DK180503B1 - Procedure for flood protection and temporary dikes for flood protection - Google Patents

Procedure for flood protection and temporary dikes for flood protection Download PDF

Info

Publication number
DK180503B1
DK180503B1 DKPA201900471A DKPA201900471A DK180503B1 DK 180503 B1 DK180503 B1 DK 180503B1 DK PA201900471 A DKPA201900471 A DK PA201900471A DK PA201900471 A DKPA201900471 A DK PA201900471A DK 180503 B1 DK180503 B1 DK 180503B1
Authority
DK
Denmark
Prior art keywords
section
wall
sections
dike
coupling part
Prior art date
Application number
DKPA201900471A
Other languages
Danish (da)
Inventor
Oliver Bach Jens
Original Assignee
Wintec Aps
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wintec Aps filed Critical Wintec Aps
Priority to DKPA201900471A priority Critical patent/DK180503B1/en
Publication of DK201900471A1 publication Critical patent/DK201900471A1/en
Application granted granted Critical
Publication of DK180503B1 publication Critical patent/DK180503B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

Midlertidigt dige til sikring mod oversvømmelser samt fremgangsmåde til sikring mod oversvømmelse, hvor det midlertidige dige omfatter en under jordniveau (2) etableret langs en digelinje forløbende forankringsvæg (6) hvortil oprette i det væsentlige vanduigennemtrængelige vægsegmenter (8) er kobbelbare over jordniveau (2) og hvor forankringsvæggen (6) omfatter præfabrikerede individuelle sektioner (10), hvor hver præfabrikeret sektion (10) har en længdeakse (20) og i retning af længdeaksen forløbende formsluttende indgrebsdele (14,16) til etablering af et formsluttende indgreb med en modsvarende indgrebsdel (14,16) af en nabosektionTemporary dike for flood protection as well as method for flood protection, wherein the temporary dike comprises an anchoring wall (6) established below ground level (2) to which upright water-impermeable wall segments (8) can be connected above ground level (2) and wherein the anchoring wall (6) comprises prefabricated individual sections (10), each prefabricated section (10) having a longitudinal axis (20) and form-fitting engaging parts (14, 16) extending towards the longitudinal axis for establishing a form-fitting engagement with a corresponding engaging part (14,16) of a neighboring section

Description

DK 180503 B1 1 Fremgangsmåde til sikring mod oversvømmelse samt midlertidigt dige til sikring mod oversvømmelse Den foreliggende opfindelse angår en fremgangsmåde til sikring mod oversvømmelse, hvor der i tilfælde af forhøjet risiko for oversvømmelse etableres et midlertidigt dige idet det udnyttes, at der på forhånd er etab- leret en digelinje med en forankringsvæg, hvortil vægsegmenter let og hurtigt kan monteres. Opfindelsen angår tillige et midlertidigt dige til sik- ring mod oversvømmelser.The present invention relates to a method for flood protection, in which a temporary dike is established in the event of an increased risk of flooding, taking advantage of the fact that there is a pre-flood. clay a dike line with an anchoring wall, to which wall segments can be easily and quickly mounted. The invention also relates to a temporary dike for protection against floods.

Det er kendt at etablere midlertidige sikringer mod oversvømmelser, hvor en forankringsvæg etableres ved støbning på stedet for dens etab- lering ved f.eks. brug af beton. Dette kræver store forberedelsesarbejder så som bygning af støbeforme på stedet, og afmontering af formelemen- ter efter støbning og hærdning af betonen, samt mulig efterbearbejdning med afhugning af støbegrater. Der er således behov for en fremgangs- måde og en forankringsvæg, som ikke har disse problemer. DE20213521 U1 viser en digelinje omfattende præfabrikerede beton- elementer, der er nedsat i en jordvold, hvoraf kun en topdel rager op over jordvolden. Den opragende topdel er vist anvendt til modtagelse af en forøgelse af højden af diget.It is known to establish temporary protection against floods, where an anchoring wall is established by casting at the place of its establishment by e.g. use of concrete. This requires major preparatory work, such as the construction of molds on site, and the removal of mold elements after casting and hardening of the concrete, as well as possible finishing with dismantling of cast bones. There is thus a need for a method and an anchoring wall which do not have these problems. DE20213521 U1 shows a dike line comprising prefabricated concrete elements set down in an earth embankment, of which only a top part protrudes above the earth embankment. The protruding top part is shown used to receive an increase in the height of the dike.

DE202007018230 U1 viser anvendelse af præfabrikerede forankringse- lementer, der er nedsatte i jorden og indrettede til modtagelse af foran- kringsliner for en højvands-mur.DE202007018230 U1 shows the use of prefabricated anchoring elements that are lowered into the ground and arranged to receive anchoring lines for a flood wall.

GB2472796 A midlertidig oversvømmelsessikring, hvor en i jorden an- bragt base er indrettet til at modtage vægsegmenter i modtagedele her- af, der lige netop er over jordoverfladen.GB2472796 A temporary flood protection, where a base located in the ground is arranged to receive wall segments in receiving parts thereof, which are just above the ground surface.

DK 180503 B1 2 Den foreliggende opfindelses formål er at angive en fremgangsmåde til etablering af et midlertidigt dige, samt et midlertidigt dige, der i det mind- ste udgør et alternativ til den kendte teknik, og hvor etableringen af diget kan effektueres relativt hurtigt og uden et væsentligt planlægningsforløb, hvor de elementer, der anvendes til etablering af diget muliggør en flek- sibel byggehøjde samt er lette at lagerføre, transportere samt opsætte og nedtage.The object of the present invention is to provide a method for establishing a temporary dike, as well as a temporary dike, which at least constitutes an alternative to the prior art, and where the establishment of the dike can be effected relatively quickly and without an important planning process, where the elements used to establish the dike enable a flexible building height and are easy to store, transport and set up and take down.

Formålet med den foreliggende opfindelse opnås med en fremgangsmå- de som defineret i krav 1, forankringsvæggen etableres sektionsvis, hvor hver sektion af forankringsvæggen præfabrikeres og efterfølgende ned- sættes i en rende langs digelinjen, idet en sektion af forankringsvæggen bringes til indgreb med en allerede i renden anbragt sektion af foran- kringsvæggen for efterfølgende at blive i det mindste delvist overdækket med jord, ler eller beton, hvor de enkelte sektioner dannes af enten L- formede eller omvendt T-formede præfabrikerede elementer, der hver omfatter en opretstående koblingsdel og en vandret foddel, hvor hver sektion enten støbes i en og samme støbeform, eller støbes med den op- rette koblingsdel og den vandrette foddel i hver sin støbeform og efterføl- gende samles til en sektion på byggepladsen, hvor der i koblingsdelen er tilvejebragt flere lodrette blindhuller.The object of the present invention is achieved by a method as defined in claim 1, the anchoring wall is established in sections, where each section of the anchoring wall is prefabricated and subsequently lowered into a gutter along the dike line, a section of the anchoring wall being brought into engagement with an already in the section of the anchoring wall is arranged to be subsequently at least partially covered with earth, clay or concrete, the individual sections being formed by either L-shaped or inverted T-shaped prefabricated elements, each comprising an upright coupling part and a horizontal foot part, where each section is either molded in one and the same mold, or molded with the upright coupling part and the horizontal foot part in separate molds and subsequently assembled into a section on the construction site, where several vertical blind holes are provided in the coupling part.

Det nye og særlige ved fremgangs- måden udgøres af at to profilstolper nedsættes i hver sit lodrette blindhul i den opretstående koblingsdel og at de vanduigennemtrængelige vægsegmenter efterfølgende anbringes ovenpå hinanden på en sådan måde, at de vanduigennemtrængelige vægsegmenter strækker sig mel- lem de to profilstolper.The new and special feature of the method is that two profile posts are lowered into their respective vertical blind holes in the upright coupling part and that the water-impermeable wall segments are subsequently placed on top of each other in such a way that the water-impermeable wall segments extend between the two profile posts.

Herved er det muligt at etablere et midlertidigt dige hurtigt og uden et væsentligt planlægningsforløb.This makes it possible to establish a temporary dike quickly and without a significant planning process.

