EP1457275A1 - Progressive die for punching press - Google Patents
Progressive die for punching press Download PDFInfo
- Publication number
- EP1457275A1 EP1457275A1 EP03015765A EP03015765A EP1457275A1 EP 1457275 A1 EP1457275 A1 EP 1457275A1 EP 03015765 A EP03015765 A EP 03015765A EP 03015765 A EP03015765 A EP 03015765A EP 1457275 A1 EP1457275 A1 EP 1457275A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- metal foil
- progressive
- primary
- tool
- stamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D13/00—Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form
- B21D13/02—Corrugating sheet metal, rods or profiles; Bending sheet metal, rods or profiles into wave form by pressing
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D31/00—Other methods for working sheet metal, metal tubes, metal profiles
- B21D31/04—Expanding other than provided for in groups B21D1/00 - B21D28/00, e.g. for making expanded metal
- B21D31/043—Making use of slitting discs or punch cutters
Definitions
- the present invention relates to a progressive tool for Production of a structured metal foil with at least two structures, one of the two structures at least partially the other structure superimposed, the progressive tool from one Tool upper part and a lower tool part. Furthermore concerns the present invention a method for producing a structured metal foil, in particular as a catalyst carrier body serves.
- Such structured metal foils are folded into long ribbons and wound into catalyst honeycomb bodies with a special geometry.
- the Honeycomb bodies have a large number of honeycomb cells, on their Wall of the catalytic process on a catalytically active Coating expires. In this way, catalysts are built primarily used in internal combustion engines to get through increasing mobility causes pollution of the environment to reduce.
- metal is there because of its advantageous physical-technical properties such as high mechanical and thermal stability, an ideal carrier material for the catalytically active Coating.
- a disadvantage of this prior art is that when using intermeshing rollers with increasingly smaller material thicknesses of Sheet metal and increasingly smaller profile depths of the wave structure comes to formation of burrs when introducing the secondary structure, which is very disruptive to the galvanic deposition of the catalytically active Coating affects, so that the conversion ability of the catalyst reduced rather than increased.
- the object of the present invention is therefore a device and a Processes to indicate that the manufacture is very thin, structured Metal foils with a large surface while observing high ones Quality standards allowed.
- the progressive tool at least three, in particular spatially separate, work areas has, namely a punching area for removing film material at certain positions on the metal foil, a primary one Shaping area for the introduction of the, preferably corrugated, Primary structure in the metal foil and a secondary Shaping area for the introduction of the, preferably corrugated, Secondary structure in the metal foil, preferably in the primary structure of the Metal foil.
- the progressive composite tool With the aid of the progressive composite tool according to the invention, it is possible to extremely thin, structured metal strips in one processing step a single tool, while maintaining the lowest Manufacturing tolerances.
- the metal strips are manufactured more economical than with that described in the prior art Device because the metal foil on a machine with a tool is processed because progressive dies with one machining step can punch and shape.
- a Progressive tool reduces the formation of burrs on the Workpieces so that a complete catalytically effective surface can be deposited on the metal carrier.
- the removal of foil material at certain positions in the Punching area ensures that a made from the material Catalyst has a significantly longer service life in everyday use because due to the removal of material tensions within the metal foil degraded, and notch effects at the transition areas between primary and secondary structure can be avoided. It is sometimes desirable that metal foil at each transition area between the primary and secondary structure is removed. There are also Areas of application in which the film material only on selected Places, for example at selected transitions between primary and Secondary structure is removed.
- a drive for the progressive die For example, a press consisting of a press bed and one driven by an eccentric disc movable bear, with the bear engaging the tool top stands. However, it does not necessarily have to be an eccentric drive be provided. For example, the operation of the Progressive tool with a hydraulic drive possible.
- the punching area in the feed direction of the metal foil before the primary and the secondary shaping area is arranged. Not this one necessary but advantageous arrangement of the punching area leads to that the foil material to be removed from the still smooth metal foil can be punched out.
- the stamping area can be significantly lower manufacturing tolerances are observed as if the punching area, for example the Shaping areas would be downstream.
- additional work areas for the introduction of additional structures in the metal foil are provided. These do not necessarily have to be dated primary and / or secondary shaping area spatially separated his. However, spatial separation is often an option.
- embossing stamp for the introduction of the Secondary structure and means for centering the metal foil are provided.
- the means for centering the metal foil ensure an exact Position the metal foil in the progressive die.
- Embossing stamps are advantageously in the upper part of the tool and Lower part of the tool provided.
- the embossing stamp in the Tool upper part is the secondary structure in the wave crests of the Primary structure introduced.
- the dies in the lower part of the tool serve to introduce the secondary structure into the troughs of the Primary structure.
- the waves of the secondary structure preferably a higher frequency and a lower amplitude than that Waves of the primary structure.
- the means for centering the Metal foil as spring-loaded clamping means in particular consisting of a spring-loaded guide plate with guide insert and a spring base, are formed, the surfaces of the guide insert and / or of the spring base at least partially like the primary structure of the Metal foil are molded.
- the special shape of the surfaces serves the metal foil provided with a primary structure in one to be able to hold the first work step by means of the spring-loaded clamping means.
- the primary shaping area at least one interacting with a sprung guide plate Stamp provided for the introduction of the primary structure into the metal foil is.
- the primary structure is not over the entire length of the Metal foil, but introduced in stages. It is necessary that Size of the stamp so that it is guaranteed that a The flow of foil material during forming is guaranteed because the otherwise very thin metal foil can tear.
- Another beneficial one The design provides that the lower stamps are rigid and the upper stamp can be moved, for example, via the toggle lever.
- the spring-loaded guide plate with guide insert therefore has a Dual function.
- the secondary molding area it serves as a part of the clamping means for centering the metal foil while it is in the primary Shaping area for shaping the metal foil is used and with a Stamp cooperates.
- the surface of the stamp and the of the sprung guide insert are designed so that the Primary structure of the metal foil in the form of a, preferably continuous, Wave results.
- the secondary structure is then in this primary wave, again in the form of a wave, in the secondary shaping area brought in.
- stamps in the feed direction of the metal foil spatially arranged one behind the other and one after the other, in particular against the direction of the metal foil, can be actuated. It points the surface of each stamp is a partial section of the Primary structure for insertion into the metal foil.
- every toggle lever mechanism consists of one Middle section exists, which with at least two toggle levers Stamp and over at least two other toggle levers with one Base plate is hinged, the middle part with the Toggle levers is arranged so that the stamp by a Sideways movement of the middle part is actuated. As a sideways movement the pivoting movement of the middle part is designated here.
- a toggle mechanism is a drive for converting a vertical movement the upper part of the tool or the lower part of the tool into one Sideways movement of the middle part of the toggle mechanism assigned.
- the order of the stamping operations of the individual stamps in the primary Timing the shaping area is advantageously provided for each drive one with the upper or lower tool part in Operationally connected standing, preferably spring-loaded, bolts is, the bolts of the individual drives are of different lengths exhibit. This is to ensure that the first secondary shaping area nearest stamp or the closest stamp group is activated and then the further stamps or stamp groups in Sequence to be operated against the feed direction of the metal foil.
- This object is achieved in that a metal foil in one Progressive tool in a machining process with a first and at least one second structure is provided, the secondary structure superimposed on the primary structure, and in which in all or selected transition areas between the first and at least second structure metal foil material is removed.
- This method according to the invention advantageously allows production extremely thin, structured metal strips in one machining step a single tool while maintaining the lowest Manufacturing tolerances.
- the method according to the invention is more economical than that described in the prior art, since it is on a Machine can be done with a tool because Progressive dies with a punching machining step, and Can reshape.
- the inventive method reduces the Formation of burrs on the work pieces so that a complete catalytically active surface deposited on the metal support can be.
- the work step of the invention Material removal also ensures that one is out of the material manufactured catalyst has a significantly longer service life in everyday use has the stresses within the Metal foil degraded, and notch effect at the transition areas between the first and second structure can be avoided.
- the method advantageously provides that work steps of the Processing process take place at different times or individual Working steps of the machining process are offset in time and space respectively.
- the time offset of the work steps enables one Refill of the material during the successive Forming processes so that micro cracks or structural breaks are avoided become.
- too a spatial variation of the work steps within the Progressive tool so that even particularly sensitive Metal foils can be processed with very good results.
- the progressive die is the primary and secondary Structure is preferably introduced as a wave structure in the metal foil the effective surface without corners that are disadvantageous for the galvanization and edges significantly enlarged. Corners and edges also lead to Formation of dead volumes, which is the conversion rate of the catalyst reduce and must therefore be avoided. Training the Structure as a wave structure also has the particular advantage that the effective surface, but not the flow resistance is enlarged beyond measure.
- the secondary structure in the crests and / or in the troughs of the primary structure is introduced and the waves of the secondary structure preferably a higher frequency and a lower amplitude than that Have waves of the first structure.
- foil material by punching out preferably in the form of an elongated hole, in the transition area between the first and second structure is removed.
- the punch is in the form of an elongated hole particularly advantageous and easy to implement, the invention comprises but also other shapes such as bone, circular or double-hole shape.
- metal foil with a thickness of 0.02 to 0.12 mm, preferably with a thickness of 0.05 mm, and is processed with a film width of 50 to 210 mm.
- the metal foil by at least a feed device is guided through the progressive tool.
- the use of at least one feed device, preferably two feeders at the beginning and end of the Progressive tool enables an optimal Processing flow.
- the method provides that the metal foil in a first Working part step between a progressive tool upper part and a progressive tool lower part in the secondary Forming area is clamped and thus centered, whereupon the Secondary structure in certain troughs of the primary structure within of the secondary shaping area is introduced, whereupon the Primary structure in the metal foil by means of at least one stamp is introduced, whereby film material is pulled in the feed direction before, during or afterwards in the punching area Metal foil material is punched out by cutting stamp and in same or after or previously stored work step Secondary structure in certain wave crests of the primary structure is introduced.
- a progressive tool 1 is shown in FIG.
- This Progressive tool 1 can preferably in presses with a Press bear or a single-acting press can be used.
- the secondary shaping area 2 is in the feed direction 3 of the metal foil 4 arranged behind the primary shaping area 5.
- the Stamping area is not shown in Figure 1. However, he is in Feed direction of the metal foil in front of the primary shaping area 5 arranged.
- the progressive tool 1 consists of an upper one Tool part 6, which with a press bear, not shown in Engagement is available, and a lower, fixed tool part 7.
- the upper Tool part 6 consists of an upper pressure plate 8 and a lower one Pressure plate 9.
- the upper pressure plate 8 is in a head plate 10, the interacts directly with the press bear, let in.
- a stamp holding plate 11 is located below the lower pressure plate 9 arranged.
- the upper stamps 12 (seen in Fig. 5) for the introduction of the secondary structure in secondary shaping area fixed. Furthermore, in the Stamp holding plate the cutting stamp of the punching area for removal supported by foil material.
