[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

EP0355240B1 - Train for renewing a railway track - Google Patents

Train for renewing a railway track Download PDF

Info

Publication number
EP0355240B1
EP0355240B1 EP88810568A EP88810568A EP0355240B1 EP 0355240 B1 EP0355240 B1 EP 0355240B1 EP 88810568 A EP88810568 A EP 88810568A EP 88810568 A EP88810568 A EP 88810568A EP 0355240 B1 EP0355240 B1 EP 0355240B1
Authority
EP
European Patent Office
Prior art keywords
train
car
mobile unit
renewal
new
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP88810568A
Other languages
German (de)
French (fr)
Other versions
EP0355240A1 (en
Inventor
Fritz Bühler
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scheuchzer SA
Original Assignee
Scheuchzer SA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheuchzer SA filed Critical Scheuchzer SA
Priority to DE8888810568T priority Critical patent/DE3876990D1/en
Priority to AT88810568T priority patent/ATE83814T1/en
Priority to EP88810568A priority patent/EP0355240B1/en
Priority to US07/385,891 priority patent/US4979247A/en
Priority to AU39458/89A priority patent/AU618831B2/en
Priority to DD89331830A priority patent/DD284068A5/en
Priority to JP1210805A priority patent/JPH02167901A/en
Publication of EP0355240A1 publication Critical patent/EP0355240A1/en
Application granted granted Critical
Publication of EP0355240B1 publication Critical patent/EP0355240B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Definitions

  • the subject of the present invention is a train for continuously renewing a railway track according to the preamble of claim 1 or 2.
  • Such a train is known from document GB-A 2 024 288.
  • This train comprises only one working unit formed by a railway wagon whose front end rests, in the working position, on the rear end of the chassis of a vehicle provided with guide rails for a gantry.
  • This gantry is intended to transport old and new sleepers.
  • the wagon is equipped with the elements to remove the old sleepers and lay the new sleepers as well as to remove the old rails and spread them laterally, as well as to lay the new rails that have been previously placed next to the track to be renewed.
  • the means for installing the new rails it is only mentioned in this document that there are guide members at the rear end of the chassis of the wagon, illustrated diagrammatically in FIG.
  • This renewal train as well as many other types of currently known trains generally consist of two wagons, one for the removal and the other for laying the track.
  • the two ends of the wagons facing each other rest on an intermediate bogie, the wheels of which are retractable and give way, in the working position, to a track capable of moving on the ballast; or else, in so-called "bridging" trains, the bogie is lifted and remains suspended.
  • the train according to the mentioned document is arranged to remove spans, that is to say assembled lengths, and not the sleepers and the rails separately.
  • the towing vehicle is loaded at the front end of the leading wagon, and in this position the gantry occupies not only the entire length of the leading wagon, but also part of the second wagon, which is unfavorable when running the train.
  • the train on the lead wagon of which the towing vehicle is loaded is advanced on the existing track until the lead wagon is at the height of the last existing rail.
  • a span is taken by the gantry and, while the train is immobilized, the towing vehicle is lowered on the ballast by means of the articulated arm, and moves in front of the train while causing in its movement the displacement of the gantry whose rear upright rolls on the guide rails until the entire span is above the location where it is to be laid.
  • the towing vehicle being immobilized on the ballast, the span is lowered onto the ballast and fixed to the rear span. During this time, the next span is brought to the lead wagon by said crane.
  • this train advances on the new laid span, so as to bring the gantry again over the entire length of the lead wagon above the next span to capture it and the operation is repeated.
  • the laying operation is not done continuously, but step by step, the train or the tractor moving alternately.
  • this train only comprises cranes or gantry cranes for transporting the spans of the storage wagons forwards, but there is no question of specific installations for handling the sleepers or the rails.
  • the purpose of the present invention is to produce a new renewal train making it possible to size, from case to case, the work units, to reduce the length of the work units in the running position with the least amount of effort, as well as to significantly reduce the weight of the machine.
  • This renewal train has the advantage of reducing the length of the work units to that of a single wagon, and of making it possible to adapt the size of the elements of the mobile unit to the working conditions and efforts, which allows to escape the demands placed on a railway car.
  • the mobile unit which comprises means for laying the new rails and is constituted by a mobile beam whose ends bear respectively on the deposit wagon and on a train auxiliary bearing.
  • the renewal train comprises a railway wagon 1 constituting the deposition unit and which moves on the track according to arrow F.
  • This wagon consists of a chassis provided at its rear end 11 with a two-axle bogie 3 whose wheels are retractable and between which is mounted a chassis with self-propelled tracks 2 also retractable.
  • the anterior end, devoid of a bogie, rests on the storage vehicle 12 for the sleepers, the vehicle to which it is articulated. This facilitates compliance, in curves, with the free passage template.
  • the tracked chassis 2 In the working position ( Figure 1), the tracked chassis 2 is lowered by hydraulic means to roll on the ballast, while the wheels of the bogie 3 are lifted. In the high walking position ( Figure 2), the wheels of the bogie 3 are lowered and roll on the rails R while the tracked chassis 2 is lifted.
  • the mobile laying unit 17 disposed at the rear of the train is built in a convertible manner between a working state and a resting state with a view to walking high.
  • the working state Figure 1
  • the front end of the mobile laying unit 17 is supported by a train 22 on the rear end 11 of wagon 1, while its rear end moves on the rails R2 of the renewed track by relying on a rolling support constituted in this case by a train of rollers 24 mounted by means of an upright 25 (FIG. 4) which can be lifted vertically and which is constituted, in the example considered, by telescopic cylinders 25a, 25b, 25c.
  • the mobile unit 17 is formed of a laying beam 18 supported at its front end by a transverse frame 18a (FIG. 3) fixed to the train of rollers 22, resting on the raceway 5 and , at its rear end, by the upright 25 fixed to the roller train 24. From this beam 18 are suspended, by movable arms 19a, roller clamps 19 for the rails, controlled by jacks, and making it possible to lift and center the new rails R2, as well as a known installation 21, for the installation of the new crosspieces T2.
  • the beam 18 is dimensioned only for lifting the new rails.
  • FIG. 5 schematically shows, in a transverse plane, an exemplary embodiment of the arrangement of the suspension of the rail clamps on the beam 18.
  • the arrangement of the elements is suspended from a shaft 35 housed under the beam , shaft which can pivot about an axis 39 perpendicular to the longitudinal direction of the beam, this axis 39 is also visible in FIG. 1.
  • a shaft 35 housed under the beam
  • shaft which can pivot about an axis 39 perpendicular to the longitudinal direction of the beam, this axis 39 is also visible in FIG. 1.
  • At this shaft 35 are articulated two symmetrical jacks 36 provided at their lower end with an arm 19a carrying the roller clamps 19 for the rails, and to adjust these rail clamps in the lateral direction, there are two other cylinders 37 articulated on the one hand on a central rod 38 fixed to the shaft 35 and on the other leaves at the lower end of the jacks 36.
  • the two roller clamps 19 for the rails can be adjusted in height by the jacks 36 and in the lateral direction by the jacks 37.
  • This shaft 35, pivoting about the axis 39, allows, in rest position, tilt the arrangement upwards, as shown in Figure 2.
  • the rear roller train 24 forming the rolling support as well as the rail clamps 19 are pulled by cables 20, to unload the load-bearing construction of the beam 18.
  • the cables 20 By pulling the roller train 24 as well as the clamps with rails 19 carrying the rails, by means of the cables 20, the force of the torque exerted on the beam 18 is reduced or avoided by all the loads that it supports. Consequently, these cables allow the mobile unit to be made in a lighter construction.
  • the installation installation is lifted 21 and the rail clamps 19 and the unit 17 is moved to the left, according to FIG. 1, on the wagon 1 by making roll the rollers 22 on the raceway 5.
  • the auxiliary roller train 23, fixed to the beam 18, supports the mobile unit 17 at the rear end, for walking up and down.
  • the mobile unit 17 is fully loaded on the wagon 1, the jacks 25a to 25c making it possible to lift the train of rollers 24 at the rear end.
  • the operation of the renewal train is as follows: at the start of construction, the mobile unit 17 is moved back and the roller train 24 is lowered using jacks 25a to 25c and centered on the track. Then, the installation 21 for laying the new sleepers is put into the working position.
  • the renewal begins: while the train is advancing continuously, the old rails R1, after dismantling their fasteners to the crosspieces at station 15 located on the storage vehicle 12, are removed using the rail clamps 6 , and the old sleepers T1 are dismantled one by one by the installation 7 comprising, in general, a sort of fork which lifts the sleepers on the conveyor 8, which conveys them on the storage conveyor 14 of the storage vehicle 12 by 1 'intermediary of the other transporter 8a. Behind the removal installation, the platform is leveled and, if necessary, lowered using the cutter 9.
  • new crossmembers T2 for example thirty, are brought from one of the transport vehicles 16 situated at the head of the train and they are unloaded onto the transporter 10.
  • the new sleepers T2 are placed one by one through the installation 21.
  • the new rails R2, previously deposited on each side of the old track, are lifted, centered and placed, by means of rail clamps 19, on the new crosspieces T2. This work is repeated while the train advances continuously and the roller train 24 rolls on the new rails R2.
  • the rolling support of the mobile laying unit 17 can be constructed in different ways.
  • the rear end of the beam 18 is supported, via a hinge 18b, for example a turntable, on a rail vehicle 26, while that its front end rests, as in the previous embodiment, on a roller train 22 which rolls on the raceway 5 of the wagon 1.
  • the rail vehicle 26 is mounted on two axles 27 and is coupled, in walking position upside down, in wagon 1.
  • Roller clamps 19 also hang from the beam 18 for the rails and the installation 21 for laying new sleepers T2.
  • the other elements of wagon 1 are the same as in the previous embodiment.
  • the railway vehicle 26 can be equipped with work places for mounting the fastenings of the new rails and can also be used as a material transport vehicle.
  • the rear end of the beam 18 is supported, by means of a hinge 31, on a bissel 28 provided with a fixed axle 29 and a movable auxiliary axle 30 which can be lowered in the working position and raised in the running position up front, in which it is coupled to the chassis of the wagon 1, as indicated in lines mixed in Figure 7.
  • the unit 17 comprises a mobile laying beam formed by three telescopic elements 32, 32a, 32b, beam whose front element 32 is suspended and slides in a frame 33 mounted at the tail of the chassis 1a of wagon 1, while the rear end of the last element 32b is supported, by means of an upright 25 composed of jacks, as illustrated in FIG. 1, on a train of rollers 24 as a rolling support which can be lifted in the running position upward.
  • This train of rollers 24 could also be replaced by a railway vehicle or by a dolly as described above.
  • this telescopic beam are suspended roller clamps 19 for the rails by means of the arms 19a and jacks 36, and an installation for installing the new cross members T2.
  • the installation installation of new sleepers is formed of two parts, namely a vertical conveyor 21a and a sleeper 21b.
  • the vertical conveyor 21a is suspended in a flexible manner on the first element 32 of the telescopic beam while the cross-member 21b is mounted tiltable or removable at the rear end of the wagon 1.
  • the other elements are the same as in the first embodiment and bear the same references.
  • the installation for laying the new sleepers is entirely mounted on the beam 18 or is completely mounted at the end of the wagon 1.
  • the laying unit only serves to center the new rails and is discharged from the laying installation.
  • the variants which have just been mentioned with regard to the installation of installation can also apply to the embodiment according to FIG. 1, namely that instead of being mounted on the beam, this installation of installation could be mounted completely at the end of wagon 1, or partly on the wagon and partly on the beam.
  • this installation is placed in the transport position, for example, using hydraulic cylinders making it possible to lift and rotate the various parts.
  • the rolling support formed by a train of rollers 24 is lifted by means of the jack 25 and is, in the rest state, entirely on the wagon 1, without that no element protrudes beyond the rear end thereof.
  • the vertical conveyor 21a is placed in an approximately horizontal position below the element 32 while the cross-member 21b is tilted on the chassis 1a of wagon 1 or dismantled and placed on this wagon. It is not absolutely necessary that nothing protrude from the rear side of the frame 33, but nothing must protrude from the rear end of the wagon 1.
  • the storage vehicle 12 is used to store the new sleepers which will have to be transported on the adjacent laying wagon while the dismantled sleepers are transported by the gantry to a transport vehicle 16.
  • this rolling support can also be used for dismantling the fixing of the rails to the head of the train.
  • the invention is not limited to the embodiments described but can have many variants.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)

