045877C (en) Article loading device on an unpiling carousel
BE1006857A3 (en) Installation top of brick masonry wall interior of pregnant.
EP0122817B1 (en) Automatic feeding method and device for a machine treating flat objects
CH639045A5 (en) DEVICE FOR INSERTING SHEET PACKETS INTO A WORKING MACHINE.
WO2008047008A1 (en) Machine for shaping blanks of cardboard boxes
EP3112294A2 (en) Storage and transfer device
EP2222418B1 (en) Device for unloading receptacles by means of a pivoting member
CA2000478A1 (en) Automatic food dispenser for bread and process for the management and distribution of products
FR2680121A1 (en) Stacking unit for postal sorting machines or the like
CH620170A5 (en)
FR2682080A1 (en) Method for automatic handling of large-capacity bottles, particularly bottles of liquified gas, and installation for implementing the method
FR2575134A1 (en) PALETTIZATION INSTALLATION, IN PARTICULAR BAG PACKAGES
FR2560173A1 (en) APPARATUS FOR DISCHARGING PALLETS CARRYING LAYERS OF ARTICLES
FR2665150A1 (en) Device for loading or unloading small boxes
FR2646620A1 (en) Device for loading and unloading boxes with flat objects such as postal envelopes
FR2629046A1 (en) MACHINE FOR LOADING AND UNLOADING ARTICLES LAYED IN LAYERS
WO1986006051A1 (en) Truck for transferring plates, particularly for freeze-drying, and corresponding loading/unloading installation
FR2587311A1 (en) Method and installation for automatic handling and temporary storage of stacked packets of semi-finished sheet products
FR3113663A1 (en) Container presentation station
FR2623472A1 (en) Chain for automatic palletisation of stacked packages
FR2704460A1 (en) Method and device for sorting objects in several passes
WO2000044654A1 (en) Palletizing device for piles of printed booklets
FR2617145A1 (en) Magazine for storing and dispensing objects
FR2609428A1 (en) Device for feeding a press from two stacks of metal-sheet blanks

Legal Events

Date Code Title Description
ST Notification of lapse

Effective date: 20100630