DE4121373C2 - Process for the production of reinforced concrete room cells and device for carrying out the process - Google Patents

Process for the production of reinforced concrete room cells and device for carrying out the process

Info

Publication number
DE4121373C2
DE4121373C2 DE4121373A DE4121373A DE4121373C2 DE 4121373 C2 DE4121373 C2 DE 4121373C2 DE 4121373 A DE4121373 A DE 4121373A DE 4121373 A DE4121373 A DE 4121373A DE 4121373 C2 DE4121373 C2 DE 4121373C2
Authority
DE
Germany
Prior art keywords
station
core formwork
pallet
concreting
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE4121373A
Other languages
German (de)
Other versions
DE4121373A1 (en
Inventor
Eberhard Schrade
Klaus Hensgen
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCHRADE, EBERHARD, 71101 SCHOENAICH, DE
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE4121373A priority Critical patent/DE4121373C2/en
Priority to DE9107967U priority patent/DE9107967U1/en
Publication of DE4121373A1 publication Critical patent/DE4121373A1/en
Application granted granted Critical
Publication of DE4121373C2 publication Critical patent/DE4121373C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Processing Of Solid Wastes (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Description

Stand der TechnikState of the art

Die Erfindung geht aus von einem aus der DE-OS 32 12 499 bekannten Verfahren zur Herstellung von Stahlbeton- Raumzellen (Modulen) und der zur Durchführung des Verfahrens vorgesehenen Vorrichtung.The invention is based on one from DE-OS 32 12 499 known processes for the production of reinforced concrete Space cells (modules) and for the implementation of the Procedure provided device.

Bei der bekannten Vorrichtung umfaßt die Betonierstation neben den üblichen Decken-, Rückwand- und einander gegenüberliegenden Seitenwandschalungen ein ortsfestes Gerüst, welches zusätzlich zu einer gegebenenfalls vorhandenen Torschaltung einen etwa horizontal aus­ kragenden Tragrahmen aufweist. Ferner ist wie üblich eine Kernschalung an der Betonierstation vorgese­ hen, wobei die herzustellende Raumzelle auf einem Palettenwagen aufbetoniert wird und zu einem späte­ ren Zeitpunkt an einer zur Betonierstation räumlich getrennten Entschalstation mittels des Palettenwagens von der Kernschalung abgezogen wird. Wesentlich ist bei dieser bekannten Schalungseinrichtung ferner, daß der Tragrahmen an dem Gerüst lösbar befestigt ist und an der Entschalstation für die Kernschalung ein weiteres Gerüst vorgesehen ist, zu der die außen­ seitig entschalte Raumzelle zusammen mit dem von dem Gerüst an der Betonierstation gelösten Tragrahmen einschließlich einiger in der Betonierstellung ver­ bliebenen Kernschalungsteilen verfahrbar ist und an deren Gerüst der Tragrahmen dann erneut lösbar befestigt wird.In the known device, the concreting station comprises next to the usual ceiling, back wall and each other opposite side wall formwork a fixed Scaffolding, which in addition to any existing gate circuit one approximately horizontally  has cantilevered support frame. Furthermore, as usual a core formwork at the concreting station hen, the room cell to be manufactured on a Pallet truck is concreted and turned into a late their time at the concreting station separate demoulding station by means of the pallet truck is subtracted from the core formwork. Is essential in this known formwork device, that the support frame is releasably attached to the scaffold and at the demoulding station for the core formwork Another scaffold is provided, to which the outside unlocked room cell together with that of support frame detached from the scaffolding at the concreting station including some in the concreting position remaining core formwork parts is movable and on the framework of the support frame then releasable is attached.

So ist es zwar möglich, bei dieser bekannten Schalungs­ einrichtung eine Trennung der Arbeitsgänge Betonieren und Entnahme jedenfalls von Teilen der Kernschalung aus der erhärteten Raumzelle zu trennen, so daß die zeitliche Auslastung der Betonierstation verbessert wird; dies führt jedoch auf der anderen Seite zu einer erheblich komplizierteren Realisierungsform, da zur Aufnahme und Lagefixierung der Kernschalung an beiden Arbeitsplätzen, Betonierstation und Entschal­ station, ein Gerüst mit lösbaren Befestigungspunkten erforderlich ist, zusätzlich zu dem an den Gerüsten jeweils zu befestigendem Tragrahmen.So it is possible with this known formwork a separation of the concreting operations and removal of parts of the core formwork separate from the hardened room cell so that the Time utilization of the concreting station improved becomes; on the other hand, this leads to a much more complicated form of implementation, there to take up and fix the core formwork at both workplaces, concreting station and shuttering station, a scaffold with removable attachment points is required in addition to that on the scaffolding support frame to be attached in each case.

Allgemein sind Schalungseinrichtungen für die Herstel­ lung von Stahlbeton-Raumzellen mit wenigstens einer offenen Seite auf einem Palettenwagen und mit einer durch feststehende, schwenkbare oder fahrbare Wände den Schalungsraum nach außen begrenzenden Betonier­ station und einer davon räumlich getrennten Entschal­ station bekannt (DE-OS 17 59 214, 24 17 805, 27 45 054). Bei allen diesen Schalungseinrichtungen wird in der üblichen Weise vorgegangen, d. h. die Betonierstation nimmt die Kernschalung auf, der Be­ toniervorgang findet statt, und anschließend wird, nach entsprechender Aushärtung entschalt und die so hergestellte Raumzelle (Modul), auf einem Palet­ tenwagen stehend, von der Kernschalung abgedrückt. Dabei kann das Abdrücken der Außenschalwände in der Betonierstation bei den bekannten Schalungseinrich­ tungen zwar gegebenenfalls früher erfolgen; die Kern­ schalung muß jedoch zur Stabilisierung solange in der Betonierstellung verbleiben, bis die endgültige Aushärtung des Betonelements erfolgt ist, so daß sich eine zeitlich unangenehm lange Blockierung der Betonierstation ergibt.Formwork devices for manufacturers are general  development of reinforced concrete room cells with at least one open side on a pallet truck and with a due to fixed, swiveling or mobile walls concreting delimiting the formwork space station and a spatially separated formwork station known (DE-OS 17 59 214, 24 17 805, 27 45 054). With all these formwork devices is carried out in the usual way, d. H. the Concreting station picks up the core formwork, the Be toning process takes place, and then after appropriate curing, switch off and the room cell (module) thus produced, on a pallet standing wagon, pulled off the core formwork. The impression of the outer formwork walls in the Concreting station at the well-known Schalungseinrich may be earlier; the core However, formwork must be in for stabilization the concreting position remain until the final The concrete element has hardened so that an uncomfortably long time blocking the Concreting station results.

