[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

EP3214891A1 - Switching-on method, base station, base station controller, switching-on system and storage medium - Google Patents

Switching-on method, base station, base station controller, switching-on system and storage medium Download PDF

Info

Publication number
EP3214891A1
EP3214891A1 EP15853970.0A EP15853970A EP3214891A1 EP 3214891 A1 EP3214891 A1 EP 3214891A1 EP 15853970 A EP15853970 A EP 15853970A EP 3214891 A1 EP3214891 A1 EP 3214891A1
Authority
EP
European Patent Office
Prior art keywords
base station
switching
parameters
identifier
timeslot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP15853970.0A
Other languages
German (de)
French (fr)
Other versions
EP3214891A4 (en
EP3214891B1 (en
Inventor
Zhe SHUAI
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Publication of EP3214891A1 publication Critical patent/EP3214891A1/en
Publication of EP3214891A4 publication Critical patent/EP3214891A4/en
Application granted granted Critical
Publication of EP3214891B1 publication Critical patent/EP3214891B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W76/00Connection management
    • H04W76/10Connection setup
    • H04W76/11Allocation or use of connection identifiers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/12Access point controller devices
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J3/00Time-division multiplex systems
    • H04J3/02Details
    • H04J3/08Intermediate station arrangements, e.g. for branching, for tapping-off
    • H04J3/085Intermediate station arrangements, e.g. for branching, for tapping-off for ring networks, e.g. SDH/SONET rings, self-healing rings, meashed SDH/SONET networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04JMULTIPLEX COMMUNICATION
    • H04J3/00Time-division multiplex systems
    • H04J3/16Time-division multiplex systems in which the time allocation to individual channels within a transmission cycle is variable, e.g. to accommodate varying complexity of signals, to vary number of channels transmitted
    • H04J3/1605Fixed allocated frame structures
    • H04J3/1623Plesiochronous digital hierarchy [PDH]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W92/00Interfaces specially adapted for wireless communication networks
    • H04W92/04Interfaces between hierarchically different network devices
    • H04W92/12Interfaces between hierarchically different network devices between access points and access point controllers

