EP2751377B1 EP11871579.6A EP11871579A EP2751377B1 EP 2751377 B1 EP2751377 B1 EP 2751377B1 EP 11871579 A EP11871579 A EP 11871579A EP 2751377 B1 EP2751377 B1 EP 2751377B1
Authority
EP
European Patent Office
Prior art keywords
zone
flow control
fluid flow
fcd
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
EP11871579.6A
Other languages
German (de)
French (fr)
Other versions
EP2751377A1 (en
EP2751377A4 (en
Inventor
John Charles GANO
Luke William Holderman
Michael Linley Fripp
Jason D. Dykstra
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Energy Services Inc
Original Assignee
Halliburton Energy Services Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Energy Services Inc filed Critical Halliburton Energy Services Inc
Publication of EP2751377A1 publication Critical patent/EP2751377A1/en
Publication of EP2751377A4 publication Critical patent/EP2751377A4/en
Application granted granted Critical
Publication of EP2751377B1 publication Critical patent/EP2751377B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/14Obtaining from a multiple-zone well
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • E21B43/27Methods for stimulating production by forming crevices or fractures by use of eroding chemicals, e.g. acids
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/08Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/12Methods or apparatus for controlling the flow of the obtained fluid to or in wells

Definitions

  • This disclosure relates, in general, to equipment utilized in conjunction with operations performed in subterranean wells and, in particular, to a downhole fluid flow control system and method having dynamic response to local well conditions to control the inflow of formation fluids and the outflow of injection fluids.
  • production tubing and various completion equipment are installed in the well to enable safe and efficient production of the formation fluids.
  • the flow control devices may include one or more flow control components such as flow tubes, nozzles, labyrinths or the like.
  • the production flowrate through these flow control devices is fixed prior to installation by the number and design of the flow control components.
  • US 2006/162935 A1 discloses a snorkel device for flow control.
  • US 2006/124310 A1 discloses a system for completing multiple well intervals.
  • the disclosure herein comprises a downhole fluid flow control system and method having dynamic response to local well conditions to control the inflow of formation fluids and the outflow of injection fluids.
  • the downhole fluid flow control system and method of the present disclosure are operable to independently control the inflow of production fluids into multiple production intervals without the requirement for well intervention as formation pressure or the composition of the fluids produced into specific intervals changes over time.
  • the downhole fluid flow control system includes a tubing string operably positionable in a wellbore. Annular barriers are positioned between the tubing string and the wellbore to isolate first and second zones. A fluid flow control device is positioned within each zone. A flow tube operably associated with the fluid flow control device of the first zone operable to establish fluid communication between the second zone and the fluid flow control device in the first zone such that a differential pressure between the first zone and the second zone is operable to actuate the fluid flow control device of the first zone from a first operating configuration to a second operating configuration.
  • the first operating configuration is an open position and the second operating configuration is a closed position. In another embodiment, the first operating configuration is a closed position and the second operating configuration is an open position. In a further embodiment, the first operating configuration is an open position and the second operating configuration is a restricted position.
  • the flow tube extends through at least one of the annular barriers. In some embodiments, a flow tube operably associated with the fluid flow control device of the second zone extends through at least one of the annular barriers to establish fluid communication between the first zone and the fluid flow control device in the second zone such that a differential pressure between the first zone and the second zone is operable to actuate the fluid flow control device of the second zone from a first operating configuration to a second operating configuration.
  • the method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the first zone and the fluid flow control device in the second zone, flowing fluid through the fluid flow control device of the first zone, generating a differential pressure between the first zone and the second zone and actuating the fluid flow control device of the second zone from a first operating configuration to a second operating configuration responsive to the differential pressure.
  • the method may also include installing annular barriers between the tubing string and the wellbore, extending a flow tube through at least one of the annular barriers, injecting a fluid from an interior of the tubing string into the formation through the first zone, performing an acid stimulation of the first zone, performing a fracture operation in the formation, changing the viscosity of the fluid or actuating the fluid flow control device of the second zone from a closed position to an open position.
  • the method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the second zone and the fluid flow control device in the first zone, flowing fluid through the fluid flow control devices of the first zone and the second zone, generating a differential pressure between the first zone and the second zone and actuating the fluid flow control device of the first zone from a first operating configuration to a second operating configuration responsive to the differential pressure.
  • the method may also include installing annular barriers between the tubing string and the wellbore, extending a flow tube through at least one of the annular barriers, producing fluid from the formation into an interior of the tubing string through the first zone and the second zone, transitioning from production of a desired fluid to production of an undesired fluid in the first zone, increasing the flowrate of the fluid produced through the first zone, changing the viscosity of the fluid produced through the first zone, actuating the fluid flow control device of the first zone from an open position to a restricted position or actuating the fluid flow control device of the first zone from an open position to a closed position.
  • the method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the second zone and the fluid flow control device in the first zone, establishing fluid communication between the first zone and the fluid flow control device in the second zone, injecting fluid from a tubing string through the fluid flow control device of the first zone into a formation, generating a differential pressure between the first zone and the second zone and responsive to the differential pressure, opening the fluid flow control device in the second zone and closing the fluid flow control device in the first zone.
  • a well system including a downhole fluid flow control system embodying principles of the present invention that is schematically illustrated and generally designated 10.
  • a wellbore 12 extends through the various earth strata.
  • Wellbore 12 has a substantially vertical section 14, the upper portion of which has cemented therein a casing string 16.
  • Wellbore 12 also has a substantially horizontal section 18 that extends through a hydrocarbon bearing subterranean formation 20. As illustrated, substantially horizontal section 18 of wellbore 12 is open hole.
  • Tubing string 22 Positioned within wellbore 12 and extending from the surface is a tubing string 22.
  • Tubing string 22 provides a conduit for formation fluids to travel from formation 20 to the surface and for injection fluids to travel from the surface to formation 20.
  • tubing string 22 is coupled to a completions string 24 that has been installed in wellbore 12 and divides the completion interval into various production intervals identified as zone 1, zone 2, zone 3 ... zone N-1 and zone N.
  • Completion string 24 includes a plurality of flow control devices identified as FCD 1, FCD 2, FCD 3, FCD N-1 and FCD N, wherein FCD 1 corresponds with zone 1, FCD 2 corresponds to zone 2 and so forth.
  • annular barrier may refer to any suitable pressure barrier known to those skilled in the art including, but not limited to, production packers, inflatable packer, swellable packer or the like as well as materials such as gravel packs or other wellbore filler materials that are operable to provide a pressure differential thereacross, thereby isolating zones in the wellbore.
  • the annular barriers may or may not provide a complete seal between the tubing string and the wellbore.
  • the flow control devices may serve numerous functions.
  • the flow control devices may function as filter media such as a wire wrap screen, a woven wire mesh screen, a prepacked screen or the like, with or without an outer shroud positioned therearound, designed to allow fluids to flow therethrough but prevent particulate matter of a predetermined size from flowing therethrough.
  • the flow control devices may function as inflow control devices to regulate the flow of a production fluid stream during the production phase of well operations or as outflow control devices to control the flow of an injection fluid stream during a treatment phase of well operations or both.
  • the inflow and outflow control may be accomplished using the same or different components within the flow control devices such that the desired flowrates are achieved.
  • the flow control devices are also operable to dynamically respond to local well conditions to control the inflow of formation fluids or the outflow of injection fluids through the various zones of the wellbore. It is noted that the function of inflow or outflow control during production or injection operations and the function of dynamic response to wellbore conditions may be performed by the same or different components within the flow control devices.
  • inflow or outflow control during production or injection operations may be achieved using fluid flow resistors such as nozzles, flow tubes, labyrinths or other tortuous path flow resistors, as well as vortex chambers or other fluidic diodes, matrix chambers containing fluid flow resisting filler material such as bead or fluid selector materials that swell when in contact with hydrocarbons, water or other stimulants such as pH, ionic concentration or the like.
  • the function of dynamic response to wellbore conditions may be achieved using valves such as sliding sleeves, piston operated valves, velocity valves or the like.
  • both inflow or outflow control during production or injection operations and dynamic response to wellbore conditions could be performed by the same component such as a choke or other infinitely variable valving assembly.
  • each of the flow control devices is in communication with one or more adjacent zones, for example, fluid communication, fluid pressure communication or the like.
  • FCD 1 is operably associated with a flow tube 28 proving upstream communication with zone 2 through one of the annular barriers 26.
  • the term flow tube shall mean any medium capable of providing a communication path, such as a fluid or pressure communication path, between a flow control device and another zone.
  • the flow tubes may be control lines or other tubing in the annulus between the tubing string and the wellbore that extend through one or more annular barriers.
  • the flow tubes could be concentric tubulars around the tubing string that extend through and are preferably positioned interiorly of one or more annular barriers.
  • the flow tubes may provide an unencumbered communication path between a flow control device and another zone or the flow tubes may include valving, pistons or other flow control or pressure operated devices.
  • FCD 2 is operably associated with a flow tube 30 proving downstream communication with zone 1 through one of the annular barriers 26.
  • FCD 2 is operably associated with a flow tube 32 proving upstream communication with zone 3 through one of the annular barriers 26.
  • FCD 3 is operably associated with a flow tube 34 proving downstream communication with zone 2 through one of the annular barriers 26.
  • FCD 3 is operably associated with a flow tube 36 proving upstream communication through one of the annular barriers 26.
  • FCD N-1 is operably associated with a flow tube 38 proving downstream communication through one of the annular barriers 26. Also, FCD N-1 is operably associated with a flow tube 40 proving upstream communication with zone N through one of the annular barriers 26. FCD N is operably associated with a flow tube 42 proving downstream communication with zone N-1 through one of the annular barriers 26. Even though figure 1 depicts each flow control device in communication with one or more adjacent zones via the flow tubes, it is to be understood by those skilled in the art that the flow control devices in the present invention could alternatively or additionally be in communication with one or more remote zones that are not adjacent to the zone in which that flow control device operates.
  • figure 1 depicts the flow control system of the present invention in an open hole environment, it should be understood by those skilled in the art that the present invention is equally well suited for use in cased wells. Also, even though figure 1 depicts one flow control device in each production interval, it should be understood by those skilled in the art that any number of flow control devices may be deployed within a production interval without departing from the principles of the present invention. In addition, even though figure 1 depicts the flow control system of the present invention in a horizontal section of the wellbore, it should be understood by those skilled in the art that the present invention is equally well suited for use in wells having other directional configurations including vertical wells, deviated wells, slanted wells, multilateral wells and the like.
  • FIG. 1 a tubing string depicted as completion string 24 has been located in wellbore 12.
  • a plurality of annular barriers 26 has been deployed which isolate a plurality of zones; namely, zone 1 - zone N.
  • Each zone includes a fluid flow control device FCD 1 - FCD N that is in fluid communication with one or more other zones via flow tubes 28-42.
  • Figure 1 depicts a first stage of a treatment operation wherein FCD 1 is in the open position and FCD 2 - FCD N are all in the closed position such that the treatment fluid, indicated by the arrows, is directed out of completions string 24 into formation 20 through FCD 1 and zone 1.
  • the treatment operation depicted may be an acid treatment, a hydraulic fracturing operation or other operation that requires pumping fluid down the tubing string into a production zone or the formation.
  • the pressure P1 in zone 1 will change as local well conditions change. For example, during an acid treatment, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as the filter cake or other wellbore damage will create resistance to the flow of the treatment fluid into the formation at the surface of the wellbore. As the acid treatment removes the filter cake in zone 1, the pressure P1 will decrease as the resistance to flow into the formation decreases. As another example, during certain fracture operations, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as a large volume of treatment fluid is pumped into the formation to create and prop open the hydraulic fractures.