Der Erfindung liegt die Aufgabe zugrunde, hier Abhilfe zu schaffen und bei gleichem zeitlichen Gewinn durch Trennung der Arbeitsgänge Betonieren und Entnahme der Kernschalung mit einem wesentlich geringerem Aufwand auszukommen.The invention is based on the object, remedy here to create and with the same time gain through Separation of the concreting and removal operations the core formwork with a much lower one Get along effort.

Vorteile der ErfindungAdvantages of the invention

Die Erfindung löst diese Aufgabe mit den Merkmalen des Anspruchs 1 bzw. des Anspruchs 6 und hat den Vorteil, daß die Kernschalung unter Ver­ zicht auf jegliche Gerüst- und Tragrahmen-Formen direkt auf dem Palettenwagen lagefixiert und verspannt so ausgebildet wird, daß Aufnahmen für die Kernscha­ lung an der Betonierstation gar nicht erforderlich sind.The invention solves this problem with the  Features of claim 1 and claim 6 and has the advantage that the core formwork under Ver no scaffolding and support frame shapes fixed and tensioned directly on the pallet truck is designed so that recordings for the Kernscha not necessary at the concreting station are.

Hierdurch vereinfachen sich nicht nur Aufbau und Funk­ tion im Bereich der Betonierstation, da diese weder Traggerüst noch sonstige Halterungen für die Kernschalung benötigt, sondern auch der Arbeitsablauf an sich verflüssigt und verbessert sich entscheidend.This not only simplifies setup and radio tion in the area of the concreting station, since this is neither Support frame still other mounts for the Core formwork is required, but also the workflow liquefied per se and improves significantly.

Durch die Erfindung reduzieren sich auch die an die verwendete Kernschalung gestellten Ansprüche; es können für diese starre Körper mit entsprechenden Aushebeschrägen oder in ihrem Querschnitt veränderli­ che Gebilde, wie für sich gesehen bekannt, verwendet werden; es ist lediglich erforderlich, daß die jeweils verwendete Kernschalung an ihrem unteren Bereich eine Art Anschluß- oder Fixierpunkte aufweist, die eine lösbare kraft- und/oder formschlüssige Verbindung zwischen der Kernschalung und dem jeweiligen Paletten­ wagen gewährleisten.The invention also reduces the number of used core formwork claims; it can with appropriate for this rigid body Lifting bevels or changing their cross section che structures, as known per se, used will; it is only necessary that each used core formwork at its lower area has a kind of connection or fixing points that a releasable non-positive and / or positive connection between the core formwork and the respective pallet ensure the carriage.

Eine Aufnahme für die Kernschalung ist lediglich an der Entschalstation, in räumlicher Trennung zur Betonierstation, vorgesehen, die vereinfacht in Form von in ihrer Höhenlage veränderlichen Trag- und Greif­ mechanismen ausgebildet sein kann, die, in den Kernschalungsraum hineinragend, an dort vorgesehenen Befestigungspunkten die Kernschalung halten und das Abziehen der fertigen Raumzelle, also des Moduls, der auf dem Palettenwagen verbleibt, ermöglichen.A holder for the core formwork is only at the demoulding station, in spatial separation from the Concreting station, provided that simplified in shape of carrying and gripping devices that vary in height mechanisms can be formed in the Formwork core protruding, provided there  Attachment points hold the core formwork and that Subtracting the finished room cell, i.e. the module, that remains on the pallet trolley.

Die für die Lagefixierung der Kernschalung auf dem Palettenwagen er­ forderlichen Halte- oder Befestigungsanordnungen sind problemlos her­ zustellen, wobei zur Herstellung eines Raumzellenbodens, falls dieser überhaupt gewünscht ist, auf dem Palettenwagen einfache Zwischenstücke als Abstandshalterungen angeordnet werden können, die zwar zu Öffnungen im Raumzellen­ boden führen, die aber im Nachgang ohne größeren Aufwand geschlossen werden können.He for fixing the position of the core formwork on the pallet truck Required holding or fastening arrangements are straightforward to deliver, whereby for the production of a room cell floor, if this is even wanted on the pallet truck simple Intermediate pieces arranged as spacers can become openings in the room cells soil, but afterwards without major Effort can be closed.

Auch hier verbleibt die Raumzelle nur solange an der Betonierstation, bis sie eine solche Frühhärte aufweist, daß die Außenschalung der Betonierstation gelöst werden kann. Anschließend wird die Frühhärte- Raumzelle, auf dem Palettenwagen stehend, zur weiteren Erhärtung, gegebenenfalls unter gleichzeitiger Behei­ zung, verfahren, entweder sofort in den Bereich einer später, also nach Erreichen der erforderlichen Festigkeit in Aktion tretenden Entschalstation oder zur Zwischenlagerung. Nach Erreichen der erforderlichen Festigkeit erfolgt dann der Endtransport auf dem Palettenwagen zur Entschalstation.Here too, the room cell remains only as long the concreting station until it has such early hardness has that the outer formwork of the concreting station can be solved. Then the early hardness is Room cell, standing on the pallet trolley, for further Hardening, if necessary with simultaneous heating tongue, proceed, either immediately into the area one later, after reaching the required Strength acting demoulding station or for temporary storage. After reaching the required The final transport then takes place on the strength Pallet truck to the demoulding station.

