EP0034907A1 - A submerged tunnel and a method of, and means for, constructing a submerged tunnel - Google Patents
A submerged tunnel and a method of, and means for, constructing a submerged tunnel Download PDFInfo
- Publication number
- EP0034907A1 EP0034907A1 EP81300640A EP81300640A EP0034907A1 EP 0034907 A1 EP0034907 A1 EP 0034907A1 EP 81300640 A EP81300640 A EP 81300640A EP 81300640 A EP81300640 A EP 81300640A EP 0034907 A1 EP0034907 A1 EP 0034907A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tunnel
- chamber
- units
- unit
- sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000006073 displacement reaction Methods 0.000 claims abstract description 15
- 238000011065 in-situ storage Methods 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 28
- 238000004873 anchoring Methods 0.000 claims description 5
- 230000008878 coupling Effects 0.000 claims description 4
- 238000010168 coupling process Methods 0.000 claims description 4
- 238000005859 coupling reaction Methods 0.000 claims description 4
- 239000012530 fluid Substances 0.000 claims description 4
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 230000000295 complement effect Effects 0.000 claims description 2
- 238000003032 molecular docking Methods 0.000 claims description 2
- 230000000452 restraining effect Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 10
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 3
- 238000009416 shuttering Methods 0.000 description 3
- 230000002411 adverse Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002990 reinforced plastic Substances 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/063—Tunnels submerged into, or built in, open water
- E02D29/067—Floating tunnels; Submerged bridge-like tunnels, i.e. tunnels supported by piers or the like above the water-bed
Definitions
- This invention relates to a method of, and means for constructing a submerged tunnel and also to a submerged tunnel.
- Submerged tunnels extending between land bases are usually provided in conditions where a bridge is not possible (for example, if the span is too great, the land bases or sea bed are inadequate foundations or a shipping hazard would result) or where a bridge is undesirable (for example, aesthetically or environmentally).
- a method of constructing a submerged tunnel in situ which comprises providing a longitudinally extending substantially cantilevered tunnel section with a chamber unit mounted on the free end thereof so that the chamber unit and bore of the tunnel section provide a water sealed working chamber; lengthening the longitudinal extent of the tunnel section within the chamber unit, and displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
- means for constructing a submerged tunnel in situ comprising a longitudinally extending substantially cantilevered tunnel section; a chamber unit mounted on the free end of the tunnel section so that that unit and the bore of the tunnel section provide a water sealed working chamber within which the longitudinal extent of the tunnel can be lengthened in the chamber unit, and means for displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
- the present invention therefore envisages the construction of a submerged tunnel in situ by successively lengthening a cantilevered tunnel section which latter will usually be anchored in support foundations of a land base so that the bore of the tube is in direct communication with land throughout the construction of the tunnel.
- the construction,being effected in a submerged state, is unlikely to be affected to any great extent by adverse weather conditions and may be at such a depth as not to present a shipping hazard.
- the tunnel section being in the form of a tube will-usually, but not necessarily, be of circular section and its lengthening within the chamber unit will usually be achieved by the addition of pre-formed elements to the end of the tunnel section or by progressively casting or moulding material to the end of the section.
- the present invention was primarily developed having in mind the construction of tunnels for the passage of vehicles therethrough in which case its dimensions will usually call for a basic tube structure of reinforced concrete although it will be appreciated that other materials for the tube can be utilised, say reinforced plastics sections for smaller tunnels which may be required for conduiting or a fluid flow passage.
- the chamber unit effectively provides a pressure vessel within which work is carried out to progressively lengthen the tunnel section within that unit; this work may be effected both on the interior and the exterior of the tunnel section and when appropriate the pressure unit is displaced longitudinally over the newly lengthened tube wall to permit further lengthening.
- two chamber units are mounted on the free end of the tunnel section, one such unit being located wholly within the other unit so that the inner chamber unit provides with the bore of the tunnel section a first working chamber and the outer chamber unit provides with the exterior of the inner unit a second working chamber within which there is access to the exterior of the tunnel section.
- the outer chamber unit effectively provides a second pressure vessel within the chamber of which further work may be carried out on the exterior of the tube section while the tunnel section is being progressively lengthened within the first working chamber.
- the inner and outer chamber units are displaced progressively along the tunnel section as the length thereof is increased.
- each chamber unit is displaceable relative to the tube section independently of the other so that when the outer chamber unit is stationary relative to the tube section the inner unit can be displaced longitudinally as the tube section is progressively lengthened to a maximum extent permitted by the outer unit and thereafter while the inner unit is stationary relative to the tube section the outer unit can be displaced over the inner unit to permit subsequent displacement of the inner unit.
