EP0186921A1 - Device for the construction of a vertical channel in the soil - Google Patents

Device for the construction of a vertical channel in the soil Download PDF

Info

Publication number
EP0186921A1
EP0186921A1 EP85201964A EP85201964A EP0186921A1 EP 0186921 A1 EP0186921 A1 EP 0186921A1 EP 85201964 A EP85201964 A EP 85201964A EP 85201964 A EP85201964 A EP 85201964A EP 0186921 A1 EP0186921 A1 EP 0186921A1
Authority
EP
European Patent Office
Prior art keywords
channel
tube
bentonite
water
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP85201964A
Other languages
German (de)
French (fr)
Other versions
EP0186921B1 (en
Inventor
Karel Frederik Brons
Anthonie Frederik Kool
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hollandsche Beton Groep NV
Original Assignee
Hollandsche Beton Groep NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hollandsche Beton Groep NV filed Critical Hollandsche Beton Groep NV
Publication of EP0186921A1 publication Critical patent/EP0186921A1/en
Application granted granted Critical
Publication of EP0186921B1 publication Critical patent/EP0186921B1/en
Expired legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/13Foundation slots or slits; Implements for making these slots or slits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/20Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with tools that only loosen the material, i.e. mill-type wheels
    • E02F3/205Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with tools that only loosen the material, i.e. mill-type wheels with a pair of digging wheels, e.g. slotting machines

