EP0108168B1 - Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens - Google Patents
Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens Download PDFInfo
- Publication number
- EP0108168B1 EP0108168B1 EP82201415A EP82201415A EP0108168B1 EP 0108168 B1 EP0108168 B1 EP 0108168B1 EP 82201415 A EP82201415 A EP 82201415A EP 82201415 A EP82201415 A EP 82201415A EP 0108168 B1 EP0108168 B1 EP 0108168B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- elements
- old
- frame
- new
- waggon
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000009434 installation Methods 0.000 title description 6
- 238000005096 rolling process Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 2
- 230000035939 shock Effects 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005067 remediation Methods 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/02—Transporting, laying, removing, or renewing lengths of assembled track, assembled switches, or assembled crossings
Definitions
- the present invention relates to a method for the renewal of a switchgear and to the train for the implementation of this method.
- the purpose of the present invention is to create a method and a device which allow rational change of the track apparatus and especially which make it possible to transport the old apparatus and the new one by a normal convoy which respects the gauge of the track without cutting the traffic on parallel tracks.
- the method according to the invention is characterized in that the new switchgear is pre-assembled in the workshop in at least two elements, where appropriate with the exception of sleepers whose length exceeds a determined length or at least with the exception of the end crossmembers of elements exceeding a determined length, that these new elements and, where applicable, the isolated new sleepers, are transported to the site in a low-wagon, said elements being kept in an inclined position in which they do not protrude not the prescribed template, that the old device is separated into at least two elements corresponding to the new pre-assembled elements and that these old elements are lifted through the interior of an empty frame of a working wagon the internal length is greater than the length of the elements and the internal width of which can be increased to a value greater than the maximum width of the elements, after having if necessary removed é the old sleepers whose length exceeds a determined length or the end sleepers of the old elements exceeding a determined length, that these old removed elements are transported on another transport wagon lowered and kept in a position in which they do not exceed the
- the method according to the invention makes it possible to completely pre-assemble in the workshop all the elements including the core element, except in exceptional cases. It is only for large switches that it may be necessary to remove, in addition to the longer crosspieces of the core element, some end crosspieces from the other elements, therefore in general from the intermediate element and from the blade element so that they can be transported to the workplace.
- DE-A-2 228 196 discloses a renewal train provided with a frame wagon which is extendable laterally in order to allow the lifting or the laying of different elements of the track between the sides of the frame.
- the lateral extension of the frame is done symmetrically at least with respect to an axis of the frame transverse to the track.
- This symmetrical deployment of the frame is done, to the detriment of the gauge of the track, over the entire length of the frame, even for the renewal of a switch, of which only a small part has a length exceeding the gauge.
- This deployment is all the more important when the renewal takes place on a curved part of the track.
- the symmetrical deployment of the frame generates unnecessary bending forces on the two end crossmembers of the frame.
- the train for renewing the switchgear is characterized by the characterizing clause of claim 4.
- This process therefore makes it possible to install pre-assembled track devices, in two, preferably in three elements, to transport them in a rational manner in lowered wagons without exceeding the gauge and with normal trains, to exchange the material without occupying the parallel tracks therefore without interrupting the traffic and finally, thanks to the integral mechanization, by using a working time and a restricted manpower.
- the proposed train allows by its asymmetrically extendable frame not to exceed the gauge of the track only where it is necessary, to better register the frame working on a curved section of the track, to limit unnecessary bending forces at least on one of the end crosspieces of the frame.
- Figure 1 we can see an example of a switch or track device which, for the purposes of removal and installation has been divided into three elements: the core element A, the intermediate element B and finally the element of Blades C.
- the length and width of these various elements are variable depending on the switchway considered and also according to their type, depending on whether it is a single or double switch or a crossing-junction.
- a renewal train is used as illustrated in FIG. 2.
- This train comprises a laying wagon 1, with an empty frame, supported by two bogies 2,3 and which will be described more in detail below, at least one wagon for transporting the new equipment 4, placed at the rear of the laying wagon 1 and at least one wagon for transporting the old equipment 5, placed at the front of the laying wagon Or vice versa.
- These two transport wagons 4,5 are lowered and make it possible to transport a complete track device, pre-assembled in three elements. They are equipped with two bogies, shock and traction installation and an automatic brake, they can be incorporated in the freight trains.
- Two gantries 6,7 can roll on rolling tracks 24 fixed on the wagon the pose 1 on the one hand and on the transport wagons 4, 5 on the other hand. These gantries 6,7 are connected together by a longitudinal beam 8 provided with three pairs of brackets 9, 9 ', 9 "with lifting winches 23 for handling the elements using cables 43 and hooks 34 ( fig. 1 0).
- the laying wagon 1, according to FIG. 3, is formed by the empty laying frame comprising two longitudinal beams 10, 10 'connected to each other by two double telescopic end crossmembers 11, 12.