Abstract

The train comprises transport vehicles (16) for the new (T1) and old (T2) ties, followed by a storage vehicle (12) for the ties, a railroad car (1) as a dismantling car, articulated to the storage vehicle (12), and a laying unit (17) constructed in a manner such as to be mobile between a working state and a state of rest when running light. When working, this mobile unit (17) bears at one end on the car (1), for example via a wheel gear (22), and at the other end on a running support (24) which moves on the new track (R2). In the state of rest, the mobile unit (17) is moved and loaded onto the car (1), the running support (24) being retracted. The running support can also be formed by a railroad vehicle (26) or by a bissel truck (28), coupled to the car when running light.

Description

La présente invention a pour objet un train pour renouveler de façon continue une voie de chemin de fer selon le préambule de la revendication 1 ou 2.The subject of the present invention is a train for continuously renewing a railway track according to the preamble of claim 1 or 2.

Un tel train est connu du document GB-A 2 024 288. Ce train ne comporte qu'une seule unité de travail formée par un wagon de chemin de fer dont l'extrémité avant s'appuie, en position de travail, sur l'extrémité arrière du châssis d'un véhicule muni de rails de guidage pour un portique. Ce portique est destiné à transporter les anciennes et les nouvelles traverses. Le wagon est muni des éléments pour déposer les anciennes traverses et poser les nouvelles traverses ainsi que pour enlever les anciens rails et les écarter latéralement, ainsi que pour poser les nouveaux rails qui ont été préalablement placés à côté de la voie à renouveler. En ce qui concerne les moyens pour poser les nouveaux rails, on mentionne seulement dans ce document qu'il y a des organes de guidage à l'extrémité arrière du châssis du wagon, illustrés schématiquement sur la figure 1, pour guider les nouveaux rails qui doivent être descendus sur les nouvelles traverses déjà déposées derrière le train. Cependant, des moyens de préhension, tels que des pinces à rails habituellement nécessaires pour lever et positionner les rails d'une manière précise, ainsi que la disposition de ces moyens, ne sont pas décrits, ni illustrés. De toute manière, la caractéristique essentielle de ce train connu est que tous les moyens pour manipuler les anciennes et les nouvelles traverses ainsi que les anciens et les nouveaux rails, sont montés sur un seul wagon de travail qui, pour cette raison, doit être assez long et lourd.Such a train is known from document GB-A 2 024 288. This train comprises only one working unit formed by a railway wagon whose front end rests, in the working position, on the rear end of the chassis of a vehicle provided with guide rails for a gantry. This gantry is intended to transport old and new sleepers. The wagon is equipped with the elements to remove the old sleepers and lay the new sleepers as well as to remove the old rails and spread them laterally, as well as to lay the new rails that have been previously placed next to the track to be renewed. With regard to the means for installing the new rails, it is only mentioned in this document that there are guide members at the rear end of the chassis of the wagon, illustrated diagrammatically in FIG. 1, to guide the new rails which must be lowered onto the new sleepers already placed behind the train. However, gripping means, such as rail clamps usually necessary for lifting and positioning the rails in a precise manner, as well as the arrangement of these means, are not described or illustrated. In any case, the essential characteristic of this known train is that all the means for handling the old and the new sleepers as well as the old and the new rails, are mounted on a single working wagon which, for this reason, must be enough long and heavy.

Un autre train de renouvellement est décrit, par exemple, dans le brevet CH-585 814. Ce train de renouvellement ainsi que beaucoup d'autres types de trains connus actuellement se composent en général de deux wagons, l'un pour la dépose et l'autre pour la pose de la voie. Les deux extrémités des wagons qui se font face s'appuient sur un boggie intermédiaire dont les roues sont escamotables et font place, en position de travail, à une chenille apte à se déplacer sur le ballast; ou alors, dans les trains dits à "arc-boutement", le boggie est levé et reste suspendu.Another renewal train is described, for example, in patent CH-585 814. This renewal train as well as many other types of currently known trains generally consist of two wagons, one for the removal and the other for laying the track. The two ends of the wagons facing each other rest on an intermediate bogie, the wheels of which are retractable and give way, in the working position, to a track capable of moving on the ballast; or else, in so-called "bridging" trains, the bogie is lifted and remains suspended.

Le train selon le document mentionné est disposé pour enlever des travées, c'est à dire des longueurs montées, et non les traverses et les rails séparément.The train according to the mentioned document is arranged to remove spans, that is to say assembled lengths, and not the sleepers and the rails separately.

