EP4103785B1 - Method for introducing a soil penetrating tool into a soil and underground construction device - Google Patents
Method for introducing a soil penetrating tool into a soil and underground construction device Download PDFInfo
- Publication number
- EP4103785B1 EP4103785B1 EP21705172.1A EP21705172A EP4103785B1 EP 4103785 B1 EP4103785 B1 EP 4103785B1 EP 21705172 A EP21705172 A EP 21705172A EP 4103785 B1 EP4103785 B1 EP 4103785B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- soil
- liquid
- liquid storage
- weight
- storage reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002689 soil Substances 0.000 title claims description 93
- 230000000149 penetrating effect Effects 0.000 title claims description 44
- 238000010276 construction Methods 0.000 title claims description 28
- 238000000034 method Methods 0.000 title claims description 23
- 239000007788 liquid Substances 0.000 claims description 68
- 230000035515 penetration Effects 0.000 claims description 59
- 238000003860 storage Methods 0.000 claims description 35
- 239000000463 material Substances 0.000 claims description 9
- 239000004575 stone Substances 0.000 claims description 8
- 238000009434 installation Methods 0.000 claims description 5
- 238000005056 compaction Methods 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 239000004567 concrete Substances 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 9
- 235000012489 doughnuts Nutrition 0.000 description 3
- -1 gravel) Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004913 activation Effects 0.000 description 1
- 239000007798 antifreeze agent Substances 0.000 description 1
- 229910000278 bentonite Inorganic materials 0.000 description 1
- 239000000440 bentonite Substances 0.000 description 1
- SVPXDRXYRYOSEX-UHFFFAOYSA-N bentoquatam Chemical compound O.O=[Si]=O.O=[Al]O[Al]=O SVPXDRXYRYOSEX-UHFFFAOYSA-N 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 230000001627 detrimental effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000011010 flushing procedure Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D11/00—Methods or apparatus specially adapted for both placing and removing sheet pile bulkheads, piles, or mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/046—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
- E02D3/054—Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil involving penetration of the soil, e.g. vibroflotation
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/26—Placing by using several means simultaneously
Definitions
- the present invention relates to underground construction and in particular to a method for introducing a soil penetrating tool into a soil and to an underground construction device.
- Underground construction often requires a soil penetrating tool to be introduced into soil to a great depth during a penetration process in which an external force acts upon the soil penetrating tool in order to drive the soil penetrating tool into the soil.
- soil penetrating tools may include vibroflots (sometimes also referred to as deep or depth vibrators), sheet pipes for conveying filling material like stones (e.g. gravel), sand, bentonite, cement, concrete, etc. down into the soil and releasing the filling material in the soil for forming bottom feed columns and/or walls of the filling material, sheet piles for forming a sheet pile wall, piles, or the like.
- Such soil penetrating tools often rely on crawler cranes which suspend the tool. In projects with large penetration depths, the cost of such crawler cranes can be a substantial part of total cost. If such soil penetrating tools could be built in sections that enter the soil in steps as is, for example, the case for deep drilling techniques where multiple drill rods are connected sequentially to reach the required depth, the cranes could be lighter in weight.
- the working process includes one or more penetration phases during which the soil penetrating tool is (completely or partially) driven down into the soil and one or more pulling phases during which the soil penetrating tool is (completely or partially) pulled out of the soil (e.g. retracted).
- the soil penetrating tool normally has to overcome a considerable soil resistance. The deeper the soil layers to be reached, the higher soil resistance. This is because the surface friction, in addition to the tip resistance, substantially contributes to the soil resistance the soil penetrating tool needs to overcome, and such surface friction rises with increased depth as it is a function of the soil overburden stress. Therefore, a high weight of the soil penetrating tool during the penetration phase(s) is advantageous.
- DE 10 2004 013 790 A1 discloses a method for driving and pulling rod-like elements like sheet piles using a vibrator that includes eccentric weights each rotating about a shaft.
- the rotational positions of the eccentric weights are adjustable relative to one another so that an imbalance which causes a driving or pulling force acting on the rod-like element can be adjusted.
- DE 10 2016 113 140 A1 relates to a vibrator assembly for creating stone columns and to a method for operating such a vibrator assembly.
- the stone columns are produced by a material like rubble, sand, gravel etc. which is stored in a supply unit.
- the vibrator assembly further includes a silo pipe which is designed to penetrate at least to some extent into the ground and to move up and down when the vibrator assembly is in operation. Thereby, the material stored in the supply unit is supplied to the silo pipe and released from the silo pipe into the ground, where it is compacted by the vibrator.
- GB 1 022 241 A describes a vibratory pile driver for driving a pile into the ground.
- the driving is assisted by tensioning a cable, which is guided upwards to a driving machine via a return sheave, so that a tractive force acting downward is applied to the pile.
- a tractive force acting downward is applied to the pile.
- leads of the pile driver are lifted due to the cable being guided over the sheave.
- tubes of the leads can be filled with water to increase the weight.
- a variable weight load device is used to add extra weight to the soil penetrating tool during its penetration phase(s) but to reduce or remove (e.g. disengage) the extra weight such that it does not contribute to the total weight suspended by the crane during the pulling phase subsequent to a previous penetration phase.