Definitions

  • the present disclosure relates to technical field of automatic switching-on for a multi-stage base station, and more particularly, to a switching-on method, a base station, a base station controller, a switching-on system, and a storage medium for implementing automatic switching-on of base station in a multi-stage base station.
  • Automatic switching-on is applicable for the first switching-on of a base station and refers to a situation as follow.
  • the base station tries to negotiate, using default configuration, with BSC (Base Station Controller) without any transmission parameters being configured, automatically completes establishment of a underlying carrier link PPP (Point to Point Protocol) link or an MLPPP (Multilink-PPP) link, enables acquisition and configuration of IP parameters, and finally establishes an operation maintenance channel between the base station and OMCB (Operation & Maintenance Center for Base transmitter station) via the Abis interface.
  • the OMCB background is able to delivery planned base station switching-on parameters to the base station via a transparent channel by means of whole-table-synchronization and the like. In this way, the base station can be deployed and operated in accordance with the planned parameters after a reboot, such that the automatic switching-on is achieved.
  • Fig. 1 which illustrates connections between base stations in a 5-level E1 ring network
  • the automatic switching-on thereof will be described as follows.
  • an OMC (Operation and Maintenance Channel) operation maintenance channel is to be established with BSC by means of automatic link establishing based on timeslots.
  • station #1 succeeds in automatically establishing the link, the maintenance staff can access the base station through a network management background, issue a configuration and then reboot the base station to take the configuration into effect.
  • a main purpose of this configuration is to configure a cross timeslot between stations #1 and #2, so that the Abis port of station #2 can be physically connected with BSC, and then the automatic link establishing is possible.
  • station #2 succeeds in automatically establishing the link, another configuration is issued through the network management background, so as to configure a cross timeslot between stations #2 and #3.
  • Above process can be also applied to other levels of base station, until station #5 succeeds in automatically establishing the link.
  • a formally planned configuration switching-on parameters
  • the delivery should be started from the end, that is, station #5, in a level-by-level way, because other stations may be out of link if the delivery starts from station #1.
  • the planned configuration may take effect by rebooting the current base station after the delivery, and other base stations may be operated in a similar manner.
  • BSC may allocate an IP address to the base station through IPCP (IP Control Protocol) negotiation, but the IP address allocated to station #3 through the negotiation is actually that would be allocated to station #2 under normal circumstances, and the switching-on parameters sent to station #3 are actually those would be sent to station #2, which will cause false switching-on of station #3.
  • IPCP IP Control Protocol
  • a switching-on method a base station, a base station controller and a switching-on system which can reduce switching-on errors.
  • a switching-on method for implementing automatic switching-on of base station, applied on a base station including:
  • the method when the base station is at a non-final level among multi-level base stations, the method, after the establishing, by the base station, an interactive link with a base station controller, includes:
  • the communication parameters includes an inlet port and an outlet port
  • the configuring, by the base station, a cross timeslot for the base station includes:
  • the port properties include a port function and an on-off state
  • the determining, by the base station, the inlet port and the outlet port according to port properties of respective ports includes:
  • the communication parameters further include an outlet timeslot and an inlet timeslot
  • the configuring, by the base station, a cross timeslot for the base station includes:
  • the determining, by the base station, the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link includes:
  • the transmitting, by the base station, an identifier includes:
  • a switching-on method for implementing automatic switching-on of base station, applied on a base station controller including:
  • the switching-on method further includes:
  • the acquiring, by the base station controller, an identifier of the base station includes:
  • a switching-on method for implementing automatic switching-on of base station including:
  • a base station including:
  • a base station controller including:
  • switching-on system for implementing automatic switching-on of base station, including the base station and the base station controller as described above.
  • an identifier which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued.
  • each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • Fig. 2 is a schematic diagram illustrating connections in the switching-on system according to a first embodiment of the disclosure.
  • the switching-on system provided by the embodiment of the disclosure includes a base station 1 and a base station controller 2.
  • the base station 1 is configured to establish an interactive link with the base station controller 2 and transmit its own identifier to the base station controller 2.
  • the interactive link according to the embodiment of the present disclosure is mainly used for realizing exchange of information required for the switching-on between the base station and the base station controller, and can be either any of existing PPP link, MLPPP link or operation maintenance (OMC) link, or may be a newly defined dedicated link.
  • OMC operation maintenance
  • the identifier involved in the embodiment of the present disclosure is used to uniquely identify the base station, which is a fixed parameter suitable for uniquely identifying each base station, such as an electronic information bar code number (a unique number) of a mainboard within the base station, or a MAC address of a main processor within the base station, or a number assigned by the operator for each base station.
  • the base station controller 2 is configured to query the identifier of the base station 1 and issues the correct switching-on parameters for the base station 1. Since the identifier can be used to uniquely determine information such as location and the like of the base station, the switching-on parameters required by the base station can be determined by the base station controller and/or maintenance personnel.
  • the base station 1 is also configured to receive the switching-on parameters, reboot and then execute the switching-on parameters. Since the switching-on parameters received by each base station are the correct station parameters corresponding to their location, no fault will occur in the switching-on.
  • the base station 1 includes:
  • the base station when the base station is at a non-final level among multi-level base stations, the base station further includes a cross timeslot configuration module configured to set a cross timeslot for the base station itself.
  • the cross timeslot may include communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  • the communication parameters mentioned in the above embodiments include an inlet port and an outlet port
  • the cross timeslot configuration module is configured to determine the inlet port and the outlet port according to port properties of respective ports.
  • the port properties include a port function and an on-off state
  • the cross timeslot configuration module is further configured to detect the port function and the on-off state for the respective ports of itself, and sequentially determine any two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  • the communication parameters further include an outlet timeslot and an inlet timeslot
  • the cross timeslot configuration module is configured to determine the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link.
  • the cross timeslot configuration module is further configured to determine, when the timeslots for establishing the interactive link by the base station include timeslots 1 to m, timeslots (m+1) to 31 as the inlet timeslot of the cross timeslot and timeslots 1 to (31-m) as the outlet timeslot of the cross timeslot, where m is an integer and 1 ⁇ m ⁇ 31.
  • the base station as shown in Fig. 2 further includes a module configured to receive an identity inquiry message sent from the base station controller. Upon receiving the identity inquiry message sent from the base station controller, the base station acquires its own identification information and transmits, using the first transmission module 12, the identification information as the identifier to the base station controller via the interactive link.
  • the first link-establishment module 11, the first transmission module 12, and the switching-on module 13 each may be implemented by CPU (Central Processing Unit), DSP (Digital Signal Processor) or FPGA (Field Programmable Gate Array) in the base station 1.
  • CPU Central Processing Unit
  • DSP Digital Signal Processor
  • FPGA Field Programmable Gate Array
  • the above-mentioned CPU, DSP and FPGA may be provided within the base station 1.
  • the base station controller 2 includes:
  • the base station controller 2 as shown in Fig. 2 further includes a module configured to set a mapping relation between switching-on parameters and identifiers.
  • the second transmission module 23 is configured to read the mapping relation, query the switching-on parameters corresponding to the identifier from the mapping relation, and determine the queried switching-on parameters as the switching-on parameters for the base station. Specifically, when the operator needs to set up a new base station at a certain location (geographical location), the identifier of the base station device may be recorded.
  • Operation parameters required by the base station provided at the certain location for performing normal communication are determined by the background through calculation and stored as switching-on parameters for the base station at the location, such that a mapping relation between the switching-on parameters and the identifier is generated in the base station controller.
  • the acquisition module 22 is configured to transmit an identity query message to the base station via the interactive link, and receive and extract the identifier fed back by the base station.
  • timing for the acquisition module 22 to transmit the identity query message to the base station via the interactive link may be triggered manually by the maintenance personnel or may be automatically triggered. For example, if no request for establishing an interactive link is received in a specified time period after a previous interactive link is established between the base station controller and a certain base station, the base station controller is considered to complete establishment of interactive links with all the base stations, thus the function for obtaining the identity of each base station can be triggered.
  • the second link-establishment module 21, the acquisition module 22, and the second transmission module 23 each may be implemented by CPU (Central Processing Unit), DSP (Digital Signal Processor) or FPGA (Field Programmable Gate Array) in the base station controller 2.
  • CPU Central Processing Unit
  • DSP Digital Signal Processor
  • FPGA Field Programmable Gate Array
  • Fig. 3 is flow chart illustrating the switching-on method according to a second embodiment of the disclosure.
  • the switching-on method which is applied at the base station side, provided by the embodiment of the disclosure includes following steps.
  • step S301 the base station establishes an interactive link with a base station controller.