Definitions

  • the invention relates to a method for the digging of a vertical channel in the soil, the channel being filled with a heavy fluid, in particular with bentonite, during the construc- ion and as the construction progresses, and the digging itself taking place by means of a ground mill, the loosened soil being removed from the channel by pumping out of it a mixture of soil and fluid.
  • a method of this type is generally known.
  • the bentonite filling serves to keep the channel stable, i.e. to prevent the channel walls falling inwards.
  • the ground mill operates in the space filled with bentonite because the bentonite filling flows freely out of the channel section already constructed into the area in which the ground mill is operating.
  • the soil loosened by means of the ground mill has to be removed by means of a pump and this pump pumps a mixture of soil and bentonite.
  • This mixture has to be separated again into its components, but this separation requires a rest period of several days and an expensive installation. This means that a relatively large amount of bentonite is needed and bentonite is a relatively expensive fluid.
  • the object of the invention is to provide a method by which it is possible to construct the channel in a more efficient manner to save considerably on bentonite.
  • This object is primarily achieved according to the invention in that the part of the channel already constructed and filled with bentonite is separated from the part still to be constructed and during the construction thereof by placing in the channel, in the direction of advance at or near the end of the channel already constructed, a former which fits closely in a sealing manner against the side walls of the channel and the space above the ground mill, which is separated from the part of the channel already constructed by the former, is kept filled with water so that the mixture to be removed therefrom consists of soil and water.
  • the invention achieves the result that the space in which the ground mill operates and the space of the channel which has already been constructed and is filled with bentonite, are kept separated from each other and the ground mill only operates in a water filled space from which the mixture of soil and water can be pumped away in an expedient manner.
  • the separation of soil and water necessary inter alia, does not present any problem.
  • Large installa- ions in which the separation of soil and bentonite has to take place are therefore no longer necessary, while there is also a saving in bentonite and the mixture of soil and water is easier to pump and therefore also requires less energy.
  • the water above the ground mill can be removed and the space made available filled with bentonite, after which the ground mill is removed.
  • the water can also be displaced by supplying bentonite and removing the ground mill at a suitable moment
  • the former can be withdrawn and clamped again between the side walls of the channel at the new front end obtained, after which the ground mill is positioned in front of the former, from the point of view of direction of advance of the channel to be made, and a new channel section is made, with simultaneous supply of water and removal of soil and water mixture.
  • the invention it is also possible to operate with at least two formers which are positioned at a distance from each other, which distance is at least equal to the length of the working area of the ground mill and the former disposed upstream, from the point of view of the direction of movement, after the positioning of the former adjacent to the working area of the ground mill is withdrawn and after the removal of the ground mill is placed at the downstream end of the new channel section then made by means of the ground mill.
  • a ground mill which is attached to a frame and which usually consists of oppositely rotating knives which are driven by hydraulic motors.
  • This frame is suspended in a lifting device for controlling or for lowering and raising.
  • a tube can now be positioned on this frame of the ground mill which in horizontal cross-section has a length and width corresponding to the working length and working width of the ground mill and which carries an expandable seal above the ground mill, which tube is provided with an inlet for water and with a drainage pump with pressurised pipe for the mixture of soil and water and furthermore an inlet is present for the supplying of bentonite to the space between the tube and above the seal.
  • This tube contains the water filling and is separated from the soil, i.e. channel wall, by a thin bentonite layer.
  • the seal between the bottom end of the tube and working area of the ground mill ensures that the bentonite is kept separated from the soil, which is loosened and from the water which forms a mixture with the soil so that there is no risk that bentonite is also removed with the soil-water mixture.
  • the tube has a height which is such that the tube projects at all times above the ground level. As a result of this it is possible to ensure a water overpressure with respect to the bentonite.
  • the space filled with ben - tonite above the seal can further be provided with a pressure sensor and the space filled with water beneath the seal can be provided with a pressure sensor, which pressure sensors control the water supply to the tube in a manner such that the water column provides an overpressure with respect to the bentonite column. There is then certainty that bentonite cannot be removed with the water-soil mixture.
  • the former or formers consist according to the invention preferably of a tube which is provided with expandable side walls, in particular inflatable side walls.
  • the drawings show a channel 2 filled with bentonite 1 having a floor 3 and a front wall 4.
  • a former 5 which is shown on a larger scale in Figure 2.
  • This former consists of a metal tube 6 of rectangular cross-section with tubular reinforcing ribs 7 at the comers and clamps 8 and 9 respectively on the front and back wall for attaching a rubber seal 10 which is closed at the extremities and which can be inflated, as shown at 11, and then rests against the side wall 12 of the already constructed channel.
  • Figure 2 shows one seal in the inflated condition and one in the uninflated condition.
  • ground mill In the direction in which the channel has to be constructed a ground mill is engaged in front of the former in digging out a further section of the channel.
  • This ground mill has a frame 13 to which ground mills 14 are attached in a manner known per se and which can be rotated around horizontal axes and are provided with cutting knives 15. These ground mills are driven by hydraulic motors which are not shown.
  • the frame of the ground mill is attached to a rising tube 16 of rectangular cross-section, which frame is suspended at 17 on a lifting device not shown.
  • the suction nozzle 18 of a suction pipe which is connected by means of a dredger pump 19 to the pressurised pipe 20.
  • Water can be supplied at 23 to the tube 16 via the pipe 21 with stopcock 22.
  • the fluid from this water content is indicated at 24.
  • the frame 13 is provided with passage channels 25 through which the water in the tube can reach the ground mills, can mix with the loosened soil, after which the mixture of soil and water can be removed via the suction opening 18 and double-action pump 19 through the pressurised pipe 20.
  • the frame 13 carries a circumferential inflatable sealing ring 26' which is constructed in a manner such that it can slide along the walls of the channel already made and along the front face 9 of the former 5.
  • Figure 1 shows that the tube 16 projects above the ground level 30 and that the fluid column in the tube is higher than the bentonite column which is situated between the outside wall of the tube and the walls of the channel in the space 27.
  • a pressure sensor which measures the pressure of the bentonite column.
  • a pressure sensor which measures the pressure of the water column. Both measurements can be used in a manner known per se for controlling the stopcock 22 in the water supply pipe 21. As a result of this it is possible to ensure that the water column always has sufficient overpressure.
  • This second former can be used as a protection for the region situated upstream, for example if it is already desired to provide a concrete filling there or if it is desired to remove the bentonite and replace it by soil after a provision has been made therein, viz. the provision for which the channel was made. This might be a watertight shield.
  • the ground mill After the ground mill has constructed a new section, the ground mill has to be brought up again.
  • the former 5' has now been drawn up at the correct time, then it can immediately be placed in the channel filled with bentonite immediately after the removal of the tube with mill.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Mechanical Engineering (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

e The invention deals the manufacturing of a wall in the sail by digging a channel (2) which is filled with bentonite (1) prior to being filled with concrete which channel by means of a former (5), which fits closely against the side walls (12) of the channel, is separated in an upstream portion filled with bentonite and a downstream portion filled with water and containing the ground mill (14) for cutting the soil and a pump (19) for removing water and soil, preferably two formers (5,5') are used which in turn are placed forwardly with the advancement of the channel, each former (5,5') having inflatable seals (10), morever a tube (16) can be provided above the ground mill (14) and with a water column (24) above it

