[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

EP3093401B1 - Apparatus for controlling combined-operation of construction machine - Google Patents

Apparatus for controlling combined-operation of construction machine Download PDF

Info

Publication number
EP3093401B1
EP3093401B1 EP14873984.0A EP14873984A EP3093401B1 EP 3093401 B1 EP3093401 B1 EP 3093401B1 EP 14873984 A EP14873984 A EP 14873984A EP 3093401 B1 EP3093401 B1 EP 3093401B1
Authority
EP
European Patent Office
Prior art keywords
driving
pump
valve
swing
construction machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP14873984.0A
Other languages
German (de)
French (fr)
Other versions
EP3093401A1 (en
EP3093401A4 (en
Inventor
Myeong Ku Yeo
Hong Sup Kwak
Hee Seog KONG
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HD Hyundai Infracore Co Ltd
Original Assignee
Doosan Infracore Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Doosan Infracore Co Ltd filed Critical Doosan Infracore Co Ltd
Publication of EP3093401A1 publication Critical patent/EP3093401A1/en
Publication of EP3093401A4 publication Critical patent/EP3093401A4/en
Application granted granted Critical
Publication of EP3093401B1 publication Critical patent/EP3093401B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/16Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
    • F15B11/17Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors using two or more pumps
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2221Control of flow rate; Load sensing arrangements
    • E02F9/2239Control of flow rate; Load sensing arrangements using two or more pumps with cross-assistance
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2282Systems using center bypass type changeover valves
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F9/00Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
    • E02F9/20Drives; Control devices
    • E02F9/22Hydraulic or pneumatic drives
    • E02F9/2278Hydraulic circuits
    • E02F9/2285Pilot-operated systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B11/00Servomotor systems without provision for follow-up action; Circuits therefor
    • F15B11/16Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors
    • F15B11/20Servomotor systems without provision for follow-up action; Circuits therefor with two or more servomotors controlling several interacting or sequentially-operating members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B13/00Details of servomotor systems ; Valves for servomotor systems
    • F15B13/02Fluid distribution or supply devices characterised by their adaptation to the control of servomotors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/20Fluid pressure source, e.g. accumulator or variable axial piston pump
    • F15B2211/205Systems with pumps
    • F15B2211/20576Systems with pumps with multiple pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/305Directional control characterised by the type of valves
    • F15B2211/3056Assemblies of multiple valves
    • F15B2211/3059Assemblies of multiple valves having multiple valves for multiple output members
    • F15B2211/30595Assemblies of multiple valves having multiple valves for multiple output members with additional valves between the groups of valves for multiple output members
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/30Directional control
    • F15B2211/31Directional control characterised by the positions of the valve element
    • F15B2211/3105Neutral or centre positions
    • F15B2211/3116Neutral or centre positions the pump port being open in the centre position, e.g. so-called open centre
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/40Flow control
    • F15B2211/415Flow control characterised by the connections of the flow control means in the circuit
    • F15B2211/41554Flow control characterised by the connections of the flow control means in the circuit being connected to a return line and a directional control valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/40Flow control
    • F15B2211/42Flow control characterised by the type of actuation
    • F15B2211/428Flow control characterised by the type of actuation actuated by fluid pressure
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/40Flow control
    • F15B2211/45Control of bleed-off flow, e.g. control of bypass flow to the return line
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/60Circuit components or control therefor
    • F15B2211/635Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements
    • F15B2211/6355Circuits providing pilot pressure to pilot pressure-controlled fluid circuit elements having valve means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/70Output members, e.g. hydraulic motors or cylinders or control therefor
    • F15B2211/71Multiple output members, e.g. multiple hydraulic motors or cylinders
    • F15B2211/7135Combinations of output members of different types, e.g. single-acting cylinders with rotary motors
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/70Output members, e.g. hydraulic motors or cylinders or control therefor
    • F15B2211/71Multiple output members, e.g. multiple hydraulic motors or cylinders
    • F15B2211/7142Multiple output members, e.g. multiple hydraulic motors or cylinders the output members being arranged in multiple groups
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F15FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
    • F15BSYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
    • F15B2211/00Circuits for servomotor systems
    • F15B2211/70Output members, e.g. hydraulic motors or cylinders or control therefor
    • F15B2211/78Control of multiple output members
    • F15B2211/781Control of multiple output members one or more output members having priority