  • step S301 the base station transmits an identifier uniquely identifying the base station.
  • the step for the base station to transmit the identifier is implemented by acquiring, by the base station, identification information of itself upon receiving an identity inquiry message sent from the base station controller, and transmitting the identification information as the identifier to the base station controller via the interactive link.
  • step S303 the base station receives switching-on parameters corresponding to the identifier and executes the switching-on parameters.
  • the switching-on method as shown in Fig. 3 includes, after the step S301, a step of configuring, by the base station, a cross timeslot for itself.
  • the cross timeslot is used to transmit in a passthrough mode slot resources to a base station at the lower level and includes communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  • the communication parameters mentioned in the above embodiments include an inlet port and an outlet port
  • the step of configuring, by the base station, a cross timeslot for itself mentioned in the above embodiments is implemented by determining the inlet port and the outlet port according to port properties of respective ports, which include a port function and an on-off state, detecting the port function and the on-off state for the respective ports of itself, and sequentially determining any two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  • the communication parameters mentioned in the above embodiments further include an outlet timeslot and an inlet timeslot
  • the step of configuring, by the base station, a cross timeslot for itself mentioned in the above embodiments is further implemented by determining the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link.
  • timeslots (m+1) to 31 are determined as the inlet timeslot of the cross timeslot
  • timeslots 1 to (31-m) are determined as the outlet timeslot of the cross timeslot, where m is an integer and 1 ⁇ m ⁇ 31.
  • the embodiment of the present disclosure also provides a first computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 3 .
  • an identifier which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued.
  • each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management.
  • manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports.
  • the problem in related art where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • Fig. 4 is flow chart illustrating the switching-on method according to a third embodiment of the disclosure. As can be seen from Fig. 4 , the switching-on method, which is applied at the base station controller side, provided by the embodiment of the disclosure includes following steps.
  • step S401 the base station controller establishes an interactive link with the base station.
  • step S402 the base station controller acquires an identifier of the base station uniquely identifying the base station.
  • step S403 the base station controller obtains switching-on parameters for the base station according to the identifier and transmits the switching-on parameters to the base station.
  • the method as shown in Fig.4 further includes setting a mapping relation between switching-on parameters and identifiers.
  • the step S403 may be implemented by reading the mapping relation, querying the switching-on parameters corresponding to the identifier from the mapping relation, and determining the queried switching-on parameters as the switching-on parameters for the base station
  • the acquiring, by the base station controller, an identifier of the base station in the above embodiments is implemented by transmitting, by the base station controller, an identity inquiry message to the base station via the interactive link, receiving and extracting the identifier fed back from the base station.
  • the method may be implemented by: establishing an interactive link between a base station and a base station controller; transmitting, by the base station, an identifier uniquely identifying the base station; acquiring, by the base station controller, the identifier of the base station, obtaining switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station; and receiving, by the base station, the switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  • the embodiment of the present disclosure also provides a second computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 4 .
  • the embodiment of the present disclosure also provides a third computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 3 and Fig. 4 .
  • an identifier which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued.
  • each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management.
  • manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports.
  • the problem in related art where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • the switching-on method provided by the embodiment of the disclosure includes following steps.
  • step S501 the base station controller sets a mapping relation between switching-on parameters and the identifiers.
  • an electronic information bar code number (an example of the identifier) of the main control board of each base station and a station number (corresponding to a uniquely determined geographical location) are recorded and fed back to the network management system.
  • the feedback results are then collected at the network management system and recorded by a background network manager in correspondence with the master control electronic information bar code number and station number of the base station.
  • Operation parameters which are assigned by the operator for respective base stations at locations corresponding to the station numbers, are acquired and used as switching-on parameters which are used to generate a mapping relation with the identifiers using the station numbers.
  • step S502 the base station which is powered on establishes an interactive link with the base station controller.
  • an automatic link-establishment is started from the first level of base station among the base stations by establishing the interactive link with the network side device, for example, by establishing an OMC channel with the network management system.
  • step S503 The base station determines whether it is at the final level, if yes, step S504 is performed, and if no, step S505 is performed.
  • the base station is at the final level, it is indicated that establishment of interactive link between multi-level base stations and the base station controller is completed and the process may enter into delivery of switching-on parameters. If the base station is at a non-final level, it is indicated that establishment of interactive link between multi-level base stations and the base station controller is not completed and, thus, the process of link-establishment is continued.
  • step S504 cross timeslots are configured automatically by the base station, an interactive link is established between a base station at next level and the base station controller, and step S503 is performed.
  • Implementation of this step with respect to a certain level of base station may include following steps.
  • step 1 the base station try to negotiate with the base station controller using timeslots 1 to m (m starts from 1).
  • step 2 if the negotiation fails, step 3 is performed, and if the negotiation succeeds, step 4 is performed.
  • step 4 a pair of ports, which support bypass function and are in physical connection, are selected as outlet and inlet ports for the cross timeslots; timeslots m+1 to 31 are selected as inlet timeslots of the cross timeslots; and timeslots 1 to 31-m are selected as outlet timeslots of the cross timeslots.
  • step 5 the establishment of interactive link at the current base station is completed and the configuration of cross timeslots is ended.
  • the step S505 is performed once the interactive link is established between the base station and the base station controller.
  • step S505 the base station controller acquires an identifier of the base station.
  • the identifier of the base station can be transmitted to the base station controller (which is generally applicable to switching-on of a single base station), such that the base station controller is able to acquire the identifier of the base station directly.
  • this step may be performed as follows.
  • the base station controller may send an identity inquiry message to the base station via the OMC channel.
  • the base station may retrieve the board bar code information of the main control board within the base station, and package the board bar code information and send it to the base station controller with a feedback message.
  • the base station controller extracts the bar code information of the main control board (i.e., the identifier of the base station).
  • step S506 the base station controller obtains switching-on parameters for the base station according to the identifier and transmits the switching-on parameters to the base station.
  • the base station controller may inquiry the corresponding station record in the base station identity database using the board barcode information, return the station number of respective base station, retrieve the corresponding switching-on parameters according to the actual station number of the base station, and send the parameters to the base station. If the base station includes multi-level base stations, the switching-on parameters corresponding to each base station may be transmitted level by level in the order from the lower-level base station to the higher-level base station.
  • step S507 the base station, upon receiving the switching-on parameters, reboots and executes the switching-on parameters to complete the automatic switching-on.
  • an identifier which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued.
  • each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management.
  • manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports.
  • the problem in related art where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • embodiments of the present disclosure may be provided as a method, a system, or a computer program product. Accordingly, the disclosure may take the form of a hardware embodiment, a software embodiment, or a combination of software and hardware aspects. Moreover, the present disclosure may take the form of a computer program product implemented in one or more computer readable storage medium (including but not limited to disk storage and optical memory, etc.) containing computer executable program code.
  • the present readable has been described with reference to a flowchart and/or block diagram of the method, apparatus (system), and computer program product according to embodiments of the present readable. It will be appreciated that each process and/or block in the flowchart and/or block diagram may be implemented by computer program instructions, as well as a combination of processes and/or blocks in flowcharts and/or block diagrams. These computer program instructions may be provided to a processor of a general purpose computer, a dedicated computer, an embedded processor, or other programmable data processing device to generate a machine such that a device for implementing the functions specified in one or more processes of flowcharts and/or one or more blocks in block diagrams will be generated through instructions executed by a processor of a computer or other programmable data processing device.
  • These computer program instructions may also be stored in a computer readable memory capable of operating a computer or other programmable data processing device in a particular manner such that instructions stored in the computer readable memory produce a product that includes a command device.
  • the command device may be configured to implement a function specified in one or more processes of flow charts and/or one or more blocks of block diagrams.
  • an identifier which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued.
  • each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