Description

  • The invention relates to a method for the digging of a vertical channel in the soil, the channel being filled with a heavy fluid, in particular with bentonite, during the construc- ion and as the construction progresses, and the digging itself taking place by means of a ground mill, the loosened soil being removed from the channel by pumping out of it a mixture of soil and fluid.
  • A method of this type is generally known. In this connection the bentonite filling serves to keep the channel stable, i.e. to prevent the channel walls falling inwards. Here we are dealing with the construction of channels to a depth of 10 to 100 metres, which channels are later filled with concrete. In the known method the ground mill operates in the space filled with bentonite because the bentonite filling flows freely out of the channel section already constructed into the area in which the ground mill is operating. The soil loosened by means of the ground mill has to be removed by means of a pump and this pump pumps a mixture of soil and bentonite. This mixture has to be separated again into its components, but this separation requires a rest period of several days and an expensive installation. This means that a relatively large amount of bentonite is needed and bentonite is a relatively expensive fluid.
  • The object of the invention is to provide a method by which it is possible to construct the channel in a more efficient manner to save considerably on bentonite.
  • This object is primarily achieved according to the invention in that the part of the channel already constructed and filled with bentonite is separated from the part still to be constructed and during the construction thereof by placing in the channel, in the direction of advance at or near the end of the channel already constructed, a former which fits closely in a sealing manner against the side walls of the channel and the space above the ground mill, which is separated from the part of the channel already constructed by the former, is kept filled with water so that the mixture to be removed therefrom consists of soil and water. The invention achieves the result that the space in which the ground mill operates and the space of the channel which has already been constructed and is filled with bentonite, are kept separated from each other and the ground mill only operates in a water filled space from which the mixture of soil and water can be pumped away in an expedient manner. In this process the separation of soil and water, necessary inter alia, does not present any problem. Large installa- ions in which the separation of soil and bentonite has to take place are therefore no longer necessary, while there is also a saving in bentonite and the mixture of soil and water is easier to pump and therefore also requires less energy. After-a new channel section has been constructed with the ground mill, the water above the ground mill can be removed and the space made available filled with bentonite, after which the ground mill is removed. The water can also be displaced by supplying bentonite and removing the ground mill at a suitable moment After filling with bentonite, the former can be withdrawn and clamped again between the side walls of the channel at the new front end obtained, after which the ground mill is positioned in front of the former, from the point of view of direction of advance of the channel to be made, and a new channel section is made, with simultaneous supply of water and removal of soil and water mixture.
  • According to the invention it is also possible to operate with at least two formers which are positioned at a distance from each other, which distance is at least equal to the length of the working area of the ground mill and the former disposed upstream, from the point of view of the direction of movement, after the positioning of the former adjacent to the working area of the ground mill is withdrawn and after the removal of the ground mill is placed at the downstream end of the new channel section then made by means of the ground mill. By this means the result is achieved that one former, and in particular the former positioned near the ground mill, can be left in position at any rate until the second former has been positioned in the front of the channel section just constructed.
  • In addition it is possible, in particular if more than two formers are used, to keep the section filled with bentonite separated from the section to be filled with concrete by means of a former of this type, the separating former being withdrawn at the correct time. Adhesion of this second former to the concrete can be prevented by the application of means preventing the adhesion or by withdrawing before adhesion can occur. As a result of this the quantity of bentonite required can be restricted further.
  • In the known method a ground mill is used which is attached to a frame and which usually consists of oppositely rotating knives which are driven by hydraulic motors. This frame is suspended in a lifting device for controlling or for lowering and raising.
  • According to the invention a tube can now be positioned on this frame of the ground mill which in horizontal cross-section has a length and width corresponding to the working length and working width of the ground mill and which carries an expandable seal above the ground mill, which tube is provided with an inlet for water and with a drainage pump with pressurised pipe for the mixture of soil and water and furthermore an inlet is present for the supplying of bentonite to the space between the tube and above the seal. This tube contains the water filling and is separated from the soil, i.e. channel wall, by a thin bentonite layer. The seal between the bottom end of the tube and working area of the ground mill ensures that the bentonite is kept separated from the soil, which is loosened and from the water which forms a mixture with the soil so that there is no risk that bentonite is also removed with the soil-water mixture.