  • the pressure P1 When the fractures cease to propagate or a sand out occurs, the pressure P1 will increase. Similarly, in other fracture operations, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as a large volume of treatment fluid is pumped into the formation to create and prop open the hydraulic fractures. As the composition of the treatment fluid changes from a high viscosity gel to a lower viscosity fluid, for example, the pressure P1 will decrease as the resistance to flow into the formation decreases. In each of these treatment scenarios, the pressure P1 changes over time and has an expected pressure signature.
  • these pressure changes in zone 1 are seen by FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tube 30.
  • the fluid pressure P1 can be routed to the appropriate side of a piston, sliding sleeve or other operation mechanism within FCD 2.
  • the other side of the piston, sliding sleeve or other operation mechanism within FCD 2 may see the pressure P2 from zone 2, which is initially reservoir pressure.
  • the differential pressure between P1 and P2 thus provides an energy source to operate FCD 2 from a first operating configuration to a second operating configuration.
  • FCD 2 is shifted from the closed to the open position, as best seen in figure 2 .
  • FCD 1 can remain open or preferably, FCD 1 can be closed.
  • the pressure P2 in zone 2 is seen by FCD 1 in zone 1 due to fluid communication through annular barrier 26 via flow tube 28.
  • the fluid pressure P2 can be routed to an appropriate side of the operation mechanism within FCD 1, the other side of which preferably sees the pressure P1 from zone 1.
  • the differential pressure between P1 and P2 thus provides an energy source to operate FCD 1 from a first operating configuration to a second operating configuration which in this case is shifting FCD 1 from the open to the closed position, as best seen in figure 2 .
  • FCD 2 is opened prior to closing FCD 1.
  • FCD 1 may be mechanically biased or locked in the closed position using springs, collets or other locking assemblies or it may be biased in the closed position by pressure in the system, such as tubing pressure.
  • the treatment operation then continues in zone 2 with the pressure P2 changing over time with an expected pressure signature that depends on the treatment operation being performed.
  • These pressure changes in zone 2 are seen by FCD 3 in zone 3 due to fluid communication through annular barrier 26 via flow tube 34.
  • the fluid pressure P2 can be routed to the appropriate side of the operation mechanism within FCD 3 with the other side preferably seeing the pressure P3 from zone 3, which is initially reservoir pressure.
  • the differential pressure between P2 and P3 thus provides an energy source to operate FCD 3 from its closed position to its open position, as best seen in figure 3 .
  • FCD 2 can remain open or preferably, FCD 2 can be closed.
  • the pressure P3 in zone 3 is seen by FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tube 32.
  • the fluid pressure P3 can be routed to an appropriate side of the operation mechanism within FCD 2, the other side of which preferably sees the pressure P2 from zone 2.
  • the differential pressure between P2 and P3 thus provides an energy source to operate FCD 2 from its open to its closed position, as best seen in figure 3 .
  • FCD 3 is opened prior to closing FCD 2 and FCD 2 is secured in the closed position.
  • This process may proceed uphole in a stepwise fashion to accomplish the desired treatment goals until the last zone of wellbore 12 is treated, as best seen in figure 4 , wherein FCD N is open to allow treatment fluid to enter zone N as indicated by the arrows and all other flow control devices are closed.
  • each of the previously closed flow control devices may be operated to the open position based upon sequential differential pressure changes in the zones. For example, as fluid is produced into zone N, the pressure PN falls below reservoir pressure. This pressure change in zone N is seen by FCD N-1 in zone N-1 due to fluid communication through annular barrier 26 via flow tube 40.
  • the fluid pressure PN can be routed to the appropriate side of the operation mechanism within FCD N-1, the other side of which preferably sees the pressure PN-1 from zone N-1, which is initially reservoir pressure.
  • the differential pressure between PN and PN-1 can be use as an energy source to operate FCD N-1 from its closed position to its open position. This process may proceed downhole in a stepwise fashion until all zones are open to production.
  • FIG. 5 a tubing string depicted as completion string 24 has been located in wellbore 12.
  • a plurality of annular barriers 26 has been deployed which isolate a plurality of zones; namely, zone 1 - zone N.
  • Each zone includes a fluid flow control device FCD 1 - FCD N that is in fluid communication with one or more other zones via flow tubes 28-42.
  • Figure 5 depicts a production operation wherein each of the flow control devices is in the open position such that the production fluid, indicated by the arrows, flows into completion string 24 through each of the flow control devices and each of the zones.
  • the inflow control components within FCD 1 - FCD N will attempt to regulate and balance production rates through each zone. Under certain conditions, however, the inflow control components may be unable to regulate and balance production rates or it may be desirable to shut-in or highly restrict production from one or more zones due to changes in flowrate through a zone or changes in the composition of a fluid being produced into a zone. For example, if the desired fluid to be produced in the well system is oil and one or more zones begin to produce an undesired fluid such as gas or water, the fluid flow control system of the present invention can dynamically respond to this local well condition.
  • the pressure in that zone is greater than the pressure in a zone producing oil.
  • the pressure in that zone is greater than the pressure in a zone producing oil through a normal permeability region of the formation. In each of these production scenarios, the pressure difference in various zones can be used to control production.
  • FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tubes 30, 32.
  • the fluid pressure P1 or P3 can be routed to the appropriate side of a piston, sliding sleeve or other operation mechanism within FCD 2 with the other side of the piston, sliding sleeve or other operation mechanism within FCD 2 seeing the pressure P2 from zone 2.
  • the differential pressure between P1 and P2 or P3 and P2 thus provides an energy source to operate FCD 2 from a first operating configuration to a second operating configuration.
  • FCD 2 when the differential pressure reaches a predetermined level, FCD 2 could be operated from its open position to a choked position or FCD 2 could be operation from its open position to a closed position, as best seen in figure 6 . Preferably, FCD 2 is then secured in the closed position.
  • the process will continue interventionlessly throughout the wellbore system as production fluid flowrates or compositions change in the various zones, with differential pressures providing the energy for the closure of the desired flow control devices. It should be noted that the required differential pressure needed to operate the various flow control devices may be different in different zones and may be preselected or predetermined.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Chemical & Material Sciences (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)
  • Multiple-Way Valves (AREA)

Description

    TECHNICAL FIELD
  • This disclosure relates, in general, to equipment utilized in conjunction with operations performed in subterranean wells and, in particular, to a downhole fluid flow control system and method having dynamic response to local well conditions to control the inflow of formation fluids and the outflow of injection fluids.
  • BACKGROUND OF THE INVENTION
  • Without limiting the scope of the present invention, its background will be described with reference to producing fluid from a hydrocarbon bearing subterranean formation, as an example.
  • During the completion of a well that traverses a hydrocarbon bearing subterranean formation, production tubing and various completion equipment are installed in the well to enable safe and efficient production of the formation fluids. For example, to control the inflow of production fluids, it is common practice to install one or more flow control devices within the tubing string. The flow control devices may include one or more flow control components such as flow tubes, nozzles, labyrinths or the like. Typically, the production flowrate through these flow control devices is fixed prior to installation by the number and design of the flow control components.
  • It has been found, however, that due to changes in formation pressure and changes in formation fluid composition over the life of the well, it may be desirable to adjust the flow control characteristics of the flow control devices. In addition, for certain completions, such as long horizontal completions having numerous production intervals, it may be desirable to independently control the inflow of production fluids into each of the production intervals. Further, in some completions, it would be desirable to adjust the flow control characteristics of the flow control devices without the requirement for well intervention.
  • Accordingly, a need has arisen for an improved flow control system that is operable to control the inflow of formation fluids. A need has also arisen for such a flow control system that is operable to independently control the inflow of production fluids from multiple production intervals and operable to control the inflow of production fluids without the requirement for well intervention as formation pressure or fluid composition changes over time.
  • US 2006/162935 A1 discloses a snorkel device for flow control.
  • US 2006/124310 A1 discloses a system for completing multiple well intervals.
  • SUMMARY OF THE INVENTION
  • In a first aspect of the present invention, there is provided a downhole fluid flow control method according to Claim 1.
  • In a second aspect of the present invention, there is provided a downhole fluid flow control system according to Claim 3.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • For a more complete understanding of the features and advantages of the present invention, reference is now made, by way of example, to the detailed description of the invention along with the accompanying figures in which corresponding numerals in the different figures refer to corresponding parts and in which:
    • Figure 1 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a first phase of a treatment operation;
    • Figure 2 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a second phase of a treatment operation;
    • Figure 3 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a third phase of a treatment operation;
    • Figure 4 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a final phase of a treatment operation;
    • Figure 5 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a production operation; and
    • Figure 6 is a schematic illustration of a well system operating a fluid flow control system according to an embodiment of the present invention during a later phase of the production operation.
    DETAILED DESCRIPTION OF THE INVENTION
  • The disclosure herein comprises a downhole fluid flow control system and method having dynamic response to local well conditions to control the inflow of formation fluids and the outflow of injection fluids. In addition, the downhole fluid flow control system and method of the present disclosure are operable to independently control the inflow of production fluids into multiple production intervals without the requirement for well intervention as formation pressure or the composition of the fluids produced into specific intervals changes over time.
  • There is disclosed a downhole fluid flow control system. The downhole fluid flow control system includes a tubing string operably positionable in a wellbore. Annular barriers are positioned between the tubing string and the wellbore to isolate first and second zones. A fluid flow control device is positioned within each zone. A flow tube operably associated with the fluid flow control device of the first zone operable to establish fluid communication between the second zone and the fluid flow control device in the first zone such that a differential pressure between the first zone and the second zone is operable to actuate the fluid flow control device of the first zone from a first operating configuration to a second operating configuration.
  • In one embodiment, the first operating configuration is an open position and the second operating configuration is a closed position. In another embodiment, the first operating configuration is a closed position and the second operating configuration is an open position. In a further embodiment, the first operating configuration is an open position and the second operating configuration is a restricted position. In certain embodiments, the flow tube extends through at least one of the annular barriers. In some embodiments, a flow tube operably associated with the fluid flow control device of the second zone extends through at least one of the annular barriers to establish fluid communication between the first zone and the fluid flow control device in the second zone such that a differential pressure between the first zone and the second zone is operable to actuate the fluid flow control device of the second zone from a first operating configuration to a second operating configuration.
  • There is also disclosed a downhole fluid flow control method. The method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the first zone and the fluid flow control device in the second zone, flowing fluid through the fluid flow control device of the first zone, generating a differential pressure between the first zone and the second zone and actuating the fluid flow control device of the second zone from a first operating configuration to a second operating configuration responsive to the differential pressure.
  • The method may also include installing annular barriers between the tubing string and the wellbore, extending a flow tube through at least one of the annular barriers, injecting a fluid from an interior of the tubing string into the formation through the first zone, performing an acid stimulation of the first zone, performing a fracture operation in the formation, changing the viscosity of the fluid or actuating the fluid flow control device of the second zone from a closed position to an open position.
  • There is further disclosed a downhole fluid flow control method. The method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the second zone and the fluid flow control device in the first zone, flowing fluid through the fluid flow control devices of the first zone and the second zone, generating a differential pressure between the first zone and the second zone and actuating the fluid flow control device of the first zone from a first operating configuration to a second operating configuration responsive to the differential pressure.
  • The method may also include installing annular barriers between the tubing string and the wellbore, extending a flow tube through at least one of the annular barriers, producing fluid from the formation into an interior of the tubing string through the first zone and the second zone, transitioning from production of a desired fluid to production of an undesired fluid in the first zone, increasing the flowrate of the fluid produced through the first zone, changing the viscosity of the fluid produced through the first zone, actuating the fluid flow control device of the first zone from an open position to a restricted position or actuating the fluid flow control device of the first zone from an open position to a closed position.
  • There is also disclosed a downhole fluid flow control method. The method includes isolating first and second zones in a wellbore, each zone having a fluid flow control device positioned therein, establishing fluid communication between the second zone and the fluid flow control device in the first zone, establishing fluid communication between the first zone and the fluid flow control device in the second zone, injecting fluid from a tubing string through the fluid flow control device of the first zone into a formation, generating a differential pressure between the first zone and the second zone and responsive to the differential pressure, opening the fluid flow control device in the second zone and closing the fluid flow control device in the first zone.
  • While the making and using of various embodiments of the present invention are discussed in detail below, it should be appreciated that the present invention provides many applicable inventive concepts which can be embodied in a wide variety of specific contexts. The specific embodiments discussed herein are merely illustrative of specific ways to make and use the invention, and do not delimit the scope of the present invention.