Provided are a switching-on method, a base station, a base station controller, a switching-on system and a storage medium. The method comprises: establishing, by a base station, an interactive link with a base station controller sending, by the base station, an identity identifier, wherein the identity identifier is used for uniquely determining the base station and receiving, by the base station, a switching-on parameter corresponding to the identity identifier, and executing the switching-on parameter. By means of the embodiments of the present invention, after a base station establishes an interactive link with a base station controller, an identity identifier which can uniquely determine the base station can be acquired, and a switching-on parameter of the base station is determined and issued according to the identity identifier, so that switching-on parameters acquired by various base stations are all correct switching-on parameters corresponding to positions thereof, thereby avoiding a switching-on error, and solving the problem of switching-on error caused by issuing a switching-on error parameter existing in allocation of a switching-on parameter according to an IP address of the base station in the related art.

Description

    TECHNICAL FIELD
  • The present disclosure relates to technical field of automatic switching-on for a multi-stage base station, and more particularly, to a switching-on method, a base station, a base station controller, a switching-on system, and a storage medium for implementing automatic switching-on of base station in a multi-stage base station.
  • BACKGROUND
  • Automatic switching-on is applicable for the first switching-on of a base station and refers to a situation as follow. The base station tries to negotiate, using default configuration, with BSC (Base Station Controller) without any transmission parameters being configured, automatically completes establishment of a underlying carrier link PPP (Point to Point Protocol) link or an MLPPP (Multilink-PPP) link, enables acquisition and configuration of IP parameters, and finally establishes an operation maintenance channel between the base station and OMCB (Operation & Maintenance Center for Base transmitter station) via the Abis interface. On this basis, the OMCB background is able to delivery planned base station switching-on parameters to the base station via a transparent channel by means of whole-table-synchronization and the like. In this way, the base station can be deployed and operated in accordance with the planned parameters after a reboot, such that the automatic switching-on is achieved.
  • Automatic switching-on of multi-level base stations, for example, multi-level base stations in E1 ring network mode, is more complicated compared to that of a single base station. As shown in Fig. 1, which illustrates connections between base stations in a 5-level E1 ring network, the automatic switching-on thereof will be described as follows. First, after power-on of the station #1, an OMC (Operation and Maintenance Channel) operation maintenance channel is to be established with BSC by means of automatic link establishing based on timeslots. Herein, the automatic link establishing based on timeslots refers to establishing a link with BSC in accordance with timeslot combinations of 1-n (n = 1, 2, 3, 4, 5 ... ... 31), that is, a total of 31 combinations. Once station #1 succeeds in automatically establishing the link, the maintenance staff can access the base station through a network management background, issue a configuration and then reboot the base station to take the configuration into effect. A main purpose of this configuration is to configure a cross timeslot between stations #1 and #2, so that the Abis port of station #2 can be physically connected with BSC, and then the automatic link establishing is possible. After station #2 succeeds in automatically establishing the link, another configuration is issued through the network management background, so as to configure a cross timeslot between stations #2 and #3. Above process can be also applied to other levels of base station, until station #5 succeeds in automatically establishing the link. After that, a formally planned configuration (switching-on parameters) is delivered to base stations by the maintenance personnel via the operation maintenance channel. At this time, the delivery should be started from the end, that is, station #5, in a level-by-level way, because other stations may be out of link if the delivery starts from station #1. The planned configuration may take effect by rebooting the current base station after the delivery, and other base stations may be operated in a similar manner.
  • In the above-described automatic switching-on method, when the base station issues switching-on parameters, it is necessary to determine location information and the like of the base station based on IP address of the base station (which is allocated during establishment of the operation maintenance channel) before setting and issuing the switching-on parameters. As the method is applied to multi-level base stations, if any intermediate station (e.g., station #2 in Fig. 1) is not powered on, a direct connection (i.e., a leapfrog link establishment) may exist between stations #3 and #1, thus station #3 physically takes the place of stations #2 to establish a link with BSC. During establishment of the link, BSC may allocate an IP address to the base station through IPCP (IP Control Protocol) negotiation, but the IP address allocated to station #3 through the negotiation is actually that would be allocated to station #2 under normal circumstances, and the switching-on parameters sent to station #3 are actually those would be sent to station #2, which will cause false switching-on of station #3.
  • Therefore, it is a technical problem that needs to be solved urgently by those skilled in the art to provide a method for realizing automatic switching-on of base station which can reduce switching-on errors for the automatic switching-on of multi-level base stations, especially when there is a leapfrog switching-on.
  • SUMMARY
  • In order to solve the problem existed in related art, there are provided a switching-on method, a base station, a base station controller and a switching-on system which can reduce switching-on errors.
  • Technical solution of embodiments of the disclosure is provided as follows.
  • According to an embodiment of the disclosure, there is provided a switching-on method for implementing automatic switching-on of base station, applied on a base station, including:
    • establishing, by the base station, an interactive link with a base station controller;
    • transmitting, by the base station, an identifier uniquely identifying the base station; and
    • receiving, by the base station, switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  • In an embodiment, when the base station is at a non-final level among multi-level base stations, the method, after the establishing, by the base station, an interactive link with a base station controller, includes:
    • configuring, by the base station, a cross timeslot for the base station, the cross timeslot comprising communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  • In an embodiment, the communication parameters includes an inlet port and an outlet port, and the configuring, by the base station, a cross timeslot for the base station includes:
    • determining, by the base station, the inlet port and the outlet port according to port properties of respective ports.
  • In an embodiment, the port properties include a port function and an on-off state, and the determining, by the base station, the inlet port and the outlet port according to port properties of respective ports includes:
    • detecting, by the base station, the port function and the on-off state for the respective ports of the base station, and sequentially determining two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  • In an embodiment, the communication parameters further include an outlet timeslot and an inlet timeslot, and the configuring, by the base station, a cross timeslot for the base station includes:
    • determining, by the base station, the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link.
  • In an embodiment, the determining, by the base station, the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link includes:
    • determining, when the timeslots for establishing the interactive link by the base station includes timeslots 1 to m, timeslots (m+1) to 31 as the inlet timeslot of the cross timeslot and timeslots 1 to (31-m) as the outlet timeslot of the cross timeslot, where m is an integer and 1<m<31.
  • In an embodiment, the transmitting, by the base station, an identifier includes:
    • acquiring, by the base station, identification information of the base station upon receiving an identity inquiry message sent from the base station controller, and transmitting the identification information as the identifier to the base station controller via the interactive link.
  • According to an embodiment of the disclosure, there is provided a switching-on method for implementing automatic switching-on of base station, applied on a base station controller, including:
    • establishing, by the base station controller, an interactive link with a base station;
    • acquiring, by the base station controller, an identifier of the base station uniquely identifying the base station; and
    • obtaining, by the base station controller, switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station.
  • In an embodiment, the switching-on method further includes:
    • setting a mapping relation between switching-on parameters and identifiers;
    • the obtaining, by the base station controller, switching-on parameters for the base station according to the identifier includes:
      • reading the mapping relation, querying the switching-on parameters corresponding to the identifier from the mapping relation, and determining the queried switching-on parameters as the switching-on parameters for the base station.
  • In an embodiment, the acquiring, by the base station controller, an identifier of the base station includes:
    • transmitting, by the base station controller, an identity inquiry message to the base station via the interactive link, receiving and extracting the identifier fed back from the base station.
  • According to an embodiment of the disclosure, there is provided a switching-on method for implementing automatic switching-on of base station, including:
    • establishing an interactive link between a base station and a base station controller;
    • transmitting, by the base station, an identifier uniquely identifying the base station;
    • acquiring, by the base station controller, the identifier of the base station, obtaining switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station; and
    • receiving, by the base station, the switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  • According to an embodiment of the disclosure, there is provided a base station, including:
    • a first link-establishment module configured to establish an interactive link with a base station controller;
    • a first transmission module configured to transmit an identifier uniquely identifying the base station; and
    • a switching-on module configured to receive switching-on parameters corresponding to the identifier and execute the switching-on parameters.
  • According to an embodiment of the disclosure, there is provided a base station controller, including:
    • a second link-establishment module configured to establish an interactive link with a base station;
    • an acquisition module configured to acquire an identifier of the base station uniquely identifying the base station; and
    • a second transmission module configured to obtain switching-on parameters for the base station according to the identifier and transmit the switching-on parameters to the base station.
  • Correspondingly, according to an embodiment of the disclosure, there is provided switching-on system for implementing automatic switching-on of base station, including the base station and the base station controller as described above.
  • According to the embodiments of the present disclosure, after establishing an interactive link between the base station and the base station controller, an identifier, which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued. In this way, each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • BRIEF DESCRIPTION OF THE DRAWINGS
    • Fig. 1 is a schematic diagram illustrating connections between base stations in an E1 ring network according to related art.
    • Fig. 2 is a schematic diagram illustrating connections in the switching-on system according to a first embodiment of the disclosure.
    • Fig. 3 is flow chart illustrating the switching-on method according to a second embodiment of the disclosure.
    • Fig. 4 is flow chart illustrating the switching-on method according to a third embodiment of the disclosure.
    • Fig. 5 is flow chart illustrating the switching-on method according to a fourth embodiment of the disclosure.
    DETAILED DESCRIPTION
  • In order to make features and technical aspects of embodiments of the present disclosure be more fully appreciated, the present disclosure will now be described in detail with reference to the accompanying drawings, which are for illustrative purposes only and are not intended to limit the disclosure.
  • First Embodiment
  • Fig. 2 is a schematic diagram illustrating connections in the switching-on system according to a first embodiment of the disclosure. As can be seen from Fig. 2, the switching-on system provided by the embodiment of the disclosure includes a base station 1 and a base station controller 2.
  • The base station 1 is configured to establish an interactive link with the base station controller 2 and transmit its own identifier to the base station controller 2. The interactive link according to the embodiment of the present disclosure is mainly used for realizing exchange of information required for the switching-on between the base station and the base station controller, and can be either any of existing PPP link, MLPPP link or operation maintenance (OMC) link, or may be a newly defined dedicated link. The identifier involved in the embodiment of the present disclosure is used to uniquely identify the base station, which is a fixed parameter suitable for uniquely identifying each base station, such as an electronic information bar code number (a unique number) of a mainboard within the base station, or a MAC address of a main processor within the base station, or a number assigned by the operator for each base station.
  • The base station controller 2 is configured to query the identifier of the base station 1 and issues the correct switching-on parameters for the base station 1. Since the identifier can be used to uniquely determine information such as location and the like of the base station, the switching-on parameters required by the base station can be determined by the base station controller and/or maintenance personnel.
  • The base station 1 is also configured to receive the switching-on parameters, reboot and then execute the switching-on parameters. Since the switching-on parameters received by each base station are the correct station parameters corresponding to their location, no fault will occur in the switching-on.
  • In an embodiment, as shown in Fig. 2, the base station 1 according to the embodiment of the disclosure includes:
    • a first link-establishment module 11 configured to establish an interactive link with the base station controller;
    • a first transmission module 12 configured to transmit an identifier uniquely identifying the base station; and
    • a switching-on module 13 configured to receive switching-on parameters corresponding to the identifier and execute the switching-on parameters.
  • In some embodiments, when the base station is at a non-final level among multi-level base stations, the base station further includes a cross timeslot configuration module configured to set a cross timeslot for the base station itself. Herein, the cross timeslot may include communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  • In some embodiments, the communication parameters mentioned in the above embodiments include an inlet port and an outlet port, the cross timeslot configuration module is configured to determine the inlet port and the outlet port according to port properties of respective ports. In an embodiment, the port properties include a port function and an on-off state, and the cross timeslot configuration module is further configured to detect the port function and the on-off state for the respective ports of itself, and sequentially determine any two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  • In some embodiments, the communication parameters further include an outlet timeslot and an inlet timeslot, and the cross timeslot configuration module is configured to determine the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link. In an embodiment, the cross timeslot configuration module is further configured to determine, when the timeslots for establishing the interactive link by the base station include timeslots 1 to m, timeslots (m+1) to 31 as the inlet timeslot of the cross timeslot and timeslots 1 to (31-m) as the outlet timeslot of the cross timeslot, where m is an integer and 1<m<31.
  • In some embodiments, the base station as shown in Fig. 2 further includes a module configured to receive an identity inquiry message sent from the base station controller. Upon receiving the identity inquiry message sent from the base station controller, the base station acquires its own identification information and transmits, using the first transmission module 12, the identification information as the identifier to the base station controller via the interactive link.
  • In a practical embodiment, the first link-establishment module 11, the first transmission module 12, and the switching-on module 13 each may be implemented by CPU (Central Processing Unit), DSP (Digital Signal Processor) or FPGA (Field Programmable Gate Array) in the base station 1. The above-mentioned CPU, DSP and FPGA may be provided within the base station 1.
  • In an embodiment, as shown in Fig. 2, the base station controller 2 according to the embodiment of the disclosure includes:
    • a second link-establishment module 21 configured to establish an interactive link with the base station;
    • an acquisition module 22 configured to acquire an identifier of the base station uniquely identifying the base station; and
    • a second transmission module 23 configured to obtain switching-on parameters for the base station according to the identifier and transmit the switching-on parameters to the base station.
  • In some embodiments, the base station controller 2 as shown in Fig. 2 further includes a module configured to set a mapping relation between switching-on parameters and identifiers. The second transmission module 23 is configured to read the mapping relation, query the switching-on parameters corresponding to the identifier from the mapping relation, and determine the queried switching-on parameters as the switching-on parameters for the base station. Specifically, when the operator needs to set up a new base station at a certain location (geographical location), the identifier of the base station device may be recorded. Operation parameters required by the base station provided at the certain location for performing normal communication are determined by the background through calculation and stored as switching-on parameters for the base station at the location, such that a mapping relation between the switching-on parameters and the identifier is generated in the base station controller.
  • In some embodiments, the acquisition module 22 is configured to transmit an identity query message to the base station via the interactive link, and receive and extract the identifier fed back by the base station. In a practical embodiment, timing for the acquisition module 22 to transmit the identity query message to the base station via the interactive link may be triggered manually by the maintenance personnel or may be automatically triggered. For example, if no request for establishing an interactive link is received in a specified time period after a previous interactive link is established between the base station controller and a certain base station, the base station controller is considered to complete establishment of interactive links with all the base stations, thus the function for obtaining the identity of each base station can be triggered.
  • In a practical embodiment, the second link-establishment module 21, the acquisition module 22, and the second transmission module 23 each may be implemented by CPU (Central Processing Unit), DSP (Digital Signal Processor) or FPGA (Field Programmable Gate Array) in the base station controller 2. The above-mentioned CPU, DSP and FPGA may be provided within the base station controller 2.
  • Second Embodiment
  • Fig. 3 is flow chart illustrating the switching-on method according to a second embodiment of the disclosure. As can be seen from Fig. 3, the switching-on method, which is applied at the base station side, provided by the embodiment of the disclosure includes following steps.
  • In step S301, the base station establishes an interactive link with a base station controller.
  • In step S301, the base station transmits an identifier uniquely identifying the base station.
  • In some embodiment, the step for the base station to transmit the identifier is implemented by acquiring, by the base station, identification information of itself upon receiving an identity inquiry message sent from the base station controller, and transmitting the identification information as the identifier to the base station controller via the interactive link.
  • In step S303, the base station receives switching-on parameters corresponding to the identifier and executes the switching-on parameters.
  • In some embodiment, when the base station is at a non-final level among multi-level base stations, the switching-on method as shown in Fig. 3 includes, after the step S301, a step of configuring, by the base station, a cross timeslot for itself. Herein, the cross timeslot is used to transmit in a passthrough mode slot resources to a base station at the lower level and includes communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  • In some embodiments, the communication parameters mentioned in the above embodiments include an inlet port and an outlet port, the step of configuring, by the base station, a cross timeslot for itself mentioned in the above embodiments is implemented by determining the inlet port and the outlet port according to port properties of respective ports, which include a port function and an on-off state, detecting the port function and the on-off state for the respective ports of itself, and sequentially determining any two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  • In some embodiments, the communication parameters mentioned in the above embodiments further include an outlet timeslot and an inlet timeslot, and the step of configuring, by the base station, a cross timeslot for itself mentioned in the above embodiments is further implemented by determining the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link. In an embodiment, when the timeslots for establishing the interactive link by the base station include timeslots 1 to m, timeslots (m+1) to 31 are determined as the inlet timeslot of the cross timeslot and timeslots 1 to (31-m) are determined as the outlet timeslot of the cross timeslot, where m is an integer and 1<m<31.
  • The embodiment of the present disclosure also provides a first computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 3.
  • According to the embodiment of the present disclosure, after establishing an interactive link between the base station and the base station controller, an identifier, which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued. In this way, each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • Further, when the base station is at a non-final level among multi-level base stations, the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management. In this way, manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • Further, the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports. In this way, the problem in related art, where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • Third Embodiment
  • Fig. 4 is flow chart illustrating the switching-on method according to a third embodiment of the disclosure. As can be seen from Fig. 4, the switching-on method, which is applied at the base station controller side, provided by the embodiment of the disclosure includes following steps.
  • In step S401, the base station controller establishes an interactive link with the base station.
  • In step S402, the base station controller acquires an identifier of the base station uniquely identifying the base station.
  • In step S403, the base station controller obtains switching-on parameters for the base station according to the identifier and transmits the switching-on parameters to the base station.
  • In some embodiments, the method as shown in Fig.4 further includes setting a mapping relation between switching-on parameters and identifiers. The step S403 may be implemented by reading the mapping relation, querying the switching-on parameters corresponding to the identifier from the mapping relation, and determining the queried switching-on parameters as the switching-on parameters for the base station