- the bolts 13 are between the two plates 8, 9 by means of Springs 14 sprung.
- the spring-loaded bolts 13 act on a Guide plate 15.
- the guide plate 15 extends over the secondary 2 and primary shaping area 5.
- Figure 1 is only to recognize that the guide plate 15 with the guide insert 16 extends over the secondary shaping region 2. This was over Clarity necessary.
- the guide plate 15 sits in primary as in the secondary shaping area down into one Leadership 16 continued.
- the surface of the guide insert 16 is in Shape of the primary structure of the metal foil.
- a spring base 17 is provided which by means of springs 18 is sprung against a base plate (see Fig. 5).
- Notches are shown within the spring base 17 provided in which lower, rigid dies 19 for introducing the Secondary structure are provided in the metal foil.
- the primary shaping area 5 consists of a sprung Guide plate 15 with a guide insert 16 and with this cooperating stamps 20, 21.
- Each stamp 20, 21 is over own toggle mechanism 22, 23 actuated.
- Each toggle mechanism 22, 23 consists of a central part 24, which is connected to the upper toggle lever 25 is articulated with the respective stamp 20.
- Lower toggle lever 26 is provided, via which the middle part 24 with a Base plate 27 is articulated.
- Each toggle mechanism 22, 23 is a drive 28, 29 assigned. By means of the drives 28, 29 vertical downward movement of the upper tool part 6 in one Converted sideways movement of the middle part 24. Through this side The stamp 20, 21 against the metal foil and pivotal movement pressed against the guide insert 16 with the guide plate 15.
- the sprung bolt 30 is shorter than the sprung bolt 35 of the drive 29. This ensures that by moving downwards of the tool upper part 6, first the drive 29 and thus the first Toggle 23 and thus the stamp 21 are moved. Stamp 21 is the one directly bordering on the secondary shaping area Stamp. Only after this part of the primary structure in the metal foil was introduced, the spring-loaded bolt 30 is the other Stamp 20 actuated. As a result, another part of the primary structure in introduced the metal foil. By dividing up the primary structure several stamps 20, 21, is achieved that metal foil material Feed direction can flow in order to tear the metal foil avoid.
- Figure 5 is the secondary shaping area 2 and the upper part of the primary shaping area 5 is shown schematically. It poses Figure 5 shows the starting position.
- the metal foil 4 with already inserted primary structure is between a sprung Guide insert 16, which extends from the secondary shaping area 2 to extends into the primary shaping area 5 and a spring base 17, which is sprung by springs 18 against a base plate.
- a sprung Guide insert 16 which extends from the secondary shaping area 2 to extends into the primary shaping area 5
- a spring base 17 which is sprung by springs 18 against a base plate.
- the top Embossing dies 12 are held within the die holding plate 11.
- FIG. 5 A section of FIG. 5 is shown enlarged in FIG.
- the guide insert 16 and the spring base 17 also have the primary structure in wave form. This is necessary to the metal foil 4 between the guide insert 16 and To be able to clamp spring base 17.
- Embossing die 19 By means of Embossing die 19 is the secondary structure in the troughs Primary structure of the metal foil 4 introduced.
- By means of the upper Embossing die 12 is the secondary structure in the wave crests of Metal foil 4 introduced.
- the secondary structure also has Waveform, but in higher frequency and smaller amplitude than that Primary structure.
- the time can be determined are punched out of the smooth film 4 in the material. This advantageously takes place after the primary structure has been introduced and before the second part of the secondary structure in the metal foil is introduced.
- the upper tool part is located in the secondary structure in the metal foil 4 6 at its lowest position. This is shown in Figure 7.
- the The spring base is completely down against the force of the springs 18 depressed.
- the lower dies 19 for introducing the The secondary structure is at its highest relative to the metal foil 4 Position.
- Embossing stamp 12 is at its lowest position, likewise the guide insert 16.
- FIG. 7 there are three stamps 21, 20, 36 shown, which serve to introduce the primary structure.
- each of these stamps has its own drive, for example in the form of a Toggle lever mechanism provided.
- the punching area 37 is provided with cutting dies 38.
- the Cutting punches 38 are anchored in the punch holding plate 11. About the Choosing the length of the punch can choose the time by moving the upper part of the tool downwards is punched out of the metal foil 4.
- FIG. 8 the detail X from FIG. 7 is shown enlarged. Here engage guide insert 16 and spring base 17 into one another. Between the metal foil 4 is clamped in this. Now you can clearly see the Secondary embossing of the metal foil. This consists of small ones Wave crests, which are introduced into wave troughs of the primary structure and small wave valleys that lie in the wave crests of the primary structure are introduced.
- FIG. 2 shows one using the method according to the invention and using metal foil 4 produced by the device according to the invention.
- the Primary structure 41 is a wave 2.5 millimeters long and 1.6 Millimeters in height.
- the wavy secondary structure 39 has one Length of 1 millimeter and a height of approx. 0.5 millimeters.
- Figure 3 shows a cross section through a corrugated metal foil 4, the Section plane lies in the I-I shown in Figure 2.
- Step 9 A possible procedure is shown in Figure 9. First thing is the metal foil to be processed is transported into the progressive tool 43. Then the metal foil is locked 44. Then the primary structure 45 and the secondary structure embossed 46. Now that is Progressive tool at a low point in its vertical movement reached. The tool has not yet completely moved together however, further material is no longer deformed. The following Step 47 then performs the punching for the area between primary and secondary structure. Then the tool articulated at its lowest point. The generated by this process wavy metal band is then through another material feed 43 promoted from the progressive tool 1 and the other Processing fed. In the processing operation described be at least one complete, depending on the material properties also two or more complete structural units in the metal foil brought in.
- the metal foil is in a first Working part step between a progressive tool upper part and a progressive tool lower part in the secondary Forming area clamped and thus locked 44.
- the Secondary structure in certain troughs of the primary structure within of the secondary shaping region is introduced 46.
- the Primary structure in the metal foil by means of at least one stamp introduced 45, whereby film material pulled in the feed direction before, during, or afterwards in the punching area
- Metal foil material punched out by cutting punches 47 and in same or after or before the previous step Secondary structure in certain wave crests of the primary structure 46 brought in.
- the secondary structure can also be at the same time, before or after punching out the metal foil material.
- Figure 10 shows schematically a progressive tool 1, the Progressive tool 1 with an eccentric 48 driven movable bear 49 is operated.
- the tool 1 contains several stamps 20, 21, 36, 12, 19 for the introduction of the primary and the secondary structure in the metal foil 4. About the choice of the length of the Stamp can control the chronological sequence of the process substeps become.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)
- Press Drives And Press Lines (AREA)
- Exhaust Gas After Treatment (AREA)
- Forging (AREA)
- Extrusion Moulding Of Plastics Or The Like (AREA)
Abstract
Description
Die vorliegende Erfindung betrifft ein Folgeverbundwerkzeug zur Herstellung einer strukturierten Metallfolie mit mindestens zwei Strukturen, wobei eine der beiden Strukturen die andere Struktur zumindest teilweise überlagert, wobei das Folgeverbundwerkzeug aus einem Werkzeugoberteil und einem Werkzeugunterteil besteht. Weiterhin betrifft die vorliegende Erfindung ein Verfahren zur Herstellung einer strukturierten Metallfolie, die insbesondere als Katalysator-Trägerkörper dient.The present invention relates to a progressive tool for Production of a structured metal foil with at least two structures, one of the two structures at least partially the other structure superimposed, the progressive tool from one Tool upper part and a lower tool part. Furthermore concerns the present invention a method for producing a structured metal foil, in particular as a catalyst carrier body serves.
Solche strukturierten Metallfolien werden zu langen Bändern gefaltet und zu Katalysatorwabenkörpern mit spezieller Geometrie gewickelt. Die Wabenkörper weisen dabei eine Vielzahl von Wabenzellen auf, an deren Wandung der katalytische Prozess an einer katalytisch aktiven Beschichtung abläuft. Auf diese Weise aufgebaute Katalysatoren werden in erster Linie bei Verbrennungsmotoren eingesetzt, um die durch zunehmende Mobilität verursachte Schadstoffbelastung der Umwelt zu reduzieren.Such structured metal foils are folded into long ribbons and wound into catalyst honeycomb bodies with a special geometry. The Honeycomb bodies have a large number of honeycomb cells, on their Wall of the catalytic process on a catalytically active Coating expires. In this way, catalysts are built primarily used in internal combustion engines to get through increasing mobility causes pollution of the environment to reduce.
Metall ist dabei, neben Keramik, aufgrund seiner vorteilhaften physikalisch-technischen Eigenschaften wie hohe mechanische und thermische Stabilität, ein idealer Trägerwerkstoff für die katalytisch aktive Beschichtung.In addition to ceramics, metal is there because of its advantageous physical-technical properties such as high mechanical and thermal stability, an ideal carrier material for the catalytically active Coating.
Diese hohe Stabilität erlaubt extrem dünne Wandstärken der Wabenzellen, sodass in einem geringen Bauvolumen eine Vielzahl von Wabenzellen realisierbar sind, die zusätzlich noch eine geringe Gesamtmasse aufweisen. Die Vielzahl der Wabenzellen ermöglicht eine hohe Konversionsrate, die aufgrund der geringen Masse des Wabenkörpers bereits nach kurzer Aufwärmzeit erreicht wird. This high stability allows extremely thin walls Honeycomb cells, so that a large number of Honeycomb cells can be realized, which are also small Have total mass. The large number of honeycomb cells enables one high conversion rate due to the low mass of the Honeycomb body is reached after a short warm-up time.
Dazu wurden in der Vergangenheit Metallbänder mit Wellenstruktur eingesetzt. Ein Verfahren zur Herstellung eines Wellenbleches wird in der DE 199 57 585 A1 beschrieben. Dabei wird ein Blech zwischen zwei kämmenden Wellwalzen hindurchgeführt, sodass durch Biege- und Ziehvorgänge zwischen den ein Profilsegment bildenden ineinandergreifenden Wellen, eine Wellstruktur auf dem Blech entsteht.In the past, metal strips with a wave structure were used for this purpose used. A method for producing a corrugated sheet is described in US Pat DE 199 57 585 A1. A sheet is between two intermeshing corrugated rollers, so that through bending and Drawing operations between those forming a profile segment interlocking waves, a corrugated structure is created on the sheet.