- each pair of crosspieces 11, 12 is composed of two adjacent guide tubes 13, 13 ′, fixed to the bogie 2 or 3 by a common articulation axis 15 around which they can pivot, each guide tube 13, 13 'being intended to receive a telescopic tube 14, 14'.
- the first telescopic tube 14 of each pair which cooperates with one of the guide tubes 13 is fixed to the lateral beam 10 while the other telescopic tube 14 'of each pair which cooperates with the other guide tube 13' is fixed to the side beam 10 '.
- the lateral beams 10, 10 ′ can be moved telescopically relative to the chassis of the laying wagon to widen the frame to a value such that the elements of the old or new switchgear can be raised and lowered respectively. through this frame.
- the control of these telescopic sleepers is carried out individually at by means of hydraulic cylinders not shown.
- one or the other lateral beam or both can be moved independently and therefore the frame can be widened either symmetrically, that is to say while preserving the parallelism of the beams 10, 10 'in enlarging the telescopic crosspieces of the same value, either asymmetrically depending on the gauge of the track device to be manipulated, as for example illustrated in FIG.
- the longitudinal beams 10, 10 ' are fixed on the ends 14a of the telescopic elements 14, 14' by in FIG. 3a.
- the telescopic tubes 13, 13 ' are locked together and form a rigid frame with the beams 10, 10'.
- Leg bogies 2, 3 on which this frame of the laying wagon 1 rests are equipped with shock and traction systems as well as an automatic brake.
- One of the bogies is fitted with a diesel engine which drives a hydraulic pump for the various control systems of the laying wagon.
- the gantries 6, 7 according to FIGS. 6 and 7 are constituted by two rolling elements 20 surmounted by columns 21 supporting the upper vault 22 which is adjustable in height by hydraulic jacks.
- the two gantries 6, 7 are linked together by a longitudinal beam 8 which can move transversely with respect to them, on transverse beams 31, 32 according to the double arrow F of FIG. 8.
- On this longitudinal beam 8 are mounted three pairs of pivoting brackets 9, 9 '9 "individually controlled by hydraulic cylinders and which are each equipped, as already mentioned, with their own lifting winch 23 with cable 43 and hook 34 (fig.10).
- the element of the track device in the winch is preferably carried out by means of special spreaders easily adaptable to the different spacings of the track devices.
- An example of a spreader 33 is illustrated in FIGS.
- FIG. 9 we can see the great possibilities offered by the lifting system which makes it possible to lift, pivot, transport the element to be placed or deposited thanks to the independent control of the lifting winches 23 and to the transverse displacement of the longitudinal beam 8 in gantries 6, 7.
- the sleepers alone can also be laid or removed using the gantry lifting system fitted for this purpose with a laying beam allowing the simultaneous transport of several sleepers.
- Each gantry is equipped with a diesel engine which drives hydraulic pumps for the traction system, for the system of transverse carriage of the longitudinal beam 8 on the transverse beams 31, 32 for the hydraulic control of the brackets 9, 9 ', 9 "and lifting winches 23.
- the procedure is as follows: before the renewal train arrives on site, the old switchgear must be dismantled by dismantling the fishplates or possibly cutting the rails in three parts of length equal to those of the new device and, if necessary, the end crossbars are unbolted, the length of which exceeds the allowed gauge.
- the renewal train is then brought to the site for the removal of the old switch and the installation of the new one.
- This exchange can be carried out piece by piece, that is to say that an old deposited element is immediately replaced by a new element without moving the laying wagon only the gantry cranes 6, 7 moving on the tracks 24 a first times according to arrow D (fig. 2) after removing the old element and a second time according to arrow P for installing the new element.
- a second method is preferably applied which consists in depositing a first element , to replace it with an auxiliary track element of the same length 37, as illustrated in fig.3, to move the laying wagon to deposit the second element and replace it with another auxiliary track element, and so on. Then we proceed to the desired remediation works of the platform using known machines.
- the gantries 6, 7 are maneuvered on the track until they occupy the position illustrated in FIG. 6, that is to say that they are on either side of the laying wagon 1.
- the gantries 6, 7 are maneuvered on the track until they occupy the position illustrated in FIG. 6, that is to say that they are on either side of the laying wagon 1.
- the telescopic crosspieces 11, 12 are actuated until the frame occupies the desired position.
- the track element is hooked to the winches via spreaders 33 and the said element is lifted until it has passed through the frame wagon 1.
- the lateral beams are replaced 10, 10 'in their initial position and the telescopic cross members are blocked in the closed position so as to allow the gantries 6, 7 to move according to the arrow D in FIG. 2 on the raceway 24 to transport the element disassembled on the transport wagon of old equipment 5. Meanwhile, the ballast can be leveled with a ballast harrow. Then, the set of gantries 6, 7 and longitudinal beam 8 is moved rearward to lift and transport according to arrow P in FIG. 2 the new element, which is operated by the winches in the manner illustrated in dashed lines on Figure 11.
- This new element which has been previously assembled in the workshop, is possibly devoid of its end crosspieces if its length exceeds the length of the lowered part of the transport wagon. In this case, the insulated sleepers are laid with the gantries before the element of the switchgear.
- Figure 8 we can see, schematically, showing only the silhouette of the elements comprising rails and sleepers, how they are stored, after handling, in the transport wagon 4 lowered; the elements are wedged using an articulated bar 25 and a lever 26.
- the arches 22 of the gantry cranes 6, 7 are adjusted in height to allow the passage of the switchgear elements.
- Wedges 27 mounted in the bottom of the transport wagon 4 ensure good positioning of the elements.
- the end crosspieces of the elements exceeding the length of the lowered part of the wagon are not assembled in the workshop, but only on the site, this in order to reduce the bulk of the elements in the wagon illustrated in FIG. 7.
- the invention is not limited to the example described in particular as regards the choice of the number of elements constituting the switchgear.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Claims (6)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT82201415T ATE26862T1 (de) | 1982-11-09 | 1982-11-09 | Verfahren zum auswechseln von einer schienenwegeinrichtung und bauzug zur durchfuehrung des verfahrens. |
EP82201415A EP0108168B1 (de) | 1982-11-09 | 1982-11-09 | Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens |
DE8282201415T DE3276185D1 (en) | 1982-11-09 | 1982-11-09 | Track installation replacement method and train for carrying out the method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP82201415A EP0108168B1 (de) | 1982-11-09 | 1982-11-09 | Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0108168A1 EP0108168A1 (de) | 1984-05-16 |
EP0108168B1 true EP0108168B1 (de) | 1987-04-29 |
Family
ID=8189528
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP82201415A Expired EP0108168B1 (de) | 1982-11-09 | 1982-11-09 | Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP0108168B1 (de) |
AT (1) | ATE26862T1 (de) |
DE (1) | DE3276185D1 (de) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015197153A1 (de) | 2014-06-24 | 2015-12-30 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Verfahren zur erneuerung eines gleises |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3468463D1 (en) * | 1983-12-20 | 1988-02-11 | Scheuchzer Fils Auguste | Method for the renewal of railroad switches, and railroad machine for carrying it out |
AT383839B (de) * | 1984-04-10 | 1987-08-25 | Plasser Bahnbaumasch Franz | Fahrbare anlage und verfahren zum aufnehmen und bzw. oder verlegen von gleisjochen |
AU648081B2 (en) * | 1991-06-04 | 1994-04-14 | Air Water Inc., | Method of nitriding steel |
AT5706U1 (de) | 2001-05-07 | 2002-10-25 | Vae Eisenbahnsysteme Gmbh | Verfahren zum einbauen von weichen in geleise sowie weiche zur durchführung dieses verfahrens |
AT500047B8 (de) * | 2004-04-07 | 2007-02-15 | Plasser Bahnbaumasch Franz | Maschine zum transport von weichen sowie verfahren |
GB2423105A (en) * | 2005-02-12 | 2006-08-16 | Carillion Construction Ltd | Method of laying an S & C crossover of a railway track |
FR3024470B1 (fr) * | 2015-10-28 | 2017-01-13 | Matisa Materiel Ind Sa | Systeme et procede de transport d'un appareil de voie |
FR3046588B1 (fr) * | 2016-01-07 | 2019-05-03 | Societe Des Anciens Etablissements L. Geismar | Systeme de bridage d'un troncon de voie ferree, notamment d'un appareil de voie ferree, sur au moins une plateforme de support d'un wagon de transport ferroviaire |
AT519220B1 (de) | 2016-11-04 | 2018-05-15 | Plasser & Theurer Export Von Bahnbaumaschinen Gmbh | Schienenfahrzeug mit Kranschienen für einen Portalkran |
CN110499681B (zh) * | 2019-09-17 | 2024-07-05 | 中铁第五勘察设计院集团有限公司 | 自动式分枕设备 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE473732C (de) * | 1929-03-21 | Ardeltwerke G M B H | Gleisausbauwagen mit einem die Einbaustelle ueberbrueckenden, auf zwei Fahrgestellen ruhenden Tragwerk | |
US1994717A (en) * | 1930-10-28 | 1935-03-19 | Maschf Augsburg Nuernberg Ag | Method and device for transporting and laying railway switches |
DE2228196C3 (de) * | 1971-06-18 | 1979-03-22 | Les Fils D'auguste Scheuchzer S.A., Lausanne (Schweiz) | Einrichtung zum Auswechseln von Gleisjochen |
DE2410718A1 (de) * | 1974-03-06 | 1975-09-11 | Knape Fritz Dipl Ing | Verfahren und einrichtung zum ein- und ausbauen von weichen |