  • Referring initially to figure 1, therein is depicted a well system including a downhole fluid flow control system embodying principles of the present invention that is schematically illustrated and generally designated 10. In the illustrated embodiment, a wellbore 12 extends through the various earth strata. Wellbore 12 has a substantially vertical section 14, the upper portion of which has cemented therein a casing string 16. Wellbore 12 also has a substantially horizontal section 18 that extends through a hydrocarbon bearing subterranean formation 20. As illustrated, substantially horizontal section 18 of wellbore 12 is open hole.
  • Positioned within wellbore 12 and extending from the surface is a tubing string 22. Tubing string 22 provides a conduit for formation fluids to travel from formation 20 to the surface and for injection fluids to travel from the surface to formation 20. At its lower end, tubing string 22 is coupled to a completions string 24 that has been installed in wellbore 12 and divides the completion interval into various production intervals identified as zone 1, zone 2, zone 3 ... zone N-1 and zone N. Completion string 24 includes a plurality of flow control devices identified as FCD 1, FCD 2, FCD 3, FCD N-1 and FCD N, wherein FCD 1 corresponds with zone 1, FCD 2 corresponds to zone 2 and so forth. Each of the flow control devices is depicted as being positioned between a pair of annular barriers 26 that extend between completion string 24 and wellbore 12, thereby isolating the production intervals. As used herein, the term annular barrier may refer to any suitable pressure barrier known to those skilled in the art including, but not limited to, production packers, inflatable packer, swellable packer or the like as well as materials such as gravel packs or other wellbore filler materials that are operable to provide a pressure differential thereacross, thereby isolating zones in the wellbore. The annular barriers may or may not provide a complete seal between the tubing string and the wellbore.
  • In the illustrated embodiment, the flow control devices may serve numerous functions. For example, the flow control devices may function as filter media such as a wire wrap screen, a woven wire mesh screen, a prepacked screen or the like, with or without an outer shroud positioned therearound, designed to allow fluids to flow therethrough but prevent particulate matter of a predetermined size from flowing therethrough. In addition, the flow control devices may function as inflow control devices to regulate the flow of a production fluid stream during the production phase of well operations or as outflow control devices to control the flow of an injection fluid stream during a treatment phase of well operations or both. The inflow and outflow control may be accomplished using the same or different components within the flow control devices such that the desired flowrates are achieved. For example, it may be desirable to have a higher injection rate than the intended production rate through the flow control devices in which case different injection valves and production valves may be used or more injection valves than production valves may be used. As explained in greater detail below, when operated in the system and according to the methods of the present invention, the flow control devices are also operable to dynamically respond to local well conditions to control the inflow of formation fluids or the outflow of injection fluids through the various zones of the wellbore. It is noted that the function of inflow or outflow control during production or injection operations and the function of dynamic response to wellbore conditions may be performed by the same or different components within the flow control devices.
  • For example, inflow or outflow control during production or injection operations may be achieved using fluid flow resistors such as nozzles, flow tubes, labyrinths or other tortuous path flow resistors, as well as vortex chambers or other fluidic diodes, matrix chambers containing fluid flow resisting filler material such as bead or fluid selector materials that swell when in contact with hydrocarbons, water or other stimulants such as pH, ionic concentration or the like. The function of dynamic response to wellbore conditions may be achieved using valves such as sliding sleeves, piston operated valves, velocity valves or the like. Alternatively, both inflow or outflow control during production or injection operations and dynamic response to wellbore conditions could be performed by the same component such as a choke or other infinitely variable valving assembly.
  • Still referring to figure 1, each of the flow control devices is in communication with one or more adjacent zones, for example, fluid communication, fluid pressure communication or the like. Specifically, FCD 1 is operably associated with a flow tube 28 proving upstream communication with zone 2 through one of the annular barriers 26. As used herein, the term flow tube shall mean any medium capable of providing a communication path, such as a fluid or pressure communication path, between a flow control device and another zone. For example, the flow tubes may be control lines or other tubing in the annulus between the tubing string and the wellbore that extend through one or more annular barriers. Alternatively, the flow tubes could be concentric tubulars around the tubing string that extend through and are preferably positioned interiorly of one or more annular barriers. The flow tubes may provide an unencumbered communication path between a flow control device and another zone or the flow tubes may include valving, pistons or other flow control or pressure operated devices. In the illustrated embodiment, FCD 2 is operably associated with a flow tube 30 proving downstream communication with zone 1 through one of the annular barriers 26. Also, FCD 2 is operably associated with a flow tube 32 proving upstream communication with zone 3 through one of the annular barriers 26. FCD 3 is operably associated with a flow tube 34 proving downstream communication with zone 2 through one of the annular barriers 26. Also, FCD 3 is operably associated with a flow tube 36 proving upstream communication through one of the annular barriers 26. FCD N-1 is operably associated with a flow tube 38 proving downstream communication through one of the annular barriers 26. Also, FCD N-1 is operably associated with a flow tube 40 proving upstream communication with zone N through one of the annular barriers 26. FCD N is operably associated with a flow tube 42 proving downstream communication with zone N-1 through one of the annular barriers 26. Even though figure 1 depicts each flow control device in communication with one or more adjacent zones via the flow tubes, it is to be understood by those skilled in the art that the flow control devices in the present invention could alternatively or additionally be in communication with one or more remote zones that are not adjacent to the zone in which that flow control device operates.
  • Even though figure 1 depicts the flow control system of the present invention in an open hole environment, it should be understood by those skilled in the art that the present invention is equally well suited for use in cased wells. Also, even though figure 1 depicts one flow control device in each production interval, it should be understood by those skilled in the art that any number of flow control devices may be deployed within a production interval without departing from the principles of the present invention. In addition, even though figure 1 depicts the flow control system of the present invention in a horizontal section of the wellbore, it should be understood by those skilled in the art that the present invention is equally well suited for use in wells having other directional configurations including vertical wells, deviated wells, slanted wells, multilateral wells and the like. Accordingly, it should be understood by those skilled in the art that the use of directional terms such as above, below, upper, lower, upward, downward, left, right, uphole, downhole and the like are used in relation to the illustrative embodiments as they are depicted in the figures, the upward direction being toward the top of the corresponding figure and the downward direction being toward the bottom of the corresponding figure, the uphole direction being toward the surface of the well and the downhole direction being toward the toe of the well.
  • The operation of the downhole fluid flow control system having dynamic response to local well conditions will now be described with reference to figures 1-4. In figure 1, a tubing string depicted as completion string 24 has been located in wellbore 12. A plurality of annular barriers 26 has been deployed which isolate a plurality of zones; namely, zone 1 - zone N. Each zone includes a fluid flow control device FCD 1 - FCD N that is in fluid communication with one or more other zones via flow tubes 28-42. Figure 1 depicts a first stage of a treatment operation wherein FCD 1 is in the open position and FCD 2 - FCD N are all in the closed position such that the treatment fluid, indicated by the arrows, is directed out of completions string 24 into formation 20 through FCD 1 and zone 1. The treatment operation depicted may be an acid treatment, a hydraulic fracturing operation or other operation that requires pumping fluid down the tubing string into a production zone or the formation.
  • As the treatment fluid is pumped into formation 20 through zone 1, the pressure P1 in zone 1 will change as local well conditions change. For example, during an acid treatment, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as the filter cake or other wellbore damage will create resistance to the flow of the treatment fluid into the formation at the surface of the wellbore. As the acid treatment removes the filter cake in zone 1, the pressure P1 will decrease as the resistance to flow into the formation decreases. As another example, during certain fracture operations, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as a large volume of treatment fluid is pumped into the formation to create and prop open the hydraulic fractures. When the fractures cease to propagate or a sand out occurs, the pressure P1 will increase. Similarly, in other fracture operations, the pressure P1 in zone 1 will initially be at a high pressure that is above reservoir pressure as a large volume of treatment fluid is pumped into the formation to create and prop open the hydraulic fractures. As the composition of the treatment fluid changes from a high viscosity gel to a lower viscosity fluid, for example, the pressure P1 will decrease as the resistance to flow into the formation decreases. In each of these treatment scenarios, the pressure P1 changes over time and has an expected pressure signature.
  • In the illustrated embodiment, these pressure changes in zone 1 are seen by FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tube 30. Depending on the expected pressure signature during the treatment operation, the fluid pressure P1 can be routed to the appropriate side of a piston, sliding sleeve or other operation mechanism within FCD 2. The other side of the piston, sliding sleeve or other operation mechanism within FCD 2 may see the pressure P2 from zone 2, which is initially reservoir pressure. The differential pressure between P1 and P2 thus provides an energy source to operate FCD 2 from a first operating configuration to a second operating configuration. Depending upon the operation being performed and the routing of pressures P1 and P2 into FCD 2, when P1 experiences the desired pressure increase or decrease, a differential pressure is created between P1 and P2 such that, in the illustrated embodiment, FCD 2 is shifted from the closed to the open position, as best seen in figure 2.
  • Depending upon the desired outcome of the treatment operation, once FCD 2 is open, FCD 1 can remain open or preferably, FCD 1 can be closed. In the illustrated embodiment, the pressure P2 in zone 2 is seen by FCD 1 in zone 1 due to fluid communication through annular barrier 26 via flow tube 28. Depending on the expected pressure signature during the treatment operation, the fluid pressure P2 can be routed to an appropriate side of the operation mechanism within FCD 1, the other side of which preferably sees the pressure P1 from zone 1. The differential pressure between P1 and P2 thus provides an energy source to operate FCD 1 from a first operating configuration to a second operating configuration which in this case is shifting FCD 1 from the open to the closed position, as best seen in figure 2. Preferably, FCD 2 is opened prior to closing FCD 1. This can be accomplished using a time delay circuit such as a metering fluid to regulate the closing speed of FCD 1. Once FCD 1 is closed, it may be mechanically biased or locked in the closed position using springs, collets or other locking assemblies or it may be biased in the closed position by pressure in the system, such as tubing pressure.
  • The treatment operation then continues in zone 2 with the pressure P2 changing over time with an expected pressure signature that depends on the treatment operation being performed. These pressure changes in zone 2 are seen by FCD 3 in zone 3 due to fluid communication through annular barrier 26 via flow tube 34. Depending on the expected pressure signature during the treatment operation, the fluid pressure P2 can be routed to the appropriate side of the operation mechanism within FCD 3 with the other side preferably seeing the pressure P3 from zone 3, which is initially reservoir pressure. The differential pressure between P2 and P3 thus provides an energy source to operate FCD 3 from its closed position to its open position, as best seen in figure 3.
  • Depending upon the desired outcome of the treatment operation, once FCD 3 is open, FCD 2 can remain open or preferably, FCD 2 can be closed. In the illustrated embodiment, the pressure P3 in zone 3 is seen by FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tube 32. Depending on the expected pressure signature during the treatment operation, the fluid pressure P3 can be routed to an appropriate side of the operation mechanism within FCD 2, the other side of which preferably sees the pressure P2 from zone 2. The differential pressure between P2 and P3 thus provides an energy source to operate FCD 2 from its open to its closed position, as best seen in figure 3. Preferably, FCD 3 is opened prior to closing FCD 2 and FCD 2 is secured in the closed position.
  • This process may proceed uphole in a stepwise fashion to accomplish the desired treatment goals until the last zone of wellbore 12 is treated, as best seen in figure 4, wherein FCD N is open to allow treatment fluid to enter zone N as indicated by the arrows and all other flow control devices are closed. After the treatment operation has been completed, each of the previously closed flow control devices may be operated to the open position based upon sequential differential pressure changes in the zones. For example, as fluid is produced into zone N, the pressure PN falls below reservoir pressure. This pressure change in zone N is seen by FCD N-1 in zone N-1 due to fluid communication through annular barrier 26 via flow tube 40. The fluid pressure PN can be routed to the appropriate side of the operation mechanism within FCD N-1, the other side of which preferably sees the pressure PN-1 from zone N-1, which is initially reservoir pressure. The differential pressure between PN and PN-1 can be use as an energy source to operate FCD N-1 from its closed position to its open position. This process may proceed downhole in a stepwise fashion until all zones are open to production.
  • Another operation of the downhole fluid flow control system having dynamic response to local well conditions will now be described with reference to figures 5-6. In figure 5, a tubing string depicted as completion string 24 has been located in wellbore 12. A plurality of annular barriers 26 has been deployed which isolate a plurality of zones; namely, zone 1 - zone N. Each zone includes a fluid flow control device FCD 1 - FCD N that is in fluid communication with one or more other zones via flow tubes 28-42. Figure 5 depicts a production operation wherein each of the flow control devices is in the open position such that the production fluid, indicated by the arrows, flows into completion string 24 through each of the flow control devices and each of the zones.
  • During the production operation, the inflow control components within FCD 1 - FCD N will attempt to regulate and balance production rates through each zone. Under certain conditions, however, the inflow control components may be unable to regulate and balance production rates or it may be desirable to shut-in or highly restrict production from one or more zones due to changes in flowrate through a zone or changes in the composition of a fluid being produced into a zone. For example, if the desired fluid to be produced in the well system is oil and one or more zones begin to produce an undesired fluid such as gas or water, the fluid flow control system of the present invention can dynamically respond to this local well condition. As the viscosity of the oil is generally higher than the viscosity of the gas or water, there is a greater pressure drop experienced by the oil as it migrates through the formation to the wellbore than that experienced by water or gas. As such, when water or gas is produced into a zone, the pressure in that zone is greater than the pressure in a zone producing oil. Likewise, if the flowrate into a zone increases due to, for example, a fissure in the formation, this low resistance region in the formation could lead to early water or gas production. As such, when oil is produced into a zone from a high permeability region in the formation, the pressure in that zone is greater than the pressure in a zone producing oil through a normal permeability region of the formation. In each of these production scenarios, the pressure difference in various zones can be used to control production.
  • In the illustrated embodiment, if a change in flowrate or fluid composition has resulted in a higher pressure in zone 2 than in zone 1 or zone 3 or both, these pressure differences are seen by FCD 2 in zone 2 due to fluid communication through annular barrier 26 via flow tubes 30, 32. The fluid pressure P1 or P3 can be routed to the appropriate side of a piston, sliding sleeve or other operation mechanism within FCD 2 with the other side of the piston, sliding sleeve or other operation mechanism within FCD 2 seeing the pressure P2 from zone 2. The differential pressure between P1 and P2 or P3 and P2 thus provides an energy source to operate FCD 2 from a first operating configuration to a second operating configuration. For example, when the differential pressure reaches a predetermined level, FCD 2 could be operated from its open position to a choked position or FCD 2 could be operation from its open position to a closed position, as best seen in figure 6. Preferably, FCD 2 is then secured in the closed position. The process will continue interventionlessly throughout the wellbore system as production fluid flowrates or compositions change in the various zones, with differential pressures providing the energy for the closure of the desired flow control devices. It should be noted that the required differential pressure needed to operate the various flow control devices may be different in different zones and may be preselected or predetermined.
  • While this invention has been described with reference to illustrative embodiments, this description is not intended to be construed in a limiting sense. Various modifications and combinations of the illustrative embodiments as well as other embodiments of the invention will be apparent to persons skilled in the art upon reference to the description. It is, therefore, intended that the appended claims encompass any such modifications or embodiments.