- the whole construction of the tunnel may be effected by progressively lengthening the tunnel section from one land base to another and in such an event it is preferred that the shape of the tube which is formed is controlled, say by use of appropriate anchorages, so that the tube is an inverted arch to resist the upward buoyancy thrust thereon. It is realised however that on many occasions the construction of the tunnel from a single land base will be impractical or inefficient and it is preferred therefore that the construction is by means of two longitudinally extending substantially cantilevered tunnel sections each having a chamber unit mounted on its free end within which unit the lengthening of the longitudinal extent of the respective tunnel section is effected.
- a first of these tunnel sections is secured at a location corresponding to one end of the tunnel which is to be constructed while the second tunnel section is secured at a location corresponding to the other end of the tunnel which is to be constructed.
- the first and second tunnel sections are then progressively lengthened by working within their respective chamber units so that the free ends of the tunnel sections project towards each other and a condition is reached where the chamber units of the respective tunnel sections can be coupled together. With the chamber units coupled together a longitudinally extending water sealed passage can be formed between those units and thereafter one or both of the tunnel sections is lengthened to extend through the sealed passage and connect the two tunnel sections together to provide continuity of the tunnel.
- the tube is an inverted arch formation as aforementioned and generally the chamber unit of the first and second tunnel sections will be coupled together in the region of the centre of the arch mid-way between the land bases.
- each tunnel section has inner and outer chamber units mounted on the free end thereof, the two outer units can be coupled together to provide the water sealed passage therethrough while the two inner units can be dismantled or otherwise removed from the sealed passage prior to connecting the tunnel sections together.
- the two inner chamber units can be retained within the sealed chamber of the outer units provided that their structure is appropriately modified to permit extension of the tunnel sections to form the continuous tunnel.
- the present invention still further provides a 1 tunnel comprising a submerged tube extending between support foundations, said tube having the form of an inverted arch to resist upward buoyancy thrust thereon and there being mounted on the exterior of the tube a chamber unit providing with the exterior of the tube a water sealed working chamber and wherein said chamber unit is longitudinally displaceable along the tube for servicing the tube.
- the chamber unit or units will generally be displaced longitudinally without rotation relative to the tunnel section such as by use of appropriate sliding seals although alternative displacement means are available, for example the or a chamber unit may have an internal screw thread which mates with a complementary external screw thread provided on the tunnel section so that the chamber unit is displaced longitudinally by rotating it relative to the tunnel section.
- the submerged tunnel is to be constructed between opposed land based support foundations 1 and 2.
- a generally cylindrical walled tunnel section 3 is secured in the foundation 1 so that the tunnel section projects from the foundation below water level 1a as a cantilever and the bore 3a of the tunnel section opens to atmosphere through the foundation.
- the completed tunnel may be intended for the passage of vehicles and may therefore include a road surface 4 or a railway and may be in the order of 12 metres diameter being constructed from reinforced concrete with internal water-proof membranes and textured external rendering.
- Mounted on the free end 5 of the tunnel section 3 is a bottle shaped chamber unit 6 having a neck part 7 within which the tunnel section 3 is received.
- Water seals 8 are provided between the neck part 7 and the tunnel section; the unit 6 is intended to be longitudinally displaceable along the tunnel section 3 and the seals 8 permit relative sliding movement and remain effective between the said two components during their relative longitudinal displacement.
- the chamber unit 6 forms with the bore 3a a working chamber 9 within which the free end of the tunnel section can be extended as indicated at 5a, for example by use of shuttering 10 where material is cast on to the existing free end of the tunnel section or by the addition of pre-cast elements to lengthen the tunnel section.
- the chamber 9 and bore 3a are substantially at atmospheric pressure and adequate ventilation can be achieved by circulating fresh air-in the direction of arrow A from the land base while exhaust air can pass in the direction of arrow B through ducts 11 located beneath the road surface 4. To promote rapid curing of the material cast in the shuttering 10 the chamber 9 can be heated.
- the chamber unit 6 is intended to be displaced longitudinally over the part 5a to permit sufficient working area in the chamber 9 for the free end of the tunnel section to be further and progressively lengthened. If required, spacers indicated at 12 can be provided between an enlarged diameter part of the unit 6-and the tunnel section 3 to maintain appropriate alignment between that section and unit.
- a further bottle-shaped chamber unit 13 within which the chamber unit 6 is wholly received.
- the unit 13 similarly to the unit 6 has a mouth part 14 with internal
- the chamber unit 13 is intended to be longitudinally displaceable relative to the tunnel section 3 and this outer unit forms a second working chamber 16 which permits, in part, access to the exterior of the tunnel section 3 over the cylindrical region indicated at 17.
- the chamber 16 being water sealed permits work to be carried out on the exterior of the tunnel section 3 over the cylindrical region 17 as aforementioned and both chamber units 6 and 13 provide effective pressure vessels which ensure adequate safety for the personnel in the chamber 9 and in the submerged length of the bore 3a.
- each chamber unit 6 and 13 are intended to be displaced longitudinally progressively and successively over the lengthened parts of the tunnel section 3.
- each chamber unit has associated therewith a clamping unit indicated at 18 by which the respective units can be selectively secured against longitudinal displacement relative to the tunnel section; the clamping units 18 may be operated by any convenient means such as mechanical, fluid pressure operated or electrical.
- Relative longitudinal displacement between the units 6 and 13 is effected by rack and pinion units indicated at 19 operating in conjunction with hydraulic rams 20.
- the driven components of the device 19 are mounted on the inner chamber unit 6 while the longitudinally extending racks with which the pinion components co-operate are mounted on the outer unit 13 and the rams 20 connect between the inner and outer units to provide a stroke which extends longitudinally thereof.
- spacer means can be provided between the units 6 and 13 to maintdin, or assist in maintaining, alignment between those units.
- the components in devices 19 can be driven and the rams 20 contracted to slidably displace the inner unit 6 rightwardly in Figure 1 along the newly lengthened tunnel section until the maximum extent of displacement of the inner unit 6 rightwardly in the outer unit 13 is reached.
- the inner unit 6 can be secured by its associated clamp unit 18 to the tunnel section 3 and the clamp unit 18 associated with the outer unit 13 released; the pinion components of devices 19 can now be driven and the rams 20 extended to displace the outer chamber unit 13 along the tunnel section 3 and rightwardly in Figure 1 to a desired extent whereafter the unit 13 can again be secured to the tunnel section 3 prior to rightward displacement of the inner chamber unit 6 as described above for further lengthening of the tunnel section.
- Desirably-the chamber 16 is maintained at a greater pressure than that in chamber 9 to relieve pressure on the seals 15 and for this purpose an air compressor 21 is provided.
- Air locks and de-compression chambers 22 and 23 are provided to permit access between the chamber 9 and the chamber 16 and between the chamber 16 and the water (the latter being convenient for external nspection).
- a water pump/sump 24 is provided in the outer chamber unit 13.
- the upward buoyancy thrust on the free end of the tunnel section increases.
- the outer chamber unit 13 is anchored to the sea bed by a hawser 25 extending from a winch 26(mounted in the unit 13) to an appropriate sea bed anchorage 27.
- the winch 26 can be operated to vary the length of the hawser 25 to maintain the free end of the tunnel section at a predetermined depth of submergence.
- several such anchoring devices can be provided.
- the tunnel section 3 can be lengthened and the chamber units 6 and 13 progressively displaced to extend that tunnel section from the base foundation 1 to the opposing foundation 2 while the. submerged depth of the tunnel section is controlled by appropriate anchorages.
- the tunnel is constructed by progressively lengthening(in a similar manner to that previously described) two similar tunnel sections extending in cantilevered manner from the base foundations 1 and 2 and at opposite ends of the effective tubular tunnel which is to be formed. * This preference is illustrated in Figure 2 where, for convenience, the same parts or members associated with with the second tunnel section as those associated with the first tunnel section 3 are indicated by dashed references having the same numerals.
- tunnel sections 3 and 3' are progressively lengthened towards each other their respective depth of submergence and alignment may be controlled by the winches 26 and 26' which, for convenience, are connected with the anchorage 27 (which is common to both winched and may be situated beneath what will be the mid-length position of the tubular tunnel when completed.
- the tunnel sections 3 and 3' are extended until the outer chamber units 13 and 13' can conveniently be coupled together in alignment.
- the chamber units are provided with mutually co-operable docking means 28, 28' which move into engagement with each other and can be welded, bolted or otherwise joined together as indicated at 29 in Figure 3 to provide a water seal.
- the completed tunnel 31 is spaced from the sea bed and may be regarded as a "submerged floating tunnel". Furthermore, the tunnel 31 has the form of an inverted arch which resists the buoyancy thrust thereon and, if required, the anchorages 25, 25' can be removed.
- the coupled chamber units 13, 13' are preferably retained to provide the water sealed chamber 16, 16' and these units can be longitudinally displaceable over the length of the tunnel to permit servicing and maintenance of the exterior of the tunnel as and when necessary.
- Any convenient means can be provided for longitudinally displacing the combined units 13, 13' for example the units may be connected by hawsers to winches on the base foundations 1 and 2 which are controlled as necessary to move the units over the tunnel.
- the tunnel section or sections will extend between opposed land bases so that the tunnel lies in a single vertical plane and in plan view is substantially straight - this permits maximum advantage to be taken of the inverted arch form of the tunnel to withstand the buoyancy thrust. It is to be realised however that the present invention is applicable to the construction of a submerged tunnel which extends other than in a single vertical plane between opposed base foundations, that is to say the tunnel may be curved in plan view and although it may still have a substantially arch-like form in side elevation the curvature in plan view may require anchorages to resist the buoyancy thrust.
- the winch devices 26 provide self (automatic) levelling and/or that buoyancy tanks are incorporated within the tunnel sections or in the working chambers, such tanks being optionally water filled or air blown to vary the effective buoyancy of the tunnel sections as required.
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
Description
- This invention relates to a method of, and means for constructing a submerged tunnel and also to a submerged tunnel.
- Submerged tunnels extending between land bases are usually provided in conditions where a bridge is not possible (for example, if the span is too great, the land bases or sea bed are inadequate foundations or a shipping hazard would result) or where a bridge is undesirable (for example, aesthetically or environmentally).
- Hitherto it has been the practice for submerged tunnels to be constructed on land and thereafter floated to the appropriate site and sunk into position; this technique besides requiring a large land based building site and heavy equipment for manoeuvring the tunnel or tunnel sections prior to their submergence is often disrupted by adverse weather conditions and interrupts shipping. It is an object of the present invention to provide a method and means of constructing a submerged tunnel in situ which alleviates the aforementioned disadvantages.
- According to the present invention there is provided a method of constructing a submerged tunnel in situ which comprises providing a longitudinally extending substantially cantilevered tunnel section with a chamber unit mounted on the free end thereof so that the chamber unit and bore of the tunnel section provide a water sealed working chamber; lengthening the longitudinal extent of the tunnel section within the chamber unit, and displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
- Further according to the present inventibn there is provided means for constructing a submerged tunnel in situ comprising a longitudinally extending substantially cantilevered tunnel section; a chamber unit mounted on the free end of the tunnel section so that that unit and the bore of the tunnel section provide a water sealed working chamber within which the longitudinal extent of the tunnel can be lengthened in the chamber unit, and means for displacing the chamber unit longitudinally relative to the tunnel section over the lengthened part thereof to permit further lengthening of the tunnel section within the chamber unit.
- The present invention therefore envisages the construction of a submerged tunnel in situ by successively lengthening a cantilevered tunnel section which latter will usually be anchored in support foundations of a land base so that the bore of the tube is in direct communication with land throughout the construction of the tunnel. The construction,being effected in a submerged state, is unlikely to be affected to any great extent by adverse weather conditions and may be at such a depth as not to present a shipping hazard. The tunnel section being in the form of a tube will-usually, but not necessarily, be of circular section and its lengthening within the chamber unit will usually be achieved by the addition of pre-formed elements to the end of the tunnel section or by progressively casting or moulding material to the end of the section. The present invention was primarily developed having in mind the construction of tunnels for the passage of vehicles therethrough in which case its dimensions will usually call for a basic tube structure of reinforced concrete although it will be appreciated that other materials for the tube can be utilised, say reinforced plastics sections for smaller tunnels which may be required for conduiting or a fluid flow passage. -
- The chamber unit effectively provides a pressure vessel within which work is carried out to progressively lengthen the tunnel section within that unit; this work may be effected both on the interior and the exterior of the tunnel section and when appropriate the pressure unit is displaced longitudinally over the newly lengthened tube wall to permit further lengthening.
- Preferably two chamber units are mounted on the free end of the tunnel section, one such unit being located wholly within the other unit so that the inner chamber unit provides with the bore of the tunnel section a first working chamber and the outer chamber unit provides with the exterior of the inner unit a second working chamber within which there is access to the exterior of the tunnel section. By this arrangement the outer chamber unit effectively provides a second pressure vessel within the chamber of which further work may be carried out on the exterior of the tube section while the tunnel section is being progressively lengthened within the first working chamber. The inner and outer chamber units are displaced progressively along the tunnel section as the length thereof is increased. This displacement of the inner and outer chamber units may be effected simultaneously so that they move in combination.but it is preferred that each chamber unit is displaceable relative to the tube section independently of the other so that when the outer chamber unit is stationary relative to the tube section the inner unit can be displaced longitudinally as the tube section is progressively lengthened to a maximum extent permitted by the outer unit and thereafter while the inner unit is stationary relative to the tube section the outer unit can be displaced over the inner unit to permit subsequent displacement of the inner unit.
- As the length of the cantilevered tunnel progressively increases from its support foundation it will be apparent that the upward buoyancy thrust thereon increases and desirably the free end of the tunnel section is restrained at a desired depth of submergence by anchoring.
- The whole construction of the tunnel may be effected by progressively lengthening the tunnel section from one land base to another and in such an event it is preferred that the shape of the tube which is formed is controlled, say by use of appropriate anchorages, so that the tube is an inverted arch to resist the upward buoyancy thrust thereon. It is realised however that on many occasions the construction of the tunnel from a single land base will be impractical or inefficient and it is preferred therefore that the construction is by means of two longitudinally extending substantially cantilevered tunnel sections each having a chamber unit mounted on its free end within which unit the lengthening of the longitudinal extent of the respective tunnel section is effected. A first of these tunnel sections is secured at a location corresponding to one end of the tunnel which is to be constructed while the second tunnel section is secured at a location corresponding to the other end of the tunnel which is to be constructed. The first and second tunnel sections are then progressively lengthened by working within their respective chamber units so that the free ends of the tunnel sections project towards each other and a condition is reached where the chamber units of the respective tunnel sections can be coupled together. With the chamber units coupled together a longitudinally extending water sealed passage can be formed between those units and thereafter one or both of the tunnel sections is lengthened to extend through the sealed passage and connect the two tunnel sections together to provide continuity of the tunnel. To resist the upward buoyancy thrust on the tunnel it is preferred that the tube is an inverted arch formation as aforementioned and generally the chamber unit of the first and second tunnel sections will be coupled together in the region of the centre of the arch mid-way between the land bases. Where each tunnel section has inner and outer chamber units mounted on the free end thereof, the two outer units can be coupled together to provide the water sealed passage therethrough while the two inner units can be dismantled or otherwise removed from the sealed passage prior to connecting the tunnel sections together. Alternatively the two inner chamber units can be retained within the sealed chamber of the outer units provided that their structure is appropriately modified to permit extension of the tunnel sections to form the continuous tunnel.
- With the chamber units coupled together to provide the water sealed passage through which the tube of the tunnel extends a desirable feature can be provided by arranging for the chamber units to be longitudinally displaceable over the tube for the purpose of maintenance or servicing of the exterior of the tube. With this in mind the present invention still further provides a 1 tunnel comprising a submerged tube extending between support foundations, said tube having the form of an inverted arch to resist upward buoyancy thrust thereon and there being mounted on the exterior of the tube a chamber unit providing with the exterior of the tube a water sealed working chamber and wherein said chamber unit is longitudinally displaceable along the tube for servicing the tube.
- As will be appreciated appropriate water seals will be provided between the chamber unit or units and the tunnel section. Longitudinal displacement of a chamber unit will usually be effected by fluid pressure operated means such as hydraulic rams and/or mechanical means such as a rack and pinion device; displacement of a chamber unit may be effected by reaction directly between that unit and the tunnel section or, in the case of the inner and outer chamber unit proposal by reaction directly between-the inner and outer units where one unit will be longitudinally displaced while the other unit is secured relative to the tunnel section. - It is envisaged that the chamber unit or units will generally be displaced longitudinally without rotation relative to the tunnel section such as by use of appropriate sliding seals although alternative displacement means are available, for example the or a chamber unit may have an internal screw thread which mates with a complementary external screw thread provided on the tunnel section so that the chamber unit is displaced longitudinally by rotating it relative to the tunnel section.
- One embodiment of the present invention will now be described, by way of example only, with reference to the accompanying illustrative drawings, in which:-
- Figure 1 diagrammatically illustrates a section through a cantilevered tunnel section and chamber units mounted on such section for the construction of a tunnel;
- Figure 2 diagrammatically illustrates an arrangement whereby two tunnel sections and associated chamber units similar to that shown in Figure 1 are disposed for constructing a tunnel from opposed ends thereof, and
- Figure 3 is a similar view to that shown in Figure 2 and diagrammatically illustrates the tunnel when completed and having mounted thereon a chamber unit which is longitudinally displaceable along the tunnel for maintenance and inspection purposes.
- The submerged tunnel is to be constructed between opposed land based support foundations 1 and 2. A generally cylindrical
walled tunnel section 3 is secured in the foundation 1 so that the tunnel section projects from the foundation belowwater level 1a as a cantilever and the bore 3a of the tunnel section opens to atmosphere through the foundation. The completed tunnel may be intended for the passage of vehicles and may therefore include a road surface 4 or a railway and may be in the order of 12 metres diameter being constructed from reinforced concrete with internal water-proof membranes and textured external rendering. Mounted on thefree end 5 of thetunnel section 3 is a bottle shaped chamber unit 6 having aneck part 7 within which thetunnel section 3 is received.Water seals 8 are provided between theneck part 7 and the tunnel section; the unit 6 is intended to be longitudinally displaceable along thetunnel section 3 and theseals 8 permit relative sliding movement and remain effective between the said two components during their relative longitudinal displacement. The chamber unit 6 forms with the bore 3a aworking chamber 9 within which the free end of the tunnel section can be extended as indicated at 5a, for example by use of shuttering 10 where material is cast on to the existing free end of the tunnel section or by the addition of pre-cast elements to lengthen the tunnel section. Thechamber 9 and bore 3a are substantially at atmospheric pressure and adequate ventilation can be achieved by circulating fresh air-in the direction of arrow A from the land base while exhaust air can pass in the direction of arrow B throughducts 11 located beneath the road surface 4. To promote rapid curing of the material cast in the shuttering 10 thechamber 9 can be heated. - Following completion of the
additional part 5a of the tunnel section (and removal of the shuttering 10) the chamber unit 6 is intended to be displaced longitudinally over thepart 5a to permit sufficient working area in thechamber 9 for the free end of the tunnel section to be further and progressively lengthened. If required, spacers indicated at 12 can be provided between an enlarged diameter part of the unit 6-and thetunnel section 3 to maintain appropriate alignment between that section and unit. - Also mounted on the free end of the tunnel-
section 3 is a further bottle-shaped chamber unit 13 within which the chamber unit 6 is wholly received. Theunit 13 similarly to the unit 6 has amouth part 14 with internal -
water seals 15 within which thetunnel section 3 is received. Again similarly to the unit 6, thechamber unit 13 is intended to be longitudinally displaceable relative to thetunnel section 3 and this outer unit forms asecond working chamber 16 which permits, in part, access to the exterior of thetunnel section 3 over the cylindrical region indicated at 17. - The
chamber 16 being water sealed permits work to be carried out on the exterior of thetunnel section 3 over thecylindrical region 17 as aforementioned and bothchamber units 6 and 13 provide effective pressure vessels which ensure adequate safety for the personnel in thechamber 9 and in the submerged length of the bore 3a. - The
chamber units 6 and 13 are intended to be displaced longitudinally progressively and successively over the lengthened parts of thetunnel section 3. For this latter purpose, each chamber unit has associated therewith a clamping unit indicated at 18 by which the respective units can be selectively secured against longitudinal displacement relative to the tunnel section; theclamping units 18 may be operated by any convenient means such as mechanical, fluid pressure operated or electrical. - Relative longitudinal displacement between the
units 6 and 13 is effected by rack and pinion units indicated at 19 operating in conjunction withhydraulic rams 20. As shown in Figure 1, the driven components of thedevice 19 are mounted on the inner chamber unit 6 while the longitudinally extending racks with which the pinion components co-operate are mounted on theouter unit 13 and therams 20 connect between the inner and outer units to provide a stroke which extends longitudinally thereof. If required spacer means (not shown) can be provided between theunits 6 and 13 to maintdin, or assist in maintaining, alignment between those units. - With the
outer unit 13 secured byclamp 18 to thetunnel section 3 the components indevices 19 can be driven and therams 20 contracted to slidably displace the inner unit 6 rightwardly in Figure 1 along the newly lengthened tunnel section until the maximum extent of displacement of the inner unit 6 rightwardly in theouter unit 13 is reached. At this latter stage the inner unit 6 can be secured by its associatedclamp unit 18 to thetunnel section 3 and theclamp unit 18 associated with theouter unit 13 released; the pinion components ofdevices 19 can now be driven and therams 20 extended to displace theouter chamber unit 13 along thetunnel section 3 and rightwardly in Figure 1 to a desired extent whereafter theunit 13 can again be secured to thetunnel section 3 prior to rightward displacement of the inner chamber unit 6 as described above for further lengthening of the tunnel section. - As will be appreciated from the aforegoing all of the materials, equipment and facilities necessary for lengthening the tunnel section are fed into the working
chamber 9 through the bore 3a. - Desirably-the
chamber 16 is maintained at a greater pressure than that inchamber 9 to relieve pressure on theseals 15 and for this purpose anair compressor 21 is provided. Air locks andde-compression chambers chamber 9 and thechamber 16 and between thechamber 16 and the water (the latter being convenient for external nspection). A water pump/sump 24 is provided in theouter chamber unit 13. - As the cantilevered length of the
tunnel section 3 is progressively increased from the base foundation 1 the upward buoyancy thrust on the free end of the tunnel section (by which is included the buoyancy attributed to the chamber units) increases. To restrain upward movement of the free end of the tunnel section as a result of this buoyancy thrust theouter chamber unit 13 is anchored to the sea bed by ahawser 25 extending from a winch 26(mounted in the unit 13) to an appropriatesea bed anchorage 27. As theouter chamber unit 13 is progressively displaced along the progressively lengtheningtunnel section 23 thewinch 26 can be operated to vary the length of thehawser 25 to maintain the free end of the tunnel section at a predetermined depth of submergence. As will be appreciated, several such anchoring devices can be provided. - If required, the
tunnel section 3 can be lengthened and thechamber units 6 and 13 progressively displaced to extend that tunnel section from the base foundation 1 to the opposing foundation 2 while the. submerged depth of the tunnel section is controlled by appropriate anchorages. Preferably however the tunnel is constructed by progressively lengthening(in a similar manner to that previously described) two similar tunnel sections extending in cantilevered manner from the base foundations 1 and 2 and at opposite ends of the effective tubular tunnel which is to be formed.* This preference is illustrated in Figure 2 where, for convenience, the same parts or members associated with with the second tunnel section as those associated with thefirst tunnel section 3 are indicated by dashed references having the same numerals. As thetunnel sections 3 and 3' are progressively lengthened towards each other their respective depth of submergence and alignment may be controlled by thewinches 26 and 26' which, for convenience, are connected with the anchorage 27 (which is common to both winched and may be situated beneath what will be the mid-length position of the tubular tunnel when completed. Thetunnel sections 3 and 3' are extended until theouter chamber units 13 and 13' can conveniently be coupled together in alignment. To facilitate such coupling the chamber units are provided with mutually co-operable docking means 28, 28' which move into engagement with each other and can be welded, bolted or otherwise joined together as indicated at 29 in Figure 3 to provide a water seal. Following the sealed connection of the two outer units, bulk heads (shown at 30 in Figure 1) in the walls of those'units are removed to provide a passage which extends longitudinally through the water sealedcoupling 29 and within the enlarged chamber formed by the combinedchambers 16 and 16'. The inner chamber units 6 and 6' are now dismantled and conveniently removed through the bore of the tunnel sections. One or both of the tunnel sections-3 and 3' is now lengthened to join with the other tunnel section within theenlarged chamber 16, 16' to complete the tubular tunnel as shown at 31 in Figure 3. - From Figure 3 it will be seen that the completed
tunnel 31 is spaced from the sea bed and may be regarded as a "submerged floating tunnel". Furthermore, thetunnel 31 has the form of an inverted arch which resists the buoyancy thrust thereon and, if required, theanchorages 25, 25' can be removed. - Following completion of the
tunnel 31 the coupledchamber units 13, 13' are preferably retained to provide the water sealedchamber 16, 16' and these units can be longitudinally displaceable over the length of the tunnel to permit servicing and maintenance of the exterior of the tunnel as and when necessary. Any convenient means can be provided for longitudinally displacing the combinedunits 13, 13' for example the units may be connected by hawsers to winches on the base foundations 1 and 2 which are controlled as necessary to move the units over the tunnel. - Usually the tunnel section or sections will extend between opposed land bases so that the tunnel lies in a single vertical plane and in plan view is substantially straight - this permits maximum advantage to be taken of the inverted arch form of the tunnel to withstand the buoyancy thrust. It is to be realised however that the present invention is applicable to the construction of a submerged tunnel which extends other than in a single vertical plane between opposed base foundations, that is to say the tunnel may be curved in plan view and although it may still have a substantially arch-like form in side elevation the curvature in plan view may require anchorages to resist the buoyancy thrust. Furthermore, to counter variations in upward buoyancy thrust that may occur on the tunnel section or sections during their lengthening as a result of the movement of heavy loads (such as material and equipment) along those sections, it may be desirable that the
winch devices 26 provide self (automatic) levelling and/or that buoyancy tanks are incorporated within the tunnel sections or in the working chambers, such tanks being optionally water filled or air blown to vary the effective buoyancy of the tunnel sections as required.
Claims (29)
from within the outer chamber units prior to lengthening the first and second tunnel sections to connect with each other.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT81300640T ATE7809T1 (en) | 1980-02-22 | 1981-02-17 | UNDERWATER TUNNEL AND METHOD AND APPARATUS FOR MAKING AN UNDERWATER TUNNEL. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB8006114A GB2070111B (en) | 1980-02-22 | 1980-02-22 | Method of constructing a submerged tunnel |
GB8006114 | 1980-02-22 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0034907A1 true EP0034907A1 (en) | 1981-09-02 |
EP0034907B1 EP0034907B1 (en) | 1984-06-06 |
Family
ID=10511601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP81300640A Expired EP0034907B1 (en) | 1980-02-22 | 1981-02-17 | A submerged tunnel and a method of, and means for, constructing a submerged tunnel |
Country Status (5)
Country | Link |
---|---|
EP (1) | EP0034907B1 (en) |
AT (1) | ATE7809T1 (en) |
DE (1) | DE3162634D1 (en) |
GB (1) | GB2070111B (en) |
GR (1) | GR78276B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT202200008171A1 (en) | 2022-04-26 | 2023-10-26 | Mario Burigo | INNOVATIVE METHOD FOR THE CONSTRUCTION OF SUBMERGED TUNNELS |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3607002A1 (en) * | 1986-03-04 | 1987-09-17 | Bernhard Furrer | Method of constructing an underwater tunnel, and an underwater tunnel constructed according to the method |
NO881538L (en) * | 1988-04-08 | 1989-10-09 | Moss Rosenberg Verft As | FLOATING ROERBRO. |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE306127C (en) * | ||||
DE369557C (en) * | 1923-02-20 | Gustav Peter Helfrich | Method of making underwater tunnels | |
DE1784974C2 (en) * | 1963-07-19 | 1972-05-04 | Holzmann Philipp Ag | Method for making an underwater tunnel |
DE2423854A1 (en) * | 1974-05-16 | 1975-12-04 | Josef Boessner | Cable-curve-suspended concrete marine tunnel - with suspended weights loading tube to produce heaviness approaching buoyancy thrust |
US3952524A (en) * | 1974-01-04 | 1976-04-27 | Rand Burgess F | Pipe laying method and apparatus |
GB2016065A (en) * | 1978-03-09 | 1979-09-19 | Precontrainte Structures Soc F | A method and an installation for launching a submerged tunnel |
-
1980
- 1980-02-22 GB GB8006114A patent/GB2070111B/en not_active Expired
-
1981
- 1981-02-17 AT AT81300640T patent/ATE7809T1/en not_active IP Right Cessation
- 1981-02-17 EP EP81300640A patent/EP0034907B1/en not_active Expired
- 1981-02-17 DE DE8181300640T patent/DE3162634D1/en not_active Expired
- 1981-02-23 GR GR64217A patent/GR78276B/el unknown
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE306127C (en) * | ||||
DE369557C (en) * | 1923-02-20 | Gustav Peter Helfrich | Method of making underwater tunnels | |
DE1784974C2 (en) * | 1963-07-19 | 1972-05-04 | Holzmann Philipp Ag | Method for making an underwater tunnel |
US3952524A (en) * | 1974-01-04 | 1976-04-27 | Rand Burgess F | Pipe laying method and apparatus |
DE2423854A1 (en) * | 1974-05-16 | 1975-12-04 | Josef Boessner | Cable-curve-suspended concrete marine tunnel - with suspended weights loading tube to produce heaviness approaching buoyancy thrust |
GB2016065A (en) * | 1978-03-09 | 1979-09-19 | Precontrainte Structures Soc F | A method and an installation for launching a submerged tunnel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT202200008171A1 (en) | 2022-04-26 | 2023-10-26 | Mario Burigo | INNOVATIVE METHOD FOR THE CONSTRUCTION OF SUBMERGED TUNNELS |
WO2023209744A1 (en) | 2022-04-26 | 2023-11-02 | Mario Burigo | Submerged tunnels |
Also Published As
Publication number | Publication date |
---|---|
GR78276B (en) | 1984-09-26 |
GB2070111A (en) | 1981-09-03 |
GB2070111B (en) | 1983-12-14 |
ATE7809T1 (en) | 1984-06-15 |
DE3162634D1 (en) | 1984-07-12 |
EP0034907B1 (en) | 1984-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4000624A (en) | Multi-component offshore platform | |
US2907172A (en) | Method and apparatus for constructing offshore drilling platforms | |
US4072018A (en) | Tunnel support structure and method | |
US7004737B2 (en) | Methods and apparatus for forming concrete structures | |
CN101832049B (en) | Concrete-structured conjoined cylindrical shell construction device and method therefor | |
US3750407A (en) | Tunnel construction method | |
JPS61294015A (en) | Construction of offshore platform | |
US3893304A (en) | Method and a device for the underwater construction of concrete structures | |
US3891037A (en) | Remotely operated seafloor coring and drilling method and system | |
US4444526A (en) | Submerged tunnel and a method of and means for constructing a submerged tunnel | |
EP0034907B1 (en) | A submerged tunnel and a method of, and means for, constructing a submerged tunnel | |
US3293865A (en) | System for lining large diameter bore holes | |
US2414310A (en) | Method of building concrete oil storage tanks | |
US4193714A (en) | Method for erecting a deck on a marine structure | |
US2675680A (en) | Construction of submerged | |
EP2417305A2 (en) | Method for erecting an offshore station and offshore station | |
CN212153427U (en) | Peripheral firm high accuracy zero interference weir mould body structure | |
JP2668184B2 (en) | How to launch a submerged box | |
US4912890A (en) | Air/water cranes | |
US3117423A (en) | Method for the production of underwater foundations | |
CN111379265A (en) | Peripherally-stabilized high-precision zero-interference weir-mold integrated structure and construction method thereof | |
EP3943666A1 (en) | Method for the installation of an offshore maritime structure and offshore maritime structure | |
WO1980002708A1 (en) | A method for performing underwater casting of concrete structures,and an apparatus for carrying out the method | |
IE44972B1 (en) | Iprovements in deep water platforms for marine work | |
EP0500221A1 (en) | Method and apparatus for constructing long span, shell-shaped, substantially horizontal concrete structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR IT LU NL SE |
|
17P | Request for examination filed |
Effective date: 19820225 |
|
ITF | It: translation for a ep patent filed | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR IT LI LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19840606 Ref country code: CH Effective date: 19840606 Ref country code: BE Effective date: 19840606 Ref country code: AT Effective date: 19840606 |
|
REF | Corresponds to: |
Ref document number: 7809 Country of ref document: AT Date of ref document: 19840615 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3162634 Country of ref document: DE Date of ref document: 19840712 |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19850228 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 19850228 Year of fee payment: 5 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19860228 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19870218 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19870901 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19871030 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19871103 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
EUG | Se: european patent has lapsed |
Ref document number: 81300640.0 Effective date: 19880215 |