Definitions

  • An exemplary embodiment of the present disclosure relates to a construction machine, and more particularly, to an apparatus for controlling a combined-operations of a construction machine, which is capable of maintaining swing performance during a combined operations of driving and swinging of the construction machine.
  • a construction machine such as an excavator includes an engine, a hydraulic pump which generates hydraulic pressure by using power from the engine, a control unit which controls the hydraulic pressure generated by the hydraulic pump by using a hydraulic pressure valve, and actuators which perform work by using hydraulic pressure.
  • the construction machine controls flow rates and hydraulic pressure to perform specific work by operating a boom, an arm, a bucket and the like, and in this case, the flow rates and the hydraulic pressure applied to the actuators need to be controlled.
  • the construction machine has at least two main pumps, and pressurized oil of the main pumps is appropriately distributed and used for a driving or front operation.
  • the front operation means operations such as an operation of moving up/down the boom, arm crowd, bucket crowd/dump, and swing of the construction machine such as an excavator.
  • the driving motor and the swing motor share the amount of oil discharged from the single main pump.
  • WO 2013/089295 A1 discloses a traveling control system for a construction machine, comprising first and second variable displacement hydraulic pumps; a left traveling motor connected to the first hydraulic pump and a first attachment; a plurality of switching valves installed in a flow path of the first hydraulic pump and configured to be shifted to control a hydraulic fluid being supplied to the left traveling motor and the first attachment; a right traveling motor connected to the second hydraulic pump and a second attachment; a plurality of switching valves installed in a flow path of the second hydraulic pump and configured to be shifted to control a hydraulic fluid being supplied to the right traveling motor and the second attachment; a straight traveling valve installed in the flow path of the second hydraulic pump and configured to be shifted to supply the hydraulic fluid discharged from the first hydraulic pump to the left and right traveling motors and to supply the hydraulic fluid discharged from the second hydraulic pump to the first attachment and the second attachment, respectively; and a control valve installed in a branch flow path having an inlet side that is connected to a flow path branched off from the flow path of the second hydraulic
  • An exemplary embodiment of the present disclosure provides an apparatus for controlling a combined operations of a construction machine, which is capable of controlling a swing speed when the construction machine performs a combined operations of driving and swinging so that the swing speed is equal to a swing speed when only a swinging operation is performed.
  • the driving priority valve may be positioned at a most upstream side of the second pump.
  • the apparatus may further include a switching valve which provides pressurized oil for switching the driving priority valve.
  • the switching valve may be switched by driving pilot pressure discharged from the operating unit when the combined operations of driving and swinging are performed by the operation of the operating unit, and swing pilot pressure discharged from the operating unit may be supplied to the driving priority valve.
  • the apparatus may further include a bypass valve which controls pressurized oil discharged from the second pump, in which the switching valve provides the swing pilot pressure to the bypass valve when the combined operations are performed.
  • the bypass valve may be positioned at the most downstream side of the second pump, and may allow the second pump to communicate with a hydraulic oil tank.
  • the first pump is used only to perform the driving operation and the second pump is used to perform the swinging operation when the combined operations of driving and swinging are performed, such that the driving and swinging operations may have no effect on each other, and may use a maximum flow rate (maximum speed).
  • Exemplary embodiments of the present disclosure illustrate ideal exemplary embodiments of the present disclosure in more detail. As a result, various modifications of the drawings are expected. Therefore, the exemplary embodiments are not limited to specific forms in regions illustrated in the drawings, and also include, for example, modifications of forms by the manufacture.
  • FIGS. 1 and 2 an apparatus for controlling a combined operations of a construction machine according to an exemplary embodiment of the present disclosure will be described with reference to FIGS. 1 and 2 .
  • the apparatus for controlling the combined operations of the construction machine includes a first pump PI, a second pump P2, a driving control spool 20, a swing control spool 30, and a driving priority valve 40.
  • the apparatus for controlling the combined operations of the construction machine has the first pump P1 and the second pump P2 in order to perform driving and front operations.
  • the first pump P1 Based on an operation of an operating unit 10, the first pump P1 provides pressurized oil to a plurality of actuators for performing the driving and front operations of the construction machine.
  • the second pump P2 provides pressurized oil to the plurality of actuators for performing front operations of the construction machine.
  • the first pump P1 and the second pump P2 use pressurized oil by appropriately distributing the pressurized oil to the plurality of actuators.
  • the front operation means operations such as an operation of moving up/down the boom, arm crowd, bucket crowd/dump, and swing of the construction machine such as an excavator.
  • the driving control spool 20 and the swing control spool 30 are installed in a flow path which is connected with the first pump P1 and the second pump P2.
  • the driving control spool 20 allows the first pump P1 to communicate with a driving motor 70. That is, the driving control spool 20 controls a flow of the pressurized oil being supplied to the driving motor 70.
  • the swing control spool 30 is positioned at a downstream side of the driving control spool 20 and allows the first pump to communicate with a swing motor 80 when the swinging operation is performed by the operating unit 10. That is, the swing control spool 30 controls a flow of the pressurized oil being supplied to the swing motor 80.
  • the driving priority valve 40 supplies the pressurized oil discharged from the first pump P1 only to the driving control spool 20, and supplies the pressurized oil discharged from the second pump P2 to the swing control spool 30.
  • the driving priority valve 40 may be positioned at a most upstream side of the second pump P2.
  • the apparatus for controlling the combined operations of the construction machine according to the exemplary embodiment of the present disclosure may further include a switching valve 50.
  • the switching valve 50 provides pressurized oil for switching the driving priority valve 40.
  • the direction of the switching valve 50 is changed to one direction by inputted pilot pressure, such that the switching valve 50 provides the pressurized oil to the driving priority valve 40.
  • the pilot pressure inputted to the switching valve 50 is generated when the operating unit 10 is operated. If the combined operations of driving and swinging are performed by the operating unit 10, driving pilot pressure and swing pilot pressure are discharged from the operating unit 10.
  • the swing pilot pressure discharged from the operating unit 10 is supplied to a lower end of the switching valve 50 through a first supply line 12, and the driving pilot pressure is supplied to one side of the switching valve 50 through a second supply line 14.
  • the direction of the switching valve 50 is changed to one direction only when the amount of the driving pilot pressure supplied to one side of the switching valve 50 is larger than pressure preset to the switching valve 50.
  • a first shuttle valve 11 may be further provided in the first supply line 12, and a second shuttle valve 13 may be further provided in the second supply line 14.
  • the first shuttle valve 11 receives left swing pilot pressure and right swing pilot pressure generated by the swinging operation of the operating unit 10, and selects higher pressure from the inputted left and right swing pilot pressure and supplies the higher pressure to the lower end of the switching valve 50.
  • the second shuttle valve 13 receives forward driving (FWD) pilot pressure and reverse driving (REV) pilot pressure generated by the driving operation of the operating unit 10, and selects higher pressure from the inputted forward and reverse driving pilot pressures and supplies the higher pressure to one side of the switching valve 50.
  • FWD forward driving
  • REV reverse driving
  • the swing pilot pressure which is supplied to the lower end of the switching valve 50, is supplied to a first merging line 51 and a second merging line 52.
  • the swing pilot pressure supplied to the first merging line 51 is supplied to a bypass valve 60.
  • the swing pilot pressure supplied to the second merging line 52 is provided as pressure for switching the driving priority valve 40.
  • the bypass valve 60 is positioned at a most downstream side of the second pump P2. Therefore, the second pump P2 and a hydraulic oil tank T are in communication with each other.
  • the pressurized oil discharged from the second pump P2 is discharged into the hydraulic oil tank T.
  • the pilot pressure supplied to the bypass valve 60 prevents the pressurized oil discharged from the second pump P2 from being discharged into the hydraulic oil tank T.
  • bypass valve 60 is switched in accordance with the swing pilot pressure, and as a result, it is possible to variably control the amount of oil being discharged from the second pump P2 into the tank T.
  • the structure of the driving priority valve 40 or 41 according to the exemplary embodiment of the present disclosure may be formed as illustrated in FIGS. 1 and 2 or as illustrated in FIGS. 3 and 4 .
  • the structure of the driving priority valve 40 is not particularly limited as long as the valve structure is a valve structure in which a flow path is disposed so that when the driving priority valve 40 is switched by the pilot pressure, a part of the pressurized oil discharged from the driving priority valve 40 may be supplied to the swing control spool 30, and the remaining part of the pressurized oil may be discharged into the hydraulic oil tank T.
  • the structure of the driving priority valve 40 illustrated in FIGS. 1 to 4 may vary depending on those skilled in the art who implement the present disclosure.
  • the first pump P1 is used only to perform the driving operation and the second pump P2 is used to perform the swinging operation when the combined operations of driving and swinging are performed, such that the driving and swinging operations may have no effect on each other, and may use a maximum flow rate (maximum speed).

