DE9005635U1 - Adhesive anchors for insulation boards, especially those made of mineral wool - Google Patents
Adhesive anchors for insulation boards, especially those made of mineral woolInfo
- Publication number
- DE9005635U1 DE9005635U1 DE9005635U DE9005635U DE9005635U1 DE 9005635 U1 DE9005635 U1 DE 9005635U1 DE 9005635 U DE9005635 U DE 9005635U DE 9005635 U DE9005635 U DE 9005635U DE 9005635 U1 DE9005635 U1 DE 9005635U1
- Authority
- DE
- Germany
- Prior art keywords
- adhesive
- engagement
- web
- insulation
- anchor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009413 insulation Methods 0.000 title claims description 53
- 239000000853 adhesive Substances 0.000 title claims description 47
- 230000001070 adhesive effect Effects 0.000 title claims description 47
- 239000011490 mineral wool Substances 0.000 title claims description 10
- 230000002787 reinforcement Effects 0.000 claims description 27
- 239000004567 concrete Substances 0.000 claims description 20
- 239000000463 material Substances 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 3
- 229910052751 metal Inorganic materials 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 12
- 239000010959 steel Substances 0.000 description 12
- 238000009415 formwork Methods 0.000 description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 210000001503 joint Anatomy 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 239000011150 reinforced concrete Substances 0.000 description 2
- 239000004698 Polyethylene Substances 0.000 description 1
- 239000007795 chemical reaction product Substances 0.000 description 1
- 238000011109 contamination Methods 0.000 description 1
- 239000011888 foil Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000008267 milk Substances 0.000 description 1
- 210000004080 milk Anatomy 0.000 description 1
- 235000013336 milk Nutrition 0.000 description 1
- 239000002557 mineral fiber Substances 0.000 description 1
- 230000000149 penetrating effect Effects 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- -1 polyethylene Polymers 0.000 description 1
- 229920000573 polyethylene Polymers 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 125000006850 spacer group Chemical group 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/76—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
- E04B1/78—Heat insulating elements
- E04B1/80—Heat insulating elements slab-shaped
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/0821—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements
- E04F13/0823—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements the additional fastening elements located in-between two adjacent covering elements piercing the side faces of the covering elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Electromagnetism (AREA)
- Acoustics & Sound (AREA)
- Building Environments (AREA)
Description
22GH06182 M:GHO£18B122GH06182 M:GHO£18B1
Grünzweig + Hartmann AGGrünzweig + Hartmann AG
latten. insbesondslats. especially
Die* Erfindung betrifft einen HaftsicfearEngsstilcör gemäß dem
Oberbegriff des Anspruchs 1.
10The invention relates to an adhesion safety device according to the preamble of claim 1.
10
Es ist häufig erwünscht-., Dämmelemente zur Bildung einer fertigen Sich-„sei, te, insK^ondpre einsr Gebäudedecke, fest mit eii.^m Gebäude zu erbinden.It is often desirable to firmly bond insulation elements to a building to form a finished self-supporting ceiling.
Eine solche Verbindung erfolgt *n konventioneller Weise durch Anbringen der Dämmelemente mittels hierzu üblicher Befestigungsmittel, wie Tellerstifte, -schrauben usw. ,wobei die Befestigungsmittel in der Regel die Dämmelemente durchstoßen. Dies führt dazu, daß die Köpfe der Befestidüngemittel sichtbar sind.Such a connection is made *in the conventional way by attaching the insulation elements using the usual fastening devices, such as cup pins, screws, etc., whereby the fastening devices usually penetrate the insulation elements. This means that the heads of the fastening devices are visible.
Zur Vermeidung solcher Störungen der Sichtseite wird die Dämmlage aus Dämmelementen h&ufig vor Ort mit einem Leichtbeton - etwa einem Akustik-Putz - versehen. Dies erfordertTo avoid such disturbances to the visible side, the insulation layer made of insulation elements is often provided on site with a lightweight concrete - such as an acoustic plaster. This requires
\25 jedoch den zusätzlichen Arbeitsgang des Verputzens. Daher ist es oftmals wünschenswert, Dämmelemente, die beispielsweise bereits eine fertige Leichtbetonschicht aufweisen, an einer Gebäudedecke sicher und dauerhaft anzubringen, ohne daß die verwendeten Befestigungsmittel die Dämmelemente durchstoßen, so daß die spätere Sichtseite nicht durch Teile der Befestigungsmittel optisch gestört wird.\25 However, the additional work step of plastering is required. Therefore, it is often desirable to attach insulation elements, which for example already have a finished lightweight concrete layer, to a building ceiling safely and permanently without the fastening materials used penetrating the insulation elements, so that the later visible side is not visually disturbed by parts of the fastening materials.