Fremgangsmåden muliggør en fleksibel byggehøjde samt gør det let at lagerføre, transportere samt opsætte og nedtage de elementer, der indgår i det midlertidige dige.The method enables a flexible construction height and makes it easy to stock, transport and set up and take down the elements that are part of the temporary dike.

DK 180503 B1 3 Ved at præfabrikere sektioner af forankringsvæggen, kan man fremstille et passende lager heraf på forhånd. Når beslutningen om etablering af et midlertidigt dige er taget, kan man hurtigt foretage det nødvendige jord- arbejde og dernæst nedsætte forankringsvæggens præfabrikerede sek- tioner efter hinanden langs den digelinje, som er fastlagt på forhånd og sikre elementerne i jorden ved en mere eller mindre omfattende tildæk- ning med jord. Nu er det simpelt med allerede kendte vægsegmenter, at etablere en midlertidig beskyttelse mod oversvømmelse, idet vægseg- menter, der er vanduigennemtrængelige hurtigt og let monteres på de præfabrikerede sektioner.DK 180503 B1 3 By prefabricating sections of the anchoring wall, a suitable stock can be made in advance. Once the decision to establish a temporary dike has been made, the necessary earthworks can be carried out quickly and then the prefabricated sections of the anchoring wall can be lowered one after the other along the dike line, which is determined in advance and secure the elements in the ground by a more or less extensive covering with soil. It is now simple with already known wall segments to establish a temporary protection against flooding, as wall segments that are impermeable to water are quickly and easily mounted on the prefabricated sections.

Det er en fordel, at de enkelte sektioner er dannede af enten L-formede eller omvendt T-formede elementer, der hver omfatter en opretstående koblingsdel og en vandret foddel, hvor hver sektion enten støbes i en og samme støbeform, eller støbes med den oprette koblingsdel og den vandrette foddel i hver sin støbeform så de efterfølgende samles til en sektion på byggepladsen. Fordelene ved støbning i et sammenhængen- de element er, at der her ikke bliver behov for en yderligere samlingsop- peration og tilhørende beslag eller lignende. Fordelene ved støbning i to adskilte forme er, at de enkelte elementer bliver lettere, så de kan hånd- teres med lettere entreprenør-materiel, hvad der kan være vigtig i by- mæssige områder, hvor pladsen omkring en udgravning til en digelinje kan være trang.It is an advantage that the individual sections are formed of either L-shaped or inverted T-shaped elements, each comprising an upright coupling part and a horizontal foot part, each section being either molded in one and the same mold, or molded with the upright coupling part and the horizontal foot part in their respective molds so that they are subsequently assembled into a section on the construction site. The advantages of casting in a coherent element are that there will be no need for an additional assembly operation and associated fittings or the like. The advantages of casting in two separate molds are that the individual elements become lighter, so that they can be handled with lighter construction material, which can be important in urban areas, where the space around an excavation for a dike line can be cramped. .

Ved nedsætningen af de præfabrikerede sektioner i en rende langs dige- linjen er det en mulighed, at sektionerne indgriber i hinanden, til sikring mod at de efterfølgende kipper eller skrider sideværts fra hinanden. Denne sikring er af betydning, idet der ved oversvømmelser vil være en vandmættet jord ud mod vandsiden af diget, og denne kan risikere at være mere eller mindre plastisk eller flydende, således at selv mindre sideværts kræfter mod de jordlagte sektioner kan få disse til at bevægeWhen lowering the prefabricated sections into a gutter along the digging line, it is possible for the sections to engage each other, to ensure that they subsequently tilt or slide laterally apart. This protection is important, as in the event of floods there will be a water-saturated soil towards the water side of the dike, and this may risk being more or less plastic or floating, so that even minor lateral forces against the buried sections can make them move

DK 180503 B1 4 sig i forhold til hinanden, og f.eks. skride ud til siden. Herved kan der komme en revne mellem to nabosektioner og gennembrud af vand, hvil- ket kan få katastrofale følger og resultere i efterfølgende mere omfatten- de digebrud. | særlige tilfælde kan der anvendes beton omkring sektio- nerne, men sædvanligvis vil jord, ler, grus eller blandinger heraf være anvendeligt, såfremt det stampes tilstrækkeligt omkring forankringsvæg- gen. Overdækningen af de enkelte sektioner med jord er ikke fuldstæn- dig, idet der skal være en del af forankringsvæggen, som er tilgængelig fra jordoverfladen.DK 180503 B1 4 themselves in relation to each other, and e.g. step out to the side. This can lead to a crack between two neighboring sections and a breakthrough in water, which can have catastrophic consequences and subsequently result in more extensive dike breaches. | In special cases, concrete can be used around the sections, but usually soil, clay, gravel or mixtures thereof will be usable if it is stamped sufficiently around the anchoring wall. The covering of the individual sections with soil is not complete, as there must be a part of the anchoring wall that is accessible from the soil surface.

Indgrebet mellem sektionerne kan omfatte brug af fastgørelseselementer så som indstøbte stænger eller lignende, eller omstøbning med beton el- ler kombinationer heraf. Det er også muligt at etablere indgreb via et spaltetætningselement som går i indgreb med to sammenstillede sektio- ner. Sektionerne kan fremstilles i en passende hærdbar støbemasse, så som beton, men det vil også være muligt at fremstille dem i plast, metal så som stål, eller de kan fremstilles i et fiberforstærket materiale, så som epoxy eller anden hærdbar plastmasse. Sektionerne kan fremstilles som massive elementer, eller de kan være hule, idet de efterfyldes med sand eller vand ved etableringen. Hensigtsmæssigt etableres der et formsluttende indgreb ved at et frem- spring ved en sektions endedel med sektionen forskydes ind i en mod- svarende reces i en tilstødende endedel. Det bemærkes, at der ved denne fremgangsmåde ikke etableres forhindring af en lodret bevægelse af en sektion i forhold til en nabosektion, og dette gør samlingen af sek- tionerne lettere, og samtidig er der ikke et væsentligt behov for at sektio- nerne efter nedgravningen opretholder en forhindring mod indbyrdes lod- rette bevægelser, da det vil være de sideværts kraft-påvirkninger, som erThe intervention between the sections may comprise the use of fastening elements such as cast-in rods or the like, or recasting with concrete or combinations thereof. It is also possible to establish engagement via a gap sealing element which engages with two juxtaposed sections. The sections can be made of a suitable curable molding compound, such as concrete, but it will also be possible to make them of plastic, metal such as steel, or they can be made of a fiber-reinforced material, such as epoxy or other curable plastic mass. The sections can be made as solid elements, or they can be hollow, being filled with sand or water at installation. Suitably, a form-fitting engagement is established by displacing a projection at an end portion of a section with the section into a corresponding recess in an adjacent end portion. It is noted that this method does not establish an obstacle to a vertical movement of a section relative to a neighboring section, and this makes the assembly of the sections easier, and at the same time there is no significant need for the sections to maintain after burial. an obstacle to mutual vertical movements, as it will be the lateral force influences which are

DK 180503 B1 dominerende.DK 180503 B1 dominant.

Reces og fremspring er fremstillede i støbeprocessen med indbyrdes mål, således at der kun er et mindre overmål af recessen i forhold til fremspringet.Recesses and projections are made in the casting process with mutual dimensions, so that there is only a small excess of recess in relation to the projection.

Det foretrækkes desuden, at der er en vis slip- vinkel.It is also preferred that there is a certain slip angle.

Med disse to tiltag sikres en let sammenstilling af de enkelte ele- 5 menter på byggepladsen.With these two measures, an easy juxtaposition of the individual elements on the construction site is ensured.

Det foretrækkes at der fremstilles et antal sektioner, som omfatter en krumning eller et knæk langs længdeaksen, således at forankringsvæg- gen kan forløbe langs en ikke retlinet digelinje.It is preferred that a number of sections be made which comprise a curvature or a bend along the longitudinal axis so that the anchoring wall can extend along a non-linear dike line.

Krumninger eller knæk kan fremstilles efter foruddefinerede mål i henhold til den enkelte opga- ve, eller der kan fremstilles et antal standardknæk og/eller krumninger, således at et bredt udsnit af forskellige ikke retlinede digelinjer vil kunne etableres ud fra lagerførte elementer.Curves or bends can be produced according to predefined dimensions according to the individual task, or a number of standard bends and / or curvatures can be produced so that a wide section of different non-rectilinear dike lines can be established based on stocked elements.

Herved sikres det, at digelinjen kan etableres i forhold til landskabet og allerede etablerede elementer som veje og huse.This ensures that the dike line can be established in relation to the landscape and already established elements such as roads and houses.

Opfindelsen angår tillige et midlertidigt dige til sikring mod oversvøm- melser, hvor det midlertidige dige har en forankringsvæg, der forløber langs en digelinje, hvortil oprette vanduigennemtrængelige vægsegmen- ter er kobbelbare over jordniveau hvor forankringsvæggen omfatter præ- fabrikerede individuelle sektioner, hvor hver præfabrikeret sektion omfat- ter en vandret foddel og en herfra opretstående koblingsdel hvor de to dele danner enten en L eller en omvendt T- form når de er samlede og nedsatte i jorden til dannelse af forankringsvægen.The invention also relates to a temporary dike for flood protection, wherein the temporary dike has an anchoring wall extending along a dike line, to which create water-impermeable wall segments are connectable above ground level where the anchoring wall comprises prefabricated individual sections, where each prefabricated section comprises a horizontal foot part and a coupling part upright therefrom, the two parts forming either an L or an inverted T-shape when they are assembled and lowered into the ground to form the anchoring wall.

Det særlige ved det midlertidige dige er, at der i koblingsdelen er tilvejebragt flere lodrette blindhuller og at to profilstolper er nedsat i hver sit lodrette blindhul i den opretstående koblingsdel og at de vanduigennemtrængelige vægseg- menter er anbragt ovenpå hinanden og strækker sig mellem de to profil- stolper.The special feature of the temporary dike is that several vertical blind holes are provided in the coupling part and that two profile posts are lowered in their respective vertical blind holes in the upright coupling part and that the water-impermeable wall segments are arranged on top of each other and extend between the two profiles. - posts.

DK 180503 B1 6 Herved er det muligt at tilvejebringe et midlertidigt dige, der kan etable- res hurtigt og uden et væsentligt planlægningsforløb. Diget er konstrue- ret på en sådan måde at byggehøjde kan varieres (ved at variere læng- den af profilstolperne samt antallet af vægsegmenter). Digets modulop- bygning gør det let at lagerføre, transportere samt opsætte og nedtage de elementer, der indgår i det midlertidige dige. Den vandrette foddel sikrer, at sektionen bedre kan modstå det moment, som vil kunne forekomme når isatte vægsegmenter over jordniveau be- lastes ensidigt med vandtryk, også selv om de enkelte sektioner ligger relativt nær jordoverfladen. Foddelens bredde på tværs af digelinjen kan eventuelt dimensioneres så den passer til den forventede højde af de vægsegmenter, der etablerer selve digefunktionen ved oversvømmelser. Ved etableringen af forankringsvæggen sikres det, at den øverste over- flade af den opretstående koblingsdel ligger enten over eller i niveau med jordoverfladen. Herved sikres det, at de koblingselementer, der hø- rer til forankringsvæggen altid er synlige og let tilgængelige, så vægsegmenterne altid let og hurtigt kan kobles hertil.DK 180503 B1 6 This makes it possible to provide a temporary dike that can be established quickly and without a significant planning process. The dike is constructed in such a way that the building height can be varied (by varying the length of the profile posts and the number of wall segments). The module structure of the dike makes it easy to store, transport and set up and take down the elements that are part of the temporary dike. The horizontal foot part ensures that the section can better withstand the moment that may occur when inserted wall segments above ground level are unilaterally loaded with water pressure, even if the individual sections are relatively close to the ground surface. The width of the foot part across the dike line can optionally be dimensioned to suit the expected height of the wall segments that establish the dike function itself in the event of floods. When establishing the anchoring wall, it is ensured that the upper surface of the upright coupling part is either above or level with the ground surface. This ensures that the coupling elements belonging to the anchoring wall are always visible and easily accessible, so that the wall segments can always be connected to it easily and quickly.

Hver sektion eller præfabrikeret element omfatter indgrebsdele til ind- greb med en nabosektion ved hver ende, således at sektionerne fasthol- des til hinanden efter samling, og ikke skrider sideværts værk fra hinan- den. Det er hensigtsmæssigt at sektionerne er støbte i beton. Dette er en velkendt fremstillingsmetode, og de anførte indgrebsdele kan let etableres med passende målfasthed i dette materiale.Each section or prefabricated element comprises engaging parts for engaging an adjacent section at each end so that the sections are held together after assembly and do not slide sideways from each other. It is advisable that the sections are cast in concrete. This is a well-known manufacturing method, and the stated engaging parts can be easily established with suitable dimensional strength in this material.

Det foretrækkes at foddel og opretstående koblingsdel enten udgør et sammenhængende ubrudt legeme, eller alternativt omfatter to separate men sammenføjede legemer. Det sammenhængende ubrudte legeme har den største styrke, men kræver også en større støbeform og tungere entreprenør-maskineri til håndtering under forankringsvæggens etable-It is preferred that the foot portion and the upright coupling portion either form a continuous unbroken body, or alternatively comprise two separate but joined bodies. The continuous unbroken body has the greatest strength, but also requires a larger mold and heavier contractor machinery for handling under the anchorage wall establishment.

DK 180503 B1 7 ring.DK 180503 B1 7 ring.

Med to separate elementer fås øget fleksibilitet og mindre forme og lettere håndterbare emner, men også flere arbejdsopperationer, idet foddel og opretstående koblingsdel kræver en sammenføjningsopperati- on f.eks. på byggepladsen, da der skal være en kraft-og momentoverfø- rende samling mellem de to dele.With two separate elements, increased flexibility and smaller shapes and easier-to-handle items are obtained, but also more work operations, as the foot part and the upright coupling part require a joining operation, e.g. on the construction site, as there must be a power and torque transmitting joint between the two parts.

Når foddel og opretstående koblingsdel fremstilles hver for sig, foretræk- kes det, at forbindelsen mellem dem omfatter en gevindtap indsat i den vandrette foddel, hvor gevindtappen er indrettet til at gå i indgreb med en vandret udragende gevindhulsvinge, der er isat ved en vandret under- side af den opretstående koblingsdel.When the foot part and the upright coupling part are manufactured separately, it is preferred that the connection between them comprises a threaded pin inserted in the horizontal foot part, the threaded pin being adapted to engage a horizontally projecting threaded hole wing inserted at a horizontal bottom. side of the upright coupling part.

Gevindtap og gevindhulsvinge er typisk udformede i stål eller tilsvarende stærkt materiale med passende bestandighed over for korrosion.Threaded studs and threaded hole blades are typically made of steel or similar strong material with suitable corrosion resistance.

De to dele isættes i formhulrummene forud for støbningen, så de hver har en forankringsdel, som sidder ind i betonelementet og en del, der rager ud herfra.The two parts are inserted into the mold cavities prior to the casting, so that they each have an anchoring part which sits into the concrete element and a part which projects from here.

Det foretrækkes ifølge opfindelsen, at den lodret opretstående koblings- del omfatter i det mindste et lodret blindhul forløbende fra en vandret overflade heraf og ned mod den vandrette foddel.It is preferred according to the invention that the vertically upright coupling part comprises at least one vertical blind hole extending from a horizontal surface thereof and down towards the horizontal foot part.

Et sådan blindhul er særdeles let at bestykke med en opretstående stolpe i stål, træ eller let- metal, hvortil vægsegmenter lader sig koble ved f.eks. at blive indført i et lodret U-profil langs stolpens lodrette akse.Such a blind hole is extremely easy to equip with an upright post in steel, wood or light metal, to which wall segments can be connected by e.g. to be inserted into a vertical U-profile along the vertical axis of the post.

Ifølge opfindelsen omfatter indgrebsdelene af en samling mellem to af forankringsvæggens individuelle sektioner fleksible pakningsmidler mod vandgennemstrømning, så som en gummielastisk pakning.According to the invention, the engaging parts of a joint between two of the individual sections of the anchoring wall comprise flexible packing means against water flow, such as a rubber-elastic packing.

Hensigtsmæssigt er de fleksible pakningsmidler tilvejebragte på både den vandrette foddels formsluttende indgrebsdele og på den opretståen- de koblingsdels fomsluttende indgrebsdele.Conveniently, the flexible packing means are provided on both the form-fitting engaging parts of the horizontal foot part and on the fumbling engaging parts of the upright coupling part.

Dermed sikres hele denThis secures the whole thing

DK 180503 B1 8 nedgravede forankringsvæg mod gennemstrømning i samlingerne mel- lem de enkelte sektioner.DK 180503 B1 8 buried anchorage wall against flow in the joints between the individual sections.

Opfindelsen vil i det følgende blive forklaret under henvisning til den medfølgende tegning, hvor Fig. 1 Aviser en skematisk illustration i 3D-visning af en sektion af en L-formet forankringsvæg 10, Fig. 1B viser en udførelsesform for en sektion af en T-formet foran- kringsvæg i 3D-visning, med separat opretstående koblingsdel 26, Fig. 1C er en yderligere udførelsesform for forankringsvæggen vist i Fig. 1B med en særlig høj opretstående koblingsdel, Fig. 1D er en sektion af en forankringsvæg, hvor der er udført en krumning hen langs forankringsvæggens længdeakse, Fig. 2A er en skematisk illustration af lodret snit gennem et landskab, Fig. 2B erlandskabet i Fig. 2A med en udgravning til brug for en dige- linje, Fig. 2C erlandskabet i Fig. 2B med i det mindste en sektion af en for- ankringsvæg 6 anbragt i udgravningen, Fig. 2D er landskabet i Fig. 2C, hvor udgravningen med forankrings- væggen 6 er opfyldt, så kun den opretstående koblingsdel er synlig over jordniveau 2, Fig. 2E er landskabet i Fig. 2C, men hvor der er indikeret en hav- vandsstigning, og hertil hørende vanduigennemtrængelige vægsegmenter 8 anbragt oven på forankringsvæggen 6, Fig. 3B — viser en illustration af det formsluttende indgrebs 12 udform- ning, Fig. 3A er det formsluttende indgrebs udformning, hvor endedelene er stillede op på linje til samling,The invention will be explained in the following with reference to the accompanying drawing, in which Figs. Fig. 1 shows a schematic illustration in 3D view of a section of an L-shaped anchoring wall 10, Figs. Fig. 1B shows an embodiment of a section of a T-shaped anchoring wall in 3D view, with a separate upright coupling part 26; 1C is a further embodiment of the anchoring wall shown in Figs. 1B with a particularly high upright coupling part, FIG. Fig. 1D is a section of an anchoring wall, where a curvature is made along the longitudinal axis of the anchoring wall; Fig. 2A is a schematic illustration of vertical section through a landscape; 2B shows the landscape in FIG. Fig. 2A with an excavation for use in a dike line; 2C shows the landscape in FIG. Fig. 2B with at least a section of an anchoring wall 6 placed in the excavation; 2D is the landscape in Figs. Fig. 2C, where the excavation with the anchoring wall 6 is completed so that only the upright coupling part is visible above ground level 2; 2E is the landscape of FIG. 2C, but where a seawater rise is indicated, and associated water-impermeable wall segments 8 placed on top of the anchoring wall 6, Figs. Fig. 3B - shows an illustration of the design of the form-fitting engagement 12, 3A is the design of the form-fitting engagement, where the end portions are aligned with the assembly,

DK 180503 B1 9DK 180503 B1 9

Fig. 4A viser en skematisk tegning af en udførelsesform ifølge opfin- delsen, hvor den vandrette foddel og den opretstående kob- lingsdel er støbt i en og samme støbeform,FIG. 4A shows a schematic drawing of an embodiment according to the invention, in which the horizontal foot part and the upright coupling part are molded in one and the same mold,

Fig. 4B er udførelsesformen i Fig. 4A med et profil monteret i det lod-FIG. 4B is the embodiment of FIG. 4A with a profile mounted in the

rette blindhul 28,straight blind hole 28,

Fig. 4C er udførelsesformen vist i Fig. 4B med sammenhørende profi- ler i de lodrette blindhuller 28,FIG. 4C, the embodiment is shown in FIG. 4B with associated profiles in the vertical blind holes 28,

Fig. 4D er udførelsesformen i Fig. 4A vist med isatte vanduigennem- trængelige vægsegmenter,FIG. 4D is the embodiment of FIG. 4A shown with inserted water impermeable wall segments,

Fig.FIG.

SA viser en udførelsesform for en sluse til montering over en sek- tion af en forankringsvæg,SA shows an embodiment of a lock for mounting over a section of an anchoring wall,

Fig. 5B viser slusen med isat blokkeringselement,FIG. 5B shows the lock with inserted blocking element,

Fig. 5C viser en skematisk fremstilling af en forankringsvæg, der føl- ger et ikke lineært forløb,FIG. 5C shows a schematic representation of an anchoring wall which follows a non-linear course,

Fig. 6A er en udførelsesform for en forankringsvæg med isatte lodrette profiler,FIG. 6A is an embodiment of an anchoring wall with inserted vertical profiles,

Fig. 6B viser udførelsesformen i Fig. 6A med isatte vanduigennem- trængelige vægsegmenter,FIG. 6B shows the embodiment of FIG. 6A with inserted water-impermeable wall segments,

Fig. 6 C erto sammensatte sektioner af en forankringsvæg vist med opsatte vanduigennemtrængelige vægsegmenter,FIG. 6 C erto composite sections of an anchoring wall shown with mounted water impermeable wall segments,

Fig. 7A er en udførelsesform, hvor det formsluttende indgreb etableres via stangelementer 37,FIG. 7A is an embodiment in which the form-fitting engagement is established via rod elements 37,

Fig. 7B viser en udførelsesform, hvor det formsluttende indgreb etab- leres efter opsætning af de præfabrikerede elementer vha. et spaltetætningselement 40,FIG. 7B shows an embodiment in which the form-fitting engagement is established after setting up the prefabricated elements by means of a slot sealing element 40,

Fig. 7C viser udførelsesformen i Fig. 7B set oppefra,FIG. 7C shows the embodiment of FIG. 7B seen from above,

Fig. 8A er en udførelsesform hvor det formsluttende indgreb etableres vha. isatte stangelementer 42, 43, der efter nedsænkning af de præfabrikerede elementer forbindes indbyrdes,FIG. 8A is an embodiment in which the form-fitting engagement is established by means of inserted rod elements 42, 43, which are interconnected after immersion of the prefabricated elements,

Fig. 8B er et udsnit af Fig. 8A, hvor en samlingsstruktur 44 til samling af stangelementer 42, 43 er vist,FIG. 8B is a sectional view of FIG. 8A, showing an assembly structure 44 for assembling rod members 42, 43,

DK 180503 B1 10 Fig. 9 viser et snit gennem en sektion 10 af en forankringsvæg med et sluserør 46, og Fig. 10 er en 3D repræsentation af en sektion med en påboltet forhøj- ning.DK 180503 B1 10 FIG. Fig. 9 shows a section through a section 10 of an anchoring wall with a lock pipe 46, and 10 is a 3D representation of a section with a bolted elevation.

Indledningsvis skal det bemærkes, at den vedhæftede tegning alene illustre- rer ikke-begrænsende udførelsesformer. En række andre udførelsesformer vil være mulige inden for omfanget af den foreliggende opfindelse. | det føl- gende vil tilsvarende eller identiske elementer i de forskellige udførelses- former betegnes med samme henvisningsbetegnelse.Initially, it should be noted that the accompanying drawing only illustrates non-limiting embodiments. A number of other embodiments will be possible within the scope of the present invention. | In the following, similar or identical elements in the various embodiments will be designated by the same reference numerals.

Fig. 1A er en skematisk illustration af en sektion af en forankringsvæg 10, til sikring mod oversvømmelse. Forankringsvæggen etableres under jordni- veau 2 (se Fig. 2D) så den forløber langs en digelinje 4 (se Fig. 6C og Fig.FIG. 1A is a schematic illustration of a section of an anchorage wall 10, for flood protection. The anchoring wall is established below ground level 2 (see Fig. 2D) so that it extends along a dike line 4 (see Fig. 6C and Fig.

50). Når der er forhøjet risiko for oversvømmelse, kobles oprette vand- uigennemtrængelige vægsegmenter hertil. Den sektion 10 af forankrings- væggen der vises i Fig. 1A er L-formet og den opretstående koblingsdel 26 er således placeret ved en side af den vandrette foddel 24.50). When there is an increased risk of flooding, create water-impermeable wall segments. The section 10 of the anchoring wall shown in Figs. 1A is L-shaped and the upright coupling part 26 is thus located at one side of the horizontal foot part 24.

Denne udformning kan være fordelagtig på steder, hvor det midlertidige di- ge skal etableres tæt op ad allerede etablerede nedgravede konstruktioner så som bygningsfundamenter eller fundamenter for trafikskilte. I de øvrige figurer vises en omvendt T-formet sektion, med den vandrette bjælke i T- formen nederst i udgravningen.This design can be advantageous in places where the temporary dike is to be established close to already established buried structures, such as building foundations or foundations for traffic signs. The other figures show an inverted T-shaped section, with the horizontal bar in the T-shape at the bottom of the excavation.

De jordfæstede forankringsvægge 6 etableres sektionsvis, idet hver sektion af forankringsvæggen 10 præfabrikeres og efterfølgende nedsættes i en rende 5 (Fig. 2B- Fig. 2E) langs digelinjen, idet en sektion af forankrings- væggen 10 bringes til indgreb med en allerede i renden 5 anbragt sektion af — forankringsvæggen 10. Renden 5 etableres forud for nedsætningen af de præfabrikerede sektioner af forankringsvæggen 10, og frembringes med enThe grounded anchoring walls 6 are established in sections, each section of the anchoring wall 10 being prefabricated and subsequently lowered into a gutter 5 (Fig. 2B-Fig. 2E) along the dike line, a section of the anchoring wall 10 being brought into engagement with an already in the gutter 5 placed section of - the anchoring wall 10. The gutter 5 is established prior to the lowering of the prefabricated sections of the anchoring wall 10, and is produced with a

DK 180503 B1 11 passende dybde, således at en større eller mindre del af elementets opret- stående koblingsdel er over jordniveau 2. Det betyder at de præfabrikerede sektioner af forankringsvæggene 10 kan opbevares og være klar til brug, når der opstår behov for det, eller der bevilges midler til at etablere et mid- lertidigt dige.DK 180503 B1 11 suitable depth so that a larger or smaller part of the upright coupling part of the element is above ground level 2. This means that the prefabricated sections of the anchoring walls 10 can be stored and be ready for use when the need arises, or funds are allocated to establish a temporary dike.

Når forankringsvæggene 10 er nedsatte i en rende 5, som vist i Fig. 2A, 2B og 2C kan disse efterfølgende blive i det mindste delvist over- dækket med jord, ler eller beton, som vist i Fig. 2D.When the anchoring walls 10 are lowered in a groove 5, as shown in Figs. 2A, 2B and 2C, these can subsequently be at least partially covered with soil, clay or concrete, as shown in Figs. 2D.

I eksemplet her vil der kun være en meget begrænset del af forankringsvæggen synlig over jordni- veau, hvilket har stor betydning for f.eks. udsigt, men også i forhold til trafik,In the example here, there will only be a very limited part of the anchoring wall visible above ground level, which is of great importance for e.g. views, but also in relation to traffic,

som evt. skal kunne passere hen over forankringsvæggen. | andre anven- delsessituationer er der behov for en større del af forankringsvæggen over jorden, f.eks. ved etablering af sluser heri.as evt. must be able to pass over the anchorage wall. | In other application situations, a larger part of the anchoring wall above the ground is needed, e.g. by establishing locks therein.

Ifølge en udførelsesform for opfindelsen etableres der mellem de enkelteAccording to an embodiment of the invention, it is established between the individual

— præfabrikerede sektioner af forankringsvæggen hensigtsmæssigt et form- sluttende indgreb, således at vandret bevægelse af en sektion 10 i forhold til en nabosektion 10 forhindres.Prefabricated sections of the anchoring wall suitably have a form-fitting engagement, so that horizontal movement of a section 10 relative to a neighboring section 10 is prevented.

Fig. 3A og 3B illustrerer en udførelsesform, hvor det formsluttende indgreb m— etableres ved at et fremspring 14 ved sektionens endedel 18 skydes ind i en modsvarende reces 16 i en tilstødende endedel 18. Som det fremgår er så- vel fremspring 14 som reces 16 indrettede med lodrette vægdele 17 således at de to nabosektioner samles til etablering af det formsluttende indgreb enten i en lodret bevægelse i forhold til hinanden og/eller ved en vandret bevægelse.FIG. 3A and 3B illustrate an embodiment in which the form-fitting engagement m - is established by sliding a projection 14 at the end portion 18 of the section into a corresponding recess 16 in an adjacent end portion 18. As can be seen, both projections 14 and recess 16 are provided with vertical wall parts 17 so that the two adjacent sections are assembled to establish the form-fitting engagement either in a vertical movement relative to each other and / or by a horizontal movement.

Den vandrette bevægelse må da følge i retning af sektionernes længdeakser 20 i forhold til hinanden.The horizontal movement must then follow in the direction of the longitudinal axes 20 of the sections relative to each other.

I eksemplet her er der vist recesser og fremspring ud for hinanden i såvel den vandrette foddel 24 som den op- retstående koblingsdel 26, hvorved der etableres en forøget sikkerhed mod, at de to sektioner af forankringsvæggen roteres i forhold til hinanden.In the example here, recesses and projections are shown next to each other in both the horizontal foot part 24 and the upright coupling part 26, whereby an increased safety is established against the two sections of the anchoring wall being rotated relative to each other.

Såvel rotation som translationer af de to sektioner af forankringsvæggen i forhold til hinanden kan forekomme, når jorden omkring sektionerne blødes op vedBoth rotation and translations of the two sections of the anchoring wall relative to each other can occur when the soil around the sections softens at

DK 180503 B1 12 en oversvømmelse, eller der sker mindre sætninger i jorden som følge af f.eks. langsomt forekommende flydninger eller punktvise trykbelastninger, der let kan forekomme i et bymiljø.DK 180503 B1 12 a flood, or there are minor settlements in the ground as a result of e.g. slow-moving fluids or point pressure loads that can easily occur in an urban environment.

Det bemærkes at i Fig. 1A, 1B, 1C, 1D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 6A, 6B og 6C vises sektionerne 10, for overskuelighedens skyld uden de i Fig. 3A og 3B viste formsluttende indgrebsdele. | praksis kan der være indgrebsdele langs enderne her, selv om det ikke vises i figurerne.It is noted that in Figs. 1A, 1B, 1C, 1D, 4A, 4B, 4C, 4D, 5A, 5B, 5C, 6A, 6B and 6C the sections 10 are shown, for the sake of clarity without those in Figs. 3A and 3B show form-fitting engagement members. | in practice, there may be engaging portions along the ends here, although not shown in the figures.

Det er muligt som vist i Fig. 1D at udforme en sektion af forankringsvæggen med et ikke lineært forløb, f.eks. som illustreret med et krumt forløb.It is possible as shown in Figs. 1D to design a section of the anchoring wall with a non-linear course, e.g. as illustrated with a curved course.

I Fig. 1D, 1C og 1B er der tillige vist en forbindelse, f.eks. i form af en ge- vindtap 13 indsat i den vandrette foddel 24, der er indrettet til at gå i indgreb med en vandret udragende gevindhulsvinge 25, der er isat ved en vandret underside af den opretstående koblingsdel 26. Gevindhulsvingen 25 kan være indsat som et stålelement ved støbningen af den opretstående kob- lingsdel, eller den kan være støbt ud i et med koblingsdelen 26. Når kob- lingsdelen er sat på plads med gevindtappene 13 gennem gevindhulsvin- gerne 25, kan der påskrues møtrikker (ikke viste) til etablering af en adskil- lelig samling mellem den vandrette foddel 24 og den lodret opretstående koblingsdel 26. Som alternativ til møtrik og gevindtap- samling kan der etab- leres svejsning eller anden form for ikke-adskilbar samling.In FIG. 1D, 1C and 1B, a compound is also shown, e.g. in the form of a threaded pin 13 inserted into the horizontal foot portion 24, which is adapted to engage a horizontally projecting threaded hole wing 25, which is inserted at a horizontal underside of the upright coupling part 26. The threaded hole wing 25 may be inserted as a steel element when casting the upright coupling part, or it can be cast in one with the coupling part 26. When the coupling part is put in place with the threaded pins 13 through the threaded hole swings 25, nuts (not shown) can be screwed on to establish a separate joint between the horizontal foot part 24 and the vertically upright coupling part 26. As an alternative to nut and threaded joint, welding or other non-separable joint can be established.

—|1Fig. 4A, 4B, 4C og 4D ses en gradvis opbygning af en del af et midlertidigt dige, hvor indledningsvist to profilstolper 7 er nedsatte i hver sit lodrette blindhul 28 i den opretstående koblingsdel 26. Dette finder normalt sted ef- ter at den viste sektion af en forankringsvæg 10 er anbragt under eller del- vist under jordniveau 2. Som det ses sidder profilstolperne 7 i hver sin ende af den viste sektion af en forankringsvæg 10. Dette er i modsætning til udfø- relsesformen i Fig. 6A, 6B og 6C hvor profilstolperne 7 sidder '4 del indad- | 1Fig. 4A, 4B, 4C and 4D show a gradual construction of a part of a temporary dike, where initially two profile posts 7 are lowered in their respective vertical blind holes 28 in the upright coupling part 26. This usually takes place after the shown section of an anchoring wall 10 is located below or partly below ground level 2. As can be seen, the profile posts 7 are located at each end of the shown section of an anchoring wall 10. This is in contrast to the embodiment in Figs. 6A, 6B and 6C where the profile posts 7 sit '4 part inwards

DK 180503 B1 13 fra enden af hver af de viste sektioner. Det betyder at de vanduigennem- trængelige vægsegmenter 8 kommer til at strække sig hen over en samling mellem to sektioner af forankringsvægge. | Fig. 4B, 4C og 4D vises profil- stolperne 7 med u-profiler 9, hvor u-profilerne 9 i de to stolper 7, der er ned- — satte i hver sin ende af en sektion af forankringsvæggen 10, vender mod hinanden. I Fig. 5A og Fig. 5B ses en sektion af en forankringsvæg 10, hvor den opret- te forankringsdel er erstattet af en sluseport 33. Sluseporten 33 omfatter et — opret betongelement med en udsparing 34. Her i kan der indsættes en slu- selem 35. Med dette arrangement bliver det muligt at åbne for et kontrolleret gennemløb af vand gennem det midlertidige dige.DK 180503 B1 13 from the end of each of the sections shown. This means that the water-impermeable wall segments 8 will extend over a joint between two sections of anchoring walls. | FIG. 4B, 4C and 4D, the profile posts 7 are shown with u-profiles 9, the u-profiles 9 in the two posts 7, which are lowered at each end of a section of the anchoring wall 10, facing each other. In FIG. 5A and FIG. 5B shows a section of an anchoring wall 10, where the upright anchoring part has been replaced by a lock gate 33. The lock gate 33 comprises an upright concrete element with a recess 34. Here a lock member 35 can be inserted. With this arrangement it becomes possible to open for a controlled passage of water through the temporary dike.

Fig. 5C viser en digelinje omfattende et knæk 22. Et sådan knæk 22 vil kun- ne etableres med forskellige knæk-vinkler alt efter behovet.FIG. 5C shows a dike line comprising a bend 22. Such a bend 22 can be established with different bend angles depending on the need.

Det bemærkes tillige at profilstolperne i Fig. 6A, 6B og 6C modtager de vanduigennemtrængelige vægsegmenter 8 i u-profiler 9, der vender hver sin vej i forhold til stolpen 7, hvor profilstolperne i Fig. 4B, 4C og 4D er ensidige, og altså kun kan modtage vanduigennemtrængelige vægsegmenter 8 til en side.It is also noted that the profile posts in Figs. 6A, 6B and 6C receive the water-impermeable wall segments 8 in u-profiles 9, each facing its own path relative to the post 7, where the profile posts in Figs. 4B, 4C and 4D are one-sided, and thus can only receive water-impermeable wall segments 8 to one side.

I Fig. 7A vises to stangelementer 37, som er indsat i den lodrette vægdelIn FIG. 7A shows two rod elements 37 which are inserted in the vertical wall part

17. Stangelementerne 37 kan være isatte enten under støbningen eller de kan være indsat i huller, der er etableret ved hjælp af kærner under støb- ningen. Stangelementerne 37 kan være gevindstænger eller andre simple strukturer, der tillader formsluttende indgreb mellem to sektioner 10 af for- ankringsvæggen, der er stillet sammen ende mod ende. | Fig. 7A er der tilli- ge skitseret huller 38, der tillader at en støbemasse fyldes heri til sikring af at stangelementernes 37 fastholdelse i forhold til forankringsvæggens sekti- on 10. Støbemasse kan her tilføres efter at stangelementerne 37 er indført huller i to nabosektioner af forankringsvæggen under opstillingen heraf i en17. The rod members 37 may be inserted either during the casting or they may be inserted into holes established by cores during the casting. The rod members 37 may be threaded rods or other simple structures that allow form-fitting engagement between two sections 10 of the anchoring wall that are juxtaposed. | FIG. 7A, holes 38 are also outlined which allow a molding compound to be filled therein to ensure that the retaining of the rod elements 37 relative to the anchor wall section 10. Casting compound can be applied here after the rod elements 37 have holes in two adjacent sections of the anchoring wall below. its arrangement in a

DK 180503 B1 14 rende 5. Hvis der under opstillingen i renden 5 efterlades en spalte 39 (som vist i Fig. 7B) kan denne udstøbes med beton efterfølgende. Fig. 7B og 7C viser en yderligere udførelsesform, hvor der mellem sektio- nerne 10 efterlades en spalte 39, og hvor der tillige isættes et spaltetæt- ningselement 40 til etablering af det formsluttende indgreb mellem sektio- nerne 10. Spaltetætningselementet 40 kan være et gummielastisk element fremstillet i et passende polymermateriale, eller det kan være udført i et sti- vere materiale så som stål.DK 180503 B1 14 gutter 5. If a gap 39 (as shown in Fig. 7B) is left during the installation in the gutter 5, this can be cast with concrete afterwards. FIG. 7B and 7C show a further embodiment, where a gap 39 is left between the sections 10, and where a gap sealing element 40 is also inserted to establish the form-fitting engagement between the sections 10. The gap sealing element 40 can be a rubber-elastic element made in a suitable polymeric material, or it may be made of a stiffer material such as steel.

I Fig. 8 ses en yderligere udførelsesform, hvor stangelementer 42 er indsat i en sektion og andre stangelementer 43 er tilsvarende indsat i en nabosekti- on. De to sæt stangelementer 42, 43 er forskudte i forhold til hinanden, så sektionerne kan sammenstilles som vist i Fig. 8b med samtlige stangele- — menter 42, 43 på en lodret linje. Dette tillader at en samlingsstruktur 44 kan føjes til stangelementer 42, 43. Samlingsstrukturen 44 kan være udformet som en wire eller en stang, der føres gennem et hul i hver af stangelemen- terne 42, 43. Et evt. mellemrum mellem sektionerne 10 kan efterfølgende udstøbes med beton, hvis det er nødvendigt.In FIG. 8 shows a further embodiment in which rod elements 42 are inserted in a section and other rod elements 43 are correspondingly inserted in a neighboring section. The two sets of rod elements 42, 43 are offset from each other so that the sections can be assembled as shown in Figs. 8b with all rod elements 42, 43 on a vertical line. This allows a joint structure 44 to be added to rod elements 42, 43. The joint structure 44 may be formed as a wire or rod which is passed through a hole in each of the rod elements 42, 43. A possible spaces between the sections 10 can subsequently be cast with concrete if necessary.

I Fig. 10 er der vist en sektion 10 af en forankringsvæg, hvor der lige ved jordniveau er indsat et rør 46, som ud mod vandsiden har påmonteret en kontraventil 45. Denne omfatter en klap 47, som er hængslet for oven ved et vandret hængsel 48. Hængslet kan evt. være dannet ud fra et fleksibelt ma- —teriale som gummi eller gummielastisk plastic, der er fæstnet til en overside af røret og samtidig forløber langs med og er forbundet til klappen 47. Her- med kan materialet i klappen 47 samtidigt danne pakning. En sådan fleksi- bel pakning kan være med til at sikre at klappen 47 lukker tæt til, når vand- standen uden for kontraventilen 45 er høj.In FIG. 10, a section 10 of an anchoring wall is shown, in which a pipe 46 is inserted just at ground level, which has a non-return valve 45 mounted towards the water side. This comprises a flap 47 which is hinged above a horizontal hinge 48. The hinge can possibly be formed from a flexible material such as rubber or rubber-elastic plastic, which is attached to an upper side of the pipe and at the same time extends along and is connected to the flap 47. Thus, the material in the flap 47 can simultaneously form a gasket. Such a flexible gasket can help to ensure that the flap 47 closes tightly when the water level outside the non-return valve 45 is high.

DK 180503 B1 15 I Fig. 10 vises en forhøjning 49, der er påboltet en sektion 10 af en foran- kringsvæg.DK 180503 B1 15 I Fig. 10 shows a ridge 49 bolted to a section 10 of an anchoring wall.

Bolte 50 kan være gennemgående og have hertil hørende mø- trikker på den modsatte side (ikke synlige i denne figur). Forhøjningen 49 kan være med til at sikre mod oversvømmelser, og kan tillige omfatte et vandfang 51, og et hermed forbundet afløbsrør 52, der evt. kan forbindes til pumpe.Bolts 50 may be continuous and have associated nuts on the opposite side (not visible in this figure). The elevation 49 can help to protect against floods, and can also comprise a water trap 51, and a drain pipe 52 connected thereto, which may can be connected to pump.

Såfremt den påboltede forhøjning 49 står alene, kan vandfanget 51 være med til at fange overløbende vand, f.eks. som følge af bølgegang på vandsiden.If the bolted-on elevation 49 stands alone, the water trap 51 can help to catch overflowing water, e.g. due to wave action on the water side.

Eller hvis der er etableret væg af vanduigennemtrængelige vægsegmenter 8 oven på den påboltede forhøjning 49, kan vandfanget sik-Or if a wall of water-impermeable wall segments 8 is established on top of the bolted-on elevation 49, the water-trapped

rer opfangning af vand, som måtte trænge igennem mindre utætheder i det opbyggede midlertidige dige og/eller overløb som følge af bølgegang.capture of water that may penetrate minor leaks in the built-up temporary dike and / or overflow due to wave action.

DK 180503 B1 16 Henvisningstal 2 jordniveau 4 digelinje rende 5 6 forankringsvæg 7 profilstolper 8 vanduigennemtrængelige vægsegmenter 9 U-profil sektion af forankringsvæg 10 12 formsluttende indgreb 13 gevindtak 14 fremspring 16 reces 17 lodrette vægdele 18 endedel sektionens længdeakse 21 krumning 22 knæk 24 vandret foddel 20 25 gevindhulsvinge 26 opretstående koblingsdel 28 lodret blindhul 30 vandret overflade af oprette koblingsdel 32 pakningsmidler 33 sluseport 34 udsparing 35 sluselem 36 gummielastisk pakning 37 stangelement 38 hul til støbemasseDK 180503 B1 16 Reference numerals 2 ground level 4 dike line gutters 5 6 anchorage wall 7 profile posts 8 water-impermeable wall segments 9 U-profile section of anchorage wall 10 12 form-fitting engagement 13 threaded roof 14 projection 16 recess 17 vertical wall parts 18 end part section longitudinal axis 21 curvature foot 22 25 threaded hole wing 26 upright coupling part 28 vertical blind hole 30 horizontal surface of upright coupling part 32 packing means 33 sluice gate 34 recess 35 sluice member 36 rubber elastic gasket 37 rod element 38 hole for molding compound

DK 180503 B1 17 39 spalte 40 spaltetætningselement 41 hul 42 stangelement med hul 43 stangelement med hul 44 samlingsstruktur (f.eks. wire) 45 kontraventil 46 rør 47 klap 48 hængsel 49 forhøjning 50 bolt 51 vandfang 52 afløbsrør (evt. til forbindelse til pumpe)DK 180503 B1 17 39 slot 40 slot sealing element 41 hole 42 rod element with hole 43 rod element with hole 44 joint structure (eg wire) 45 non-return valve 46 pipe 47 flap 48 hinge 49 elevation 50 bolt 51 water trap 52 drain pipe (possibly for connection to pump )

Claims (11)

DK 180503 B1 18 PatentkravDK 180503 B1 18 Patent claim 1. Fremgangsmåde til sikring mod oversvømmelse, hvor der etableres en forankringsvæg (6), der forløber langs en digelinje (4), hvortil oprette vanduigennemtrængelige vægsegmenter (8) er kobbelbare, at foran- kringsvæggen (6) etableres sektionsvis, hvor hver sektion af foran- kringsvæggen (10) præfabrikeres og efterfølgende nedsættes i en rende (5) langs digelinjen (4), idet en sektion af forankringsvæggen (10) bringes til indgreb med en allerede i renden (5) anbragt sektion af forankrings- væggen (10) for efterfølgende at blive i det mindste delvist overdækket med jord, ler eller beton, hvor de enkelte sektioner (10) dannes af enten L-formede eller omvendt T-formede præfabrikerede elementer, der hver omfatter en opretstående koblingsdel (26) og en vandret foddel (24), hvor hver sektion (10) enten støbes i en og samme støbeform, eller støbes med den oprette koblingsdel (26) og den vandrette foddel (24) i hver sin støbeform og efterfølgende samles til en sektion på byggepladsen, hvor der i koblingsdelen (26) er tilvejebragt flere lodrette blindhuller (28), ken- detegnet ved, at to profilstolper (7) nedsættes i hver sit lodrette blindhul (28) i den opretstående koblingsdel (26) og at de vanduigennemtrænge- lige vægsegmenter (8) efterfølgende anbringes ovenpå hinanden på en sådan måde, at de vanduigennemtrængelige vægsegmenter (8) strækker sig mellem de to profilstolper (7).A method of protection against flooding, wherein an anchoring wall (6) is established, which runs along a dike line (4), to which create water-impermeable wall segments (8) can be coupled, the anchoring wall (6) being established in sections, where each section of the anchoring wall (10) is prefabricated and subsequently lowered into a gutter (5) along the dike line (4), a section of the anchoring wall (10) being brought into engagement with a section of the anchoring wall (10) already arranged in the gutter (5). to subsequently be at least partially covered with earth, clay or concrete, the individual sections (10) being formed by either L-shaped or inverted T-shaped prefabricated elements, each comprising an upright coupling part (26) and a horizontal foot part (24), where each section (10) is either molded in one and the same mold, or molded with the upright coupling part (26) and the horizontal foot part (24) in separate molds and subsequently assembled into a section on the construction site, where in the coupling part (26) several vertical blind holes (28) are provided, characterized in that two profile posts (7) are lowered in their respective vertical blind holes (28) in the upright coupling part (26) and that the water-impermeable wall segments (8 ) are subsequently placed on top of each other in such a way that the water-impermeable wall segments (8) extend between the two profile posts (7). 2. Fremgangsmåde ifølge krav 1, kendetegnet ved, at der etableres et indgreb mellem sektionerne gennem omstøbning af et samlingsområde mellem sektionerne med beton.Method according to claim 1, characterized in that an engagement is established between the sections by recasting a joint area between the sections with concrete. 3. Fremgangsmåde ifølge krav 1 eller krav 2, kendetegnet ved, at der etableres formsluttende indgreb mellem sektionerne ved at et fremspring (14) ved sektionens endedel (18) med sektionen forskydes ind i en mod- svarende reces (16) i en tilstødende sektions endedel (18).Method according to claim 1 or claim 2, characterized in that form-fitting engagement is established between the sections by displacing a projection (14) at the end part (18) of the section with the section into a corresponding recess (16) in an adjacent section. end part (18). DK 180503 B1 19DK 180503 B1 19 4. Fremgangsmåde ifølge krav et eller flere af kravene 1 - 2, kendeteg- net ved, at der fremstilles et antal sektioner, som omfatter en krumning (21) eller et knæk (22) langs længdeaksen (20), således at forankrings- væggen (6) kan forløbe langs en ikke retlinet digelinje (4).Method according to one or more of Claims 1 to 2, characterized in that a number of sections are produced which comprise a curvature (21) or a bend (22) along the longitudinal axis (20) so that the anchoring wall (6) may extend along a non-linear dike line (4). 5. Midlertidigt dige til sikring mod oversvømmelser, hvor det midlertidige dige omfatter en forankringsvæg (6), der forløber langs en digelinje hvor- til oprette vanduigennemtrængelige vægsegmenter (8) er kobbelbare over jordniveau (2), hvor forankringsvæggen (6) omfatter præfabrikerede individuelle sektioner (10), hvor hver præfabrikeret sektion (10) omfatter en vandret foddel (24) og en herfra opretstående koblingsdel (26), hvor de to dele danner enten en L eller en omvendt T- form når de er nedsatte i jorden til dannelse af forankringsvægen (6), hvor der i koblingsdelen (26) er tilvejebragt flere lodrette blindhuller (28), kendetegnet ved, at to profilstolper (7) er nedsat i hver sit lodrette blindhul (28) i den opretståen- de koblingsdel (26) og at de vanduigennemtrængelige vægsegmenter (8) er anbragt ovenpå hinanden og strækker sig mellem de to profilstolper (7).Temporary dike for flood protection, the temporary dike comprising an anchorage wall (6) extending along a dike line to which create water-impermeable wall segments (8) are connectable above ground level (2), the anchorage wall (6) comprising prefabricated individual sections (10), each prefabricated section (10) comprising a horizontal foot portion (24) and an upright coupling portion (26) therefrom, the two portions forming either an L or an inverted T-shape when lowered into the ground to form of the anchoring wall (6), where several vertical blind holes (28) are provided in the coupling part (26), characterized in that two profile posts (7) are lowered in their respective vertical blind holes (28) in the upright coupling part (26). and that the water-impermeable wall segments (8) are arranged on top of each other and extend between the two profile posts (7). 6. Midlertidigt dige ifølge krav 5, kendetegnet ved, at der til hver indivi- duel sektion (10) hører et eller flere indgrebsdele til sammenkobling af en sektion til dennes nabosektioner.Temporary dike according to Claim 5, characterized in that each individual section (10) has one or more engaging parts for connecting one section to its adjacent sections. 7. Midlertidigt dige ifølge krav 5 eller krav 6, kendetegnet ved, at foddel (24) og opretstående koblingsdel (26) enten udgør et sammenhængende ubrudt legeme, eller omfatter to separate men sammenføjede legemer.Temporary dike according to claim 5 or claim 6, characterized in that the foot part (24) and the upright coupling part (26) either form a continuous unbroken body, or comprise two separate but joined bodies. 8. Midlertidigt dige ifølge krav 7, kendetegnet ved, at forbindelsen mel- lem opretstående koblingsdel (26) og foddel (24) omfatter en gevindtap (13) indsat i den vandrette foddel (24), hvilken gevindtap (13) er indrettetTemporary dike according to claim 7, characterized in that the connection between upright coupling part (26) and foot part (24) comprises a threaded pin (13) inserted in the horizontal foot part (24), which threaded pin (13) is arranged DK 180503 B1 20 til at gå i indgreb med en vandret udragende gevindhulsvinge (25), der er isat ved en vandret underside af den opretstående koblingsdel (26).DK 180503 B1 20 to engage with a horizontally projecting threaded hole wing (25) inserted at a horizontal underside of the upright coupling part (26). 9. Midlertidigt dige ifølge krav 8, kendetegnet ved, at den lodret opret- stående koblingsdel omfatter i det mindste et lodret blindhul (28) forlø- bende fra en vandret overflade (30) heraf og ned mod den vandrette fod- del (24).Temporary dike according to claim 8, characterized in that the vertically upright coupling part comprises at least one vertical blind hole (28) extending from a horizontal surface (30) thereof and down towards the horizontal foot part (24). . 10. Midlertidigt dige ifølge krav 5, kendetegnet ved, at indgrebsdele (14) af en samling mellem to af forankringsvæggens (6) individuelle sektioner (10) omfatter fleksible pakningsmidler (32) mod vandgennemstrømning, så som en gummielastisk pakning.Temporary dike according to claim 5, characterized in that engaging parts (14) of a joint between two of the individual sections (10) of the anchoring wall (6) comprise flexible packing means (32) against water flow, such as a rubber-elastic gasket. 11. Midlertidigt dige ifølge krav 10, kendetegnet ved, at de fleksible pak- ningsmidler (32) er tilvejebragte på både den vandrette foddels (24) formsluttende indgrebsdele (16,14) og på den opretstående koblingsdels (26) formsluttende indgrebsdele (14,16).Temporary dike according to claim 10, characterized in that the flexible packing means (32) are provided on both the form-fitting engaging parts (16, 14) of the horizontal foot part (24) and on the form-fitting engaging parts (14, 14) of the upright coupling part (26). 16).
DKPA201900471A 2019-04-17 2019-04-17 Procedure for flood protection and temporary dikes for flood protection DK180503B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DKPA201900471A DK180503B1 (en) 2019-04-17 2019-04-17 Procedure for flood protection and temporary dikes for flood protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DKPA201900471A DK180503B1 (en) 2019-04-17 2019-04-17 Procedure for flood protection and temporary dikes for flood protection

Publications (2)

Publication Number Publication Date
DK201900471A1 DK201900471A1 (en) 2020-11-23
DK180503B1 true DK180503B1 (en) 2021-06-03

Family

ID=73497432

Family Applications (1)

Application Number Title Priority Date Filing Date
DKPA201900471A DK180503B1 (en) 2019-04-17 2019-04-17 Procedure for flood protection and temporary dikes for flood protection

Country Status (1)

Country Link
DK (1) DK180503B1 (en)

Also Published As

Publication number Publication date
DK201900471A1 (en) 2020-11-23

Similar Documents

Publication Publication Date Title
US7708495B1 (en) Levee system
AU2023203639B2 (en) Precast Concrete Panels used as Surface Lining of Perimeter Surfaces of Excavations
KR102153902B1 (en) Slurry wall, construction method for the same and wire mesh assembly
ES2445575T3 (en) Method and set to build a continuous screen
BR112021014346A2 (en) METHOD OF CONSTRUCTION OF AN UNDERWATER CONCRETE BLOCK STRUCTURE
CN210482200U (en) Ecological bank protection structure of high and steep river course bank slope
KR100959301B1 (en) Tunnel structure object and tunnel and tunnel construction work method
KR101281070B1 (en) Wall structure for the water-storage tank and its constructing method
CN108951611B (en) Canal type cutting assembly type underground continuous wall and construction method
AU2013263720A1 (en) Wall Seal System
CZ201857A3 (en) Permanent prefabricated shoring wall
KR20220012525A (en) Slurry wall, construction method for the same and wire mesh assembly
DK180503B1 (en) Procedure for flood protection and temporary dikes for flood protection
US884354A (en) Marine concrete construction.
US20160010297A1 (en) Pilaster repair device and method for repairing seawalls
KR102138839B1 (en) Cast-in-place concrete blocks using large scales and revetment methods using them
US5325643A (en) Soil retainer block
JP7126889B2 (en) Steel wall and its construction method
RU220607U1 (en) Well base
KR101862761B1 (en) the method of constructing underground basic structure
KR101201796B1 (en) Rain-storage tank
JP3975131B2 (en) Caisson filling method, caisson structure manufacturing method
KR102371284B1 (en) Slurry wall, construction method for the same and wire mesh assembly
KR102699128B1 (en) Construction method for permanent underground wall used as earth retaining wall having interlocking structure and permanent underground wall used as earth retaining wall constructed thereby
KR20200005841A (en) Rainwater storage tank construction method using top-down method

Legal Events

Date Code Title Description
PAT Application published

Effective date: 20201018

PME Patent granted

Effective date: 20210603