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Operation Control Of Excavators (AREA)
  • Fluid-Pressure Circuits (AREA)

Description

    [Technical Field]
  • An exemplary embodiment of the present disclosure relates to a construction machine, and more particularly, to an apparatus for controlling a combined-operations of a construction machine, which is capable of maintaining swing performance during a combined operations of driving and swinging of the construction machine.
  • [Background Art]
  • In general, a construction machine such as an excavator includes an engine, a hydraulic pump which generates hydraulic pressure by using power from the engine, a control unit which controls the hydraulic pressure generated by the hydraulic pump by using a hydraulic pressure valve, and actuators which perform work by using hydraulic pressure.
  • In particular, the construction machine controls flow rates and hydraulic pressure to perform specific work by operating a boom, an arm, a bucket and the like, and in this case, the flow rates and the hydraulic pressure applied to the actuators need to be controlled.
  • The construction machine has at least two main pumps, and pressurized oil of the main pumps is appropriately distributed and used for a driving or front operation.
  • Here, the front operation means operations such as an operation of moving up/down the boom, arm crowd, bucket crowd/dump, and swing of the construction machine such as an excavator.
  • In the case of a hydraulic system for a construction machine in the related art, when the construction machine performs a combined operations of driving and swinging, pressurized oil discharged from a single main pump is used and distributed to a driving motor for performing a driving operation and a swing motor for performing a swinging operation.
  • However, even though the hydraulic pressure system includes two main pumps, the driving motor and the swing motor share the amount of oil discharged from the single main pump.
  • Therefore, there is a problem in that a larger amount of oil is supplied to the driving motor than the swing motor, such that a driving speed is high, while a swing speed is very low.
  • WO 2013/089295 A1 discloses a traveling control system for a construction machine, comprising first and second variable displacement hydraulic pumps; a left traveling motor connected to the first hydraulic pump and a first attachment; a plurality of switching valves installed in a flow path of the first hydraulic pump and configured to be shifted to control a hydraulic fluid being supplied to the left traveling motor and the first attachment; a right traveling motor connected to the second hydraulic pump and a second attachment; a plurality of switching valves installed in a flow path of the second hydraulic pump and configured to be shifted to control a hydraulic fluid being supplied to the right traveling motor and the second attachment; a straight traveling valve installed in the flow path of the second hydraulic pump and configured to be shifted to supply the hydraulic fluid discharged from the first hydraulic pump to the left and right traveling motors and to supply the hydraulic fluid discharged from the second hydraulic pump to the first attachment and the second attachment, respectively; and a control valve installed in a branch flow path having an inlet side that is connected to a flow path branched off from the flow path of the second hydraulic pump and an outlet side that is connected to the flow path of the second hydraulic pump on a downstream side of the straight traveling valve, and configured to serve as a check valve and an orifice so as to interrupt the supply of the hydraulic fluid from the second hydraulic pump to the left traveling motor and the right traveling motor via the straight traveling valve during a combined operation in which a traveling operation and a working operation are performed simultaneously.
  • [Disclosure] [Technical Problem]
  • An exemplary embodiment of the present disclosure provides an apparatus for controlling a combined operations of a construction machine, which is capable of controlling a swing speed when the construction machine performs a combined operations of driving and swinging so that the swing speed is equal to a swing speed when only a swinging operation is performed.
  • [Technical Solution]
  • According to the invention, an apparatus having the features of claim 1 is provided.
  • The driving priority valve may be positioned at a most upstream side of the second pump.
  • The apparatus may further include a switching valve which provides pressurized oil for switching the driving priority valve.
  • The switching valve may be switched by driving pilot pressure discharged from the operating unit when the combined operations of driving and swinging are performed by the operation of the operating unit, and swing pilot pressure discharged from the operating unit may be supplied to the driving priority valve.
  • The apparatus may further include a bypass valve which controls pressurized oil discharged from the second pump, in which the switching valve provides the swing pilot pressure to the bypass valve when the combined operations are performed.
  • The bypass valve may be positioned at the most downstream side of the second pump, and may allow the second pump to communicate with a hydraulic oil tank.
  • [Advantageous Effects]
  • According to the exemplary embodiment of the present disclosure, in the apparatus for controlling the combined operations of the construction machine, the first pump is used only to perform the driving operation and the second pump is used to perform the swinging operation when the combined operations of driving and swinging are performed, such that the driving and swinging operations may have no effect on each other, and may use a maximum flow rate (maximum speed).
  • [Description of Drawings]
    • FIGS. 1 and 2 are circuit diagrams of an apparatus for controlling a combined operations of a construction machine according to an exemplary embodiment of the present disclosure.
    • FIGS. 3 and 4 are circuit diagrams of an apparatus for controlling a combined operations of a construction machine according to another exemplary embodiment of the present disclosure, which uses a driving priority valve having a structure different from a structure of a driving priority valve illustrated in FIG. 1.
    [Description of Main Reference Numerals of Drawings]
  • 10:
    Operating unit
    11:
    First shuttle valve
    12:
    First supply line
    13:
    Second shuttle valve
    14:
    Second supply line
    20:
    Driving control spool
    30:
    Swing control spool
    40:
    Driving priority valve
    50:
    Switching valve
    51:
    First merging line
    52:
    Second merging line
    60:
    Bypass valve
    PI:
    First pump
    P2:
    Second pump
    T:
    Hydraulic oil tank
    [Best Mode]
  • Hereinafter, exemplary embodiments of the present disclosure will be described in detail with reference to the accompanying drawings so that those skilled in the technical field to which the present disclosure pertains may easily carry out the exemplary embodiments. The present disclosure may be implemented in various different ways, and is not limited to the exemplary embodiments described herein.
  • It is noted that the drawings are schematic, and are not illustrated based on actual scales. Relative dimensions and proportions of parts illustrated in the drawings are exaggerated or reduced in size for the purpose of clarity and convenience in the drawings, and any dimension is just illustrative but not restrictive. Further, the same reference numerals designate the same structures, elements or components illustrated in two or more drawings in order to exhibit similar characteristics.
  • Exemplary embodiments of the present disclosure illustrate ideal exemplary embodiments of the present disclosure in more detail. As a result, various modifications of the drawings are expected. Therefore, the exemplary embodiments are not limited to specific forms in regions illustrated in the drawings, and also include, for example, modifications of forms by the manufacture.
  • Hereinafter, an apparatus for controlling a combined operations of a construction machine according to an exemplary embodiment of the present disclosure will be described with reference to FIGS. 1 and 2.
  • As illustrated in FIGS. 1 and 2, the apparatus for controlling the combined operations of the construction machine according to the exemplary embodiment of the present disclosure includes a first pump PI, a second pump P2, a driving control spool 20, a swing control spool 30, and a driving priority valve 40.
  • The apparatus for controlling the combined operations of the construction machine according to the exemplary embodiment of the present disclosure has the first pump P1 and the second pump P2 in order to perform driving and front operations.
  • Based on an operation of an operating unit 10, the first pump P1 provides pressurized oil to a plurality of actuators for performing the driving and front operations of the construction machine.
  • In addition, based on the operation of the operating unit 10, the second pump P2 provides pressurized oil to the plurality of actuators for performing front operations of the construction machine.
  • That is, the first pump P1 and the second pump P2 use pressurized oil by appropriately distributing the pressurized oil to the plurality of actuators.
  • In this case, the front operation means operations such as an operation of moving up/down the boom, arm crowd, bucket crowd/dump, and swing of the construction machine such as an excavator.
  • The driving control spool 20 and the swing control spool 30 are installed in a flow path which is connected with the first pump P1 and the second pump P2.
  • When the driving operation is performed by the operating unit 10, the driving control spool 20 allows the first pump P1 to communicate with a driving motor 70. That is, the driving control spool 20 controls a flow of the pressurized oil being supplied to the driving motor 70.
  • The swing control spool 30 is positioned at a downstream side of the driving control spool 20 and allows the first pump to communicate with a swing motor 80 when the swinging operation is performed by the operating unit 10. That is, the swing control spool 30 controls a flow of the pressurized oil being supplied to the swing motor 80.