  • In some embodiments, the acquiring, by the base station controller, an identifier of the base station in the above embodiments is implemented by transmitting, by the base station controller, an identity inquiry message to the base station via the interactive link, receiving and extracting the identifier fed back from the base station.
  • There is also provided a switching-on method for implementing automatic switching-on of base station. The method may be implemented by: establishing an interactive link between a base station and a base station controller; transmitting, by the base station, an identifier uniquely identifying the base station; acquiring, by the base station controller, the identifier of the base station, obtaining switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station; and receiving, by the base station, the switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  • The embodiment of the present disclosure also provides a second computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 4.
  • The embodiment of the present disclosure also provides a third computer readable storage medium including a set of instructions for performing the switching-on method as shown in Fig. 3 and Fig. 4.
  • According to the embodiment of the present disclosure, after establishing an interactive link between the base station and the base station controller, an identifier, which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued. In this way, each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • Further, when the base station is at a non-final level among multi-level base stations, the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management. In this way, manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • Further, the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports. In this way, the problem in related art, where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • Fourth Embodiment
  • The present invention will now be described in further detail with reference to specific application examples. As can be seen from Fig. 5, the switching-on method provided by the embodiment of the disclosure includes following steps.
  • In step S501, the base station controller sets a mapping relation between switching-on parameters and the identifiers.
  • When the station equipment is installed before the switching-on, an electronic information bar code number (an example of the identifier) of the main control board of each base station and a station number (corresponding to a uniquely determined geographical location) are recorded and fed back to the network management system. The feedback results are then collected at the network management system and recorded by a background network manager in correspondence with the master control electronic information bar code number and station number of the base station. Operation parameters, which are assigned by the operator for respective base stations at locations corresponding to the station numbers, are acquired and used as switching-on parameters which are used to generate a mapping relation with the identifiers using the station numbers.
  • In step S502, the base station which is powered on establishes an interactive link with the base station controller.
  • In an embodiment, when the automatic switching-on is applied on multi-level base stations, an automatic link-establishment is started from the first level of base station among the base stations by establishing the interactive link with the network side device, for example, by establishing an OMC channel with the network management system.
  • In step S503, The base station determines whether it is at the final level, if yes, step S504 is performed, and if no, step S505 is performed.
  • If the base station is at the final level, it is indicated that establishment of interactive link between multi-level base stations and the base station controller is completed and the process may enter into delivery of switching-on parameters. If the base station is at a non-final level, it is indicated that establishment of interactive link between multi-level base stations and the base station controller is not completed and, thus, the process of link-establishment is continued.
  • In step S504, cross timeslots are configured automatically by the base station, an interactive link is established between a base station at next level and the base station controller, and step S503 is performed.
  • Implementation of this step with respect to a certain level of base station (at the non-final level) may include following steps.
  • In step 1, the base station try to negotiate with the base station controller using timeslots 1 to m (m starts from 1).
  • In step 2, if the negotiation fails, step 3 is performed, and if the negotiation succeeds, step 4 is performed.
  • In step 3, it is determined whether m is greater than 31, if yes, it is indicated the link-establishment fails and step 5 is performed; and if m is less than 31, then m=m+1 and step 1 is performed.
  • In step 4, a pair of ports, which support bypass function and are in physical connection, are selected as outlet and inlet ports for the cross timeslots; timeslots m+1 to 31 are selected as inlet timeslots of the cross timeslots; and timeslots 1 to 31-m are selected as outlet timeslots of the cross timeslots.
  • In step 5, the establishment of interactive link at the current base station is completed and the configuration of cross timeslots is ended.
  • In an embodiment, when the automatic switching-on is implemented for a single base station, the step S505 is performed once the interactive link is established between the base station and the base station controller.
  • In step S505, the base station controller acquires an identifier of the base station.
  • When the interactive link is established between the base station and the base station controller, the identifier of the base station can be transmitted to the base station controller (which is generally applicable to switching-on of a single base station), such that the base station controller is able to acquire the identifier of the base station directly.
  • If the identifier is not uploaded initiatively by the base station, this step may be performed as follows. The base station controller may send an identity inquiry message to the base station via the OMC channel. Upon receiving the message, the base station may retrieve the board bar code information of the main control board within the base station, and package the board bar code information and send it to the base station controller with a feedback message. After receiving the feedback message, the base station controller extracts the bar code information of the main control board (i.e., the identifier of the base station).
  • In step S506, the base station controller obtains switching-on parameters for the base station according to the identifier and transmits the switching-on parameters to the base station.
  • The base station controller may inquiry the corresponding station record in the base station identity database using the board barcode information, return the station number of respective base station, retrieve the corresponding switching-on parameters according to the actual station number of the base station, and send the parameters to the base station. If the base station includes multi-level base stations, the switching-on parameters corresponding to each base station may be transmitted level by level in the order from the lower-level base station to the higher-level base station.
  • In step S507, the base station, upon receiving the switching-on parameters, reboots and executes the switching-on parameters to complete the automatic switching-on.
  • To sum up, according to implementation of the present disclosure, at least following advantageous effects can be achieved.
  • After establishing an interactive link between the base station and the base station controller, an identifier, which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued. In this way, each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.
  • Further, when the base station is at a non-final level among multi-level base stations, the cross timeslot is automatically configured after establishment of the interactive link by the base station, without the need for the maintenance personnel to send through the background of network management. In this way, manual operations can be reduced in the automatic establishment of interactive link among multi-level base stations, and a process of rebooting the current base station for taking the parameters into effect is avoided, thus time cost of switching-on can be substantially saved.
  • Further, the cross timeslots include both outlet and inlet ports (supporting the bypass function), thus, when a base station at upper level is subject to failures such as power down, an interactive link can be established between the base station controller and a base station at lower level with the bypass function supported by those outlet and inlet ports. In this way, the problem in related art, where it is unable to cope with abnormal situation of power down occurred in some base stations within a ring network, is solved and, thus, a leapfrog switching-on method is provided.
  • It will be appreciated by those skilled in the art that embodiments of the present disclosure may be provided as a method, a system, or a computer program product. Accordingly, the disclosure may take the form of a hardware embodiment, a software embodiment, or a combination of software and hardware aspects. Moreover, the present disclosure may take the form of a computer program product implemented in one or more computer readable storage medium (including but not limited to disk storage and optical memory, etc.) containing computer executable program code.
  • The present readable has been described with reference to a flowchart and/or block diagram of the method, apparatus (system), and computer program product according to embodiments of the present readable. It will be appreciated that each process and/or block in the flowchart and/or block diagram may be implemented by computer program instructions, as well as a combination of processes and/or blocks in flowcharts and/or block diagrams. These computer program instructions may be provided to a processor of a general purpose computer, a dedicated computer, an embedded processor, or other programmable data processing device to generate a machine such that a device for implementing the functions specified in one or more processes of flowcharts and/or one or more blocks in block diagrams will be generated through instructions executed by a processor of a computer or other programmable data processing device.
  • These computer program instructions may also be stored in a computer readable memory capable of operating a computer or other programmable data processing device in a particular manner such that instructions stored in the computer readable memory produce a product that includes a command device. The command device may be configured to implement a function specified in one or more processes of flow charts and/or one or more blocks of block diagrams.
  • These computer program instructions may also be loaded onto a computer or other programmable data processing device such that a series of operational steps are performed on the computer or other programmable device to produce computer-implemented processing. Accordingly, steps for implementing the functions specified in one or more processes of the flowcharts and/or one or more blocks of the block diagrams are provided through the instructions executed on the computer or other programmable device.
  • The foregoing is a preferred embodiment of the present invention. It should be noted that a number of improvements and modifications may be made by those skilled in the art that without departing from the principles of the invention set forth herein, which will fall within the scope of the invention.
  • Industrial Applicability
  • According to the embodiment of the present disclosure, after establishing an interactive link between the base station and the base station controller, an identifier, which can be used to uniquely identify the base station, is acquired, and switching-on parameters of the base station are determined according to the identifier and then issued. In this way, each base station is able to obtain correct switching-on parameters corresponding to their location, so that false switching-on can be avoided and it can be solved the problem of false switching-on in related art caused by erroneous delivery of switching-on parameters which are assigned based on IP address of the base station.

Claims (17)

  1. A switching-on method for implementing automatic switching-on of base station, applied on a base station, comprising:
    establishing, by the base station, an interactive link with a base station controller;
    transmitting, by the base station, an identifier uniquely identifying the base station; and
    receiving, by the base station, switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  2. The switching-on method according to claim 1, wherein, when the base station is at a non-final level among multi-level base stations, the method, after the establishing, by the base station, an interactive link with a base station controller, comprises:
    configuring, by the base station, a cross timeslot for the base station, the cross timeslot comprising communication parameters required for establishing an interactive link between another base station downstream to the base station and the base station controller.
  3. The switching-on method according to claim 2, wherein the communication parameters comprise an inlet port and an outlet port, and the configuring, by the base station, a cross timeslot for the base station comprises:
    determining, by the base station, the inlet port and the outlet port according to port properties of respective ports.
  4. The switching-on method according to claim 3, wherein the port properties comprise a port function and an on-off state, and the determining, by the base station, the inlet port and the outlet port according to port properties of respective ports comprises:
    detecting, by the base station, the port function and the on-off state for the respective ports of the base station, and sequentially determining two ports supporting a bypass function and in physical connection as the outlet port and the inlet port.
  5. The switching-on method according to claim 3, wherein the communication parameters further comprise an outlet timeslot and an inlet timeslot, and the configuring, by the base station, a cross timeslot for the base station comprises:
    determining, by the base station, the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link.
  6. The switching-on method according to claim 5, wherein the determining, by the base station, the outlet timeslot and the inlet timeslot based on timeslots for establishing the interactive link comprises:
    determining, when the timeslots for establishing the interactive link by the base station comprises timeslots 1 to m, timeslots (m+1) to 31 as the inlet timeslot of the cross timeslot and timeslots 1 to (31-m) as the outlet timeslot of the cross timeslot, where m is an integer and 1<m<31.
  7. The switching-on method according to any one of claims 1-6, wherein the transmitting, by the base station, an identifier comprises:
    acquiring, by the base station, identification information of the base station upon receiving an identity inquiry message sent from the base station controller, and transmitting the identification information as the identifier to the base station controller via the interactive link.
  8. A switching-on method for implementing automatic switching-on of base station, applied on a base station controller, comprising:
    establishing, by the base station controller, an interactive link with a base station;
    acquiring, by the base station controller, an identifier of the base station uniquely identifying the base station; and
    obtaining, by the base station controller, switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station.
  9. The switching-on method according to claim 8, further comprising:
    setting a mapping relation between switching-on parameters and identifiers;
    the obtaining, by the base station controller, switching-on parameters for the base station according to the identifier comprises:
    reading the mapping relation, querying the switching-on parameters corresponding to the identifier from the mapping relation, and determining the queried switching-on parameters as the switching-on parameters for the base station.
  10. The switching-on method according to claim 8 or 9, wherein the acquiring, by the base station controller, an identifier of the base station comprises:
    transmitting, by the base station controller, an identity inquiry message to the base station via the interactive link, receiving and extracting the identifier fed back from the base station.
  11. A switching-on method for implementing automatic switching-on of base station, comprising:
    establishing an interactive link between a base station and a base station controller;
    transmitting, by the base station, an identifier uniquely identifying the base station;
    acquiring, by the base station controller, the identifier of the base station, obtaining switching-on parameters for the base station according to the identifier and transmitting the switching-on parameters to the base station; and
    receiving, by the base station, the switching-on parameters corresponding to the identifier and executing the switching-on parameters.
  12. Abase station, comprising:
    a first link-establishment module configured to establish an interactive link with a base station controller;
    a first transmission module configured to transmit an identifier uniquely identifying the base station; and
    a switching-on module configured to receive switching-on parameters corresponding to the identifier and execute the switching-on parameters.
  13. Abase station controller, comprising:
    a second link-establishment module configured to establish an interactive link with a base station;
    an acquisition module configured to acquire an identifier of the base station uniquely identifying the base station; and
    a second transmission module configured to obtain switching-on parameters for the base station according to the identifier and transmit the switching-on parameters to the base station.
  14. A switching-on system for implementing automatic switching-on of base station, comprising the base station according to claim 12 and the base station controller according to claim 13.
  15. A first computer readable storage medium, comprising a set of instructions used for performing the switching-on method according to any one of claims 1-7.
  16. A second computer readable storage medium, comprising a set of instructions used for performing the switching-on method according to any one of claims 8-10.
  17. A third computer readable storage medium, comprising a set of instructions used for performing the switching-on method according to claim 11.
EP15853970.0A 2014-10-27 2015-04-27 Switching-on method, base station and storage medium Active EP3214891B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410584295.1A CN105636234B (en) 2014-10-27 2014-10-27 Station opening method, base station controller and station opening system
PCT/CN2015/077499 WO2016065875A1 (en) 2014-10-27 2015-04-27 Switching-on method, base station, base station controller, switching-on system and storage medium

Publications (3)

Publication Number Publication Date
EP3214891A1 true EP3214891A1 (en) 2017-09-06
EP3214891A4 EP3214891A4 (en) 2018-05-30
EP3214891B1 EP3214891B1 (en) 2020-02-19

Family

ID=55856515

Family Applications (1)

Application Number Title Priority Date Filing Date
EP15853970.0A Active EP3214891B1 (en) 2014-10-27 2015-04-27 Switching-on method, base station and storage medium

Country Status (5)

Country Link
US (1) US10405361B2 (en)
EP (1) EP3214891B1 (en)
CN (1) CN105636234B (en)
ES (1) ES2788456T3 (en)
WO (1) WO2016065875A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107465536B (en) * 2017-07-03 2020-06-30 珠海高凌信息科技股份有限公司 Network management message automatic routing method and system based on multiplexing equipment
CN113364610B (en) * 2018-03-30 2022-08-09 华为技术有限公司 Network equipment management method, device and system
CN109195141B (en) * 2018-07-25 2021-09-10 京信网络系统股份有限公司 Base station opening method and device, computer storage medium and equipment
CN109068343B (en) * 2018-08-21 2021-09-10 京信网络系统股份有限公司 Base station opening method and device, computer storage medium and equipment
CN110875826A (en) * 2018-08-31 2020-03-10 上海华为技术有限公司 Method and device for acquiring open-station data
CN109688536A (en) * 2018-12-13 2019-04-26 京信通信系统(中国)有限公司 Realize method, apparatus, storage medium and the equipment of small opening base station
CN109729535B (en) * 2018-12-13 2021-08-17 京信网络系统股份有限公司 Base station opening method and device, computer storage medium and equipment
CN109561382B (en) * 2018-12-13 2021-11-12 京信网络系统股份有限公司 Home base station parameter self-configuration method, system, storage medium and equipment
CN110061871B (en) * 2019-04-11 2021-01-05 京信通信系统(中国)有限公司 Base station opening method and device, computer storage medium and equipment
CN111031542B (en) * 2019-11-26 2023-01-31 京信网络系统股份有限公司 Base station opening method, device, communication equipment and storage medium
CN115243297B (en) * 2022-09-20 2022-12-13 深圳市艾伯通信有限公司 Base station opening method and system based on TR069 protocol