Claims (6)

  1. A downhole fluid flow control method comprising:
    isolating first, second and third zones in a wellbore (12), each zone having a fluid flow control device (FCD) positioned therein;
    establishing fluid communication between the second zone and the fluid flow control device (FCD 1) in the first zone;
    establishing fluid communication between the first zone and the fluid flow control device (FCD 2) in the second zone;
    establishing fluid communication between the third zone and the fluid flow control device (FCD 2) in the second zone;
    establishing fluid communication between the second zone and the fluid flow control device (FCD 3) in the third zone;
    injecting a treatment fluid from a tubing string (22) through the fluid flow control device (FCD 1) of the first zone into a formation while the fluid flow control devices of the second and third zones are in the closed position;
    generating a first differential pressure between the first zone and the second zone;
    responsive to the first differential pressure, opening the fluid flow control device (FCD 2) in the second zone and closing the fluid flow control device (FCD 1) in the first zone;
    injecting the treatment fluid from the tubing string (22) through the fluid flow control device (FCD 2) of the second zone while the fluid flow control devices of the first and third zones are in the closed position;
    generating a second differential pressure between the second zone and the third zone;
    responsive to the second differential pressure, opening the fluid flow control device (FCD 3) in the third zone and closing the fluid flow control device (FCD 2) in the second zone; and
    injecting the treatment fluid from the tubing string (22) through the fluid flow control device (FCD 3) of the third zone while the fluid flow control devices of the first and second zones are in the closed position.
  2. The downhole fluid flow control method as recited in claim 1 wherein isolating first, second and third zones in the wellbore (12) further comprises installing annular barriers (26) between a tubing string (22) and the wellbore (12); and/or
    wherein injecting fluid from the tubing string through the fluid flow control device (FCD 1) of the first zone into the formation further comprises performing an acid stimulation of the first zone; and/or
    wherein injecting fluid from the tubing string (22) through the fluid flow control device (FCD 1) of the first zone into the formation further comprises performing a fracture operation in the formation.
  3. A downhole fluid flow control system comprising:
    a tubing string (22) operably positionable in a wellbore (12);
    a plurality of annular barriers (26) positionable between the tubing string (22) and the wellbore (12) to isolate first, second and third zones;
    a fluid flow control device (FCD) positioned within each zone;
    a first flow tube (28) operably associated with the fluid flow control device (FCD 1) of the first zone, the first flow tube establishing communication between the second zone and the fluid flow control device (FCD 1) in the first zone such that a differential pressure between the first zone and the second zone is operable to actuate the fluid flow control device (FCD 1) of the first zone from a first operating configuration to a second operating configuration;
    a second flow tube (32) operably associated with the fluid flow control device (FCD 2) of the second zone, the second flow tube establishing communication between the third zone and
    the fluid flow control device in the second zone such that a differential pressure between the second zone and the third zone is operable to actuate the fluid flow control device (FCD 2) of the second zone from a first operating configuration to a second operating configuration;
    a third flow tube (30) operably associated with the fluid flow control device (FCD 2) of the second zone, the third flow tube establishing communication between the first zone and the fluid flow control device (FCD 2) in the second zone; and
    a fourth flow tube (34) operably associated with the fluid flow control device (FCD 3) of the third zone, the fourth flow tube establishing communication between the second zone and the fluid flow control device (FCD 3) in the third zone.
  4. The downhole fluid flow control system as recited in claim 3 wherein at least one of flow tube extends through at least one of the annular barriers (26).
  5. The downhole fluid flow control system as recited in claim 3 wherein the first operating configuration is an open position and the second operating configuration is a closed position; or
    wherein the first operating configuration is a closed position and the second operating configuration is an open position.
  6. The downhole fluid flow control system as recited in claim 3 wherein the first operating configuration is an open position and the second operating configuration is a restricted position.
EP11871579.6A 2011-08-29 2011-08-29 Downhole fluid flow control system and method having dynamic response to local well conditions Active EP2751377B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/US2011/049527 WO2013032433A1 (en) 2011-08-29 2011-08-29 Downhole fluid flow control system and method having dynamic response to local well conditions

Publications (3)

Publication Number Publication Date
EP2751377A1 EP2751377A1 (en) 2014-07-09
EP2751377A4 EP2751377A4 (en) 2016-04-13
EP2751377B1 true EP2751377B1 (en) 2017-10-18

Family

ID=47756671

Family Applications (1)

Application Number Title Priority Date Filing Date
EP11871579.6A Active EP2751377B1 (en) 2011-08-29 2011-08-29 Downhole fluid flow control system and method having dynamic response to local well conditions

Country Status (7)

Country Link
EP (1) EP2751377B1 (en)
CN (1) CN103688013A (en)
AU (1) AU2011375763B2 (en)
BR (1) BR112013032877B1 (en)
CA (1) CA2838164C (en)
SG (1) SG194941A1 (en)
WO (1) WO2013032433A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9638000B2 (en) 2014-07-10 2017-05-02 Inflow Systems Inc. Method and apparatus for controlling the flow of fluids into wellbore tubulars
US20240102355A1 (en) * 2020-12-03 2024-03-28 Baker Hughes Oilfield Operations Llc Wellbore having opposing action valvular conduits
CN113503143B (en) * 2021-08-05 2022-03-04 大庆凯思石油技术开发有限公司 Underground slide valve switch opened by circuit and pressure difference control

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5547029A (en) * 1994-09-27 1996-08-20 Rubbo; Richard P. Surface controlled reservoir analysis and management system
MY132567A (en) * 2000-02-15 2007-10-31 Exxonmobil Upstream Res Co Method and apparatus for stimulation of multiple formation intervals
US7387165B2 (en) * 2004-12-14 2008-06-17 Schlumberger Technology Corporation System for completing multiple well intervals
US7455114B2 (en) * 2005-01-25 2008-11-25 Schlumberger Technology Corporation Snorkel device for flow control
US7331398B2 (en) * 2005-06-14 2008-02-19 Schlumberger Technology Corporation Multi-drop flow control valve system
CA2532295A1 (en) * 2006-01-06 2007-07-06 Trican Well Service Ltd. Packer cups
US20080149349A1 (en) * 2006-12-20 2008-06-26 Stephane Hiron Integrated flow control device and isolation element
US8863833B2 (en) * 2008-06-03 2014-10-21 Baker Hughes Incorporated Multi-point injection system for oilfield operations
US8186444B2 (en) * 2008-08-15 2012-05-29 Schlumberger Technology Corporation Flow control valve platform
US8408314B2 (en) * 2009-10-06 2013-04-02 Schlumberger Technology Corporation Multi-point chemical injection system for intelligent completion

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
None *

Also Published As

Publication number Publication date
BR112013032877B1 (en) 2020-10-27
AU2011375763A1 (en) 2013-11-28
EP2751377A1 (en) 2014-07-09
CA2838164A1 (en) 2013-03-07
EP2751377A4 (en) 2016-04-13
WO2013032433A1 (en) 2013-03-07
CA2838164C (en) 2017-03-28
CN103688013A (en) 2014-03-26
BR112013032877A2 (en) 2017-01-24
SG194941A1 (en) 2013-12-30
AU2011375763B2 (en) 2015-06-25

Similar Documents

Publication Publication Date Title
US9512703B2 (en) Downhole fluid flow control system and method having dynamic response to local well conditions
US7857061B2 (en) Flow control in a well bore
US7367395B2 (en) Sand control completion having smart well capability and method for use of same
US8245782B2 (en) Tool and method of performing rigless sand control in multiple zones
US8739886B2 (en) Downhole fluid flow control system having a fluidic module with a bridge network and method for use of same
US10138708B2 (en) Remotely operated production valve
AU2012371604B2 (en) Downhole fluid flow control system having pressure sensitive autonomous operation
EP2751377B1 (en) Downhole fluid flow control system and method having dynamic response to local well conditions
US9540906B2 (en) Remote-open inflow control device with swellable actuator
WO2014112970A1 (en) Remote-open inflow control device with swellable actuator
AU2015255294B2 (en) Downhole fluid flow control system having a fluidic module with a bridge network and method for use of same

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 20140108

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

DAX Request for extension of the european patent (deleted)
RA4 Supplementary search report drawn up and despatched (corrected)

Effective date: 20160314

RIC1 Information provided on ipc code assigned before grant

Ipc: E21B 43/12 20060101ALI20160308BHEP

Ipc: E21B 34/08 20060101ALI20160308BHEP

Ipc: E21B 21/08 20060101AFI20160308BHEP

Ipc: E21B 43/26 20060101ALI20160308BHEP

Ipc: E21B 43/14 20060101ALI20160308BHEP

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

INTG Intention to grant announced

Effective date: 20170613

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: AT

Ref legal event code: REF

Ref document number: 938124

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171115

Ref country code: IE

Ref legal event code: FG4D

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 602011042603

Country of ref document: DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: MP

Effective date: 20171018

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

REG Reference to a national code

Ref country code: AT

Ref legal event code: MK05

Ref document number: 938124

Country of ref document: AT

Kind code of ref document: T

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180118

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180218

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180119

Ref country code: AT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20180118

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 602011042603

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

26N No opposition filed

Effective date: 20180719

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 602011042603

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180829

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180831

REG Reference to a national code

Ref country code: BE

Ref legal event code: MM

Effective date: 20180831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20190301

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180831

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: HU

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO

Effective date: 20110829

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20180829

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

Ref country code: MK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20171018

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20171018

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240605

Year of fee payment: 14