Hierzu werden Dämmelemente auf einer Außenschalung angeordnet und als verlorene Schalung mit bestimmten Fixiereinrichtungen am oder im überlagerten Beton fixiert. Nach den Bauvorschriften ist es erforderlich, daß Im Beton eine Stahlbe-For this purpose, insulation elements are arranged on an external formwork and fixed as permanent formwork with certain fixing devices on or in the overlying concrete. According to the building regulations, it is necessary that a steel reinforcement is installed in the concrete.
1 11 1
1 11 1
I ) II ) I
1 11 1
wehrung vorgesehen sein muß, die sich in einem Minimalabstand von 15 mm von der Oberfläche der Betonschicht
befinden muß. Hierzu sind übliche Abstützungen für die Bewehrung vorgesehen.
5reinforcement must be provided, which must be located at a minimum distance of 15 mm from the surface of the concrete layer. Standard supports for the reinforcement are provided for this purpose.
5
So ist geoäß der Lehre der DE-U c"i 31 222 bekannt, daß Dämmelemente, wie z.B. mehrschichtige Dämmelemente auf Mineralwollebasis, -reiche auf ihrer späteren Sichtseite eine Schicht aus einem Leichtbeton aufweisen können, mit ü-förmigen Haftsicherungsankern, welche eine angespit." ce Lasche, einen Steg und ein Laftsicherungsteil aufweisen, als verlorene Schalung, beispielsweise mit einer Decke, fest verbunden werden können.According to the teaching of DE-U c "i 31 222, it is known that insulation elements, such as multi-layer insulation elements based on mineral wool, can have a layer of lightweight concrete on their later visible side, with U-shaped adhesive securing anchors, which have a pointed tab, a web and a load securing part, can be firmly connected as permanent formwork, for example with a ceiling.
Derartige U-förmige Haftsicherungsanker werden mit einem U-Schenkel mit spitzem Ende in die Stirnfläche einer Mineralwolleplatte geschoben, so daß der andere U-Schenkel der Oberfläche der Dämmplatte parallel anliegt. Nachdem sämtliche Dämmplatten einer Decke verlegt sind, wird der auf der Oberfläche der Dämmplatte liegende flächig ausgebildete Schenkel des Haftsicherungsankers in eine zu der Oberfläche der Dämmeplatte senkrechte Position gebracht und sodann mit Beton überlagert, so daß das Haftsicherungsteil nach dem Aushärten des Betons in diesen eingebunden wird und sich dadurch eine Haft- und Haltewirkung ergibt.Such U-shaped adhesive anchors are pushed with a U-leg with a pointed end into the front face of a mineral wool panel so that the other U-leg is parallel to the surface of the insulation panel. After all the insulation panels of a ceiling have been laid, the flat leg of the adhesive anchor lying on the surface of the insulation panel is brought into a position perpendicular to the surface of the insulation panel and then covered with concrete so that the adhesive part is embedded in the concrete after it has hardened, thus creating an adhesive and holding effect.
Ausgehend vom Stand der Technik der DE-TJ 85 31 222 ist es Aufgabe der vorliegenden Erfindung, den Aufwand für die Herstellung einer derart gedämmten Betonwand zu vermindern und dabei eine sichere Befestigung der Dämmelemente zu ermöglichen. Based on the state of the art of DE-TJ 85 31 222, the object of the present invention is to reduce the effort required to produce a concrete wall insulated in this way and to enable the insulation elements to be securely attached.
Die Lösung dieser Aufgabe erfolgt durch die kennzeichnenden Merkmale des Anspruchs 1.This problem is solved by the characterizing features of claim 1.
&igr; r &igr;·&igr;&igr;&igr; r &igr;·&igr;&igr;
Durch die so geschaffene Abstützfläche des Haftsicherungsteils £ür die Bewehrung kann jeglicher Aufwanä für zusätzliche Maßnahmen zur Abstützung der Bewehrung entfallen, so daß sich eine sehr wirtschaftliche Methode der Befestigung der Dämmelemente ergibt, The support surface of the adhesive securing part for the reinforcement created in this way eliminates any expense for additional measures to support the reinforcement, resulting in a very economical method of fastening the insulation elements .
Ein erfindungsgemäßer Haftsicherungsanker für Dämmplatten weist einen Eingriffsteil für einen Eingriff in das Material der Dämmplatte auf, wodurch der Haftsicherungsanker nach Montage der gesamten Dämmlage optisch nicht mehr in Erscheinung tritt.An adhesive securing anchor for insulation boards according to the invention has an engagement part for engaging the material of the insulation board, whereby the adhesive securing anchor is no longer visually visible after the entire insulation layer has been installed.
Desweiteren weist der Haftsicherungsanker einen Führungsteil für eine Führung an einer Oberf Iac -aonseite der Dämmplatte auf, womit gewährleistet ist, daß das sich ebenfalls über einen Steg anschließende Haftsicherungsteil, welches in einem der erforderlichen Betonüberdeckung entsprechenden Abstand eine Abstützfläche für die Bewehrung aufweist, immer im selben Abstand von der Oberfläche der Mineralwolle befindet. Furthermore, the adhesive securing anchor has a guide part for guidance on a surface of the insulation board, which ensures that the adhesive securing part, which is also connected via a web and has a support surface for the reinforcement at a distance corresponding to the required concrete cover, is always at the same distance from the surface of the mineral wool.
Das Haftsicherungsteil zusammen mit dem Führungsteii kann beispielsweise die Form eines querliegenden U haben, wobei der längere auf der Oberfläche der Mineralwolledämmplatte anliegende Schenkel des querliegenden U das Führungsteil bildet und der obere in der Regel kürzere Schenkel Bestandteil des Haftsicherungsteils ist. Auf seiner, von dem Führungsteii abgewandten Seite weist das Haftsicherungsteil eine Abstützfläche für die Bewehrung auf.The adhesive securing part together with the guide part can, for example, have the shape of a transverse U, whereby the longer leg of the transverse U resting on the surface of the mineral wool insulation board forms the guide part and the upper, usually shorter leg is part of the adhesive securing part. On its side facing away from the guide part, the adhesive securing part has a support surface for the reinforcement.
Eine solche Abstützfläche ist im einfachsten Falls eine zur Oberfläche der Dämmlage parallele ebene Fläche, jedoch kann sie im Bedarfs falle auf die Form der Bewehrungselemente abgestimmt werden. So sind beispielsweise konkav verlaufende Flächen zur Aufnahme der üblichen Stahlgitterbewehmng denk-In the simplest case, such a support surface is a flat surface parallel to the surface of the insulation layer, but if necessary it can be adapted to the shape of the reinforcement elements. For example, concave surfaces are conceivable for accommodating the usual steel grid reinforcement.
bar, so daß beim Auflegen der Bewehrung ein Abrutschen von der Abstützfläche vermieden werden kann.bar, so that slipping from the support surface can be avoided when the reinforcement is placed.
Dadurch, daß das Eingriffsteil sich gemäß Anspruch 2 beidseitig des Steges erstreckt, ist gewährleistet, daß zwei Dämmplatten auf Stoß miteinander verbunden und lagefixiert werden können, ; ämlich derart, daß zunächst eine Dämmplatte auf eine Außenschalung gelegt wird, sodann ein erfindungsgemäßer Haftsicherungsanker unter Anlage seines Führungsteiies an die von der Sichtseite der Dämmplatte abgewandte Oberfläche der Dämmplatte angelegt wird und das Eingriffsteil in eine Stirnseite der Mineralwolle-Dämmplatte eingedrückt wird, so daß ein entsprechendes Kingriffsteil auf der anderen Seite des Steges des Haftsicherungsankers vorspringt. Dann wird die nächste Dämmplatte auf der Außenschalung auf dieses vorspringende Eingriffsteil entlang des Haftsicherungsankers zu bewegt, wobei dieses Teil stirnseitig in die zweite Dämmplatte eingreift und sich demzufolge eine optisch kaum wahrnehmbare Stoßfuge zwischen beiden Dämmplatten ergibt. The fact that the engagement part extends on both sides of the web according to claim 2 ensures that two insulation panels can be connected to one another end to end and fixed in position, namely in such a way that first an insulation panel is placed on an external formwork, then an adhesive securing anchor according to the invention is placed with its guide part on the surface of the insulation panel facing away from the visible side of the insulation panel and the engagement part is pressed into one end of the mineral wool insulation panel so that a corresponding gripping part protrudes on the other side of the web of the adhesive securing anchor. Then the next insulation panel on the external formwork is moved towards this protruding engagement part along the adhesive securing anchor, whereby this part engages the end face of the second insulation panel and consequently a visually barely perceptible butt joint is created between the two insulation panels.
Dadurch, daß der Haftsicherungsanker gemäß Anspruch 3 ein Blechstanzteil, beispielsweise aus verzinktem Stahlblech ist, ergibt sich eine leichte Herstellungsweise in flächiger Form, so daß das Stanzteil an vorgegebenen Linien geeignet abgekantet werden kann, so daß sich der einbaufertige Haftsicherungsanker ergibt.The fact that the adhesive securing anchor according to claim 3 is a sheet metal stamping, for example made of galvanized sheet steel, results in an easy manufacturing method in a flat form, so that the stamping can be suitably bent along predetermined lines, so that the adhesive securing anchor is produced ready for installation.
Dadurch, daß das Führungsteil denjenigen Bereich des Eingriffsteils,
der auf der gleichen Seite des Steges wie das Führungsteil angeordnet ist, in Eingriffsrichtung des Eingriff
steils gemäß Anspruch 4 überragt, ergibt sich eine sichere Führung des Haftsicherungsankers an der Oberfläche des
Dämmelementes.
35Due to the fact that the guide part projects steeply in the direction of engagement of the engagement over that region of the engagement part which is arranged on the same side of the web as the guide part, this results in a secure guidance of the adhesive securing anchor on the surface of the insulation element.
35
t Il ·t Il ·
I Il ·I II ·
ft»· ·ft»· ·
111111
5·5·
Der Haftsicherungsanker kann in vorteilhafter Weise aus einem Stanzteil hergestellt werden, wenn er gemäß .Anspruch 5 alternierend angeordnete Laschen aufweist, weil somit die Laschen des Stanzrohlings abwechselnd nach links bzw. rechts in Bezug auf den Steg zwischen Eingriffsteil und Führungsteil abgekantet werden können.The adhesive securing anchor can advantageously be manufactured from a stamped part if it has alternately arranged tabs according to claim 5, because the tabs of the stamped blank can thus be bent alternately to the left or right in relation to the web between the engagement part and the guide part.
In vorteilhafter Weise sind die Laschen des Eingriffsteiles gemäß Anspruch 6 flächly äüäyöijildet., üiü insbesondere 1&Pgr; solchen Materalien wie Mineralwolle eine hinreichende Haltekraft zu gewährleisten, ohne größere Beschädigungen der Mineralwolle-Dämmplatte zu bewirken.Advantageously, the tabs of the engagement part are surface-mounted according to claim 6, in particular to ensure sufficient holding force for materials such as mineral wool, without causing major damage to the mineral wool insulation board.
Die Maßnahmen des Anspruches 7 führen dazu, daß ein umständliches Ausrichten der Bewehrung, insbesondere der Stahlgitter-Bewehrung, entfällt, da beispielsweise bei Verwendung der üblichen Stahlgitter-Bewehrung mit sich wiederholendem Quadratmuster - also quadratischer Elementargeometrie - die Längenausdehnung der Abstützfläche so gewählt wird, daß sie mindestens der Kantenlänge des Elementarquadrates entspricht, so daß bei Auflegen der Bewehrung auf dis Abstützflächsn. isaasr vrsnigstsns sin Bewehrungseisen zur Auflage kommt.The measures of claim 7 mean that a laborious alignment of the reinforcement, in particular the steel grid reinforcement, is no longer necessary, since, for example, when using the usual steel grid reinforcement with a repeating square pattern - i.e. square elementary geometry - the length of the support surface is selected so that it corresponds at least to the edge length of the elementary square, so that when the reinforcement is placed on the support surface, the reinforcing iron is at the front.
Weitere Vorteile und Merkmale der vorliegenden Erfindung ergeben sich auf Grund der Beschreibung eines Ausführungsbeispiels und anhand der Zeichnung. Further advantages and features of the present invention will become apparent from the description of an embodiment and the drawing.
Es zeigt:
30It shows:
30
Fig. 1 eine Draufsicht eines Stanzrohlings eines erfindungsgemäßen Haftsicherungsankers;Fig. 1 is a plan view of a punched blank of a retaining anchor according to the invention;
Fig. 2 einen erfindungsgemäßen Haftsicherungsanker in perspektivischer Darstellung;Fig. 2 shows a perspective view of an adhesive securing anchor according to the invention;
t · * IIIt · * III
f · · I I I * 'f · · I I I * '
t · &igr; · I ■ f It · &igr; · I ■ f I
Fig. 3 einen Querschnitt eines erfindungsgemäßen Hafrsicherungsankers in Einbaulage zwischen zwei Dännnplatten vor Überlagerung mit Beton;Fig. 3 shows a cross-section of an adhesion securing anchor according to the invention in the installation position between two thin plates before overlaying with concrete;
Fig. 4 einen Querschnitt eines erfindungsgemäßen Haftsicherungsankers in Einbaulage nach Überlagerung mit Beton; undFig. 4 a cross-section of an adhesive anchor according to the invention in the installed position after being covered with concrete; and
Fig. 5 sine perspektivische Ansicht einer teilweise fertig-1.0 gestellten Dämmlage unter Verwendung von erf indungsFig. 5 is a perspective view of a partially completed insulation layer using the inventive
gemäßen Haftsicherungsankernappropriate anchorage anchors
In Fig. 1 ist mit 1 ein Stanzrohling als Blechstanzteil bezeichnet. Der Stanzrohling 1 weist auf seiner in Fig. 1 rechten Seite Laschen 2 auf. Zur Bildung des einbaufertigen Endproduktes wird der Stanzrohling 1 an der mit a bezeichneten Linie senkrecht zu der von den Linien b und c umfriedeten Fläche des Stanzrohlings 1 nach unten abgekantet, im nächsten Schritt erfolgt die Abkantung entlang der Linie b in dieselbe Richtung und die Abkantung entlang der Linie c senkrecht nach oben in Bezug auf die von de.i Linien b und c uinfriedets Flachs des Stanzrohün^s 1 ; Anschließend werden die Laschen 2 entlang der Linie b abwechselnd nach links oder rechts abgekantet, so daß sie eine zu der durch die Li-) 25 nien b und c umfriedeten Fläche parallele. Positior einnehmen. Ein derart gebilderter Haftsicherungsanker 3 ist in Fig. 2 in perspektivischer Ansicht gezeigt.In Fig. 1, a stamping blank is designated as a sheet metal stamping with 1. The stamping blank 1 has tabs 2 on its right-hand side in Fig. 1. To form the ready-to-install end product, the stamping blank 1 is bent downwards along the line designated a perpendicular to the surface of the stamping blank 1 enclosed by lines b and c. In the next step, the bent is carried out along line b in the same direction and the bent is carried out along line c vertically upwards in relation to the surface of the stamping blank 1 enclosed by lines b and c. The tabs 2 are then bent alternately to the left or right along line b so that they assume a position parallel to the surface enclosed by lines b and c. An adhesive securing anchor 3 formed in this way is shown in perspective view in Fig. 2.
Ein solcher Kaftsicherungsanker 3 weist in seinem unteren Teil 4 ein Eingriffsteil 5 auf, welches sich beidseits eines Steges 6 in Form von flächig ausgebildeten Laschen 2 erstreckt . Der Steg 6 verbindet das Eingriff steil 5 auf der dem Eingriffsteil 5 abgewandten oberen Seite 7 des Steges 6 mit einem flächigem Führungsteil 8, wobei das Führungsteil 8 in eine«» Winkel von ca. 90° zu dem Steg 6 angeordnet ist.Such a force securing anchor 3 has in its lower part 4 an engagement part 5 which extends on both sides of a web 6 in the form of flat tabs 2. The web 6 connects the engagement part 5 on the upper side 7 of the web 6 facing away from the engagement part 5 with a flat guide part 8, wherein the guide part 8 is arranged at an angle of approximately 90° to the web 6.
" —i "—i
In einem von dem Steg 6 abgewandten Bereich 9 des Führungsteiles 8 weist der Haftsicherungsanker 3 ein Haftsicherungsteil 10 auf. Das Haftsicherungsteil 10 weist, eine Abstützfläche 11 auf, welche parallel zu dem Führungsteil 8 angeordnet ist, und welche über einen Abstandshalter 12 mit diesem verbunden ist. Der Abstand s der Abstützfläche 11 von dem Führungsteil 8 beträgt im Beispielsfalle 15 mm und entspricht somit dem für die Bewehrung von einer Stahlbetondecke erforderlichen Mindestabstand einer Bewehrung von der Betonoberfläche.In an area 9 of the guide part 8 facing away from the web 6, the adhesive securing anchor 3 has an adhesive securing part 10. The adhesive securing part 10 has a support surface 11 which is arranged parallel to the guide part 8 and which is connected to it via a spacer 12. The distance s of the support surface 11 from the guide part 8 is 15 mm in the example and thus corresponds to the minimum distance of a reinforcement from the concrete surface required for the reinforcement of a reinforced concrete ceiling.
f- In Fig. 3 ist ein Haftsicherungsanker 3 in Montageposition zum Anbetonier en von Dämmelementen 13 gezeigt. Die Dämmelemente 13 weisen eine Platte 14 aus gebundener Mineralwolle auf. Auf ihrer Unterseite 15 ist eine Schicht aus Leichtbeton 16 angeordnet, welche mit einer entfernbaren Schutzfolie 17 aus Polyethylen, zum Schutz gegen Verunreinigungen, beispielsweise durch Betonmilch, überdeckt ist. f- In Fig. 3, an adhesive anchor 3 is shown in the assembly position for concreting insulation elements 13. The insulation elements 13 have a plate 14 made of bonded mineral wool. On their underside 15, a layer of lightweight concrete 16 is arranged, which is covered with a removable protective film 17 made of polyethylene, to protect against contamination, for example from concrete milk.
Zur Verlegung derartiger Dämmelemente 13 werden einzelne Dämme 1 entente 13 mit ihrer folienbeschichteten Seite 18 auf eine Außenschalung 19 gelegt. Dann wird ein Haftsicherungsanker 3 mit seinem Führungsteil 8 auf der Oberfläche 20 des Dämmelementes 13 angelegt und der Haftsicherungsanker 3 der-( 25 art auf die Stirnseite 21 des Dämmelementes 13 zubewegt, daß die auf der Stirnseite 21 des Dämmelementes 13 befindlichen Laschen 2 des Eingriffsteiles 5 zwischen die Mineralfasern 22 des Dämmelementes 13 gelangen und somit in das Material der Dämmelemente 13 eingreifen. Hierbei ist es besonders hilfreich, daß das Führungsteil 8 denjenigen Bereich des Eingriffsteils 5, der auf der gleichen Seite des Steges 6 wie das Führungsteil 8 angeordnet ist, in Eingriffsrichtung des Eingriffsteils 5 überragt, da durch diese Ausbildung eine leichte und sichere Führung des Haftsicherungsankers 3 an der Oberfläche 20 des Dämmelementes 13 gewährleistet ist.To install such insulation elements 13, individual insulation elements 13 are placed with their foil-coated side 18 on an external formwork 19. Then a retaining anchor 3 is placed with its guide part 8 on the surface 20 of the insulation element 13 and the retaining anchor 3 is moved towards the front side 21 of the insulation element 13 in such a way that the tabs 2 of the engagement part 5 located on the front side 21 of the insulation element 13 get between the mineral fibers 22 of the insulation element 13 and thus engage in the material of the insulation elements 13. It is particularly helpful here that the guide part 8 protrudes beyond the area of the engagement part 5 that is arranged on the same side of the web 6 as the guide part 8 in the engagement direction of the engagement part 5, since this design ensures easy and safe guidance of the retaining anchor 3 on the surface 20 of the insulation element 13.
Sodann wird ein in Fig. 3 rechts liegendes zweites Dämmelement 13 mit seiner Stirnseite 23 auf die der Stirnseite 23 zuweisenden Lascher. 2 des Eingriff steiles 5 zubewegt, so daß die beiden Dämmelemente 13 den Haftsicherungsanker 3 in ihrer Stoßfuge derart einschließen, daß der Haftsicherungsanker 3 später auf der Sichtseite einer derart gedarrten Decks nicht mehr sichtbar ist. Wenn alle Dämmelemente si schließlich ihrer Haftsicherungsanker 3 verlegt sind, vird eine Stahlgitter-Bewehrung 24 für Stahlbeton auf die Abstilts: ?icLen 11 der Haftsicherungsanker 3 gelegt, ao daß die Stahlgitterbowehrung 24 in einem vordefinierten Abstand nt im Falle des Ausfuhrungsiiispiels 15 mm von der Oberfläche 20 der D£;kuelemente 13, den Bauvorschriften entsprechend, gehalten wird.Then a second insulation element 13, located on the right in Fig. 3, is moved with its front side 23 towards the tabs 2 of the engagement section 5 facing the front side 23, so that the two insulation elements 13 enclose the adhesive securing anchor 3 in their butt joint in such a way that the adhesive securing anchor 3 is later no longer visible on the visible side of a deck dried in this way. When all insulation elements have finally been laid with their adhesive securing anchors 3, a steel grid reinforcement 24 for reinforced concrete is laid on the supports 11 of the adhesive securing anchors 3, so that the steel grid reinforcement 24 is kept at a predefined distance n t in the case of the exemplary embodiment 15 mm from the surface 20 of the insulation elements 13, in accordance with the building regulations.
Nach Verlegung der Stahlgitter-Bewehrung 24 werden die Dämmelemente 13 mit Beton 25 überlagert. Dieser Zustand ist in Fig. 4 gezeigt. Der Beton kriecht dabei unter anderem zwischen die Abstützfläche 11 und das Führungsteil 9, so daß nach dem Aushärten des Betons 25 das Haftsicherungsteil 10 des Haftsicherungsankers 3 fest in die Betondecke 26 eingebunden ist, so daß vermöge der Haltewirkung der Laschen 2 des Eingriffsteils 5 die Dämmelemente 13 nach Abnahme der Außenschalung 19 als verlorene Schalung in der Gebäudedecke verbleiben und dort sicher verankert sind.After laying the steel mesh reinforcement 24, the insulation elements 13 are covered with concrete 25. This state is shown in Fig. 4. The concrete creeps between the support surface 11 and the guide part 9, among other things, so that after the concrete 25 has hardened, the adhesive securing part 10 of the adhesive securing anchor 3 is firmly integrated into the concrete ceiling 26, so that due to the holding effect of the tabs 2 of the engagement part 5, the insulation elements 13 remain as permanent formwork in the building ceiling after the external formwork 19 has been removed and are securely anchored there.
Anschließend entfernt man die Schutzfolie 17, so uaß eine Dämmlage mit optisch einwandfreier Sichtseite zur VerfügungThe protective film 17 is then removed, so that an insulating layer with a visually perfect visible side is available
steht.
30stands.
30
In Fig. 5 ist ein Ausschnitt aus einer verschalten Decken-• wand 26 in perspektivischer Darstellung gezeigt. Hieraus ist auch ersichtlich, daß es bevorzugt ist, die Querstangen 27 der Stahlgitter-Bewehrung 24 auf den Abstützflächen 11 der Haftsicherungsanker 3 abzustützen, so daß die Abstützflächen 11 der Haftsicherungsanker 3 in Montagestellung im wesentli-In Fig. 5, a section of a paneled ceiling wall 26 is shown in perspective. From this it can also be seen that it is preferable to support the crossbars 27 of the steel grid reinforcement 24 on the support surfaces 11 of the adhesive securing anchors 3, so that the support surfaces 11 of the adhesive securing anchors 3 in the assembly position are essentially
• · · I· · I
chen senkrecht zu den Querstangen 27 der Stahlgitter-Bewehrung 24 angeordnet sind.chen are arranged perpendicular to the cross bars 27 of the steel grid reinforcement 24.
Ferner entfällt ein umständliches Ausrichten der Stahlgitter-Bewehrung 24, da die Längenausdehnung der Abstützfläche 11 des Haftsicherungsankers 3 größer ist, &ngr;&Lgr;< dsm Abstand zweier benachbarter Üuerstangen 27 entspricht.Furthermore, a laborious alignment of the steel grid reinforcement 24 is eliminated, since the longitudinal extension of the support surface 11 of the adhesive anchor 3 is larger, ν�L< dsm corresponds to the distance between two adjacent outer rods 27.
Somit eröffnet der erfindungsgemäße Haftsix-herungsanker 3 die Möglichkeit des Anbetonierens von Dämmelementen 1.? in sicherer Art und w^isa und dient gleichzeitig als AbstützungThus, the adhesive anchor 3 according to the invention opens up the possibility of concreted insulation elements 1.? in a safe and secure manner and at the same time serves as a support
/-» für eine Bewehrung 24, so '^ß auf 2.*isätzl?,che Abstii+"7hilfen für die Stahlgixv.er-Bewehr -7 (24) verzichtet werden kann./-» for a reinforcement 24, so that 2.* additional support aids for the steel girder reinforcement -7 (24) can be dispensed with.
Claims (7)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE9005635U DE9005635U1 (en) | 1990-05-17 | 1990-05-17 | Adhesive anchors for insulation boards, especially those made of mineral wool |
EP19910401192 EP0457652B1 (en) | 1990-05-17 | 1991-05-07 | Use of embedded anchoring elements for insulating slabs, in particular for slabs made of rock wool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE9005635U DE9005635U1 (en) | 1990-05-17 | 1990-05-17 | Adhesive anchors for insulation boards, especially those made of mineral wool |
Publications (1)
Publication Number | Publication Date |
---|---|
DE9005635U1 true DE9005635U1 (en) | 1990-07-19 |
Family
ID=6853899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE9005635U Expired - Lifetime DE9005635U1 (en) | 1990-05-17 | 1990-05-17 | Adhesive anchors for insulation boards, especially those made of mineral wool |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0457652B1 (en) |
DE (1) | DE9005635U1 (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2650613A1 (en) * | 1989-08-03 | 1991-02-08 | Saint Gobain Isover | INSULATING ELEMENT BASED ON MINERAL WOOL AND WALL PRODUCED WITH SUCH INSULATING ELEMENTS |
FR2725225A1 (en) * | 1994-10-03 | 1996-04-05 | Bouygues Sa | Concrete floor structure |
FR2797901A1 (en) * | 1999-08-31 | 2001-03-02 | Knauf Snc | Method for fixing covering panel to building surface has channel shaped clip to fit onto support profile and receiving section for cover panel |
EP0896106B1 (en) * | 1997-08-07 | 2002-06-05 | Saint-Gobain Isover | Wall panel |
DE102004022277B4 (en) * | 2003-08-14 | 2007-08-30 | Deutsche Rockwool Mineralwoll Gmbh & Co. Ohg | Device for fastening insulating elements to flat surfaces |
WO2008064753A1 (en) * | 2006-11-27 | 2008-06-05 | Deutsche Rockwool Mineralwoll Gmbh & Co. Ohg | Under rafter insulation system for a roof, in particular a pitched roof, and holding element for the under rafter insulation system |
EP2584111A1 (en) * | 2011-10-18 | 2013-04-24 | Rockwool International A/S | Reinforced concrete wall provided with insulating panels on the underside and a method of making such wall |
ITPN20130012A1 (en) * | 2013-02-19 | 2014-08-20 | Pontarolo Engineering Spa | SYSTEM AND METHOD FOR CONSTRUCTION OF BUILDING STRUCTURES. |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1510230B (en) * | 2002-12-22 | 2010-04-28 | 邱则有 | Member for cast-in-situ steel reinforced concrete |
CN100356002C (en) * | 2003-09-15 | 2007-12-19 | 邱则有 | Light moulding bed component for cast-in-situ concrete |
CN100476128C (en) * | 2003-09-15 | 2009-04-08 | 邱则有 | Light moulding bed for cast-in-place concrete |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2326506A (en) * | 1940-05-09 | 1943-08-10 | Samuel H Tummins | Wallboard fastener |
US3359701A (en) * | 1965-05-17 | 1967-12-26 | Nat Gypsum Co | Roof-forming plank clip |
FR2226519A1 (en) * | 1973-04-19 | 1974-11-15 | Strati France | Fixing device for insulating panels - comprises toothed metal plate which is attached to panels and support |
FR2437519A1 (en) * | 1978-05-19 | 1980-04-25 | Vannier Andre | Clips for fixing thermal insulation panels - has prongs insert in edge of panel and tongues positioned on top surface |
FR2476717A1 (en) * | 1980-02-25 | 1981-08-28 | Costamagna & Cie B M | Precast concrete beam for suspended floor - includes embedded fittings whose projecting flaps have end rolls for nails fixing false ceilings |
FR2480827A1 (en) * | 1980-04-17 | 1981-10-23 | Judas Pierre | Heat and noise insulating panels - consist of asymmetrically assembled layers and are attached to existing partition |
-
1990
- 1990-05-17 DE DE9005635U patent/DE9005635U1/en not_active Expired - Lifetime
-
1991
- 1991-05-07 EP EP19910401192 patent/EP0457652B1/en not_active Expired - Lifetime
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2650613A1 (en) * | 1989-08-03 | 1991-02-08 | Saint Gobain Isover | INSULATING ELEMENT BASED ON MINERAL WOOL AND WALL PRODUCED WITH SUCH INSULATING ELEMENTS |
FR2725225A1 (en) * | 1994-10-03 | 1996-04-05 | Bouygues Sa | Concrete floor structure |
EP0896106B1 (en) * | 1997-08-07 | 2002-06-05 | Saint-Gobain Isover | Wall panel |
FR2797901A1 (en) * | 1999-08-31 | 2001-03-02 | Knauf Snc | Method for fixing covering panel to building surface has channel shaped clip to fit onto support profile and receiving section for cover panel |
DE102004022277B4 (en) * | 2003-08-14 | 2007-08-30 | Deutsche Rockwool Mineralwoll Gmbh & Co. Ohg | Device for fastening insulating elements to flat surfaces |
WO2008064753A1 (en) * | 2006-11-27 | 2008-06-05 | Deutsche Rockwool Mineralwoll Gmbh & Co. Ohg | Under rafter insulation system for a roof, in particular a pitched roof, and holding element for the under rafter insulation system |
EP2584111A1 (en) * | 2011-10-18 | 2013-04-24 | Rockwool International A/S | Reinforced concrete wall provided with insulating panels on the underside and a method of making such wall |
ITPN20130012A1 (en) * | 2013-02-19 | 2014-08-20 | Pontarolo Engineering Spa | SYSTEM AND METHOD FOR CONSTRUCTION OF BUILDING STRUCTURES. |
Also Published As
Publication number | Publication date |
---|---|
EP0457652A1 (en) | 1991-11-21 |
EP0457652B1 (en) | 1994-07-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2310333A1 (en) | WALL ARRANGEMENT CONSISTS OF AN INNER WALL PART AND AN OUTER WALL PART, WHICH ARE SITUATED AT A DISTANCES | |
WO2010149625A1 (en) | Support bracket for a facade system | |
EP0161532A2 (en) | Profile combination for separation of plastered areas in the region of joints in buildings with full thermal covering | |
DE9005635U1 (en) | Adhesive anchors for insulation boards, especially those made of mineral wool | |
DE202004004965U1 (en) | Shuttering element, uses connector parts between shuttering boards to hold concrete reinforcement structure at distance from these boards | |
DE29606107U1 (en) | End profile for the thermal insulation layer of a building wall | |
DE2005319B2 (en) | For flush insertion in an in-situ concrete ceiling or the like. serving fastener | |
DE9210792U1 (en) | Edge protection strip | |
DE202007011315U1 (en) | An element | |
EP0647747A1 (en) | Supporting structure for the covering and/or the cladding of buildings | |
DE102010025042A1 (en) | Steel beam for precast ceilings | |
EP0851071B1 (en) | Thermal-insulation finishing with finishing profiles for construction corners | |
EP1052339A2 (en) | Masonry block for the erection of wall without grout joints and wall anchor therefor | |
EP1617001A2 (en) | Heat insulation system for an exterior cavity wall | |
DE102007017612A1 (en) | Frame for a balcony or a terrace and method for its production | |
CH672523A5 (en) | ||
DE3203387A1 (en) | Device for fixing an element to the outer insulation of building walls on a building outer wall | |
DE29722108U1 (en) | Precast concrete and transport anchor for the transport of this precast concrete | |
DE202014100860U1 (en) | Base plate for industrial floors | |
DE2626117A1 (en) | ANCHORS FOR FRONT FORMWORK FOR BUILDING CEILINGS | |
DE102009014309B4 (en) | Sealing element for concrete structures | |
DE29819035U1 (en) | Cover for roofs and facades | |
DE102022131325A1 (en) | Formwork element and arrangement of formwork elements | |
DE7607394U1 (en) | ANCHORING BRACKET | |
DE9317720U1 (en) | Retaining bracket for concrete slabs |