Nachteilig an diesem Stand der Technik ist, dass es bei Verwendung von kämmenden Walzen bei zunehmend geringeren Materialstärken des Metallbleches und zunehmend geringeren Profiltiefen der Wellenstruktur zu Gratbildung bei Einbringung der Sekundärstruktur kommt, die sich sehr störend auf die galvanische Abscheidung der katalytisch aktiven Beschichtung auswirkt, so dass die Konversionsfähigkeit des Katalysators herabgesetzt, anstatt erhöht wird.A disadvantage of this prior art is that when using intermeshing rollers with increasingly smaller material thicknesses of Sheet metal and increasingly smaller profile depths of the wave structure comes to formation of burrs when introducing the secondary structure, which is very disruptive to the galvanic deposition of the catalytically active Coating affects, so that the conversion ability of the catalyst reduced rather than increased.
Aufgabe der vorliegenden Erfindung ist es daher, eine Vorrichtung und ein Verfahren anzugeben, dass die Herstellung sehr dünner, strukturierter Metallfolien mit großer Oberfläche unter Einhaltung hoher Qualitätsstandards erlaubt.The object of the present invention is therefore a device and a Processes to indicate that the manufacture is very thin, structured Metal foils with a large surface while observing high ones Quality standards allowed.
Diese Aufgabe wird dadurch gelöst, dass das Folgeverbundwerkzeug mindestens drei, insbesondere räumlich getrennte, Arbeitsbereiche aufweist, nämlich einen Stanzbereich zur Entfernung von Folienmaterial an bestimmten Positionen der Metallfolie, einen primären Formgebungsbereich zur Einbringung der, vorzugsweise gewellten, Primärstruktur in der Metallfolie und einen sekundären Formgebungsbereich zur Einbringung der, vorzugsweise gewellten, Sekundärstruktur in die Metallfolie, vorzugsweise in die Primärstruktur der Metallfolie.This object is achieved in that the progressive tool at least three, in particular spatially separate, work areas has, namely a punching area for removing film material at certain positions on the metal foil, a primary one Shaping area for the introduction of the, preferably corrugated, Primary structure in the metal foil and a secondary Shaping area for the introduction of the, preferably corrugated, Secondary structure in the metal foil, preferably in the primary structure of the Metal foil.
Mit Hilfe des erfindungsgemäßen Folgeverbundwerkzeuges ist es möglich, extrem dünne, strukturierte Metallbänder in einem Bearbeitungsschritt mit einem einzigen Werkzeug, bei gleichzeitiger Einhaltung geringster Fertigungstoleranzen, herzustellen. Die Fertigung der Metallbänder erfolgt wirtschaftlicher, als mit der im Stand der Technik beschriebenen Vorrichtung, da die Metallfolie an einer Maschine mit einem Werkzeug bearbeitet wird, da Folgeverbundwerkzeuge mit einem Bearbeitungsschritt stanzen und umformen können. Durch den Einsatz eines Folgeverbundwerkzeuges verringert sich die Bildung von Graten an den Werkstücken, sodass eine vollständige katalytisch wirksame Oberfläche auf dem Metallträger abgeschieden werden kann.With the aid of the progressive composite tool according to the invention, it is possible to extremely thin, structured metal strips in one processing step a single tool, while maintaining the lowest Manufacturing tolerances. The metal strips are manufactured more economical than with that described in the prior art Device because the metal foil on a machine with a tool is processed because progressive dies with one machining step can punch and shape. By using a Progressive tool reduces the formation of burrs on the Workpieces so that a complete catalytically effective surface can be deposited on the metal carrier.
Das Entfernen von Folienmaterial an bestimmten Positionen im Stanzbereich stellt sicher, dass ein aus dem Material hergestellter Katalysator eine deutlich höhere Standzeit im Alltagsbetrieb aufweist, da durch die Materialentfernung Spannungen innerhalb der Metallfolie abgebaut, und Kerbwirkungen an den Übergangsbereichen zwischen primärer und sekundärer Struktur vermieden werden. Dabei ist es manchmal wünschenswert, dass Metallfolie an jedem Übergangsbereich zwischen Primär- und Sekundärstruktur entfernt wird. Es gibt auch Anwendungsbereiche, bei denen das Folienmaterial nur an ausgewählten Stellen, beispielsweise an ausgesuchten Übergängen zwischen Primärund Sekundärstruktur, entfernt wird.The removal of foil material at certain positions in the Punching area ensures that a made from the material Catalyst has a significantly longer service life in everyday use because due to the removal of material tensions within the metal foil degraded, and notch effects at the transition areas between primary and secondary structure can be avoided. It is sometimes desirable that metal foil at each transition area between the primary and secondary structure is removed. There are also Areas of application in which the film material only on selected Places, for example at selected transitions between primary and Secondary structure is removed.
Es ist notwendig, für das Folgeverbundwerkzeug einen Antrieb vorzusehen. Hierzu bietet sich beispielsweise eine Presse, bestehend aus einem Pressenbett und einem durch eine Exzenterscheibe angetriebenen beweglichen Bären an, wobei der Bär mit dem Werkzeugoberteil in Eingriff steht. Es muss jedoch nicht notwendigerweise ein Exzenterantrieb vorgesehen werden. Beispielsweise ist der Betrieb des Folgeverbundwerkzeuges mit einem hydraulischen Antrieb möglich. It is necessary to have a drive for the progressive die provided. For example, a press consisting of a press bed and one driven by an eccentric disc movable bear, with the bear engaging the tool top stands. However, it does not necessarily have to be an eccentric drive be provided. For example, the operation of the Progressive tool with a hydraulic drive possible.
Gemäß einer vorteilhaften Ausgestaltung der Erfindung ist vorgesehen, dass der Stanzbereich in Einzugsrichtung der Metallfolie vor dem primären und dem sekundären Formgebungsbereich angeordnet ist. Diese nicht notwendige, aber vorteilhafte Anordnung des Stanzbereichs führt dazu, dass das zu entfernende Folienmaterial aus der noch glatten Metallfolie herausgestanzt werden kann. Durch die erfindungsgemäße Anordnung des Stanzbereichs können wesentlich geringere Fertigungstoleranzen eingehalten werden, als wenn der Stanzbereich beispielsweise den Formgebungsbereichen nachgeschaltet wäre.According to an advantageous embodiment of the invention, that the punching area in the feed direction of the metal foil before the primary and the secondary shaping area is arranged. Not this one necessary but advantageous arrangement of the punching area leads to that the foil material to be removed from the still smooth metal foil can be punched out. Through the arrangement according to the invention of the stamping area can be significantly lower manufacturing tolerances are observed as if the punching area, for example the Shaping areas would be downstream.
In bestimmten Anwendungsfällen kann es zweckmäßig sein, dass zusätzlich weitere Arbeitsbereiche zur Einbringung weiterer Strukturen in die Metallfolie vorgesehen sind. Diese müssen nicht zwangsläufig vom primären und/oder sekundären Formgebungsbereich räumlich getrennt sein. Jedoch bietet sich eine räumliche Trennung häufig an. Durch das Vorsehen zusätzlicher Arbeitsbereiche wird erreicht, dass eine Vielzahl von Strukturen auf der Metallfolie überlagert werden können, so dass die wirksame Oberfläche der Metallfolie erheblich vergrößert wird.In certain applications, it may be useful that additional work areas for the introduction of additional structures in the metal foil are provided. These do not necessarily have to be dated primary and / or secondary shaping area spatially separated his. However, spatial separation is often an option. By the Providing additional work areas will achieve a variety can be overlaid by structures on the metal foil, so that the effective surface of the metal foil is significantly increased.
Es kann in bestimmten Anwendungsfällen von Vorteil sein, dass zusätzlich weitere Arbeitsbereiche zur Einbringung von Übergangsbereichen zwischen zwei oder mehr Strukturen vorgesehen sind. In diesen Arbeitsbereichen wird ein fließender Übergang zwischen den verschiedenen Strukturen hergestellt.In certain use cases, it can be advantageous that additional further work areas for the introduction of transition areas are provided between two or more structures. In these Working areas will be a smooth transition between the different structures.
In vorteilhafter Ausgestaltung der Erfindung ist vorgesehen, dass im sekundären Formgebungsbereich Prägestempel zur Einbringung der Sekundärstruktur, sowie Mittel zur Zentrierung der Metallfolie vorgesehen sind. Die Mittel zur Zentrierung der Metallfolie gewährleisten eine exakte Positionierung der Metallfolie im Folgeverbundwerkzeug. Mittels der Prägestempel wird die Sekundärstruktur in die Primärstruktur eingebracht. In an advantageous embodiment of the invention it is provided that in secondary shaping area embossing stamp for the introduction of the Secondary structure and means for centering the metal foil are provided are. The means for centering the metal foil ensure an exact Position the metal foil in the progressive die. By means of the The secondary structure is embossed into the primary structure.
Dabei sind vorteilhafterweise Prägestempel im Werkzeugoberteil und im Werkzeugunterteil vorgesehen. Mittels der Prägestempel im Werkzeugoberteil wird die Sekundärstruktur in die Wellenberge der Primärstruktur eingebracht. Die Prägestempel im Werkzeugunterteil dienen zur Einbringung der Sekundärstruktur in die Wellentäler der Primärstruktur. Dabei weisen die Wellen der Sekundärstruktur vorzugsweise eine höhere Frequenz und eine geringere Amplitude als die Wellen der Primärstruktur auf.Embossing stamps are advantageously in the upper part of the tool and Lower part of the tool provided. Using the embossing stamp in the Tool upper part is the secondary structure in the wave crests of the Primary structure introduced. The dies in the lower part of the tool serve to introduce the secondary structure into the troughs of the Primary structure. The waves of the secondary structure preferably a higher frequency and a lower amplitude than that Waves of the primary structure.
Es ist mit Vorteil vorgesehen, dass die Mittel zur Zentrierung der Metallfolie als gefederte Klemmmittel, insbesondere bestehend aus einer gefederten Führungsplatte mit Führungseinsatz und einem Federboden, ausgebildet sind, wobei die Oberflächen des Führungseinsatzes und/oder des Federbodens zumindest teilweise wie die Primärstruktur der Metallfolie ausgeformt sind. Die spezielle Ausformung der Oberflächen dient dazu, die mit einer Primärstruktur versehene Metallfolie in einem ersten Arbeitsschritt mittels der gefederten Klemmmittel halten zu können.It is advantageously provided that the means for centering the Metal foil as spring-loaded clamping means, in particular consisting of a spring-loaded guide plate with guide insert and a spring base, are formed, the surfaces of the guide insert and / or of the spring base at least partially like the primary structure of the Metal foil are molded. The special shape of the surfaces serves the metal foil provided with a primary structure in one to be able to hold the first work step by means of the spring-loaded clamping means.
Es ist besonders zweckmäßig, dass im primären Formgebungsbereich mindestens ein, mit einer gefederten Führungsplatte zusammenwirkender, Stempel, zur Einbringung der Primärstruktur in die Metallfolie, vorgesehen ist. Dabei wird die Primärstruktur nicht über die gesamte Länge der Metallfolie, sondern etappenweise, eingebracht. Es ist notwendig, die Größe des Stempels so zu bemessen, dass gewährleistet ist, dass ein Nachfließen von Folienmaterial beim Umformen gewährleistet wird, da die sehr dünne Metallfolie ansonsten reißen kann. Eine weitere vorteilhafte Ausgestaltung sieht vor, dass die unteren Stempel starr sind und die oberen Stempel beispielsweise über Kniehebel bewegbar sind.It is particularly useful that in the primary shaping area at least one interacting with a sprung guide plate Stamp provided for the introduction of the primary structure into the metal foil is. The primary structure is not over the entire length of the Metal foil, but introduced in stages. It is necessary that Size of the stamp so that it is guaranteed that a The flow of foil material during forming is guaranteed because the otherwise very thin metal foil can tear. Another beneficial one The design provides that the lower stamps are rigid and the upper stamp can be moved, for example, via the toggle lever.
Als konstruktiv von Vorteil hat sich herausgestellt, wenn sich die gefederte Führungsplatte mit Führungseinsatz des sekundären Formgebungsbereich im primären Formgebungsbereich fortsetzt. Die gefederte Führungsplatte mit Führungseinsatz hat somit eine Doppelfunktion. Im sekundären Formgebungsbereich dient sie als ein Teil des Klemmmittels zur Zentrierung der Metallfolie, während sie im primären Formgebungsbereich zur Formgebung der Metallfolie dient und mit einem Stempel zusammenwirkt.It has proven to be constructively advantageous if the sprung Guide plate with guide insert of the secondary Shaping area continues in the primary shaping area. The spring-loaded guide plate with guide insert therefore has a Dual function. In the secondary molding area, it serves as a part of the clamping means for centering the metal foil while it is in the primary Shaping area for shaping the metal foil is used and with a Stamp cooperates.
Es ist besonders zweckmäßig, dass die Oberfläche des Stempels und die des gefederten Führungseinsatzes so ausgestaltet sind, dass die Primärstruktur der Metallfolie die Form einer, vorzugsweise fortlaufenden, Welle ergibt. In diese primäre Welle wird dann die Sekundärstruktur, wiederum in Form einer Welle, im sekundären Formgebungsbereich eingebracht.It is particularly useful that the surface of the stamp and the of the sprung guide insert are designed so that the Primary structure of the metal foil in the form of a, preferably continuous, Wave results. The secondary structure is then in this primary wave, again in the form of a wave, in the secondary shaping area brought in.
In Weiterbildung der Erfindung ist vorgesehen, dass mehrere, vorzugsweise mindestens zwei, Stempel in Einzugsrichtung der Metallfolie räumlich hintereinander angeordnet und nacheinander, insbesondere entgegen der Einzugsrichtung der Metallfolie, betätigbar sind. Dabei weist die Oberfläche eines jeden Stempels einen Teilausschnitt der Primärstruktur zur Einbringung in die Metallfolie auf. Dadurch, dass mehrere Stempel mit kurzer Längenausdehnung in Einzugsrichtung hintereinander zum Einsatz kommen, wird gewährleistet, dass beim jeweiligen Stempelvorgang genügend Folienmaterial nachfließen kann, um ein Reißen der Metallfolie mit Vorteil zu vermeiden.In a development of the invention it is provided that several preferably at least two stamps in the feed direction of the metal foil spatially arranged one behind the other and one after the other, in particular against the direction of the metal foil, can be actuated. It points the surface of each stamp is a partial section of the Primary structure for insertion into the metal foil. As a result of that several stamps with a short length in the feed direction are used in succession, it is guaranteed that the enough foil material can flow in each stamping process, to advantageously avoid tearing the metal foil.
Da bei den Stempelvorgängen besonders hohe Kräfte auf die Metallfolie über die Stempel wirken müssen, ist mit Vorteil vorgesehen, dass jedem Stempel oder einer Gruppe von benachbarten Stempeln, ein Kniehebelwerk zugeordnet ist, über welches der Stempel beziehungsweise die Gruppe von Stempeln betätigbar ist. Über das Kniehebelwerk können hohe Kräfte übertragen werden. Because particularly high forces are exerted on the metal foil during the stamping processes over which stamps have to act, it is advantageously provided that everyone Stamp or a group of adjacent stamps Knee lever mechanism is assigned, via which the stamp or the group of stamps can be actuated. About the High forces can be transmitted through the toggle mechanism.
Es ist von besonderem Vorteil, dass jedes Kniehebelwerk aus einem Mittelteil besteht, welches über mindestens zwei Kniehebel mit dem Stempel und über mindestens zwei weitere Kniehebel mit einer Grundplatte gelenkig verbunden ist, wobei das Mittelteil mit den Kniehebeln so angeordnet ist, dass der Stempel durch eine Seitwärtsbewegung des Mittelteils betätigbar ist. Als Seitwärtsbewegung ist hier die Schwenkbewegung des Mittelteils bezeichnet.It is particularly advantageous that every toggle lever mechanism consists of one Middle section exists, which with at least two toggle levers Stamp and over at least two other toggle levers with one Base plate is hinged, the middle part with the Toggle levers is arranged so that the stamp by a Sideways movement of the middle part is actuated. As a sideways movement the pivoting movement of the middle part is designated here.
Mit Vorteil ist jedem Kniehebelwerk oder jeder Gruppe von Kniehebelwerken ein Antrieb, zur Umwandlung einer Senkrechtbewegung des Werkzeugoberteils oder des Werkzeugunterteils in eine Seitwärtsbewegung des Mittelteils des Kniehebelwerks zugeordnet.Each toggle mechanism or group of is advantageous A toggle mechanism is a drive for converting a vertical movement the upper part of the tool or the lower part of the tool into one Sideways movement of the middle part of the toggle mechanism assigned.
Um die Abfolge der Stempelvorgänge der einzelnen Stempel im primären Formgebungsbereich zeitlich zu steuern, ist mit Vorteil vorgesehen, dass jedem Antrieb ein mit dem Werkzeugoberteil oder Werkzeugunterteil in Wirkverbindung stehender, vorzugsweise gefederter, Bolzen zugeordnet ist, wobei die Bolzen der einzelnen Antriebe eine unterschiedliche Länge aufweisen. Hierdurch soll erreicht werden, dass zuerst der dem sekundären Formgebungsbereich nächstgelegene Stempel beziehungsweise die nächstgelegenste Stempelgruppe betätigt wird und dann die weiteren Stempel beziehungsweise Stempelgruppen in Reihenfolge entgegen der Einzugsrichtung der Metallfolie betätigt werden.The order of the stamping operations of the individual stamps in the primary Timing the shaping area is advantageously provided for each drive one with the upper or lower tool part in Operationally connected standing, preferably spring-loaded, bolts is, the bolts of the individual drives are of different lengths exhibit. This is to ensure that the first secondary shaping area nearest stamp or the closest stamp group is activated and then the further stamps or stamp groups in Sequence to be operated against the feed direction of the metal foil.
Weiterhin war es Aufgabe der vorliegenden Erfindung, ein Verfahren anzugeben, dass die Herstellung sehr dünner, strukturierter Metallfolie mit großer Oberfläche unter Einhaltung hoher Qualitätsstandards erlaubt.It was also an object of the present invention to provide a method indicate that the manufacture of very thin, structured metal foil with large surface allowed while maintaining high quality standards.
Diese Aufgabe wird dadurch gelöst, dass eine Metallfolie in einem Folgeverbundwerkzeug in einem Bearbeitungsvorgang mit einer ersten und wenigstens einer zweiten Struktur versehen wird, wobei die sekundäre Struktur die primäre Struktur überlagert, und bei dem in allen oder ausgewählten Übergangsbereichen zwischen erster und wenigstens zweiter Struktur Metallfolienmaterial entfernt wird.This object is achieved in that a metal foil in one Progressive tool in a machining process with a first and at least one second structure is provided, the secondary structure superimposed on the primary structure, and in which in all or selected transition areas between the first and at least second structure metal foil material is removed.
Dieses erfindungsgemäße Verfahren erlaubt mit Vorteil die Herstellung extrem dünner, strukturierter Metallbänder in einem Bearbeitungsschritt in einem einzigen Werkzeug bei gleichzeitiger Einhaltung geringster Fertigungstoleranzen. Das erfindungsgemäße Verfahren ist wirtschaftlicher als das im Stand der Technik beschriebene, da es an einer Maschine mit einem Werkzeug durchgeführt werden kann, da Folgeverbundwerkzeuge mit einem Bearbeitungsschritt Stanzen, und Umformen können. Das erfindungsgemäße Verfahren verringert die Bildung von Graten an den Werkstücken, so dass eine vollständige katalytisch wirksame Oberfläche auf dem Metallträger abgeschieden werden kann. Der erfindungsgemäß vorgesehene Arbeitsschritt der Materialentfernung stellt gleichzeitig sicher, dass ein aus dem Material hergestellter Katalysator eine deutlich höhere Standzeit im Alltagsbetrieb aufweist, die durch die Materialentfernung Spannungen innerhalb der Metallfolie abgebaut, und Kerbwirkung an den Übergangsbereichen zwischen erster und zweiter Struktur vermieden werden.This method according to the invention advantageously allows production extremely thin, structured metal strips in one machining step a single tool while maintaining the lowest Manufacturing tolerances. The method according to the invention is more economical than that described in the prior art, since it is on a Machine can be done with a tool because Progressive dies with a punching machining step, and Can reshape. The inventive method reduces the Formation of burrs on the work pieces so that a complete catalytically active surface deposited on the metal support can be. The work step of the invention Material removal also ensures that one is out of the material manufactured catalyst has a significantly longer service life in everyday use has the stresses within the Metal foil degraded, and notch effect at the transition areas between the first and second structure can be avoided.
Vorteilhafterweise sieht das Verfahren vor, dass Arbeitsschritte des Bearbeitungsvorganges zeitlich versetzt erfolgen oder einzelne Arbeitsschritte des Bearbeitungsvorganges zeitlich und räumlich versetzt erfolgen. Der zeitliche Versatz der Arbeitsschritte ermöglicht ein Nachfließen des Materials während der aufeinanderfolgenden Formungsvorgänge, so dass Mikrorisse oder Strukturbrüche vermieden werden. In Abhängigkeit von dem zu verformenden Material kann auch eine räumliche Variation der Arbeitsschritte innerhalb des Folgeverbundwerkzeuges erfolgen, so dass auch besonders empfindliche Metallfolien mit sehr gutem Ergebnis verarbeitet werden können. The method advantageously provides that work steps of the Processing process take place at different times or individual Working steps of the machining process are offset in time and space respectively. The time offset of the work steps enables one Refill of the material during the successive Forming processes so that micro cracks or structural breaks are avoided become. Depending on the material to be deformed, too a spatial variation of the work steps within the Progressive tool, so that even particularly sensitive Metal foils can be processed with very good results.