Die Erfindung eignet sich besonders zur Herstellung von üblicherweise auf einer Seite offenen Stahlbeton- Raumzellen oder Modulen, wie sie in der deutschen Patentanmeldung P 41 15 643.9 beschrieben sind. Dabei wird so vorgegangen, daß die Bewehrungskörbe, die bei den genannten früheren Patentanmeldungen speziell in den vier Eckstützenbereichen der so hergestellten Module bzw. Raumzellen angeordnet sind, an geeigneter Stelle, auch über Abstandhalter, an der Kernschalung befestigt werden, die dann auf dem Palettenwagen in die Betonierstation hineinfährt.The invention is particularly suitable for production of reinforced concrete usually open on one side Space cells or modules, as they are in German Patent application P 41 15 643.9 are described. It will be like this that the reinforcement cages used in the  mentioned earlier patent applications specifically in the four corner support areas of the so manufactured Modules or room cells are arranged at a suitable Place, also via spacers, on the core formwork which are then attached to the pallet truck drives into the concreting station.

Zur paßgenauen Positionierung der Kernschalung und/oder des Palettenwagens in der Betonierstation können Führungsbolzen dienen, die eine formschlüssige Verbin­ dung vorzugsweise zwischen dem Palettenwagen und dem Längs- und/oder Seitenwänden in der Betonierstation sicherstellen.For precise positioning of the core formwork and / or of the pallet truck in the concreting station Serve guide bolts that form a positive connection preferably between the pallet truck and the Longitudinal and / or side walls in the concreting station to ensure.

Die Erfindung eignet sich besonders gut für die Herstel­ lung solcher vorgefertigter Stahlbeton-Module, bei denen aus bautechnischen Gründen der Boden vollkommen fehlt, so daß insofern der Palettenwagen auch nicht als Bodenschalung eingesetzt zu werden braucht und es darüber hinaus möglich ist, die Kernschalung unmit­ telbar, also ohne deren Lage fixierende und eine Verspannung mit dem Palettenwagen bewirkenden Abstands­ elemente auf dem Palettenwagen aufzusetzen.The invention is particularly suitable for manufacturers development of such prefabricated reinforced concrete modules for technical reasons the floor is perfect is missing, so that the pallet truck is not needs to be used as floor formwork and it is also possible to immit the core formwork telbar, ie without fixing their position and one Bracing with the distance causing the pallet truck place elements on the pallet trolley.

Bei Wegfall des Bodens der zu fertigenden Raumzelle genügen einfache Haltemechanismen etwa am Palettenwa­ genboden, die in Ausnehmungen der Kernschalung eingrei­ fen, um diese präzise in ihrer Lage zu fixieren, wobei solche Haltemechanismen bei der Entschalung, wenn also die Kernschalung von dem Palettenwagen freikommt, automatisch oder manuell eingezogen werden können. If the floor of the room cell to be manufactured ceases to exist simple holding mechanisms, for example on the pallet wa, are sufficient Genboden that in recesses of the core formwork to fix them precisely in their position, such holding mechanisms when removing formwork, so if the core formwork from the pallet truck is released, automatically or manually can.  

Ein weiterer besonderer Vorteil vorliegender Erfindung besteht darin, daß, jedenfalls in sehr vielen Anwen­ dungsfällen, ein umständlicher Transport der fertig hergestellten Raumzellen oder Module von der Betonier­ station zu den gegebenenfalls sehr weit entfernten Baustellen über Schiene oder Straße entfallen kann, da durch die ausschließlich horizontale Bewegung des Palettenwagens mit der von ihm getragenen Kernscha­ lung ohne die Notwendigkeit umständlicher und entspre­ chend kräftiger Gerüste und Tragarme auch ein Trans­ port der Betonierstation mit einer Entschalstation an die Baustelle unmittelbar möglich ist, so daß die Module vorort hergestellt werden können. Es genügt dann, auf einem entsprechenden Areal eine vorgegebene Anzahl von Laufschienen für die Palettenwagen anzuord­ nen.Another particular advantage of the present invention is that, at least in very many applications cases, a cumbersome transport of the finished manufactured cells or modules by the concreting company station to those who may be very far away Construction sites by rail or road can be omitted, because of the exclusively horizontal movement of the pallet truck with the core scha carried by him without the need for more complicated and corresponding strong scaffolding and support arms also a trans port of the concreting station with a demoulding station to the construction site is possible so that the modules can be manufactured on site. It is sufficient then, a given area on a corresponding area Arrange the number of tracks for the pallet trolleys nen.

Durch die in den Unteransprüchen aufgeführten Maßnahmen sind weitere vorteilhafte Ausgestaltungen und Verbes­ serungen der Erfindung möglich. Besonders vorteilhaft ist die Anordnung von der Aufnahme und Lagefixierung der Kernschalung auf dem Palettenwagen dienenden, am Palettenwagen angeordneten Zwischenstücken mit Spannstellen, die ein mechanisches oder hydraulisches Verspannen von der Kernschalung aus gestatten.By the measures listed in the subclaims are further advantageous refinements and verbs Solutions of the invention possible. Particularly advantageous is the arrangement of the admission and position fixation serving the core formwork on the pallet truck, intermediate pieces arranged on the pallet truck Clamping points that are mechanical or hydraulic Allow tensioning from the core formwork.

Zur Halterung und erforderlichen Bewegung der Kern­ schalung in der Entschalstation können an dieser in das Innere der Kernschalung greifende Tragarme mit einer entsprechenden Aufnahmetechnik vorgesehen sein, die die Kernschalung festhalten, während Abdruck­ stempel im Bereich der Entschalstation die auf dem Palettenwagen verbleibende Raumzelle abdrücken.For holding and necessary movement of the core Formwork in the demoulding station can be used on this Support arms reaching into the interior of the core formwork provided with appropriate recording technology be that hold the core formwork in place during impression stamp in the area of the demoulding station on the  Push off the remaining space cell on the pallet truck.

Nach dem Entschalen wird die Raumzelle auf dem Paletten­ wagen dann zu einem Lagerplatz oder zur Komplettierung gefahren bzw. kann auch einem sofortigen Einbau zuge­ führt werden, wenn die ganze Betonieranlage vor Ort an der Baustelle eingesetzt ist; die Kernschalung wird auf einen leeren Palettenwagen aufgesetzt, der über Schienen mit entsprechenden Kreuzungsstellen an die Entschalstation herangebracht ist, und von dort wieder zur Betonierstation gefahren.After stripping, the room cell is placed on the pallet then venture to a storage location or to complete it driven or can also be installed immediately if the entire concreting plant is on site is used at the construction site; the core formwork is placed on an empty pallet truck, the over rails with corresponding crossing points is brought to the demoulding station, and from there again drove to the concreting station.