Ces trains de renouvellement permettent d'effectuer toutes les opérations simultanément, c'est-à-dire une fois que les fixations des rails aux traverses ont été démontées, de soulever et d'écarter les anciens rails au moyen de pinces, de déposer les anciennes traverses et de les acheminer sur un wagon de transport, de poser les nouvelles traverses, l'une après l'autre, par l'intermédiaire du deuxième wagon, ces nouvelles traverses étant stockées sur un wagon de transport et, après la mise en place des nouvelles traverses, de poser les nouveaux rails qui ont été préalablement déposés en attente de chaque côté de l'ancienne voie. Pour transporter les nouvelles traverses à l'endroit de travail et enlever les anciennes traverses, on utilise généralement des portiques qui peuvent se déplacer sur des chemins de roulement continus disposés sur les deux wagons de travail et sur les véhicules de transport, ainsi que des transporteurs à chaîne.These renewal trains make it possible to carry out all the operations simultaneously, that is to say once the fastenings of the rails to the sleepers have been dismantled, to lift and spread the old rails by means of pliers, to deposit the old sleepers and transport them on a transport wagon, to lay the new sleepers, one after the other, via the second wagon, these new sleepers being stored on a transport wagon and, after placing place new sleepers, lay the new rails that have been previously deposited waiting on each side of the old track. To transport the new sleepers to the work place and remove the old sleepers, gantries are generally used which can move on continuous tracks arranged on the two work wagons and on the transport vehicles, as well as transporters chain.

Les trains actuels, avec les deux wagons de dépose et de pose, nécessitent des châssis relativement lourds et surdimensionnés quant à la charge de travail. En outre, la longueur de la machine en position de marche haut le pied est déterminée par la longueur du tronçon travaillé, laquelle peut être considérable.Current trains, with the two removal and installation wagons, require relatively heavy and oversized chassis in terms of workload. In addition, the length of the machine in the running position with the foot up is determined by the length of the section worked, which can be considerable.

D'autre part, on connait des trains de pose et/ou de dépose de longueurs montées de voie ferrée (ou travées). Selon le brevet CH-A 569 839, un tel train de pose est composé de plusieurs wagons munis de rails de guidage sur lesquels peut se déplacer une grue transportant les travées. Le wagon situé en tête de train est en outre muni d'un grand portique dont la portée correspond à la longueur d'une travée. Le montant antérieur de ce portique est fixé, par l'intermédiaire d'un bras articulé, au châssis d'un véhicule tracteur qui peut se trouver chargé sur le wagon de tête ou descendu sur le ballast en avant de ce wagon de tête. Pendant la marche haut-le-pied, le véhicule tracteur est chargé à l'extrémité avant du wagon de tête, et dans cette position le portique occupe non seulement toute la longueur du wagon de tête, mais aussi également une partie du deuxième wagon, ce qui est défavorable lors de la circulation du train. Au début des travaux de pose, le train sur le wagon de tête duquel est chargé le véhicule tracteur, est avancé sur la voie existante jusqu'à ce que le wagon de tête se trouve à la hauteur du dernier rail existant. Une travée est prise par le portique et, pendant que le train est immobilisé, le véhicule tracteur est descendu sur le ballast au moyen du bras articulé, et se déplace en avant du train en entrainant dans son mouvement le déplacement du portique dont le montant arrière roule sur les rails de guidage jusqu'à ce que toute la travée se trouve au dessus de l'emplacement où elle doit être posée. Puis, le véhicule tracteur étant immobilisé sur le ballast, la travée est descendue sur le ballast et fixée à la travée arrière. Pendant ce temps, la travée suivante est amenée sur le wagon de tête par ladite grue.On the other hand, there are known trains for laying and / or depositing mounted lengths of railroad tracks (or spans). According to patent CH-A 569 839, such a laying train is composed of several wagons provided with guide rails on which a crane carrying the spans can move. The wagon located at the head of the train is also provided with a large gantry crane whose span corresponds to the length of a span. The front upright of this gantry is fixed, by means of an articulated arm, to the chassis of a towing vehicle which may be loaded on the lead wagon or lowered onto the ballast in front of this lead wagon. During the hitchhike, the towing vehicle is loaded at the front end of the leading wagon, and in this position the gantry occupies not only the entire length of the leading wagon, but also part of the second wagon, which is unfavorable when running the train. At the start of the laying works, the train on the lead wagon of which the towing vehicle is loaded is advanced on the existing track until the lead wagon is at the height of the last existing rail. A span is taken by the gantry and, while the train is immobilized, the towing vehicle is lowered on the ballast by means of the articulated arm, and moves in front of the train while causing in its movement the displacement of the gantry whose rear upright rolls on the guide rails until the entire span is above the location where it is to be laid. Then, the towing vehicle being immobilized on the ballast, the span is lowered onto the ballast and fixed to the rear span. During this time, the next span is brought to the lead wagon by said crane.

Ensuite, tandis que le véhicule tracteur reste toujours immobile, le train avance sur la nouvelle travée posée, de manière à amener le portique de nouveau sur toute la longueur du wagon de tête au dessus de la travée suivante pour la saisir et l'opération est répétée. Avec ce train, l'opération de pose ne se fait pas d'une manière continue, mais pas à pas, le train ou le véhicule tracteur avançant alternativement. D'autre part, ce train ne comporte que des grues ou des portiques pour transporter des travées des wagons de stockage vers l'avant, mais il n'est pas question d'installations particulières pour manipuler les traverses ou les rails.Then, while the towing vehicle still remains stationary, the train advances on the new laid span, so as to bring the gantry again over the entire length of the lead wagon above the next span to capture it and the operation is repeated. With this train, the laying operation is not done continuously, but step by step, the train or the tractor moving alternately. On the other hand, this train only comprises cranes or gantry cranes for transporting the spans of the storage wagons forwards, but there is no question of specific installations for handling the sleepers or the rails.

La présente invention a pour but de réaliser un nouveau train de renouvellement permettant de dimensionner, de cas en cas, les unités de travail, de réduire la longueur des unités de travail en position de marche haut le pied, ainsi que de réduire notablement le poids de la machine.The purpose of the present invention is to produce a new renewal train making it possible to size, from case to case, the work units, to reduce the length of the work units in the running position with the least amount of effort, as well as to significantly reduce the weight of the machine.

Ce but est atteint par la clause caractérisante des revendications 1 ou 2.This object is achieved by the characterizing clause of claims 1 or 2.

Ce train de renouvellement présente l'avantage de réduire la longueur des unités de travail à celle d'un seul wagon, et de permettre d'adapter la dimension des éléments de l'unité mobile aux conditions et aux efforts de travail, ce qui permet d'échapper aux exigences imposées à un wagon de chemin de fer.This renewal train has the advantage of reducing the length of the work units to that of a single wagon, and of making it possible to adapt the size of the elements of the mobile unit to the working conditions and efforts, which allows to escape the demands placed on a railway car.

Selon une forme d'exécution préférée de l'invention, c'est l'unité mobile qui comporte des moyens de pose des nouveaux rails et est constituée par une poutre mobile dont les extrémités prennent appui respectivement sur le wagon de dépose et sur un train de roulement auxiliaire.According to a preferred embodiment of the invention, it is the mobile unit which comprises means for laying the new rails and is constituted by a mobile beam whose ends bear respectively on the deposit wagon and on a train auxiliary bearing.

Des formes d'exécution avantageuses de l'invention sont décrites dans les revendications dépendantes.Advantageous embodiments of the invention are described in the dependent claims.

