EP0989241B1 - Verfahren zum Herstellen eines Ortbetonpfahles im Boden - Google Patents
Verfahren zum Herstellen eines Ortbetonpfahles im Boden Download PDFInfo
- Publication number
- EP0989241B1 EP0989241B1 EP19980203265 EP98203265A EP0989241B1 EP 0989241 B1 EP0989241 B1 EP 0989241B1 EP 19980203265 EP19980203265 EP 19980203265 EP 98203265 A EP98203265 A EP 98203265A EP 0989241 B1 EP0989241 B1 EP 0989241B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- soil
- hole
- tubular rod
- head
- liquid material
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/36—Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
Definitions
- the present invention relates to a method for installing concrete piles in the soil, wherein a hole is made in the soil by forcing a soil displacement head, fixed to a tubular rod, into the soil thereby laterally displacing the soil, the tubular rod having a diameter smaller than the diameter of said hole so that a cavity is formed by the hole around the tubular rod, at least the tubular rod is withdrawn from the hole, and, when withdrawing the tubular rod, concrete is injected through this rod into the hole to form the concrete pile therein.
- the soil displacement head and the tubular rod can be rammed in the soil to make the required hole therein.
- the soil displacement head which is in fact a relatively simple base plate closing off the lowermost end of the tubular rod, is left in the ground and concrete is injected in the hole through the tubular rod. In this way a so-called ramming pile is formed.
- a problem of these methods for installing concrete piles according to the aforementioned method is that they may cause pollution of the underground, in particular of ground water layers.
- This problem arises especially in case the hole is to be made through different soil layers comprising a relatively water impermeable layer, for example a clay containing layer, covered by a permeable layer containing just above the water impermeable layer, a layer of polluted water. Since the water impermeable layer does not provide a sufficient bearing capacity, the pile has to extend through this layer into the bearing layer situated thereunder.
- This bearing layer is, however, permeable for water. Due to the fact that when making the hole, a hollow cavity is formed around the tubular rod, the polluted water can easily penetrate into the bearing layer which is normally not yet polluted. It is clear that a pollution of such deeper ground layers is to be avoided especially since they are often exploited for drinking-water winning.
- An object of the present invention is therefore to propose a new method of the above type which allows installing concrete piles in the soil whilst avoiding possible penetration of pollutants into deeper soil layers.
- the method according to the invention is characterized in that when forcing the soil displacement head into the soil and forming said cavity around the tubular rod, a liquid material is injected in this cavity, at the bottom thereof, to keep it filled with the liquid material from the soil displacement head upto the soil level.
- WO94/02687 and US-A-4 458 765 also discloses a method wherein a liquid material, in particular concrete, is injected at the bottom in said cavity but the injected concrete is subsequently immediately laterally displaced to reinforce the wall of the hole while this hole is still being made. At the level of a polluted water layer, the reinforced wall will quickly be penetrated by the polluted water, due to the hydrostatic pressure thereof, which water will then meet no further obstacle for flowing to the deeper soil layers.
- US-A-4 458 765 further also discloses a method wherein the cavity around the tubular rod is filled from the soil surface with concrete when the auger head is screwed in the soil.
- This concrete is not laterally displaced when screwing the auger head in the soil but instead when it is screwed out of the soil to form a hole with a reinforced wall therein.
- This method also does not solve the problem of polluted water penetrating to deeper soil layers since it has been found that, by feeding the concrete from the soil surface, the cavity cannot be filled sufficiently completely with concrete to prevent penetration of water to the deeper soil layers.
- water can penetrate through the wall of the formed hole and can subsequently easily flow therethrough to the deeper soil layers since the bottom end of this hole is even not covered with concrete.
- said liquid material has a specific weight and a viscosity higher than that of water.
- the liquid material will keep the cavity around the tubular rod filled down to the bottom thereof and cannot be urged upwards by penetration of water into this cavity. Due to the higher viscosity, local mixing of the liquid material with possibly polluted water is also prevented.
- said liquid material comprises an aqueous slurry of a clay, in particular of bentonite.
- Figure 1 shows schematically a side elevational view of a drill rig for installing concrete piles in the soil in accordance with the present invention.
- Figure 2 shows schematically the different steps for installing a pile in the soil by means of the drill rig shown in Figure 1 and in accordance with the method according to the invention.
- the drill rig or installation for installing concrete piles in the soil as illustrated in Figure 1 comprises a crane 1 with a vertical mast 2 provided with an auger motor 3 or drill table which is slidably mounted onto the mast 2.
- the motor 3 could also be fixed at the bottom of the mast 2.
- the installation further comprises a bentonite reclaiming unit 4, a bentonite mixing installation 5 and a bentonite pump 6.
- the different steps for installing a concrete pile in the soil are schematically shown in Figure 2.
- the illustrated soil shows three different soil layers, namely an incoherent top layer 7, a non-bearing, water impermeable intermediate layer 8, and a bearing layer 9.
- Such a soil profile is for example typical in polders raised by means of dredged materials, the original polder clay forming the intermediate layer 8. Due to contaminants present in the dredged materials or originating from the industry which has developed in these area's, a polluted water layer 10 is often situated on top of the water impermeable layer 8. A problem with such soils is that the polluted water may not be allowed to penetrate to deeper soil layers when installing concrete piles in the soil.
- a hole is made in the soil by forcing a soil displacement head 11, fixed to a tubular rod 12 in the soil so that the soil is displaced laterally over a distance larger than the diameter of the tubular rod 12.
- the soil displacement head is a soil displacement auger head 11 which comprises a screw blade 14 so that it can be screwed in and out of the soil.
- an additional push down force can further be exerted onto the drill table 3 to enhance the penetration of the auger head 11 into the soil.
- the illustrated auger head corresponds to the auger head disclosed in FR-A-2,215,075 and comprises a lower displacement body part 15 for displacing the soil when screwing in and an upper displacement body part 16 for displacing the soil again when screwing out.
- An other possible type of auger head is for example disclosed in WO95/12050, the description of which is incorporated herein by way of reference.
- the auger head 11 has been screwed according to arrows 17 over a certain distance into the top soil layer 7.
- a liquid material 18, preferably water-bentonite is injected at the bottom in the cavity 13 formed along the tubular rod or drill stem 12. In the illustrated embodiment, this is done through two ducts 19 welded or otherwise fixed along the outer side of the tubular rod 12. Alternatively, the ducts 19 could also be provided within the tubular rod 12, preferably integrated into the wall thereof in order not to hamper the possible later insertion of a reinforcement.
- the bentonite slurry is preferably injected so that the cavity is kept filled therewith up to the soil level.
- an enclosure 20 is placed around the tubular rod 12 on the soil surface and pushed somewhat in the soil to collect the possible excess of water-bentonite which could flow out of the hole.
- Figure 2b shows the situation wherein the hole has been drilled through the polluted water layer 10. As can be seen, no substantial amount of polluted water has entered the cavity 13 around the tubular rod 12. This can be explained by the fact that the injected water-bentonite has a somewhat higher specific weight than water so that it cannot be urged upwards by the water pressure and by the fact that it is relatively viscous so that the polluted water does not easily mix with the bentonite. In fact, in area's where the bentonite is not stirred, it will quickly form a kind of a rather solid cake.
- the auger head 11 When injecting the concrete, the auger head 11 is screwed out of the soil according to arrows 23, i.e. in opposite direction of arrows 17. However, in case use is made of an auger head 11 as disclosed in WO95/12050, the auger head could be rotated in the same direction as when screwing in.
- the bentonite slurry which has been injected into the cavity 13 is urged out of the hole when screwing the auger head 11 out and is gradually replaced by concrete.
- penetration of water in the hole is thus continuously avoided namely successively by the presence of the bentonite slurry around the tubular rod and subsequently by the concrete which entirely fills the hole.
- the bentonite slurry is mainly urged out of the hole to the soil surface and is collected there in the enclosure 20.
- the collected bentonite is pumped through a tubing 24 to the bentonite reclaiming unit 4 wherein sand and other coarse materials are filtered out.
- the reclaimed bentonite is then pumped through a tubing 25 to the bentonite mixing installation 5 wherein further dry bentonite and water may be added to compensate for the amount of bentonite which may be left in the soil.
- the bentonite mixture can be fed through an outlet 26 to the bentonite pump 6, which pumps the bentonite through a tubing 27 into the ducts 19.
- an injection ring 28 is provided on top of the tubular rod 12.
- This injection ring 28 has not been shown in detail but can easily be designed by a skilled person. It comprises for example a stationary annular space extending around the tubular rod 12 and comprising a fitting for connecting the tubing 27.
- the bottom of the annular space may consist of a disk, provided with a central opening for the tubular rod, which is rotatably mounted to the stationary part of the injection ring and which comprises two fittings for connecting the ducts 19.
- an aqueous slurry of bentonite was injected in the cavity 13 around the tubular rod 12.
- This slurry usually contains about 20 to 40 kg dry matter (bentonite) per cubic meter.
- bentonite which forms a relatively solid cake but which does not harden
- a hardening mixture in the cavity around the tubular rod 12, in particular a mixture comprising water, cement, sand and optionally gravel.
- preference is given to a grout containing water, cement and sand since such a grout can be injected through relatively narrow ducts 19 and substantially does not increase the frictional resistance against the tubular rod 12.
- a mixture of water, cement, sand and gravel i.e. a concrete, as hardening mixture
- this auger head When using a hardening mixture and a soil displacement auger head, this auger head has preferably a top portion provided for displacing this hardening mixture at least partially laterally into the soil during screwing out so that a pile with an increased bearing power is obtained.
- this bentonite is preferably removed as much as possible from the hole.
- the present invention is not only applicable to so-called screw piles but also to ramming piles.
- piles are in particular made by ramming a steel tube, which is closed off at its lowermost extremity, into the soil.
- the base plate or head used for closing the tube also displaces the soil laterally over a distance larger than the diameter of the tube so that, in this case also, a cavity is formed around the tube or tubular rod.
- one or more ducts 19 can also be provided along or within the tube or tubular rod 12 of a ramming pile for filling the cavity around this tube with a liquid material.
- This liquid material may also be bentonite slurry.
- this bentonite slurry will indeed be urged to the rod surface by the concrete poured through the tubular rod in the hole.
- preference is however given to the use of a hardening mixture, in particular of concrete, for filling the cavity.
- this hardening mixture has not to be displaced laterally in the soil when withdrawing the tubular rod and will form the outer portion of the pile.
- no separate injection ducts 19 have to be provided but it is sufficient to provide one or more openings underneath in the tubular rod so that the hardening mixture can be injected through the interior of the tubular rod itself.
- the liquid material which is injected in the cavity around the tubular rod should not necessarily be injected above the soil displacement head but could also be injected at the level of the soil displacement head itself, but then above the portion of this head showing the maximum diameter.
- the liquid material when injecting the liquid material below this maximum diameter, it has to be injected in the soil at a relatively high pressure so that this soil is disintegrated and mixed with the liquid material. Since this mixture is further laterally displaced, it will be difficult to obtain in this way an effective seal against penetration of the polluted water along the tubular rod into deeper layers.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Claims (9)
- Ein Verfahren zur Anbringung von Betonpfählen im Boden, wobei ein Loch in den Boden getrieben wird, indem ein Bodenverdrängungskopf (11), befestigt an einer Rohrstange (12), in den Boden getrieben wird, wodurch der Boden seitlich verdrängt wird, wobei die Rohrstange (12) einen Durchmesser hat, der geringer als der Durchmesser des erwähnten Loches ist, sodass ein Hohlraum (13) durch das Loch um die Rohrstange (12) geformt wird, zumindest wenn die Rohrstange (12) aus dem Loch gezogen ist, und, beim Herausziehen der Rohrstange (12) Beton durch diese Stange (12) in das Loch injiziert wird, um darin den Betonpfahl zu bilden, dadurch gekennzeichnet, dass, wenn der Bodenverdrängungskopf (11) in den Boden getrieben wird und der erwähnte Hohlraum (13) um die Rohrstange (12) gebildet wird, ein flüssiges Material (18) in diesen Hohlraum (13) injiziert wird, an dessen Boden, damit er mit dem flüssigen Material (18) vom Bodenverdrängungskopf (11) bis hinauf zum Bodenniveau gefüllt bleibt.
- Ein Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der erwähnte Bodenverdrängungskopf (11) ein Bodenverdrängungsbohrkopf ist und in den Boden geschraubt wird, um das erwähnte Loch zu machen.
- Ein Verfahren nach Anspruch 1, dadurch gekennzeichnet, dass der erwähnte Bodenverdrängungskopf (11) und die Rohrstange (12), an der der Bodenverdrängungskopf (11) befestigt ist, in den Boden gerammt werden.
- Ein Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass das flüssige Material (18), das in den erwähnten Hohlraum (13) injiziert wurde, beim Herausziehen der Rohrstange (12), zumindest teilweise aus dem Loch gedrängt wird.
- Ein Verfahren nach Anspruch 4, dadurch gekennzeichnet, dass das flüssige Material (18), das aus dem Loch gedrängt wird, auf der Bodenoberfläche gesammelt und bei der Anbringung eines weiteren Betonpfahls im Boden wiederverwendet wird.
- Ein Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass das erwähnte flüssige Material (18) ein spezifisches Gewicht und eine Viskosität hat, die höher als jene von Wasser sind.
- Ein Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass das erwähnte flüssige Material (18) einen wässrigen Schlamm eines Tons, insbesondere von Bentonit, umfasst.
- Ein Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass das erwähnte flüssige Material (18) eine aushärtende Mischung umfasst, insbesondere eine Mischung, die Wasser, Zement, Sand und optional Kies umfasst.
- Ein Verfahren nach Anspruch 8, dadurch gekennzeichnet, dass der erwähnte Bodenverdrängungskopf (11) ein Bodenverdrängungsbohrkopf ist, der in den Boden geschraubt wird, wenn das erwähnte Loch angelegt wird, und der aus dem Loch heraus geschraubt wird, wenn die Rohrstange (12) herausgezogen wird, wobei zumindest ein Teil der erwähnten aushärtenden Mischung (18) seitlich in den Boden gedrängt wird, wenn der Bodenverdrängungsbohrkopf aus dem Loch heraus geschraubt wird.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE69828604T DE69828604D1 (de) | 1998-09-24 | 1998-09-24 | Verfahren zum Herstellen eines Ortbetonpfahles im Boden |
EP19980203265 EP0989241B1 (de) | 1998-09-24 | 1998-09-24 | Verfahren zum Herstellen eines Ortbetonpfahles im Boden |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19980203265 EP0989241B1 (de) | 1998-09-24 | 1998-09-24 | Verfahren zum Herstellen eines Ortbetonpfahles im Boden |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0989241A1 EP0989241A1 (de) | 2000-03-29 |
EP0989241B1 true EP0989241B1 (de) | 2005-01-12 |
Family
ID=8234167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19980203265 Expired - Lifetime EP0989241B1 (de) | 1998-09-24 | 1998-09-24 | Verfahren zum Herstellen eines Ortbetonpfahles im Boden |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0989241B1 (de) |
DE (1) | DE69828604D1 (de) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2308095T3 (es) * | 2004-12-14 | 2008-12-01 | Bauer Maschinen Gmbh | Dispositivo y metodo para la produccion de un elemento de cimentacion. |
CN111395346A (zh) * | 2020-03-19 | 2020-07-10 | 广州市建筑科学研究院有限公司 | 一种溶洞灌注混凝土的施工方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH336337A (de) * | 1955-10-07 | 1959-02-15 | Mueller Ludwig | Verfahren zum Herstellen eines Rammpfahles mit Betonummantelung |
BE646386A (de) * | 1963-05-11 | 1964-07-31 | ||
FR2215075A6 (de) | 1973-01-19 | 1974-08-19 | Atlas France | |
US4180350A (en) * | 1978-03-30 | 1979-12-25 | Early California Industries, Inc. | Method for forming foundation piers |
GB2064627B (en) * | 1979-12-11 | 1983-09-21 | Piling Tech Ltd | Method of piling |
US4458765A (en) | 1982-05-12 | 1984-07-10 | Dnepropetrovsky Inzhenerno-Stroitelny Institut | Tool for forming a hole in macroporous compressible soil |
BE903965A (nl) | 1985-12-31 | 1986-04-16 | Coelus Gaspar Jozef | Apparaat en methode om boorpalen uit te voeren. |
NL9000865A (nl) * | 1990-04-12 | 1991-11-01 | Beheermaatschappij Verstraeten | Werkwijze voor het in de bodem aanbrengen van een funderingspaal met verbrede paalvoet. |
WO1994002687A1 (en) | 1992-07-24 | 1994-02-03 | Wagstaff Piling Pty. Ltd. | Apparatus and method for forming piles |
BE1007558A5 (nl) | 1993-10-28 | 1995-08-01 | Hareninvest | Grondverdringingsboorkop voor het vormen van palen in de grond. |
-
1998
- 1998-09-24 EP EP19980203265 patent/EP0989241B1/de not_active Expired - Lifetime
- 1998-09-24 DE DE69828604T patent/DE69828604D1/de not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
DE69828604D1 (de) | 2005-02-17 |
EP0989241A1 (de) | 2000-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7198434B2 (en) | Full-displacement pressure grouted pile system and method | |
KR930012067B1 (ko) | 토질처리 및 복수장비의 연속설치방법과 그 장치 | |
US8043028B2 (en) | Apparatus for providing a support column | |
KR101841250B1 (ko) | 토사 겔화에 의한 비배토 파일 시공 방법 | |
US6048137A (en) | Drilled, cast-in-place shell pile and method of constructing same | |
US5259702A (en) | Method for installation of an outer-cased piling | |
CN1206417C (zh) | 防水桩挡墙的成型方法 | |
US5697734A (en) | Method for forming a foundation pile in the ground utilizing a prefabricated pile shaft | |
JP4811176B2 (ja) | 既製杭の施工方法 | |
EP0989241B1 (de) | Verfahren zum Herstellen eines Ortbetonpfahles im Boden | |
US7429148B2 (en) | Method for making a foundation pile | |
JP3481508B2 (ja) | 石積擁壁補強方法 | |
JP4872561B2 (ja) | 既製杭の施工方法 | |
KR100564368B1 (ko) | 차수벽 시공을 위한 컨시스턴시 컴펙션 그라우팅 시스템 | |
JP5034581B2 (ja) | 地中構造の構築工法及びその工法で構築された地中構造物 | |
JPH10266196A (ja) | 杭及び鋼管杭の施工方法並びに鋼管杭 | |
JPH04185813A (ja) | ソイルセメント合成杭造成方法 | |
JP3760343B2 (ja) | 掘削底面安定化工法と地下建造物の構築法 | |
JP3673171B2 (ja) | コンクリート杭の沈設方法 | |
JPH086318B2 (ja) | 木杭の埋設方法 | |
US4027490A (en) | Self-sinking, axial passage foundation pile and method | |
JP4197074B2 (ja) | 埋込み杭施工装置 | |
JP2002097639A (ja) | 杭の埋設方法及び治具 | |
JP2000154540A (ja) | 埋込み杭、その施工方法、施工装置および埋込み杭用既成杭 | |
GB2358211A (en) | Method of forming piles using a continuous flight auger and a liner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE FR GB IT NL |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 20000920 |
|
AKX | Designation fees paid |
Free format text: BE DE FR GB IT NL |
|
17Q | First examination report despatched |
Effective date: 20020320 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR GB IT NL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT Effective date: 20050112 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 69828604 Country of ref document: DE Date of ref document: 20050217 Kind code of ref document: P |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050413 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050924 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
ET | Fr: translation filed | ||
26N | No opposition filed |
Effective date: 20051013 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20050924 |
|
BECN | Be: change of holder's name |
Owner name: *FRANKI FOUNDATIONS BELGIUM, EN ABREGE "F.F.B." Effective date: 20110909 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: TD Effective date: 20111025 Ref country code: NL Ref legal event code: SD Effective date: 20111025 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20110830 Year of fee payment: 14 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: TP Owner name: FRANKI FOUNDATIONS BELGIUM, BE Effective date: 20111116 Ref country code: FR Ref legal event code: CD Owner name: FRANKI FOUNDATIONS BELGIUM, BE Effective date: 20111116 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20110826 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20110915 Year of fee payment: 14 |
|
BERE | Be: lapsed |
Owner name: *FRANKI FOUNDATIONS BELGIUM, EN ABREGE "F.F.B." Effective date: 20120930 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: V1 Effective date: 20130401 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20130531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20121001 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130401 |