ES2668024A2 - Sistema de montaje eficiente de un contrapeso de gran escala para un elevador vertical de embarcaciones y método de montaje asociado. - Google Patents
Sistema de montaje eficiente de un contrapeso de gran escala para un elevador vertical de embarcaciones y método de montaje asociado. Download PDFInfo
- Publication number
- ES2668024A2 ES2668024A2 ES201590023A ES201590023A ES2668024A2 ES 2668024 A2 ES2668024 A2 ES 2668024A2 ES 201590023 A ES201590023 A ES 201590023A ES 201590023 A ES201590023 A ES 201590023A ES 2668024 A2 ES2668024 A2 ES 2668024A2
- Authority
- ES
- Spain
- Prior art keywords
- auxiliary
- counterweight block
- boat lift
- vertical boat
- sized concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02C—SHIP-LIFTING DEVICES OR MECHANISMS
- E02C5/00—Mechanisms for lifting ships vertically
Landscapes
- Engineering & Computer Science (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Intermediate Stations On Conveyors (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
Sistema de montaje eficiente de un contrapeso de gran escala para un elevador vertical de embarcaciones y su método de montaje, consistente en un dispositivo auxiliar de transporte y volteo, un vagón auxiliar de transferencia, un dispositivo auxiliar de seguimiento del volteo, una columna auxiliar de soporte, una auxiliar cabeza de elevación, y una parte especial de un dispositivo auxiliar de transferencia y montaje. El método eficiente de montaje del contrapeso de larga escala para un elevador vertical de embarcaciones que se pretende consiste en: 1) transporte y volteo del contrapeso; 2) transporte del contrapeso a un pozo para el contrapeso de afuera hacia dentro mediante un vagón auxiliar de transferencia; 3) montaje de la cabeza auxiliar de elevación; 4) elevación del contrapeso en dirección horizontal a la vertical; 5) emplazamiento temporal del contrapeso sobre una columna auxiliar de soporte; 6) transferencia y montaje del contrapeso mediante la adopción dé una parte especial de un dispositivo auxiliar de transferencia y montaje.
Description
En la columna auxiliar de soporte (4), una columna de soporte (4-2) se fija en el pozo del contrapeso arriba de la polea guía del volteo (3-1) y a la que esta va conectada por medio de una columna colgante (4-1).
En la cabeza auxiliar de elevación (5), un vástago auxiliar de elevación (5-1) se conecta a un contrapeso (7) mediante un vástago de conexión (5-2).
En la parte especial del dispositivo auxiliar de transferencia y montaje (6), vagones auxiliares de transferencia (6-2) se colocan en raíles auxiliares de transferencia (61), una columna de conexión (6-3) se coloca en los vagones auxiliares de transferencia, múltiples jacks (6-4) son instalados en la columna de conexión (6-3), un vástago elevador de conexión (6-5) es conectado a los jacks (6-4), un extremo de la cadena guía se fija a los extremos de los raíles auxiliares de transferencia (6-1) y al otro extremo de la cadena guía se fija a los vagones auxiliares de transferencia (6-2).
La columna de bloqueo (6-3) de la parte especial del dispositivo auxiliar de montaje y transferencia (6) consiste en dos columnas individuales (6-3-1) y tornillos de conexión (6-32) para la conexión de los extremos de las columnas individuales (6-3-1).
El rail de transferencia (2-3) del vagón auxiliar de transferencia del rail de transferencia (2-3) del vagón auxiliar de transferencia es instalado en una plataforma plana elevadora de concreto de 84m al exterior del pozo de contrapeso.
El cabestrante de volteo (2-4) del dispositivo auxiliar de seguimiento del volteo (3) se instala en la plataforma plana elevadora de concreto de 84m dentro del pozo del contrapeso, y la polea guía de volteo (3-1) se instala en una posición correspondiente a la parte posterior del contrapeso, en una plataforma plana elevadora de concreto de 112m dentro del pozo del contrapeso.