- One aspect of the present invention relates to a method for introducing a soil penetrating tool into a soil using a variable weight load device which is coupled to the soil penetration tool.
- the method includes a penetration phase and a pulling phase.
- the soil penetrating tool is at least partially driven into the soil with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool.
- the pulling phase the penetrating tool is at least partially pulled out of the soil with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight.
- the variable weight load device includes at least one liquid storage reservoir which is filled with a liquid in order to provide the penetration phase weight. In order to provide the pulling phase weight, the liquid is at least partially removed from the at least one liquid storage reservoir.
- a further aspect of the present invention relates to an underground construction device comprising a soil penetrating tool, a variable weight load device coupled to the soil penetration tool, and a ground-based tank.
- the variable weight load device comprises at least one liquid storage reservoir.
- the underground construction device is configured to perform a penetration phase during which the soil penetrating tool is at least partially driven into the soil with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool.
- the underground construction device is further configured to perform a pulling phase during which the soil penetrating tool is at least partially pulled out of the soil with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight.
- the underground construction device is further configured to fill the at least one liquid storage reservoir with a liquid in order to provide the penetration phase weight; take the liquid for filling the at least one liquid storage reservoir from the ground-based tank in order to provide the penetration phase weight; and at least partially remove the liquid from the at least one liquid storage reservoir in order to provide the pulling phase weight and to fill back the at least partly removed liquid in the ground-based tank.
- FIG. 1 shows an underground construction device 100 with a crawler crane 110 and a bottom feed rig 120 suspended from the crawler crane 110.
- An enlarged section of the rig 120 is illustrated in FIG. 2 .
- the underground construction device 100 serves to produce gravel columns in a soil 200.
- a bucket 11 filled with gravel fills the gravel into a hopper 3 from where it drops into a silo tube 12.
- a vibroflot 16 is attached to the bottom end of the silo tube 12.
- the lower part of the silo tube 12 and the vibroflot 16 attached thereto are introduced (i.e. moved down) into the soil 200 to a pre-defined depth.
- the gravel gets to a tremie pipe (not shown) along the vibroflot 16 to the bottom tip of vibroflot 16 where it is released into the soil 200.
- the released gravel is compacted by the vibrating vibroflot 16.
- the silo tube 12 with the attached vibroflot 16 may be pulled up and moved down alternately. Thereby, the bottom part of the silo tube 12 and the vibroflot 16 may remain below the surface 201 of the soil 200.
- the result is a section of a gravel column to be produced.
- the gravel column can be completed by sequentially forming such sections one above the other at different depths.
- the silo tube 12 with the attached vibroflot 16 may be completely pulled out of the soil 200.
- the part of the rig 120 penetrating the soil 200 is also referred to as soil penetrating tool.
- a penetration phase is a phase in which the bottom end of the rig 120 (in this embodiment the bottom part of the silo tube 12 and the vibroflot 16) is in contact with the soil 200 and moves downward into the soil 200.
- a pulling phase is a phase in which the rig 120 is moved upward, i.e. in a direction in which it can be pulled out of the soil.
- a heavy weight load acting on the rig 120 can advantageously support the penetration in the penetration phases.
- the weight load acting on the rig 120 is reduced.
- the rig 120 is equipped with a variable weight load device which in the present embodiment is at least one ballast tank 4.
- the ballast tank 4 is also referred to as liquid storage reservoir.
- ballast tanks 4 there are six ballast tanks 4. However any other number of ballast tanks 4 may also be used. For example, there may be just one ballast tank 4, or at least two ballast tanks 4.
- These ballast tank(s) 4 can be filled with a liquid (partially or completely), for example water, and (partially or completely) emptied via either only one hose 13, or they can be filled via one hose 14 and emptied via another hose 13.
- the liquid can be operated in a closed cycle via a ground-based tank 15 from which it is pumped back and forth between ground-based tank 15 and the ballast tank(s) 4.
- the hose(s) 13 each connect the ground-based tank 15 and the at least one ballast tank 4.
- the liquid is not restricted to water. In principle, any other liquid may be used as well. In particular, a mixture of water and antifreeze agent may be used.
- the ballast tank(s) 4 can be partially or completely filled with the liquid in order to provide a heavy weight load (in the following also referred to as penetration weight) on the rig 120, and in preparation for the pulling phases, the ballast tank(s) 4 can be partially or completely emptied in order to provide a reduced weight load (in the following also referred to as pulling weight) on the rig 120. That is, the pulling weight is significantly lower than the penetration weight.
- the difference between the penetration weight and the pulling weight may be at least 1500,kilograms, at least 5000 kilograms or even at least 10000 kilograms.
- FIG. 2 Some more details of a possible variant of such temporary liquid ballasting system are shown in FIG. 2 .
- the rig 120 is suspended from the crawler crane 110 via a lifting head 1.
- the bucket 11 in this variant is not impeded in its motion by the ballast tanks 4 which are installed on a support frame 9.
- the capacity of each of six ballast tanks 4 is, at least 1.5 m 3 . That is, the total capacity amounts to at least 9 m 3 .
- the maximum possible difference between the penetration phase weight and the pulling phase weight may be 9000 kg. Of course, any other difference of more than 0 kg and less than 9000 kg may be used as well.
- ballast tanks 4 may be interconnected via hoses 5, 10 in fluid connection so that they can commonly be filled and emptied via either a common hose 13 or, as illustrated in FIG. 1 , a pair of hoses 13 and 14.
- the gravel is transported by a bucket 11 that is guided by a fork 2 to drop the gravel into the hopper 3 and from there into a first tank 7.
- This first tank 7 is separated from the hopper 3 by an air tight gate. Further, the first tank 7 is separated from a second tank 8 by another gate. The two gates together form the so called "double lock".
- a variable weight load device may be installed in a space between a lower end of a bucket frame 520 holding at least one gravel bucket 521, 522 and the at least one gravel bucket 521, 522.
- the variable weight load device may also include at least one ballast tank 4 which is/are installed in the space between the lower end of the bucket frame 520 and the at least one gravel bucket 521, 522 and which is/are operated using a ground-based tank 15, one or two hoses 13, 14 and a liquid as described above with reference to FIGS. 1 and 2 .
- the ground based tank 15 is optional if the liquid is water, in which case the water can also come from a water mains or a surface water body (pond, lake, river) directly.
- a variable weight load device may include an additional ballast weight 18 which is suspended by wire ropes 17.
- the wire ropes 17 run through two winches 19 which are coupled to the silo pipe 12 and the vibroflot 16 coupled to the silo pipe 12.
- the winches 19 are mounted to the hopper 3. Instead, the winches could be mounted to any other suitable part of the rig 120.
- ballast weight 18 When the ballast weight 18 shall act to support penetration, i.e. during the penetration phases, it is lifted by the winches 19 from the soil surface 201 ( FIG. 5 ), while when it shall not act as additional weight, i.e. during the pulling phases, it can rest on the soil surface 201 ( FIG. 6 ). If in a penetration phase the ballast weight 18 is hovered above the soil surface 201, the ballast weight 18 is active and acts on the rig 120 thereby supporting the penetration process. If in a pulling phase the ballast weight 18 rests on the soil surface 201, the ballast weight 18 is inactive and does not act on the rig 120 so that the crawler crane 110 is not required to hold the weight of the ballast weight 18.
- ballast weight 18 may be moved along the soil penetrating tool so that it is moved from a suspended state into a state in which it rests on the surface 201 of the soil 200.
- such a switching between the penetration phase and the pulling phase and vice versa is much faster than the time needed to fill or empty a ballast tank 4.
- the ballast weight 18 may be a solid weight, e.g. made of stone or metal like iron, steel, etc, or a liquid-filled container. In case of a liquid-filled container, the same kinds of liquids described with reference to FIGS. 1 to 3 may be used. According to one example, the ballast weight 18 may have a ring shape (e.g. a "donut shape") and surround the soil penetrating tool.
- a ring shape e.g. a "donut shape
- Example 1 An underground construction device for vibro compaction and stone column installation, or vibrated sheet pipe or pile segment, is temporarily ballasted by an extra weight during penetration phase.
- Example 2 The underground construction device of example 1 using liquid storage reservoirs as shown for example in FIG. 1 and FIG. 2 that are filled and emptied via hoses and thereby allow to raise the total weight of the rig during its penetration to depth, when higher weight is favorable to reach the necessary depth, and reduce its weight during retrieval of the rig from the ground, so that the necessary pulling capacity of the carrier crane, which is pulling on lifting head, is minimized.
- Example 3 The underground construction device of example 1 or 2, where the ballast weight is part of a secondary tool (for example the gravel bucket as per Fig. 3 ) that is at least temporarily suspended not from a carrier rig but by the primary soil penetrating tool itself, thus adding extra weight to such tool during penetration without needing extra lifting capacity from the crawler crane.
- a secondary tool for example the gravel bucket as per Fig. 3
- Example 4 The underground construction device of one of examples 1 to 3, where the ballast weight, favorably in a ring-shape (e.g. "donut shape"), with the soil penetrating tool (e.g. vibroflot rig) running through the middle of such donut, is lifted by a winch attached to the soil penetrating tool but not connected to any secondary device such as gravel bucket.
- a ring-shape e.g. "donut shape”
- the soil penetrating tool e.g. vibroflot rig
- Example 5 The underground construction device of one of examples 1 to 4 having the advantage that the acting ballast weight can be rapidly changed by the ballast weight hovering close to the soil surface so it can be either fully suspended and hence act with its full weight or be deactivated by setting it on the ground surface.
- Example 6 The underground construction device of one of examples 4 and 5 with the ballast weight resting on the soil surface and the at least one winch allowing for a computer-controlled force activation that can mobilize any desired force between zero and the full weight of the ballast weight.
- Example 7 The underground construction device of any one of the preceding claims, wherein the device comprises a vibroflot.
- the underground construction device may be operated such that during none of the pulling phases the respective variable weight load device imposes weight on the soil penetrating tool. This helps to avoid that the initially described problems occur at any time.
- variable weight load device may be applied to any soil penetration tool with or without a vibrobflot.
- these principles may also be realized without described details like the double-lock, the bucket 11, bucket gravel reservoirs 521, 522, the ground-based tank 15, the crawler crane 110, etc.
- the invention is defined by the appended claims.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
- The present invention relates to underground construction and in particular to a method for introducing a soil penetrating tool into a soil and to an underground construction device. Underground construction often requires a soil penetrating tool to be introduced into soil to a great depth during a penetration process in which an external force acts upon the soil penetrating tool in order to drive the soil penetrating tool into the soil. Examples for such soil penetrating tools may include vibroflots (sometimes also referred to as deep or depth vibrators), sheet pipes for conveying filling material like stones (e.g. gravel), sand, bentonite, cement, concrete, etc. down into the soil and releasing the filling material in the soil for forming bottom feed columns and/or walls of the filling material, sheet piles for forming a sheet pile wall, piles, or the like.
- Such soil penetrating tools often rely on crawler cranes which suspend the tool. In projects with large penetration depths, the cost of such crawler cranes can be a substantial part of total cost. If such soil penetrating tools could be built in sections that enter the soil in steps as is, for example, the case for deep drilling techniques where multiple drill rods are connected sequentially to reach the required depth, the cranes could be lighter in weight.
- While this is feasible for drill rods, it is highly unpractical for other techniques, for example the production of bottom feed stone columns, since the supply to the vibroflot with electricity, flushing air and water, and the air tight transport of stones etc. are not easy achievable with extendable length segments like they are used with drill rods.
- Substantially, the working process includes one or more penetration phases during which the soil penetrating tool is (completely or partially) driven down into the soil and one or more pulling phases during which the soil penetrating tool is (completely or partially) pulled out of the soil (e.g. retracted). During the penetration phase(s), the soil penetrating tool normally has to overcome a considerable soil resistance. The deeper the soil layers to be reached, the higher soil resistance. This is because the surface friction, in addition to the tip resistance, substantially contributes to the soil resistance the soil penetrating tool needs to overcome, and such surface friction rises with increased depth as it is a function of the soil overburden stress. Therefore, a high weight of the soil penetrating tool during the penetration phase(s) is advantageous.
- However, during the pulling phase(s), a high weight of the soil penetrating tool is detrimental since it adds to the total weight the crane has to lift. The high weight reduces the stability of the crane, especially if it is strongly inclined. In addition, the ground under the crane is heavily loaded, which can trigger landslides if the crane is located close to a raised edge of the terrain as is, for example, often the case in coal mine reclamation fill compaction projects. In such projects, the center of the crane conventionally needs to be at a certain safe distance from the location where the soil penetrating tool enters the soil so that the crane is required to stay at a safe distance from locations of potential landslides. Hence, there is a need for an improved solution.
-
DE 10 2004 013 790 A1 discloses a method for driving and pulling rod-like elements like sheet piles using a vibrator that includes eccentric weights each rotating about a shaft. The rotational positions of the eccentric weights are adjustable relative to one another so that an imbalance which causes a driving or pulling force acting on the rod-like element can be adjusted. -
DE 10 2016 113 140 A1 relates to a vibrator assembly for creating stone columns and to a method for operating such a vibrator assembly. The stone columns are produced by a material like rubble, sand, gravel etc. which is stored in a supply unit. The vibrator assembly further includes a silo pipe which is designed to penetrate at least to some extent into the ground and to move up and down when the vibrator assembly is in operation. Thereby, the material stored in the supply unit is supplied to the silo pipe and released from the silo pipe into the ground, where it is compacted by the vibrator. -
GB 1 022 241 A - According to the present invention, a variable weight load device is used to add extra weight to the soil penetrating tool during its penetration phase(s) but to reduce or remove (e.g. disengage) the extra weight such that it does not contribute to the total weight suspended by the crane during the pulling phase subsequent to a previous penetration phase.
- One aspect of the present invention relates to a method for introducing a soil penetrating tool into a soil using a variable weight load device which is coupled to the soil penetration tool. The method includes a penetration phase and a pulling phase. During the penetration phase, the soil penetrating tool is at least partially driven into the soil with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool. During the pulling phase, the penetrating tool is at least partially pulled out of the soil with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight. The variable weight load device includes at least one liquid storage reservoir which is filled with a liquid in order to provide the penetration phase weight. In order to provide the pulling phase weight, the liquid is at least partially removed from the at least one liquid storage reservoir.
- A further aspect of the present invention relates to an underground construction device comprising a soil penetrating tool, a variable weight load device coupled to the soil penetration tool, and a ground-based tank. The variable weight load device comprises at least one liquid storage reservoir. The underground construction device is configured to perform a penetration phase during which the soil penetrating tool is at least partially driven into the soil with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool. The underground construction device is further configured to perform a pulling phase during which the soil penetrating tool is at least partially pulled out of the soil with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight. The underground construction device is further configured to fill the at least one liquid storage reservoir with a liquid in order to provide the penetration phase weight; take the liquid for filling the at least one liquid storage reservoir from the ground-based tank in order to provide the penetration phase weight; and at least partially remove the liquid from the at least one liquid storage reservoir in order to provide the pulling phase weight and to fill back the at least partly removed liquid in the ground-based tank.
- For a more complete understanding of the present invention and the advantages thereof, reference is now made to the following descriptions taken in conjunction with the accompanying drawings, in which
-
FIG. 1 is a side view of an underground construction device which comprises a rig suspended from a crane according to one embodiment of the present invention; -
FIG. 2 is a perspective view of a section of the rig ofFIG. 1 ; -
FIG. 3 is a perspective view of a section of a rig that is equipped with a variable weight load device according to a further embodiment of the present invention; -
FIG. 4 which does do not show an embodiment of the present invention, is a perspective view of a rig that is equipped with a variable weight load device and serves to explain certain aspects of the invention; -
FIG. 5 is a side view of the variable weight load device ofFIG. 4 during a penetration phase; and -
FIG. 6 is a side view of the variable weight load device ofFIG. 4 during a pulling phase. -
FIG. 1 shows anunderground construction device 100 with acrawler crane 110 and abottom feed rig 120 suspended from thecrawler crane 110. An enlarged section of therig 120 is illustrated inFIG. 2 . Theunderground construction device 100 serves to produce gravel columns in asoil 200. By help of aguide fork 2, abucket 11 filled with gravel fills the gravel into ahopper 3 from where it drops into asilo tube 12. Avibroflot 16 is attached to the bottom end of thesilo tube 12. For operation, the lower part of thesilo tube 12 and thevibroflot 16 attached thereto are introduced (i.e. moved down) into thesoil 200 to a pre-defined depth. From thesilo tube 12, the gravel gets to a tremie pipe (not shown) along thevibroflot 16 to the bottom tip ofvibroflot 16 where it is released into thesoil 200. - Simultaneously or subsequently, the released gravel is compacted by the vibrating
vibroflot 16. During compaction, thesilo tube 12 with the attachedvibroflot 16 may be pulled up and moved down alternately. Thereby, the bottom part of thesilo tube 12 and thevibroflot 16 may remain below thesurface 201 of thesoil 200. The result is a section of a gravel column to be produced. In this manner, the gravel column can be completed by sequentially forming such sections one above the other at different depths. When the gravel column is completed, thesilo tube 12 with the attachedvibroflot 16 may be completely pulled out of thesoil 200. In the following, the part of therig 120 penetrating thesoil 200 is also referred to as soil penetrating tool. - The described process includes two kinds of phases: penetration phases and pulling phases. A penetration phase is a phase in which the bottom end of the rig 120 (in this embodiment the bottom part of the
silo tube 12 and the vibroflot 16) is in contact with thesoil 200 and moves downward into thesoil 200. A pulling phase is a phase in which therig 120 is moved upward, i.e. in a direction in which it can be pulled out of the soil. - As initially described, a heavy weight load acting on the
rig 120 can advantageously support the penetration in the penetration phases. In contrast, in the pulling phases the weight load acting on therig 120 is reduced. In order to temporarily provide such a heavy weight load acting on therig 120 during the penetration phases but not during the pulling phases, therig 120 is equipped with a variable weight load device which in the present embodiment is at least oneballast tank 4. In the following, theballast tank 4 is also referred to as liquid storage reservoir. - In the illustrated embodiment there are six
ballast tanks 4. However any other number ofballast tanks 4 may also be used. For example, there may be just oneballast tank 4, or at least twoballast tanks 4. These ballast tank(s) 4 can be filled with a liquid (partially or completely), for example water, and (partially or completely) emptied via either only onehose 13, or they can be filled via onehose 14 and emptied via anotherhose 13. The liquid can be operated in a closed cycle via a ground-basedtank 15 from which it is pumped back and forth between ground-basedtank 15 and the ballast tank(s) 4. If such a ground-basedtank 15 is used, the hose(s) 13 (and 14, if provided) each connect the ground-basedtank 15 and the at least oneballast tank 4. It is to be noted that the liquid is not restricted to water. In principle, any other liquid may be used as well. In particular, a mixture of water and antifreeze agent may be used. - In preparation for the penetration phases, the ballast tank(s) 4 can be partially or completely filled with the liquid in order to provide a heavy weight load (in the following also referred to as penetration weight) on the
rig 120, and in preparation for the pulling phases, the ballast tank(s) 4 can be partially or completely emptied in order to provide a reduced weight load (in the following also referred to as pulling weight) on therig 120. That is, the pulling weight is significantly lower than the penetration weight. For example, the difference between the penetration weight and the pulling weight may be at least 1500,kilograms, at least 5000 kilograms or even at least 10000 kilograms. - Some more details of a possible variant of such temporary liquid ballasting system are shown in
FIG. 2 . Therig 120 is suspended from thecrawler crane 110 via a liftinghead 1. Thebucket 11 in this variant is not impeded in its motion by theballast tanks 4 which are installed on asupport frame 9. In the present example, the capacity of each of sixballast tanks 4 is, at least 1.5 m3. That is, the total capacity amounts to at least 9 m3. If a liquid having at least the density of water is used, the maximum possible difference between the penetration phase weight and the pulling phase weight may be 9000 kg. Of course, any other difference of more than 0 kg and less than 9000 kg may be used as well. - If there are two or
more ballast tanks 4, allballast tanks 4 may be interconnected viahoses common hose 13 or, as illustrated inFIG. 1 , a pair ofhoses - As illustrated in
FIG. 2 , the gravel is transported by abucket 11 that is guided by afork 2 to drop the gravel into thehopper 3 and from there into afirst tank 7. Thisfirst tank 7 is separated from thehopper 3 by an air tight gate. Further, thefirst tank 7 is separated from asecond tank 8 by another gate. The two gates together form the so called "double lock". - According to a further embodiment illustrated in
FIG. 3 , a variable weight load device (not shown) may be installed in a space between a lower end of abucket frame 520 holding at least onegravel bucket gravel bucket FIG. 3 , the variable weight load device may also include at least oneballast tank 4 which is/are installed in the space between the lower end of thebucket frame 520 and the at least onegravel bucket tank 15, one or twohoses FIGS. 1 and2 . The ground basedtank 15 is optional if the liquid is water, in which case the water can also come from a water mains or a surface water body (pond, lake, river) directly. - According to
FIG. 4 , a variable weight load device may include anadditional ballast weight 18 which is suspended bywire ropes 17. Thewire ropes 17 run through twowinches 19 which are coupled to thesilo pipe 12 and thevibroflot 16 coupled to thesilo pipe 12. As illustrated example, thewinches 19 are mounted to thehopper 3. Instead, the winches could be mounted to any other suitable part of therig 120. - When the
ballast weight 18 shall act to support penetration, i.e. during the penetration phases, it is lifted by thewinches 19 from the soil surface 201 (FIG. 5 ), while when it shall not act as additional weight, i.e. during the pulling phases, it can rest on the soil surface 201 (FIG. 6 ). If in a penetration phase theballast weight 18 is hovered above thesoil surface 201, theballast weight 18 is active and acts on therig 120 thereby supporting the penetration process. If in a pulling phase theballast weight 18 rests on thesoil surface 201, theballast weight 18 is inactive and does not act on therig 120 so that thecrawler crane 110 is not required to hold the weight of theballast weight 18. - Using this principle allows for quickly switching from a penetration phase to a pulling phase and vice versa since the
ballast weight 18 only has to be raised or lowered by a small distance. That is, in order to make a transition from the penetration phase to the pulling phase, theballast weight 18 may be moved along the soil penetrating tool so that it is moved from a suspended state into a state in which it rests on thesurface 201 of thesoil 200. As compared to the embodiments described with reference toFIGS. 1 to 3 , such a switching between the penetration phase and the pulling phase and vice versa is much faster than the time needed to fill or empty aballast tank 4. - The
ballast weight 18 may be a solid weight, e.g. made of stone or metal like iron, steel, etc, or a liquid-filled container. In case of a liquid-filled container, the same kinds of liquids described with reference toFIGS. 1 to 3 may be used. According to one example, theballast weight 18 may have a ring shape (e.g. a "donut shape") and surround the soil penetrating tool. - In the following, some example embodiments of the present invention are summarized here. Other embodiments can also be understood from the entirety of the specification and the claims filed herein.
- Example 1: An underground construction device for vibro compaction and stone column installation, or vibrated sheet pipe or pile segment, is temporarily ballasted by an extra weight during penetration phase.
- Example 2: The underground construction device of example 1 using liquid storage reservoirs as shown for example in
FIG. 1 andFIG. 2 that are filled and emptied via hoses and thereby allow to raise the total weight of the rig during its penetration to depth, when higher weight is favorable to reach the necessary depth, and reduce its weight during retrieval of the rig from the ground, so that the necessary pulling capacity of the carrier crane, which is pulling on lifting head, is minimized. - Example 3: The underground construction device of example 1 or 2, where the ballast weight is part of a secondary tool (for example the gravel bucket as per
Fig. 3 ) that is at least temporarily suspended not from a carrier rig but by the primary soil penetrating tool itself, thus adding extra weight to such tool during penetration without needing extra lifting capacity from the crawler crane. - Example 4: The underground construction device of one of examples 1 to 3, where the ballast weight, favorably in a ring-shape (e.g. "donut shape"), with the soil penetrating tool (e.g. vibroflot rig) running through the middle of such donut, is lifted by a winch attached to the soil penetrating tool but not connected to any secondary device such as gravel bucket.
- Example 5: The underground construction device of one of examples 1 to 4 having the advantage that the acting ballast weight can be rapidly changed by the ballast weight hovering close to the soil surface so it can be either fully suspended and hence act with its full weight or be deactivated by setting it on the ground surface.
- Example 6: The underground construction device of one of examples 4 and 5 with the ballast weight resting on the soil surface and the at least one winch allowing for a computer-controlled force activation that can mobilize any desired force between zero and the full weight of the ballast weight.
- Example 7: The underground construction device of any one of the preceding claims, wherein the device comprises a vibroflot.
- In all embodiments of the present invention, the underground construction device may be operated such that during none of the pulling phases the respective variable weight load device imposes weight on the soil penetrating tool. This helps to avoid that the initially described problems occur at any time.
- It is to be noted that the inventive principle is not restricted to the described embodiments. For example, the principles of the variable weight load device may be applied to any soil penetration tool with or without a vibrobflot. As a person of ordinary skill in the art will appreciate, these principles may also be realized without described details like the double-lock, the
bucket 11,bucket gravel reservoirs tank 15, thecrawler crane 110, etc. The invention is defined by the appended claims. -
- 1
- lifting head
- 2
- guide fork
- 3
- hopper
- 4
- ballast tank
- 5
- hose
- 7
- first tank
- 8
- second tank
- 9
- support frame
- 10
- hose
- 11
- bucket
- 12
- silo tube
- 13
- hose
- 14
- hose
- 15
- ground-based tank
- 16
- vibroflot
- 17
- rope
- 18
- extra ballast
- 19
- winch
- 100
- underground construction device
- 110
- crawler crane
- 120
- rig
- 200
- soil
- 201
- soil surface
- 520
- bucket frame
- 521
- bucket gravel reservoir
- 522
- bucket gravel reservoir
Claims (15)
- A method for introducing a soil penetrating tool into a soil (200) using a variable weight load device coupled to the soil penetration tool, the method comprising:a penetration phase during which the soil penetrating tool is at least partially driven into the soil (200) with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool, anda pulling phase during which the soil penetrating tool is at least partially pulled out of the soil (200) with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight;wherein the variable weight load device includes at least one liquid storage reservoir (4) and wherein:the at least one liquid storage reservoir (4) is filled with a liquid in order to provide the penetration phase weight;the liquid is at least partially removed from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight.
- The method of claim 1, wherein:
the difference between the penetration phase weight and the pulling phase weight is at least 1500 kg, at least 5000 kg or at least 10000 kg. - The method of claim 1 or 2, wherein:the liquid for filling the at least one liquid storage reservoir (4) in order to provide the penetration phase weight is taken from a ground-based tank (15); andthe liquid which is at least partially removed from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight is filled back into the ground-based tank (15).
- The method of one of the preceding claims, wherein:filling the at least one liquid storage reservoir (4) with the liquid in order to provide the penetration phase weight takes place via a first hose (14) connecting the liquid storage reservoir (4) and the ground-based tank (15); andat least partially removing the liquid from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight takes place via a second hose which (13) is different from the first hose (14) and which connects the liquid storage reservoir (4) and the ground-based tank (15).
- The method of one of the preceding claims, wherein:filling the at least one liquid storage reservoir (4) with the liquid in order to provide the penetration phase weight takes place via a common hose (13) connecting the liquid storage reservoir (4) and the ground-based tank (15); andat least partially removing the liquid from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight takes place via the common hose (13).
- The method of one of the preceding claims, wherein
the variable weight load device includes at least two liquid storage reservoirs (4) interconnected in fluid connection. - The method of one of the preceding claims, wherein the variable weight load device is different from a storage bucket (521, 522) for storing a filling material to be introduced in the soil (200).
- The method of one of the preceding claims comprising:
filling a filling material to be introduced in the soil (200) in a storage bucket (521, 522) which is different from the variable weight load device. - The method of claim 8 comprising:
introducing the filling material stored in the storage bucket (521, 522) in the soil (200) and subsequently compacting the introduced filling material using a vibroflot (16). - The method of one of the preceding claims comprising performing at least one of:vibro compaction;stone or sand column installation;concrete pile installation;vibrated sheet pipe installation;vibrated sheet pile installation.
- An underground construction device comprisinga soil penetrating tool;a variable weight load device coupled to the soil penetration tool and comprising at least one liquid storage reservoir (4); anda ground-based tank (15);the underground construction device being configured to:- perform a penetration phase during which the soil penetrating tool is at least partially driven into the soil (200) with the variable weight load device providing a penetration phase weight which acts on the soil penetrating tool, and- perform a pulling phase during which the soil penetrating tool is at least partially pulled out of the soil (200) with the variable weight load device providing a pulling phase weight which acts on the soil penetrating tool and which is lower than the penetration phase weight:- fill the at least one liquid storage reservoir (4) with a liquid in order to provide the penetration phase weight;- take the liquid for filling the at least one liquid storage reservoir (4) from the ground-based tank (15) in order to provide the penetration phase weight; and- at least partially remove the liquid from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight and to fill back the at least partly removed liquid in the ground-based tank (15).
- The underground construction device of claim 11 configured to provide a difference between the penetration phase weight and the pulling phase weight of at least 1500 kg, at least 5000 kg or at least 10000 kg.
- The underground construction device of one of claims 11 or 12 comprising a first hose (14) and a second hose (13) each connecting the liquid storage reservoir (4) and the ground-based tank (15), the underground construction device being configured to:fill the at least one liquid storage reservoir (4) with the liquid from the ground-based tank via (15) the first hose (14) in order to provide the penetration phase weight; andat least partially remove the liquid from the at least one liquid storage reservoir (4) in order to provide the pulling phase weight and fill back the at least partially removed liquid into the ground-based tank (15) via the second hose (13).
- The underground construction device of claims 11 to 13 comprising a common hose (13) connecting the liquid storage reservoir and the ground-based tank (15, the underground construction device being configured to:fill the at least one liquid storage reservoir with the liquid from the ground-based tank (15) via the common hose (13) in order to provide the penetration phase weight; andat least partially remove the liquid from the at least one liquid storage reservoir in order to provide the pulling phase weight and fill back the at least partially removed liquid into the ground-based tank via (15) the common hose (13).
- The underground construction device of one of claims 11 to 14, wherein:
the variable weight load device includes at least two liquid storage reservoirs (4) interconnected in fluid connection.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102020103576 | 2020-02-12 | ||
PCT/EP2021/053449 WO2021160798A1 (en) | 2020-02-12 | 2021-02-12 | Method for introducing a soil penetrating tool into a soil and underground construction device |
Publications (3)
Publication Number | Publication Date |
---|---|
EP4103785A1 EP4103785A1 (en) | 2022-12-21 |
EP4103785C0 EP4103785C0 (en) | 2024-11-06 |
EP4103785B1 true EP4103785B1 (en) | 2024-11-06 |
Family
ID=74595309
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP21705172.1A Active EP4103785B1 (en) | 2020-02-12 | 2021-02-12 | Method for introducing a soil penetrating tool into a soil and underground construction device |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP4103785B1 (en) |
WO (1) | WO2021160798A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP4335974B1 (en) * | 2022-09-08 | 2024-11-06 | Technische Universität Hamburg | Method of inserting a profile into the ground and vibrator assembly therefor |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1022241A (en) * | 1962-11-19 | 1966-03-09 | Albert George Bodine | Vibratory pile driver |
DE102004013790A1 (en) * | 2004-03-20 | 2005-10-06 | Josef Möbius Bau-Aktiengesellschaft | Rod shaped unit e.g. pipe, driving and moving out method for use in construction vehicle, involves providing two exciter cells whose torques are adjusted such that torques are brought in-phase on rod shaped unit |
DE102016113140A1 (en) * | 2016-07-15 | 2018-01-18 | Alexander Degen | Jogger arrangement for producing stuffing columns |
-
2021
- 2021-02-12 WO PCT/EP2021/053449 patent/WO2021160798A1/en unknown
- 2021-02-12 EP EP21705172.1A patent/EP4103785B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
WO2021160798A1 (en) | 2021-08-19 |
EP4103785C0 (en) | 2024-11-06 |
EP4103785A1 (en) | 2022-12-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835284B (en) | A kind of Pile In Drill In Karst Terrain structure and construction method | |
US4696607A (en) | Slurry trench method and apparatus for constructing underground walls | |
US4730954A (en) | Ground treatment | |
EP2929093B1 (en) | Soil densification system and method | |
CN105714834B (en) | A kind of construction technology of hardpan preexisting hole grouting behind shaft or drift lining H profile steel stake | |
CN203741820U (en) | Cast-in-situ bored pile structure for karst area | |
CN114108654A (en) | Construction method for removing obstacles in foundation pit area invaded by pressure-bearing water dock | |
EP4103785B1 (en) | Method for introducing a soil penetrating tool into a soil and underground construction device | |
US20090285637A1 (en) | Pile mandrel with extendable reaming members | |
CN109183790A (en) | A kind of Screw Pile and its construction tool and construction method | |
KR101358622B1 (en) | Apparatus for constructing stone column by adding vertical impact with a cycle and method for constructing stone column by the apparatus | |
EP3041998B1 (en) | Methods and apparatuses for compacting soil and granular materials | |
CN104131562A (en) | Pile-forming construction equipment for composite foundation piles | |
JP5876353B2 (en) | Steel pipe pile construction method | |
EP0084921B1 (en) | Piles | |
JP2008063916A (en) | Ground improvement construction method and ground improvement device | |
CN209162815U (en) | A kind of Screw Pile and its construction tool | |
JP4490710B2 (en) | Pile foundation construction equipment and construction method | |
CN113374481A (en) | Well drilling method well sinking process with drilling before and after | |
US1822550A (en) | Foundation for buildings, bridges, and the like | |
EP3969669B1 (en) | Filling chimney for deep vibrator arrangement, deep vibrator arrangement and method of operating a deep vibrator arrangement | |
Mangushev | Pile construction technology | |
CN215471979U (en) | Tubular pile production unloading auxiliary device | |
CN103774638B (en) | Arm pipe fusion type crawler belt dynamic replacement machine | |
KR102239806B1 (en) | Soft ground improvement method using mechanical replacement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20221004 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20240704 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602021021382 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
U01 | Request for unitary effect filed |
Effective date: 20241202 |
|
U07 | Unitary effect registered |
Designated state(s): AT BE BG DE DK EE FI FR IT LT LU LV MT NL PT RO SE SI Effective date: 20241211 |