Dadurch, dass das Folgeverbundwerkzeug die primäre und sekundäre Struktur vorzugsweise als Wellenstruktur in die Metallfolie einbringt, wird die wirksame Oberfläche ohne für die Galvanisierung nachteiligen Ecken und Kanten deutlich vergrößert. Ecken und Kanten führen zusätzlich zur Bildung von Totvolumina, die die Konversionsrate des Katalysators herabsetzen und müssen daher vermieden werden. Die Ausbildung der Struktur als Wellenstruktur hat weiterhin den besonderen Vorteil, dass zwar die wirksame Oberfläche, nicht jedoch der Strömungswiderstand über die Maßen vergrößert wird.Because the progressive die is the primary and secondary Structure is preferably introduced as a wave structure in the metal foil the effective surface without corners that are disadvantageous for the galvanization and edges significantly enlarged. Corners and edges also lead to Formation of dead volumes, which is the conversion rate of the catalyst reduce and must therefore be avoided. Training the Structure as a wave structure also has the particular advantage that the effective surface, but not the flow resistance is enlarged beyond measure.
Zur Oberflächenvergrößerung ist vorgesehen, dass die sekundäre Struktur in die Wellenkämme und/oder in die Wellentäler der primären Struktur eingebracht wird und wobei die Wellen der sekundären Struktur vorzugsweise eine höhere Frequenz und eine geringere Amplitude als die Wellen der ersten Struktur aufweisen. Mit besonderem Vorteil führt dieser Bearbeitungsschritt zu einer optimalen Vergrößerung der Oberfläche.To increase the surface area it is provided that the secondary structure in the crests and / or in the troughs of the primary structure is introduced and the waves of the secondary structure preferably a higher frequency and a lower amplitude than that Have waves of the first structure. This leads with particular advantage Processing step for an optimal enlargement of the surface.
Weiterhin ist vorgesehen, dass Folienmaterial durch Ausstanzen, vorzugsweise in Langlochform, im Übergangsbereich zwischen erster und zweiter Struktur entfernt wird. Die Stanze in Form eines Langloches ist besonders vorteilhaft und einfach zu realisieren, die Erfindung umfasst jedoch auch andere Formen wie Knochen-, Kreis- oder Doppellochform.It is further provided that foil material by punching out, preferably in the form of an elongated hole, in the transition area between the first and second structure is removed. The punch is in the form of an elongated hole particularly advantageous and easy to implement, the invention comprises but also other shapes such as bone, circular or double-hole shape.
Gemäß einer Ausgestaltung der Erfindung ist vorgesehen, dass Metallfolie mit einer Dicke von 0,02 bis 0,12 mm, vorzugsweise mit einer Dicke von 0,05 mm, und mit einer Folienbreite von 50 bis 210 mm verarbeitet wird.According to an embodiment of the invention, it is provided that metal foil with a thickness of 0.02 to 0.12 mm, preferably with a thickness of 0.05 mm, and is processed with a film width of 50 to 210 mm.
Weiterhin ist mit Vorteil vorgesehen, dass die Metallfolie durch mindestens eine Einzugsvorrichtung durch das Folgeverbundwerkzeug geführt wird. Die Verwendung von mindestens einer Einzugsvorrichtung, vorzugsweise zwei Einzugsvorrichtungen zu Beginn und am Ende des Folgeverbundwerkzeuges ermöglicht einen optimalen Verarbeitungsablauf.It is also advantageously provided that the metal foil by at least a feed device is guided through the progressive tool. The use of at least one feed device, preferably two feeders at the beginning and end of the Progressive tool enables an optimal Processing flow.
Gemäß einer besonders effektiven Ausgestaltung des erfindungsgemäßen Verfahrens ist vorgesehen, dass die Metallfolie in einem ersten Arbeitsteilschritt zwischen einem Folgeverbundwerkzeugoberteil und einem Folgeverbundwerkzeugunterteil im sekundären Formgebungsbereich geklemmt und damit zentriert wird, woraufhin die Sekundärstruktur in bestimmte Wellentäler der Primärstruktur innerhalb des sekundären Formgebungsbereichs eingebracht wird, woraufhin die Primärstruktur mittels mindestens eines Stempels in die Metallfolie eingebracht wird, wodurch Folienmaterial in Einzugsrichtung nachgezogen wird, davor, währenddessen oder daraufhin im Stanzbereich Metallfolienmaterial durch Schneidstempel herausgestanzt wird und im gleichen oder danach oder zuvor gelagerten Arbeitsschritt die Sekundärstruktur in bestimmte Wellenberge der Primärstruktur eingebracht wird.According to a particularly effective embodiment of the invention The method provides that the metal foil in a first Working part step between a progressive tool upper part and a progressive tool lower part in the secondary Forming area is clamped and thus centered, whereupon the Secondary structure in certain troughs of the primary structure within of the secondary shaping area is introduced, whereupon the Primary structure in the metal foil by means of at least one stamp is introduced, whereby film material is pulled in the feed direction before, during or afterwards in the punching area Metal foil material is punched out by cutting stamp and in same or after or previously stored work step Secondary structure in certain wave crests of the primary structure is introduced.
Im Folgenden werden anhand der Figuren der Zeichnung weitere Einzelheiten und Vorteile der Erfindung erläutert. Im einzelnen stellen dabei die
- Fig. 1:
- ein erfindungsgemäßes Folgeverbundwerkzeug,
- Fig. 2:
- eine perspektivische Ansicht einer erfindungsgemäß erzeugten gewellten Metallfolie,
- Fig. 3:
- einen Querschnitt durch diese Metallfolie,
- Fig. 4:
- eine perspektivische Ansicht einer gewellten Metallfolie ohne Ausstanzungen,
- Fig. 5:
- eine Prinzipdarstellung eines Ausschnitts des erfindungsgemäßen Folgeverbundwerkzeugs,
- Fig. 6:
- einen vergrößerten Ausschnitt aus Fig. 5,
- Fig. 7:
- eine Prinzipdarstellung des Folgeverbundwerkzeugs beim letzten Arbeitsteilschritt, und
- Fig. 8:
- eine vergrößerte Darstellung eines Ausschnitts von Fig. 7,
- Fig. 9:
- ein Ablaufschema eines Bearbeitungsvorgangs,
- Fig. 10:
- eine Prinzipskizze eines Folgeverbundwerkzeugs,
- Fig. 1:
- a progressive tool according to the invention,
- Fig. 2:
- 2 shows a perspective view of a corrugated metal foil produced according to the invention,
- Fig. 3:
- a cross section through this metal foil,
- Fig. 4:
- a perspective view of a corrugated metal foil without punching,
- Fig. 5:
- 2 shows a basic illustration of a section of the progressive composite tool according to the invention,
- Fig. 6:
- 5 shows an enlarged detail from FIG. 5,
- Fig. 7:
- a schematic diagram of the progressive tool in the last sub-step, and
- Fig. 8:
- 7 shows an enlarged illustration of a detail from FIG. 7,
- Fig. 9:
- a flow chart of a machining process,
- Fig. 10:
- a schematic diagram of a progressive tool,
In Figur 1 ist ein Folgeverbundwerkzeug 1 dargestellt. Dieses
Folgeverbundwerkzeug 1 kann vorzugsweise in Pressen mit einem
Pressenbär oder einer einfach wirkenden Presse eingesetzt werden. Der
sekundäre Formgebungsbereich 2 ist in Einzugsrichtung 3 der Metallfolie
4 hinter dem primären Formgebungsbereich 5 angeordnet. Der
Stanzbereich ist in Figur 1 nicht dargestellt. Er ist jedoch in
Einzugsrichtung der Metallfolie vor dem primären Formgebungsbereich 5
angeordnet. Das Folgeverbundwerkzeug 1 besteht aus einem oberen
Werkzeugteil 6, welches mit einem nicht dargestellten Pressbären in
Eingriff steht, und einem unteren, fixierten Werkzeugteil 7. Das obere
Werkzeugteil 6 besteht aus einer oberen Druckplatte 8 und einer unteren
Druckplatte 9. Die obere Druckplatte 8 ist in eine Kopfplatte 10, die
unmittelbar mit dem Pressbären zusammenwirkt, eingelassen.A
Unterhalb der unteren Druckplatte 9 ist eine Stempelhalteplatte 11
angeordnet. In dieser Stempelhalteplatte 11 sind die oberen Prägestempel
12 (in Fig. 5 zu sehen) zur Einbringung der Sekundärstruktur im
sekundären Formgebungsbereich fixiert. Weiterhin sind in der
Stempelhalteplatte die Schneidstempel des Stanzbereichs zur Entfernung
von Folienmaterial gehaltert.A
In der oberen Druckplatte 8 und unteren Druckplatte 9 sind mehrere
Bolzen 13 geführt. Die Bolzen 13 sind zwischen beiden Platten 8, 9 mittels
Federn 14 gefedert. Die gefederten Bolzen 13 wirken auf eine
Führungsplatte 15. Die Führungsplatte 15 erstreckt sich über den
sekundären 2 und primären Formgebungsbereich 5. In Figur 1 ist lediglich
zu erkennen, dass sich die Führungsplatte 15 mit dem Führungseinsatz
16 über den sekundären Formgebungsbereich 2 erstreckt. Dies war aus
Übersichtlichkeitsgründen notwendig. Die Führungsplatte 15 setzt sich im
primären wie im sekundären Formgebungsbereich nach unten in einen
Führungseinsatz 16 fort. Die Oberfläche des Führungseinsatzes 16 ist in
Form der Primärstruktur der Metallfolie ausgestaltet.There are several in the upper pressure plate 8 and
Im sekundären Formgebungsbereich 2 ist unterhalb des gefederten
Führungseinsatzes 16 ein Federboden 17 vorgesehen, der mittels Federn
18 gegenüber einer Grundplatte gefedert ist (siehe Fig. 5).In the
Innerhalb des Federbodens 17 sind nicht dargestellte Aussparungen
vorgesehen, in denen untere, starre Prägestempel 19 zur Einbringung der
Sekundärstruktur in die Metallfolie vorgesehen sind.Notches are shown within the
Der primäre Formgebungsbereich 5 besteht aus einer gefederten
Führungsplatte 15 mit einem Führungseinsatz 16 und mit diesem
zusammenwirkenden Stempeln 20, 21. Jeder Stempel 20, 21 wird über
ein eigenes Kniehebelwerk 22, 23 betätigt. Jedes Kniehebelwerk 22, 23