Cuando la plataforma plana elevadora de concreto de 112m del pozo del contrapeso se atraviesa con cuerdas de acero en concordancia con la disposición de la polea guía de volteo conectada a la columna (3-1), se requiere asegurar que dos agujeros para las cuerdas en la dirección río abajo estén dispuestas simétricamente respecto al centro del rail, y por lo tanto el centro de la polea guía de seguimiento de volteo (3-2) se superponga con el centro del contrapeso (7) tanto como sea posible, y se prevenga que ángulos de torsión o
10
Claims (1)
-
imagen1 imagen2 imagen3 imagen4 imagen5
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410323598.8 | 2014-07-09 | ||
CN201410323598.8A CN104120702B (zh) | 2014-07-09 | 2014-07-09 | 垂直升船机大型混凝土平衡重块高效安装系统及其安装方法 |
PCT/CN2015/071158 WO2016004753A1 (zh) | 2014-07-09 | 2015-01-20 | 垂直升船机大型混凝土平衡重块高效安装系统及其安装方法 |
Publications (4)
Publication Number | Publication Date |
---|---|
ES2668024A2 true ES2668024A2 (es) | 2018-05-16 |
ES2668024A8 ES2668024A8 (es) | 2019-01-10 |
ES2668024R1 ES2668024R1 (es) | 2019-01-14 |
ES2668024B1 ES2668024B1 (es) | 2019-10-22 |
Family
ID=51766319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ES201590023A Active ES2668024B1 (es) | 2014-07-09 | 2015-01-20 | Sistema de montaje eficiente de un contrapeso de gran escala para un elevador vertical de embarcaciones y metodo de montaje |
Country Status (3)
Country | Link |
---|---|
CN (1) | CN104120702B (es) |
ES (1) | ES2668024B1 (es) |
WO (1) | WO2016004753A1 (es) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104120702B (zh) * | 2014-07-09 | 2015-09-30 | 中国葛洲坝集团股份有限公司 | 垂直升船机大型混凝土平衡重块高效安装系统及其安装方法 |
CN204000816U (zh) * | 2014-07-09 | 2014-12-10 | 中国葛洲坝集团股份有限公司 | 垂直升船机大型混凝土平衡重块高效安装系统 |
CN105804039B (zh) * | 2016-04-07 | 2017-11-10 | 中国葛洲坝集团机电建设有限公司 | 一种垂直升船机平衡重轨道快速安装调整装置及其应用方法 |
CN108691308B (zh) * | 2018-06-26 | 2024-08-20 | 中国葛洲坝集团机电建设有限公司 | 大型升船机平衡重锁定式安装检修方法及其施工系统 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE725861C (de) * | 1940-08-13 | 1942-10-01 | Dortmunder Union Brueckenbau A | Gewichtsausgleich fuer Trogtore von Schiffshebewerken |
DE2008060A1 (de) * | 1970-02-21 | 1971-09-16 | Maschinenfabrik Augsburg-Nürnberg AG, Zweigniederl. Nürnberg, 8500 Nürnberg | Gegengewicht zum Ausgleichen einer heb- und senkbaren Last, insbesondere des Troges eines senkrechten Schiffshebewerkes |
CN2403818Y (zh) * | 1999-12-25 | 2000-11-01 | 中国长江三峡工程开发总公司 | 水力浮动式转矩平衡重升船机 |
KR100576697B1 (ko) * | 2003-02-06 | 2006-05-03 | 한만엽 | 가변 웨이트 기능의 카운터웨이트 기술을 이용한 쉽 리프트장치 및 방법 |
US6979149B1 (en) * | 2004-06-16 | 2005-12-27 | Thompson Kenneth R | Vessel transfer system and associated methods |
US7354223B2 (en) * | 2005-07-25 | 2008-04-08 | Shelton Bert G | Mechanical ship lift |
CN102337737A (zh) * | 2010-07-16 | 2012-02-01 | 中国水电顾问集团贵阳勘测设计研究院 | 平衡重式垂直升船机的安全保障方法及装置 |
CN103758100B (zh) * | 2014-01-27 | 2015-07-29 | 太原科技大学 | 一种升船装置 |
CN104120702B (zh) * | 2014-07-09 | 2015-09-30 | 中国葛洲坝集团股份有限公司 | 垂直升船机大型混凝土平衡重块高效安装系统及其安装方法 |
CN204000816U (zh) * | 2014-07-09 | 2014-12-10 | 中国葛洲坝集团股份有限公司 | 垂直升船机大型混凝土平衡重块高效安装系统 |
-
2014
- 2014-07-09 CN CN201410323598.8A patent/CN104120702B/zh active Active
-
2015
- 2015-01-20 WO PCT/CN2015/071158 patent/WO2016004753A1/zh active Application Filing
- 2015-01-20 ES ES201590023A patent/ES2668024B1/es active Active
Also Published As
Publication number | Publication date |
---|---|
ES2668024R1 (es) | 2019-01-14 |
CN104120702A (zh) | 2014-10-29 |
ES2668024A8 (es) | 2019-01-10 |
ES2668024B1 (es) | 2019-10-22 |
CN104120702B (zh) | 2015-09-30 |
WO2016004753A1 (zh) | 2016-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES2668024A2 (es) | Sistema de montaje eficiente de un contrapeso de gran escala para un elevador vertical de embarcaciones y método de montaje asociado. | |
US10106946B2 (en) | Pile upending system | |
BRPI0508903A (pt) | sistema de controle de movimento de carga para um sistema de guincho ou guindaste e método de controlar o movimento de uma carga elevada ou abaixada por um sistema de guincho ou guindaste provido em um navio e aparelho e método de compensação de arfada | |
PL416700A1 (pl) | Ruchoma dźwignica | |
CA2798397C (en) | Adjustable module lift assembly | |
ES2660473T3 (es) | Método y sistema para levantar y manipular una carga | |
ES2554647A1 (es) | Grúa de pórtico para la manipulación de contenedores. | |
ATE541808T1 (de) | Brücken- oder portalkran, insbesondere zum handhaben von iso-containern | |
CN203833511U (zh) | 一种可升降和移动的门式起重机 | |
MX2018012502A (es) | Tractor elevador de cubierta, conducto de rescate y tanque de carga. | |
ES2534957A1 (es) | Sistema para informar del desplome de gruas y aparatos de elevación con respecto a la carga. | |
RU2013140395A (ru) | Грузоподъемное устройство для монтажа эстакад | |
JP2016142097A (ja) | 可搬式昇降装置および水平部材の解体方法 | |
FI3212558T3 (fi) | Sidontavälineellä sidottujen tavaroiden nostolaite | |
US20120055898A1 (en) | Gantry with suspending links | |
JP6223877B2 (ja) | 免震装置の制御方法 | |
CL2020000682A1 (es) | Disposición de elevación de un elevador de una grúa. | |
ES2432230B1 (es) | Sistema para la medición de un peso y un método para calcular el peso de un contenedor de carga manipulado por una carretilla pórtico | |
US517008A (en) | matton | |
RU2560012C1 (ru) | Устройство для подъема и монтажа блоков пролетного строения | |
MD1107Y (ro) | Pod telescopic mobil | |
CN204373880U (zh) | 一种汽车风洞试验模型吊装架装置 | |
BR102015021840A2 (pt) | sistema para elevação e transporte de plataformas de colheitadeiras | |
KR101550753B1 (ko) | 실린더의 휨 방지를 위한 승강기 | |
RU2013131653A (ru) | Кран для подъема грузов в оконный проем, на лоджии и балконы строящихся и ремонтируемых зданий |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PC2A | Transfer of patent |
Owner name: CHINA GEZHOUBA GROUP CO., LTD Effective date: 20150903 |
|
EC2A | Search report published |
Ref document number: 2668024 Country of ref document: ES Kind code of ref document: R1 Effective date: 20190104 |
|
FG2A | Definitive protection |
Ref document number: 2668024 Country of ref document: ES Kind code of ref document: B1 Effective date: 20191022 |