EP0584072A1 - Gas- und dampfturbinenanlage. - Google Patents
Gas- und dampfturbinenanlage.Info
- Publication number
- EP0584072A1 EP0584072A1 EP92900067A EP92900067A EP0584072A1 EP 0584072 A1 EP0584072 A1 EP 0584072A1 EP 92900067 A EP92900067 A EP 92900067A EP 92900067 A EP92900067 A EP 92900067A EP 0584072 A1 EP0584072 A1 EP 0584072A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steam
- gas
- turbine
- heat exchanger
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
- F01K23/103—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler
Definitions
- the invention relates to a gas and steam turbine system with a steam generator downstream of the gas turbine on the exhaust gas side for generating steam for the steam turbine in a water-steam cycle, the steam generator comprising a combustion system connected downstream of a coal mill.
- the invention is therefore based on the object of achieving the highest possible overall efficiency when retrofitting an existing steam turbine system with a gas turbine in all operating states.
- the aim is to enable existing modules to be used to the greatest possible extent.
- a first adjustable partial quantity of the exhaust gas cooled in a heat exchanger can be supplied as combustion air from the gas turbine of the combustion system, in that a second adjustable partial quantity of the cooled exhaust gas can be supplied to a heat exchanger for heating air for the coal mill and that a third adjustable subset of the cooled waste gases can be mixed with the flue gas flowing through the steam generator from the furnace.
- the heat exchanger or cooler through which the exhaust gas from the gas turbine flows is expediently switched into the water-steam circuit of the steam turbine.
- the exhaust gas from the gas turbine is advantageously cooled to the maximum temperature permitted in the design of the existing flue gas ducts of the steam turbine system.
- part of the air warmed up in the second heat exchanger can be fed to the first part of the cooled exhaust gas from the gas turbine.
- the air warmed up in the second heat exchanger can be mixed with cold air for the coal mill.
- the advantages achieved by the invention consist in particular in that, on the one hand, by cooling the exhaust gases from the gas turbine in a heat exchanger, overheating of already existing flue gas ducts of the steam turbine system is reliably avoided, and on the other hand, by dividing the cooled exhaust gases into controllable partial quantities additional use of the heat contained in the exhaust gases for the overall process and thus a high overall efficiency of the system is achieved regardless of the operating state.
- FIG. 1 shows a schematic illustration of a gas and steam turbine system with a division of the exhaust gases from the gas turbine into three controllable partial flows.
- the gas and steam turbine system comprises a steam generator 2 and a steam turbine 4 connected to a water-steam circuit 3 with a coupled generator 5 and a gas turbine 6 connected upstream of the steam generator 2 with a coupled generator 7.
- the steam generator 2 comprises a firing system 8 which is connected to a coal mill 10 via a fuel line 9.
- a condenser 15 and a pump 16 connected downstream of the condenser 15 and a preheater 17 arranged in the steam generator 2 are connected in the water-steam circuit 3 of the steam turbine 4, which is shown in simplified form.
- the preheater 17 is connected via a first branch 18, into which a valve 19 is connected, to a heat exchanger 20 heated by the hot exhaust gas a from the gas turbine 6.
- the preheater 17 is also connected via a second branch 22 to a heating device 24 arranged in the steam generator 2 in the region of a combustion chamber 23.
- the heat exchanger 20 is connected on the output side to the steam turbine 4 via a steam line 21.
- the heat exchanger 20 is connected on the primary side to an exhaust line 25 connected to the gas turbine 6.
- a first partial flow line 26 is connected to the exhaust line 25 and opens into the combustion system 8.
- the exhaust gas line 25 is also connected via a second partial flow line 27 to an inlet 2a of the steam generator 2.
- the exhaust gas line 25 also has a third partial flow line 28, into which a second heat exchanger 29 is connected.
- Flaps 30, 31 and 32 for example throttle valves or other control elements, are connected in the partial flow lines 26, 27 and 28. The flaps 30, 31 and 32 can be actuated by motors, not shown.
- the effluent from the gas turbine 6 hot exhaust gas A is cooled in heat exchanger 20 to about 400 * C, so that the walls of the heated as Rauch ⁇ gas channels formed partial flow lines 26, 27 and 28 is not more than 400 "C
- the exhaust gas a is divided into three adjustable subsets tl, t2 and t3.
- the partial quantity tl flowing via the partial flow line 26 is determined by the combustion system 8's need for combustion air, i. H . in particular depending on the operating state of the system.
- the air compressor 35 is connected to the partial flow line 26 via an air line 36 connected to the heat exchanger 29 on the secondary side. To set the required amount of air is in the air line
- the part of the exhaust gases a not required for the combustion system 8 is passed via the partial flow lines 27 and 28 on the one hand into the steam generator 2 and on the other hand via the second heat exchanger 29.
- the partial quantity t.3 of the exhaust gas a flowing via the partial flow line 27 is mixed with the flue gas r generated in the combustion system 8.
- the partial quantity t3 of the exhaust gas a and da s flue gas r leave the steam generator 2 via its outlet 2b and via a gas filter 40 in the direction of a chimney (not shown).
- the adjustable partial quantity t2 of the exhaust gas a conducted via the partial flow line 28 heats the air L flowing through the air line 36 in the heat exchanger 29 and is then mixed in with the flue gas r flowing out of the steam generator 2 behind the gas filter 40.
- the temperature of the air L for the coal mill 10 is adjusted by admixing an amount of cold air that can be adjusted by means of the flap 46 to the heated air L from the heat exchanger 29.
- the flue gas r from the combustion system 8 and the partial quantity t3 of the exhaust gas a flowing into the steam generator 2 via the partial flow line 27 serve to generate steam for the steam turbine 4.
- water from the condenser 15 is pumped into the flue gas r and pumped by the exhaust gas a preheater 17 and preheated there.
- the heated water flowing over the branch 22 is in the hot
- the superheated steam is fed to the steam turbine 4 via a steam line 50.
- the heated water flowing via the branch 18 is likewise evaporated and overheated in the heat exchanger 20 and fed to the steam turbine 4. There, the superheated steam is expanded and then condensed in the condenser 15.
- the gas turbine 6 Due to the inventive division of the cooled exhaust gases a from the gas turbine 6 into three adjustable subsets t1, t2 and t3, on the one hand the gas turbine 6 is decoupled from the requirements of the combustion system with regard to the amount of air required for different operating conditions. On the other hand, the steam generator 2 and thus the steam process can be operated independently of the load state of the gas turbine 6.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Air Supply (AREA)
Description
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4116065 | 1991-05-16 | ||
DE4116065A DE4116065A1 (de) | 1991-05-16 | 1991-05-16 | Gas- und dampfturbinenanlage |
PCT/DE1991/000952 WO1992020905A1 (de) | 1991-05-16 | 1991-12-06 | Gas- und dampfturbinenanlage |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0584072A1 true EP0584072A1 (de) | 1994-03-02 |
EP0584072B1 EP0584072B1 (de) | 1996-05-22 |
Family
ID=6431811
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP92900067A Expired - Lifetime EP0584072B1 (de) | 1991-05-16 | 1991-12-06 | Gas- und dampfturbinenanlage |
Country Status (7)
Country | Link |
---|---|
US (1) | US5367870A (de) |
EP (1) | EP0584072B1 (de) |
JP (1) | JP3231761B2 (de) |
DE (2) | DE4116065A1 (de) |
RU (1) | RU2090761C1 (de) |
UA (1) | UA27727C2 (de) |
WO (1) | WO1992020905A1 (de) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5673634A (en) * | 1992-11-17 | 1997-10-07 | Apparatebau Rothemuhle Brandt & Kritzler Gmbh | Incineration plant with heat exchanger |
ES2064242B1 (es) * | 1992-12-02 | 1997-09-01 | Ingenieria Y Promocion Ind S A | Sistema de regulacion de gases de escape de turbinas de gas en una caldera de recuperacion y caldera correspondiente. |
DE4304124C1 (de) * | 1993-01-23 | 1994-03-31 | Steinmueller Gmbh L & C | Verfahren zur Erzeugung von elektrischer Energie in einem Kombi-Kraftwerk und Kombi-Kraftwerk zur Durchführung des Verfahrens |
AT411183B (de) * | 1994-10-28 | 2003-10-27 | Ae Energietechnik Gmbh | Verfahren und kombikraftwerk zur thermischen leistungserhöhung |
DE19542917A1 (de) * | 1994-12-21 | 1996-06-27 | Abb Management Ag | Kombianlage mit konventionellem Wasser/Dampf-Kreislauf |
DE19626011A1 (de) * | 1996-06-28 | 1998-01-02 | Lentjes Kraftwerkstechnik | Kombinierte Gas-Dampf-Kraftanlage und Prozeß |
DE10001997A1 (de) | 2000-01-19 | 2001-07-26 | Alstom Power Schweiz Ag Baden | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes |
EP1174591A1 (de) * | 2000-07-21 | 2002-01-23 | Siemens Aktiengesellschaft | Verfahren zur Primärregelung mit einer kombinierten Gas- und Dampfturbinenanlage |
DE10225126B4 (de) * | 2001-06-13 | 2014-05-15 | Alstom Technology Ltd. | Verfahren zur Verfeuerung eines festen und/oder pastösen Brennstoffes sowie ein staubbefeuerter Dampferzeuger zur Durchführung des Verfahrens |
ITVE20090055A1 (it) * | 2009-10-02 | 2011-04-03 | Giovanni Parise | Aumento di efficienza degli impianti termoelettrici |
CN103170398A (zh) * | 2013-03-26 | 2013-06-26 | 上海理工大学 | 一种利用微电站余热的烘干破碎机系统 |
JP6351389B2 (ja) * | 2014-06-10 | 2018-07-04 | 大阪瓦斯株式会社 | 排気再燃システム |
US11319874B1 (en) * | 2020-10-30 | 2022-05-03 | Doosan Heavy Industries & Construction Co., Ltd. | Air supplying apparatus and method of hybrid power generation equipment |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2055385A (en) * | 1933-08-08 | 1936-09-22 | Bbc Brown Boveri & Cie | Pulverizing plant |
FR927969A (fr) * | 1946-04-26 | 1947-11-14 | Réchauffage de la vapeur en cours de détente dans une machine par les gaz d'échappement d'une machine thermique à gaz | |
US3095699A (en) * | 1958-12-18 | 1963-07-02 | Babcock & Wilcox Co | Combined gas-steam turbine power plant and method of operating the same |
GB904536A (en) * | 1960-04-08 | 1962-08-29 | Mini Of Mines & Technical Surv | Combined steam and gas turbine plant |
US3314231A (en) * | 1965-12-29 | 1967-04-18 | Combustion Eng | Steaming feedwater system utilizing gas turbine exhaust |
FR2030500A5 (de) * | 1969-01-31 | 1970-11-13 | Stein Industrie | |
CH528702A (de) * | 1970-09-08 | 1972-09-30 | Sulzer Ag | Abgasdampferzeuger |
DE2044619C3 (de) * | 1970-09-09 | 1975-01-09 | Bayer Ag, 5090 Leverkusen | Basische Azolindolin-Farbstoffe, Verfahren zu deren Herstellung und deren Verwendung zum Färben und Bedrucken von organischen Fasermaterialien |
JPH0678536B2 (ja) * | 1985-08-27 | 1994-10-05 | 三菱重工業株式会社 | コンバインドプラント |
ATE49627T1 (de) * | 1985-09-02 | 1990-02-15 | Siemens Ag | Kombiniertes gas- und dampfturbinenkraftwerk. |
-
1991
- 1991-05-16 DE DE4116065A patent/DE4116065A1/de not_active Withdrawn
- 1991-12-06 DE DE59107850T patent/DE59107850D1/de not_active Expired - Fee Related
- 1991-12-06 UA UA93002431A patent/UA27727C2/uk unknown
- 1991-12-06 RU RU9193058484A patent/RU2090761C1/ru active
- 1991-12-06 JP JP50027392A patent/JP3231761B2/ja not_active Expired - Fee Related
- 1991-12-06 WO PCT/DE1991/000952 patent/WO1992020905A1/de active IP Right Grant
- 1991-12-06 EP EP92900067A patent/EP0584072B1/de not_active Expired - Lifetime
-
1993
- 1993-11-16 US US08/153,181 patent/US5367870A/en not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
See references of WO9220905A1 * |
Also Published As
Publication number | Publication date |
---|---|
US5367870A (en) | 1994-11-29 |
RU2090761C1 (ru) | 1997-09-20 |
DE4116065A1 (de) | 1992-11-19 |
JP3231761B2 (ja) | 2001-11-26 |
WO1992020905A1 (de) | 1992-11-26 |
UA27727C2 (uk) | 2000-10-16 |
EP0584072B1 (de) | 1996-05-22 |
DE59107850D1 (de) | 1996-06-27 |
JPH06507459A (ja) | 1994-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE4333439C1 (de) | Vorrichtung zur Kühlmittelkühlung einer gekühlten Gasturbine einer Gas- und Dampfturbinenanlage | |
DE69127564T2 (de) | Kombiniertes Kraftwerk mit aufgeladener Wirbelschichtfeuerung sowie Verfahren zum Betrieb desselben | |
DE10041413B4 (de) | Verfahren zum Betrieb einer Kraftwerksanlage | |
DE4312072C5 (de) | Dampfkraftwerk mit Vorschaltgasturbine | |
EP0591163B1 (de) | Kombinierte gas- und dampfturbinenanlage | |
EP2067940B2 (de) | Verfahren zum Betrieb eines Kombikraftwerks sowie Kombikraftwerk zur Durchführung des Verfahrens | |
WO2006131283A2 (de) | Dampferzeugungsanlage und verfahren zum betreiben und nachrüsten einer dampferzeuganlage | |
WO1999019608A1 (de) | Gas- und dampfturbinenanlage und verfahren zum betreiben einer derartigen anlage | |
EP0584072A1 (de) | Gas- und dampfturbinenanlage. | |
EP1119688A1 (de) | Gas- und dampfturbinenanlage | |
EP0666412B1 (de) | Verfahren zur Kühlung von Kühlluft für eine Gasturbine | |
DE1526897C3 (de) | Gas-Dampfturbinenanlage | |
EP0515911A1 (de) | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage und entsprechende Anlage | |
CH708481A2 (de) | Kombinationszyklussystem. | |
EP0519304B1 (de) | Verfahren und Anlage zum Betreiben einer Gasturbine | |
EP1105624A1 (de) | Gas- und dampfturbinenanlage | |
EP0220510B1 (de) | Druckaufgeladen betreibbare Feuerung für einen Dampferzeuger | |
DE4025527C1 (en) | Steam boiler with economiser - incorporates combustion chamber with recirculation circuit | |
DE3419560A1 (de) | Verfahren zum betrieb einer gasturbinenanlage sowie anlage zur durchfuehrung des verfahrens | |
EP0650554B1 (de) | Verfahren zum betreiben einer gasturbine | |
DE69108024T2 (de) | Methode zur temperaturregelung der verbrennungsluft in einer wirbelschicht-verbrennungsanlage mit druckbeaufschlagung. | |
DE1247074B (de) | Dampfkrafterzeugungsanlage mit einem Kernreaktor als Waermequelle und einem Gasturbinenprozess fuer Spitzenlast | |
DE3833832A1 (de) | Verfahren zum betreiben einer waerme-kraft-anlage | |
EP0816642A2 (de) | Kombinierte Gas-Dampf-Kraftanlage und Prozess | |
DE2915031A1 (de) | Ingangsetzung eines verfahrens |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19930909 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FR GB SE |
|
17Q | First examination report despatched |
Effective date: 19950310 |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE FR GB SE |
|
REF | Corresponds to: |
Ref document number: 59107850 Country of ref document: DE Date of ref document: 19960627 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19960705 |
|
ET | Fr: translation filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19961223 Year of fee payment: 6 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY Effective date: 19971231 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20011206 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20011219 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20021206 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20021207 |
|
EUG | Se: european patent has lapsed | ||
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20080218 Year of fee payment: 17 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20090701 |