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100571285C (en) * 2006-07-03 2009-12-16 中兴通讯股份有限公司 A kind of identification method of multi-stage far-end wireless device and device
EP2047635A2 (en) * 2006-07-20 2009-04-15 Bandspeed, Inc. Managing wireless base stations using a distributed virtual base station manager
US20080070580A1 (en) * 2006-09-14 2008-03-20 Motorola, Inc. Method and apparatus for configuring equipment in a communication network
CN101193402B (en) * 2006-11-20 2010-04-14 华为技术有限公司 Configuration method and system for multi-system base station
CN101188821B (en) * 2007-12-03 2011-08-10 上海华为技术有限公司 Method for obtaining topology location of RF remote communication device, communication system and related device
CN101835166B (en) * 2009-03-09 2012-12-12 上海贝尔股份有限公司 Channel allocation optimization method and channel allocation optimization equipment
US20100313262A1 (en) * 2009-06-03 2010-12-09 Aruba Networks, Inc. Provisioning remote access points
CN101651987B (en) * 2009-09-09 2012-05-09 中兴通讯股份有限公司 Cascade base station configuration method, device and system
CN101754478B (en) * 2010-01-08 2014-03-19 中兴通讯股份有限公司 Network administration data configuration management method and system
CN102378230B (en) * 2010-08-17 2014-12-31 中兴通讯股份有限公司 Railway application base station system and networking method thereof
CN102742620A (en) * 2011-04-19 2012-10-24 南通华普工艺纺织品有限公司 Pawpaw flavor moon cake
CN102790962A (en) 2011-05-17 2012-11-21 中兴通讯股份有限公司 Remedy method and system under condition of failure in putting base station into operation, and base station
CN102811447A (en) * 2011-05-31 2012-12-05 中兴通讯股份有限公司 Method, device and system for configuring base station data
CN102301662B (en) * 2011-06-27 2013-10-02 华为技术有限公司 MAC address protection method and switches
CN103379614B (en) * 2012-04-11 2016-12-07 中国移动通信集团公司 The air interface synchronization method of Home eNodeB and base station
US9397888B2 (en) * 2012-04-12 2016-07-19 Telefonaktiebolaget Lm Ericsson (Publ) Method and a server for assisting a centralized initialization of a radio access node
US9331900B2 (en) * 2013-07-03 2016-05-03 Fortinet, Inc. Centralized management of access points

Also Published As

Publication number Publication date
CN105636234B (en) 2021-06-25
WO2016065875A1 (en) 2016-05-06
US10405361B2 (en) 2019-09-03
CN105636234A (en) 2016-06-01
ES2788456T3 (en) 2020-10-21
US20170359844A1 (en) 2017-12-14
EP3214891A4 (en) 2018-05-30
EP3214891B1 (en) 2020-02-19

Similar Documents

Publication Publication Date Title
US10405361B2 (en) Switching-on method, base station, base station controller, switching-on system and storage medium
US9038053B2 (en) Non-disruptive software updates for servers processing network traffic
CN109451021B (en) Internet of things edge side multi-heterogeneous network access system and method
CN102972070B (en) System and method for using multiple network addresses to establish synchronization of a device under test and test equipment controlling the test
CN105446928B (en) The serial bus communication method and system that address is distributed automatically
CN110752954A (en) Networking fault detection method and related device for household electrical appliance
CN109040178B (en) Configuration information sending method and device
CN103138988A (en) Positioning treatment method and positioning treatment device of network faults
CN101820359A (en) Fault processing method and equipment for network equipment
US9575915B2 (en) Data migration method and apparatus
CN102665237B (en) Simulative Ir interface protocol conformance testing device and interoperability testing method
WO2020000657A1 (en) Method and apparatus for establishing operation and maintenance monitoring connection, terminal device, and medium
CN112714010B (en) Network topology management method and device, expansion unit and storage medium
CN103533069B (en) Method for starting automatic configuration of network equipment and network equipment
CN116137603B (en) Link fault detection method and device, storage medium and electronic device
EP3180659B1 (en) Mobile device, engineering tool device, system and methods for cable configuration in a process control system
CN105099734B (en) A kind of fault cues method and device
US20160156501A1 (en) Network apparatus with inserted management mechanism, system, and method for management and supervision
CN114244686B (en) Communication fault detection method, device and system
CN115454896A (en) SMBUS-based SSD MCTP control message verification method and device, computer equipment and storage medium
EP2887754B1 (en) Method, device and system for determining working mode of data card type terminal
CN102761518B (en) Communication method and server supporting multiple socket connection modes
JP2011087190A (en) Intra-office apparatus, optical communication system, configuration detecting method and program of the apparatus
CN102013918B (en) Method, system and device for transmitting data
CN105681065A (en) Device operation and maintenance method and system

Legal Events

Date Code Title Description
STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE

PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170525

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIC1 Information provided on ipc code assigned before grant

Ipc: H04W 24/02 20090101ALI20171012BHEP

Ipc: H04W 92/12 20090101ALN20171012BHEP

Ipc: H04W 76/02 20090101AFI20171012BHEP

DAV Request for validation of the european patent (deleted)
DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20180504

RIC1 Information provided on ipc code assigned before grant

Ipc: H04J 3/08 20060101ALI20180426BHEP

Ipc: H04W 92/12 20090101ALN20180426BHEP

Ipc: H04W 76/10 20180101ALI20180426BHEP

Ipc: H04L 12/46 20060101ALI20180426BHEP

Ipc: H04B 1/715 20110101ALI20180426BHEP

Ipc: H04W 88/12 20090101ALI20180426BHEP

Ipc: H04W 24/02 20090101AFI20180426BHEP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R079

Ref document number: 602015047493

Country of ref document: DE

Free format text: PREVIOUS MAIN CLASS: H04W0076020000

Ipc: H04W0024020000

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: H04J 3/16 20060101ALN20190424BHEP

Ipc: H04J 3/08 20060101ALN20190424BHEP

Ipc: H04W 76/10 20180101ALI20190424BHEP

Ipc: H04W 92/12 20090101ALN20190424BHEP

Ipc: H04W 88/12 20090101ALI20190424BHEP

Ipc: H04W 24/02 20090101AFI20190424BHEP

INTG Intention to grant announced

Effective date: 20190527

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602015047493

Country of ref document: DE

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1236370

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200315

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200519

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200520

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200519

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200619

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2788456

Country of ref document: ES

Kind code of ref document: T3

Effective date: 20201021

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200712

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1236370

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200219

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602015047493

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20201120

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200430

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200427

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200430

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20200430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200430

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20200519

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200519

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200427

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200219

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20230307

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240308

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 20240509

Year of fee payment: 10