  • Preferably the tube has a height which is such that the tube projects at all times above the ground level. As a result of this it is possible to ensure a water overpressure with respect to the bentonite.
  • According to the invention the space filled with ben- tonite above the seal can further be provided with a pressure sensor and the space filled with water beneath the seal can be provided with a pressure sensor, which pressure sensors control the water supply to the tube in a manner such that the water column provides an overpressure with respect to the bentonite column. There is then certainty that bentonite cannot be removed with the water-soil mixture.
  • The former or formers consist according to the invention preferably of a tube which is provided with expandable side walls, in particular inflatable side walls.
  • The invention will now be explained in more detail by reference to the drawings.
    • Figure 1 shows diagrammatically a method and device according to the invention in side view.
    • Figure 2 is a plan view of Figure 1, but on a larger scale.
  • The drawings show a channel 2 filled with bentonite 1 having a floor 3 and a front wall 4.
  • At the position of the front wall the channel is closed off by means of a former 5 which is shown on a larger scale in Figure 2. This former consists of a metal tube 6 of rectangular cross-section with tubular reinforcing ribs 7 at the comers and clamps 8 and 9 respectively on the front and back wall for attaching a rubber seal 10 which is closed at the extremities and which can be inflated, as shown at 11, and then rests against the side wall 12 of the already constructed channel.
  • Figure 2 shows one seal in the inflated condition and one in the uninflated condition.
  • In the direction in which the channel has to be constructed a ground mill is engaged in front of the former in digging out a further section of the channel. This ground mill has a frame 13 to which ground mills 14 are attached in a manner known per se and which can be rotated around horizontal axes and are provided with cutting knives 15. These ground mills are driven by hydraulic motors which are not shown.
  • The frame of the ground mill is attached to a rising tube 16 of rectangular cross-section, which frame is suspended at 17 on a lifting device not shown.
  • Between the ground mills 14 is located the suction nozzle 18 of a suction pipe which is connected by means of a dredger pump 19 to the pressurised pipe 20.
  • Water can be supplied at 23 to the tube 16 via the pipe 21 with stopcock 22. The fluid from this water content is indicated at 24. The frame 13 is provided with passage channels 25 through which the water in the tube can reach the ground mills, can mix with the loosened soil, after which the mixture of soil and water can be removed via the suction opening 18 and double-action pump 19 through the pressurised pipe 20.
  • At 26 the frame 13 carries a circumferential inflatable sealing ring 26' which is constructed in a manner such that it can slide along the walls of the channel already made and along the front face 9 of the former 5.
  • In the space between the outside wall of the tube 16 and the walls of the channel there is a relatively thin layer of bentonite 27 which is supplied via the pipe 28, 29.
  • Figure 1 shows that the tube 16 projects above the ground level 30 and that the fluid column in the tube is higher than the bentonite column which is situated between the outside wall of the tube and the walls of the channel in the space 27.
  • As a result of this it is possible to produce an overpressure which ensures that bentonite remains above the seal 26' and cannot leak downwards past it.
  • At 31 there is situated at the outside edge of the tube a pressure sensor which measures the pressure of the bentonite column. At 32, below the sealing ring 26, there is situated a pressure sensor which measures the pressure of the water column. Both measurements can be used in a manner known per se for controlling the stopcock 22 in the water supply pipe 21. As a result of this it is possible to ensure that the water column always has sufficient overpressure.
  • Operation with two formers is conceivable as is shown by means of dotted lines in Figure 1 by 5'. This second former can be used as a protection for the region situated upstream, for example if it is already desired to provide a concrete filling there or if it is desired to remove the bentonite and replace it by soil after a provision has been made therein, viz. the provision for which the channel was made. This might be a watertight shield.
  • After the ground mill has constructed a new section, the ground mill has to be brought up again. In order to ensure that the walls of the section just constructed remain stable, it is advantageous to remove the water from the tube 16, for example by means of the pump 19, and then, while the tube with ground mill is being brought up, during which the seal 26 is withdrawn, to supply bentonite either via the supply pipe 28 or via another pipe not shown directly into the tube, in which case the bentonite then flows via the channels 25 through into the space beneath the tube with mill which is moving upwards.
  • If the former 5' has now been drawn up at the correct time, then it can immediately be placed in the channel filled with bentonite immediately after the removal of the tube with mill.

Claims (7)

1. Method for the digging of a vertical channel (2) in the soil, the channel (2) being filled with a heavy fluid, in particular with bentonite (1), during the construction and as construction progresses, and the digging itself taking place by means of a ground mill (14), the loosened soil being removed from the channel by pumping out of it a mixture of soil and fluid, characterized in that the part of the channel already constructed and filled with bentonite (1) is separated from the part still to be constructed and during the construction thereof by placing in the channel (2), in the near direction of advance at or near the end of the channel (2) already constructed, a former (5) which fits closely in a sealing manner against the side walls (12) of the channel (2) and the space above the ground mill, which is separated from the part of the channel already constructed by the former (5), is kept filled with water so that the mixture to be removed therefrom consists of soil and water.
2. Method according to claim 1, characterized in that at least two formers (5,5') are used at a distance from each other, which distance is at least to the length of the working area of the ground mill (14) and the former (5') disposed upstream, from the point of view of the directional movement, after the positioning of a former (5) adjacent to the working area of the ground ill (14) is withdrawn and after the removal of the ground mill is placed at the downstream end of the new channel section then made by means of the ground mill.
3. Device for the carrying out of the method of claim 1 or 2, the ground mill (14) being attached to a frame (13) which is suspended on a lifting device (17), characterized in that a tube (16) is placed on the frame (13) of the ground mill, which in horizontal cross-secction has a length and width corresponding to the working length and working width of the ground mill (14) and which carries an expandable seal (26) above the ground mill, which tube is provided with an inlet (23) for water and with a drainage pump (19) with pressurized pipe (20) for the mixture of soil and water and furthermore an inlet (28) is present for the supply of bentonite to the space between the tube and above the seal (26).
4. Device according to claim 3, characterized in that the tube has a height which is such that the tube (16) projects at all times above the ground level.
5. Device according to claim 4, characterized in that the space filled with bentonite between tube (16) and channel wall situated just above the seal (26) is provided with a pressure sensor, the space below the seal filled with water is also provided with a pressure sensor and both pressure sensors control the water supply to the tube in a manner such that the water column (24) above the bottom of the seal provides an overpressure with respect to the bentonite column above the seal.
6. Device according to one or more of the preceding claims, characterized in that the former or formers (5,5') consist of a tube with expandable, in particular, inflatable, side walls
(10).
EP19850201964 1984-11-29 1985-11-25 Device for the construction of a vertical channel in the soil Expired EP0186921B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL8403641A NL8403641A (en) 1984-11-29 1984-11-29 DEVICE FOR MANUFACTURING A VERTICAL SLOT IN THE GROUND.
NL8403641 1984-11-29

Publications (2)

Publication Number Publication Date
EP0186921A1 true EP0186921A1 (en) 1986-07-09
EP0186921B1 EP0186921B1 (en) 1988-09-07

Family

ID=19844835

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19850201964 Expired EP0186921B1 (en) 1984-11-29 1985-11-25 Device for the construction of a vertical channel in the soil

Country Status (3)

Country Link
EP (1) EP0186921B1 (en)
DE (1) DE3564837D1 (en)
NL (1) NL8403641A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1993022241A1 (en) * 1992-04-23 1993-11-11 University Of Waterloo System for treating polluted groundwater
US5800096A (en) * 1995-04-27 1998-09-01 Barrow; Jeffrey Subsurface barrier wall and method of installation
US5911546A (en) * 1989-03-03 1999-06-15 University Of Waterloo In-ground barrier
CN110042855A (en) * 2019-04-25 2019-07-23 倡创(上海)咨询管理事务所 Concrete cut and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1532666A (en) * 1967-06-13 1968-07-12 Masch Und Bohrgerate Fabrik A Method and device for drilling holes
DE1634262B1 (en) * 1966-04-09 1970-09-24 Bade & Co Gmbh Milling tool for making slots for slot walls
US3564855A (en) * 1968-04-08 1971-02-23 Johann Morner Method and device for making slit walls
FR2429047A1 (en) * 1978-06-23 1980-01-18 Solmarine Injecting fluid products e.g. cement, into restricted space - by valve opening only under fixed pressure allowing washing of feed pipes without washing fluid entering vol.
US4379658A (en) * 1980-12-03 1983-04-12 Thatcher Engineering Corporation Method and apparatus for constructing slurry walls