Man erkennt, daß es mit drei Kernschalungen möglich ist, einen schnellen und probleinlosen Ablauf der Fertigung sicherzustellen, wobei sich eine der Kern­ schalungen in der Betonierstation, die andere in der Entschalstation und die dritte zum abschließenden Aushärtungsprozeß einer Raumzelle mit dieser auf einem Palettenwagen an einer geeigneten Aushärtestelle, gegebenenfalls mit Beheizung, befindet.It can be seen that it is possible with three core formwork is a quick and easy process of the Ensure manufacturing, being one of the core formwork in the concreting station, the other in the demoulding station and the third to the final one Curing process of a room cell with this a pallet truck at a suitable curing point, possibly with heating.

Die Anzahl der Kernschalungen hängt dabei von der möglichen Taktfolge in der Betonierstation bzw., wenn hier mehrere im Bereich der verlegten Schienen­ stränge vorgesehen sind, der vorhandenen Betoniersta­ tionen und Entschalstationen und der erforderlichen Zeiträume zum Aushärten der Raumzellen ab.The number of core formwork depends on the possible cycle sequence in the concreting station or, if there are several in the area of the laid rails strands are provided, the existing concreting stations and demoulding stations and the required Periods of time for the room cells to harden.

Zeichnungdrawing

Ausführungsbeispiele der Erfindung sind in der Zeich­ nung dargestellt und werden in der nachfolgenden Beschreibung näher erläutert. Es zeigen:Embodiments of the invention are in the drawing  and are shown in the following Description explained in more detail. Show it:

Fig. 1 grob schematisch eine mögliche Ausführungsform einer Schalungsgesamtanlage mit einer oder mehreren Betonier- und Schalungsstationen sowie einer Kreuzungsbereiche aufweisenden Schienenanlage, auf welcher die jeweiligen Palettenwagen verfahren werden; FIG. 1 is a rough schematic of a possible embodiment of a formwork entire plant with one or more concreting and formwork stations as well as a crossing regions having rail system on which the respective pallet trolleys are moved;

Fig. 2 in ebenfalls schematisierter Darstellung eine Frontansicht einer Betonierstation mit auf einem Palettenwagen aufsitzender und mit dieser eingebrachten Kernschalung; FIG. 2 shows a schematic view of a front view of a concreting station with core formwork seated on a pallet truck and inserted with it;

Fig. 3 zeigt die Betonierstation der Fig. 2 in einer Seitenansicht und Fig. 3 shows the concreting station of Fig. 2 in a side view

Fig. 4 die gleiche Betonierstation in Draufsicht, während die Fig. 4 shows the same pouring station in top view, while the

Fig. 5, 6 und 7 in der gleichen Reihenfolge Front­ sicht, Seitenansicht und Draufsicht auf eine Entschalstation mit Kernschalung und Paletten­ wagen zeigen. Fig. 5, 6 and 7 are side and plan views of view in front of the same order, to a demoulding with core shuttering and pallets show cars.

Beschreibung der ErfindungsbeispieleDescription of the invention examples

Die Erfindung beruht auf der Erkenntnis, daß es bei entsprechender Modifizierung des Palettenwagens mög­ lich ist, die Kernschalung auf dem Palettenwagen lagezufixieren und so zu verspannen, daß es der Palet­ tenwagen selbst ist, der in jeder Arbeitsphase und bei jedem Bewegungsablauf die Kernschalung trägt und paßgenau aufnimmt, so daß irgendwelche gesonderten Gerüste, Tragarme, Halteeinrichtungen u. dgl. für die Kernschalung überflüssig sind und lediglich an der Entschalstation die Kernschalung einmal erfaßt und die voll ausgehärtete Raumzelle von dieser abge­ zogen wird, woraufhin sofort wieder das Aufset­ zen auf einen neuen Palettenwagen erfolgt.The invention is based on the knowledge that it is appropriate modification of the pallet truck possible is the core formwork on the pallet truck fix it and brace it so that it is the palet tenwagen itself, which is in every work phase and at carries the core formwork with every movement and fits exactly, so that any separate Scaffolding, support arms, holding devices and. Like for  the core formwork is superfluous and only on the formwork station once recorded the core formwork and the fully hardened room cell removed from it is pulled, whereupon the attachment immediately zen on a new pallet trolley.

Entsprechend Fig. 1 kann eine geeignete Betonieranlage für die Herstellung vorgefertigter Raumzellen oder Module ein System geeignet verlegter Schienenstränge 1 umfassen, auf denen Palettenwagen 10 verfahrbar sind, wobei die Schienenstränge 1 beliebige Kreuzungspunkte 2 aufweisen, damit die Palettenwagen jeweils zu hier vorgesehenen zwei Betonierstationen 3 bzw. in der gleichen Anzahl vorgesehenen Entschalungsstationen 4 verfahren werden können.According to Fig. 1, a suitable concreting system for the production of prefabricated room cells or modules can comprise a system of suitably laid rail tracks 1 on which pallet carriages 10 can be moved, the rail tracks 1 having any crossing points 2 , so that the pallet carriages in each case to two concrete pouring stations 3 or can be moved in the same number of provided formwork stations 4 .

An geeigneter nicht dargestellter Stelle können weite­ re Leerpalettenwagen angeordnet werdend oder es können sich Lagerstellen befinden, die der vollständigen Aushärtung von frühgehärteten, auf ihren Palettenwagen einschließlich Kernschalung noch aufsitzenden Raum­ zellen dienen.At a suitable point, not shown, wide re empty pallet trolleys are arranged or it can there are storage locations that the complete Hardening of early hardened on their pallet trolleys including core formwork still sitting space serve cells.

Der gesamte Transportmechanismus läuft mit den Palet­ tenwagen und mit deren Hilfe in einer gegebenen hori­ zontalen Ebene ab, was auch deshalb von Vorteil ist, weil wie bei früheren Schalungseinrichtungen noch üblich, die Entnahme eines dann vollständig ausge­ härteten vorgefertigten Moduls nach oben aus der Betonier­ station etwa mit Hilfe eines Brückenkrans u. dgl. nicht mehr erforderlich ist. The entire transport mechanism runs with the pallet tenwagen and with their help in a given hori zonal level, which is also an advantage, because as with previous formwork equipment usual, the removal of one then completely out hardened prefabricated module upwards out of the concreting station with the help of a bridge crane u. the like is no longer required.  

Entsprechend Fig. 2 umfaßt die Betonierstation 3 eine üblicherweise feststehende Rück- oder Längswand 14, üblicherweise verschwenk- oder verfahrbare Seiten­ wände 15 sowie eine Deckenwand 11, die ebenfalls feststehend sein kann. Diese zur Betonierstation gehörenden und, den Füllraum begrenzenden Wände können, falls gewünscht, mit an den Seitenwänden 15 angedeuteten Podesten 16 versehen sein.According to Fig. 2 comprises the concreting station 3 is a usually stationary rear or longitudinal wall 14, usually pivotable or movable side walls 15 and a top wall 11, which may also be fixed. These walls belonging to the concreting station and delimiting the filling space can, if desired, be provided with platforms 16 indicated on the side walls 15 .

In der Betonierstation 3 befindet sich, auf einem Palettenwagen 10 aufsitzend, eine Kernschalung 12 von grundsätzlich beliebiger Form und Ausgestaltung, wobei die Kernschalung entweder unmittelbar auf der Oberfläche des Palettenwagens aufsitzt und mit diesem in geeigneter Weise verspannt ist, wenn nämlich eine Raumzelle oder ein vorgefertigter Modul ohne Boden hergestellt werden soll, oder es sind, vorzugsweise als Bestandteile des Palettenwagens 10, Zwischenstücke 13 vorgesehen, die die Kernschalung 12 im Abstand zum Palettenwagen 10 halten, der dann mit seiner der Kernschalung zugewandten Oberfläche die äußere Bodenschalung für die herzustellende Raumzelle bildet.In the concreting station 3 , seated on a pallet truck 10 , there is a core formwork 12 of basically any shape and configuration, the core formwork either sitting directly on the surface of the pallet truck and being braced with it in a suitable manner, namely if a room cell or a prefabricated one Module to be produced without a floor, or there are, preferably as components of the pallet truck 10 , intermediate pieces 13 are provided which keep the core formwork 12 at a distance from the pallet truck 10 , which then forms the outer floor formwork for the space cell to be produced with its surface facing the core formwork.

Dabei fährt der Palettenwagen 10 in die Betoniersta­ tion 3 vorzugsweise über die in Fig. 1 schon erwähnten Schienen 1 ein, deren Verlauf in Fig. 3 gestrichelt angedeutet ist.The pallet truck 10 moves into the concrete station 3, preferably via the rails 1 already mentioned in FIG. 1, the course of which is indicated in FIG. 3 by dashed lines.

Damit nach der Früherhärtung die in der Zeichnung nicht erkennbare Raumzelle, auf dem Palettenwagen 10 stehend, von der Betonierstation fortbewegt werden kann, sind bei 17 noch angedeutete Abdruckstempel vorgesehen, die die ganze Einheit aus Palettenwagen 10, frühgehärteter Raumzelle und dieser die noch erforderliche Stabilität verleihender, also in dieser verbleibender Kernschalung 12 von der Betonierstation 3 abdrücken, woraufhin dann ein problemloser Transport des Palettenwagens mit der Raumzelle, beispielsweise über die auf den Schienen 1 rollenden Räder oder Rollen 18 zum nachfolgenden Standort möglich ist.So that after the early hardening the space cell, which is not recognizable in the drawing, standing on the pallet truck 10 , can be moved away from the concreting station, impression stamps are also indicated at 17 , which stamp the entire unit from the pallet truck 10 , the early-hardened room cell and this gives the stability required , so press in this remaining core formwork 12 from the concreting station 3 , whereupon a problem-free transport of the pallet truck with the space cell is possible, for example via the wheels or rollers 18 rolling on the rails 1 to the subsequent location.

Zur Lagefixierung des Palettenwagens in der Betonier­ station während des Betoniervorgangs können bei 19 angedeutete Führungsbolzen dienen, die eine formschlüs­ sige Verbindung zwischen dem Palettenwagen 10 und den Längs- und/oder Seitenwänden der Betonierstation sicher­ stellen. Da andererseits die Kernschalung 12 auf dem Palettenwagen ihrerseits entweder mit Hilfe der Zwischenstücke 13 oder bei deren Wegfall durch sonstige geeignete formschlüssige Halte- bzw. Rastmittel hoch­ genau lagefixiert ist, ist sichergestellt, daß die Kernschalung für den Betoniervorgang die gewünschte genaue Position in der Betonierstation einnimmt.To fix the position of the pallet truck in the concreting station during the concreting process, 19 indicated guide bolts can be used to ensure a positive connection between the pallet truck 10 and the longitudinal and / or side walls of the concreting station. On the other hand, since the core formwork 12 on the pallet truck itself is either fixed in position with the aid of the intermediate pieces 13 or when they are eliminated by other suitable form-fitting holding or latching means, it is ensured that the core formwork for the concreting process assumes the desired exact position in the concreting station .

In den Fig. 5, 6 und 7 ist die Entschalstation 4 gezeigt, mit einem sich im Stationsbereich befinden­ den, beispielsweise auf seinen eigenen Rollen oder Rädern 18 herantransportierten Palettenwagen 10 mit darüber befindlicher Kernschalung 12 einschließlich der nunmehr endausgehärteten Raumzelle.In Figs. 5, 6 and 7, the demoulding station 4 is shown, with a in the station area are the, for example, zoom transported on their own wheels or rollers 18 pallet carriage 10 located thereabove core mold 12 including the now endausgehärteten space cell.

Im einfachsten Fall kann die Entschalstation 4 aus einer einfachen L-förmigen Haltestruktur oder einem Gerüst 22 bestehen, welches über Greifmechanismen 23 in unterschiedlicher Höhe und auf beiden Seiten verfügt, die, in ihrer Höhenlage bevorzugt hydraulisch verän­ derlich, in den Kernschalungsraum hineinragen und an dort vorgesehenen Griffpunkten 24 die Kernschalung aufnehmen und festhalten.In the simplest case, the demoulding station 4 can consist of a simple L-shaped holding structure or a scaffold 22 , which has gripping mechanisms 23 at different heights and on both sides, which, in terms of their height, preferably change hydraulically, protrude into the core formwork space and there provided grip points 24 pick up and hold the core formwork.

An der Kernschalung 12 sind noch an dieser vorzusehende Spannstellen 20 sowie Begrenzungsteile 21 angedeutet, die jeweils entsprechend den gewünschten Raumzel­ len-Abmessungen an der Kernschalung angeordnet werden.At the core formwork 12 are to be provided at this tensioning points 20 and delimiting parts 21 , which are each arranged according to the desired Raumzel len dimensions on the core formwork.

Die zum Trennen der Kernschalung 12 von der ausgehär­ teten Raumzelle aufzubringenden Kräfte werden von in geeigneter Weise und Höhe angebrachten Abdruckstem­ peln 25 aufgebracht, die den Palettenwagen 10 mit der auf diesem verbleibenden Raumzelle abdrücken, wobei die Kernschalung von den Trag- und Greifmecha­ nismen 23 dann so lange freischwebend gehalten wird, bis ein neuer Palettenwagen 10 zum Abtransport der Kernschalung aus der Entschalstation 4 herangebracht ist.The forces to be used to separate the core formwork 12 from the room cell which has been cured are applied by suitable and height-mounted impression stamps 25 , which press the pallet truck 10 with the space cell remaining on it, the core formwork from the supporting and gripping mechanisms 23 then being applied is kept floating until a new pallet carriage 10 is brought to remove the core formwork from the demoulding station 4 .

Im Bereich der Entschalstation können ferner noch Podeste 26 in beliebiger Ausgestaltung entsprechend den vorgegebenen Raumzellen und Bauhöhen vorgesehen sein, um außer den speziellen Entschalarbeiten noch andere, im fertigungstechnischen Ablauf erforder­ liche Arbeiten, wie zum Beispiel Reinigen, Aufbringen von Trennmitteln, Einbauen einer Bewehrung in geeig­ neter Weise durchführen zu können. In the area of the demoulding station, platforms 26 can also be provided in any configuration according to the given room cells and heights, in addition to the special demoulding work, other work required in the production process, such as cleaning, applying release agents, installing a reinforcement, etc. neter way to be able to perform.

Es versteht sich, daß grundsätzlich der Transport, also der Bewegungsablauf der Palettenwagen, auch auf andere Weise erfolgen kann, beispielsweise nach einer Art Huckepack-Verfahren, oder, wenn das Verlegen von Schienen zu aufwendig ist, ein Transport in ande­ rer geeigneter Weise.It goes without saying that transportation, So the sequence of movements of the pallet trolleys, also on another way can be done, for example, according to Kind of piggyback, or when mislaid from rails to complex is a transport to other appropriately.

Auf jeden Fall trägt der Palettenwagen, der bei Bedarf auch den Raumzellenboden aufnimmt, die Kernschalung, die dann entweder direkt auf der Palettenwagen­ oberseite oder auf mehreren Zwischenstücken aufsitzt und mit dem Palettenwagen so verbunden ist, daß sie mit diesem gemeinsam zum Betoniervorgang in die Beto­ nierstation eingefahren werden kann. Die Betoniersta­ tion bildet dann mit ihren eigenen äußeren, entweder feststehenden oder schwenkbaren er auch verfahrba­ ren Wänden die äußeren Schalungsflächen.In any case, the pallet truck carries the if necessary also takes up the room cell floor, the core formwork, which then either directly on the pallet truck on top or on several intermediate pieces and is connected to the pallet truck so that it together with this to the concreting process in the concrete kidney station can be retracted. The concreting station tion then forms with their own outer, either fixed or swiveling he also movable walls the outer formwork surfaces.

Der weitere Funktionsablauf ist dann so, daß zur Reduzierung der Verweildauer, die durch das Erhärten der Raumzelle in der Betonierstation erforderlich ist, die noch nicht völlig erhärtete Raumzelle mit der Kernschalung auf dem Palettenwagen zur endgülti­ gen Aushärtung auf einen separaten, gegebenenfalls beheizbaren Platz gefahren wird, so daß sich eine wesentlich bessere Auslastung der Betonierstation ergibt, da sofort nach Entnahme der frühgehärteten Raumzelle ein neuer Palettenwagen mit von ihm ge­ tragener Kernschalung in die Betonierstation eingefah­ ren werden kann.The further functional sequence is then such that Reduction of the time spent by hardening the cell in the concreting station is required is the not yet fully hardened room cell with the core formwork on the pallet truck for the final curing on a separate, if necessary heated place is driven, so that a much better utilization of the concreting station results because immediately after removing the early hardened Room cell a new pallet trolley with ge from him core formwork entered the concreting station can be ren.

Claims (12)

1. Verfahren zur Herstellung von an wenigstens einer Seite offenen Stahlbeton-Raumzellen, bei dem nach dem Betonieren in einer Betonierstation die früh­ ausgehärtete Raumzelle mit zunächst in ihr ver­ bleibender Kernschalung zur Aushärtung in eine Entschalstation oder an einen anderen Ort verbracht und anschließend in der Entschalstation von der Kernschalung getrennt wird und dann die Kernschalung unmittelbar auf einen Palettenwagen aufgesetzt und auf diesem lagefixiert in die Betonierstation eingefahren wird und das Betonieren bei auf dem Palettenwagen aufsitzender Kernschalung erfolgt.1. Process for the production of at least one Side open reinforced concrete room cells, according to concreting early in a concreting station cured room cell with ver first in it permanent core formwork for hardening in a Stripping station or moved to another location and then in the demoulding station of the Core formwork is separated and then the core formwork placed directly on a pallet truck and fixed in position in the concreting station is retracted and concreting on the Pallet trolleys on the core formwork. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß nach der Frühaushärtung der Raumzelle diese mit auf dem Palettenwagen aufsitzender Kernschalung zur sofortigen Freigabe der Betonierstation aus dieser verfahren und nach Endaushärtung dadurch in der Entschalstation bei gleichzeitigem Verbleiben auf dem Palettenwagen von der Kernschalung getrennt wird, daß diese von Trag- und Greifmechanismen der Entschalstation aufgenommen und die auf dem Palet­ tenwagen stehende Raumzelle von der Kernschalung abgedrückt wird.2. The method according to claim 1, characterized in that that after the early curing of the room cell this with Core formwork on the pallet truck immediate release of the concreting station from this process and after final curing in the Demoulding station while remaining open the pallet truck separated from the core formwork is that this of carrying and gripping mechanisms of Stripping station added and the one on the pallet  standing cell from the core formwork is pulled. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekenn­ zeichnet, daß die in der Entschalstation aufgenomme­ ne Kernschalung so lange freischwebend gehalten wird, bis ein nächster Palettenwagen herangebracht und unter die Kernschalung verfahren ist, woraufhin diese auf dem Palettenwagen lagefixiert verspannt wird.3. The method according to claim 1 or 2, characterized records that the recorded in the demoulding station ne core formwork kept floating for so long until a next pallet truck is brought up and moved under the core formwork, whereupon these are clamped in place on the pallet truck becomes. 4. Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß bei der Herstellung von Raumzel­ len mit Boden die Kernschalung auf der Palettenwa­ gen-Oberfläche mit Hilfe von Zwischenstücken, dabei auf diesen aufsitzend, lagefixiert wird.4. The method according to any one of claims 1 to 3, characterized characterized in that in the manufacture of Raumzel len with the floor formwork on the pallet surface with the help of spacers sitting on it, fixed in position. 5. Verfahren nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß beim Einfahren eines jeweils eine Kernschalung lagefixiert tragenden Palettenwa­ gens in die Betonierstation eine Lagefixierung des Palettenwagens selbst mit aufgesetzter und verspann­ ter Kernschalung durch formschlüssig wirkende Führungsmittel vorgenommen wird.5. The method according to any one of claims 1 to 4, characterized characterized in that when retracting one each a core formwork fixed in position carrying pallet wa position in the concreting station Pallet truck itself with attached and braced core formwork through form-fitting Leadership is made. 6. Vorrichtung zur Herstellung von an wenigstens einer Seite offenen Stahlbeton-Raumzellen auf einem Palettenwagen, mit einer Betonierstation (3) mit feststehenden, schwenkbaren oder fahrbaren Wänden (11, 14, 15) zur Bildung der äußeren Schalungs­ flächen und mit einer die Kernschalung von der Raumzelle trennenden, von der Betonierstation räumlich getrennten Entschalstation, wobei der Palettenwagen (10) mit der Kernschalung von der Betonierstation zur Entschalstation und umgekehrt verfahrbar und so ausgebildet ist, daß er die Kernschalung (12) selbst unmittelbar lagefixiert aufnimmt und in der Betonierstation während des Betonierens abstützt.6. Device for the production of open at least one side reinforced concrete room cells on a pallet truck, with a concreting station ( 3 ) with fixed, pivotable or movable walls ( 11 , 14 , 15 ) to form the outer formwork surfaces and with a core formwork separating the space cell, spatially separated from the concreting station, wherein the pallet carriage ( 10 ) with the core formwork can be moved from the concreting station to the descaling station and vice versa and is designed so that it receives the core formwork ( 12 ) itself directly fixed in position and in the concreting station during the Concrete supports. 7. Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß bei der Herstellung von Raumzellen mit Böden die Kernschalung auf der Palettenwagen-Oberseite über Zwischenstücke (13), die gleichzeitig der Lagefixie­ rung und Verspannung dienen, aufsitzt.7. The device according to claim 6, characterized in that in the manufacture of room cells with floors, the core formwork on the top of the pallet truck via spacers ( 13 ), which serve at the same time the Lagefixie tion and bracing. 8. Vorrichtung nach Anspruch 6, dadurch gekennzeichnet, daß bei der Herstellung von bodenfreien Raumzellen die Kernschalung mit ihrer Unterseite unmittelbar auf der Palettenwagen-Oberseite lagefixiert und verspannt aufsitzt.8. The device according to claim 6, characterized in that in the manufacture of floor-free room cells the core formwork with its underside immediately fixed on the top of the pallet truck and sits tense. 9. Vorrichtung nach einem der Ansprüche 6 bis 8, dadurch gekennzeichnet, daß die Entschalstation (4) zur Aufnahme der Kernschalung (12) Trag- und Greif­ mechanismen (23) aufweist, die die Kernschalung während des Abdrückvorgangs der auf dem Palettenwa­ gen (10) stehenden Raumzelle mit Hilfe von Abdrück­ stempeln (25) halten, bis ein weiterer Palettenwagen (10) in die Entschalstation zur erneuten lagefixier­ ten Aufnahme der Kernschalung eingefahren ist.9. Device according to one of claims 6 to 8, characterized in that the demoulding station ( 4 ) for receiving the core formwork ( 12 ) carrying and gripping mechanisms ( 23 ) which the core formwork during the push-off process on the pallet wa gene ( 10 ) Hold the standing cell with the help of a stamp ( 25 ) until another pallet trolley ( 10 ) has moved into the demoulding station for renewed location-fixation of the core formwork. 10. Vorrichtung nach einem der Ansprüche 6 bis 9, dadurch gekennzeichnet, daß zur Lagefixierung der Palettenwagen (10) mit aufgesetzter und verspannter Kernschalung (12) in der Betonierstation (3) Füh­ rungsmittel (19) vorgesehen sind.10. Device according to one of claims 6 to 9, characterized in that for fixing the position of the pallet truck ( 10 ) with attached and tensioned core formwork ( 12 ) in the concreting station ( 3 ) guide means ( 19 ) are provided. 11. Vorrichtung nach Anspruch 10, dadurch gekennzeich­ net, daß die Führungsmittel Führungsbolzen sind, die eine formschlüssige Verbindung zwischen Längs­ und/oder Seitenwänden der Betonierstation und dem Palettenwagen bewirken.11. The device according to claim 10, characterized in net that the guide means are guide bolts that a positive connection between longitudinal and / or side walls of the concreting station and the Effect pallet truck. 12. Vorrichtung nach einem der Ansprüche 6 bis 11, dadurch gekennzeichnet, daß die Palettenwagen (10) auf Schienensträngen (1) mit Kreuzungspunkten (2) bis unmittelbar angrenzend an bzw. in die Betonier­ station (3) und die Entschalstation (4) verfahrbar sind.12. The device according to one of claims 6 to 11, characterized in that the pallet carriage ( 10 ) on rail tracks ( 1 ) with crossing points ( 2 ) to immediately adjacent to or in the concreting station ( 3 ) and the demoulding station ( 4 ) can be moved are.
DE4121373A 1991-06-28 1991-06-28 Process for the production of reinforced concrete room cells and device for carrying out the process Expired - Fee Related DE4121373C2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
DE4121373A DE4121373C2 (en) 1991-06-28 1991-06-28 Process for the production of reinforced concrete room cells and device for carrying out the process
DE9107967U DE9107967U1 (en) 1991-06-28 1991-06-28 Device for the production of reinforced concrete room cells

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE4121373A DE4121373C2 (en) 1991-06-28 1991-06-28 Process for the production of reinforced concrete room cells and device for carrying out the process
DE9107967U DE9107967U1 (en) 1991-06-28 1991-06-28 Device for the production of reinforced concrete room cells

Publications (2)

Publication Number Publication Date
DE4121373A1 DE4121373A1 (en) 1993-01-07
DE4121373C2 true DE4121373C2 (en) 1997-09-25

Family

ID=40430092

Family Applications (2)

Application Number Title Priority Date Filing Date
DE4121373A Expired - Fee Related DE4121373C2 (en) 1991-06-28 1991-06-28 Process for the production of reinforced concrete room cells and device for carrying out the process
DE9107967U Expired - Lifetime DE9107967U1 (en) 1991-06-28 1991-06-28 Device for the production of reinforced concrete room cells

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE9107967U Expired - Lifetime DE9107967U1 (en) 1991-06-28 1991-06-28 Device for the production of reinforced concrete room cells

Country Status (1)

Country Link
DE (2) DE4121373C2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1759214C3 (en) * 1968-04-10 1982-06-03 Bauunternehmung und Betonwerke Lorenz Kesting GmbH & Co KG, 4670 Lünen Device for the serial production of single-sided open space cells made of reinforced concrete
DE2417805C2 (en) * 1974-04-11 1982-02-25 Kesting Interprefab AG, Zug Formwork core for the production of reinforced concrete room cells that are open on one side
DE2745054C3 (en) * 1977-10-06 1981-01-08 F.J. Sommer, Maschinenfabrik, 8300 Landshut Core formwork for the production of at least one-sided open room cells made of reinforced concrete
DE3202336A1 (en) * 1982-01-26 1983-07-28 Kesting, Lorenz, 4600 Dortmund METHOD AND DEVICE FOR PRODUCING ROOM CELLS FROM MATERIALIZING BUILDING MATERIAL
DE3212499A1 (en) * 1982-04-03 1983-10-13 IBK-Ingenieurbüro, Bauer + Kaletka GmbH, 7570 Baden-Baden Shuttering arrangement for the manufacture of reinforced-concrete building modules

Also Published As

Publication number Publication date
DE4121373A1 (en) 1993-01-07
DE9107967U1 (en) 1991-09-26

Similar Documents

Publication Publication Date Title
WO2016184947A1 (en) Formwork device
DE2106937C3 (en) Equipment for the production of large-area concrete slabs
DE1810310A1 (en) Process and device for the production of a reinforced concrete structure
DE2845106C2 (en) Method and device for the production of monolithic reinforced concrete room cells, e.g. prefabricated garages
DE4121373C2 (en) Process for the production of reinforced concrete room cells and device for carrying out the process
DE1808989B2 (en) Device for the production of monolithic reinforced concrete room cells with one open side pointing downwards, in particular prefabricated garages, under the corridor
DE2640372C2 (en) Device for the production of prefabricated concrete or reinforced concrete parts with approximately plate-shaped cross-section
DE3416028C2 (en)
DE1683876C2 (en) Device for producing room-sized structures made of reinforced concrete, which are open at least on one side, and in particular prefabricated garages
DE19522478C2 (en) Process for precise and low-tolerance production of rail support points with high surface accuracy and formwork elements for carrying out the process
DE2711116C2 (en) Formwork for the production of space cells, such as prefabricated garages or the like.
DE2322139C3 (en) Battery mold and method of making concrete slabs
DE1683860B2 (en) Formwork for the serial production of at least one-sided open space cells made of concrete, such as prefabricated garages or the like
EP1170106A2 (en) Apparatus for making large-surface concrete elements
DE3212499C2 (en)
DE2430009A1 (en) Multiple formwork for concrete slabs - has outer vertical formwork plates released and slabs lifted from supporting intermediate plates
DE2139661C3 (en) Battery formwork
DE2426930A1 (en) FORMWORK DEVICE AND METHOD FOR MANUFACTURING SPACE BOXES
DE2204785C3 (en) Process and plant for the production of large panels from reinforced concrete
EP4051472A1 (en) Formwork device
DE2301900A1 (en) METHOD FOR MANUFACTURING PLATE-SHAPED PARTS AND DEVICE THEREFORE
DE2541330A1 (en) Precast concrete section mould - has battery of positionable mould casing sections mounted on transporter vehicle
DE1683992A1 (en) Transportable manufacturing machine for reinforced concrete prefabricated parts of all kinds
DE2756996A1 (en) Concrete panel prodn. equipment - has frame with shuttering plates on rails between stationary tipping platforms
DE2707576A1 (en) Concrete structure made from prefabricated components - uses site cast elements made in shuttering formed of units movable on tower crane track

Legal Events

Date Code Title Description
8110 Request for examination paragraph 44
8127 New person/name/address of the applicant

Owner name: SCHRADE, EBERHARD, 71101 SCHOENAICH, DE

D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee