[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

EP3578730A1 - Method for producing concrete staircases and staircase obtained by said method - Google Patents

Method for producing concrete staircases and staircase obtained by said method Download PDF

Info

Publication number
EP3578730A1
EP3578730A1 EP19164856.7A EP19164856A EP3578730A1 EP 3578730 A1 EP3578730 A1 EP 3578730A1 EP 19164856 A EP19164856 A EP 19164856A EP 3578730 A1 EP3578730 A1 EP 3578730A1
Authority
EP
European Patent Office
Prior art keywords
concrete
mold
lower mold
cover
volume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19164856.7A
Other languages
German (de)
French (fr)
Other versions
EP3578730B1 (en
Inventor
Bernard Michel
Benoit TATTEGRAIN
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PBM Groupe SAS
Original Assignee
PBM Groupe SAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PBM Groupe SAS filed Critical PBM Groupe SAS
Publication of EP3578730A1 publication Critical patent/EP3578730A1/en
Application granted granted Critical
Publication of EP3578730B1 publication Critical patent/EP3578730B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/0275Feeding a slurry or a ceramic slip
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • B28B7/225Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units for making stairs or stair units comprising more than one step
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • E04F11/032Spiral stairways supported by a central column
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F2011/0203Miscellaneous features of stairways not otherwise provided for
    • E04F2011/0205Stairways characterised by the use of specific materials for the supporting structure of the treads
    • E04F2011/021Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass
    • E04F2011/0212Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete
    • E04F2011/0214Stairways characterised by the use of specific materials for the supporting structure of the treads mainly of stone or stone like materials, e.g. concrete; mainly of glass mainly of concrete cast in situ

Definitions

  • the invention relates, in the first place, to a method for the realization on site or in the factory of concrete staircases, more particularly but not limited to the central drum type.
  • the invention also relates to concrete stairs obtained by the aforementioned method.
  • the first step is the establishment of a mold, defining a central column to form the drum.
  • the latter is made by casting concrete through the upper end of the mold defining such a central shaft. Then the concrete is poured on the areas of the mold to define the steps and risers. The concrete thus deposited is vibrated, then the operator equalizes the steps thus made including using a shovel or a trowel, then smooth concrete not yet massed with a trowel.
  • the finish must be strong enough to allow repeated passages of users without any wear or burst related to the presence of air bubbles. This explains the need for the presence of at least two layers of plaster, thereby increasing the loss of time.
  • the document CN 206170284 discloses a method of manufacturing a staircase from a mold.
  • the mold is thus available in several parts, including a bottom giving their shape to different steps and risers, side walls, a top cover closing the mold and constituting the future underside of the stairs. These different parts are then assembled to form a mold in which concrete is poured.
  • the staircase is manufactured not in position, so directly in operational mode for example on the site in question, but upside down.
  • the air bubbles that rise to the surface of the concrete are then found on the underside of the stairs. They are no longer on the surface of the steps and the passage of users is no longer a problem for the maintenance of the coating layer ensuring the finish.
  • the finishing step turns out to be much less crucial.
  • the prescribers of this type of staircase claiming a finished product free of any defects, including at the level of the lower face of the staircase, that is to say of the face opposite to that receiving the steps.
  • the method described does not allow the realization of the staircase in place in its final location, and secondly, it allows the manufacture of a single step height mold, and therefore involves having as many molds as stair types to achieve.
  • the present invention provides a method for obtaining a stone staircase or balanced barrel, or not, finished out of the mold, and requiring only very minor retouching, reducing the arduousness and dangerousness of work on the mold while allowing the manufacture of several step heights per mold.
  • the invention is directed to a method for producing on one-piece concrete staircases, in particular but not exclusively of the central drum type, using a closed mold composed of a lower mold and a top mold. or hood, defining between them a volume intended to be filled with concrete.
  • the invention consists first of all in implementing a closed mold, whose shape corresponds to the shape of the staircase to be made, and on the other hand, to inject the concrete with a consistency much more liquid than the traditional concretes used for the stairs, from the bottom end of the mold in an upward movement, in particular by means of a suitable pump, and more particularly a peristaltic pump.
  • Self-placing concrete therefore does not need to be vibrated, usually a very physical and painful operation, and has a greatly reduced number of air bubbles, making it possible to obtain a smoother finished product on the surface.
  • the various constituent elements of the upper mold or hood may consist of several sectors, in order to promote, on the one hand, their production, on the other hand their displacement, their storage, their implementation on the site and their demolding.
  • the internal face of the upper mold or hood that is to say the surface called to define the shape of the different steps and risers of the future staircase, is coated, in particular by spraying, with a mortar, prior to the injection of the self-placing concrete.
  • This mortar is mainly intended to trap the air resulting from the setting concrete mass between said concrete and mortar.
  • the mortar which is distinguished from concrete by the absence of gravel in its constitution, comes to form a perfectly smooth layer in contact with the inner wall of the hood.
  • the self-placing concrete is then injected into the mold and comes into contact with the mortar.
  • the last remaining air bubbles are trapped between the top of the concrete and the bottom of the mortar. They no longer appear on the surface of the walk, which appears smooth.
  • the inner wall of the cover is covered with mortar before mounting the cover on the lower mold. More advantageously, said mortar is sprayed on this surface, thereby reducing the preparation time of the mold cover.
  • the lower and upper molds or bonnet are pre-coated, on their internal face, that is to say on their face intended to receive the self-placing concrete, a component capable of promoting demolding, and in particular demolding oil.
  • the demolding oil is previously deposited on said inner face.
  • the concrete is injected from the base of a column, able to define said central casing, said column communicating with the volume defined by the two molds respectively lower and upper, by means of through lights.
  • the concrete being injected at the base or lower end of the column rises in it and, as and when, fills the volume defined by the two molds, so as to obtain a staircase of character monobloc also integrating the central shaft.
  • the self-placing concrete used belongs to the SF2 class (spread between 660 mm and 750 mm), or to the SF3 class (spread between 760 mm and 850 mm), these two classes being defined by the NF EN 206 standard, the spreading being a test described by standard NF EN 12350-8.
  • stiffeners are integrated and fixed to the lower mold before placing the mold or upper cover.
  • the invention also relates to monobloc concrete stairs implementing the method described above.
  • the figure 1 therefore represents the fundamental elements for the realization of a monobloc staircase free from any central shaft, and in this case a bench-top staircase.
  • reference (1) designates the staircase resulting from the implementation of the method according to the invention
  • reference (2) designates the lower mold
  • references (3) and (4) designate two sectors of the hood or upper mold, intended to cooperate with the lower mold (2).
  • the method of the invention is aimed at producing a one-piece concrete staircase in position.
  • the lower mold is fixed to the ground to prevent lifting during demolding of the staircase.
  • This lower mold typically made of steel, has in this case a flat and inclined bottom (5), since as well, the underside of the staircase has no specific technical function.
  • the lower mold (2) is intended to receive a hood or upper mold (3) and (4), also steel, whose shape specifically corresponds to the different steps and risers of the staircase to achieve.
  • the upper cover (3) and (4) is therefore intended to be positioned on the lower mold (2), the latter being provided for this purpose with lateral cutouts (6) able to receive in support of said upper cover (3) and ( 4) of corresponding form, and this, as already said, to define the steps and risers.
  • the fixation of the upper mold or cover on the lower mold is obtained by means of bolts and centerers distributed along the central shaft on the one hand, and at the outer edges, by means of rods and nuts or bolts. associated with centrers.
  • This concrete is of the self-placing type of SF2 minimum class, that is to say, having a spreading at Abrham cones greater than 660 mm.
  • the objective of such a relatively liquid concrete is, on the one hand, to allow its rise within the mold, in particular by implementing a peristaltic pump and, on the other hand, to reduce macro-bubbling, a constituent element one of the disadvantages of the methods of the prior art.
  • such a concrete has a grit / sand ratio of between 0.5 and 1.4, typically close to 1.
  • the cement a key element of the concrete, is dosed between 280 and 500 kg / m 3 of concrete, and typically close to 340 kg / m 3 .
  • the equivalent water / binder ratio in the sense of the EN206 standard is 0.3 to 0.6, typically close to 0.5.
  • Such a concrete is also likely to receive additives in the sense of standard EN206 of the dairy type, metakaolin, fly ash, calcareous filler, to complete the particle size, optimize the costs or mechanical performance.
  • a super-plasticizer or water reducer with a dosage close to 3 l / m 3 .
  • a superplasticizer thus added may be of the high water reduction type, such as a polycarboxylate.
  • a demolding oil may consist of a solvent (for example sold under the reference Grace wax E-31), a synthetic oil (for example marketed under the reference Chryso Dem Oléo 64), a vegetable oil or vegetable-based (for example marketed under the reference Grace Decobio S33).
  • the inner face of the hoods (3) and (4) is coated, in particular by spraying, that is to say, including at the level of what will be the step and the riser of the staircase, a mortar intended as already said to include imprison any bubbles resulting from the concrete between said mortar and concrete, besides promoting the appearance of the steps.
  • the demolding oil having previously coated the inner face of said covers (3) and (4) is chosen so that the mortar adheres to the fresh state on the hood, but not to the hardened state. It may be an oil of the type previously described. This oil is selected precisely following the completion of various tests, during which we observe the possible detachment of the mortar from the mold and micro-bubbling phenomena or tasks that can appear on the siding. The selection of the oil therefore depends on locally available materials to manufacture the mortar, concrete and equipment used for the application (spraying, scraping or not).
  • the lower mold (2) comprises, in its central position, a column portion, intended to cooperate with the upper covers, each provided with a complementary column portion with that of the lower mold, in order to define a cylinder (in the case of circular base case) adapted to define the shaft or central core.
  • stiffening elements (10) in this case both horizontal and vertical.
  • stiffeners have the main function to resume the thrust of the concrete resulting from the injection, especially at the lower level. This thrust of the concrete is exerted perpendicular to all surfaces, and it may be necessary to block the vertical forces but also horizontal, in particular to avoid rotation of the hoods during the injection of concrete.
  • stiffeners may consist of tubular reinforcing bars, in particular of square cross-section, disposed on the top cover, vertically to each of the risers, the diagonals of the square sections being oriented respectively in the horizontal and in the vertical direction.
  • the stiffeners can also result from an assembly of folded and welded sheets.
  • These stiffeners can be fixed with a rod / nut clamping, by means of a profile notched for this purpose, allowing a certain flexibility in the initial positioning of the cover, and the inclination of the profiles at 45 ° allows a good recovery of the horizontal forces and vertical. The tightening then tends to position the hood in the optimum position.
  • the invention relates to monobloc concrete stairs cast in position obtained by the method of the invention. If the mechanical properties of these stairs do not differ or little from the stairs made with the traditional production methods, on the other hand they have a state of finishing very much improved, because of the absence or near-absence of micro-bubbling bursting on the upper surface of the steps, generating a considerable gain in terms of duration of implementation.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Ce procédé pour la réalisation d'escaliers monoblocs en béton met en oeuvre un moule fermé, composé d'un moule inférieur (2) et d'un moule supérieur ou capot (3, 4), définissant entre eux un volume destiné à être rempli par du béton.This method for producing one-piece concrete staircases uses a closed mold consisting of a lower mold (2) and an upper mold or cover (3, 4) defining between them a volume intended to be filled. by concrete.

Ce procédé consiste :
▪ à fixer et installer le moule inférieur (2) en position opérationnelle;
▪ à positionner le moule supérieur ou capot (3, 4) en regard dudit moule inférieur (2) et à le fixer sur ledit moule inférieur ;
▪ à injecter dans le volume défini par les deux moules respectivement inférieur (2) et supérieur (3, 4), et à partir de la base inférieure dudit volume, du béton notamment de type auto-plaçant, jusqu'à combler l'intégralité dudit volume ;
▪ après prise en masse du béton, à ôter le moule supérieur et le moule inférieur, et donc à démouler l'escalier ainsi réalisé.

Figure imgaf001
This process consists of:
▪ to fix and install the lower mold (2) in operational position;
Positioning the upper mold or cover (3, 4) facing said lower mold (2) and fixing it on said lower mold;
▪ to inject into the volume defined by the two molds respectively lower (2) and upper (3, 4), and from the lower base of said volume, concrete including self-placing type, to fill the entirety said volume;
▪ after cementing the concrete, remove the upper mold and the lower mold, and thus unmold the stair thus produced.
Figure imgaf001

Description

DOMAINE DE L'INVENTIONFIELD OF THE INVENTION

L'invention concerne, en premier lieu, un procédé pour la réalisation sur site ou en usine d'escaliers en béton, plus particulièrement mais cependant non limitativement du type à fût central.The invention relates, in the first place, to a method for the realization on site or in the factory of concrete staircases, more particularly but not limited to the central drum type.

L'invention concerne également les escaliers en béton obtenus par le procédé précité.The invention also relates to concrete stairs obtained by the aforementioned method.

ETAT ANTERIEUR DE LA TECHNIQUEPRIOR STATE OF THE TECHNIQUE

Traditionnellement, la réalisation d'escaliers en béton, notamment de type monobloc, sont réalisés sur site. Cependant, de plus en plus, ces escaliers sont réalisés en usine, puis transportés et mis en place sur site.Traditionally, the realization of concrete stairs, including monobloc type, are made on site. However, more and more, these stairs are made in factory, then transported and set up on site.

Ainsi, dans le cadre de la réalisation de tels escaliers en béton directement sur site, ils sont réalisés de la manière suivante, par exemple dans le cas où l'escalier comporte un fût central.Thus, in the context of the realization of such concrete stairs directly on site, they are made in the following manner, for example in the case where the staircase comprises a central shaft.

On procède tout d'abord à la mise en place d'un moule, définissant une colonne centrale destinée à constituer le fût. Ce dernier est réalisé en coulant du béton par l'extrémité supérieure du moule définissant un tel fût central. Puis l'on procède au coulage du béton sur les zones du moule destinées à définir les marches et contremarches. Le béton ainsi déposé est vibré, puis l'opérateur égalise les marches ainsi réalisées notamment à l'aide d'une pelle ou d'une truelle, puis lisse le béton non encore pris en masse avec une lisseuse.The first step is the establishment of a mold, defining a central column to form the drum. The latter is made by casting concrete through the upper end of the mold defining such a central shaft. Then the concrete is poured on the areas of the mold to define the steps and risers. The concrete thus deposited is vibrated, then the operator equalizes the steps thus made including using a shovel or a trowel, then smooth concrete not yet massed with a trowel.

En effet, classiquement, il se crée concomitamment avec le coulage du béton, des bulles d'air, qui remontent en surface lors de la prise en masse du béton. Ces bulles d'air peuvent se figer dans la masse du béton, mais peuvent également éclater à la surface supérieure de chacune des marches, faisant apparaître des cratères, qu'il convient d'éliminer. Ce phénomène de bullage, bien connu dans le domaine considéré, engendre la nécessité de procéder à une deuxième opération de lissage lorsque le béton a débuté sa prise.In fact, conventionally, it is created concomitantly with the pouring of concrete, air bubbles, which rise to the surface when the concrete is hardened. These air bubbles can congeal in the mass of the concrete, but can also burst on the upper surface of each of the steps, causing craters to appear which should be removed. This bubbling phenomenon, well known in the field under consideration, gives rise to the need for a second smoothing operation when the concrete has begun to set.

Qui plus est, il n'est pas rare nonobstant cette double opération de lissage, qu'un dépôt d'un autre revêtement ou enduit soit mis en oeuvre sur le parement des pièces en béton, dans un souci d'esthétique notamment, afin de complètement escamoter ce phénomène de bullage.What is more, it is not uncommon despite this double smoothing operation, a deposit of another coating or coating is implemented on the facing of concrete parts, for the sake of aesthetics including, in order to completely avoid this bubbling phenomenon.

D'ores et déjà, on comprendra aisément que la réalisation des escaliers en béton monoblocs, tel que décrit précédemment, que ces escaliers soient réalisés sur site ou en usine entraîne un travail important de finition, tout particulièrement chronophage.From now on, it will be readily understood that the realization of one-piece concrete staircases, as described above, that these stairs are made on site or in the factory involves significant finishing work, especially time-consuming.

Par ailleurs, bien que certaines techniques, comme la vibration du béton, aient été développées afin de réduire ce problème, le produit sort néanmoins bullé et nécessite alors un important travail de finition pour masquer ces bulles.In addition, although some techniques, such as the vibration of concrete, have been developed to reduce this problem, the product nevertheless comes out bubbled and then requires a major finishing work to hide these bubbles.

De plus, la finition se doit d'être suffisamment solide pour permettre les passages répétés des usagers sans présenter aucune usure ou éclatement lié à la présence de bulles d'air. Ceci explique la nécessité de la présence d'au moins deux couches d'enduit, accroissant d'autant la perte de temps.In addition, the finish must be strong enough to allow repeated passages of users without any wear or burst related to the presence of air bubbles. This explains the need for the presence of at least two layers of plaster, thereby increasing the loss of time.

En outre, la réalisation de tels escaliers s'accompagne d'une grande pénibilité pour le ou les opérateurs, dans la mesure où ces derniers doivent procéder, outre au coulage du béton, à son égalisation au niveau de chacune des marches notamment à l'aide d'une pelle, étant souligné que cette opération est à réaliser alors même que le béton n'est pas pris en masse, et que l'opérateur est plus ou moins en position d'équilibriste sur les contreforts éventuels du moule. Outre cet aspect de pénibilité, vient se rajouter une problématique de sécurité, justement en raison du positionnement de l'opérateur un peu comme il peut, pour assurer cette opération d'égalisation des marches puis de lissage du béton, l'opérateur devant travailler dans l'escalier en cours de réalisation, courbé à même le moule à plusieurs mètres de hauteur, les risques de chute étant bien présents.In addition, the realization of such stairs is accompanied by great difficulty for the operator or operators, to the extent that they must proceed, in addition to pouring concrete, its equalization at each of the steps including the using a shovel, being stressed that this operation is to be carried out even though the concrete is not set in mass, and that the operator is more or less balancing on the buttresses of the mold. In addition to this aspect of arduousness, is added a security problem, precisely because of the positioning of the operator a little as he can, to ensure the operation of equalizing steps and smoothing concrete, the operator to work in the stairs in progress, bent into the mold several meters high, the risk of falling being present.

Enfin, en raison de la mise en oeuvre d'un béton relativement ferme, il convient traditionnellement de procéder à une opération de vibration du moule ou interne avec des aiguilles vibrantes, rajoutant aux inconvénients précités une nuisance sonore, affectant de manière supplémentaire les conditions de travail de l'opérateur.Finally, because of the use of a relatively firm concrete, it is customary to carry out a vibration operation of the mold or internal with vibrating needles, adding to the aforementioned drawbacks a noise nuisance, further affecting the conditions of the work of the operator.

Des solutions ont été proposées pour remédier à ces inconvénients. Ainsi, le document CN 206170284 décrit un procédé de fabrication d'un escalier à partir d'un moule. Le moule est ainsi disponible en plusieurs parties, dont un fond donnant leurs formes aux différentes marches et contremarches, des parois latérales, un capot supérieur refermant le moule et constituant la future face inférieure de l'escalier. Ces différentes parties sont ensuite assemblées afin de constituer un moule dans lequel du béton est coulé.Solutions have been proposed to overcome these disadvantages. Thus, the document CN 206170284 discloses a method of manufacturing a staircase from a mold. The mold is thus available in several parts, including a bottom giving their shape to different steps and risers, side walls, a top cover closing the mold and constituting the future underside of the stairs. These different parts are then assembled to form a mold in which concrete is poured.

Cependant, l'escalier est fabriqué non pas en position, donc directement en mode opérationnel par exemple sur le site considéré, mais à l'envers. De ce fait, les bulles d'air qui remontent à la surface du béton, se retrouvent alors sur la face inférieure de l'escalier. Elles ne sont donc plus sur la surface des marches et le passage des usagers ne constitue alors plus un problème pour la tenue de la couche d'enduit assurant la finition. L'étape de finition s'avère donc être beaucoup moins cruciale.However, the staircase is manufactured not in position, so directly in operational mode for example on the site in question, but upside down. As a result, the air bubbles that rise to the surface of the concrete are then found on the underside of the stairs. They are no longer on the surface of the steps and the passage of users is no longer a problem for the maintenance of the coating layer ensuring the finish. The finishing step turns out to be much less crucial.

En revanche, bien que la partie affectée par le phénomène de bullage n'affecte plus la surface visible des marches, l'étape de finition demeure nécessaire, les prescripteurs de ce type d'escalier réclamant un produit fini exempt de tout défaut, y compris au niveau de la face inférieure de l'escalier, c'est-à-dire de la face opposée à celle recevant les marches.On the other hand, although the part affected by the bubbling phenomenon no longer affects the visible surface of the steps, the finishing step remains necessary, the prescribers of this type of staircase claiming a finished product free of any defects, including at the level of the lower face of the staircase, that is to say of the face opposite to that receiving the steps.

Mais d'autre part et surtout, d'une part le procédé décrit ne permet pas la réalisation de l'escalier en place en son lieu définitif, et d'autre part, il ne permet la fabrication que d'une seule hauteur de marche par moule, et implique donc de disposer d'autant de moules que de types d'escalier à réaliser.But on the other hand and above all, on the one hand the method described does not allow the realization of the staircase in place in its final location, and secondly, it allows the manufacture of a single step height mold, and therefore involves having as many molds as stair types to achieve.

La présente invention propose un procédé permettant l'obtention d'un escalier à noyau ou balancé à fût, ou non, fini en sortie du moule, et ne nécessitant que des retouches très mineures, réduisant la pénibilité et la dangerosité liées au travail sur le moule tout en autorisant la fabrication de plusieurs hauteurs de marche par moule.The present invention provides a method for obtaining a stone staircase or balanced barrel, or not, finished out of the mold, and requiring only very minor retouching, reducing the arduousness and dangerousness of work on the mold while allowing the manufacture of several step heights per mold.

DESCRIPTION SOMMAIRE DE L'INVENTIONSUMMARY DESCRIPTION OF THE INVENTION

A cet effet, l'invention vise un procédé pour la réalisation sur d'escaliers monoblocs en béton, notamment mais non exclusivement de type à fût central, mettant en oeuvre un moule fermé, composé d'un moule inférieur et d'un moule supérieur ou capot, définissant entre eux un volume destiné à être rempli par du béton.For this purpose, the invention is directed to a method for producing on one-piece concrete staircases, in particular but not exclusively of the central drum type, using a closed mold composed of a lower mold and a top mold. or hood, defining between them a volume intended to be filled with concrete.

Ce procédé consiste :

  • ▪ à fixer et installer le moule inférieur en position opérationnelle ;
  • ▪ à positionner le moule supérieur ou capot en regard dudit moule inférieur et à le fixer sur ledit moule inférieur ;
  • ▪ à injecter dans le volume défini par les deux moules respectivement inférieur et supérieur, et à partir de la base inférieure dudit volume, du béton notamment de type auto-plaçant, jusqu'à combler l'intégralité dudit volume ;
  • ▪ après prise en masse du béton, à ôter le moule supérieur et le moule inférieur, et donc à démouler l'escalier ainsi réalisé.
This process consists of:
  • ▪ to fix and install the lower mold in operational position;
  • Positioning the upper mold or cowl facing said lower mold and fixing it on said lower mold;
  • ▪ to inject into the volume defined by the two molds respectively lower and upper, and from the lower base of said volume, concrete including self-placing type, to fill the entirety of said volume;
  • ▪ after cementing the concrete, remove the upper mold and the lower mold, and thus unmold the stair thus produced.

En d'autres termes, contrairement aux procédés classiques et traditionnels de réalisation d'escaliers en béton, l'invention consiste tout d'abord à mettre en oeuvre un moule fermé, dont la forme correspond à la forme de l'escalier à réaliser, et d'autre part, à injecter le béton de consistance nettement plus liquide que les bétons traditionnels mis en oeuvre pour les escaliers, à partir de l'extrémité inférieure du moule selon un mouvement ascendant, notamment au moyen d'une pompe adaptée, et plus particulièrement d'une pompe péristaltique. Le béton auto-plaçant n'a donc pas besoin d'être vibré, opération usuellement très physique et pénible, et présente un nombre fortement réduit de bulles d'air, permettant d'obtenir un produit fini plus lisse en surface.In other words, unlike traditional and traditional methods of making concrete stairs, the invention consists first of all in implementing a closed mold, whose shape corresponds to the shape of the staircase to be made, and on the other hand, to inject the concrete with a consistency much more liquid than the traditional concretes used for the stairs, from the bottom end of the mold in an upward movement, in particular by means of a suitable pump, and more particularly a peristaltic pump. Self-placing concrete therefore does not need to be vibrated, usually a very physical and painful operation, and has a greatly reduced number of air bubbles, making it possible to obtain a smoother finished product on the surface.

Selon l'invention, les différents éléments constitutifs du moule supérieur ou capot, peuvent être constitués de plusieurs secteurs, afin de favoriser, d'une part leur réalisation, d'autre part leur déplacement, leur stockage, leur mise en place sur le site et leur démoulage.According to the invention, the various constituent elements of the upper mold or hood, may consist of several sectors, in order to promote, on the one hand, their production, on the other hand their displacement, their storage, their implementation on the site and their demolding.

Selon une autre caractéristique de l'invention, on enduit, notamment par pulvérisation, la face interne du moule supérieur ou capot, c'est-à-dire la surface appelée à définir la forme des différentes marches et contremarches du futur escalier, d'un mortier, préalablement à l'injection du béton auto-plaçant. Ce mortier a principalement pour vocation d'emprisonner l'air résultant de la prise en masse du béton entre ledit béton et le mortier. Le choix particulier du béton auto-plaçant d'une part, et du mortier d'autre part, permet d'éviter que les bulles d'air ne percent à la surface supérieure de l'escalier après démoulage.According to another characteristic of the invention, the internal face of the upper mold or hood, that is to say the surface called to define the shape of the different steps and risers of the future staircase, is coated, in particular by spraying, with a mortar, prior to the injection of the self-placing concrete. This mortar is mainly intended to trap the air resulting from the setting concrete mass between said concrete and mortar. The particular choice of self-placing concrete on the one hand, and the mortar on the other hand, makes it possible to prevent the air bubbles from piercing on the upper surface of the staircase after demolding.

Le mortier, qui se distingue du béton par l'absence de gravillons dans sa constitution, vient former une couche parfaitement lisse au contact de la paroi interne du capot. Le béton auto-plaçant est ensuite injecté dans le moule et vient au contact du mortier. Les dernières bulles d'air susceptibles de subsister, sont alors emprisonnées entre la partie supérieure du béton et la partie inférieure du mortier. Elles n'apparaissent donc plus en surface de la marche qui apparaît comme lisse.The mortar, which is distinguished from concrete by the absence of gravel in its constitution, comes to form a perfectly smooth layer in contact with the inner wall of the hood. The self-placing concrete is then injected into the mold and comes into contact with the mortar. The last remaining air bubbles are trapped between the top of the concrete and the bottom of the mortar. They no longer appear on the surface of the walk, which appears smooth.

De fait et selon l'invention, le mortier mis en oeuvre comprend :

  • ▪ entre 5 et 50 % en masse de ciment ;
  • ▪ entre 40 et 95 % en masse d'agrégats fins (notamment sables, filler) ;
  • ▪ un mélange d'adjuvants choisis dans le groupe comprenant les super-plastifiants, les accélérateurs de prise en masse, les retardateurs de prise en masse, les agents anti-retrait, etc..
In fact and according to the invention, the mortar used comprises:
  • ▪ between 5 and 50% by weight of cement;
  • ▪ Between 40 and 95% by weight of fine aggregates (especially sand, filler);
  • A mixture of adjuvants selected from the group consisting of super-plasticizers, caking accelerators, caking retarders, anti-removal agents, etc.

Avantageusement, la paroi interne du capot est recouverte de mortier avant le montage du capot sur le moule inférieur. Plus avantageusement, ledit mortier est projeté sur cette surface, permettant ainsi de réduire la durée de préparation du capot du moule.Advantageously, the inner wall of the cover is covered with mortar before mounting the cover on the lower mold. More advantageously, said mortar is sprayed on this surface, thereby reducing the preparation time of the mold cover.

Par ailleurs, et selon une autre caractéristique de l'invention, les moules inférieur et supérieur ou capot sont préalablement enduit, sur leur face interne, c'est-à-dire sur leur face destinée à recevoir le béton auto-plaçant, d'un composant apte à favoriser le démoulage, et notamment de l'huile de démoulage.Furthermore, and according to another characteristic of the invention, the lower and upper molds or bonnet are pre-coated, on their internal face, that is to say on their face intended to receive the self-placing concrete, a component capable of promoting demolding, and in particular demolding oil.

Lorsque le capot reçoit sur sa face interne le mortier précédemment évoqué, l'huile de démoulage est préalablement déposée sur ladite face interne.When the cover receives on its internal face the previously mentioned mortar, the demolding oil is previously deposited on said inner face.

Dans le cas plus particulier de réalisation d'escaliers monoblocs en béton à fut central, l'injection du béton est réalisée à partir de la base d'une colonne, apte à définir ledit fût central, ladite colonne communiquant avec le volume défini par les deux moules respectivement inférieur et supérieur, au moyen de lumières traversantes. Ce faisant, le béton étant injecté au niveau de la base ou extrémité inférieure de la colonne, monte dans celle-ci et, au fur et à mesure, remplit le volume défini par les deux moules, de telle sorte à obtenir un escalier de caractère monobloc intégrant également le fût central.In the more specific case of one-block concrete staircases with central casing, the concrete is injected from the base of a column, able to define said central casing, said column communicating with the volume defined by the two molds respectively lower and upper, by means of through lights. In doing so, the concrete being injected at the base or lower end of the column, rises in it and, as and when, fills the volume defined by the two molds, so as to obtain a staircase of character monobloc also integrating the central shaft.

Avantageusement, le béton auto-plaçant utilisé appartient à la classe SF2 (étalement compris entre 660mm et 750mm), ou à la classe SF3 (étalement compris entre 760mm et 850mm), ces deux classes étant définies par la norme NF EN 206, l'étalement étant un essai décrit par la norme NF EN 12350-8.Advantageously, the self-placing concrete used belongs to the SF2 class (spread between 660 mm and 750 mm), or to the SF3 class (spread between 760 mm and 850 mm), these two classes being defined by the NF EN 206 standard, the spreading being a test described by standard NF EN 12350-8.

Selon l'invention, et lorsque cela est requis, des raidisseurs sont intégrés et fixés au moule inférieur avant mise en place du moule ou capot supérieur.According to the invention, and when required, stiffeners are integrated and fixed to the lower mold before placing the mold or upper cover.

L'invention vise également les escaliers monoblocs en béton mettant en oeuvre le procédé décrit précédemment.The invention also relates to monobloc concrete stairs implementing the method described above.

BREVE DESCRIPTION DES FIGURESBRIEF DESCRIPTION OF THE FIGURES

La manière dont l'invention peut être réalisée, et les avantages qui en découlent, ressortiront mieux des exemples de réalisation qui suivent, donnés à titre indicatif et non limitatif à l'appui des figures annexées.

  • La figure 1 est une vue en éclaté des éléments constitutifs du moule pour obtenir un escalier exempt de fût central conforme au procédé de l'invention.
  • La figure 2 est une vue analogue à la figure 1 mais d'un escalier à fût central.
  • La figure 3 est une représentation schématique en perspective du moule inférieur pour la réalisation d'un escalier à fût central, dont la figure 4 est une vue de détail et la figure 5 une vue en section sagittale.
  • La figure 6 est une représentation schématique en perspective du moule inférieur pour la réalisation de l'escalier à fût central, faisant apparaître les raidisseurs le cas échéant mis en oeuvre dans le cadre du procédé de l'invention.
The way in which the invention can be realized, and the advantages which result therefrom, will emerge more clearly from the following exemplary embodiments, given as an indication and not a limitation to the accompanying figures.
  • The figure 1 is an exploded view of the constituent elements of the mold to obtain a staircase free of central shaft according to the method of the invention.
  • The figure 2 is a view similar to the figure 1 but of a staircase with central shaft.
  • The figure 3 is a schematic representation in perspective of the lower mold for the realization of a staircase with central shaft, whose figure 4 is a detail view and the figure 5 a sagittal section view.
  • The figure 6 is a schematic representation in perspective of the lower mold for the realization of the staircase with central shaft, showing the stiffeners where appropriate implemented in the context of the method of the invention.

DESCRIPTION DETAILLEE DE L'INVENTIONDETAILED DESCRIPTION OF THE INVENTION

La figure 1 représente donc les éléments fondamentaux pour la réalisation d'un escalier monobloc exempt de tout fût central, et en l'espèce d'un escalier à paillasse.The figure 1 therefore represents the fundamental elements for the realization of a monobloc staircase free from any central shaft, and in this case a bench-top staircase.

Plus précisément, la référence (1) désigne l'escalier résultant de la mise en oeuvre du procédé conforme à l'invention, la référence (2) désigne le moule inférieur et les références (3) et (4) désignent deux secteurs du capot ou moule supérieur, destiné à coopérer avec le moule inférieur (2)..More specifically, the reference (1) designates the staircase resulting from the implementation of the method according to the invention, reference (2) designates the lower mold and references (3) and (4) designate two sectors of the hood or upper mold, intended to cooperate with the lower mold (2).

Comme déjà indiqué précédemment, le procédé de l'invention vise la réalisation d'un escalier monobloc en béton en position. A cet effet, le moule inférieur est fixé au sol pour éviter un soulèvement en phase de démoulage de l'escalier. Ce moule inférieur, typiquement réalisé en acier, présente dans le cas d'espèce un fond plat et incliné (5), puisqu'aussi bien, la face inférieure de l'escalier n'a pas de fonction technique spécifique.As already indicated above, the method of the invention is aimed at producing a one-piece concrete staircase in position. For this purpose, the lower mold is fixed to the ground to prevent lifting during demolding of the staircase. This lower mold, typically made of steel, has in this case a flat and inclined bottom (5), since as well, the underside of the staircase has no specific technical function.

En revanche, le moule inférieur (2) est destiné à recevoir un capot ou moule supérieur (3) et (4), également en acier, dont la forme correspond spécifiquement aux différentes marches et contremarches de l'escalier à réaliser.In contrast, the lower mold (2) is intended to receive a hood or upper mold (3) and (4), also steel, whose shape specifically corresponds to the different steps and risers of the staircase to achieve.

Le capot supérieur (3) et (4) a donc vocation à être positionné sur le moule inférieur (2), ce dernier étant muni à cet effet de découpes latérales (6) aptes à recevoir en appui ledit capot supérieur (3) et (4) de forme correspondante, et ce, comme déjà dit, pour définir les marches et contremarches. Typiquement, la fixation du moule supérieur ou capot sur le moule inférieur est obtenue au moyen de boulons et de centreurs répartis le long du fût central d'une part, et au niveau des rives externes, au moyen de tiges et écrous ou encore de boulons associés à des centreurs.The upper cover (3) and (4) is therefore intended to be positioned on the lower mold (2), the latter being provided for this purpose with lateral cutouts (6) able to receive in support of said upper cover (3) and ( 4) of corresponding form, and this, as already said, to define the steps and risers. Typically, the fixation of the upper mold or cover on the lower mold is obtained by means of bolts and centerers distributed along the central shaft on the one hand, and at the outer edges, by means of rods and nuts or bolts. associated with centrers.

On a illustré sur cette figure, et notamment au niveau du moule inférieur (2) des orifices traversants (7), positionnés au choix sur ou sous la contremarche numéro 1, ou au niveau de la rive intérieure ou extérieure dudit moule. Il convient en effet de rappeler que selon invention, le béton constitutif de l'escalier (1) à réaliser est injecté à partir de la base, donc de l'extrémité inférieure du moule.Illustrated in this figure, and in particular at the lower mold (2) through holes (7), optionally positioned on or under the riser number 1, or at the inner or outer edge of said mold. It should be remembered that according to the invention, the constituent concrete staircase (1) to be produced is injected from the base, so the lower end of the mold.

Ce béton est du type auto-plaçant de classe SF2 minimum, c'est-à-dire, présentant un étalement aux cônes d'Abrhams supérieur à 660 mm. L'objectif d'un tel béton relativement liquide est, d'une part, de permettre son ascension au sein du moule, notamment en mettant en oeuvre une pompe péristaltique et, d'autre part, de diminuer le macro-bullage, élément constituant l'un des inconvénients des procédés de l'art antérieur.This concrete is of the self-placing type of SF2 minimum class, that is to say, having a spreading at Abrham cones greater than 660 mm. The objective of such a relatively liquid concrete is, on the one hand, to allow its rise within the mold, in particular by implementing a peristaltic pump and, on the other hand, to reduce macro-bubbling, a constituent element one of the disadvantages of the methods of the prior art.

A titre exemplatif, un tel béton présente un rapport gravillon / sable compris entre 0,5 et 1,4, typiquement voisin de 1. Le ciment, élément phare du béton, est dosé entre 280 et 500 kg/m3 de béton, et typiquement voisin de 340 kg/m3. Le rapport eau / liant équivalent au sens de la norme EN206 est de 0,3 à 0,6, typiquement voisin de 0,5.By way of example, such a concrete has a grit / sand ratio of between 0.5 and 1.4, typically close to 1. The cement, a key element of the concrete, is dosed between 280 and 500 kg / m 3 of concrete, and typically close to 340 kg / m 3 . The equivalent water / binder ratio in the sense of the EN206 standard is 0.3 to 0.6, typically close to 0.5.

Un tel béton est également susceptible de recevoir des additifs au sens de la norme EN206 du type laitier, métakaolin, cendres volantes, filler calcaire, ce pour compléter la granulométrie, optimiser les coûts ou les performances mécaniques.Such a concrete is also likely to receive additives in the sense of standard EN206 of the dairy type, metakaolin, fly ash, calcareous filler, to complete the particle size, optimize the costs or mechanical performance.

Avantageusement on intègre des adjuvants au mélange : un super-plastifiant ou réducteur d'eau avec un dosage voisin de 3 l/m3. Un superplastifiant ainsi ajouté peut être du type à haute réduction d'eau, tel qu'un polycarboxylate.Advantageously admixtures are added to the mixture: a super-plasticizer or water reducer with a dosage close to 3 l / m 3 . A superplasticizer thus added may be of the high water reduction type, such as a polycarboxylate.

Selon une caractéristique avantageuse, préalablement à l'injection de béton dans le moule constitué des éléments (2), (3) et (4), les parois internes dudit moule sont revêtues d'une huile de démoulage appliquée par exemple au pulvérisateur. Une telle huile de démoulage peut être constituée d'une solvantée (par exemple commercialisée sous la référence Grâce cire E-31), d'une huile de synthèse (par exemple commercialisée sous la référence Chryso Dem Oléo 64), d'une huile végétale ou à base végétale (par exemple commercialisée sous la référence Grâce Décobio S33).According to an advantageous characteristic, prior to the injection of concrete into the mold consisting of elements (2), (3) and (4), the internal walls of said mold are coated with a release oil applied for example to the sprayer. Such a demolding oil may consist of a solvent (for example sold under the reference Grace wax E-31), a synthetic oil (for example marketed under the reference Chryso Dem Oléo 64), a vegetable oil or vegetable-based (for example marketed under the reference Grace Decobio S33).

Selon encore une autre caractéristique avantageuse de l'invention, on enduit, notamment par pulvérisation, la face interne des capots (3) et (4), c'est-à-dire y compris au niveau de ce qui sera la marche et la contremarche de l'escalier, d'un mortier destiné comme déjà dit à notamment emprisonner les éventuelles bulles résultant du béton entre ledit mortier et le béton, outre à favoriser l'aspect extérieur des marches.According to yet another advantageous characteristic of the invention, the inner face of the hoods (3) and (4) is coated, in particular by spraying, that is to say, including at the level of what will be the step and the riser of the staircase, a mortar intended as already said to include imprison any bubbles resulting from the concrete between said mortar and concrete, besides promoting the appearance of the steps.

Ce mortier comprend :

  • entre 5 à 50 % en masse de ciment ;
  • ▪ entre 40 et 95 % en masse d'agrégats fins, typiquement inférieurs à 1 millimètre ;
  • ▪ et un mélange d'adjuvants comprenant un super-plastifiant et/ou des accélérateurs ou retardateurs de prise en masse du béton et/ou des agents anti-retrait.
This mortar includes:
  • ▪ between 5 to 50% by mass of cement;
  • ▪ between 40 and 95% by weight of fine aggregates, typically less than 1 millimeter;
  • ▪ and a mixture of additives comprising a super-plasticizer and / or accelerators or retarders for setting the concrete and / or anti-shrinkage agents.

A cet égard, il est précisé que l'huile de démoulage ayant préalablement revêtu la face interne dudit capots (3) et (4) est choisie de telle sorte que le mortier adhère à l'état frais sur le capot, mais pas à l'état durci. Il peut s'agir d'une huile du type de celles précédemment décrites. Cette huile est sélectionnée précisément en suite de la réalisation de différents essais, au cours desquels on observe les décollements éventuels du mortier par rapport au moule et les phénomènes de micro-bullage ou tâches pouvant apparaitre sur les parements. La sélection de l'huile dépend donc des matériaux localement disponibles pour fabriquer le mortier, le béton et du matériel utilisé pour l'application (pulvérisation, chiffonnage ou non).In this regard, it is specified that the demolding oil having previously coated the inner face of said covers (3) and (4) is chosen so that the mortar adheres to the fresh state on the hood, but not to the hardened state. It may be an oil of the type previously described. This oil is selected precisely following the completion of various tests, during which we observe the possible detachment of the mortar from the mold and micro-bubbling phenomena or tasks that can appear on the siding. The selection of the oil therefore depends on locally available materials to manufacture the mortar, concrete and equipment used for the application (spraying, scraping or not).

En raison du procédé de réalisation d'un escalier en béton monobloc de l'invention, coulé en position, il est possible avec le même moule inférieur (2) de pouvoir réaliser des escaliers avec une hauteur de marche légèrement différente du fond de moule, en choisissant les capots (3) et (4) appropriés. Ces déclinaisons par rapport à la hauteur de base du moule s'établit généralement avec un écart de 2 à 4 millimètres, et ce, afin de limiter la surépaisseur des plateaux ou de la paillasse de l'escalier au niveau de son pied ou de sa tête. En d'autres termes, avec le même moule inférieur, il devient possible de réaliser des escaliers avec différentes hauteurs de marche, en adaptant le capot supérieur.Due to the method of producing a one-piece concrete staircase of the invention, cast in position, it is possible with the same lower mold (2) to be able to make stairs with a walking height slightly different from the mold base, choosing the appropriate covers (3) and (4). These variations with respect to the base height of the mold is generally established with a difference of 2 to 4 millimeters, and this, in order to limit the extra thickness of the trays or the bench of the staircase at the level of his foot or his head. In other words, with the same lower mold, it becomes possible to make stairs with different operating heights, adapting the top cover.

On a représenté, en relation avec la figure 2, une vue éclatée analogue à la figure 1, mais cette fois-ci pour la réalisation d'un escalier monobloc pourvu d'un fût central (8). Dans cette configuration, le moule inférieur (2) comporte, en sa position centrale, une partie de colonne, destinée à coopérer avec les capots supérieurs, munis chacun d'une partie de colonne complémentaire avec celle du moule inférieur, ce afin de définir un cylindre (dans le cas d'espèce de base circulaire) apte à définir le fût ou noyau central.In connection with the figure 2 , an exploded view similar to the figure 1 , but this time for the realization of a monobloc staircase provided with a central shaft (8). In this configuration, the lower mold (2) comprises, in its central position, a column portion, intended to cooperate with the upper covers, each provided with a complementary column portion with that of the lower mold, in order to define a cylinder (in the case of circular base case) adapted to define the shaft or central core.

En outre, dans le cadre de la réalisation d'un tel escalier à fût central, l'injection de béton s'effectue toujours au niveau inférieur, mais par le biais de la colonne destinée à constituer le fût central. A cet effet, les éléments définissant la colonne sont percés de lumières traversantes (9), permettant au béton subissant l'ascension au sein de la colonne, de venir se répartir dans le volume défini entre le capot supérieur et le moule inférieur, et ainsi réaliser et constituer les marches et contremarches de l'escalier souhaité. Ces lumières ont été schématisées sur les figures 3 à 5. Elles sont de dimension, et notamment de hauteur sensiblement inférieure aux contremarches.In addition, in the context of the realization of such a staircase with central shaft, the injection of concrete is always performed at the lower level, but through the column intended to form the central shaft. For this purpose, the elements defining the column are pierced with through-holes (9), allowing the concrete undergoing ascension within the column to be distributed in the volume defined between the upper cover and the lower mold, and thus realize and build the steps and risers of the desired staircase. These lights have been schematized on the Figures 3 to 5 . They are of dimension, and in particular of height substantially lower than risers.

On a illustré, au sein de la figure 6, la mise en oeuvre lorsque cela est requis, d'éléments raidisseurs (10), en l'espèce tant horizontaux que verticaux.We have illustrated, within the figure 6 , the implementation when required of stiffening elements (10), in this case both horizontal and vertical.

Ces raidisseurs ont pour principale fonction de reprendre la poussée du béton résultant de l'injection, notamment au niveau inférieur. Cette poussée du béton s'exerce perpendiculairement à toutes les surfaces, et il peut s'avérer nécessaire de bloquer les efforts verticaux mais également horizontaux, afin d'éviter notamment une mise en rotation des capots lors de l'injection du béton.These stiffeners have the main function to resume the thrust of the concrete resulting from the injection, especially at the lower level. This thrust of the concrete is exerted perpendicular to all surfaces, and it may be necessary to block the vertical forces but also horizontal, in particular to avoid rotation of the hoods during the injection of concrete.

Ces raidisseurs peuvent être constitués de barres de renforcement tubulaires, notamment de section transversale carrée, disposées sur le capot supérieur, à la verticale de chacune des contremarches, les diagonales des sections carrées étant orientées respectivement selon l'horizontale et selon la verticale. Les raidisseurs peuvent aussi résulter d'un assemblage de tôles pliés et soudés. Ces raidisseurs peuvent être fixés avec un bridage tige / écrou, au moyen d'un profilé encoché à cet effet, permettant une certaine souplesse dans le positionnement initial du capot, et l'inclinaison des profils à 45° permet une bonne reprise des efforts horizontaux et verticaux. Le serrage tend alors à positionner le capot en position optimale.These stiffeners may consist of tubular reinforcing bars, in particular of square cross-section, disposed on the top cover, vertically to each of the risers, the diagonals of the square sections being oriented respectively in the horizontal and in the vertical direction. The stiffeners can also result from an assembly of folded and welded sheets. These stiffeners can be fixed with a rod / nut clamping, by means of a profile notched for this purpose, allowing a certain flexibility in the initial positioning of the cover, and the inclination of the profiles at 45 ° allows a good recovery of the horizontal forces and vertical. The tightening then tends to position the hood in the optimum position.

Il peut également être réalisé avec écrou et centreur, assurant une meilleure répétabilité que le système tige / écrou, mais en revanche moins tolérant aux écarts de positionnements initiaux.It can also be realized with nut and centraliser, ensuring a better repeatability than the rod / nut system, but on the other hand less tolerant to initial positioning gaps.

L'invention vise les escaliers en béton monoblocs coulés en position obtenus par le procédé de l'invention. Si les propriétés mécaniques de ces escaliers ne diffèrent pas ou peu des escaliers réalisés avec les procédés de réalisation traditionnels, en revanche ils présentent un état de finition très nettement amélioré, en raison de l'absence ou quasi-absence de micro-bullage venant éclater à la surface supérieure des marches, engendrant un gain considérable en termes de durée de réalisation.The invention relates to monobloc concrete stairs cast in position obtained by the method of the invention. If the mechanical properties of these stairs do not differ or little from the stairs made with the traditional production methods, on the other hand they have a state of finishing very much improved, because of the absence or near-absence of micro-bubbling bursting on the upper surface of the steps, generating a considerable gain in terms of duration of implementation.

Parallèlement, en raison du mode de réalisation de ces escaliers, c'est-à-dire un moulage intégral (face inférieure et face supérieure), les conditions de réalisation de ces escaliers sont beaucoup plus confortables pour les opérateurs et, surtout, permettent une augmentation significative de la sécurité, puisqu'aussi bien, l'opérateur n'a plus à assurer l'étalage du béton en position précaire ou le lissage de celui-ci. Les éventuelles opérations ultimes de finition, lorsqu'elles peuvent s'avérer nécessaires, se font sur un escalier dont le béton a pris en masse donc durci, facilitant considérablement ces opérations.Meanwhile, because of the embodiment of these stairs, that is to say, an integral molding (lower face and upper face), the conditions of realization of these stairs are much more comfortable for operators and, above all, allow a Significant increase in safety, since, as well, the operator no longer has to ensure the display of concrete in precarious position or the smoothing thereof. Ultimate finishing operations, when they may be necessary, are done on a staircase whose concrete has hardened so hardened, facilitating considerably these operations.

Claims (12)

Procédé pour la réalisation d'escaliers monoblocs en béton mettant en oeuvre un moule fermé, composé d'un moule inférieur (2) et d'un moule supérieur ou capot (3, 4), définissant entre eux un volume destiné à être rempli par du béton, consistant : ▪ à fixer et installer le moule inférieur (2) en position opérationnelle; ▪ à positionner le moule supérieur ou capot (3, 4) en regard dudit moule inférieur (2) et à le fixer sur ledit moule inférieur ; ▪ à injecter dans le volume défini par les deux moules respectivement inférieur (2) et supérieur (3, 4), et à partir de la base inférieure dudit volume, du béton notamment de type auto-plaçant, jusqu'à combler l'intégralité dudit volume ; ▪ après prise en masse du béton, à ôter le moule supérieur et le moule inférieur, et donc à démouler l'escalier ainsi réalisé. Process for the production of one-piece concrete staircases using a closed mold consisting of a lower mold (2) and an upper mold or cover (3, 4) defining between them a volume intended to be filled by concrete, consisting of: ▪ to fix and install the lower mold (2) in operational position; Positioning the upper mold or cover (3, 4) facing said lower mold (2) and fixing it on said lower mold; ▪ to inject into the volume defined by the two molds respectively lower (2) and upper (3, 4), and from the lower base of said volume, concrete including self-placing type, to fill the entirety said volume; ▪ after cementing the concrete, remove the upper mold and the lower mold, and thus unmold the stair thus produced. Procédé pour la réalisation d'escaliers monoblocs en béton à fût ou noyau central mettant en oeuvre un moule fermé, composé d'un moule inférieur (2) et d'un moule supérieur ou capot (3, 4), définissant entre eux un volume destiné à être rempli par du béton, consistant : ▪ à fixer et installer le moule inférieur (2) en position opérationnelle; ▪ à positionner le moule supérieur ou capot (3, 4) en regard dudit moule inférieur (2) et à le fixer sur ledit moule inférieur ; ▪ à injecter dans le volume défini par les deux moules respectivement inférieur (2) et supérieur (3, 4), et à partir de la base inférieure de la colonne destinée à constituer le fût ou noyau central, du béton notamment de type auto-plaçant, ladite colonne communiquant avec le volume défini par les deux moules respectivement inférieur et supérieur, au moyen de lumières traversantes (9), jusqu'à combler l'intégralité dudit volume ; ▪ après prise en masse du béton, à ôter le moule supérieur et le moule inférieur, et donc à démouler l'escalier ainsi réalisé. Process for the production of one-piece concrete staircases with a drum or central core using a closed mold composed of a lower mold (2) and an upper mold or cover (3, 4) defining a volume between them intended to be filled with concrete, consisting of: ▪ to fix and install the lower mold (2) in operational position; Positioning the upper mold or cover (3, 4) facing said lower mold (2) and fixing it on said lower mold; ▪ to inject into the volume defined by the two molds respectively lower (2) and upper (3, 4), and from the lower base of the column intended to form the shaft or central core, concrete including self- placing, said column communicating with the volume defined by the two molds respectively lower and upper, by means of through openings (9), to fill the entirety of said volume; ▪ after cementing the concrete, remove the upper mold and the lower mold, and thus unmold the stair thus produced. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 1 et 2, dans lequel le moule supérieur ou capot est constitué de plusieurs secteurs.Process for producing one-piece concrete staircases according to one of claims 1 and 2, wherein the upper mold or cover consists of several sectors. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 1 à 3, dans lequel, préalablement à l'injection du béton auto-plaçant dans le volume défini par les deux moules, on enduit, notamment par pulvérisation, la face interne du moule supérieur ou capot, c'est-à-dire la surface appelée à définir la forme des différentes marches et contremarches du futur escalier, d'un mortier.Process for the production of one-piece concrete staircases according to one of Claims 1 to 3, in which, prior to the injection of the self-placing concrete into the volume defined by the two molds, the coating, in particular by spraying, is coated internal face of the upper mold or hood, that is to say the surface called to define the shape of the various steps and risers of the future staircase, a mortar. Procédé pour la réalisation d'escaliers monoblocs en béton selon la revendication 4, dans lequel le mortier comprend : ▪ entre 5 et 50 % en masse de ciment ; ▪ entre 40 et 95 % en masse d'agrégats fins ; ▪ un mélange d'adjuvants choisis dans le groupe comprenant les super-plastifiants, les accélérateurs de prise en masse, les retardateurs de prise en masse, les agents anti-retrait. A method for producing one-piece concrete stairways according to claim 4, wherein the mortar comprises: ▪ between 5 and 50% by weight of cement; ▪ between 40 and 95% by weight of fine aggregates; A mixture of adjuvants selected from the group consisting of superplasticizers, caking accelerators, setting retarders, anti-shrinkage agents. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 4 et 5, dans lequel la paroi interne du capot (3, 4) est recouverte de mortier avant le montage dudit capot sur le moule inférieur (2).Method for producing one-piece concrete staircases according to one of claims 4 and 5, wherein the inner wall of the cover (3, 4) is covered with mortar before mounting said cover on the lower mold (2). Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 4 à 6, dans lequel le mortier est projeté sur la surface interne du capot.A method for making one-piece concrete staircases according to one of claims 4 to 6, wherein the mortar is projected onto the inner surface of the hood. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 1 à 7, dans lequel les moules inférieur (2) et supérieur (3, 4) ou capot sont préalablement enduit, sur leur face interne, c'est-à-dire sur leur face destinée à recevoir le béton auto-plaçant, d'un composant apte à favoriser le démoulage, et notamment de l'huile de démoulage.Process for the production of one-piece concrete staircases according to one of Claims 1 to 7, in which the lower (2) and upper (3, 4) or bonnet molds are pre-coated on their internal face, ie that is to say on their face intended to receive the self-placing concrete, a component capable of promoting demoulding, and in particular demolding oil. Procédé pour la réalisation d'escaliers monoblocs en béton selon la revendication 8, dans lequel lorsque le capot reçoit sur sa face interne le mortier selon l'une des revendications 4 à 7, l'huile de démoulage est préalablement déposée sur ladite face interne.A method for producing one-piece concrete staircases according to claim 8, wherein when the cover receives on its inner face the mortar according to one of claims 4 to 7, the release oil is previously deposited on said inner face. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 1 à 9, dans lequel le béton auto-plaçant mis en oeuvre appartient à la classe SF2 ou à la classe SF3.Process for the production of one-piece concrete staircases according to one of Claims 1 to 9, in which the self-placing concrete used is in the class SF2 or in the class SF3. Procédé pour la réalisation d'escaliers monoblocs en béton selon l'une des revendications 1 à 10, dans lequel des raidisseurs (10) sont intégrés et fixés au moule inférieur avant mise en place du moule ou capot supérieur.Process for producing one-piece concrete staircases according to one of claims 1 to 10, wherein stiffeners (10) are integrated and fixed to the lower mold before placing the mold or upper cover. Escalier monobloc en béton obtenu par la mise en oeuvre du procédé selon l'une des revendications 1 à 11.Monobloc concrete staircase obtained by implementing the method according to one of claims 1 to 11.
EP19164856.7A 2018-06-04 2019-03-25 Method for producing concrete staircases and staircase obtained by said method Active EP3578730B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR1854813A FR3081896B1 (en) 2018-06-04 2018-06-04 PROCESS FOR THE PRODUCTION OF CONCRETE STAIRS AND STAIRS OBTAINED BY THIS PROCESS

Publications (2)

Publication Number Publication Date
EP3578730A1 true EP3578730A1 (en) 2019-12-11
EP3578730B1 EP3578730B1 (en) 2022-01-19

Family

ID=63209535

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19164856.7A Active EP3578730B1 (en) 2018-06-04 2019-03-25 Method for producing concrete staircases and staircase obtained by said method

Country Status (2)

Country Link
EP (1) EP3578730B1 (en)
FR (1) FR3081896B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR3110188B1 (en) 2020-05-15 2022-04-29 Pbm Groupe METHOD FOR MAKING A THREE-DIMENSIONAL CONCRETE STRUCTURE OR PART OF A MONOBLOCK STRUCTURE AND STRUCTURE OR PART OF A THREE-DIMENSIONAL CONCRETE STRUCTURE THUS OBTAINED

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05287901A (en) * 1992-04-14 1993-11-02 Takenaka Komuten Co Ltd Construction of stairs
FR2765604A1 (en) * 1997-07-04 1999-01-08 Marc Claude Voisine Sectional poured concrete spiral staircase with central column and integral external walls
EP0987381A1 (en) * 1998-09-18 2000-03-22 Stefan Schmid Staircase
FR2801620A1 (en) * 1999-11-30 2001-06-01 Holding Pbm Prefabricated concrete staircase has precast concrete treads with lugs connected by cast in metal beam
EP2395182A1 (en) * 2010-06-08 2011-12-14 Thomas Choquet Method and device for quick formworking of winding stairs implementing a central core
CN206170284U (en) 2016-11-08 2017-05-17 江苏金贸科技发展有限公司 Prefabricated staircase mould with splint

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05287901A (en) * 1992-04-14 1993-11-02 Takenaka Komuten Co Ltd Construction of stairs
FR2765604A1 (en) * 1997-07-04 1999-01-08 Marc Claude Voisine Sectional poured concrete spiral staircase with central column and integral external walls
EP0987381A1 (en) * 1998-09-18 2000-03-22 Stefan Schmid Staircase
FR2801620A1 (en) * 1999-11-30 2001-06-01 Holding Pbm Prefabricated concrete staircase has precast concrete treads with lugs connected by cast in metal beam
EP2395182A1 (en) * 2010-06-08 2011-12-14 Thomas Choquet Method and device for quick formworking of winding stairs implementing a central core
CN206170284U (en) 2016-11-08 2017-05-17 江苏金贸科技发展有限公司 Prefabricated staircase mould with splint

Also Published As

Publication number Publication date
FR3081896B1 (en) 2020-06-19
FR3081896A1 (en) 2019-12-06
EP3578730B1 (en) 2022-01-19

Similar Documents

Publication Publication Date Title
EP3578730B1 (en) Method for producing concrete staircases and staircase obtained by said method
FR3107714A1 (en) Machine and method for the manufacture of a plate intended to make a wall or a floor
WO2012080681A1 (en) Apparatus for extruding a fresh layer of hydraulic finishing coating
EP3910129A1 (en) Method for producing a three-dimensional single-piece concrete structure or part thereof and three-dimensional concrete structure or part thereof thus obtained
EP3395541B1 (en) Method for manufacturing at least one wall of a prefabricated construction element with matrix facing
FR2507647A1 (en) Composite prefabricated construction panel - has grooved insulation to concrete interface to aid connection between them
FR2836940A3 (en) Concrete paving stone is composed of upper and lower layers formed from hardened liquid concrete
CA3163004A1 (en) Panels for producing a wall and methods for producing such panels
FR2949702A1 (en) EQUIPMENT AND METHOD FOR MANUFACTURING TUNNEL TAPES IN SELF - LACTING CONCRETE.
FR2835272A1 (en) Method for making insulating wall comprises pouring concrete into horizontal mold, placing insulating panel inside mold, removing assembly from mold, pouring second concrete layer into mold and returning assembly to mold
EP2069583B1 (en) Assembly composed of a construction element and a masonry tool
FR2863637A1 (en) Formwork support device for running concrete floors, has tightening unit with certain elasticity such that when force is applied on wall top, pile cap portion is in horizontal position and support unit is in driving position
EP1292746B1 (en) Method for making aquatic pools and in particular for swimming pools
FR3105274A3 (en) Method of forming a building layer with a passage
FR2673654A1 (en) Raiser method for frames and elements for implementing it
EP1985765A1 (en) Device and method for installing a helical foundation micro-pile
OA12693A (en) Construction method using concrete blocks molded in the form of H or 2H as a formwork for adobe.
FR2588909A1 (en) Prefabricated opening frame, process and installation for its manufacture
EP4326951A1 (en) Building block for constructing a building and method for constructing a building
FR2769654A1 (en) System for fixing natural stone on facades
FR3115550A1 (en) Removable template serving as a formwork and allowing the realization of a mortar screed, a coating, a slab, a tile or a set of concrete tiles on a level ground or a ground which does not is not level.
FR2474384A1 (en) Placing machine for concrete wall casting - has vibrating chute mounted above moulding board on movable carriage to feed concrete to U-shaped frames
FR2891562A1 (en) Prefabricated concrete unit for forming e.g. passage slab, has reinforcing sheet with connecting elements each being cut and folded to present anchoring faces, where elements are inclined with respect to sheet and extended inside body
BE480402A (en)
FR3101271A1 (en) STRUCTURAL SHELL IN BFUHP

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20200603

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: B28B 13/02 20060101ALI20211018BHEP

Ipc: E04F 11/032 20060101ALI20211018BHEP

Ipc: B28B 7/22 20060101ALI20211018BHEP

Ipc: E04F 11/02 20060101AFI20211018BHEP

INTG Intention to grant announced

Effective date: 20211104

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602019010963

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1463882

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220215

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: FRENCH

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG9D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20220119

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1463882

Country of ref document: AT

Kind code of ref document: T

Effective date: 20220119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220519

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220419

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220419

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220420

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220519

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602019010963

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

26N No opposition filed

Effective date: 20221020

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20220325

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20221001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230527

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20230325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230325

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20230325

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: LU

Payment date: 20240226

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20190325

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240328

Year of fee payment: 6

Ref country code: BE

Payment date: 20240326

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20240402

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20220119