Ci-dessous, l'invention est exposée plus en détail à l'aide des dessins annexés dans lesquels :

  • La figure 1 est une vue en élévation schématique d'une première forme d'exécution du train de renouvellement, en position de travail, où le wagon 1 est l'unité de dépose et où l'élément 17 est l'unité mobile de pose, dont l'extrémité arrière s'appuie sur les nouveaux rails par l'intermédiaire d'un train de galets comme support roulant.
  • La figure 2 représente le wagon et l'unité mobile de pose, selon la figure 1, en position de marche haut le pied.
  • La figure 3 est une coupe transversale selon III-III de la figure 1.
  • La figure 4 est une coupe transversale selon IV-IV de la figure 1.
  • La figure 5 montre schématiquement la suspension des pinces à rails, commandées par des vérins et basculables vers le haut.
  • La figure 6 représente une deuxième forme d'exécution du support roulant pour l'extrémité arrière de l'unité mobile de pose, constitué par un véhicule ferroviaire.
  • La figure 7 représente une troisième forme d'exécution du support roulant, constitué par un bissel avec un essieu auxiliaire.
  • La figure 8 représente une quatrième forme d'exécution du train de renouvellement, avec une autre conception de l'unité mobile de pose, sous forme d'une unité télescopique.
  • La figure 9 représente le train selon la figure 8 dans l'état rétracté.
Below, the invention is explained in more detail using the appended drawings in which:
  • Figure 1 is a schematic elevational view of a first embodiment of the renewal train, in the working position, where the wagon 1 is the removal unit and where the element 17 is the mobile installation unit , whose rear end rests on the new rails via a roller train as a rolling support.
  • FIG. 2 represents the wagon and the mobile laying unit, according to FIG. 1, in the running position with the top of the foot.
  • Figure 3 is a cross section along III-III of Figure 1.
  • Figure 4 is a cross section along IV-IV of Figure 1.
  • FIG. 5 schematically shows the suspension of the rail clamps, controlled by jacks and tiltable upwards.
  • FIG. 6 represents a second embodiment of the rolling support for the rear end of the mobile laying unit, constituted by a railway vehicle.
  • Figure 7 shows a third embodiment of the rolling support, consisting of a dolly with an auxiliary axle.
  • FIG. 8 represents a fourth embodiment of the renewal train, with another design of the mobile laying unit, in the form of a telescopic unit.
  • Figure 9 shows the train according to Figure 8 in the retracted state.

Selon la première forme d'exécution illustrée aux figures 1 à 4, le train de renouvellement comprend un wagon de chemin de fer 1 constituant l'unité de dépose et qui se déplace sur la voie selon la flèche F. Ce wagon se compose d'un châssis la muni, à son extrémité postérieure 11, d'un boggie à deux essieux 3 dont les roues sont escamotables et entre lesquelles est monté un châssis à chenilles automotrices 2 aussi escamotables. L'extrémité antérieure, dépourvue de boggie, s'appuie sur le véhicule de stockage 12 des traverses, véhicule auquel elle est articulée. Cela facilite le respect, dans les courbes, du gabarit de libre passage.According to the first embodiment illustrated in Figures 1 to 4, the renewal train comprises a railway wagon 1 constituting the deposition unit and which moves on the track according to arrow F. This wagon consists of a chassis provided at its rear end 11 with a two-axle bogie 3 whose wheels are retractable and between which is mounted a chassis with self-propelled tracks 2 also retractable. The anterior end, devoid of a bogie, rests on the storage vehicle 12 for the sleepers, the vehicle to which it is articulated. This facilitates compliance, in curves, with the free passage template.

Dans la position de travail (figure 1), le châssis à chenilles 2 est abaissé par des moyens hydrauliques pour rouler sur le ballast, pendant que les roues du boggie 3 sont levées. En position de marche haut le pied (figure 2), les roues du boggie 3 sont abaissées et roulent sur les rails R tandis que le châssis à chenilles 2 est levé.In the working position (Figure 1), the tracked chassis 2 is lowered by hydraulic means to roll on the ballast, while the wheels of the bogie 3 are lifted. In the high walking position (Figure 2), the wheels of the bogie 3 are lowered and roll on the rails R while the tracked chassis 2 is lifted.

Le wagon de dépose 1 est pourvu:

  • d'un chemin de roulement 5 pour
  • un portique automoteur 4 ayant une poutre de levage 4a munie de pinces pour saisir, lever et transporter des traverses;
  • de pinces à rails 6 pour le levage et l'écartement des anciens rails R1;
  • d'une installation de dépose 7 des anciennes traverses T1;
  • de plusieurs transporteurs mis à la file, par exemple 8, 8a (figure 1), pour acheminer les anciennes traverses T1 de l'installation 7 sur le transporteur 14 qui se trouve sur le véhicule de stockage 12 où elles sont stockées;
  • d'une fraise 9 pour l'égalisation de la banquette;
  • de plusieurs transporteurs 10, 10a (figure 2), mis à la file, pour les nouvelles traverses T2.
Drop car 1 is provided with:
  • of a raceway 5 for
  • a self-propelled gantry 4 having a lifting beam 4a provided with grippers for gripping, lifting and transporting sleepers;
  • rail clamps 6 for lifting and spacing old R1 rails;
  • a removal installation 7 of the old T1 sleepers;
  • several conveyors queued, for example 8, 8a (FIG. 1), for routing the old sleepers T1 of the installation 7 to the conveyor 14 which is located on the storage vehicle 12 where they are stored;
  • a cutter 9 for leveling the bench;
  • several conveyors 10, 10a (FIG. 2), queued, for the new T2 sleepers.

Sur les figures, seulement deux transporteurs 8, 8a et 10, 10a ont été représentés, mais en réalité leur nombre peut varier en fonction des besoins.In the figures, only two transporters 8, 8a and 10, 10a have been shown, but in reality their number may vary according to needs.

A la tête du véhicule de stockage 12 se trouvent des véhicules de transport dont seulement un, 16, est indiqué sur la figure 1, accouplé au véhicule de stockage 12. Tous ces véhicules 12, 16 sont également munis du chemin de roulement continu prolongeant celui, 5, qui est installé sur le wagon 1 pour que le portique 4 puisse se déplacer le long du wagon et de ces véhicules.At the head of the storage vehicle 12 are transport vehicles of which only one, 16, is indicated in FIG. 1, coupled to the storage vehicle 12. All these vehicles 12, 16 are also provided with the continuous raceway extending that , 5, which is installed on the wagon 1 so that the gantry crane 4 can move along the wagon and these vehicles.

Le véhicule de stockage 12 des anciennes traverses T1 articulé à l'avant du wagon de dépose 1, considéré dans le sens de la marche, repose sur deux boggies 13 à moteur et est équipé d'un transporteur de stockage 14 des anciennes traverses, de places de travail 15 pour le démontage des fixations des rails, ainsi que du groupe d'entraînement du portique automoteur 4 permettant la prise et le transport de plusieurs traverses, par exemple trente traverses.The storage vehicle 12 of the old sleepers T1 articulated at the front of the deposit wagon 1, considered in the direction of travel, rests on two bogies 13 with motor and is equipped with a storage transporter 14 of the old sleepers, of working places 15 for dismantling the rail fasteners, as well as the drive unit of the self-propelled gantry 4 allowing the taking and transport of several sleepers, for example thirty sleepers.

L'unité mobile de pose 17 disposée à l'arrière du train est construite de façon convertible entre un état de travail et un état de repos en vue de la marche haut le pied. A l'état de travail (figure 1), l'extrémité antérieure de l'unité mobile de pose 17 s'appuie par un train 22 sur l'extrémité arrière 11 du wagon 1, tandis que son extrémité postérieure se déplace sur les rails R2 de la voie renouvelée en s'appuyant sur un support roulant constitué dans ce cas par un train de galets 24 monté par l'intermédiaire d'un montant 25 (figure 4) qui peut être levé verticalement et qui est constitué, dans l'exemple considéré, par des vérins 25a, 25b, 25c télescopiques.The mobile laying unit 17 disposed at the rear of the train is built in a convertible manner between a working state and a resting state with a view to walking high. In the working state (Figure 1), the front end of the mobile laying unit 17 is supported by a train 22 on the rear end 11 of wagon 1, while its rear end moves on the rails R2 of the renewed track by relying on a rolling support constituted in this case by a train of rollers 24 mounted by means of an upright 25 (FIG. 4) which can be lifted vertically and which is constituted, in the example considered, by telescopic cylinders 25a, 25b, 25c.

Selon cette forme d'exécution, l'unité mobile 17 est formée d'une poutre de pose 18 soutenue à son extrémité antérieure par un cadre transversal 18a (figure 3) fixé au train de galets 22, reposant sur le chemin de roulement 5 et, à son extrémité postérieure, par le montant 25 fixé au train de galets 24. A cette poutre 18 sont suspendues, par des bras mobiles 19a, des pinces à galets 19 pour les rails, commandées par des vérins, et permettant de lever et de centrer les nouveaux rails R2, ainsi qu'une installation 21 connue, pour la pose des nouvelles traverses T2. La poutre 18 est dimensionnée uniquement pour le levage des nouveaux rails.According to this embodiment, the mobile unit 17 is formed of a laying beam 18 supported at its front end by a transverse frame 18a (FIG. 3) fixed to the train of rollers 22, resting on the raceway 5 and , at its rear end, by the upright 25 fixed to the roller train 24. From this beam 18 are suspended, by movable arms 19a, roller clamps 19 for the rails, controlled by jacks, and making it possible to lift and center the new rails R2, as well as a known installation 21, for the installation of the new crosspieces T2. The beam 18 is dimensioned only for lifting the new rails.