besteht aus jeweils einem Mittelteil 24, welches über obere Kniehebel 25
mit dem jeweiligen Stempel 20 gelenkig verbunden ist. Weiterhin sind
untere Kniehebel 26 vorgesehen, über die das Mittelteil 24 mit einer
Grundplatte 27 gelenkig verbunden ist. Jedem Kniehebelwerk 22, 23 ist
ein Antrieb 28, 29 zugeordnet. Mittels der Antriebe 28, 29 wird die
senkrechte Abwärtsbewegung des oberen Werkzeugteils 6 in eine
Seitwärtsbewegung des Mittelteils 24 umgewandelt. Durch diese seitliche
Schwenkbewegung werden die Stempel 20, 21 gegen die Metallfolie und
gegen den Führungseinsatz 16 mit Führungsplatte 15 gepresst. Jeder
Antrieb 28, 29 besteht aus einem gefederten Bolzen 30, welcher in der
Rahmenplatte geführt ist. Der gefederte Bolzen 30 trifft auf den Ausleger
31 einer Wippe 32. Die Wippe steht im gelenkigen Eingriff mit dem
Mittelteil 24 des Kniehebelwerks 22 und ist im Folgeverbundwerkzeug
gelenkig gelagert. Durch Herunterdrücken des gefederten Bolzen 30 wird
das Mittelteil 24 nach rechts verschwenkt, was eine Aufwärtsbewegung
des Stempels 20 zur Folge hat. Mittels des Stempels 20 wird ein Teil der
Primärstruktur in die Metallfolie 4 eingepresst. Nach Entlastung des
gefederten Bolzens 30 erfolgt die Zurückbewegung des Mittelteils 24
durch eine Feder 33, zwischen einem weiteren Ausleger 34 der Wippe 32
und der Stempelhalteplatte 11. Die anderen Antriebe sind entsprechend
ausgebildet. Dabei ist es je nach Anordnung der Kniehebel und des
Bolzens 30, sowie der Wippe 32 möglich, den Antrieb ziehend oder
drückend auf das Mittelteil 24 wirkend auszubilden.The
Der gefederte Bolzen 30 ist kürzer ausgebildet als der gefederte Bolzen
35 des Antriebs 29. Hierdurch wird erreicht, dass durch Abwärtsbewegung
des Werkzeugoberteils 6 zuerst der Antrieb 29 und damit zuerst das
Kniehebelwerk 23 und damit der Stempel 21 bewegt werden. Stempel 21
ist dabei der direkt an den sekundären Formgebungsbereich grenzende
Stempel. Erst nachdem dieser Teil der Primärstruktur in die Metallfolie
eingebracht wurde, wird durch den gefederten Bolzen 30 der weitere
Stempel 20 betätigt. Hierdurch wird ein weiterer Teil der Primärstruktur in
die Metallfolie eingebracht. Durch die Aufteilung der Primärstruktur auf
mehrere Stempel 20, 21, wird erreicht, dass Metallfolienmaterial aus
Einzugsrichtung nachfließen kann, um ein Reißen der Metallfolie zu
vermeiden. The sprung
Anstelle der Kniehebelwerke können selbstverständlich auch hydraulisch
betätigte Stempel etc. eingesetzt werden. Durch die Kniehebelwerke ist es
jedoch möglich, die Abwärtsbewegung des oberen Werkzeugteils 6 in die
Stempelbewegung umzuwandeln.Instead of the toggle mechanisms, of course, hydraulic
actuated stamps etc. are used. It's through the toggle mechanisms
however, the downward movement of the
Anhand der Figuren 5 bis 8 wird nun der Ablauf der Fertigung erläutert. In
Figur 5 ist der sekundäre Formgebungsbereich 2 und der obere Teil des
primären Formgebungsbereiches 5 schematisch dargestellt. Dabei stellt
Figur 5 die Ausgangsposition dar. Die Metallfolie 4 mit bereits
eingebrachter Primärstruktur befindet sich zwischen einem gefederten
Führungseinsatz 16, der sich vom sekundären Formgebungsbereich 2 bis
in den primären Formgebungsbereich 5 erstreckt und einem Federboden
17, welcher mittels Federn 18 gegenüber einer Grundplatte gefedert ist.
Innerhalb von Ausnehmungen des Führungseinsatzes 16 befinden sich
obere Prägestempel 12 zur Einbringung der Sekundärstruktur. Die oberen
Prägestempel 12 sind innerhalb der Stempelhalteplatte 11 gehalten.
Weiterhin sind fixierte untere Prägestempel 19 im sekundären
Formgebungsbereich vorgesehen. Mittels der Prägestempel 12, 19 wird
die Sekundärstruktur in die Primärstruktur der Metallfolie 4 eingebracht.The production sequence is now explained with reference to FIGS. 5 to 8. In
Figure 5 is the
In Figur 6 ist ein Ausschnitt der Figur 5 vergrößert dargestellt. Man kann
deutlich die Metallfolie 4 mit der bereits geprägten wellenförmigen
Primärstruktur erkennen. Der Führunseinsatz 16, sowie der Federboden
17 weisen ebenfalls die Primärstruktur in Wellenform auf. Dies ist
notwendig, um die Metallfolie 4 zwischen Führungseinsatz 16 und
Federboden 17 einklemmen zu können. Deutlich zu erkennen ist auch der
oberen Prägestempel 12, sowie der untere Prägestempel 19. Mittels des
Prägestempels 19 wird die Sekundärstruktur in die Wellentäler der
Primärstruktur der Metallfolie 4 eingebracht. Mittels des oberen
Prägestempels 12 wird die Sekundärstruktur in die Wellenberge der
Metallfolie 4 eingebracht. Dabei hat die Sekundärstruktur ebenfalls
Wellenform, jedoch in höherer Frequenz und kleinerer Amplitude als die
Primärstruktur.A section of FIG. 5 is shown enlarged in FIG. One can
clearly the
In Figur 5 befindet sich das obere Werkzeugteil 6 des
Folgeverbundwerkzeugs 1 in seiner obersten Position. Der Pressenbär
drückt nun auf die Kopfplatte 10, wodurch eine Abwärtsbewegung des
oberen Werkzeugteils 6 erfolgt. Die Führungsplatte 15 und damit der
Führungseinsatz 16 sind mittels der Federn 14 stärker gefedert als der
Federboden 17 mit seinen Federn 18. Durch die Abwärtsbewegung der
oberen Druckplatte 8 wird der Führungseinsatz 16 von oben gegen die
Metallfolie 4 gedrückt. Nach einer weiteren Abwärtsbewegung stösst die
Metallfolie 4 mit dem Führungseinsatz 16 auf den Federboden 17. Die
Metallfolie ist nun im sekundären Formgebungsbereich 2 fixiert und damit
zentriert. Da die Führungsplatte 15 und damit der Führungseinsatz 16
stärker gefedert sind als der Federboden 17, wird die Abwärtsbewegung
fortgesetzt. Nun wird die Metallfolie 4 gegen die unteren, starren
Prägestempel 19 für die Sekundärstruktur gedrückt. Hierdurch wird die
Sekundärstruktur in die Wellentäler der Primärstruktur eingebracht.In Figure 5, the
Durch die weitere Abwärtsbewegung des oberen Werkzeugteils 6 werden
die Antriebe 29, 28 der Kniehebelwerke 23, 22 betätigt. Hierdurch wird
zuerst der Prägestempel 21 zur Einbringung der Primärstruktur in
Richtung Metallfolie bewegt. Der Stempel 21 drückt die Metallfolie gegen
den Führungseinsatz 16, wodurch ein Teil der Primärstruktur in die
Metallfolie eingebracht wird. Durch die weitere Abwärtsbewegung wird der
Antrieb des Kniehebelwerks 22 über den gefederten Bolzen 30 betätigt.
Hierdurch verfährt der Stempel 20 gegen die Metallfolie 4 und gegen den
Führungseinsatz 16. Durch die zeitliche Abfolge der Stempelvorgänge
wird ein Nachfließen von Metallfolienmaterial ermöglicht. Ein Reißen der
Folie wird mit Vorteil vermieden. Durch eine weitere Abwärtsbewegung
des Werkzeugoberteils 6 wird die Sekundärstruktur im sekundären
Formgebungsbereich durch Abwärtsbewegung des starren, oberen
Prägestempels 12 in die Wellenberge der Primärstruktur eingebracht. Die
Ausgestaltung der Oberfläche des oberen und der des unteren
Prägestempels sind aus Figur 6 ersichtlich.Due to the further downward movement of the
Durch die Länge der Schneidstempel des Stanzbereichs, die in der
Stempelhalteplatte 11 verankert sind, kann der Zeitpunkt bestimmt
werden, in dem Material aus der glatten Folie 4 herausgestanzt wird.
Vorteilhafterweise geschieht dies, nachdem die Primärstruktur eingebracht
und bevor der zweite Teil der Sekundärstruktur in die Metallfolie
eingebracht wird. Nach Einbringung des oberen Teils der
Sekundärstruktur in die Metallfolie 4 befindet sich das obere Werkzeugteil
6 an seiner tiefsten Position. Diese ist in Figur 7 wiedergegeben. Der
Federboden ist komplett nach unten entgegen der Kraft der Federn 18
heruntergedrückt. Die unteren Prägestempel 19 zur Einbringung der
Sekundärstruktur befinden sich relativ zur Metallfolie 4 in ihrer höchsten
Position. Prägestempel 12 befindet sich an seiner tiefsten Position,
ebenso der Führungseinsatz 16. In Figur 7 sind drei Stempel 21, 20, 36
dargestellt, die zur Einbringung der Primärstruktur dienen. Dabei ist für
jeden dieser Stempel ein eigener Antrieb, beispielsweise in Form eines
Kniehebelwerks vorgesehen. Räumlich vor dem primären
Formgebungsbereich 5 und dem sekundären Formgebungsbereich 2 ist
der Stanzbereich 37 mit Schneidstempeln 38 vorgesehen. Die
Schneidstempel 38 sind in der Stempelhalteplatte 11 verankert. Über die
Auswahl der Länge der Schneidstempel kann der Zeitpunkt gewählt
werden, in dem durch Abwärtsbewegung des Werkzeugoberteils Material
aus der Metallfolie 4 herausgestanzt wird.By the length of the cutting punch of the punching area, which in the
Nach Erreichen dieser Position wird der Pressenbär und damit das Werkzeugoberteil wieder in seine Ausgangslage (Figur 5) verfahren. Daraufhin wird die Metallfolie mittels eines ziehenden Vorschubs in Einzugsrichtung weiter transportiert, so dass die neu eingebrachte Primärstruktur im sekundären Formgebungsbereich fixiert und damit zentriert werden kann. Nun beginnt der Arbeitsgang von Neuem. Beim Einlegen der Metallfolie muss selbstverständlich zu Anfang einmal über einen Teilbereich die Primärstruktur in die Metallfolie eingebracht werden, so dass die Metallfolie daraufhin im sekundären Formgebungsbereich gehalten werden kann.After reaching this position, the press bear and thus that Move the upper part of the tool back to its starting position (Figure 5). The metal foil is then pulled in by means of a pulling feed Transport direction transported further, so that the newly introduced Primary structure fixed in the secondary shaping area and thus can be centered. Now the process begins anew. At the Of course, the metal foil must be inserted at the beginning a part of the primary structure is introduced into the metal foil, so that the metal foil is then in the secondary molding area can be held.
In Figur 8 ist der Ausschnitt X aus Figur 7 vergrößert dargestellt. Hier
greifen Führungseinsatz 16 und Federboden 17 ineinander. Zwischen
diesen ist die Metallfolie 4 eingeklemmt. Deutlich zu erkennen ist nun die
Sekundärprägung der Metallfolie. Diese besteht aus kleinen
Wellenbergen, die in Wellentäler der Primärstruktur eingebracht sind und
kleinen Wellentälern, die in die Wellenberge der Primärstruktur
eingebracht sind.In FIG. 8, the detail X from FIG. 7 is shown enlarged. Here
engage
In Figur 4 ist die Metallfolie 4 nach Durchlaufen des sekundären
Formgebungsbereichs 2 dargestellt. Die Ausstanzungen wurden nicht
dargestellt. Deutlich zu erkennen ist, dass die Sekundärstruktur 39 mittels
des oberen Prägestempels in die Wellenberge 40 der Primärstruktur 41
eingebracht wurde. Durch die unteren Prägestempel 19 wurde die
Sekundärstruktur 39 in Form von kleinen Wellenbergen in die Wellentäler
42 der Primärstruktur 41 eingebracht.In Figure 4, the
In Figur 2 ist eine mittels des erfindungsgemäßen Verfahrens und mittels
der erfindungsgemäßen Vorrichtung erzeugte Metallfolie 4 dargestellt. Die
Primärstruktur 41 ist eine Welle von 2,5 Millimetern Länge und 1,6
Millimetern Höhe. Die wellenförmige Sekundärstruktur 39 weist eine
Länge von 1 Millimeter und eine Höhe von ca. 0,5 Millimetern auf.FIG. 2 shows one using the method according to the invention and using
Figur 3 zeigt einen Querschnitt durch eine gewellte Metallfolie 4, wobei die
Schnittebene in der in Figur 2 eingezeichneten I-I liegt. Figure 3 shows a cross section through a
Ein möglicher Verfahrensablauf ist in Figur 9 dargestellt. Als erstes wird
die zu bearbeitende Metallfolie in das Folgeverbundwerkzeug transportiert
43. Daraufhin wird die Metallfolie arretiert 44. Dann wird die Primärstruktur
45 und die Sekundärstruktur eingeprägt 46. Nun ist das
Folgeverbundwerkzeug an einem tiefen Punkt seiner Vertikalbewegung
angelangt. Das Werkzeug ist noch nicht ganz zusammengefahren,
weiteres Material wird jedoch nicht mehr verformt. Der folgende
Arbeitsschritt 47 führt anschließend die Stanzung für den Bereich
zwischen Primär- und Sekundärstruktur aus. Daraufhin ist das Werkzeug
an seinem tiefsten Punkt angelenkt. Das durch dieses Verfahren erzeugte
wellige Metallband wird anschließend durch einen weiteren Materialeinzug
43 aus dem Folgeverbundwerkzeug 1 gefördert und der weiteren
Verarbeitung zugeführt. In dem geschilderten Bearbeitungsvorgang
werden mindestens je eine vollständige, je nach Materialbeschaffenheit
auch zwei oder mehr vollständige Struktureinheiten in die Metallfolie
eingebracht.A possible procedure is shown in Figure 9. First thing is
the metal foil to be processed is transported into the progressive tool
43. Then the metal foil is locked 44. Then the primary structure
45 and the secondary structure embossed 46. Now that is
Progressive tool at a low point in its vertical movement
reached. The tool has not yet completely moved together
however, further material is no longer deformed. The following
Step 47 then performs the punching for the area
between primary and secondary structure. Then the tool
articulated at its lowest point. The generated by this process
wavy metal band is then through another material feed
43 promoted from the
Anstelle des unmittelbaren Aufeinanderfolgens der zwei Prägeschritte 44, 45 ist in Abhängigkeit von den Werkstückeigenschaften erfindungsgemäß auch vorgesehen, dass die weitere Metallbearbeitung erst nach einem Transport des Werkstückes innerhalb des Werkzeuges an die Position eines zweiten Stempels erfolgt, der dann die zweite Einbringung 46 und anschließende Stanzung 47 vornimmt.Instead of the direct succession of the two embossing steps 44, 45 is according to the invention depending on the workpiece properties also provided that the further metalworking only after a Transport of the workpiece to the position within the tool a second stamp takes place, which is then the second insertion 46 and subsequent punching 47 makes.
In einem optimierten Verfahren wird die Metallfolie in einem ersten Arbeitsteilschritt zwischen einem Folgeverbundwerkzeugoberteil und einem Folgeverbundwerkzeugunterteil im sekundären Formgebungsbereich geklemmt und damit arretiert 44. Danach wird die Sekundärstruktur in bestimmte Wellentäler der Primärstruktur innerhalb des sekundären Formgebungsbereichs eingebracht 46. Daraufhin wird die Primärstruktur mittels mindestens eines Stempels in die Metallfolie eingebracht 45, wodurch Folienmaterial in Einzugsrichtung nachgezogen wird, davor, währenddessen oder daraufhin wird im Stanzbereich Metallfolienmaterial durch Schneidstempel herausgestanzt 47 und im gleichen oder danach oder zuvorgelagerten Arbeitsschritt die Sekundärstruktur in bestimmte Wellenberge der Primärstruktur 46 eingebracht. Die Sekundärstruktur kann jedoch auch zugleich, vor oder nach dem Ausstanzen des Metallfolienmaterials erfolgen.In an optimized process, the metal foil is in a first Working part step between a progressive tool upper part and a progressive tool lower part in the secondary Forming area clamped and thus locked 44. Then the Secondary structure in certain troughs of the primary structure within of the secondary shaping region is introduced 46. Then the Primary structure in the metal foil by means of at least one stamp introduced 45, whereby film material pulled in the feed direction before, during, or afterwards in the punching area Metal foil material punched out by cutting punches 47 and in same or after or before the previous step Secondary structure in certain wave crests of the primary structure 46 brought in. However, the secondary structure can also be at the same time, before or after punching out the metal foil material.
Figur 10 zeigt schematisch ein Folgeverbundwerkzeug 1, wobei das
Folgeverbundwerkzeug 1 mit einem über eine Exzenterscheibe 48
angetriebenen beweglichen Bären 49 betätigt wird. Das Werkzeug 1
beinhaltet mehrere Stempel 20, 21, 36, 12, 19 zur Einbringung der Primärund
der Sekundärstruktur in die Metallfolie 4. Über die Wahl der Länge der
Stempel kann die zeitliche Abfolge der Verfahrensteilschritte gesteuert
werden. Figure 10 shows schematically a
- 11
- FolgeverbundwerkzeugProgressive Die
- 22
- sekundärer Formgebungsbereichsecondary shaping area
- 33
- EinzugsrichtungFeeding direction
- 44
- Metallfoliemetal foil
- 55
- primärer Formgebungsbereichprimary shaping area
- 66
- oberer Werkzeugteilupper tool part
- 77
- unterer Werkzeugteillower tool part
- 88th
- obere Druckplatteupper pressure plate
- 99
- untere Druckplattelower pressure plate
- 1010
- Kopfplatteheadstock
- 1111
- StempelhalteplattePunch plate
- 1212
- obere Prägestempel für Sekundärstrukturupper stamp for secondary structure
- 1313
- Bolzenbolt
- 1414
- Federnfeathers
- 1515
- Führungsplatteguide plate
- 1616
- Führungseinsatzguide insert
- 1717
- Federbodenspring base
- 1818
- Federnfeathers
- 1919
- untere Prägestempel für Sekundärstrukturlower stamp for secondary structure
- 2020
- Stempelstamp
- 2121
- Stempelstamp
- 2222
- KniehebelwerkKnee lever mechanism
- 2323
- KniehebelwerkKnee lever mechanism
- 2424
- Mittelteilmidsection
- 2525
- obere Kniehebelupper toggle
- 2626
- untere Kniehebellower toggle
- 2727
- GrundplatteneinsatzBase use
- 2828
- Antrieb drive
- 2929
- Antriebdrive
- 3030
- gefederter Bodensprung bottom
- 3131
- Auslegerboom
- 3232
- Wippeseesaw
- 3333
- Federfeather
- 3434
- Auslegerboom
- 3535
- gefederter Bodensprung bottom
- 3636
- Stempelstamp
- 3737
- Stanzbereichpunch area
- 3838
- Schneidstempelcutting punch
- 3939
- Sekundärstruktursecondary structure
- 4040
- Wellenberge der PrimärstrukturWaves of the primary structure
- 4141
- Primärstrukturprimary structure
- 4242
- Wellentäler der PrimärstrukturTroughs of the primary structure
- 4343
- Transporttransport
- 4444
- Arretierunglock
- 4545
- Prägung PrimärstrukturEmbossing primary structure
- 4646
- Prägung SekundärstrukturEmbossed secondary structure
- 4747
- Materialaussparungmaterial cut
- 4848
- Exzenterscheibeeccentric
- 4949
- Pressenbärram hammer
- 5050
- Pressenunterteil/-tischPress base / table
Claims (23)
und dass danach die Sekundärstruktur (39) in bestimmte Wellentäler (42) der Primärstruktur (41) innerhalb des sekundären Formgebungsbereichs (2) eingebracht wird,
woraufhin die Primärstruktur (41) mittels mindestens eines Stempels (20, 21) in die Metallfolie (4) eingebracht wird, wodurch Folienmaterial (4) in Einzugsrichtung (3) nachgezogen wird, davor, währenddessen oder daraufhin im Stanzbereich (37) Metallfolienmaterial (4) durch Schneidstempel (38) herausgestanzt wird und im gleichen oder danach oder zuvor gelagerten Arbeitsteilschritt die Sekundärstruktur (39) in bestimmte Wellenberge (40) der Primärstruktur (41) eingebracht wird.Method according to one of the preceding method claims, characterized in that the metal foil is clamped in a first working part step between the progressive tool part (6) and the progressive tool lower part (7) in the secondary shaping area (2),
and that the secondary structure (39) is then introduced into certain troughs (42) of the primary structure (41) within the secondary shaping region (2),
whereupon the primary structure (41) is introduced into the metal foil (4) by means of at least one stamp (20, 21), as a result of which foil material (4) is drawn in in the feed direction (3), before, during or thereafter in the stamping area (37) metal foil material (4 ) is punched out by cutting punches (38) and the secondary structure (39) is introduced into certain wave crests (40) of the primary structure (41) in the same or after or previously stored work step.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10311174 | 2003-03-12 | ||
DE10311174A DE10311174A1 (en) | 2003-03-12 | 2003-03-12 | Process for the production of a structured metal foil |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1457275A1 true EP1457275A1 (en) | 2004-09-15 |
EP1457275B1 EP1457275B1 (en) | 2006-07-12 |
Family
ID=32748240
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03015765A Expired - Lifetime EP1457275B1 (en) | 2003-03-12 | 2003-07-10 | Progressive die for punching press |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1457275B1 (en) |
AT (1) | ATE332770T1 (en) |
DE (2) | DE10311174A1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006027008A1 (en) * | 2004-09-09 | 2006-03-16 | Unimet Gmbh | Follow-on composite tool and method for producing structured foils |
DE102004045106A1 (en) * | 2004-09-17 | 2006-03-23 | Emitec Gesellschaft Für Emissionstechnologie Mbh | Metal foil with different indentations |
GB2441983A (en) * | 2006-07-14 | 2008-03-26 | Aea Technology Plc | Catalytic structures for use in catalytic reactors |
DE102008057019A1 (en) | 2008-11-12 | 2010-05-20 | Reinhard Schmid | Forming tool for machining workpiece in electronic industry, has rotatable shaft including fastening element at circumference of eccentric shaft, where fastening element indirectly stays in drive connection with processing plunger |
CN103537539A (en) * | 2013-10-18 | 2014-01-29 | 中国科学院深圳先进技术研究院 | Stamping device of corrugated foils and production device of corrugated foils |
CN113751586A (en) * | 2021-09-26 | 2021-12-07 | 广东恒力精密工业有限公司 | One-step forming automatic production line for double-bead elastic sheet |
EP3967512A1 (en) * | 2020-09-14 | 2022-03-16 | Gerhard Rauch Ges.m.b.H. | Device for embossing films |
CN115446175A (en) * | 2022-08-26 | 2022-12-09 | 楚能新能源股份有限公司 | Anti-manufacturing installation that prevents of laser welding sheetmetal |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010000551A1 (en) * | 2010-02-25 | 2011-08-25 | Unimet GmbH, 87669 | Punching and bending process |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3009510A (en) * | 1958-04-25 | 1961-11-21 | Rca Corp | Apparatus and method for corrugating sheet metal strip |
JPS59220220A (en) * | 1983-05-30 | 1984-12-11 | Hitachi Ltd | Continuous forming device of wave crest |
US4502315A (en) * | 1980-12-10 | 1985-03-05 | Gosadarstvenny Sojuzny Nauchno-Issledovatelsky Traktorny Institut | Device for corrugating sheet material |
EP0262106A2 (en) * | 1986-09-24 | 1988-03-30 | Nordisk Kartro Ab | Method and device for moving a tool to exact shaping and working engagement with a strip of material having a repeated basic shape |
DE19856950A1 (en) * | 1998-12-10 | 2000-06-15 | Stade Umformtechnik Gmbh | Beaded sheet producing device for sheets with several closed beads, with lower tool which has plate moved by external hydraulic cylinder |
US6145363A (en) * | 1998-06-18 | 2000-11-14 | Sovema S.R.L. | Forming machine for metal strips, in particular for the manufacture of plates for electrics accumulators |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1301667A (en) * | 1969-05-09 | 1973-01-04 | ||
DE4207165A1 (en) * | 1992-03-06 | 1993-09-09 | Fuji Electric Co Ltd | Stamping of metallic foil in piezoelectrically operated press - is performed with vertical oscillation of stamping punches held flat against both sides of foil and moved through less than half of its thickness |
DE19847902B4 (en) * | 1998-10-18 | 2005-12-01 | Dr. Mirtsch Gmbh | Process for forming thin, beulstrukturierter material webs |
DE29908254U1 (en) * | 1999-05-07 | 1999-09-16 | Höfer, Andreas, Dr.-Ing., 31515 Wunstorf | Tool for the production of perforated foils |
-
2003
- 2003-03-12 DE DE10311174A patent/DE10311174A1/en not_active Withdrawn
- 2003-07-10 DE DE50304208T patent/DE50304208D1/en not_active Expired - Lifetime
- 2003-07-10 AT AT03015765T patent/ATE332770T1/en not_active IP Right Cessation
- 2003-07-10 EP EP03015765A patent/EP1457275B1/en not_active Expired - Lifetime
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3009510A (en) * | 1958-04-25 | 1961-11-21 | Rca Corp | Apparatus and method for corrugating sheet metal strip |
US4502315A (en) * | 1980-12-10 | 1985-03-05 | Gosadarstvenny Sojuzny Nauchno-Issledovatelsky Traktorny Institut | Device for corrugating sheet material |
JPS59220220A (en) * | 1983-05-30 | 1984-12-11 | Hitachi Ltd | Continuous forming device of wave crest |
EP0262106A2 (en) * | 1986-09-24 | 1988-03-30 | Nordisk Kartro Ab | Method and device for moving a tool to exact shaping and working engagement with a strip of material having a repeated basic shape |
US6145363A (en) * | 1998-06-18 | 2000-11-14 | Sovema S.R.L. | Forming machine for metal strips, in particular for the manufacture of plates for electrics accumulators |
DE19856950A1 (en) * | 1998-12-10 | 2000-06-15 | Stade Umformtechnik Gmbh | Beaded sheet producing device for sheets with several closed beads, with lower tool which has plate moved by external hydraulic cylinder |
Non-Patent Citations (1)
Title |
---|
PATENT ABSTRACTS OF JAPAN vol. 009, no. 094 (M - 374) 24 April 1985 (1985-04-24) * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006027008A1 (en) * | 2004-09-09 | 2006-03-16 | Unimet Gmbh | Follow-on composite tool and method for producing structured foils |
DE102004045106A1 (en) * | 2004-09-17 | 2006-03-23 | Emitec Gesellschaft Für Emissionstechnologie Mbh | Metal foil with different indentations |
US7871576B2 (en) | 2004-09-17 | 2011-01-18 | Emitec Gesellschaft Fuer Emissionstechnologie Mbh | Metal foil having different indentations and assembly, honeycomb body and exhaust gas treatment device having a metal foil |
GB2441983A (en) * | 2006-07-14 | 2008-03-26 | Aea Technology Plc | Catalytic structures for use in catalytic reactors |
DE102008057019A1 (en) | 2008-11-12 | 2010-05-20 | Reinhard Schmid | Forming tool for machining workpiece in electronic industry, has rotatable shaft including fastening element at circumference of eccentric shaft, where fastening element indirectly stays in drive connection with processing plunger |
CN103537539A (en) * | 2013-10-18 | 2014-01-29 | 中国科学院深圳先进技术研究院 | Stamping device of corrugated foils and production device of corrugated foils |
CN103537539B (en) * | 2013-10-18 | 2015-12-09 | 中国科学院深圳先进技术研究院 | The press molding equipment of corrugated foil and the production equipment of corrugated foil |
EP3967512A1 (en) * | 2020-09-14 | 2022-03-16 | Gerhard Rauch Ges.m.b.H. | Device for embossing films |
US11524476B2 (en) | 2020-09-14 | 2022-12-13 | Gerhard Rauch Ges.m.b.H. | Device for embossing foils |
CN113751586A (en) * | 2021-09-26 | 2021-12-07 | 广东恒力精密工业有限公司 | One-step forming automatic production line for double-bead elastic sheet |
CN113751586B (en) * | 2021-09-26 | 2024-04-23 | 广东恒力精密工业有限公司 | Automatic production line for one-step forming of double-bead spring plate |
CN115446175A (en) * | 2022-08-26 | 2022-12-09 | 楚能新能源股份有限公司 | Anti-manufacturing installation that prevents of laser welding sheetmetal |
Also Published As
Publication number | Publication date |
---|---|
DE50304208D1 (en) | 2006-08-24 |
EP1457275B1 (en) | 2006-07-12 |
DE10311174A1 (en) | 2004-09-23 |
ATE332770T1 (en) | 2006-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2608299B1 (en) | Device and method for manufacturing metallic bipolar panels | |
DE102009003668B4 (en) | Device and method for producing at least partially closed profiles or semi-finished products from a circuit board | |
DE2235933A1 (en) | METHOD AND DEVICE FOR PRODUCING BEARINGS FROM A STRIP OF MATERIAL | |
DE10031095B4 (en) | Method for producing a multilayer gasket and gasket | |
EP1457275B1 (en) | Progressive die for punching press | |
DE19842750B4 (en) | Method and production of deep-drawn hollow parts and drawing tool | |
DE3339503C2 (en) | Punching machine and tool kit for punching machines | |
EP1793947B1 (en) | Follow-on composite tool for producing structured foils | |
DE102019211066B3 (en) | Method for cutting a groove-shaped recess in a workpiece | |
DE10042896B4 (en) | Method for producing a ring element | |
DE19901015A1 (en) | Device and method for the technical joining of parts | |
EP0953386A2 (en) | Apparatus and method for joining parts by plastic deformation | |
WO2009065694A1 (en) | Method for producing a burr-free cut surface and device for carrying out the method | |
DE1800910A1 (en) | Tool and method and device for producing the same | |
EP1775042A1 (en) | Method and apparatus for punching a metal sheet | |
DE102012013771B4 (en) | Cutting tool and cutting device equipped with such | |
DE3516764A1 (en) | Elastic laminate, especially for electrical apparatuses, a method for producing such laminates, and a device for carrying out this method | |
EP0654312A1 (en) | Device and method for the forming of corrugated sheets having flat parallel marginal portions | |
DE10350156B3 (en) | Tool for cutting hollow strip has cutting and deforming functions, transversely adjustable cutting edge and shaping die wall | |
DE10226473B4 (en) | Press tool | |
DE2344831B2 (en) | Process for the production of curved fittings and use of a device for carrying out the process | |
DE19515791A1 (en) | Cutting shapes from glass fibre mats | |
WO2016074668A2 (en) | Tool for producing cups, and blanking and drawing press | |
DE10159249B4 (en) | Method and press tool for producing a polygonal bolt | |
EP1677923A1 (en) | Tool and internal high pressure forming of a hollow section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK |
|
17P | Request for examination filed |
Effective date: 20050215 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
AXX | Extension fees paid |
Extension state: AL Payment date: 20050315 Extension state: MK Payment date: 20050315 Extension state: LT Payment date: 20050315 Extension state: LV Payment date: 20050315 |
|
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT RO SE SI SK TR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REF | Corresponds to: |
Ref document number: 50304208 Country of ref document: DE Date of ref document: 20060824 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061012 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061012 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061023 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20061020 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061212 |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070413 |
|
BERE | Be: lapsed |
Owner name: UNIMET G.M.B.H. Effective date: 20070731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20061013 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20060712 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20070113 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20100723 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110711 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20160721 Year of fee payment: 14 Ref country code: DE Payment date: 20160922 Year of fee payment: 14 Ref country code: GB Payment date: 20160722 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20160722 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50304208 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20170710 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20180330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180201 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170710 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170710 |