  • When the combined operations of driving and swinging are performed by the operating unit 10, the driving priority valve 40 supplies the pressurized oil discharged from the first pump P1 only to the driving control spool 20, and supplies the pressurized oil discharged from the second pump P2 to the swing control spool 30.
  • In this case, the driving priority valve 40 may be positioned at a most upstream side of the second pump P2.
  • The apparatus for controlling the combined operations of the construction machine according to the exemplary embodiment of the present disclosure may further include a switching valve 50.
  • Specifically, the switching valve 50 provides pressurized oil for switching the driving priority valve 40. The direction of the switching valve 50 is changed to one direction by inputted pilot pressure, such that the switching valve 50 provides the pressurized oil to the driving priority valve 40.
  • The pilot pressure inputted to the switching valve 50 is generated when the operating unit 10 is operated. If the combined operations of driving and swinging are performed by the operating unit 10, driving pilot pressure and swing pilot pressure are discharged from the operating unit 10.
  • In this case, the swing pilot pressure discharged from the operating unit 10 is supplied to a lower end of the switching valve 50 through a first supply line 12, and the driving pilot pressure is supplied to one side of the switching valve 50 through a second supply line 14.
  • The direction of the switching valve 50 is changed to one direction only when the amount of the driving pilot pressure supplied to one side of the switching valve 50 is larger than pressure preset to the switching valve 50.
  • According to the exemplary embodiment of the present disclosure, a first shuttle valve 11 may be further provided in the first supply line 12, and a second shuttle valve 13 may be further provided in the second supply line 14.
  • The first shuttle valve 11 receives left swing pilot pressure and right swing pilot pressure generated by the swinging operation of the operating unit 10, and selects higher pressure from the inputted left and right swing pilot pressure and supplies the higher pressure to the lower end of the switching valve 50.
  • The second shuttle valve 13 receives forward driving (FWD) pilot pressure and reverse driving (REV) pilot pressure generated by the driving operation of the operating unit 10, and selects higher pressure from the inputted forward and reverse driving pilot pressures and supplies the higher pressure to one side of the switching valve 50.
  • When the switching valve 50 is switched by the driving pilot pressure, the swing pilot pressure, which is supplied to the lower end of the switching valve 50, is supplied to a first merging line 51 and a second merging line 52.
  • In this case, the swing pilot pressure supplied to the first merging line 51 is supplied to a bypass valve 60.
  • The swing pilot pressure supplied to the second merging line 52 is provided as pressure for switching the driving priority valve 40.
  • The bypass valve 60 is positioned at a most downstream side of the second pump P2. Therefore, the second pump P2 and a hydraulic oil tank T are in communication with each other.
  • When the construction machine according to the exemplary embodiment of the present disclosure only performs the driving operation without performing the swinging operation, the pressurized oil discharged from the second pump P2 is discharged into the hydraulic oil tank T.
  • At this time, if the combined operations of driving and swinging are performed by the operating unit 10, the pilot pressure supplied to the bypass valve 60 prevents the pressurized oil discharged from the second pump P2 from being discharged into the hydraulic oil tank T.
  • That is, the bypass valve 60 is switched in accordance with the swing pilot pressure, and as a result, it is possible to variably control the amount of oil being discharged from the second pump P2 into the tank T.
  • In this case, the structure of the driving priority valve 40 or 41 according to the exemplary embodiment of the present disclosure may be formed as illustrated in FIGS. 1 and 2 or as illustrated in FIGS. 3 and 4.
  • That is, the structure of the driving priority valve 40 is not particularly limited as long as the valve structure is a valve structure in which a flow path is disposed so that when the driving priority valve 40 is switched by the pilot pressure, a part of the pressurized oil discharged from the driving priority valve 40 may be supplied to the swing control spool 30, and the remaining part of the pressurized oil may be discharged into the hydraulic oil tank T.
  • Therefore, the structure of the driving priority valve 40 illustrated in FIGS. 1 to 4 may vary depending on those skilled in the art who implement the present disclosure.
  • According to the apparatus for controlling the combined operations of the construction machine which have the aforementioned configurations, the first pump P1 is used only to perform the driving operation and the second pump P2 is used to perform the swinging operation when the combined operations of driving and swinging are performed, such that the driving and swinging operations may have no effect on each other, and may use a maximum flow rate (maximum speed).

Claims (6)

  1. An apparatus for controlling a combined operations of a construction machine, the apparatus comprising:
    a plurality of actuators including one driving motor (70) for performing driving operation and a swing motor (80) for performing swinging operation;
    an operating unit (10);
    a first pump (P1) and a second pump (P2) which provide pressurized oil to the plurality of actuators for performing driving and swinging operations of the construction machine by an operation of the operating unit (10);
    a driving control spool (20) which allows the first pump (P1) to communicate with the driving motor (70); and
    a swing control spool (30) which is positioned at a downstream of the driving control spool (20) and allows the first pump (P1) to communicate with the swing motor (80),
    wherein the driving control spool (20) allows the driving motor (70) to selectively communicate with the first pump (P1), and the apparatus comprises a driving priority valve (40) which allows the pressurized oil discharged from the first pump (P1) to be supplied to only the driving control spool (20) and allows the pressurized oil discharged from the second pump (P2) to be supplied to the swing control spool (30) when a combined operations of driving and swinging of the construction machine are performed.
  2. The apparatus of claim 1, wherein the driving priority valve (40) is positioned at a most upstream side of the second pump (P2).
  3. The apparatus of claim 1, further comprising:
    a switching valve (50) which provides pressurized oil for switching the driving priority valve (40).
  4. The apparatus of claim 3, wherein the switching valve (50) is switched by driving pilot pressure discharged from the operating unit (10) when the combined operations of driving and swinging are performed by the operation of the operating unit (10), and swing pilot pressure discharged from the operating unit (10) is supplied to the driving priority valve (40) to be switched,
    wherein the switching valve (50) is switched only when the amount of the driving pilot pressure supplied to one side of the switching valve (50) is larger than pressure preset to the switching valve (50).
  5. The apparatus of claim 4, further comprising:
    a bypass valve (60) which controls pressurized oil discharged from the second pump (P2),
    wherein the switching valve (50) provides the swing pilot pressure for switching the bypass valve (60) when the combined operations are performed.
  6. The apparatus of claim 5, wherein the bypass valve (60) is positioned at the most downstream side of the second pump (P2), and allows the second pump (P2) to communicate with a hydraulic oil tank (T).
EP14873984.0A 2013-12-26 2014-12-17 Apparatus for controlling combined-operation of construction machine Active EP3093401B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020130164663A KR102083687B1 (en) 2013-12-26 2013-12-26 Combined operation controlling appratus of construction machine
PCT/KR2014/012439 WO2015099352A1 (en) 2013-12-26 2014-12-17 Apparatus for controlling combined-operation of construction machine

Publications (3)

Publication Number Publication Date
EP3093401A1 EP3093401A1 (en) 2016-11-16
EP3093401A4 EP3093401A4 (en) 2017-09-13
EP3093401B1 true EP3093401B1 (en) 2019-09-25

Family

ID=53479143

Family Applications (1)

Application Number Title Priority Date Filing Date
EP14873984.0A Active EP3093401B1 (en) 2013-12-26 2014-12-17 Apparatus for controlling combined-operation of construction machine

Country Status (4)

Country Link
EP (1) EP3093401B1 (en)
KR (1) KR102083687B1 (en)
CN (1) CN105917052B (en)
WO (1) WO2015099352A1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110925253B (en) * 2019-12-19 2021-11-09 三一重机有限公司 Engineering machinery composite action control method and device

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4112821A (en) * 1976-12-03 1978-09-12 Caterpillar Tractor Co. Fluid control system for multiple circuited work elements
JP2776702B2 (en) * 1992-09-18 1998-07-16 新キャタピラー三菱株式会社 Hydraulic circuit of construction machinery
US5940997A (en) * 1997-09-05 1999-08-24 Hitachi Construction Machinery Co., Ltd. Hydraulic circuit system for hydraulic working machine
KR100797315B1 (en) * 2001-07-16 2008-01-23 두산인프라코어 주식회사 Hydraulic apparatus for controlling complex work mode of travel and front works
JP4033849B2 (en) * 2004-03-30 2008-01-16 株式会社カワサキプレシジョンマシナリ Variable displacement hydraulic pump controller
JP5238181B2 (en) * 2007-04-17 2013-07-17 カヤバ工業株式会社 Excavator
KR100974285B1 (en) * 2008-08-12 2010-08-06 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 hydraulic circuit of normal open type
KR20100044585A (en) * 2008-10-22 2010-04-30 볼보 컨스트럭션 이키프먼트 홀딩 스웨덴 에이비 Hydraulic circuit of construction equipment of having swing apparatus
JP2010101095A (en) 2008-10-24 2010-05-06 Kobelco Contstruction Machinery Ltd Hydraulic control device for working machine
KR101625681B1 (en) * 2009-12-23 2016-05-30 두산인프라코어 주식회사 Sudden Turning Prevention System for Construction Machinery
KR101641270B1 (en) * 2011-12-15 2016-07-20 볼보 컨스트럭션 이큅먼트 에이비 Travel control system for construction machinery
CN102587445A (en) * 2012-03-20 2012-07-18 龙工(上海)桥箱有限公司 Load sensing flow control hydraulic system with energy regeneration and conservation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
EP3093401A1 (en) 2016-11-16
CN105917052B (en) 2018-11-30
KR20150076045A (en) 2015-07-06
KR102083687B1 (en) 2020-04-14
CN105917052A (en) 2016-08-31
EP3093401A4 (en) 2017-09-13
WO2015099352A1 (en) 2015-07-02

Similar Documents

Publication Publication Date Title
EP2157245B1 (en) Hydraulic system for construction equipment
US10107311B2 (en) Hydraulic drive system for construction machine
JP5669448B2 (en) Hydraulic drive system for excavator
US9932995B2 (en) Hydraulic excavator drive system
JP2010013927A (en) Hydraulic drive system for excavator
EP3203086A1 (en) Hydraulic circuit for construction machine
KR101190553B1 (en) Hydraulic drive apparatus for cosntruction machinery
EP2799723B1 (en) System for reducing fuel consumption in excavator
JP6004900B2 (en) Hydraulic pressure control device for power shovel
US9765504B2 (en) Hydraulic system for construction machinery
RU2698149C2 (en) Machine hydraulic system and machine
KR20030008069A (en) Hydraulic apparatus for controlling complex work mode of travel and front works
KR20150033928A (en) A Hydraulic Control System for Driving Complex Operation of Construction Equipment
EP3093401B1 (en) Apparatus for controlling combined-operation of construction machine
KR101080173B1 (en) A main control valve assembly for excavator with multiple control valve units
JP6012021B2 (en) Hydraulic pressure control device for power shovel
KR102088062B1 (en) Travel control apparatus of excavator
KR20080051212A (en) Hydraulic system for small-sized excavator to improve bucket speed
JP5455563B2 (en) Hydraulic circuit device
KR102083034B1 (en) Main control valve for Excavator
KR101568047B1 (en) Hydraulic Circuit for Arm and Bucket of Excavator
RU2668413C2 (en) Hydraulic system for machine, machine and method of controlling hydraulic system
KR20200037480A (en) Contorl system for construction machinery
KR20120046343A (en) Hydraulic circuit for construction machinery

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20160726

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RIN1 Information on inventor provided before grant (corrected)

Inventor name: KONG, HEE SEOG

Inventor name: YEO, MYEONG KU

Inventor name: KWAK, HONG SUP

DAX Request for extension of the european patent (deleted)
A4 Supplementary search report drawn up and despatched

Effective date: 20170817

RIC1 Information provided on ipc code assigned before grant

Ipc: F15B 13/02 20060101ALI20170810BHEP

Ipc: F15B 11/20 20060101ALI20170810BHEP

Ipc: E02F 9/22 20060101AFI20170810BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

INTG Intention to grant announced

Effective date: 20190416

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 1183951

Country of ref document: AT

Kind code of ref document: T

Effective date: 20191015

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602014054371

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191225

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20191226

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 1183951

Country of ref document: AT

Kind code of ref document: T

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200127

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200224

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602014054371

Country of ref document: DE

PG2D Information on lapse in contracting state deleted

Ref country code: IS

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200126

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20191231

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

26N No opposition filed

Effective date: 20200626

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191217

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191217

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20191231

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20141217

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602014054371

Country of ref document: DE

Owner name: HYUNDAI DOOSAN INFRACORE CO., LTD., KR

Free format text: FORMER OWNER: DOOSAN INFRACORE CO., LTD., INCHEON, KR

Ref country code: DE

Ref legal event code: R081

Ref document number: 602014054371

Country of ref document: DE

Owner name: HD HYUNDAI INFRACORE CO., LTD., KR

Free format text: FORMER OWNER: DOOSAN INFRACORE CO., LTD., INCHEON, KR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20190925

REG Reference to a national code

Ref country code: DE

Ref legal event code: R081

Ref document number: 602014054371

Country of ref document: DE

Owner name: HD HYUNDAI INFRACORE CO., LTD., KR

Free format text: FORMER OWNER: HYUNDAI DOOSAN INFRACORE CO., LTD., INCHEON, KR

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20231109

Year of fee payment: 10

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20231108

Year of fee payment: 10

Ref country code: DE

Payment date: 20231114

Year of fee payment: 10