FR2424361A1 (fr) * | 1978-04-25 | 1979-11-23 | Mercadier Paul | Procede et appareillages de renouvellement d'appareils de voie ferree |
DE2928151C2 (de) * | 1979-07-12 | 1982-06-16 | Bochumer Eisenhütte Heintzmann GmbH & Co, 4630 Bochum | Ausbaugestell |
-
1982
- 1982-11-09 EP EP82201415A patent/EP0108168B1/de not_active Expired
- 1982-11-09 DE DE8282201415T patent/DE3276185D1/de not_active Expired
- 1982-11-09 AT AT82201415T patent/ATE26862T1/de not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015197153A1 (de) | 2014-06-24 | 2015-12-30 | Plasser & Theurer Export Von Bahnbaumaschinen Gesellschaft M.B.H. | Verfahren zur erneuerung eines gleises |
EA034099B1 (ru) * | 2014-06-24 | 2019-12-26 | Плассер Энд Тойрер Экспорт Фон Банбаумашинен Гезельшафт М.Б.Х. | Способ обновления рельсового пути |
Also Published As
Publication number | Publication date |
---|---|
DE3276185D1 (en) | 1987-06-04 |
ATE26862T1 (de) | 1987-05-15 |
EP0108168A1 (de) | 1984-05-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0108168B1 (de) | Verfahren zum Auswechseln von einer Schienenwegeinrichtung und Bauzug zur Durchführung des Verfahrens | |
FR2559739A1 (fr) | Appareil mobile d'arret d'aeronefs | |
CH620005A5 (de) | ||
EP0146164B1 (de) | Verfahren zum Erneuern von Gleisweichen und Eisenbahnvorrichtung zu seiner Durchführung | |
EP0355240B1 (de) | Zug zur Erneuerung eines Eisenbahngleises | |
EP1262600B1 (de) | Militärisches Schnellbaubrückensystem | |
EP3368718B1 (de) | System und verfahren zum transport einer schienenweiche | |
FR2562572A1 (fr) | Installation roulante et procede pour la reception et/ou la pose de travees de voie ferree | |
FR2912158A1 (fr) | Wagon pour le dechargement de ballast sur une voie ferree | |
EP0486456B1 (de) | Weichentransportwagen | |
EP0505240B1 (de) | Vorrichtung zum Ver- und Ersetzen von Eisenbahnelementen und Verfahren zur Verwendung dieser Vorrichtung | |
FR2972378A1 (fr) | Abri de soudage. | |
FR2597129A1 (fr) | Travure legere repliable pour le franchissement de breches par des engins dits lourds, notamment des engins blindes | |
DE69108150T2 (de) | Transportsystem für einen Brückenteil zur Überwindung von Gräben und System zum Ablegen eines Brückenteils von einem Fahrzeug. | |
FR2572432A1 (fr) | Chariot sur rails pour le remplacement ou la pose et la depose ainsi que pour le transport de travees de voie ferree. | |
FR2536770A1 (fr) | Machine de chantier ferroviaire pour le remplacement d'un troncon ou d'un appareil de voie monte | |
CH653071A5 (fr) | Machine ferroviaire pour la pose et la depose de troncons ou d'appareils de voie montes. | |
CH653072A5 (fr) | Machine ferroviaire pour la pose et la depose de troncons ou d'appareils de voie montes. | |
EP0160898A2 (de) | Auf- und Abladevorrichtung für zusammengebaute Eisenbahnweichen oder -kreuzungen | |
CH658085A5 (en) | Device for laying and removing a railway track gear panel | |
EP2177415B1 (de) | Wagon für den Transport von Kraftfahrzeugen | |
CH650045A5 (fr) | Machine de chantier ferroviaire pour la saisie et le portage de troncons et/ou d'appareils de voie montes. | |
EP0182958B1 (de) | Vorrichtung zum Behandeln einer Eisenbahnstrecke | |
CH657650A5 (en) | Apparatus for handling a railway gear panel | |
CH398663A (fr) | Equipement pour la pose de traverses sur le lit de ballast d'une voie ferrée |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT CH DE FR IT LI |
|
17P | Request for examination filed |
Effective date: 19841008 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT CH DE FR IT LI |
|
REF | Corresponds to: |
Ref document number: 26862 Country of ref document: AT Date of ref document: 19870515 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3276185 Country of ref document: DE Date of ref document: 19870604 |
|
ITF | It: translation for a ep patent filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19890918 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19891114 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19891120 Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19901109 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Effective date: 19910731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19910801 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19910920 Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19921130 Ref country code: CH Effective date: 19921130 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |