EP3387594A1 - Verfahren zur verwaltung einer gruppe von stromverbrauchenden vorrichtungen und stromverwaltungsmodul - Google Patents
Verfahren zur verwaltung einer gruppe von stromverbrauchenden vorrichtungen und stromverwaltungsmodulInfo
- Publication number
- EP3387594A1 EP3387594A1 EP16825458.9A EP16825458A EP3387594A1 EP 3387594 A1 EP3387594 A1 EP 3387594A1 EP 16825458 A EP16825458 A EP 16825458A EP 3387594 A1 EP3387594 A1 EP 3387594A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- power
- power supply
- value
- electrical
- supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000007726 management method Methods 0.000 claims description 30
- 230000005611 electricity Effects 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 11
- 238000005259 measurement Methods 0.000 claims description 9
- 230000007547 defect Effects 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 7
- 230000000694 effects Effects 0.000 claims description 6
- 230000009467 reduction Effects 0.000 description 9
- 230000006870 function Effects 0.000 description 7
- 238000009434 installation Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010616 electrical installation Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 238000005406 washing Methods 0.000 description 3
- 230000003111 delayed effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 230000004913 activation Effects 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004513 sizing Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/64—Optimising energy costs, e.g. responding to electricity rates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/66—Data transfer between charging stations and vehicles
- B60L53/665—Methods related to measuring, billing or payment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/10—The network having a local or delimited stationary reach
- H02J2310/12—The local stationary network supplying a household or a building
- H02J2310/14—The load or loads being home appliances
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/242—Home appliances
Definitions
- a first aspect of the invention provides a method of managing a set of electrical energy consuming apparatuses for powering these apparatuses. electrical energy from an electric power delivery point that is common to the appliances.
- the method of the invention comprises the following steps: IM collect values of an electric power which is available at the delivery point according to successive time slots, and collect tariff data for electricity consumption for each time slot;
- a second improvement of the invention takes advantage of the potential capacity of at least one of the devices of the set of devices to be fed alternately in several different modes.
- Such a device, said variable power supply has several power modes that are associated with respective values of different power supply.
- Steps 131 and 141 are then executed for this flexible power supply device by adopting one of its power modes which has the highest power supply value, said first power mode, to determine the start time. of the power supply. But, if there are time slots later than the start time and during the power supply period of the first power mode, for which the power supply value of the same first power mode is greater than the value of the electric power that is available at the delivery point, then another power supply mode of the modular power supply unit is adopted for these later hours when the power is exceeded.
- each power mode of at least one of the devices can be transmitted to an energy manager who implements the management method, by an operator of the device or by the device itself. -even.
- these characteristics can be determined by the energy manager by means of automatic learning that is based on power supply characteristics recorded during a second period of time.
- FIG. 2 is a diagram of steps of a method according to the invention.
- the electric power supplier 100 establishes a rating scale of the power consumption, with consumption rates that may vary between predetermined time periods.
- the cost of the electrical consumption for the occupant of the dwelling 101 can then be calculated as the sum for all the successive time slots of the electrical consumption during each time slot multiplied by a kilowatt-hour price for this time slot. In most cases, the kilowatt-hour price to be used may also depend on the maximum electrical power value that is assigned to delivery point 1.
- a list can also be established for the appliances of the home 01 01 whose power can not be deferred, in step S2.
- the electrical power supply of these devices is therefore prioritized over those of the list of step S1.
- the electrical consumption of each of these priority devices for the power supply can be predictable or random, and in particular depend on a start command that is actuated by the occupant of the dwelling 101, or be imposed by a security imperative. etc.
- the connection box to the internet network 1 1, the vacuum cleaner 1 2, the kitchen utensil 1 3, the television set 14 and the lighting system 1 5 are given priority when they are programmed or started by the occupant of dwelling 1 01. They are grouped together in the set 110 that is the subject of the list declared in step S2.
- the other devices, grouped in the sets 20 and 30, are u devices, whose power supplies can be deferred.
- Each device u, or priority, is declared to the module 2 in the form of a vector which defines its mode of supply, and which comprises at least some of the following characteristics: - a value of the power supply power of the apparatus, which is denoted Pi for the apparatus u, at each moment of operation;
- the module 2 may also have a fifth input 2e dedicated to the transmission of measurement results that are performed in real time during the supply of at least some of the devices.
- These measurements can relate to the power supply of some of the appliances, their feed times or their electrical consumption, or the total electrical power that is supplied to the house 101 by the delivery point 1.
- the results of these measurements can be used to update some of the data that is used in the following process of the invention.
- the necessary measuring means can be integrated in the electricity meter which is located at the delivery point 1, or integrated in the module 2 itself.
- the devices u are classified in step S6 in descending order of their respective electrical consumption E ,.
- the first apparatus u in the ranking established in step S6, is first selected in step S71.
- step S74 the power supply value P, of the apparatus u, does not exceed the available power value P av for all the time slots which are concerned by the power duration. te, initiated from the time t d op ti- In other words, this verification ensures that the total electrical power expected to power the device u, in addition to the priority devices, does not exceed the value of the maximum electrical power which is available at the delivery point 1.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Power Engineering (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Mechanical Engineering (AREA)
- Transportation (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1562001A FR3044799B1 (fr) | 2015-12-08 | 2015-12-08 | Procede de gestion d'un ensemble d'appareils consommateurs d'energie electrique, et module gestionnaire d'energie electrique |
PCT/FR2016/053230 WO2017098137A1 (fr) | 2015-12-08 | 2016-12-06 | Procede de gestion d'un ensemble d'appareils consommateurs d'energie electrique, et module gestionnaire d'energie electrique |
Publications (1)
Publication Number | Publication Date |
---|---|
EP3387594A1 true EP3387594A1 (de) | 2018-10-17 |
Family
ID=55646717
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16825458.9A Withdrawn EP3387594A1 (de) | 2015-12-08 | 2016-12-06 | Verfahren zur verwaltung einer gruppe von stromverbrauchenden vorrichtungen und stromverwaltungsmodul |
Country Status (4)
Country | Link |
---|---|
US (1) | US20180375328A1 (de) |
EP (1) | EP3387594A1 (de) |
FR (1) | FR3044799B1 (de) |
WO (1) | WO2017098137A1 (de) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3097087B1 (fr) * | 2019-06-06 | 2021-07-09 | Electricite De France | Procédé de gestion de consommation dans un réseau de distribution |
FR3105516B1 (fr) * | 2019-12-20 | 2021-12-17 | Sagemcom Energy & Telecom Sas | Procédé de délestage de sorties d’une installation de production d’énergie électrique |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2672400B1 (fr) * | 1991-02-01 | 1993-04-30 | Euro Cp Sarl | Procede de gestion globale de l'energie electrique dans un reseau domotique. |
US20100332373A1 (en) * | 2009-02-26 | 2010-12-30 | Jason Crabtree | System and method for participation in energy-related markets |
KR101801095B1 (ko) * | 2010-10-25 | 2017-11-24 | 삼성전자주식회사 | 전력 관리 장치, 그를 가지는 전력 관리 시스템 및 그 제어 방법 |
KR101730081B1 (ko) * | 2010-12-23 | 2017-04-25 | 한국전자통신연구원 | 지능형 전력망 연동 홈 네트워크에서의 전력 관리 시스템, 전력 관리 장치 및 방법 |
-
2015
- 2015-12-08 FR FR1562001A patent/FR3044799B1/fr active Active
-
2016
- 2016-12-06 US US15/781,613 patent/US20180375328A1/en not_active Abandoned
- 2016-12-06 EP EP16825458.9A patent/EP3387594A1/de not_active Withdrawn
- 2016-12-06 WO PCT/FR2016/053230 patent/WO2017098137A1/fr unknown
Also Published As
Publication number | Publication date |
---|---|
WO2017098137A1 (fr) | 2017-06-15 |
US20180375328A1 (en) | 2018-12-27 |
FR3044799B1 (fr) | 2023-01-06 |
FR3044799A1 (fr) | 2017-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA3047500C (fr) | Gestion d'energie electrique composite | |
FR3029326A1 (fr) | Procede et systeme pour la gestion d’energie | |
EP3387594A1 (de) | Verfahren zur verwaltung einer gruppe von stromverbrauchenden vorrichtungen und stromverwaltungsmodul | |
FR2979762A1 (fr) | Procede et dispositif de recharge optimisee de batterie electrique | |
EP2892753A2 (de) | Wiederaufladung einer gruppe von batterien | |
EP4066181A1 (de) | Hierarchische energieverwaltungslösung | |
EP2479862A1 (de) | Verwaltung der Energiezuführung zu einem lokalen Energietransportnetz | |
FR3020903A1 (fr) | Dispositif pour reduire la puissance electrique consommee par au moins une charge electrique de puissance, systeme et procede associes | |
FR2998111A1 (fr) | Dispositif intermediaire de gestion d'energie et procede de gestion d'energie associe. | |
EP3662558B1 (de) | Glättung einer lastkurve mit aggregation von elementaren lastkurven | |
FR3060819A1 (fr) | Coordination de gestion de consommation d'energie electrique | |
WO2020216881A1 (fr) | Systeme et methode de distribution d'energie electrique | |
EP3407454B1 (de) | Schnittstellenvorrichtung zwischen einem allgemeinen stromnetz und einem lokalen stromnetz, die einen lokalen energieaustausch ermöglicht | |
FR2997349A1 (fr) | Systeme et procede de gestion de l'approvisionnement en energie d'un vehicule a partir d'une source exterieure d'energie | |
EP4066340B1 (de) | Robustes mikronetzwerk für elektrische strahlungsheizgeräte | |
EP2533391B1 (de) | Multi-Source-Steuerungssystem von Stromgeneratoren | |
FR2991823A1 (fr) | Dispositif et procede de repartition de la puissance electrique issue de differentes sources d'electricite | |
FR3012646A1 (fr) | Procede d'optimisation de la consommation et de la production d'une installation electrique | |
EP4175160A1 (de) | Optimierung der verwendung einer elektrogengruppe | |
FR3087286A1 (fr) | Optimisation d'un partage d'energie electrique en contexte d'autoconsommation et d'autoproduction collectives | |
FR3050883B1 (fr) | Dispositif et procede pour recevoir des telecommandes transpises par au moins deux canaux independants dans un reseau electrique | |
FR3028602A1 (fr) | Systeme de production d'eau chaude comprenant un champ photovoltaique alimentant de maniere optimisee la resistance d'une pluralite de ballons electriques de production d'eau chaude | |
WO2023111166A1 (fr) | Dispositif, procédé et programme d'ordinateur de pilotage d'une source de tension | |
WO2017174909A1 (fr) | Procede d'optimisation de la consommation electrique d'une installation | |
FR3058240A1 (fr) | Procede d'optimisation de la consommation electrique d'une installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20180529 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20200604 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20201215 |