EP1262612A2 - Temporary guard rail - Google Patents
Temporary guard rail Download PDFInfo
- Publication number
- EP1262612A2 EP1262612A2 EP20020253881 EP02253881A EP1262612A2 EP 1262612 A2 EP1262612 A2 EP 1262612A2 EP 20020253881 EP20020253881 EP 20020253881 EP 02253881 A EP02253881 A EP 02253881A EP 1262612 A2 EP1262612 A2 EP 1262612A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- guard rail
- level
- next level
- deck
- rail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
- E04G5/147—Railings specially adapted for mounting prior to the mounting of the platform
Definitions
- This invention relates to a structures which comprise standards joined by transoms and ledgers at one or more levels, a deck at the or each level resting on the transoms and a permanent guard rail joining the standards at each level.
- operatives stand at ground level or on a previously assembled deck, to fit the transoms, ledgers and deck of the next level, in order to fit a guard rail for the next level, they have to stand on the deck at that level and, without a guard rail, they are required by Health and Safety procedures to wear a safety harness and to clip it to the scaffolding.
- the harness is uncomfortable to wear; It is expensive to buy one for each operative, especially sing they require periodic replacement; and the procedure is time consuming and unpopular.
- a temporary guard rail comprising a frame having an upper rail member supported by stanchions, the frame having clips by which it can be attached to a permanent guard rail at one level and to the ledger of the next level up from said one level, to locate said rail member above the deck of the next level up to act as a guard rail.
- the temporary guard rail can be fitted from the present level and before the operative ascends to the next level up, so that when s/he does ascend, the guard rail is already there and there is no need to use a safety harness.
- the permanent guard rail can be fitted, the temporary guard rail can be demounted and used for the (new) next level up.
- the temporary guard rails can be used on the next job; they may be made robustly so as to outlast safety harnesses and they are needed in numbers to suit the scaffolding being erected, not one per scaffolder.
- permanent is intended to mean that the guard rail is left fitted until the structure is dismantled and “temporary” that the guard rail may be used in erecting the scaffolding and removed once the "permanent" guard rail has been fitted.
- the temporary guard rail is so formed as to space the stanchions and the rail member away from the standards above the ledger to which it is attached in use, in order to enable a permanent guard rail to be fitted to the standards.
- the stanchions are preferably joined by one or more cross members in addition to the rail member.
- the clips are in the form of downwardly-open hooks.
- the hooks to attach to the guard rail of one level, or the hooks to attach to the ledger of the next level up preferably extend further than the hooks to attach to the other, so that the hooks which extend further can engage the guard rail or ledger before the other hooks engage the ledger or guard rail.
- a scaffolding structure 2 is being erected against a wall 4 of a building.
- the principal components are standards 6, transoms 8, and ledgers 10, interconnected by scaffolding clips one of which is shown schematically at 12.
- the structure is braced by diagonal members 16 and decks are provided at each level by boards 16.
- FIG 1 there is shown a fully assembled first or ground level 18, a fully assembled second level 20 and a partly assembled next level up: level three.
- Ladders 24 interconnect the levels.
- Two horizontal tubes 26 are clipped to the standards to act as guard rails. Until guard rails are fitted at a particular level, it is not conventionally permitted to work on that level without being clipped to the structure by a safety harness.
- a temporary guard rail 28 for the third level can be installed from the second level.
- each sectional assembly comprises two stanchions 32, spaced by a rail member 34, to act as a guard rail, and further cross members 36 of which two are illustrated.
- each stanchion 30 Attached to each stanchion 30 are two clips in the form of hook members 38 spaced vertically sufficiently to engage both a permanent guard rail 26 and the ledger 10 of the next level up.
- the hook members 38 are dimensioned suitably to receive the 48.3 mm diameter tube of standard scaffolding pole which comprise the guard rail 26 and the ledger 10.
- the scaffolder will install a permanent guard rail 26, transoms 8, ledgers 10 and deck 16 for the next (fourth) level and will than move the temporary guard rail up one level so as to be able to work on the fourth level without the need for a safety harness.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Emergency Lowering Means (AREA)
Abstract
When assembling scaffolding, operatives stand at ground level or on a previously
assembled deck, to fit the transoms, ledgers and deck of the next level, in order to fit a
guard rail for the next level, they have to stand on the deck at that level and, without a
guard rail, they are required by Health and Safety procedures to wear a safety harness
and to clip it to the scaffolding. The harness is uncomfortable to wear; It is expensive to
buy one for each operative, especially sing they require periodic replacement; and the
procedure is time consuming and unpopular.
A temporary guard rail is disclosed, comprising a frame having an upper rail
member supported by stanchions. The frame has clips by which it can be attached to a
permanent guard rail at one level and to the ledger of the next level up from said one
level, to locate said rail member above the deck of the next level up to act as a guard
rail. Once the transoms, ledgers and deck have been fitted for the next level up, the
temporary guard rail can be fitted from the present level and before the operative
ascends to the next level up, so that when s/he does ascend, the guard rail is already
there and there is no need to use a safety harness. At the next level up, the permanent
guard rail can be fitted, the temporary guard rail can be demounted and used for the
(new) next level up. Once assembly is complete, the temporary guard rails can be used
on the next job; they may be made robustly so as to outlast safety harnesses and they
are needed in numbers to suit the scaffolding being erected, not one per scaffolder.
Description
- This invention relates to a structures which comprise standards joined by transoms and ledgers at one or more levels, a deck at the or each level resting on the transoms and a permanent guard rail joining the standards at each level.
- An example of such a structure is scaffolding and the invention will be explained against the background of practice in the scaffolding industry, although the reader may readily think of other applications for the invention.
- When assembling scaffolding, operatives stand at ground level or on a previously assembled deck, to fit the transoms, ledgers and deck of the next level, in order to fit a guard rail for the next level, they have to stand on the deck at that level and, without a guard rail, they are required by Health and Safety procedures to wear a safety harness and to clip it to the scaffolding. The harness is uncomfortable to wear; It is expensive to buy one for each operative, especially sing they require periodic replacement; and the procedure is time consuming and unpopular.
- Against this background the invention provides a temporary guard rail, comprising a frame having an upper rail member supported by stanchions, the frame having clips by which it can be attached to a permanent guard rail at one level and to the ledger of the next level up from said one level, to locate said rail member above the deck of the next level up to act as a guard rail. Once the transoms, ledgers and deck have been fitted for the next level up, the temporary guard rail can be fitted from the present level and before the operative ascends to the next level up, so that when s/he does ascend, the guard rail is already there and there is no need to use a safety harness. At the next level up, the permanent guard rail can be fitted, the temporary guard rail can be demounted and used for the (new) next level up. Once assembly is complete, the temporary guard rails can be used on the next job; they may be made robustly so as to outlast safety harnesses and they are needed in numbers to suit the scaffolding being erected, not one per scaffolder. In this specification "permanent" is intended to mean that the guard rail is left fitted until the structure is dismantled and "temporary" that the guard rail may be used in erecting the scaffolding and removed once the "permanent" guard rail has been fitted.
- Preferably the temporary guard rail is so formed as to space the stanchions and the rail member away from the standards above the ledger to which it is attached in use, in order to enable a permanent guard rail to be fitted to the standards.
- The stanchions are preferably joined by one or more cross members in addition to the rail member.
- In a preferred example, the clips are in the form of downwardly-open hooks.
- The hooks to attach to the guard rail of one level, or the hooks to attach to the ledger of the next level up preferably extend further than the hooks to attach to the other, so that the hooks which extend further can engage the guard rail or ledger before the other hooks engage the ledger or guard rail.
- One embodiment of the invention will now be described, by way of example, with reference to the accompanying drawings, in which:
- Figure 1 is a pictorial view of part of a scaffolding structure incorporating a temporary guard rail embodying the invention;
- Figure 2 is a side view of the a temporary guard; and
- Figure 3 is a front view of the temporary guard rail of Figure 2.
-
- Referring to the drawings, a scaffolding structure 2 is being erected against a wall 4 of a building. The principal components are
standards 6,transoms 8, andledgers 10, interconnected by scaffolding clips one of which is shown schematically at 12. The structure is braced bydiagonal members 16 and decks are provided at each level byboards 16. - In Figure 1, there is shown a fully assembled first or
ground level 18, a fully assembledsecond level 20 and a partly assembled next level up: level three.Ladders 24 interconnect the levels. In the construction of thesecond level 20, Twohorizontal tubes 26 are clipped to the standards to act as guard rails. Until guard rails are fitted at a particular level, it is not conventionally permitted to work on that level without being clipped to the structure by a safety harness. - In order to avoid that requirement, a
temporary guard rail 28 for the third level can be installed from the second level. - Referring to Figures 2 and 3, the temporary
guard rail assembly 28 is provided insectional assemblies 30. Each sectional assembly comprises twostanchions 32, spaced by arail member 34, to act as a guard rail, andfurther cross members 36 of which two are illustrated. - Attached to each
stanchion 30 are two clips in the form ofhook members 38 spaced vertically sufficiently to engage both apermanent guard rail 26 and theledger 10 of the next level up. Thehook members 38 are dimensioned suitably to receive the 48.3 mm diameter tube of standard scaffolding pole which comprise theguard rail 26 and theledger 10. - In use, once a scaffolder working, say on the
second level 20 has fitted theledgers 10 of the next level up, temporary guard rails for that level may be fitted, with the operative working on level two, by clipping thesectional assemblies 30 to theguard rail 26 at level two 20, and theledger 10 for the next level up. Once thetransoms 8 and thedeck 16 for level three have been installed, the scaffolder may work at that level without the need for a safety harness. In order to allow the permanent guard rail to be fitted therail member 34 and (at least) the upper part of thestantions 32 must be spaced sufficiently from thestandards 6. In the embodiment illustrated, this is achieved by a crank in the stantions. - On this level the scaffolder will install a
permanent guard rail 26,transoms 8,ledgers 10 anddeck 16 for the next (fourth) level and will than move the temporary guard rail up one level so as to be able to work on the fourth level without the need for a safety harness.
Claims (5)
- A temporary guard rail for use in assembling a structure, which structure comprises standards joined by transoms and ledgers at one or more levels, a deck at the or each level resting on the transoms and a permanent guard rail joining the standards at each level, said temporary guard rail comprising a frame having an upper rail member supported by stanchions, the frame having clips by which it can be attached to a permanent guard rail at one level and to the ledger of the next level up from said one level, to locate said rail member above the deck of the next level up to act as a guard rail.
- A temporary guard rail as claimed in claim 1, so formed as to space the stanchions and the rail member away from the standards above the ledger to which it is attached in use, in order to enable a permanent guard rail to be fitted to the standards.
- A temporary guard rail as claimed in claim 1 or 2, wherein the stanchions are joined by one or more cross members in addition to the rail member.
- A temporary guard rail as claimed in any preceding claim, wherein the clips are in the form of downwardly open-hooks.
- A temporary guard rail as claimed in claim 4, wherein the hooks to attach to the guard rail of one level, or the hooks to attach to the ledger of the next level up extend further than the hooks to attach to the other, so that the hooks which extend further can engage the guard rail or ledger before the other hooks engage the ledger or guard rail.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0113204A GB0113204D0 (en) | 2001-05-31 | 2001-05-31 | Temporary guard rail |
GB0113204 | 2001-05-31 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1262612A2 true EP1262612A2 (en) | 2002-12-04 |
Family
ID=9915620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20020253881 Withdrawn EP1262612A2 (en) | 2001-05-31 | 2002-05-31 | Temporary guard rail |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1262612A2 (en) |
GB (1) | GB0113204D0 (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2887907A1 (en) * | 2005-06-30 | 2007-01-05 | Comabi Sa | Temporary balustrade for scaffolding of building, has frame made of aluminum, and fixation pins for positioning frame in one vertical plane situated in front of another vertical plane passing through posts during utilization of balustrade |
FR2923239A1 (en) * | 2007-11-02 | 2009-05-08 | Participations Soc Par Actions | Suspended scaffolding for wall of building, has support frame maintained on bracket in stable raised support position and slidingly mounted relative to bracket that forms guiding path of frame, in unlocked state of bracket |
DE102009007918A1 (en) * | 2009-02-06 | 2010-08-12 | Wilhelm Layher Verwaltungs-Gmbh | Leading railing device and method of assembly therefor |
AU2010100013B4 (en) * | 2009-07-01 | 2010-09-09 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
EP2527563A3 (en) * | 2011-05-25 | 2014-01-15 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
AU2012200673B2 (en) * | 2011-02-11 | 2014-01-30 | Independent Ezy Access Pty Ltd | Barrier |
FR3006354A1 (en) * | 2013-05-28 | 2014-12-05 | Sateco Sa | FORMWORK BANK HAVING LOWER GUARD RAIL |
AU2010224325B2 (en) * | 2010-09-17 | 2016-09-08 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
GB2565057A (en) * | 2017-07-28 | 2019-02-06 | Tag Industrial Scaffolding Ltd | Advanced guardrail coupling system and its method of use |
GB2577863A (en) * | 2018-09-20 | 2020-04-15 | Sherwood Samuel | A scaffold barrier |
-
2001
- 2001-05-31 GB GB0113204A patent/GB0113204D0/en not_active Ceased
-
2002
- 2002-05-31 EP EP20020253881 patent/EP1262612A2/en not_active Withdrawn
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2887907A1 (en) * | 2005-06-30 | 2007-01-05 | Comabi Sa | Temporary balustrade for scaffolding of building, has frame made of aluminum, and fixation pins for positioning frame in one vertical plane situated in front of another vertical plane passing through posts during utilization of balustrade |
FR2923239A1 (en) * | 2007-11-02 | 2009-05-08 | Participations Soc Par Actions | Suspended scaffolding for wall of building, has support frame maintained on bracket in stable raised support position and slidingly mounted relative to bracket that forms guiding path of frame, in unlocked state of bracket |
DE102009007918A1 (en) * | 2009-02-06 | 2010-08-12 | Wilhelm Layher Verwaltungs-Gmbh | Leading railing device and method of assembly therefor |
EP2216465A3 (en) * | 2009-02-06 | 2011-08-10 | Wilhelm Layher Verwaltungs-GmbH | Lead rail device and method for fitting same |
AU2010100013B4 (en) * | 2009-07-01 | 2010-09-09 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
AU2010224325B2 (en) * | 2010-09-17 | 2016-09-08 | 4 Ken Pty Ltd | Temporary edge protection for scaffolding |
AU2012200673B2 (en) * | 2011-02-11 | 2014-01-30 | Independent Ezy Access Pty Ltd | Barrier |
EP2527563A3 (en) * | 2011-05-25 | 2014-01-15 | Harsco Infrastructure B.V. | Scaffolding and guard rail for use therein |
FR3006354A1 (en) * | 2013-05-28 | 2014-12-05 | Sateco Sa | FORMWORK BANK HAVING LOWER GUARD RAIL |
GB2565057A (en) * | 2017-07-28 | 2019-02-06 | Tag Industrial Scaffolding Ltd | Advanced guardrail coupling system and its method of use |
GB2565057B (en) * | 2017-07-28 | 2023-02-15 | Tag Industrial Scaffolding Ltd | Advanced guardrail coupling system and its method of use |
GB2577863A (en) * | 2018-09-20 | 2020-04-15 | Sherwood Samuel | A scaffold barrier |
Also Published As
Publication number | Publication date |
---|---|
GB0113204D0 (en) | 2001-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8196705B2 (en) | Safety scaffolding | |
US6422345B1 (en) | Dismountable facade scaffold | |
EP1262612A2 (en) | Temporary guard rail | |
US4782914A (en) | Safety guard rail for scaffolding | |
AU2014268090B2 (en) | Suspended scaffolding structure and connector therefor | |
AU2021424267B2 (en) | Arrangement of scaffolding components | |
US6722470B2 (en) | Anchorage adapter, systems and methods for use in fall protection | |
US20080264725A1 (en) | Hook-On Scaffold | |
CA2353355A1 (en) | Anchor clamp | |
JP2007327286A (en) | Fence and its construction method | |
US20030015696A1 (en) | Support for safety barrier | |
US6015028A (en) | Pump jack hoisting apparatus including a safety railing for protecting workers from accidental falling | |
CA2268946A1 (en) | Securing device for a supporting bar | |
AU2010100013A4 (en) | Temporary edge protection for scaffolding | |
US20210095484A1 (en) | Elevated walkway system and method | |
EP1700973B1 (en) | Ladder support bracket | |
CN102575477B (en) | Scaffolding system comprising a scaffolding element and method for erecting a scaffolding system | |
KR100559118B1 (en) | Working tower for a high place | |
US4858724A (en) | Safety fence for scaffolds | |
EP1867806A1 (en) | Removable protection for intermediate stages of scaffolding | |
KR200409977Y1 (en) | Hanger way bridge checking supporter | |
AU2010224325B2 (en) | Temporary edge protection for scaffolding | |
AU2008229925B2 (en) | A Scaffolding Arrangement and Method of Assembly | |
AU2021107218A4 (en) | Ladder platform system | |
RU2158813C1 (en) | Scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20041201 |