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1634262B1 (en) * 1966-04-09 1970-09-24 Bade & Co Gmbh Milling tool for making slots for slot walls
FR1532666A (en) * 1967-06-13 1968-07-12 Masch Und Bohrgerate Fabrik A Method and device for drilling holes
US3564855A (en) * 1968-04-08 1971-02-23 Johann Morner Method and device for making slit walls
FR2429047A1 (en) * 1978-06-23 1980-01-18 Solmarine Injecting fluid products e.g. cement, into restricted space - by valve opening only under fixed pressure allowing washing of feed pipes without washing fluid entering vol.
US4379658A (en) * 1980-12-03 1983-04-12 Thatcher Engineering Corporation Method and apparatus for constructing slurry walls

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5911546A (en) * 1989-03-03 1999-06-15 University Of Waterloo In-ground barrier
US5957625A (en) * 1989-03-03 1999-09-28 University Of Waterloo In-ground barrier
WO1993022241A1 (en) * 1992-04-23 1993-11-11 University Of Waterloo System for treating polluted groundwater
US5487622A (en) * 1992-04-23 1996-01-30 University Of Waterloo System for treating polluted groundwater
US5800096A (en) * 1995-04-27 1998-09-01 Barrow; Jeffrey Subsurface barrier wall and method of installation
CN110042855A (en) * 2019-04-25 2019-07-23 倡创(上海)咨询管理事务所 Concrete cut and construction method

Also Published As

Publication number Publication date
NL8403641A (en) 1986-06-16
DE3564837D1 (en) 1988-10-13
EP0186921B1 (en) 1988-09-07

Similar Documents

Publication Publication Date Title
US4904119A (en) Process for placing a piling in the ground, a drilling machine and an arrangement for implementing this process
US3965687A (en) Apparatus for anchoring a structure to the floor of a body of water
RU2712866C2 (en) Drilling system with barrel expansion unit
CN109339813A (en) A kind of pipe jacking tunnelling machine
EP0056814A1 (en) Slurry trench method and apparatus for constructing underground walls
US4003211A (en) Methods and apparatus for constructing tunnels
US3439953A (en) Apparatus for and method of mining a subterranean ore deposit
EP0186921B1 (en) Device for the construction of a vertical channel in the soil
US4309127A (en) Apparatus for controlling submarine oil leakage
EP0580264A1 (en) Method for providing deep partition walls in the ground and an excavating apparatus for use in this method
CN105317065B (en) Synchronous slotting paving modeling all-in-one machine
EP0268500B1 (en) Silos and methods of burying same
CN209277887U (en) A kind of pipe jacking tunnelling machine
JPH07173991A (en) Pressure adjusting device for horizontal pit excavating device and pressure adjusting method therefor
CN210216518U (en) Pressure maintaining structure in construction process of small and medium-sized basements
JPH0525988A (en) Shielding machine for vertical type shield method
JPS6147277B2 (en)
JPS6131244B2 (en)
GB2102043A (en) Process and apparatus for jacking conduits in ground containing ground water
DE2328672C2 (en) Rotating cutter excavator for deep narrow trenches - has vertical column for cutter and removes soil and flushing liquid
SU1395749A1 (en) Method of colnstructing horizontal drainage
US6385868B2 (en) Jet excavating device
CA3211346A1 (en) Method and apparatus for use in stope backfill mining
SU1437483A1 (en) Method and apparatus for pressing-down holes in soil
JPH02112525A (en) Muddy water caisson technique

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE GB NL

17P Request for examination filed

Effective date: 19860620

17Q First examination report despatched

Effective date: 19880128

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE GB NL

REF Corresponds to:

Ref document number: 3564837

Country of ref document: DE

Date of ref document: 19881013

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19921116

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19921212

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19921223

Year of fee payment: 8

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Effective date: 19931125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Effective date: 19931130

BERE Be: lapsed

Owner name: HOLLANDSCHE BETON GROEP N.V.

Effective date: 19931130

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19931125

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Effective date: 19940802

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19991130

Year of fee payment: 15

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010601

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20010601