La figure 5 montre schématiquement, dans un plan transversal, un exemple de réalisation de l'arrangement de la suspension des pinces à rails à la poutre 18. Selon cette figure, l'arrangement des éléments est suspendu à un arbre 35 logé sous la poutre, arbre qui peut pivoter autour d'un axe 39 perpendiculaire à la direction longitudinale de la poutre, cet axe 39 étant également visible sur la figure 1. A cet arbre 35 sont articulés deux vérins symétriques 36 pourvus à leur extrémité inférieure d'un bras 19a portant les pinces à galets 19 pour les rails, et pour ajuster ces pinces à rails dans le sens latéral, il est prévu deux autres vérins 37 articulés d'une part sur une tige médiane 38 fixée à l'arbre 35 et d'autre part à l'extrémité inférieure des vérins 36. Les deux pinces à galets 19 pour les rails peuvent être ajustées en hauteur par les vérins 36 et dans le sens latéral par les vérins 37. Cet arbre 35, pivotant autour de l'axe 39, permet, en position de repos, de basculer l'arrangement vers le haut, comme illustré sur la figure 2.FIG. 5 schematically shows, in a transverse plane, an exemplary embodiment of the arrangement of the suspension of the rail clamps on the beam 18. According to this figure, the arrangement of the elements is suspended from a shaft 35 housed under the beam , shaft which can pivot about an axis 39 perpendicular to the longitudinal direction of the beam, this axis 39 is also visible in FIG. 1. At this shaft 35 are articulated two symmetrical jacks 36 provided at their lower end with an arm 19a carrying the roller clamps 19 for the rails, and to adjust these rail clamps in the lateral direction, there are two other cylinders 37 articulated on the one hand on a central rod 38 fixed to the shaft 35 and on the other leaves at the lower end of the jacks 36. The two roller clamps 19 for the rails can be adjusted in height by the jacks 36 and in the lateral direction by the jacks 37. This shaft 35, pivoting about the axis 39, allows, in rest position, tilt the arrangement upwards, as shown in Figure 2.

En position de travail, le train de galets arrière 24 formant le support roulant ainsi que les pinces à rails 19 sont tirés par des câbles 20, pour décharger la construction porteuse de la poutre 18. En tirant le train de galets 24 ainsi que les pinces à rails 19 portant les rails, par l'intermédiaire des câbles 20, on diminue ou évite la force du couple exercée sur la poutre 18 par toutes les charges qu'elle supporte. Par conséquent, ces câbles permettent de réaliser l'unité mobile selon une construction plus légère.In the working position, the rear roller train 24 forming the rolling support as well as the rail clamps 19 are pulled by cables 20, to unload the load-bearing construction of the beam 18. By pulling the roller train 24 as well as the clamps with rails 19 carrying the rails, by means of the cables 20, the force of the torque exerted on the beam 18 is reduced or avoided by all the loads that it supports. Consequently, these cables allow the mobile unit to be made in a lighter construction.

Pour mettre l'installation à l'état de repos, on lève l'installation de pose 21 et les pinces à rails 19 et l'on déplace l'unité 17 vers la gauche, selon la figure 1, sur le wagon 1 en faisant rouler les galets 22 sur le chemin de roulement 5. Puis le train de galets auxiliaire 23, fixé à la poutre 18, supporte l'unité mobile 17 à l'extrémité postérieure, en vue de la marche haut le pied. A l'état de marche haut le pied, illustré figure 2, l'unité mobile 17 est complètement chargée sur le wagon 1, les vérins 25a à 25c permettant de soulever le train de galets 24 à l'extrémité postérieure.To put the installation in the rest state, the installation installation is lifted 21 and the rail clamps 19 and the unit 17 is moved to the left, according to FIG. 1, on the wagon 1 by making roll the rollers 22 on the raceway 5. Then the auxiliary roller train 23, fixed to the beam 18, supports the mobile unit 17 at the rear end, for walking up and down. In the running condition, illustrated in FIG. 2, the mobile unit 17 is fully loaded on the wagon 1, the jacks 25a to 25c making it possible to lift the train of rollers 24 at the rear end.

Le fonctionnement du train de renouvellement est le suivant: au début du chantier, l'unité mobile 17 est reculée et le train de galets 24 est abaissé à l'aide des vérins 25a à 25c et centré sur la voie. Ensuite, l'installation 21 pour la pose des nouvelles traverses est mise en position de travail.The operation of the renewal train is as follows: at the start of construction, the mobile unit 17 is moved back and the roller train 24 is lowered using jacks 25a to 25c and centered on the track. Then, the installation 21 for laying the new sleepers is put into the working position.

Puis le renouvellement commence : pendant que le train avance d'une façon continue, les anciens rails R1, après démontage de leurs fixations aux traverses au poste 15 situé sur le véhicule de stockage 12, sont écartés à l'aide des pinces à rails 6, et les anciennes traverses T1 sont démontées une à une par l'installation 7 comportant, en général, une sorte de fourchette qui lève les traverses sur le transporteur 8, lequel les achemine sur le transporteur de stockage 14 du véhicule de stockage 12 par l'intermédiaire de l'autre transporteur 8a. Derrière l'installation de dépose, la plate-forme est égalisée et, si nécessaire, abaissée à l'aide de la fraise 9.Then the renewal begins: while the train is advancing continuously, the old rails R1, after dismantling their fasteners to the crosspieces at station 15 located on the storage vehicle 12, are removed using the rail clamps 6 , and the old sleepers T1 are dismantled one by one by the installation 7 comprising, in general, a sort of fork which lifts the sleepers on the conveyor 8, which conveys them on the storage conveyor 14 of the storage vehicle 12 by 1 'intermediary of the other transporter 8a. Behind the removal installation, the platform is leveled and, if necessary, lowered using the cutter 9.

Dès que les roues du boggie 3 qui servent à la marche haut le pied se sont approchées de la zone dépourvue de rails et de traverses, ces roues sont escamotées pour faire place au châssis à chenilles 2 qui est abaissé et roule maintenant sur le ballast.As soon as the wheels of the bogie 3 which are used for walking high have approached the area devoid of rails and crosspieces, these wheels are retracted to make room for the tracked chassis 2 which is lowered and now rolls on the ballast.

Au moyen du portique 4 et de sa poutre de levage 4a munie de pinces, on apporte de nouvelles traverses T2, par exemple trente, depuis un des véhicules de transport 16 situé en tête du train et on les décharge sur le transporteur 10. On prend ensuite, toujours à l'aide du portique 4, le même nombre d'anciennes traverses T1 stockées sur le transporteur de stockage 14 et on les évacue sur un des véhicules de transport 16. Quand l'installation de pose 21 arrive à la hauteur de la zone dépourvue de rails, les nouvelles traverses T2 sont mises en place une à une par l'intermédiaire de l'installation 21. Les nouveaux rails R2, préalablement déposés en attente de chaque côté de l'ancienne voie, sont levés, centrés et posés, au moyen des pinces à rails 19, sur les nouvelles traverses T2. Ces travaux se répètent pendant que le train avance d'une façon continue et le train de galets 24 roule sur les nouveaux rails R2.By means of the gantry crane 4 and its lifting beam 4a provided with clamps, new crossmembers T2, for example thirty, are brought from one of the transport vehicles 16 situated at the head of the train and they are unloaded onto the transporter 10. We take then, still using the gantry 4, the same number of old sleepers T1 stored on the storage conveyor 14 and they are removed on one of the transport vehicles 16. When the laying installation 21 reaches the height of the area devoid of rails, the new sleepers T2 are placed one by one through the installation 21. The new rails R2, previously deposited on each side of the old track, are lifted, centered and placed, by means of rail clamps 19, on the new crosspieces T2. This work is repeated while the train advances continuously and the roller train 24 rolls on the new rails R2.

A la fin du chantier, quand les roues du boggie 3 arrivent au-dessus des rails qui sont adjacents à la fin de la zone renouvelée, ce boggie 3 est abaissé sur ceux-ci pendant que le châssis à chenilles 2 est levé, comme illustré à la figure 2, et l'on pose encore le dernier nouveau rail pour combler la lacune. Ensuite l'installation 21 de pose des nouvelles traverses est levée, respectivement basculée dans une position horizontale, les pinces à galets 19 pour les rails avec les vérins 36, 37 sont basculés vers le haut et ensuite la poutre 18 est avancée sur le wagon 1. Dès que le train de galets auxiliaire 23 s'appuie sur le chemin de roulement 5 du wagon 1, le train de galets arrière 24 est levé et toute l'installation est mise en position de marche haut le pied.At the end of the construction site, when the wheels of the bogie 3 arrive above the rails which are adjacent to the end of the renewed area, this bogie 3 is lowered thereon while the tracked chassis 2 is lifted, as illustrated in FIG. 2, and the last new rail is again placed to fill the gap. Then the installation 21 for laying the new sleepers is lifted, respectively tilted in a horizontal position, the roller clamps 19 for the rails with the jacks 36, 37 are tilted upwards and then the beam 18 is advanced on the wagon 1 As soon as the auxiliary roller train 23 rests on the raceway 5 of the wagon 1, the rear roller train 24 is lifted and the whole installation is put in the running position without much.

Le support roulant de l'unité mobile de pose 17 peut être construit de différentes façons. Par exemple, selon la forme d'exécution représentée à la figure 6, l'extrémité arrière de la poutre 18 s'appuie, par l'intermédiaire d'une articulation 18b, par exemple une plaque tournante, sur un véhicule ferroviaire 26, tandis que son extrémité avant s'appuie, comme dans la forme d'exécution précédente, sur un train de galets 22 qui roule sur le chemin de roulement 5 du wagon 1. Le véhicule ferroviaire 26 est monté sur deux essieux 27 et est accouplé, en position de marche haut le pied, au wagon 1. A la poutre 18 sont également suspendues des pinces à galets 19 pour les rails et l'installation 21 de pose des nouvelles traverses T2. Les autres éléments du wagon 1 sont les mêmes que dans la forme d'exécution précédente. Le véhicule ferroviaire 26 peut être équipé de places de travail pour le montage des fixations des nouveaux rails et peut aussi être utilisé comme véhicule de transport de matériel.The rolling support of the mobile laying unit 17 can be constructed in different ways. For example, according to the embodiment shown in Figure 6, the rear end of the beam 18 is supported, via a hinge 18b, for example a turntable, on a rail vehicle 26, while that its front end rests, as in the previous embodiment, on a roller train 22 which rolls on the raceway 5 of the wagon 1. The rail vehicle 26 is mounted on two axles 27 and is coupled, in walking position upside down, in wagon 1. Roller clamps 19 also hang from the beam 18 for the rails and the installation 21 for laying new sleepers T2. The other elements of wagon 1 are the same as in the previous embodiment. The railway vehicle 26 can be equipped with work places for mounting the fastenings of the new rails and can also be used as a material transport vehicle.

Selon une autre forme d'exécution du support roulant de l'unité mobile de pose 17, représentée à la figure 7, l'extrémité arrière de la poutre 18 s'appuie, par l'intermédiaire d'une articulation 31, sur un bissel 28 muni d'un essieu fixe 29 et d'un essieu auxiliaire 30 mobile qui peut être abaissé en position de travail et relevé en position de marche haut le pied, dans laquelle il est accouplé au châssis la du wagon 1, comme indiqué en traits mixtes à la figure 7.According to another embodiment of the rolling support of the mobile laying unit 17, shown in Figure 7, the rear end of the beam 18 is supported, by means of a hinge 31, on a bissel 28 provided with a fixed axle 29 and a movable auxiliary axle 30 which can be lowered in the working position and raised in the running position up front, in which it is coupled to the chassis of the wagon 1, as indicated in lines mixed in Figure 7.

Enfin, selon une autre forme d'exécution représentée à la figure 8, l'unité 17 comprend une poutre mobile de pose formée de trois éléments télescopiques 32,32a,32b, poutre dont l'élément antérieur 32 est suspendu et glisse dans un cadre 33 monté en queue du châssis la du wagon 1, tandis que l'extrémité postérieure du dernier élément 32b s'appuie, par l'intermédiaire d'un montant 25 composé de vérins, comme illustré à la figure 1, sur un train de galets 24 comme support roulent qui peut être levé en position de marche haut le pied. Ce train de galets 24 pourrait également être remplacé par un véhicule ferroviaire ou par un bissel tels que décrits précédemment. Comme dans la première forme d'exécution décrite, à cette poutre télescopique sont suspendues des pinces à galets 19 pour les rails par l'intermédiaire des bras 19a et des vérins 36, et une installation pour la pose des nouvelles traverses T2.Finally, according to another embodiment shown in FIG. 8, the unit 17 comprises a mobile laying beam formed by three telescopic elements 32, 32a, 32b, beam whose front element 32 is suspended and slides in a frame 33 mounted at the tail of the chassis 1a of wagon 1, while the rear end of the last element 32b is supported, by means of an upright 25 composed of jacks, as illustrated in FIG. 1, on a train of rollers 24 as a rolling support which can be lifted in the running position upward. This train of rollers 24 could also be replaced by a railway vehicle or by a dolly as described above. As in the first embodiment described, on this telescopic beam are suspended roller clamps 19 for the rails by means of the arms 19a and jacks 36, and an installation for installing the new cross members T2.

Dans la forme d'exécution représentée à la figure 8, l'installation de pose des nouvelles traverses est formée de deux pièces, à savoir d'un transporteur vertical 21a et d'un pose-traverses 21b. Le transporteur vertical 21a est suspendu d'une manière besculable sur le premier élément 32 de le poutre télescopique pendant que le pose-traverses 21b est monté basculable ou amovible à l'extrémité postérieure du wagon 1. Les autres éléments sont les mêmes que dans la première forme d'exécution et portent les mêmes références.In the embodiment shown in Figure 8, the installation installation of new sleepers is formed of two parts, namely a vertical conveyor 21a and a sleeper 21b. The vertical conveyor 21a is suspended in a flexible manner on the first element 32 of the telescopic beam while the cross-member 21b is mounted tiltable or removable at the rear end of the wagon 1. The other elements are the same as in the first embodiment and bear the same references.

Par ailleurs, dans l'exemple d'exécution selon la figure 8, il est aussi possible que l'installation de pose des nouvelles traverses soit entièrement montée sur la poutre 18 ou soit complètement montée à l'extrémité du wagon 1. Dans ce dernier cas, l'unité de pose ne sert qu'à centrer les nouveaux rails et est déchargée de l'installation de pose. Les variantes qui viennent d'être mentionnées au sujet de l'installation de pose peuvent aussi s'appliquer à la forme d'exécution selon la figure 1, à savoir qu'au lieu d'être montée sur la poutre, cette installation de pose pourrait être montée complètement à l'extrémité du wagon 1, ou en partie sur le wagon et en partie sur la poutre.Furthermore, in the exemplary embodiment according to FIG. 8, it is also possible that the installation for laying the new sleepers is entirely mounted on the beam 18 or is completely mounted at the end of the wagon 1. In the latter In this case, the laying unit only serves to center the new rails and is discharged from the laying installation. The variants which have just been mentioned with regard to the installation of installation can also apply to the embodiment according to FIG. 1, namely that instead of being mounted on the beam, this installation of installation could be mounted completely at the end of wagon 1, or partly on the wagon and partly on the beam.

Dans tous les cas, cette installation est mise en position de transport, par exemple, à l'aide de vérins hydrauliques permettant de lever et de faire pivoter les différentes pièces.In all cases, this installation is placed in the transport position, for example, using hydraulic cylinders making it possible to lift and rotate the various parts.

Pour muter l'unité mobile de pose 17, selon la figure 8, à l'état de repos, on lève le train de galets 24 et l'on bascule les arrangements de pinces à rails 19 ainsi que l'installation de pose des nouvelles traverses 21a, 21b; puis on fait glisser l'élément télescopique antérieur 32 vers l'avant, à travers le cadre 33, jusqu'à ce qu'il se trouve complètement au-dessus du wagon 1, l'extrémité antérieure de cet élément 32 dépassent à l'extérieur du cadre, le guidage étant assuré par des rouleeux 34 prévus dans le cadre 33; puis on fait rétracter les autres éléments 32a, 32b dans le premier élément 32, comme illustré schématiquement à la figure 9.To transfer the mobile laying unit 17, according to FIG. 8, in the resting state, the roller train 24 is lifted and the arrangements of rail clamps 19 and the installation of new ones are rocked. sleepers 21a, 21b; then the front telescopic element 32 is slid forward, through the frame 33, until it is completely above the wagon 1, the front end of this element 32 protrude at the outside the frame, the guidance being provided by rollers 34 provided in the frame 33; then the other elements 32a, 32b are retracted in the first element 32, as shown diagrammatically in FIG. 9.

Bien sûr, comme dans l'exemple de la figure 1, le support roulant formé par un train de galets 24 est levé au moyen du vérin 25 et se trouve, à l'état de repos, entièrement sur le wagon 1, sans qu'aucun élément ne dépasse l'extrémité arrière de celui-ci. Le transporteur vertical 21a est mis dans une position approximativement horizontale au-dessous de l'élément 32 tandis que le pose-traverses 21b est basculé sur le châssis la du wagon 1 ou démonté et placé sur ce wagon. Il n'est pas absolument nécessaire que rien ne dépasse du côté postérieur du cadre 33, mais rien ne doit dépasser de l'extrémité postérieure du wagon 1.Of course, as in the example of FIG. 1, the rolling support formed by a train of rollers 24 is lifted by means of the jack 25 and is, in the rest state, entirely on the wagon 1, without that no element protrudes beyond the rear end thereof. The vertical conveyor 21a is placed in an approximately horizontal position below the element 32 while the cross-member 21b is tilted on the chassis 1a of wagon 1 or dismantled and placed on this wagon. It is not absolutely necessary that nothing protrude from the rear side of the frame 33, but nothing must protrude from the rear end of the wagon 1.

Il est possible d'inverser les fonctions de pose et de dépose, en ce sens que l'unité mobile de pose devient l'unité de dépose, tandis que l'unité construite comme un wagon de chemin de fer devient l'unité de pose. Dans ce cas, les véhicules de transport se trouvent en queue du wagon de pose et le train peut être poussé. Le véhicule de stockage 12 sert à entreposer les nouvelles traverses qui devront être transportées sur le wagon de pose adjacent pendant que les traverses démontées sont transportées par le portique vers un véhicule de transport 16.It is possible to reverse the laying and removal functions, in the sense that the mobile laying unit becomes the laying unit, while the unit built like a railway wagon becomes the laying unit . In this case, the transport vehicles are at the tail of the laying wagon and the train can be pushed. The storage vehicle 12 is used to store the new sleepers which will have to be transported on the adjacent laying wagon while the dismantled sleepers are transported by the gantry to a transport vehicle 16.

Si l'on utilise comme support roulant un véhicule de chemin de fer 26 ou un bissel 28, on peut aussi utiliser ce support roulant pour les travaux de démontage de la fixation des rails à la tête du train.If a railway vehicle 26 or a dolly 28 is used as a rolling support, this rolling support can also be used for dismantling the fixing of the rails to the head of the train.

L'invention n'est pas limitée aux formes d'exécution décrites mais peut présenter de nombreuses variantes.The invention is not limited to the embodiments described but can have many variants.

Claims (12)

  1. Train for the renewal of a railroad track in a continuous manner, comprising transport vehicles (16) for old ties (T1) and new ties (T2), a working vehicle in the form of a railroad car (1) equipped, at its end opposite to said transport vehicles (16), with a truck whose wheels are retractable and replaced by caterpillar tracks (2) when the train is working, said car (1) being equipped with dismantling means for old tracks (R1) and old ties (T1), said train comprising moreover laying means for new ties (T2) and new tracks (R2), characterized in that the laying means (19) for the new tracks (R2) are installed on a mobile unit (17), the said mobile unit bearing, during the renewal operations, on the one hand on the said end of the car (1) that is behind said transport vehicles (16), and on the other hand on a running support (24, 26, 28) which moves in a continuous manner along the new track (R2), the said mobile unit (17) being loaded, in the state of rest, on the car (1) when running light.
  2. Train for the renewal of a railroad track in a continuous manner, comprising transport vehicles (16) for old ties (T1) and new ties (T2), a working vehicle in the form of a railroad car (1) equipped, at its end opposite to said transport vehicles (16), with a truck whose wheels are retractable and replaced by caterpillar tracks (2) when the train is working, said car (1) being equipped with laying means for new tracks (R2) and new ties (T2), said train comprising moreover dismantling means for old ties (T1) and old tracks (R1), characterized in that the dismantling means (6) for the old tracks (R1) are installed on a mobile unit (17), the said mobile unit bearing, during the renewal operations, on the one hand on the said end of the car (1) and on the other hand on a running support (24, 26, 28) which moves in a continuous manner along the old track (R1), the said transport vehicles (16) being behind said car (1), and in that the said mobile unit (17) is loaded, in the state of rest, on the car (1) when running light.
  3. Renewal train as claimed in claim 1 or 2, characterized in that the other end of said car (1) is articulated to a storage vehicle (12) and has no truck, bearing in a pivoting manner on the chassis of this storage vehicle (12).
  4. Renewal train as claimed in one of claims 1 to 3, characterized in that the mobile unit (17) consists of at least one beam (18) from which laying elements are suspended, and in that the said beam bears and is movable on the said car (1) by a wheel gear (22).
  5. Renewal train as claimed in one of claims 1 to 3, characterized in that the said mobile unit (17) consists of a telescopic beam (32, 32a, 32b) from which the laying elements are suspended, the extended end of the said beam bearing, in the working position, on the running support (24), while the other end is suspended from a frame (33) mounted at the adjacent end of the car (1), the elements of this beam being retracted one into the other and being entirely loaded on the said car (1) when running light.
  6. Renewal train as claimed in one of claims 1 to 5, characterized in that the said running support is a wheel gear (24) mounted via a retractable strut (25), in particular lifting jacks (25a-25c), in order to be retracted when running light.
  7. Renewal train as claimed in claim 6, characterized in that the mobile unit (17) is equipped with an auxiliary wheel gear (23) on which the said mobile unit (17) bears when running light.
  8. Renewal train as claimed in one of claims 1 to 5, characterized in that the running support is a railroad vehicle (26) which is coupled to the car (1) in the position for running light.
  9. Renewal train as claimed in one of claims 1 to 5, characterized in that the running support is a bissel truck (28, 29) which is coupled to the car (1) in the position for running light and is equipped with a mobile auxiliary axle (30) which is lowered in the working position and retracted when running light.
  10. Renewal train as claimed in one of claims 4 or 7, characterized in that the transport vehicles (16), the storage vehicle (12) and the car (1) are equipped with a continuous craneway (5) for at least one gantry (4) for lifting and transporting the ties, and in that the said craneway (5) likewise serves for moving the wheel gear (22) and, if appropriate, the auxiliary wheel gear (23), in the state of rest.
  11. Renewal train as claimed in one of claims 1 or 3 to 10, characterized in that the laying installation (21) for the ties can be folded back on the mobile unit.
  12. Renewal train as claimed in one of claims 1 or 3 to 11, characterized in that the rail grapplers (19) and the running support for the mobile unit (17) are pulled by cables (20) to relieve the load on the laying beam.
EP88810568A 1988-08-18 1988-08-18 Train for renewing a railway track Expired - Lifetime EP0355240B1 (en)

Priority Applications (7)

Application Number Priority Date Filing Date Title
DE8888810568T DE3876990D1 (en) 1988-08-18 1988-08-18 TRAIN FOR RENEWING A RAILWAY TRACK.
AT88810568T ATE83814T1 (en) 1988-08-18 1988-08-18 TRAIN TO RENEW A RAILWAY TRACK.
EP88810568A EP0355240B1 (en) 1988-08-18 1988-08-18 Train for renewing a railway track
US07/385,891 US4979247A (en) 1988-08-18 1989-07-26 Railroad track renewal train
AU39458/89A AU618831B2 (en) 1988-08-18 1989-08-09 Railway track renewal train
DD89331830A DD284068A5 (en) 1988-08-18 1989-08-16 UM
JP1210805A JPH02167901A (en) 1988-08-18 1989-08-17 Train revived on rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP88810568A EP0355240B1 (en) 1988-08-18 1988-08-18 Train for renewing a railway track

Publications (2)

Publication Number Publication Date
EP0355240A1 EP0355240A1 (en) 1990-02-28
EP0355240B1 true EP0355240B1 (en) 1992-12-23

Family

ID=8200597

Family Applications (1)

Application Number Title Priority Date Filing Date
EP88810568A Expired - Lifetime EP0355240B1 (en) 1988-08-18 1988-08-18 Train for renewing a railway track

Country Status (7)

Country Link
US (1) US4979247A (en)
EP (1) EP0355240B1 (en)
JP (1) JPH02167901A (en)
AT (1) ATE83814T1 (en)
AU (1) AU618831B2 (en)
DD (1) DD284068A5 (en)
DE (1) DE3876990D1 (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5361704A (en) * 1989-03-30 1994-11-08 Herzog Contracting Corp. Railroad track laying system with multiple railroad tie handling
US5243918A (en) * 1991-08-12 1993-09-14 Herzog Contracting Company Railroad track laying system with multiple railroad tie handling
ATE103025T1 (en) * 1990-07-13 1994-04-15 Scheuchzer Sa PROCEDURE FOR NEUTRALIZING RAILWAY TRACKS IN SITU.
CH686144A5 (en) * 1991-10-30 1996-01-15 Matisa Materiel Ind Sa Renewal train a railway line.
DE9305927U1 (en) * 1993-04-20 1994-05-26 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H., Wien Machine for renewing or laying a railroad track
WO1995008029A1 (en) * 1993-09-16 1995-03-23 Matisa Materiel Industriel S.A. Track-laying machine for renewing rails
US5528991A (en) * 1995-06-30 1996-06-25 Huber; Friedrich Apparatus and associated methods of laying track
ATA96796A (en) * 1996-06-04 1997-09-15 Plasser Bahnbaumasch Franz MACHINE FOR LAYING A TRACK
AT3918U3 (en) * 2000-07-13 2001-08-27 Plasser Bahnbaumasch Franz MACHINE FOR RENEWING A TRACK
AT6158U3 (en) * 2003-01-29 2004-03-25 Plasser Bahnbaumasch Franz MACHINE FOR TREATING A TRACK
CN101035950B (en) 2004-08-20 2013-03-06 罗兰路线维护股份有限公司 Long rail pick-up and delivery system
AT505403B1 (en) * 2007-06-19 2009-01-15 Plasser Bahnbaumasch Franz MACHINE FOR RECEIVING AND STORING SMALL IRONS OF A TRACK AND PROCESS
FR3021674A1 (en) * 2014-05-27 2015-12-04 Eiffage Rail RAILWAY RENOVATION KIT
AT518062B1 (en) 2016-02-15 2017-07-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Track construction vehicle for carrying out track construction work
AT519220B1 (en) * 2016-11-04 2018-05-15 Plasser & Theurer Export Von Bahnbaumaschinen Gmbh Rail vehicle with crane rails for a gantry crane
US11976424B2 (en) 2018-02-16 2024-05-07 Bridge and Track Crane LLC Railroad maintenance systems and methods
RU191642U1 (en) * 2019-05-29 2019-08-14 Открытое Акционерное Общество "Российские Железные Дороги" Attachment for earthmoving equipment designed to bend a rail link when laying a railway track
FR3112352B1 (en) * 2020-07-08 2023-10-27 Matisa Materiel Ind Sa Process for renewing the rails of a railway line using long new rails, and associated work train
CN112319726B (en) * 2020-11-09 2021-09-21 广州黄船海洋工程有限公司 Installation method of lengthened track for train transport ship and tooling vehicle
DE102021202939A1 (en) 2021-03-25 2022-09-29 Robel Bahnbaumaschinen Gmbh Method and device for carrying out track work

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT313347B (en) * 1970-04-17 1974-02-11 Plasser Bahnbaumasch Franz Mobile leveling and tamping machine
CH569839A5 (en) * 1973-10-09 1975-11-28 Matisa Materiel Ind Sa Railway tracklaying machine - truss slides off wagon to span from wagon to tractor and handle track
CH585814A5 (en) * 1974-05-27 1977-03-15 Scheuchzer Auguste Les Fils De Track renewal unit - has series of wagons running with front on old and rear on new track containing roller conveyor with crane
DE2410718A1 (en) * 1974-03-06 1975-09-11 Knape Fritz Dipl Ing Switch point layer and dismantler - has two undercarriages on train connected by bridge and lifting equipment on chain drive
CH600046A5 (en) * 1977-04-22 1978-06-15 Matisa Materiel Ind Sa
AT359541B (en) * 1978-06-28 1980-11-10 Plasser Bahnbaumasch Franz DEVICE FOR REPLACING THE RAILS AND SLEEPERS OF A TRACK
AT359537B (en) * 1978-09-14 1980-11-10 Plasser Bahnbaumasch Franz TRACK CONSTRUCTION TRAIN WITH PORTAL VEHICLES FOR THRESHOLD TRANSPORT
AT360572B (en) * 1978-09-14 1981-01-26 Plasser Bahnbaumasch Franz DEVICE FOR THE OPERATION OF TRANSPORT VEHICLES ON A TRACK OF VEHICLES
DE3117898A1 (en) * 1980-07-24 1982-03-04 Franz Plasser Bahnbaumaschinen-Industriegesellschaft mbH, 1010 Wien DRIVABLE PLANT AND METHOD FOR RENOVATING THE SIDELINE
IT1179729B (en) * 1984-07-10 1987-09-16 Enrico Valditerra CONVOGLIO FOR THE RENEWAL OF RAILWAY ROADS

Also Published As

Publication number Publication date
DD284068A5 (en) 1990-10-31
AU618831B2 (en) 1992-01-09
ATE83814T1 (en) 1993-01-15
US4979247A (en) 1990-12-25
JPH02167901A (en) 1990-06-28
AU3945889A (en) 1990-02-22
DE3876990D1 (en) 1993-02-04
EP0355240A1 (en) 1990-02-28

Similar Documents

Publication Publication Date Title
EP0355240B1 (en) Train for renewing a railway track
EP0004985A1 (en) Train for the renewal of a railway track
EP0307331B1 (en) Repairing and control apparatus for damaged vehicle bodies
EP0564555B1 (en) Apparatus for the lateral transferring of containers
FR2618466A1 (en) EXCHANGE MACHINE OF TRAVERSES
EP1079988B1 (en) Supporting and positioning rear structure for vehicle transporting cars
FR2562572A1 (en) ROLL-UP SYSTEM AND METHOD FOR RECEIVING AND / OR INSTALLING RAILWAY WORKS
EP0971071B1 (en) Method and device for laying railway track elements using a tracked vehicle
EP0505240B1 (en) Device for placing and replacing rail components and procedure for using this device
EP0168101A2 (en) Train for the renewal of tracks provided with supporting and guiding means for its advance
CH657649A5 (en) Railway site machine for the at least partial repair of a railway track portion
FR2572432A1 (en) RAILWAY TROLLEY FOR REPLACEMENT OR INSTALLATION AND REMOVAL AS WELL AS FOR THE TRANSPORTATION OF RAILWAYS.
EP0388573B1 (en) Articulated train for renewing railway tracks
EP0160898B1 (en) Handling apparatus for assembled railway switches or crossings
EP0773153B1 (en) Mobile platform for surmounting height deviations
FR2546925A1 (en) Multi-chassis rail track laying and dismantling machine
CH651338A5 (en) RAILWAY SITE MACHINE FOR REPLACING A SECTION OR MOUNTED TRACK APPARATUS.
FR2546924A1 (en) Multi chassis rail track laying and lifting machine
EP0467001A1 (en) Train for laying new tracks and method for their laying using such a train
CH498247A (en) Renewal process for railway tracks and equipment for its implementation
EP0182958B1 (en) Track-handling apparatus for a railroad track section
FR2538425A1 (en) Railway ballast mobile clearing and levelling machine
CH569839A5 (en) Railway tracklaying machine - truss slides off wagon to span from wagon to tractor and handle track
CH585814A5 (en) Track renewal unit - has series of wagons running with front on old and rear on new track containing roller conveyor with crane
FR2546923A1 (en) Rail tack sections laying and lifting machine

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE ES FR GB GR IT LI LU NL SE

RBV Designated contracting states (corrected)

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL SE

17P Request for examination filed

Effective date: 19900707

17Q First examination report despatched

Effective date: 19910701

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: SCHEUCHZER S.A.

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB IT LI LU NL SE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19921223

Ref country code: GB

Effective date: 19921223

Ref country code: SE

Effective date: 19921223

Ref country code: DE

Effective date: 19921223

Ref country code: AT

Effective date: 19921223

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19921223

Ref country code: NL

Effective date: 19921223

REF Corresponds to:

Ref document number: 83814

Country of ref document: AT

Date of ref document: 19930115

Kind code of ref document: T

REF Corresponds to:

Ref document number: 3876990

Country of ref document: DE

Date of ref document: 19930204

NLV1 Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act
GBV Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed]

Effective date: 19921223

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19930831

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19930831

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
BERE Be: lapsed

Owner name: S.A. SCHEUCHZER

Effective date: 19930831

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19940429

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19980901

Year of fee payment: 11

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990831

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL