Floor or joist support/reinforcement system, and support/reinforcement therefor Download PDFInfo
- Publication number
- EP2097592B1 EP2097592B1 EP07824790.5A EP07824790A EP2097592B1 EP 2097592 B1 EP2097592 B1 EP 2097592B1 EP 07824790 A EP07824790 A EP 07824790A EP 2097592 B1 EP2097592 B1 EP 2097592B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- joist
- support
- reinforcement
- end portion
- floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
- 230000002787 reinforcement Effects 0.000 title claims description 289
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 230000007704 transition Effects 0.000 description 18
- 230000003466 anti-cipated effect Effects 0.000 description 12
- 230000002401 inhibitory effect Effects 0.000 description 10
- 230000007423 decrease Effects 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000002184 metal Substances 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000005452 bending Methods 0.000 description 3
- 230000033228 biological regulation Effects 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 239000002131 composite material Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/12—Load-carrying floor structures formed substantially of prefabricated units with wooden beams
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/04—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
- E04B7/045—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls with connectors made of sheet metal for connecting the roof structure to the supporting wall
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/04—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
- E04C3/06—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web
- E04C3/07—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web at least partly of bent or otherwise deformed strip- or sheet-like material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/12—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/12—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
- E04C3/125—End caps therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/02—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
- E04C3/12—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members
- E04C3/18—Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of wood, e.g. with reinforcements, with tensioning members with metal or other reinforcements or tensioning members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0237—Increasing or restoring the load-bearing capacity of building construction elements of storey floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0266—Enlarging
- E04G23/027—Loft conversion by truss modification
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0288—Repairing or restoring floor slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B1/2612—Joist hangers
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2415—Brackets, gussets, joining plates
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G2023/0248—Increasing or restoring the load-bearing capacity of building construction elements of elements made of wood
Definitions
- the present invention relates to a floor or joist support/reinforcement system and, in particular (but not exclusively), to a floor or joist support/reinforcement system that may be used to support a floor or joist in a loft (or attic) space or the like.
- US 2004/0200180 A1 discloses a system to reinforce a floor joist at the location of a hole in its web portion.
- roofs in most houses and certain other buildings are supported by roof trusses. Whilst roof trusses provide sufficient strength to support the roof above and a ceiling (e.g. plasterboard) of a room below, they do not provide sufficient strength to satisfactorily support a floor.
- Floors in a loft are typically supported by a series of parallel steel joists which run along the length of the loft. Such steel joists are heavy and often have to be put into place using a crane or other lifting equipment. This is expensive and inconvenient.
- One possible alternative would be to use solid timber joists, I-joists or other engineered timber joists.
- the present invention seeks to address and/or mitigate one or more of the problems of the prior art.
- the present invention provides a floor or joist support/reinforcement system according to claim 1 and, in a second aspect, according to claim 2.
- the support preferably comprises a fixing portion for fixing the support to a building.
- the floor support system of the present invention facilitates the use of joists that could otherwise not be used because removal of part of the end of the joist would reduce the strength of the joist. Such a joist may not meeting building regulations.
- the joist is preferably elongate. It is preferred that the joist has substantially the same cross section along whole of length of joist apart from the end portion (the end portion having a reduced cross-sectional area compared to the body portion).
- the end portion of the joist comprises a face that is obliquely angled with respect to the longitudinal axis of joist.
- a joist may be supplied pre-shaped, or a worker may make an oblique cut in the end of the joist.
- the angle between the oblique face and the longitudinal axis of the body portion may be from 30 to 70 degrees, preferably from 30 to 50 degrees.
- the end portion of the joist may comprise a face that is substantially normal to the longitudinal axis of the body portion. Such a face may provide the end face of the joist.
- a joist may comprise a face that is obliquely angled with respect to the longitudinal axis of the body portion and a face that is substantially normal to the longitudinal axis of the body portion.
- the joist is wooden. Such joists are light and may be easily shaped using manually-operated tools.
- the support comprises a fixing portion for attachment to a building.
- the supporting portion may provide a slot into which the end portion of the joist may be received. This provides a simple and effective way of locating the joist in the support. A slot may allow the joist to be slid into place.
- the supporting portion may comprise an enclosure portion for receiving the end portion of the joist.
- the enclosure portion provides a slot in the form of an enclosed cavity for receipt of the end portion of the joist.
- the supporting portion may comprises a collar or sleeve for receipt of the end portion of the joist.
- the collar or sleeve defines a slot for the receipt of the end portion of the joist. In use, a least a part of the end portion of the joist protrudes through the collar or sleeve.
- the enclosure portion, collar or sleeve may be provided by two or more side wall portions and a top portion interconnecting the side walls portions.
- the enclosure portion, collar or sleeve may define an aperture for the receipt of the joist.
- the cross-section of the slot defined by the enclosure portion, collar or sleeve may decrease with increasing distance from the aperture. In other words, in use.
- the cross-section of the slot defined by the enclosure portion, collar or sleeve may decrease with increasing distance from the body portion of the joist.
- the support may be made from a metal, such as steel.
- the support may comprise a strap portion for attaching the support to the joist.
- the support or part thereof may be readily deformable from a first configuration in which the joist may be readily presented to, and removed from the support, to a second configuration in which the support of part thereof frictionally engages with the joist to inhibit removal of the joist from the support.
- the support may be provided with deformable elements which are readily deformable.
- the deformable elements may be in the form of walls.
- the support may be provided with a barb, and the support or part thereof may be readily deformable from a first configuration in which the joist may be readily presented to, and removed from the support, to a second configuration in which the barb engages with the joist to inhibit removal of the joist from the support.
- the support may be provided with one or more barbs to inhibit the removal of the joist from the support once the support has been fitted to the joist.
- Figures 15a to 15d and 17a to 17b disclose embodiments according to the invention. The remaining embodiments do not form part of the invention.
- the roofing structure 1 comprises a plurality of roof trusses 2, only one of which is shown in the figure.
- the roof truss 2 comprises a substantially horizontal portion 3 and an angled portion 4.
- the roof truss 2 is supported via a wall plate 6 provided on an inner wall 5, the upper end of which is slightly raised compared to the outer wall 8 and the wall cavity 7.
- the roofing structure 1 presents a space for the possible insertion of a floor-supporting joist.
- a conventional floor-supporting joist is shown in dashed lines and is denoted by reference numeral 9.
- a conventional floor-supporting joist 9 compromises the conventional roofing structure as it cannot be accommodated without extending the roof covering (not shown) or moving the roofing structure 1. This is highly inconvenient given that many floor-support joists 9 would be required to support a floor in a roofing space such as a loft or attic.
- FIG. 2 A first embodiment of each of a floor or joist support/reinforcement system 10 and a support/reinforcement 40 are shown in Figure 2 .
- the floor or joist support/reinforcement system 10 comprises a joist 20 suitable for supporting a floor (not shown) and a support/reinforcement 40 for the joist 20.
- the joist 20 shown in this embodiment is an I-joist (although any joist may be beneficially employed) and comprises an upper flange 21, a lower flange 22 and a web 23 extending therebetween.
- the joist 20 further comprises an end portion 25 (hidden inside the support/reinforcement 40) and a body portion 24, the cross-sectional area of the end portion 25 being less than the cross-sectional area of the body portion 24.
- the reduced cross-sectional area of the end portion 25 of the joist 20 permits it to be accommodated within the available space of a conventional roofing structure 1.
- the end portion 25 may typically be formed by making an oblique cut into a conventional joist. However, this compromises the structural integrity of the joist 20 as the effective shear plane of the reduced cross-sectional area of the end portion 25 is less than that of the cross-sectional area of the body portion 24 (as can best be seen in Figure 19 ).
- the floor or joist support/reinforcement system 10 further comprises the support/reinforcement 40 for supporting and/or reinforcing the end portion 25 of the joist 20.
- the support/reinforcement 40 comprises an enclosure portion 45 which provides additional strength to the end portion 25 of the joist 20 so that it recovers sufficient of its effective shear plane to function effectively.
- the enclosure 45 is formed of flanges 47 which receives and encloses the end part of the end portion 25 of the joist 20.
- the enclosure 45 provides a slot into which the end portion 25 of the joist 20 is inserted.
- the cross-sectional area of the enclosure 45 decreases with increasing distance from the body portion 24 towards the end portion 25 of the joist 20.
- the joist 20 may be simply received in the support/reinforcement 40, or may be fixed in place using fasteners 90. Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain the joist 20 in place within the support/reinforcement 40. Optionally, an interference fit between the joist 20 and support/reinforcement 40 may be employed. Without the additional support of the support/reinforcement 40, however, the joist 20 may not be sufficiently strong to support any overlying floor and may not meet building regulations.
- the support/reinforcement 40 shown further comprises an optional return flange 46 for fixing the support/reinforcement 40 to the outer surface of the inner wall 5 of the house or other building or structure.
- the support/reinforcement 40 shown also comprises a section 48 for receiving the upper flange 21 of the main body 24 of joist 20. This provides the option to tie (using fasteners) the upper flange 21 to the lower flange 22 of the joist 20 by making use of the structural integrity of the support/reinforcement 40, thereby increasing the load capacity of the system 10.
- the support/reinforcement 40 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the support/reinforcement 40 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the support/reinforcement 40 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- Figure 19 usefully demonstrates (schematically) the respective shear plane mechanisms at play when a joist 20 is mounted on top of a wall 5 via a wall plate 6.
- the effective shear plane is at A, in line with the point at which the wall 5 ceases to support the joist 20. It will be readily understood by those skilled in the art that the effective shear plane at A is significantly reduced due to the reduced cross sectional area of the joist at this point. This is a direct result of the oblique cut in the joist 20 necessary to accommodate the joist 20 in the roof structure 1.
- FIG. 3 to 20 Further embodiments of floor or joist support/reinforcement systems and support/reinforcements are shown in Figures 3 to 20 . Many of the features of the floor or joist support/reinforcement systems and support/reinforcements are the same as those shown in Figure 2 and will not be described further in detail. For these features, like numbering has been used.
- the joist 20 comprises an end portion 25 and a body portion 24, the cross-sectional area of the end portion 25 being less than the cross-sectional area of the body portion 24 (in the Figure 20 embodiment the cross-sectional area of the end portion 25 is zero).
- the joist 20 is shown in dotted line in order that the features of the support/reinforcement may be seen more clearly.
- the support/reinforcement 140 can be seen to comprise an L-shaped bracket.
- a first arm 142 of the bracket is provided with fastener/fixture-receiving apertures 143 (only one of which is labelled) for fixing the support/reinforcement 140 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- a second arm 144 of the bracket provides a support surface for, and strength to, the joist 20.
- the second arm 144 of the bracket is provided with fastener/fixture-receiving apertures 145 (only one of which is labelled) for fixing the joist 20 to the support/reinforcement 140 using fasteners or fixtures (not shown).
- the second arm 144 of the bracket which provides additional strength to the end portion 25 of the joist 20, is of such length as is necessary for the joist 20 to recover sufficient of its effective shear plane to function effectively.
- the second arm 144 of the bracket may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the second arm 144 of the bracket may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 (as shown) to recover the full effective shear plane of the joist 20.
- FIG. 4 A further alternative floor or joist support/reinforcement system 200 and support/reinforcement 240 are shown in Figure 4 .
- the support/reinforcement 240 comprises a flange 242 provided with fastener/fixture-receiving apertures 243 (only one of which is labelled) for fixing the support/reinforcement 240 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the support/reinforcement 240 comprises a substantially U-shaped portion 244 for receiving and providing strength to the end portion 25 of the joist 20.
- the U-shaped portion 244 forms a slot which is shaped to enable convenient location therein of the end portion 25 at least of the joist 20.
- the U-shaped portion 244 comprises upwardly extending flanges 245, 246 attached at their lower ends to a base portion 247.
- the flanges 245, 246 are relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the U-shaped portion 244, or may be fixed in place using fasteners (not shown). It is anticipated, however, that it may be desirable for the flanges 245, 246 to be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- one or both of the flanges 245, 246 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 240 once the flange or flanges 245, 246 has or have been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- the U-shaped portion 244 of the support/reinforcement 240 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the U-shaped portion 244 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered (as shown). Alternatively, the U-shaped portion 244 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20.
- FIG. 5 A yet further alternative floor or joist support/reinforcement system 300 and support/reinforcement 340 are shown in Figure 5 .
- the support/reinforcement 340 comprises a flange 342 provided with fastener/fixture-receiving apertures 343 (only one of which is labelled) for fixing the support/reinforcement 340 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the support/reinforcement 340 comprises a slot portion 344 for receiving and providing strength to the end portion 25 of the joist 20.
- a first slot region 345 and second slot region 346 are defined by a slot base portion 347 and slot-forming portions 348, 349.
- the first and second slot regions 345, 346 are arranged to slidably receive the lower flange 22 of an I-joist 20 (or lower part of a solid timber joist with grooves cut in).
- the gap (not labelled) between slot-forming portions 348, 349 facilitates the passage thereinto of the web 23 of joist 20.
- the slot-forming portions 348, 349 are relatively rigid and cannot be readily deformed. It is anticipated, however, that it may be desirable for the slot-forming portions 348, 349 to be readily deformable so as to engage with the lower flange 22 of the joist 20 once the joist has been put in place, such engagement inhibiting removal of the joist 20.
- one or both of the slot-forming portions 348, 349 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 340 once the slot-forming portion or portions 348, 349 has or have been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- the support/reinforcement 340 may be provided with an end stop which inhibits the support/reinforcement 340 from being slid along the length of the joist 20, ensuring that the support/reinforcement 340 remains located on the end of the joist 20.
- the slot portion 344 of the support/reinforcement 340 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the slot portion 344 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the slot portion 344 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- FIG. 6 A further alternative floor or joist support/reinforcement system 400 and support/reinforcement 440 are shown in Figure 6 .
- the support/reinforcement 440 comprises a flange 442 provided with fastener/fixture-receiving apertures 443 (only one of which is labelled) for fixing the support/reinforcement 440 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the support/reinforcement 440 comprises a slot portion 444 for receiving and providing strength to the end portion 25 of the joist.
- the slot portion 444 comprises side walls 445, 446 which have been deformed to engage with the joist 20.
- the side walls 445, 446 Prior to presentation of the joist 20 to the support/reinforcement 440, the side walls 445, 446 formed part of a substantially U-shaped structure for the receipt of the joist 20. Upon receipt of the joist 20, the side walls 445, 446 are then deformed to form a snug frictional or interference fit around the end portion 25 of the joist 20. Alternatively or additionally, one or both of the side walls 445, 446 may be provided with a barb or barbs which inhibits removal of the joist 20 from the support/reinforcement 440 once the side wall or walls 445, 446 has or have been deformed to engage with the joist 20. Alternatively or additionally, fasteners may be used to fix the joist 20 in place.
- the support/reinforcement 440 may be provided with an end stop which inhibits the support/reinforcement 440 from being slid along the length of the joist 20, ensuring that the support/reinforcement 440 remains located on the end of the joist 20. This may be achieved, for example, by bending downwards an end portion of one or both of the side walls 445, 446 adjacent to the flange 442.
- the slot portion 444 of the support/reinforcement 440 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the slot portion 444 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the slot portion 444 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- FIG. 7 A yet further alternative floor or joist support/reinforcement system 500 and support/reinforcement 540 are shown in Figure 7 .
- the support/reinforcement 540 comprises a flange 542 provided with fastener/fixture-receiving apertures 543 (only one of which is labelled) for fixing the support/reinforcement 540 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the support/reinforcement 540 comprises an arm 544 for providing strength to the end portion 25 of the joist 20.
- the support/reinforcement 540 further comprises a collar 545 for receiving and providing further strength to the end portion 25 of the joist 25.
- the cross-sectional area of the slot formed by collar 545 decreases with increasing distance from the body portion 24 (not shown) of the joist 20 towards the end portion 25 of the joist 20.
- the joist 20 may be simply received in the collar 545, or may be fixed in place in the collar and/or on the arm 544 using fasteners (not shown).
- fasteners not shown
- tabs, barbs or other means may be beneficially employed to retain the joist 20 in place within the collar 545 and/or on the arm 544.
- an interference fit between the joist 20 and support/reinforcement 540 may be employed.
- the arm 544 and collar 545 of the support/reinforcement 540 which provides additional strength to the end portion 25 of the joist 20, are of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the arm 544 and/or collar 545 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered (as shown).
- the arm 544 and/or collar 545 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20.
- FIG. 8 A further alternative floor or joist support/reinforcement system 600 and support/reinforcement 640 are shown in Figure 8 .
- the support/reinforcement 640 comprises a flange 642 provided with fastener/fixture-receiving apertures 643 (only one of which is labelled) for fixing the support/reinforcement 640 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the support/reinforcement 640 comprises a shoe portion 644 for receiving and providing strength to the end portion 25 of the joist 20.
- the shoe portion 644 comprises side walls 645, 646 and an end wall 647 extending upwardly from a base portion 648.
- the shoe portion 644 forms a recess which is shaped to enable convenient locating therein of the joist 20.
- the support/reinforcement 640 further comprises a strap portion 649 which is brought into contact with the oblique angled surface of joist end portion 25.
- Fastener/fixture means may be inserted through fastener/fixture-receiving apertures 650 (only one of which is labelled) to attach the strap portion 649 to the joist 20.
- tabs, barbs or other means may be beneficially employed to retain the joist 20 in place.
- an interference fit between the joist 20 and support/reinforcement 640 may be employed.
- the shoe portion 644 of the support/reinforcement 640 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the shoe portion 644 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered (as shown).
- the shoe portion 644 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20.
- FIG. 9 A yet further alternative floor or joist support/reinforcement system 700 and support/reinforcement 740 are shown in Figure 9 .
- the floor or joist support/reinforcement system 700 and support/reinforcement 740 are very similar to those shown in Figure 2 .
- the arrangement for fixing the support/reinforcement 740 to the building is, however, different to that shown in Figure 2 .
- the flange 46 is dispensed with and in its place are provided two laterally-projecting fixing portions 746a, 746b which may be attached to the upper edge (e.g. wall plate 6) of inner wall 5 for example, using fasteners (not shown).
- FIG. 10 A further alternative floor or joist support/reinforcement system 800 and support/reinforcement 840 are shown in Figure 10 .
- the floor or joist support/reinforcement system 800 and support/reinforcement 840 are very similar to those shown in Figure 9 .
- the arrangement for fixing the support/reinforcement 840 to the building is, however, different to that shown in Figure 9 in that the two laterally-projecting fixing portions 846a, 846b extend substantially horizontally from the base 847 of the support/reinforcement 840 so as to lie on the upper edge (e.g. wall plate 6) of inner wall 5 along substantially their entire length.
- the two laterally-projecting fixing portions 846a, 846b may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the substantially vertical sidewalls 841 of the support/reinforcement 840 differ from the Figure 9 embodiment in that they extend the full length of the end portion 25 of joist 20 from the end of the end portion 25 past the transition to the body portion 24 to recover the full effective shear plane of the joist 20.
- the upper flange 21 and lower flange 22 of the joist 20 are tied together via the support/reinforcement 840, increasing the structural integrity of the joist 20 and thereby increasing the load capacity of the system 800.
- FIG. 11 A yet further alternative floor or joist support/reinforcement system 900 and support/reinforcement 940 are shown in Figure 11 .
- the support/reinforcement 940 comprises a return flange 942 provided with fasteners 90 for fixing the support/reinforcement 940 to the wall plate 6 of a wall 5 in house or other building or structure.
- the support/reinforcement 940 comprises a substantially U-shaped portion 944 for receiving and providing strength to the end portion 25 of the joist 20.
- the U-shaped portion 944 forms a slot which is shaped to enable convenient locating therein of the end portion 25 at least of the joist 20.
- the U-shaped portion 944 comprises upwardly extending flanges 945, 946 attached at their lower ends to a base portion 947.
- the flanges 945, 946 are relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the U-shaped portion 944 and fixed in place using fasteners 90. It is anticipated, however, that it may be desirable for the flanges 945, 946 to be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- one or both of the flanges 945, 946 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 940 once the flange or flanges 945, 946 has or have been deformed to engage with the joist 20.
- fasteners 90 may be used to fix the joist 20 in place.
- Two laterally-projecting fixing portions 948a, 948b are provided and extend substantially horizontally from the base 947 of the support/reinforcement 940 so as to lie on the upper edge of the wall plate 6 of inner wall 5 along substantially their entire length.
- the two laterally-projecting fixing portions 948a, 948b are arranged so as to be substantially perpendicular to flanges 945, 946 and return flange 942, and may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the U-shaped portion 944 of the support/reinforcement 940 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively. As such, the U-shaped portion 944 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the U-shaped portion 944 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- a variation of this embodiment of support/reinforcement 940 is possible by omitting the base 947 of the U-shaped portion 944.
- each laterally-projecting fixing portion 948a, 948b may be arranged so as to be joined along an edge of the return flange 942.
- each flange 945, 946 may be arranged so as to be joined along an edge of one of the laterally-projecting fixing portions 948a, 948b.
- each of the return flange 942, two laterally-projecting fixing portions 948a, 948b and flanges 945, 946 may be arranged substantially perpendicular to one another, as shown in Figure 11 .
- the support/reinforcement 1040 comprises a substantially U-shaped portion 1044 for receiving and providing strength to the end portion 25 of the joist 20.
- the U-shaped portion 1044 forms a slot which is shaped to enable convenient locating therein of the end portion 25 at least of the joist 20.
- the U-shaped portion 1044 comprises upwardly extending flanges 1045, 1046 attached at their lower ends to a base portion 1047, the upwardly extending flanges 1045, 1046 further comprising upstanding strap elements 1050, 1051 which extend between the upper and lower flanges 21, 22 of the joist 20.
- the upper flange 21 and lower flange 22 of the joist 20 are tied together via the support/reinforcement 1040, increasing the structural integrity of the joist 20 and thereby increasing the load capacity of the system 1000.
- the flanges 1045, 1046 are relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the U-shaped portion 1044 and fixed in place using fasteners 90.
- the flanges 1045, 1046 and/or strap elements 1050, 1051 may be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- one or both of the flanges 1045, 1046 and/or strap elements 1050, 1051 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1040 once the flange or flanges 1045, 1046 has or have been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- Two laterally-projecting fixing portions 1048a, 1048b are provided and extend substantially horizontally from the base 1047 of the support/reinforcement 1040 so as to lie on the upper edge of the wall plate 6 of inner wall 5 along substantially their entire length.
- the two laterally-projecting fixing portions 1048a, 1048b are arranged so as to be substantially perpendicular to flanges 1045, 1046 and strap elements 1050, 1051, and may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the U-shaped portion 1044 of the support/reinforcement 1040 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the U-shaped portion 1044 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered. Alternatively, the U-shaped portion 1044 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- a variation of this embodiment of support/reinforcement 1040 is possible by omitting the base 1047 of the U-shaped portion 1044. Instead, the support/reinforcement 1040 may comprise two parts, a left hand part and a right hand part.
- each laterally-projecting fixing portion 1048a, 1048b may be arranged so as to be joined respectively along an edge of a flange 1045, 1046 (itself incorporating a strap element 1050, 1051) to form a left hand or right hand part.
- the laterally-projecting fixing portion 1048a, 1048b of each part may be arranged substantially perpendicular to the flange 1045, 1046 of that part, as shown in Figure 12 .
- FIG. 13 A yet further alternative floor or joist support/reinforcement system 1100 and support/reinforcement 1140 are shown in Figure 13 .
- the floor or joist support/reinforcement system 1100 and support/reinforcement 1140 are similar to those shown in Figure 12 .
- the arrangement is, however, different to that shown in Figure 12 in that the support/reinforcement 1140 connects to just one side of the joist 20.
- the support/reinforcement 1140 comprises a substantially L-shaped portion 1144 for receiving and providing strength to the end portion 25 of the joist 20.
- the L-shaped portion 1144 is shaped to enable convenient location therein of the end portion 25 at least of the joist 20.
- the L-shaped portion 1144 comprises an upwardly extending flange 1145 attached at its lower end to a base portion 1147, the upwardly extending flange 1145 further comprising an upstanding strap element 1150 which extends between the upper and lower flanges 21, 22 of the joist 20.
- the upper flange 21 and lower flange 22 of the joist 20 are tied together via the support/reinforcement 1140, increasing the structural integrity of the joist 20 and thereby increasing the load capacity of the system 1100.
- the flange 1145 is relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the L-shaped portion 1144 and fixed in place using fasteners 90. It is anticipated, however, that it may be.desirable for the flange 1145 and/or strap element 1150 to be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, the flange 1145 and/or strap element 1150 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1140 once the flange 1145 has or have been deformed to engage with the joist 20.
- fasteners 90 may be used to fix the joist 20 in place.
- the base 1147a extends laterally, substantially horizontally, beyond the width of the joist 20 to a base portion 1147b so as to lie on the upper edge of the wall plate 6 of inner wall 5 along substantially its entire length.
- the base portion 1147 is arranged so as to be substantially perpendicular to flange 1145, and may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the L-shaped portion 1144 of the support/reinforcement 1140 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the L-shaped portion 1144 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered. Alternatively, the L-shaped portion 1144 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- a variation of this embodiment of support/reinforcement 1140 is possible by reversing the hand of the support/reinforcement 1140 such that it connects on the opposite side of the joist 20, with the base 1147a and base portion 1147b extending under the joist 20 in the opposite direction to that shown in Figure 13 .
- FIG. 14a to 14e Further alternatives of floor or joist support/reinforcement system 1200 and support/reinforcement 1240 are shown in Figures 14a to 14e .
- the support/reinforcement 1240 of Figures 14d and 14e illustrate an optional return flange 1242 provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1240 to the wall of a house or other building or structure, typically using fasteners or fixtures.
- the support/reinforcement 1240 of each of Figures 14a to 14e comprise at least two side flanges 1245, 1246 for receiving and providing strength to the end portion 25 of the joist 20 so that it recovers sufficient of its effective shear plane to function effectively.
- the side flanges 1245, 1246 extend the full height between the upper and lower flanges 21, 22 of the joist 20.
- the side flanges 1245, 1246 are arranged such that the lower end of each side flange 1245, 1246 is at least partially located, and connected to the joist 20, in the end portion 25 of the joist 20.
- the side flanges 1245, 1246 are relatively rigid and cannot be readily deformed. It is anticipated, however, that it may be desirable for the side flanges 1245, 1246 to be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- the side flanges 1245, 1246 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1240 once the side flange 1245, 1246 have been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- Simple side flanges 1245, 1246 may be provided in the form of straps, as shown in Figures 14a (side elevation) and Figure 14b (perspective view).
- a bottom flange 1247 ( Figure 14d ) and/or top flange 1248 ( Figure 14c ) may be incorporated to provide additional strength.
- the bottom flange 1247 and/or top flange 1248 may be an integral part (i.e. joined) with one or both of the side flanges 1245, 1246.
- the support/reinforcement 1240 may be one piece, either in the form of a collar which fully envelops the joist 20 and is slid onto the joist 20, or in the form a plate that folds around the joist 20 leaving a join line 1250, as illustrated in Figure 14e . It is therefore possible to partially or fully envelop the body portion 24 and end portion 25 of the joist 20.
- the support/reinforcement 1240 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the support/reinforcement 1240 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20, or may be angled in a similar way to the oblique angle (but not necessarily the same angle) of the cut to the joist 20 to achieve this effect (as shown).
- FIG. 15a to 15d Yet further alternatives of floor or joist support/reinforcement system 1300 and support/reinforcement 1340 are shown in Figures 15a to 15d .
- the support/reinforcement 1340 may include an optional return flange (not shown) provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1340 to the wall 5 of a house or other building or structure, typically via a wall plate 6 using fasteners or fixtures.
- the support/reinforcement 1340 of each of Figures 15a to 15c comprise at least two side flanges 1345, 1346 for receiving and providing strength to the end portion 25 of the joist 20 so that it recovers sufficient of its effective shear plane to function effectively.
- Each side flange 1345, 1346 is offered up to a side of the web 23 of the joist 20 and spans between the upper and lower flanges 21, 22 of the joist 20.
- each side flange 1345, 1346 further comprises at least one lateral flange 1347, 1348 which extends substantially perpendicular to the side flange 1345, 1346 and is offered up to the inner face of the lower flange 22 of the joist 20, as shown in Figures 15a and 15b .
- each side flange 1345, 1346 further comprises at least one lateral flange 1349, 1350 which extends substantially perpendicular to the side flange 1345, 1346 and is offered up to the inner face of the upper flange 21 of the joist 20.
- each side flange 1345, 1346 may further comprise a lower side flange 1351, 1352 and/or upper side flange 1353, 1354 which is offered up to the side face of the respective lower and/or upper flange 21, 22 of joist 20, as shown in Figure 15c .
- the support/reinforcement 1340 may fully envelop the joist 20.
- Such a support/reinforcement 1340 may be one piece and, as such, be manufactured by extrusion or forming. These embodiments of support/reinforcement 1340 provide the option to tie (using fasteners 90) the upper flange 21 to the lower flange 22 of the joist 20 by making use of the structural integrity of the support/reinforcement 1340, thereby increasing the load capacity of the system 1300. In the present embodiment the support/reinforcement 1340 is relatively rigid and cannot be readily deformed.
- the support/reinforcement 1340 may be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- the support/reinforcement 1340 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1340 once it has been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place in the support/reinforcement 1340.
- the support/reinforcement 1340 may be one piece, either in the form of a collar which fully envelops the joist 20 and is slid onto the joist 20, or in the form a plate that folds around the joist 20 leaving a join line. It is therefore possible to partially or fully envelop the body portion 24 and end portion 25 of the joist 20. In either case, the support/reinforcement 1340 can be formed or trimmed so as to respect the oblique cut of the joist 20.
- the support/reinforcement 1340 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively. As such, the support/reinforcement 1340 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- the support/reinforcement 1440 comprises a substantially U-shaped portion 1444 for receiving and providing strength to the end portion 25 of the joist 20.
- the U-shaped portion 1444 forms a slot which is shaped to enable convenient locating therein of the end portion 25 at least of the joist 20.
- the U-shaped portion 1444 comprises upwardly extending flanges 1445, 1446 attached at their lower ends to a base portion 1447, which extend between the upper and lower regions of the joist 20.
- the flanges 1445, 1446 are relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the U-shaped portion 1444 and fixed in place using fasteners 90. It is anticipated, however, that it may be desirable for the flanges 1445, 1446 to be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, one or both of the flanges 1445, 1446 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1440 once the flange or flanges 1445, 1446 has or have been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- Two laterally-projecting fixing portions 1448a, 1448b are provided and extend substantially horizontally from the base 1447 of the support/reinforcement 1440 so as to lie on the upper edge of the wall plate 6 of inner wall 5 along substantially their entire length.
- the two laterally-projecting fixing portions 1448a, 1448b are arranged so as to be substantially perpendicular to flanges 1445, 1446 and may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the U-shaped portion 1444 of the support/reinforcement 1440 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the U-shaped portion 1444 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the U-shaped portion 1444 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- each laterally-projecting fixing portion 1448a, 1448b may be arranged so as to be joined along an edge of a respective flange 1445, 1446.
- the laterally-projecting fixing portions 1448a, 1448b may be arranged substantially perpendicular to the flanges 1445, 1446 of each part, as shown in Figure 16 .
- FIG. 17a and 17b A yet further alternative floor or joist support/reinforcement system 1500 and support/reinforcement 1540 are shown in Figures 17a and 17b .
- the floor or joist support/reinforcement system 1500 and support/reinforcement 1540 are similar to those shown in Figure 16 .
- the arrangement is, however, different to that shown in Figure 16 in that the support/reinforcement 1540 does not comprise laterally-projecting fixing portions.
- the support/reinforcement 1540 comprises substantially L-shaped portions 1544a, 1544b for receiving and providing strength to the end portion 25 of the joist 20.
- the L-shaped portions 1544a, 1544b are shaped to enable convenient locating therein of the end portion 25 at least of the joist 20.
- the L-shaped portions 1544a, 1544b comprise an upwardly extending flange 1545a, 1545b which extends between the upper and lower regions of the joist 20, each attached at its lower end to a base portion 1547a, 1547b.
- the flanges 1544a, 1544b are relatively rigid and cannot be readily deformed.
- the joist 20 may be simply received in the L-shaped portions 1544a, 1544b and fixed in place using fasteners 90.
- the flanges 1545a, 1545b may be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- the support/reinforcement 1540 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1540 once the support/reinforcement 1540 has been deformed to engage with the joist 20.
- fasteners may be used to fix the joist 20 in place.
- the base portions 1547a, 1547b extend laterally, substantially horizontally, underneath and towards the centre of the joist 20 so as to lie on the upper edge of the wall plate 6 of inner wall 5.
- the base portions 1547a, 1547b are arranged so as to be substantially perpendicular to flanges 1545a, 1545b, and may be attached to the wall plate 6 of inner wall 5 using fasteners 90.
- the L-shaped portions 1544a, 1544b of the support/reinforcement 1540 which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the L-shaped portions 1544a, 1544b may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the L-shaped portions 1544a, 1544b may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- FIG. 18a and 18b A yet further alternative floor or joist support/reinforcement system 1600 and support/reinforcement 1640 are shown in Figures 18a and 18b .
- the support/reinforcement 1640 comprises an elongate strap for receiving and providing strength to the end portion 25 of the joist 20.
- the elongate strap comprises two side flanges 1644, 1645 and an end face flange 1646.
- the joist 20 may be simply received in the U-shape of the elongate strap, and the two side flanges 1644, 1645 and the end face flange 1646 fixed in place around the lower periphery of the joist 20 using fasteners 90.
- the support/reinforcement 1640 may be readily deformable so as to engage with the joist 20 once the joist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement).
- the support/reinforcement 1640 may be provided with a barb or barbs which inhibit removal of the joist 20 from the support/reinforcement 1640 once the support/reinforcement 1640 has or have been deformed to engage with the joist 20.
- the support/reinforcement 1640 which provides additional (tensile) strength in the bottom of the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the side flanges 1644, 1645 may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the side flanges 1644, 1645 may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 to recover the full effective shear plane of the joist 20 (as shown).
- FIG. 19 A further alternative floor or joist support/reinforcement system 1700 and support/reinforcement 1740 are shown in Figure 19 .
- the support/reinforcement 1740 can be seen to comprise an F-shaped bracket.
- a first arm 1742 of the bracket is provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1740 to the outer face of a wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- a second arm 1744 of the bracket provides a support surface for, and strength to, the joist 20.
- the second arm 1744 of the bracket is provided with fastener/fixture-receiving apertures (not shown) for fixing the joist 20 to the support/reinforcement 1740 using fasteners or fixtures (not shown).
- a third arm 1743 of the bracket is provided substantially parallel to, but spaced inside of, the first arm 1742.
- the third arm 1743 is of sufficient length (same length, longer or shorter than the first arm 1742) to increase the strength of the bracket to resist bending moments from the supported joist, and may be provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1740 to the inner face of a wall of a house or other building or structure, typically using fasteners or fixtures (not shown).
- the second arm 1744 of the bracket which provides additional strength to the end portion 25 of the joist 20, is of sufficient length so that the joist 20 recovers sufficient of its effective shear plane to function effectively.
- the second arm 1744 of the bracket may extend from the end of the end portion 25 of the joist 20 only partly along the length of the end portion 25 until sufficient of its effective shear plane is recovered.
- the second arm 1744 of the bracket may extend at least the full length of the end portion 25 of joist 20 to and/or past the transition to the body portion 24 (as shown) to recover the full effective shear plane of the joist 20.
- Reference numerals 1750, 1751 and 1752 represent a ceiling plasterboard, a dot and dab, and a wall plasterboard respectively.
- the floor or joist support/reinforcement system 1800 comprises a joist 20 suitable for supporting a floor (not shown) and a support/reinforcement 1840 for the joist 20.
- the joist 20 shown in this embodiment is an I-joist (although any joist may be beneficially employed) and comprises an upper flange 21, a lower flange 22 and a web 23 extending therebetween.
- the joist 20 further comprises a body portion 24 of full cross-sectional area.
- the end portion 25 of reduced cross-sectional area (when compared to that of the body portion 24) either stops short of the usual wall 5 or other support structure of the building or other structure, or is non existent, as shown (has zero cross-sectional area, i.e. has less cross-sectional area than the body portion 24), such that the body portion 24 stops short of the usual wall 5 or other support structure of the building or other structure.
- the floor or joist support/reinforcement system 1800 further comprises the support/reinforcement 1840 for bridging the gap between the joist 20 and supporting wall 5 and/or reinforcing the joist 20.
- the support/reinforcement 1840 comprises one or more horizontal straps 1841 which are connected using fasteners 90 to the lower flange 22 of the joist 20 and extend laterally to rest on and/or attach to wall plate 6 of the wall 5 of a house or other building or structure.
- the support/reinforcement 1840 further comprises one or more angled straps 1842 which are connected using a fastener or fasteners 90 to the upper flange 21 of the joist 20 and extend laterally and downwardly towards wall plate 6 where they connect to the respective one or more horizontal straps 1841 at pivot point 1847 (secured by way of a fastener or fasteners) at an angle ⁇ therebetween.
- the support/reinforcement 1840 recovers the lost section of joist 20 and necessary amount of effective shear plane and structural integrity required whilst fitting within the available space.
- the angle ⁇ may be varied as appropriate to fit the available space and/or provide the necessary structural integrity by varying the respective lengths of the horizontal straps 1841 and angled straps 1842, and/or the respective fixing positions of each on the joist 20.
- the support/reinforcement 1840 may take any suitable form and may make take the general (but adapted) form of any of the preceding embodiments of support/reinforcement described above. What is important, however, is that the cross-sectional area of the support/reinforcement 1840 (or its effective envelope) decreases with increasing distance from the body portion 24 of the joist 20 towards the wall 5 or other support structure of the building or other structure.
- the joist 20 may be simply received in the support/reinforcement 1840, or may be fixed in place using fasteners 90. Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain the joist 20 in place within the support/reinforcement 1840. Optionally, an interference fit between the joist 20 and support/reinforcement 1840 may be employed.
- the support/reinforcement 1840 may further comprise a return flange (not shown) for fixing the support/reinforcement 1840 to the outer surface of the inner wall 5 of the house or other building or structure. In this case, the flange may be attached by use of fasteners 90.
- the support/reinforcement may be connected to the joist, or the joist connected to the support/reinforcement.
- the support/reinforcement may be provided in parts which may be assembled prior to, or during, its installation.
- the support/reinforcement may be retrofit.
- the support/reinforcement need not extend over the whole length of the end portion of the joist. It may be sufficient for the supporting member to extend over a fraction of the length of the joist end portion.
- the support/reinforcement which provides additional strength to the end portion of the joist, is of sufficient length so that the joist recovers sufficient of its effective shear plane to function effectively.
- the support/reinforcement may extend from the end of the end portion of the joist only partly along the length of the end portion until sufficient of its effective shear plane is recovered.
- the support/reinforcement may extend at least the full length of the end portion of the joist to and/or past the transition to the body portion to recover the full effective shear plane of the joist (as shown in Figure 19 ).
- fastener/fixture-receiving apertures referred to above are suitable for receiving screws, nails, pins, rivets, bolts or any other fixture means whatsoever that may be beneficially employed.
- the support/reinforcements described may be manufactured from any suitable material, laminate or composite using any suitable manufacturing process. Typically, the support/reinforcements described will be made from sheet metal and folded, formed, welded as appropriate (for example, by cutting from one piece of metal or by joining pieces of metal, e.g. by welding). Alternatvely, the support/reinforcements described may be extruded (particularly where they envelop the joist.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Wood Science & Technology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Floor Finish (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
- The present invention relates to a floor or joist support/reinforcement system and, in particular (but not exclusively), to a floor or joist support/reinforcement system that may be used to support a floor or joist in a loft (or attic) space or the like.
US 2004/0200180 A1 discloses a system to reinforce a floor joist at the location of a hole in its web portion. - Roofs in most houses and certain other buildings are supported by roof trusses. Whilst roof trusses provide sufficient strength to support the roof above and a ceiling (e.g. plasterboard) of a room below, they do not provide sufficient strength to satisfactorily support a floor. Floors in a loft are typically supported by a series of parallel steel joists which run along the length of the loft. Such steel joists are heavy and often have to be put into place using a crane or other lifting equipment. This is expensive and inconvenient. One possible alternative would be to use solid timber joists, I-joists or other engineered timber joists. However, such joists would protrude through the proposed roof space (as shown in
Figure 1 ) and would need a conventional roof to be moved to accommodate the joist. Accordingly, the use of steel joists is conventional as they can be accommodated in the available space. - The present invention seeks to address and/or mitigate one or more of the problems of the prior art.
- Accordingly, in a first aspect, the present invention provides a floor or joist support/reinforcement system according to
claim 1 and, in a second aspect, according toclaim 2. - The support preferably comprises a fixing portion for fixing the support to a building.
- The floor support system of the present invention facilitates the use of joists that could otherwise not be used because removal of part of the end of the joist would reduce the strength of the joist. Such a joist may not meeting building regulations.
- The joist is preferably elongate. It is preferred that the joist has substantially the same cross section along whole of length of joist apart from the end portion (the end portion having a reduced cross-sectional area compared to the body portion).
- The end portion of the joist comprises a face that is obliquely angled with respect to the longitudinal axis of joist. Such a joist may be supplied pre-shaped, or a worker may make an oblique cut in the end of the joist. The angle between the oblique face and the longitudinal axis of the body portion may be from 30 to 70 degrees, preferably from 30 to 50 degrees. The end portion of the joist may comprise a face that is substantially normal to the longitudinal axis of the body portion. Such a face may provide the end face of the joist. For the avoidance of confusion, it is noted that a joist may comprise a face that is obliquely angled with respect to the longitudinal axis of the body portion and a face that is substantially normal to the longitudinal axis of the body portion.
- It is preferred that the joist is wooden. Such joists are light and may be easily shaped using manually-operated tools.
- It is preferred that the support comprises a fixing portion for attachment to a building.
- For the avoidance of confusion, it is hereby noted that the following statements in relation to the nature of the support apply to the support of the floor support system of the first aspect of the invention and the second aspect of the present invention.
- The supporting portion may provide a slot into which the end portion of the joist may be received. This provides a simple and effective way of locating the joist in the support. A slot may allow the joist to be slid into place.
- The supporting portion may comprise an enclosure portion for receiving the end portion of the joist. The enclosure portion provides a slot in the form of an enclosed cavity for receipt of the end portion of the joist.
- The supporting portion may comprises a collar or sleeve for receipt of the end portion of the joist. The collar or sleeve defines a slot for the receipt of the end portion of the joist. In use, a least a part of the end portion of the joist protrudes through the collar or sleeve.
- The enclosure portion, collar or sleeve may be provided by two or more side wall portions and a top portion interconnecting the side walls portions.
- The enclosure portion, collar or sleeve may define an aperture for the receipt of the joist. The cross-section of the slot defined by the enclosure portion, collar or sleeve may decrease with increasing distance from the aperture. In other words, in use. The cross-section of the slot defined by the enclosure portion, collar or sleeve may decrease with increasing distance from the body portion of the joist.
- The support may be made from a metal, such as steel.
- The support may comprise a strap portion for attaching the support to the joist.
- The support or part thereof may be readily deformable from a first configuration in which the joist may be readily presented to, and removed from the support, to a second configuration in which the support of part thereof frictionally engages with the joist to inhibit removal of the joist from the support. The support may be provided with deformable elements which are readily deformable. The deformable elements may be in the form of walls.
- The support may be provided with a barb, and the support or part thereof may be readily deformable from a first configuration in which the joist may be readily presented to, and removed from the support, to a second configuration in which the barb engages with the joist to inhibit removal of the joist from the support.
- The support may be provided with one or more barbs to inhibit the removal of the joist from the support once the support has been fitted to the joist.
- Preferred embodiments will now be described by way of example only with reference to the following drawings.
Figures 15a to 15d and17a to 17b disclose embodiments according to the invention. The remaining embodiments do not form part of the invention. -
Figure 1 is a schematic cross-sectional view of a conventional roof structure, showing the size and shape of a conventional prior art joist in relation to the roof structure; -
Figure 2 is a schematic perspective view of an embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a hollow body portion which defines an opening for the receipt of a joist; -
Figure 3 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a bracket which defines a surface for the receipt of a joist; -
Figure 4 is a schematic perspective view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement , the support/reinforcement comprising a U-shaped supporting portion which defines a slot for the receipt of a joist; -
Figure 5 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a slot for the sliding receipt of the lower flange of a joist (I-joist shown); -
Figure 6 is a schematic perspective view of a yet further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising deformable side-wall portions that have been deformed to frictionally engage with a joist; -
Figure 7 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a collar which defines a space for the receipt of a joist; -
Figure 8 is a schematic perspective view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a shoe portion and a deformable strap portion for attaching to the joist; -
Figure 9 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising two laterally-extending fixing portions and a hollow body portion which defines an opening for the receipt of a joist; -
Figure 10 is a schematic perspective view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising two laterally-extending fixing portions and a hollow body portion which defines an opening for the receipt of a joist; -
Figure 11 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a U-shaped supporting portion which defines a slot for the receipt of a joist; -
Figure 12 is a schematic perspective view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a bracket which defines a surface for the receipt of a joist; -
Figure 13 is a schematic perspective view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a bracket which defines a surface for the receipt of a joist; -
Figure 14a is a schematic side elevation view andFigures 14b to 14e are schematic perspective views of further alternative embodiments of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcements comprising flanges or portions for attachment to a joist; -
Figure 15a is a schematic side elevation view andFigures 15b to 15d are schematic end elevation views of further alternative embodiments of floor or joist support/reinforcement system and support/reinforcement according to the present invention, the support/reinforcements comprising flanges or portions for attachment to a joist; -
Figures 16 is a schematic perspective view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising flanges or portions for attachment to a joist; -
Figure 17a is a schematic perspective view andFigure 17b is schematic end elevation view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement according to the present invention, the support/reinforcement comprising brackets for attachment to a joist; -
Figure 18a is a schematic perspective view andFigure 18b is schematic plan view from above of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a strap for attachment to a joist; -
Figure 19 is a schematic side elevation view of an alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising a bracket which defines a surface for the receipt of a joist; and -
Figure 20 is a schematic side elevation view of a further alternative embodiment of floor or joist support/reinforcement system and support/reinforcement, the support/reinforcement comprising straps for attachment to a joist. - Referring first to
Figure 1 , there is shown a cross-section through aconventional roofing structure 1. Theroofing structure 1 comprises a plurality of roof trusses 2, only one of which is shown in the figure. Theroof truss 2 comprises a substantiallyhorizontal portion 3 and an angled portion 4. Theroof truss 2 is supported via awall plate 6 provided on aninner wall 5, the upper end of which is slightly raised compared to theouter wall 8 and thewall cavity 7. Theroofing structure 1 presents a space for the possible insertion of a floor-supporting joist. A conventional floor-supporting joist is shown in dashed lines and is denoted by reference numeral 9. As can be seen, a conventional floor-supporting joist 9 compromises the conventional roofing structure as it cannot be accommodated without extending the roof covering (not shown) or moving theroofing structure 1. This is highly inconvenient given that many floor-support joists 9 would be required to support a floor in a roofing space such as a loft or attic. - A first embodiment of each of a floor or joist support/
reinforcement system 10 and a support/reinforcement 40 are shown inFigure 2 . The floor or joist support/reinforcement system 10 comprises ajoist 20 suitable for supporting a floor (not shown) and a support/reinforcement 40 for thejoist 20. Thejoist 20 shown in this embodiment is an I-joist (although any joist may be beneficially employed) and comprises anupper flange 21, alower flange 22 and aweb 23 extending therebetween. Thejoist 20 further comprises an end portion 25 (hidden inside the support/reinforcement 40) and abody portion 24, the cross-sectional area of theend portion 25 being less than the cross-sectional area of thebody portion 24. The reduced cross-sectional area of theend portion 25 of thejoist 20 permits it to be accommodated within the available space of aconventional roofing structure 1. Theend portion 25 may typically be formed by making an oblique cut into a conventional joist. However, this compromises the structural integrity of thejoist 20 as the effective shear plane of the reduced cross-sectional area of theend portion 25 is less than that of the cross-sectional area of the body portion 24 (as can best be seen inFigure 19 ). Accordingly, to recover the necessary amount of effective shear plane, the floor or joist support/reinforcement system 10 further comprises the support/reinforcement 40 for supporting and/or reinforcing theend portion 25 of thejoist 20. The support/reinforcement 40 comprises anenclosure portion 45 which provides additional strength to theend portion 25 of thejoist 20 so that it recovers sufficient of its effective shear plane to function effectively. Theenclosure 45 is formed offlanges 47 which receives and encloses the end part of theend portion 25 of thejoist 20. Theenclosure 45 provides a slot into which theend portion 25 of thejoist 20 is inserted. The cross-sectional area of theenclosure 45 decreases with increasing distance from thebody portion 24 towards theend portion 25 of thejoist 20. Thejoist 20 may be simply received in the support/reinforcement 40, or may be fixed inplace using fasteners 90. Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain thejoist 20 in place within the support/reinforcement 40. Optionally, an interference fit between thejoist 20 and support/reinforcement 40 may be employed. Without the additional support of the support/reinforcement 40, however, thejoist 20 may not be sufficiently strong to support any overlying floor and may not meet building regulations. The support/reinforcement 40 shown further comprises anoptional return flange 46 for fixing the support/reinforcement 40 to the outer surface of theinner wall 5 of the house or other building or structure. In this case, theflange 46 is attached usingfasteners 90. Theouter wall 8 andwall cavity 7 are shown in dotted line. The support/reinforcement 40 shown also comprises asection 48 for receiving theupper flange 21 of themain body 24 ofjoist 20. This provides the option to tie (using fasteners) theupper flange 21 to thelower flange 22 of thejoist 20 by making use of the structural integrity of the support/reinforcement 40, thereby increasing the load capacity of thesystem 10. - The support/
reinforcement 40, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, the support/reinforcement 40 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, the support/reinforcement 40 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). -
Figure 19 usefully demonstrates (schematically) the respective shear plane mechanisms at play when ajoist 20 is mounted on top of awall 5 via awall plate 6. In a first case, with no support/reinforcement present (ignoring the support/reinforcement 1740), the effective shear plane is at A, in line with the point at which thewall 5 ceases to support thejoist 20. It will be readily understood by those skilled in the art that the effective shear plane at A is significantly reduced due to the reduced cross sectional area of the joist at this point. This is a direct result of the oblique cut in thejoist 20 necessary to accommodate thejoist 20 in theroof structure 1. In a second case, with a support/reinforcement in place, the effective shear plane is moved to B in line with the point at which the support/reinforcement ceases to support thejoist 20. It will be readily understood by those skilled in the art that the full effective shear plane at B is restored due to the joist having its full cross sectional area available at this point. - Further embodiments of floor or joist support/reinforcement systems and support/reinforcements are shown in
Figures 3 to 20 . Many of the features of the floor or joist support/reinforcement systems and support/reinforcements are the same as those shown inFigure 2 and will not be described further in detail. For these features, like numbering has been used. In the embodiments shown, thejoist 20 comprises anend portion 25 and abody portion 24, the cross-sectional area of theend portion 25 being less than the cross-sectional area of the body portion 24 (in theFigure 20 embodiment the cross-sectional area of theend portion 25 is zero). In each ofFigures 3 to 8 , thejoist 20 is shown in dotted line in order that the features of the support/reinforcement may be seen more clearly. - Referring next to the floor or joist support/
reinforcement system 100 and support/reinforcement 140 ofFigure 3 , the support/reinforcement 140 can be seen to comprise an L-shaped bracket. Afirst arm 142 of the bracket is provided with fastener/fixture-receiving apertures 143 (only one of which is labelled) for fixing the support/reinforcement 140 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). Asecond arm 144 of the bracket provides a support surface for, and strength to, thejoist 20. Thesecond arm 144 of the bracket is provided with fastener/fixture-receiving apertures 145 (only one of which is labelled) for fixing thejoist 20 to the support/reinforcement 140 using fasteners or fixtures (not shown). Thesecond arm 144 of the bracket, which provides additional strength to theend portion 25 of thejoist 20, is of such length as is necessary for thejoist 20 to recover sufficient of its effective shear plane to function effectively. As such, thesecond arm 144 of the bracket may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, thesecond arm 144 of the bracket may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to the body portion 24 (as shown) to recover the full effective shear plane of thejoist 20. - A further alternative floor or joist support/
reinforcement system 200 and support/reinforcement 240 are shown inFigure 4 . The support/reinforcement 240 comprises aflange 242 provided with fastener/fixture-receiving apertures 243 (only one of which is labelled) for fixing the support/reinforcement 240 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). The support/reinforcement 240 comprises a substantiallyU-shaped portion 244 for receiving and providing strength to theend portion 25 of thejoist 20. TheU-shaped portion 244 forms a slot which is shaped to enable convenient location therein of theend portion 25 at least of thejoist 20. TheU-shaped portion 244 comprises upwardly extendingflanges base portion 247. In the present embodiment, theflanges joist 20 may be simply received in theU-shaped portion 244, or may be fixed in place using fasteners (not shown). It is anticipated, however, that it may be desirable for theflanges joist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, one or both of theflanges joist 20 from the support/reinforcement 240 once the flange orflanges joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. TheU-shaped portion 244 of the support/reinforcement 240, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theU-shaped portion 244 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered (as shown). Alternatively, theU-shaped portion 244 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of thejoist 20. - A yet further alternative floor or joist support/
reinforcement system 300 and support/reinforcement 340 are shown inFigure 5 . The support/reinforcement 340 comprises aflange 342 provided with fastener/fixture-receiving apertures 343 (only one of which is labelled) for fixing the support/reinforcement 340 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). The support/reinforcement 340 comprises aslot portion 344 for receiving and providing strength to theend portion 25 of thejoist 20. Afirst slot region 345 andsecond slot region 346 are defined by aslot base portion 347 and slot-formingportions second slot regions lower flange 22 of an I-joist 20 (or lower part of a solid timber joist with grooves cut in). The gap (not labelled) between slot-formingportions web 23 ofjoist 20. In the present embodiment, the slot-formingportions portions lower flange 22 of thejoist 20 once the joist has been put in place, such engagement inhibiting removal of thejoist 20. Alternatively or additionally, one or both of the slot-formingportions joist 20 from the support/reinforcement 340 once the slot-forming portion orportions joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. It is further anticipated that the support/reinforcement 340 may be provided with an end stop which inhibits the support/reinforcement 340 from being slid along the length of thejoist 20, ensuring that the support/reinforcement 340 remains located on the end of thejoist 20. This may be achieved, for example, by bending downwards an end portion of one or both of the slot-formingmembers flange 342. Theslot portion 344 of the support/reinforcement 340, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theslot portion 344 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theslot portion 344 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). - A further alternative floor or joist support/
reinforcement system 400 and support/reinforcement 440 are shown inFigure 6 . The support/reinforcement 440 comprises aflange 442 provided with fastener/fixture-receiving apertures 443 (only one of which is labelled) for fixing the support/reinforcement 440 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). The support/reinforcement 440 comprises aslot portion 444 for receiving and providing strength to theend portion 25 of the joist. Theslot portion 444 comprisesside walls joist 20. Prior to presentation of thejoist 20 to the support/reinforcement 440, theside walls joist 20. Upon receipt of thejoist 20, theside walls end portion 25 of thejoist 20. Alternatively or additionally, one or both of theside walls joist 20 from the support/reinforcement 440 once the side wall orwalls joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. It is further anticipated that the support/reinforcement 440 may be provided with an end stop which inhibits the support/reinforcement 440 from being slid along the length of thejoist 20, ensuring that the support/reinforcement 440 remains located on the end of thejoist 20. This may be achieved, for example, by bending downwards an end portion of one or both of theside walls flange 442. Theslot portion 444 of the support/reinforcement 440, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theslot portion 444 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theslot portion 444 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). - A yet further alternative floor or joist support/
reinforcement system 500 and support/reinforcement 540 are shown inFigure 7 . The support/reinforcement 540 comprises aflange 542 provided with fastener/fixture-receiving apertures 543 (only one of which is labelled) for fixing the support/reinforcement 540 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). The support/reinforcement 540 comprises anarm 544 for providing strength to theend portion 25 of thejoist 20. The support/reinforcement 540 further comprises acollar 545 for receiving and providing further strength to theend portion 25 of thejoist 25. The cross-sectional area of the slot formed bycollar 545 decreases with increasing distance from the body portion 24 (not shown) of thejoist 20 towards theend portion 25 of thejoist 20. Thejoist 20 may be simply received in thecollar 545, or may be fixed in place in the collar and/or on thearm 544 using fasteners (not shown). Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain thejoist 20 in place within thecollar 545 and/or on thearm 544. Optionally, an interference fit between thejoist 20 and support/reinforcement 540 may be employed. Thearm 544 andcollar 545 of the support/reinforcement 540, which provides additional strength to theend portion 25 of thejoist 20, are of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, thearm 544 and/orcollar 545 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered (as shown). Alternatively, thearm 544 and/orcollar 545 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of thejoist 20. - A further alternative floor or joist support/
reinforcement system 600 and support/reinforcement 640 are shown inFigure 8 . The support/reinforcement 640 comprises aflange 642 provided with fastener/fixture-receiving apertures 643 (only one of which is labelled) for fixing the support/reinforcement 640 to the wall of a house or other building or structure, typically using fasteners or fixtures (not shown). The support/reinforcement 640 comprises ashoe portion 644 for receiving and providing strength to theend portion 25 of thejoist 20. Theshoe portion 644 comprisesside walls end wall 647 extending upwardly from abase portion 648. Theshoe portion 644 forms a recess which is shaped to enable convenient locating therein of thejoist 20. The support/reinforcement 640 further comprises astrap portion 649 which is brought into contact with the oblique angled surface ofjoist end portion 25. Fastener/fixture means (not shown) may be inserted through fastener/fixture-receiving apertures 650 (only one of which is labelled) to attach thestrap portion 649 to thejoist 20. Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain thejoist 20 in place. Optionally, an interference fit between thejoist 20 and support/reinforcement 640 may be employed. Theshoe portion 644 of the support/reinforcement 640, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theshoe portion 644 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered (as shown). Alternatively, theshoe portion 644 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of thejoist 20. - A yet further alternative floor or joist support/
reinforcement system 700 and support/reinforcement 740 are shown inFigure 9 . The floor or joist support/reinforcement system 700 and support/reinforcement 740 are very similar to those shown inFigure 2 . The arrangement for fixing the support/reinforcement 740 to the building is, however, different to that shown inFigure 2 . In the embodiment shown inFigure 9 , theflange 46 is dispensed with and in its place are provided two laterally-projectingfixing portions inner wall 5 for example, using fasteners (not shown). - A further alternative floor or joist support/
reinforcement system 800 and support/reinforcement 840 are shown inFigure 10 . The floor or joist support/reinforcement system 800 and support/reinforcement 840 are very similar to those shown inFigure 9 . The arrangement for fixing the support/reinforcement 840 to the building is, however, different to that shown inFigure 9 in that the two laterally-projectingfixing portions base 847 of the support/reinforcement 840 so as to lie on the upper edge (e.g. wall plate 6) ofinner wall 5 along substantially their entire length. As in theFigure 9 embodiment, the two laterally-projectingfixing portions wall plate 6 ofinner wall 5 usingfasteners 90. In addition, the substantiallyvertical sidewalls 841 of the support/reinforcement 840 differ from theFigure 9 embodiment in that they extend the full length of theend portion 25 ofjoist 20 from the end of theend portion 25 past the transition to thebody portion 24 to recover the full effective shear plane of thejoist 20. By fastening the support/reinforcement 840 to theupper flange 21 andlower flange 22 of thejoist 20 usingfasteners 90 as illustrated, theupper flange 21 andlower flange 22 of thejoist 20 are tied together via the support/reinforcement 840, increasing the structural integrity of thejoist 20 and thereby increasing the load capacity of thesystem 800. - A yet further alternative floor or joist support/
reinforcement system 900 and support/reinforcement 940 are shown inFigure 11 . The support/reinforcement 940 comprises areturn flange 942 provided withfasteners 90 for fixing the support/reinforcement 940 to thewall plate 6 of awall 5 in house or other building or structure. The support/reinforcement 940 comprises a substantiallyU-shaped portion 944 for receiving and providing strength to theend portion 25 of thejoist 20. TheU-shaped portion 944 forms a slot which is shaped to enable convenient locating therein of theend portion 25 at least of thejoist 20. TheU-shaped portion 944 comprises upwardly extendingflanges base portion 947. In the present embodiment theflanges joist 20 may be simply received in theU-shaped portion 944 and fixed inplace using fasteners 90. It is anticipated, however, that it may be desirable for theflanges joist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, one or both of theflanges joist 20 from the support/reinforcement 940 once the flange orflanges joist 20. Alternatively or additionally,fasteners 90 may be used to fix thejoist 20 in place. Two laterally-projectingfixing portions base 947 of the support/reinforcement 940 so as to lie on the upper edge of thewall plate 6 ofinner wall 5 along substantially their entire length. The two laterally-projectingfixing portions flanges flange 942, and may be attached to thewall plate 6 ofinner wall 5 usingfasteners 90. TheU-shaped portion 944 of the support/reinforcement 940, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theU-shaped portion 944 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theU-shaped portion 944 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). A variation of this embodiment of support/reinforcement 940 is possible by omitting thebase 947 of theU-shaped portion 944. Instead, each laterally-projectingfixing portion return flange 942. In turn, eachflange fixing portions return flange 942, two laterally-projectingfixing portions flanges Figure 11 . - A further alternative floor or joist support/
reinforcement system 1000 and support/reinforcement 1040 are shown inFigure 12 . The support/reinforcement 1040 comprises a substantiallyU-shaped portion 1044 for receiving and providing strength to theend portion 25 of thejoist 20. TheU-shaped portion 1044 forms a slot which is shaped to enable convenient locating therein of theend portion 25 at least of thejoist 20. TheU-shaped portion 1044 comprises upwardly extendingflanges base portion 1047, the upwardly extendingflanges upstanding strap elements 1050, 1051 which extend between the upper andlower flanges joist 20. By fastening thestrap elements 1050, 1051 to theupper flange 21 andlower flange 22 of thejoist 20 usingfasteners 90 as illustrated, theupper flange 21 andlower flange 22 of thejoist 20 are tied together via the support/reinforcement 1040, increasing the structural integrity of thejoist 20 and thereby increasing the load capacity of thesystem 1000. In the present embodiment theflanges joist 20 may be simply received in theU-shaped portion 1044 and fixed inplace using fasteners 90. It is anticipated, however, that it may be desirable for theflanges strap elements 1050, 1051 to be readily deformable so as to engage with thejoist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, one or both of theflanges strap elements 1050, 1051 may be provided with a barb or barbs which inhibit removal of thejoist 20 from the support/reinforcement 1040 once the flange orflanges joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. Two laterally-projectingfixing portions base 1047 of the support/reinforcement 1040 so as to lie on the upper edge of thewall plate 6 ofinner wall 5 along substantially their entire length. The two laterally-projectingfixing portions flanges strap elements 1050, 1051, and may be attached to thewall plate 6 ofinner wall 5 usingfasteners 90. TheU-shaped portion 1044 of the support/reinforcement 1040, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theU-shaped portion 1044 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theU-shaped portion 1044 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). A variation of this embodiment of support/reinforcement 1040 is possible by omitting thebase 1047 of theU-shaped portion 1044. Instead, the support/reinforcement 1040 may comprise two parts, a left hand part and a right hand part. In this case, each laterally-projectingfixing portion flange 1045, 1046 (itself incorporating astrap element 1050, 1051) to form a left hand or right hand part. In use, the laterally-projectingfixing portion flange Figure 12 . - A yet further alternative floor or joist support/
reinforcement system 1100 and support/reinforcement 1140 are shown inFigure 13 . The floor or joist support/reinforcement system 1100 and support/reinforcement 1140 are similar to those shown inFigure 12 . The arrangement is, however, different to that shown inFigure 12 in that the support/reinforcement 1140 connects to just one side of thejoist 20. The support/reinforcement 1140 comprises a substantially L-shapedportion 1144 for receiving and providing strength to theend portion 25 of thejoist 20. The L-shapedportion 1144 is shaped to enable convenient location therein of theend portion 25 at least of thejoist 20. The L-shapedportion 1144 comprises an upwardly extendingflange 1145 attached at its lower end to a base portion 1147, the upwardly extendingflange 1145 further comprising anupstanding strap element 1150 which extends between the upper andlower flanges joist 20. By fastening thestrap element 1150 to theupper flange 21 andlower flange 22 of thejoist 20 usingfasteners 90 as illustrated, theupper flange 21 andlower flange 22 of thejoist 20 are tied together via the support/reinforcement 1140, increasing the structural integrity of thejoist 20 and thereby increasing the load capacity of thesystem 1100. in the present embodiment theflange 1145 is relatively rigid and cannot be readily deformed. Thejoist 20 may be simply received in the L-shapedportion 1144 and fixed inplace using fasteners 90. It is anticipated, however, that it may be.desirable for theflange 1145 and/orstrap element 1150 to be readily deformable so as to engage with thejoist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, theflange 1145 and/orstrap element 1150 may be provided with a barb or barbs which inhibit removal of thejoist 20 from the support/reinforcement 1140 once theflange 1145 has or have been deformed to engage with thejoist 20. Alternatively or additionally,fasteners 90 may be used to fix thejoist 20 in place. Thebase 1147a extends laterally, substantially horizontally, beyond the width of thejoist 20 to abase portion 1147b so as to lie on the upper edge of thewall plate 6 ofinner wall 5 along substantially its entire length. The base portion 1147 is arranged so as to be substantially perpendicular toflange 1145, and may be attached to thewall plate 6 ofinner wall 5 usingfasteners 90. The L-shapedportion 1144 of the support/reinforcement 1140, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, the L-shapedportion 1144 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, the L-shapedportion 1144 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). A variation of this embodiment of support/reinforcement 1140 is possible by reversing the hand of the support/reinforcement 1140 such that it connects on the opposite side of thejoist 20, with thebase 1147a andbase portion 1147b extending under thejoist 20 in the opposite direction to that shown inFigure 13 . - Further alternatives of floor or joist support/
reinforcement system 1200 and support/reinforcement 1240 are shown inFigures 14a to 14e . The support/reinforcement 1240 ofFigures 14d and 14e illustrate anoptional return flange 1242 provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1240 to the wall of a house or other building or structure, typically using fasteners or fixtures. The support/reinforcement 1240 of each ofFigures 14a to 14e comprise at least twoside flanges end portion 25 of thejoist 20 so that it recovers sufficient of its effective shear plane to function effectively. Theside flanges lower flanges joist 20. By fastening theside flanges upper flange 21 andlower flange 22 of thejoist 20 usingfasteners 90 as illustrated, theupper flange 21 andlower flange 22 of thejoist 20 are tied together via the support/reinforcement 1240, increasing the structural integrity of thejoist 20 and thereby increasing the load capacity of thesystem 1200. Theside flanges side flange joist 20, in theend portion 25 of thejoist 20. In the present embodiment theside flanges side flanges joist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, theside flanges joist 20 from the support/reinforcement 1240 once theside flange joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place.Simple side flanges Figures 14a (side elevation) andFigure 14b (perspective view). Alternatively, a bottom flange 1247 (Figure 14d ) and/or top flange 1248 (Figure 14c ) may be incorporated to provide additional strength. Thebottom flange 1247 and/ortop flange 1248 may be an integral part (i.e. joined) with one or both of theside flanges reinforcement 1240 may be one piece, either in the form of a collar which fully envelops thejoist 20 and is slid onto thejoist 20, or in the form a plate that folds around thejoist 20 leaving ajoin line 1250, as illustrated inFigure 14e . It is therefore possible to partially or fully envelop thebody portion 24 andend portion 25 of thejoist 20. The support/reinforcement 1240, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, the support/reinforcement 1240 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of thejoist 20, or may be angled in a similar way to the oblique angle (but not necessarily the same angle) of the cut to thejoist 20 to achieve this effect (as shown). - Yet further alternatives of floor or joist support/
reinforcement system 1300 and support/reinforcement 1340 are shown inFigures 15a to 15d . The support/reinforcement 1340 may include an optional return flange (not shown) provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1340 to thewall 5 of a house or other building or structure, typically via awall plate 6 using fasteners or fixtures. The support/reinforcement 1340 of each ofFigures 15a to 15c comprise at least twoside flanges end portion 25 of thejoist 20 so that it recovers sufficient of its effective shear plane to function effectively. Eachside flange web 23 of thejoist 20 and spans between the upper andlower flanges joist 20. Preferably, eachside flange lateral flange side flange lower flange 22 of thejoist 20, as shown inFigures 15a and 15b . Alternatively, or additionally, eachside flange lateral flange side flange upper flange 21 of thejoist 20. Additionally, eachside flange lower side flange upper side flange upper flange joist 20, as shown inFigure 15c . Indeed, as shown inFigure 15d , the support/reinforcement 1340 may fully envelop thejoist 20. Such a support/reinforcement 1340 may be one piece and, as such, be manufactured by extrusion or forming. These embodiments of support/reinforcement 1340 provide the option to tie (using fasteners 90) theupper flange 21 to thelower flange 22 of thejoist 20 by making use of the structural integrity of the support/reinforcement 1340, thereby increasing the load capacity of thesystem 1300. In the present embodiment the support/reinforcement 1340 is relatively rigid and cannot be readily deformed. It is anticipated, however, that it may be desirable for the support/reinforcement 1340 to be readily deformable so as to engage with thejoist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, the support/reinforcement 1340 may be provided with a barb or barbs which inhibit removal of thejoist 20 from the support/reinforcement 1340 once it has been deformed to engage with thejoist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place in the support/reinforcement 1340. The support/reinforcement 1340 may be one piece, either in the form of a collar which fully envelops thejoist 20 and is slid onto thejoist 20, or in the form a plate that folds around thejoist 20 leaving a join line. It is therefore possible to partially or fully envelop thebody portion 24 andend portion 25 of thejoist 20. In either case, the support/reinforcement 1340 can be formed or trimmed so as to respect the oblique cut of thejoist 20. The support/reinforcement 1340, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, the support/reinforcement 1340 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). - A further alternative floor or joist support/
reinforcement system 1400 and support/reinforcement 1440 are shown inFigure 16 . The support/reinforcement 1440 comprises a substantiallyU-shaped portion 1444 for receiving and providing strength to theend portion 25 of thejoist 20. TheU-shaped portion 1444 forms a slot which is shaped to enable convenient locating therein of theend portion 25 at least of thejoist 20. TheU-shaped portion 1444 comprises upwardly extendingflanges base portion 1447, which extend between the upper and lower regions of thejoist 20. In the present embodiment theflanges joist 20 may be simply received in theU-shaped portion 1444 and fixed inplace using fasteners 90. It is anticipated, however, that it may be desirable for theflanges joist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, one or both of theflanges joist 20 from the support/reinforcement 1440 once the flange orflanges joist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. Two laterally-projectingfixing portions base 1447 of the support/reinforcement 1440 so as to lie on the upper edge of thewall plate 6 ofinner wall 5 along substantially their entire length. The two laterally-projectingfixing portions flanges wall plate 6 ofinner wall 5 usingfasteners 90. TheU-shaped portion 1444 of the support/reinforcement 1440, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theU-shaped portion 1444 may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theU-shaped portion 1444 may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). A variation of this embodiment of support/reinforcement 1440 is possible by omitting thebase 1447 of theU-shaped portion 1444. Instead, the support/reinforcement 1440 may comprise two parts, a left hand part and a right hand part. In this case, each laterally-projectingfixing portion respective flange fixing portions flanges Figure 16 . - A yet further alternative floor or joist support/
reinforcement system 1500 and support/reinforcement 1540 are shown inFigures 17a and 17b . The floor or joist support/reinforcement system 1500 and support/reinforcement 1540 are similar to those shown inFigure 16 . The arrangement is, however, different to that shown inFigure 16 in that the support/reinforcement 1540 does not comprise laterally-projecting fixing portions. Instead, the support/reinforcement 1540 comprises substantially L-shapedportions end portion 25 of thejoist 20. The L-shapedportions end portion 25 at least of thejoist 20. The L-shapedportions flange joist 20, each attached at its lower end to abase portion flanges joist 20 may be simply received in the L-shapedportions place using fasteners 90. It is anticipated, however, that it may be desirable for theflanges joist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, the support/reinforcement 1540 may be provided with a barb or barbs which inhibit removal of thejoist 20 from the support/reinforcement 1540 once the support/reinforcement 1540 has been deformed to engage with thejoist 20. Alternatively or additionally, fasteners may be used to fix thejoist 20 in place. Thebase portions joist 20 so as to lie on the upper edge of thewall plate 6 ofinner wall 5. Thebase portions flanges wall plate 6 ofinner wall 5 usingfasteners 90. The L-shapedportions reinforcement 1540, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, the L-shapedportions end portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, the L-shapedportions end portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). - A yet further alternative floor or joist support/
reinforcement system 1600 and support/reinforcement 1640 are shown inFigures 18a and 18b . The support/reinforcement 1640 comprises an elongate strap for receiving and providing strength to theend portion 25 of thejoist 20. The elongate strap comprises twoside flanges end face flange 1646. Thejoist 20 may be simply received in the U-shape of the elongate strap, and the twoside flanges end face flange 1646 fixed in place around the lower periphery of thejoist 20 usingfasteners 90. It is anticipated, however, that it may be desirable for the support/reinforcement 1640 to be readily deformable so as to engage with thejoist 20 once thejoist 20 has been put in place, such engagement inhibiting removal of the joist 20 (by way of frictional or deformable engagement). Alternatively or additionally, the support/reinforcement 1640 may be provided with a barb or barbs which inhibit removal of thejoist 20 from the support/reinforcement 1640 once the support/reinforcement 1640 has or have been deformed to engage with thejoist 20. The support/reinforcement 1640, which provides additional (tensile) strength in the bottom of theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, theside flanges end portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, theside flanges end portion 25 ofjoist 20 to and/or past the transition to thebody portion 24 to recover the full effective shear plane of the joist 20 (as shown). - A further alternative floor or joist support/
reinforcement system 1700 and support/reinforcement 1740 are shown inFigure 19 . The support/reinforcement 1740 can be seen to comprise an F-shaped bracket. Afirst arm 1742 of the bracket is provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1740 to the outer face of a wall of a house or other building or structure, typically using fasteners or fixtures (not shown). Asecond arm 1744 of the bracket provides a support surface for, and strength to, thejoist 20. Thesecond arm 1744 of the bracket is provided with fastener/fixture-receiving apertures (not shown) for fixing thejoist 20 to the support/reinforcement 1740 using fasteners or fixtures (not shown). Athird arm 1743 of the bracket is provided substantially parallel to, but spaced inside of, thefirst arm 1742. Thethird arm 1743 is of sufficient length (same length, longer or shorter than the first arm 1742) to increase the strength of the bracket to resist bending moments from the supported joist, and may be provided with fastener/fixture-receiving apertures (not shown) for fixing the support/reinforcement 1740 to the inner face of a wall of a house or other building or structure, typically using fasteners or fixtures (not shown). Thesecond arm 1744 of the bracket, which provides additional strength to theend portion 25 of thejoist 20, is of sufficient length so that thejoist 20 recovers sufficient of its effective shear plane to function effectively. As such, thesecond arm 1744 of the bracket may extend from the end of theend portion 25 of thejoist 20 only partly along the length of theend portion 25 until sufficient of its effective shear plane is recovered. Alternatively, thesecond arm 1744 of the bracket may extend at least the full length of theend portion 25 ofjoist 20 to and/or past the transition to the body portion 24 (as shown) to recover the full effective shear plane of thejoist 20.Reference numerals - An alternative embodiment of each of a floor or joist support/
reinforcement system 1800 and a support/reinforcement 1840 are shown inFigure 20 . The floor or joist support/reinforcement system 1800 comprises ajoist 20 suitable for supporting a floor (not shown) and a support/reinforcement 1840 for thejoist 20. Thejoist 20 shown in this embodiment is an I-joist (although any joist may be beneficially employed) and comprises anupper flange 21, alower flange 22 and aweb 23 extending therebetween. As before, thejoist 20 further comprises abody portion 24 of full cross-sectional area. However, theend portion 25 of reduced cross-sectional area (when compared to that of the body portion 24) either stops short of theusual wall 5 or other support structure of the building or other structure, or is non existent, as shown (has zero cross-sectional area, i.e. has less cross-sectional area than the body portion 24), such that thebody portion 24 stops short of theusual wall 5 or other support structure of the building or other structure. This permits thejoist 20 to be accommodated within the available space of aconventional roofing structure 1 without suffering an oblique cut. However, this compromises the structural integrity of thejoist 20 as it stops short of theusual wall 5 or other support structure of the building ,or other structure. Accordingly, to recover the lost section ofjoist 20 and necessary amount of effective shear plane, the floor or joist support/reinforcement system 1800 further comprises the support/reinforcement 1840 for bridging the gap between thejoist 20 and supportingwall 5 and/or reinforcing thejoist 20. In the embodiment shown, the support/reinforcement 1840 comprises one or morehorizontal straps 1841 which are connected usingfasteners 90 to thelower flange 22 of thejoist 20 and extend laterally to rest on and/or attach towall plate 6 of thewall 5 of a house or other building or structure. The support/reinforcement 1840 further comprises one or moreangled straps 1842 which are connected using a fastener orfasteners 90 to theupper flange 21 of thejoist 20 and extend laterally and downwardly towardswall plate 6 where they connect to the respective one or morehorizontal straps 1841 at pivot point 1847 (secured by way of a fastener or fasteners) at an angle α therebetween. Thus, the support/reinforcement 1840 recovers the lost section ofjoist 20 and necessary amount of effective shear plane and structural integrity required whilst fitting within the available space. The angle α may be varied as appropriate to fit the available space and/or provide the necessary structural integrity by varying the respective lengths of thehorizontal straps 1841 and angledstraps 1842, and/or the respective fixing positions of each on thejoist 20. It will be appreciated that the support/reinforcement 1840 may take any suitable form and may make take the general (but adapted) form of any of the preceding embodiments of support/reinforcement described above. What is important, however, is that the cross-sectional area of the support/reinforcement 1840 (or its effective envelope) decreases with increasing distance from thebody portion 24 of thejoist 20 towards thewall 5 or other support structure of the building or other structure. Thejoist 20 may be simply received in the support/reinforcement 1840, or may be fixed inplace using fasteners 90. Alternatively or additionally, tabs, barbs or other means (not shown) may be beneficially employed to retain thejoist 20 in place within the support/reinforcement 1840. Optionally, an interference fit between thejoist 20 and support/reinforcement 1840 may be employed. The support/reinforcement 1840 may further comprise a return flange (not shown) for fixing the support/reinforcement 1840 to the outer surface of theinner wall 5 of the house or other building or structure. In this case, the flange may be attached by use offasteners 90. - Whilst preferred embodiments of the present invention have been described above and illustrated in
figures 15a to 15d and17a to 17b , these are by way of example only and non-limiting. It will be appreciated by those skilled in the art that many alternatives are possible within the ambit of the invention, as set out in the appended claims. - It will be understood by those skilled in the art that the support/reinforcement may be connected to the joist, or the joist connected to the support/reinforcement. The support/reinforcement may be provided in parts which may be assembled prior to, or during, its installation. The support/reinforcement may be retrofit.
- It will also be understood by those skilled in the art that the support/reinforcement need not extend over the whole length of the end portion of the joist. It may be sufficient for the supporting member to extend over a fraction of the length of the joist end portion. The support/reinforcement, which provides additional strength to the end portion of the joist, is of sufficient length so that the joist recovers sufficient of its effective shear plane to function effectively. As such, the support/reinforcement may extend from the end of the end portion of the joist only partly along the length of the end portion until sufficient of its effective shear plane is recovered. Alternatively, the support/reinforcement may extend at least the full length of the end portion of the joist to and/or past the transition to the body portion to recover the full effective shear plane of the joist (as shown in
Figure 19 ). - The fastener/fixture-receiving apertures referred to above are suitable for receiving screws, nails, pins, rivets, bolts or any other fixture means whatsoever that may be beneficially employed.
- The support/reinforcements described may be manufactured from any suitable material, laminate or composite using any suitable manufacturing process. Typically, the support/reinforcements described will be made from sheet metal and folded, formed, welded as appropriate (for example, by cutting from one piece of metal or by joining pieces of metal, e.g. by welding). Alternatvely, the support/reinforcements described may be extruded (particularly where they envelop the joist.
Claims (9)
- A floor or joist support/reinforcement system (1300) comprising:a joist (20) for supporting a floor, the joist comprising a main body portion (24) of substantially uniform cross-sectional area, and an end portion (25) whose cross-sectional area is less than that of the main body portion (24) in that the end portion (25) of the joist (20) comprises a face that is obliquely angled with respect to a longitudinal axis of joist (20), wherein the main body portion (24) of the joist (20) is I-shaped in cross section; anda support/reinforcement (1340) for supporting and/or reinforcing the joist (20), the support/reinforcement (1340) providing support for and/or strength to at least part of the end portion (25) of the joist (20), wherein the support/reinforcement (1340) comprises:- at least two side flanges (1345, 1346) for receiving and providing strength to the end portion (25) of the joist (20), wherein each side flange (1345, 1346), is offered up to a side of a web (23) of the joist (20) and spans between upper and lower flanges (21, 22) of the joist (20); andeach side flange (1345, 1346) further comprises at least one lateral flange (1347, 1348) which extends substantially perpendicular to the side flange (1345, 1346) and is offered up to the inner face of the lower flange (22) of the joist (20).
- A floor or joist support/reinforcement system (1500) comprising:a joist (20) for supporting a floor, the joist comprising a main body portion (24) of substantially uniform cross-sectional area, and an end portion (25) whose cross-sectional area is less than that of the main body portion (24) in that the end portion (25) of the joist (20) comprises a face that is obliquely angled with respect to a longitudinal axis of joist (20), wherein the main body portion (24) of the joist (20) is rectangular in cross section;
anda support/reinforcement (1540) for supporting and/or reinforcing the joist (20), the support/reinforcement (1540) providing support for and/or strength to at least part of the end portion (25) of the joist (20), wherein the support/reinforcement (1540) comprises:two substantially L-shaped brackets (1544a, 1544b) for receiving and providing strength to the end portion (25) of the joist (20), the L-shaped brackets (1544a, 1544b) comprising an upwardly extending flange (1545a, 1545b) which extends between the upper and lower regions of the joist (20), each upwardly extending flange (1545a, 1545b) attached at its lower end to a base portion (1547a, 1547b), wherein the base portions (1547a, 1547b) extend laterally, substantially horizontally, underneath and towards the centre of the joist (20). - A floor or joist support/reinforcement system as claimed in any one of the preceding claims wherein the support/reinforcement (1340) comprises a fixing portion for fixing the support to a building or other structure.
- A floor or joist support/reinforcement system as claimed in claim 5 wherein the fixing portion comprises a return flange.
- A floor or joist support/reinforcement system as claimed in any one of the preceding claims wherein the joist (20) is elongate and the joist has substantially the same cross section along whole of length of joist apart from the end portion (25), wherein the end portion has a reduced cross-sectional area.
- A floor or joist support/reinforcement system as claimed in any one of the preceding claims wherein the end portion (25) of the joist comprises a face that is substantially normal to the longitudinal axis of the body portion (24).
- A floor or joist support/reinforcement system as claimed in any one of the preceding claims wherein the support/reinforcement (1340) provides at least a partial slot into which the end portion of the joist at least, or at least a portion thereof, may be received.
- A floor or joist support/reinforcement system as claimed in any one of the preceding claims wherein the support/reinforcement (1340) comprises one or more planar plates (1345, 1346) for offering up to and/or attachment to the side face or web of a joist.
- A method for the formation of at least part of a floor or joist support/reinforcement system (1300) as claimed in any one of the preceding claims, the method comprising the step of using at least one of the supports/reinforcements (1340, 1540) together with at least one joist (20).
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB0624066.7A GB0624066D0 (en) | 2006-12-01 | 2006-12-01 | I beam or timber joist, end support or collar or sleeve or shoe or clip or bracket |
GB0704849A GB2444337A (en) | 2006-12-01 | 2007-03-13 | A floor support system |
PCT/GB2007/004634 WO2008065437A1 (en) | 2006-12-01 | 2007-12-03 | Floor or joist support/reinforcement system, and support/reinforcement therefor |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2097592A1 EP2097592A1 (en) | 2009-09-09 |
EP2097592B1 true EP2097592B1 (en) | 2015-02-11 |
Family
ID=37671721
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07824790.5A Not-in-force EP2097592B1 (en) | 2006-12-01 | 2007-12-03 | Floor or joist support/reinforcement system, and support/reinforcement therefor |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2097592B1 (en) |
GB (3) | GB0624066D0 (en) |
WO (1) | WO2008065437A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMO20130215A1 (en) * | 2013-07-26 | 2015-01-27 | Luigi Pierli | DEVICE AND METHOD TO INCREASE THE RESISTANCE OF INDUSTRIAL BUILDINGS TO SEISMIC ACTIVITY |
US8615935B1 (en) * | 2013-08-20 | 2013-12-31 | Anthony J. Calini | Multi-heel connector |
CN104234443B (en) * | 2014-10-08 | 2016-05-25 | 苏州中固建筑科技有限公司 | A kind of corbel type reinforcement means of steel reinforced concrete member and newly-increased beam |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US943847A (en) * | 1909-02-20 | 1909-12-21 | Henry C Seipp | Joist-hanger. |
US1785791A (en) * | 1928-12-17 | 1930-12-23 | Franklin N Ropp | Combination joist hanger and tie |
GB2233382A (en) * | 1989-06-16 | 1991-01-09 | Donald Alexander Payne | Repairing or supporting a structural member |
GB2316103A (en) * | 1996-08-10 | 1998-02-18 | Furfix Products Ltd | A two piece joist hanger |
CA2393218A1 (en) * | 2002-07-12 | 2004-01-12 | Robert M. Callahan | Joist reinforcing bracket |
US20040200180A1 (en) * | 2003-04-08 | 2004-10-14 | Davis John D. | Buckling opposing support for I-joist |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3040479A (en) * | 1960-06-27 | 1962-06-26 | Ayotte Edward Thomas | Process of converting a low pitch house to a house of higher pitch |
GB1362564A (en) * | 1971-07-10 | 1974-08-07 | Houghton J | Joist brackets for buildings |
DE3101900A1 (en) * | 1981-01-22 | 1982-09-02 | Friedrich Stelling Kunststoffverarbeitungs-Gesellschaft mbH, 2724 Sottrum | Connecting element for connecting wooden load-bearing members |
GB2126307A (en) * | 1982-07-16 | 1984-03-21 | Catnic Components Ltd | A purlin or joist connector |
GB8316644D0 (en) * | 1983-06-18 | 1983-07-20 | Press Bat Holdings Ltd | Butt jointing timbers in building |
GB8332533D0 (en) * | 1983-12-06 | 1984-01-11 | Dinardo & Partners | Restoration and strengthening of timber components |
US5699639A (en) * | 1995-12-14 | 1997-12-23 | Fernandez; Roger | Adjustable anchorage for trusses |
US20020124483A1 (en) * | 2001-03-09 | 2002-09-12 | Rosas Ted A. | Framing fastener for connecting construction support members |
AUPS203902A0 (en) * | 2002-04-30 | 2002-06-06 | Mitek Industries, Inc. | Framework and hold down connector |
US7237368B2 (en) * | 2002-05-24 | 2007-07-03 | Richard B. Richardson | Adjustable anchoring system for a wall |
-
2006
- 2006-12-01 GB GBGB0624066.7A patent/GB0624066D0/en not_active Ceased
-
2007
- 2007-03-13 GB GB0704849A patent/GB2444337A/en not_active Withdrawn
- 2007-12-03 GB GB0910324.3A patent/GB2457205B/en active Active
- 2007-12-03 EP EP07824790.5A patent/EP2097592B1/en not_active Not-in-force
- 2007-12-03 WO PCT/GB2007/004634 patent/WO2008065437A1/en active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US943847A (en) * | 1909-02-20 | 1909-12-21 | Henry C Seipp | Joist-hanger. |
US1785791A (en) * | 1928-12-17 | 1930-12-23 | Franklin N Ropp | Combination joist hanger and tie |
GB2233382A (en) * | 1989-06-16 | 1991-01-09 | Donald Alexander Payne | Repairing or supporting a structural member |
GB2316103A (en) * | 1996-08-10 | 1998-02-18 | Furfix Products Ltd | A two piece joist hanger |
CA2393218A1 (en) * | 2002-07-12 | 2004-01-12 | Robert M. Callahan | Joist reinforcing bracket |
US20040200180A1 (en) * | 2003-04-08 | 2004-10-14 | Davis John D. | Buckling opposing support for I-joist |
Also Published As
Publication number | Publication date |
---|---|
GB0704849D0 (en) | 2007-04-18 |
GB2457205A (en) | 2009-08-12 |
EP2097592A1 (en) | 2009-09-09 |
GB0624066D0 (en) | 2007-01-10 |
GB2457205B (en) | 2012-07-25 |
GB2444337A (en) | 2008-06-04 |
GB0910324D0 (en) | 2009-07-29 |
WO2008065437A1 (en) | 2008-06-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8720155B1 (en) | Method and system of framing components and hangers used in a structural interface | |
US8281551B2 (en) | Corrugated shearwall | |
CA2749006C (en) | Support framing system for use with bar joists and beams | |
US3751870A (en) | Frame structure system | |
US5519977A (en) | Joist reinforcing bracket | |
US6729083B1 (en) | Adjustable roof support frame | |
US6763634B1 (en) | Retrofit hurricane-earthquake clip | |
US20110120051A1 (en) | Supporting system with bridging members | |
US20040200172A1 (en) | Building construction systems and methods | |
US8407966B2 (en) | Cold-formed steel joist | |
US20100229495A1 (en) | Continuity tie for prefabricated shearwalls | |
US20150267407A1 (en) | Truss | |
US20020005022A1 (en) | Sheet material attachment system | |
US8276335B2 (en) | Attachment profile | |
EP3350382B1 (en) | Shear transfer system | |
US20040003569A1 (en) | Metal and wood composite framing member | |
US5979136A (en) | Prefabricated structure panel | |
EP2097592B1 (en) | Floor or joist support/reinforcement system, and support/reinforcement therefor | |
US20050284073A1 (en) | Corrugated shearwall | |
US5544459A (en) | Duct chase frame for joists | |
GB2480994A (en) | Timber I-beams and panels in attic roof structures | |
US6098360A (en) | Offset web composite beam | |
EP0110849A1 (en) | Surface-forming panel | |
US4087949A (en) | Building of improved cardboard panel construction | |
EP2770131B1 (en) | An Improved Roofing Arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20090615 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20100824 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602007040236 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: E04B0007040000 Ipc: E04B0005120000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04C 3/12 20060101ALI20140324BHEP Ipc: E04B 5/12 20060101AFI20140324BHEP Ipc: E04B 1/26 20060101ALI20140324BHEP Ipc: E04G 23/02 20060101ALI20140324BHEP Ipc: E04C 3/18 20060101ALI20140324BHEP |
|
INTG | Intention to grant announced |
Effective date: 20140410 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 709989 Country of ref document: AT Kind code of ref document: T Effective date: 20150315 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602007040236 Country of ref document: DE Effective date: 20150326 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20150211 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 709989 Country of ref document: AT Kind code of ref document: T Effective date: 20150211 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150512 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150611 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602007040236 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
26N | No opposition filed |
Effective date: 20151112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602007040236 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151203 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20151203 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20160831 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151203 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151203 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151231 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151231 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160701 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20151231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20071203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150211 |